Document of The World Bank Report No: 101323-AFR RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF CLEAR FRANCOPHONE AFRICA GRANT (TF12951, P132789) TO THE CENTRE AFRICAIN D'ETUDES SUPERIEURES EN GESTION (CESAG - The African Center for Higher Education in Management) November 30, 2015 ABBREVIATIONS AND ACRONYMS CESAG Centre Africain d'Etudes Superieures en Gestion (The African Center for Higher Education in Management) CLEAR Centers for Learning on Evaluation and Results (CLEAR) Regional Vice President: Country Director: Manager (IEG): Task Team Leader (IEG): Makhtar Diop Rachid Benmessaoud Monika Weber Fahr Ximena Fernandez Ordonez 1 CLEAR FRANCOPHONE AFRICA GRANT (P132789) CONTENTS A. B. C. SUMMARY ........................................................................................................................... 3 PROJECT STATUS ............................................................................................................. 3 PROPOSED CHANGES ...................................................................................................... 4 Tables Table 1: List of Activities pending implementation .................................................................. 4 Table 2 Results Framewrok ....................................................................................................... 5 Table 3: List of implemented and ongoing activities................................................................. 6 2 CLEAR FRANCOPHONE AFRICA (TF12951, P132789) RESTRUCTURING PAPER A. SUMMARY 1. The proposed change is an extension to the closing date from November 30, 2015 to May 30, 2016. The extension is to ensure that the implementing agency is able to complete all project activities, and thereby meet the Project Development Objective (PDO). B. PROJECT STATUS 2. The PDO is to enhance the capacity of the Centre Africain d'Etudes Superieures en Gestion (CESAG - The African Center for Higher Education in Management) to be established and developed as a Center for Learning on Evaluation and Results (CLEAR) to provide demanddriven, high-quality, and cost-effective capacity building services in monitoring and evaluation and performance management to the Participating Countries’ government and civil societies. 3. CLEAR is a global program for evaluation capacity building that is supported by several multilateral and bilateral donors. CESAG, in Senegal, was selected as the CLEAR center in Francophone Africa, and CLEAR Grant No TF012951 (P132789) was signed in October 2012. 4. In September 2014, CESAG got a first extension for the grant for 14 months (from September 30, 2014 to November 30, 2015). 5. Implementation progress has improved substantially over the project implementation period. Implementation was delayed due to a number of constraints, including: unstable political situation in some target countries (such as Burkina Faso and Cote d'Ivoire that caused cancellation or postponement of many planned activities); and frequent ministerial reshuffles that caused CESAG to change implementation partners (such as in Benin and Togo). 6. Furthermore, CESAG was understaffed to execute this grant, but a temporary solution has already been found to fix this issue. In the beginning, it was hard for CESAG to attract experts to implement the grant activities. However, during the last four months, they have able to attract teachers to develop and implement planned activities such as Impact Evaluation courses and courses on M&E for Water and Sanitation. 7. This progress has been evident in the past virtual monthly progress review meetings held between the Bank and CESAG. Overall, implementation is becoming sound with a strong focus on working with strategic clients. 8. Despite this improved implementation some project activities will not be able to be completed by end November 2015, jeopardizing successful achievement of the PDO. 9. As of November, 2015, the disbursement rate is 37%. 10. However, as indicated in their request for extension, CESAG estimates that the execution rate is73% (US$196,511 out US$ US$268970). According to CESAG, this difference emanates from the fact that some activities have already been executed and paid for, but not yet submitted to for reimbursement (US$58,264); and other activities have been executed but not yet paid for (US$38,420). 3 C. PROPOSED CHANGES Closing date 11. CESAG has requested to extend the closing date of the grant by 6 months from November 30, 2015 to May 30, 2016. 12. The extension would ensure that CESAG is able to implement activities that were delayed due to a number of constraints, including: unstable political situation in some target countries (such as Burkina Faso and Cote d'Ivoire that caused cancellation or postponement of many planned activities); and frequent ministerial reshuffles that caused CESAG to change implementation partners (such as in Benin and Togo). Furthermore, CESAG was understaffed to execute this grant. The Center had a Director that was part time and had many other commitments within the organization. Also, the Center was having a hard time attracting expertise outside of CESAG, and being able to leverage other members of the organization to provide their expertise to design and implement the planned activities, as the original program design envisioned. However, CESAG has already found solutions to these situations. A new, full time Center Director was appointed. He has already recruited two full time additional staff members for the Center. Additionally, CESAG’s director issued a memo requesting CESAG’s staff to devote time on CLEAR’s activities. The Center has already gotten additional support from two of CENSAG’s staff members for oter technical activities such as a course on Water and Sanitation and on Impact Evaluation. Adequate staffing for the project is being followed closely in the virtual monthly monitoring meetings between the Center and the World Bank. . 13. Within the timeframe of the extension, CESAG will implement the following activities Table 1: List of Activities pending implementation Implementation Status and Completion Date List of activities pending implementation Component 1: Center's Development CLEAR Management Support Component 2: Client's Capacity Building Training Design and deliver M&E courses adapted to water, sanitation and energy sectors Fifth seminar in results based M&E for professionals Second seminar in IE for professionals in Dakar and another country Parliamentarian workshop in Benin Studies and applied research (tools) in M&E Case studies (Local, Sector, Community) (4 cases) Dissemination / Communication / Developing a culture of evaluation Round Table for discussion and sharing with SENEVAL and BOM on the institutionalization of evaluation in Senegal Component 4: Audit Audit Ongoing - May 31, 2016 Design Completed, Implementation Ongoing - March 31, 2016 Commited - February 28, 2016 Commited - March 31, 2016 Commited and ongoing - December 30, 2015 Commited and ongoing - December 30, 2015 Commited and ongoing - December 30, 2015 To be completed - May 31, 2016 4 In sum at the end of the project, the Results Framewrok should be as follows: Table 2 Results Framework PDO The CLEAR Center at CESAG provides high quality capacity development in monitoring and evaluation (M&E) and performance management (PM) on a regional basis Intermediate Outcomes Component One: Center’s Institutional Assessment and Capacity Strengthening Component Two: Offering M&E and Performance Management and Capacity Building Services to the Region Project Outcome Indicators By May 2016, the center and its partners provide M&E and PM capacity development services on a regional basis for at least four countries in Francophone Africa At least 50% of the centers regional clients are from countries other than Senegal At least 85% of the centers’ clients rate the quality and utility of their services highly By May 2016, there is an increase in the range of capacity building programs implemented, from basic monitoring and evaluation methods to rapid evaluations, performance based-budgeting, and impact evaluations. Intermediate Outcomes/Output Indicators CLEAR Francophone Africa Center is established and operational. (This component will be implemented using both CLEAR and IDF funds. Below are activities/items to be financed using CLEAR funds.) Center’s administrative, management and governance capacity established by May 2016. The Center is adequately staffed to implement its workprogram, incuding staff hired for the project and CESAG’s staff time committed to CLEAR, by December 2016. Center provides M&E and PM capacity building services through training/workshops, advisory/knowledge service, evaluation and applied research. Design and Deliver M&E Training for Trainers: Two trainings/workshops by May 2016. Design and Deliver training for M&E Professionals (Government, civil society and other professionals): 14 trainings/workshops delivered by May 2016. Studies and Applied Research in M&E (Government Officials, Civil Society): Four case studies delivered by May 2016. M&E Regional Networks: Participation in four regional network meetings (such as Afrea, AfCop, CLEAR Forum, etc.) May 2016. Component Three: Development and Implementation of the Center’s Monitoring & Evaluation System Component Four: Audit Monitoring and Evaluation plan designed and implemented. (This component will not use Grant funds) CLEAR Center is Audited by the end of the grant to ensure resources that resources are managed and used according appropriately and according to World Bank financial management and procurement guidelines. 5 Table 3: List of implemented and ongoing activities Components Component 1: Component 2: List of Activities Center's Development CESAG institutional assessment - Plan for the capacity building CLEAR Management Support Training for CLEAR Center Staff SHIPDET training ( 2 persons ) Other thematic workshops ( 2 persons ) Assessment of demand in Togo Development of Procurement Plan and Procedure Manual Development of the Business and Strategic Plans Implementation Status and Completion Date Completed Ongoing - May 31, 2016 Completed Completed Completed Completed Completed Client's Capacity Building Training Training for Regional Trainers Two M&E training for trainers (Dakar & Ouagadougou) Preparatory training of trainers (ToT) in Impact Evaluation Stabilization of SERAF materials Training for Clients Design of short-term M&E training modules Design of short-term IE training modules Completed Completed Completed Completed Completed First seminar in results based M&E for professionals in Dakar Second seminar in results based M&E for professionals in Dakar Third seminar in results based M&E for professionals in Togo DIME's capacity building in statistical analysis and regression (Self-generated/Paid service) Training for BOM's advisers in public policy evaluation Training for officials of the prime minister of Niger Fourth seminar in results based M&E for professionals in Burkina Faso First seminar in IE for professionals in Dakar Training of Niger government officials on Evaluation of public policies 6 Completed Completed Completed Completed Completed Completed Completed Completed Completed Strengthening the capacities of VOPE's (Voluntary Organisation for Professionalization of Evaluation) representatives Design and deliver M&E courses adapted to water, sanitation and energy sectors Fifth seminar in results based M&E for professionals Second seminar in IE for professionals in Dakar and another country Parliamentarian workshop in Benin Studies and applied research (tools) in M&E Case studies (Local, Sector, Community) (4 cases) Dissemination / Communication / Networking / Developing a culture of evaluation Technical workshop "Young Evaluators: Challenges and Prospects" Awareness workshop of media professionals on public policies evaluation Conference on "Strengthening Capacities in Evaluation : Issues and Innovations" International Francophone Forum of evaluation (FIFE) Coaching and support to emerging evaluators to attend Canadian Evaluation Society conference Regional Symposium on Public Policies evaluation & French dialogue on strengthening national capacities in evaluation Anglophone dialogue on strengthening national capacities in evaluation & support to twendé mbélé Round Table for discussion and sharing with SENEVAL and BOM on the institutionalization of evaluation in Senegal Component 3: Component 4: Completed Design Completed, Implementation Ongoing March 31, 2016 Commited - February 28, 2016 Commited - March 31, 2016 Commited and ongoing - December 30, 2015 Commited and ongoing - December 30, 2015 Completed Completed Completed Completed Completed Completed Completed Commited and ongoing - December 30, 2015 Development of communication plan Development of a Website CLEAR-CESAG Participation in M&E regional networks meetings (AFREA, AFCOP, CLEAR Forum, etc..) Monitoring and Evaluation Completed Completed Development of an M&E System for CLEAR Center and CESAG Completed Audit Audit To be completed -May 31, 2016 7 Completed