from here - Emirates Prefabricated & Steel building

advertisement
INTRODUCTION
INDUSTRIAL
PROJECTS
MILITARY
PROJECTS
RESIDENTIAL
PROJECTS
AWARDS
CONTACT US

Though started small in size, however it is vast in
aspiration, willingness and resolution for excellence and
its desire to take honor and pride in participation into
this overall construction drive of the United Arab
Emirates.

When we started in 2003, we were aware of the fact that
the emergence of a new contracting company into this
market congested with companies operating in this field
since ages is an adventure that was never taken simple
with a mission not so easy.

To be the clients' first choice in turnkey solutions for
specialized and integrated construction requirements
across the GCC and Asia.

EPS is dedicated to the delivery of world-class turnkey
solutions to our stakeholders in partnership with our
clients, consultants and the government. We achieve
this through adhering to the highest standards of
safety, quality and environmentally centric practices
while completing our projects on time and within
budget
Eng. Mudhafar
Alwan Wadi
Executive Chairman
Emirati Sponsor
Khalfan Mohammed Khalfan
Almdhani
Eng. Jamal Alwan
Wadi
Eng. Sara Awad
Mohammed
Design
Eng Nadhim A.
Mudhen
Management
Administrators
Design consaltant
& production
Eng. Saad Alwan Wadi
Production
Technicians
Workers
Eng. Khalid J S Khalil
Steel Structure

EPS Factory is an industrial
Limited Liability Company
associated with Sands
Consultant Engineers owned by
Tow owners
Owners:

1 – Eng. Mudhafar A. Wadi

2 – Eng. Muheeb A. Rishan.

Our success can be attributed to our commitment to
maintain a harmonious and professional working
environment based on honesty, fair dealing and sound
business ethics. Our organization is strongly committed to
implementing policies and procedures that reflect a high
level of ethical business practices and client satisfaction.
We are committed to building excellence through
partnerships and we will continuously strengthen our
policies and practices to promote the interests of our
clients, partners, employees' community and the country
in which we operate.

We in all of our projects, we
have used modern methods
in construction that have
been used in U.S.A in
several styles and different
specifications.
INDUSTRIAL
PROJECTS

Al Dar Site
AlRaha Beach, Abu Dhabi
1250 Caravans for 5000 Workers

Client
: ALDAR

Contractor : ISCS Contracting

Cost
: 6.543.000 Dhs.

Location
: U.A.E - Abu Dhabi

year of completion : 2007

Parsens Camp

Client
: Parsens Company

Contractor : EMEC Contracting

Cost
: 23.855.000 Dhs.

Location
: Iraq – Baigi

year of completion : 2006

Al Rumaila Oil Field

Client
: China Petroleum
Engineering

Contractor : Al Rumaila Gate

Cost
: 10.323.000 Dhs.

Location
: Iraq – Basra

year of completion : 2011

BP Petroleum Project

Client
: British Petroleum

Contractor : ALAMCO Contracting

Cost
: 17.600.000 Dhs.

Location
: Iraq – Basrah

year of completion : 2011

Construction Of Incinerator

Client
Int.
: Inglett And Stubbs

Location
: Balad / Iraq

year of completion :Mar.2006 –
Nov.2006

Project Description:
Installation of 4 each incinerator units with mechanical and electrical infrastructure including power
supply and a warehouse.

Moonlight Warehouses

Client
: Moonlight Company

Cost
: 4.650.000 Dhs.

Location
: U.A.E – Ajman

year of completion : 2008

Bin Ham Warehouses

Client
: Bin Ham Company

Contractor : Over Seas Company

Cost
: 3.670.000 Dhs.

Location
: U.A.E - Abu Dhabi

year of completion : 2009

Bin Hafez Warehouses &
Camps

Client
Company
: Bin Hafez

Contractor : Over Seas Company

Cost
: 7.200.000 Dhs.

Location
: U.A.E – Dubai

year of completion : 2006
MILITARY
PROJECTS

Directorate of Military
Works Projects

Clint
: Directorate of
Military Works

Contractor : RECH Contracting

Cost
: 2.375.000 Dhs.

Location
: U.A.E – Abu Dhabi

year of completion : 2011

Police Academy Project

Clint
Interior
: Ministry of the

Contractor : ALAMCO Contracting

Cost
: 34.130.000 Dhs.

Location
: Iraq – Baghdad

year of completion : 2004

U.S Army Camps

Client
: U.S Army

Cost
: 64.225.000 Dhs.

Location
: Iraq – Salah Al Deen

year of completion : 2010

U.S Army Camps

Design And Construct Fyos
Dining Facility

Client
Root
: Kellogg Brown &

Location
: Camp Delta / Iraq

year of completion :Oct. 2009 –
Dec. 2009

Project Description:
The Project consists of design and construction of a Dining Facility at Forwarding Operating
Base (FOB) Delta to support military operations. Anti-terrorism measures are included. The
Facility is approximately 60.000SF. The Dining facility has the ability to serve 5900
personnel per meal. All furnishings and kitchen equipments are provided and installed. The
Facility also includes all supporting facility requirements such as power production and
distribution requirements, water and sewage distribution systems, mechanical systems and
other supporting facility features such as roads, curbs, walkways, parking pavement,
walkways and site drainage. The building has an integral protective roof system that
includes, a two layer protective roof system consisting of pre-detonation layer 100MM
insulated steel panels supported on steel framing. The fragmentation roof is a 150MM
composite steel/concrete roof deck with the steel decking of 16 gage minimum.

Design And Construct Convoy
Support Center, Phase I And
Phase II

Client
Root
: Kellogg Brown &

Location
: Tallil Air Base / Iraq

year of completion :Nov. 2009
Project Description:

Project Consists of the design and construction of the Convoy Support Center which is 1.5 km square with pre-engineered
metal or modular facilities.
The work includes the preparation of design documents and construction of a fully functional facility providing, all labor,
materials and equipments.
This Project also consists of completion of the design and construction of a 12MW (megawatt) diesel-fired Power Plant and
connection to associated utilities. This includes preparation of all design documents for mechanical systems at the Power
Plant.
Preparation of design documents for and construction of the site 11 KV (Kilovolt) primary power distribution system
around the Convoy Support Center (CSC) and 400/230 V secondary electric power services to facilities as required.
Preparation of design documents for and construction of two new Reverse Osmosis Water Purification Units (ROWPUs)
along with all associated tanks, pumps, power supply, piping and chemical storage at the existing water supply point at
COB Adder.

Preparation of design documents for and construction of a wastewater collection system including piping and holding
tanks at the CSC site.

Preparation of design documents for, and paving of existing roadways.

Joint Distribution Center/Central
Distribution Center ( Jdc/Cdc )
Yard

Client
: Inglett And
Stubbs Int.

Location

year of completion :Jan. 2007 –
Jan. 2008
Project Description:

: Balad / Iraq
The Project has consisted of design and build of three facilities totaling 32640 SM and configured for dry
storage functions, warehouse functions at Camp Anaconda Balad/ Iraq; Class 1 facility configured for dry
storage functions at 14400 SM.
Multiclass facility has configured for warehouse functions at 9120 SM. Also FRP facility has configured for
maintenance functions at 9120 SM. The supporting facilities have included a pump house for sprinkler system,
generator sunshades, site grading, storm drainage, utility connections to suit the various mission requirements
at Camp Anaconda Bald in Iraq.
Thermal insulation of facilities has been provided by polyurethane foamed galvanized metal size and roofing
panels. Regular type, wet type and fire rated gypsum partition boards have been used in facilities to separate
the interior spaces. Doors have been selected in accordance with Anti-Terrorism Force Protection standards.
Buildings have been supported with sprinkler system, fire detection systems.

Power Plant

Client
Root

Location
:Camp Speicher /
Tikrit / Iraq

year of completion :2004 - 2005

Project Description:
: Kellogg Brown &
11kv 18 MVA Power plant and 11 kv Power Grid system and 17 EA 11/0.4 kv Secondary Substations at Tikrit, Iraq.
This system has included Bea 11kv, 2275 MVA Diesel generators, 3ea 11kv Busbar system, Master synchronization
panel-technical description of control and monitoring of generators and load bus control panel. 11/0.4 kv Mobile
Type Secondary Substations have included 630 A RMU, 630 and 1000 Kva Transformers and LV panels.
Also outdoor x indoor electrical systems and automatic control system for buildings, warehouses, oil pump
stations have provided and installed by EPS Co.

This Project design, installation, test and commissioning of MV Power Plant, 11 kv Grid System and 141/0.4 kv
Secondary Substations has been done per the international Codes.

Combat Aviation Brigade
Beddown Airfield Pavement

Client
Engineers
: KBR / US Corps Of

Location
: Tallil Air Base / Iraq

year of completion :Oct. 2008 –
Nov. 2009

Project Description:
The Project consists of designing and construction of Armed Helo Apron, Un-Armed Helo Apron, ISR Airlift Ramp
and an Air Traffic Control Tower at Tallil Air Base, (Approximately 280.000 sqm concrete pavement area). The
airfield pavements have edge lighting and flood lighting. The airfield pavement design and construction scope
includes but not limited to all required site work, paving or surfacing, supporting utilities/infrastructure,
signage, paint / markings, lighting and security necessary to make them complete and usable. The Air Traffic
Control Tower design and construction scope includes but not limited to the Air Traffic Control Reinforced
Concrete Tower, site work, utilities / infrastructure, fire protection / suppression, fire pumphouse,
communications infrastructure, Access roads/ routes / parking, and force protection / security to make it
complete and usable facility.

Materials was Purchased from Turkey and USA as well as locally.

KBR Man Cap, 800 Living
Container

Client
Roof
: Kellogg Brown &

Location
: Lsa, Anaconda / Iraq

year of completion :July. 2005 –
July. 2006

Project Description:
The Project consist of Design and Construction of the site associated with utilities to support 800
trailers (3x10 m), trailer fabrication, transportation, foundations, placemet, HVAC system and utility
connections of 1.600 person capacity billeting trailers to suit the various mission requirements at LSA
Anaconda / Balad in IRAQ.
The work in this contract includes the preparation of Design documents and the construction required
to provide fully functional facilities with force protection measures.

Life Support Operations And
Maintenace

Client
Roof
: Kellogg Brown &

Location
: Lsa, Anaconda / Iraq

year of completion :2004 – 2007

Project Description:
Work consist of construction of establishing a Labor Camp for 2.500 personals and serving to 25.000
people in the areas of Construction, Infrastructure, Catering, Laundry Service, Grounds Keeping,
Cleaning, Custodial and janitorial Services and electromechanical maintenance and vehicle
maintenance.
Man camp includes; Dormitories, Dining Facility, Morale, welfare and recreation centers, Canteen,
Shopping Center, Laundry, Showers & Latrine areas, GYM, Power Plant, Waste water system,
Portable water system, Call Shop, Medical Clinic, HVAC System, Security, Utilities and IT System.

53 Each Building Renovation
Projects

Client
Roof
: Kellogg Brown &

Location
: Balad / Iraq

year of completion :Sep. 2004 –
Nov. 2006

Project Description:
Scope of work includes the renovation of 53 each buildings with total built up area of around 40,000
square meters. Electrical, Mechanical and architectural renovation of these buildings have been
done in the required US. Building codes and standards. All electrical and mechanical infrastructure
renovation have also been done by EPS Co.

Construction Of Fitness And
Community Center

Client
Roof
: Kellogg Brown &

Location
: Balad / Iraq

year of completion :Mar. 2004 –
Apr. 2005

Project Description:
Two each steel structure buildings with total built up area of 20,000 square meters. Scope of work
includes civil works, structural works. Provision and installation of force protection measures such as
concrete barriers and provision and installation of all furniture’s and equipments have also been
done by EPS Co.

Construction Of Ssa
Warehouses

Client
Roof
: Kellogg Brown &

Location
: Balad / Iraq

year of completion :June. 2004 –
May. 2005

Project Description:
3 each steel structure buildings with total built up area of 30,000 square meters. Scope of
work includes civil works, provision and installation of prefabricated steel structure and wall
claddings, electrical works, HVAC, Provision and installation of all electrical and mechanical
infrastructure including power generators. Force protection measures such as concrete
barriers which surround the buildings have also been provided and installed by EPS Co.

Construction US Army
Headquarters

Client
: US Army

Location
: Balad / Iraq

year of completion :June. 2004 –
Feb. 2005

Project Description:
Construction of US Army Headquarters Building. Scope of work includes all disciplines of
construction, including provision and installation of generator sets, landscaping and force
protection measures such as shielded slab and walls.
RESIDENTIAL
PROJECTS

Birecik Dam & Hepp Turn-key
Operators Village Cons
(Subcontract)

Client
strabay JV
: Holzmann-gama-

Location
: Birecik / Turkey

year of completion :2003 – 2004

Project Description:
The work consisted of constructing an integral site for the operators of the hydroelectric dam on the Firat River. Everything
started from scratch to the completion of a small town. The basic designs were done by joint venture designers.
But the actual distribution of the housing and other common buildings were done by our design proposals and the design
office collaboration.
A- The work included bachelor housings, flats, family housings (single and double), restaurants, club-house, school,
gymnasium, church, gas station, entrance building, social building, administration building, tennis courts, swimming pool,
toddler’s pool, saunas, and shopping mall.
B- The work included the site arrangement, landscaping, roads, walkways, street lighting, TV distribution system, telephone
distribution system, high medium and low voltage electrical distribution, drainage systems, drainage channels, raw water
collection for the dam, raw water distribution, waste water collection, fire water distribution, raw water header tank,
portable water header tank and distribution, fire hydrants, retaining walls, pergolas, waste water treatment and pumping
station, water. Treatment plant and pumping station, sub-transformers, chiller rooms.

Complex of Villas
( low cost )

Client
: Private Office of His
Highness Sheikh Saif bin Zayed Al
Nahyan

Cost
: 3.100.000 Dhs.

Location
: U.A.E – Al Ain

year of completion :
Under construction

Sheikh Khalifa Bin Zayed Al
Nahyan Masjed Site office

Client
: Department of
Presidential Affairs

Contractor : Unisons Company

Cost
: 5.800.000 Dhs.

Location
: AL Ain - U.A.E

Area
: 2600 Sq/m

year of completion : 2011

Sheikh Khalifa Bin Zayed Al
Nahyan Masjed Site office

ISMAIL HAKKI TONGEC
SWIMMING POOL

Client
: Carrefour Sa.

Location
: Ankara / Turkey

year of completion :Dec 2004

Project Description:
Design and build of a semi Olympic indoor pool with all auxiliary and administrative buildings.

Car Shed
AWARDS
Car Shed
Car Shed


U.A.E – Abu Dhabi Office
U.A.E – Ajman Office
Hamdan Bin Mohamed St.
Sheikh Khalifa St.
Mob : +971 552219581
Emirates Islamic Bank Building
E-mail :
Fl.№:1005
muheeb.ahmed@yahoo.com
Tele : +971 6 7466033
Factory: Ajman new industrial
plant
Fax : +971 6 7466013
Mob : +971 509571123
Mob : +971 504536974
P.O. Box : 13390 Ajman
E-mail :
E-mail :
emirates_cabin@yahoo.com


emi.modafer@yahoo.com
Iraq Office
Basrah
E-mail :
emirates_cabin@yahoo.com
CONTACT US
Mob : +964 7804802099
Download