Fit Out Guide WP VG Issue 8 Jan 15 1.0 INTRODUCTION................................................................................................................. 2 2.0 PROJECT DIRECTORY ..................................................................................................... 3 3.0 LANDLORD APPROVAL PROCESS ................................................................................ 5 STEP 1 RETAILER BRIEFING ........................................................................................... 6 STEP 2(A) CONCEPT DESIGN REVIEW .......................................................................... 7 STEP 2(B) DETAILED DESIGN REVIEW .......................................................................... 8 STEP 3 PRE-START, HANDOVER AND FIT OUT ............................................................ 9 STEP 4 COMPLETION AND CONSENT TO TRADE ...................................................... 10 4.0 4.1 4.2 STORE DESIGN ............................................................................................................... 11 INTRODUCTION............................................................................................................... 11 SUSTAINABILITY ............................................................................................................. 11 5.0 5.1 5.1.1 5.1.2 5.1.3 5.1.4 5.1.5 5.2 5.2.1 5.2.2 5.3 5.3.1 5.3.2 5.3.3 5.3.4 5.3.5 5.3.6 5.3.7 5.3.8 5.3.9 5.3.10 5.3.11 5.4 5.5 5.6 5.6.1 5.6.2 5.6.3 5.6.4 5.7 5.8 5.9 5.10 5.10.1 5.10.2 5.10.3 5.10.4 5.10.5 5.10.6 5.11 5.11.1 TECHNICAL DESIGN ....................................................................................................... 12 GENERALLY..................................................................................................................... 12 Drawing Information from Landlord................................................................................... 12 Queries/Further Information Required .............................................................................. 12 Minimum Retailer Shop Fitting Requirements .................................................................. 12 Existing Shop Fitting ......................................................................................................... 12 Environmental Policy......................................................................................................... 12 FLOORS ........................................................................................................................... 13 Mezzanines ....................................................................................................................... 13 Internal Walls .................................................................................................................... 13 WALLS .............................................................................................................................. 14 External Wall/Façade ........................................................................................................ 14 Superstructures ................................................................................................................. 14 Structure by the Tenant ..................................................................................................... 14 Lifts .................................................................................................................................... 15 Princesshay Loading and Deflection Criteria .................................................................... 15 Movement Joints ............................................................................................................... 15 Stability.............................................................................................................................. 15 Fire Protection ................................................................................................................... 15 Concrete Finishes ............................................................................................................. 15 Staircases.......................................................................................................................... 16 BWIC Holes ....................................................................................................................... 16 WINDOWS AND DOORS ................................................................................................. 16 SHOPFRONTS ................................................................................................................. 17 ROOFS ............................................................................................................................. 18 Rooflights .......................................................................................................................... 18 Roof Drainage ................................................................................................................... 18 Services Plant and Equipment .......................................................................................... 18 Roof Plant.......................................................................................................................... 18 PROHIBITED MATERIALS ............................................................................................... 19 TENANT’S REFUSE STORAGE ...................................................................................... 19 MEANS OF ESCAPE ........................................................................................................ 19 ACOUSTIC CRITERIA ...................................................................................................... 20 Tenant Activity Noise......................................................................................................... 20 Atmospheric Plant Noise Emissions ................................................................................. 20 Plant Noise and Vibration Transfer to Internal Area .......................................................... 22 Activity Noise Transfer to External Areas .......................................................................... 23 Activity Noise and Vibration Transfer to Internal Areas ..................................................... 23 Noise and Vibration ........................................................................................................... 24 SERVICES ........................................................................................................................ 24 H.V.A.C ............................................................................................................................. 25 WP VG Issue 8 Jan 15 Contents 5.11.2 5.11.3 5.11.4 5.11.5 5.11.6 5.11.7 5.11.8 5.11.9 5.11.10 5.11.11 5.11.12 5.11.13 5.11.14 5.11.15 5.11.16 5.11.17 5.11.18 5.11.19 5.11.20 5.11.21 Air Conditioning and Ventilation ........................................................................................ 26 Smoke Ventilation ............................................................................................................. 26 Services Riser ................................................................................................................... 26 Landlords Services within Units ........................................................................................ 27 Gas Supply........................................................................................................................ 27 Foul Water Drainage ......................................................................................................... 27 Water Supply..................................................................................................................... 28 Sprinklers .......................................................................................................................... 28 Electrical ............................................................................................................................ 29 Lighting .............................................................................................................................. 30 Fire Exit Signage ............................................................................................................... 30 Fire Alarms ........................................................................................................................ 30 Alarms and Tenant Active System (TAS) .......................................................................... 32 Smoke Control................................................................................................................... 32 Lightning Protection .......................................................................................................... 32 Communications................................................................................................................ 32 TV/FM System .................................................................................................................. 33 Wi-Fi .................................................................................................................................. 33 External Services by the Tenant ....................................................................................... 33 Food Operator Kitchen Requirements………………………………………………………...33 6.0 6.1 6.1.1 6.1.2 6.1.3 6.1.4 6.1.5 6.1.6 6.2 6.3 6.4 6.5 6.6 6.7 6.8 6.9 6.10 6.11 FIT OUT ............................................................................................................................ 37 GENERALLY..................................................................................................................... 37 Contractors Site Team Contact Details ............................................................................. 37 Condition Survey ............................................................................................................... 37 Site Rules .......................................................................................................................... 37 Existing Services ............................................................................................................... 38 Insurances ......................................................................................................................... 38 Retailer Responsibilities .................................................................................................... 39 ROAD ACCESS ................................................................................................................ 39 DELIVERIES/WASTE MANAGEMENT ............................................................................ 39 SERVICE LIFTS ............................................................................................................... 40 ENVIRONMENTAL CONSTRAINTS ................................................................................ 40 CONTRACTORS PERMIT TO WORK ............................................................................. 40 SITE WORKING HOURS ................................................................................................. 41 WELFARE ......................................................................................................................... 41 FIRE EVACUATION ......................................................................................................... 41 PARKING .......................................................................................................................... 42 HOARDING ....................................................................................................................... 42 7.0 7.1 7.2 7.3 7.4 7.5 COMMISSIONING ............................................................................................................ 43 CHARGES ........................................................................................................................ 43 FIRE ALARM CONNECTION PROCEDURE ................................................................... 43 SPRINKLER CONNECTION PROCEDURE .................................................................... 43 COLD WATER CONNECTION PROCEDURE ................................................................. 44 FOUL DRAINAGE CONNECTION PROCEDURE ........................................................... 44 8.1 CONSENT TO TRADE ..................................................................................................... 45 The following are Appendices to the Fit Out Guide and are separate documents on the website: APPENDIX A – BLOCK PLANS APPENDIX B – DESIGN GUIDE APPENDIX C – APPROVAL PROCESS SUBMISSION FORMS APPENDIX D - PERMIT SYSTEM WP VG Issue 8 Jan 15 Contents 1.0 - INTRODUCTION This guide is designed to lead you through the Retail Delivery process throughout all stages including: parties involved, the process to be followed, concept design, technical design, fit out, commissioning and finally consent to trade. Princesshay will provide support to the Retailer to ensure a high standard of design and smooth transition through the process however it is the Retailers responsibility to ensure their agents, designers and contractors are aware of the contents of this document and comply with all requirements. Whilst all information contained within this document is given in good faith and believed to be accurate at the time of circulation, it is not intended to constitute any legal representation or warranty and Retailers are recommended to undertake their own independent investigations, inspections, surveys and enquiries to satisfy themselves on all points. Information has been collated from various sources including the design consultants for the developments in order to produce a simplified source of relevant information. Princesshay are committed to delivering sustainable developments and recognise the importance of working in partnership with our occupiers to make a difference towards this goal. We have produced a Low Carbon Fit Out Guide (refer to Appendix D) to provide guidance on the practical ways retailers can reduce energy by good practice design and effective energy management. All retailers and catering unit operators are asked to consider the guidance given. We also advocate the use of sustainable materials when carrying out shop-fits. If you require any assistance please do not hesitate to contact a member of Centre Management or Princesshay Environment Team. WPVG Issue 8 Jan 15 2015 22015 2 2.0 - PROJECT DIRECTORY The Retailer will be expected to issue a Project Directory at the earliest opportunity and nominate a single point of contact for the Retail Delivery Manager. Communications by email are to include in the header the shop unit reference, retailer trading name and primary content of the email. Key contacts for the Landlords team are noted below:- LANDLORD TEAM Retail Delivery Manager Management Surveyor Princesshay Centre Director Contact: Address: e-mail: Telephone: Contact: Address: E-mail: Telephone: Contact: Address: E-mail: Telephone: Princesshay Technical Services Manager Contact: Address: E-mail: Telephone: Princesshay Operations Manager M&E Consultant +44 (0) 207 409 8814 Wayne Pearce nd Princesshay, Centre Management, 2 Floor, St Stephens House, 9 Catherine Street, Exeter, EX1 1EU Wayne.pearce@princesshay.co.uk 01392 456 540 Vince Gerrard nd Princesshay, Centre Management, 2 Floor, St Stephens House, 9 Catherine Street, Exeter, EX1 vince.gerrard@princesshay.co.uk 01392 456 542 E-mail: Telephone: 01392 456 551 Contact: Address: Matthew Heaman Hoare Lea, 140 Aztec West Business Park, Almondsbury, Bristol, BS32 4TX MatthewHeaman@hoarelea.com 01454 889 166 Contact: Address: E-mail: Telephone: WP VG Issue 8 Jan 15 JLees@savills.com Andy Littlejohns nd Princesshay, Centre Management, 2 Floor, St Stephens House, 9 Catherine Street, Exeter, EX1 1EU Andy.littlejohns@princesshay.co.uk Contact: Address: E-mail: Telephone: Structural Engineer Hedley Jones Workman LLP,Rivergate House,70 Redcliff Street, BRISTOL BS1 6AL hedley.jones@workman.co.uk +44 (0)117 980 6227 Jeremy Lees Savills, 33 Margaret Street, London, W1G 0JD Timothy Roe Sinclair Knight Merz - Incorporating SKM Anthony Hunts, Gloucester House 60 Dyer Street, Cirencester, Gloucestershire, GL7 2PF TRoe@skmconsulting.com 01285 813011 3 2.0 - PROJECT DIRECTORY LANDLORD TEAM Landlord’s Fire Alarm Contractors Contact: Address: E-mail: Telephone: Landlord’s Sprinkler Contractors Contact: Address: E-mail: Telephone: Building Control Contact: Address: Trinity Protection Systems, 121A Milton Park, Abingdon, Oxfordshire, OX14 4SA info@trinitythames.co.uk 01235 862 456 Tyco Fire (Head Office) Tyco Park, Grimshaw Lane, Newton Heath, Manchester, M40 2WL 01454 240 071 Exeter City Council, Civic Centre, Paris Street, Exeter, EX1 1NN E-mail: Telephone: Fire Officer Contact: Address: E-mail: Telephone: Planning Contact Contact: Address: Devon & Somerset Fire and Rescue Service Service Headquarters, The Knowle, Clyst St George, Exeter EX3 0NW 01392 872 200 Planning Services, Exeter City Council, Civic Centre, Paris Street, Exeter, EX1 1NN E-mail: Telephone: 01392 265 776 WP VG Issue 8 Jan 15 4 3.0 - LANDLORD APPROVAL PROCESS There are four key stages to the Retail Delivery process and Retailers should ensure they liaise with the Landlord’s Portfolio Director at the earliest possible stage regardless of the scope of the proposal (i.e. minor alterations or full unit re-fit) to ensure the appropriate level of input is agreed. Following agreement on the Scope of Works between the Landlord and the Retailer the following process will need to be followed:- Retailer Briefing Retailer briefing by the Retail Delivery Manager to introduce the process and issue the guides. Invoice issued to Retailer for fees, where appropriate. 2 3 Design Review Pre-Start Handover & Fit Out Retailer submits Concept information using the ‘Concept Design Submission’ form and following agreement from the Retail Delivery Manager then proceeds with the detailed design and submits this information with the ‘Detailed Design Submission’ form (see Appendix C). Retail Delivery Manager signs off concept stage with the ‘Concept Design Approval’. Retail Delivery Manager signs off detailed design stage with the ‘Detailed Design Approval’. Fees where appropriate invoice settled by Retailer. Retailer meets with the Centre Management Team, submits pre-start information using the ‘Pre Start Information Submission’ form and subject to approval then commences work. Retail Delivery Manager signs off pre start information with the ‘Pre Start Approval’ The pre-start process and work on site is monitored by the Centre Management Team. 4 Completion & Consent to Trade Retailer submits as built information and commissioning certificates using the ‘Consent to Trade’ form. A damages inspection is undertaken. Retail Delivery Manager signs off fit out with the ‘Consent to Trade’ form. Outstanding as built information, completion of damages and subsequent release of deposits. WP VG Issue 8 Jan 15 5 3.0 - LANDLORD APPROVAL PROCESS Step 1 Retailer Briefing Objective The purpose of this stage is to ensure all parties understand the requirements of the Retail Delivery process in order to ensure a good quality result within the agreed programme. From this point the Retail Delivery Surveyor will be the Retailers primary point of contact. Action The Retail Delivery Manager will arrange a briefing meeting if required with the Retailer/ Project Leader/Retail Designer in order to present the guide and ensure all parties understand the Retail Delivery process, design requirements, technical constraints and commissioning requirements. A programme will be agreed. A contact list will be provided by the Retailer. Confirmation of the fees, deposits and other Landlord charges will be agreed. STEP 2(A) CONCEPT DESIGN REVIEW Objective The purpose of the Concept Design Review is to ensure the Retailers proposals achieve the requirements of the design guide prior to progressing with detailed design and statutory submissions. Action The Retailer will submit for approval pdf (and CAD) or paper A3 copies of their Concept to the Retail Delivery Manager using the ‘Concept Design Submission’ form (see Appendix C). This submission must include the information included within the form to ensure adequate information is available for review and to avoid possible delays. A response from the Retail Delivery Manager will be issued as follows:A Approved Retailer may proceed to Step 2(b) Detailed Design Review. B Approved with comments Retailer may proceed to Step 2(b) Detailed Design Review but must provide acceptable replies to the comments. C Rejected Retailer must re-submit in line with the guide requirements. It is the Retailers responsibility to consult with the necessary statutory authorities to ensure compliance with for example Building Control, Fire Officer, Planning and the like. The Retailer should allow one week for comments to be returned following their submission. WP VG Issue 8 Jan 15 6 3.0 - LANDLORD APPROVAL PROCESS STEP 2(B) DETAILED DESIGN REVIEW Objective The purpose of this stage is to ensure a detailed design that complies with legal, statutory and technical requirements addressing any site specific constraints and design requirements in line with the previously approved concept design. Action The Retailer will submit for approval pdf (and CAD) or paper A3 copies of their Detailed Design to the Retail Delivery Manager using the ‘Detailed Design Submission’ form (see Appendix C). This submission must include the information included within the form to ensure adequate information is available for review and to avoid possible delays. A response from the Retail Delivery Manager will be issued as follows:A Approved Retailer may proceed to Step 3 Pre-Start. B Approved with comments Retailer may proceed to Step 3 Pre-Start but must provide acceptable replies to the comments. C Rejected Retailer must re-submit in line with the guide requirements. It is the Retailers responsibility to consult with the necessary statutory authorities to ensure compliance for example Building Control, Fire Officer, Planning and the like. The Retailer should allow one week for comments to be returned following their submission. WP VG Issue 8 Jan 15 7 3.0 - LANDLORD APPROVAL PROCESS STEP 3 PRE-START, HANDOVER AND FIT OUT Objective The purpose of this stage is to ensure the Retailer has satisfied the requirements for all approvals, the necessary pre-start information has been received and the Retailers contractor team has been briefed by the Centre Management in relation to site constraints, site rules and the like. From this point the Retailers primary point of contact during the site phase will by the Centre Management Team. Action The Retailer will be responsible for arranging a meeting with the Centre Management Team and attending this together with their Project Leader and Principle Contractor having first submitted the required pre-start information as noted within the ‘Pre Start Information Submission’ Form (see Appendix C). A response from the Retail Delivery Manager will be issued as follows:A Approved Retailer may proceed to Fit Out. C Rejected Retailer must re-submit in line with the guide requirements. Works will not be permitted to commence on site without: WP VG Issue 8 Jan 15 A completed Agreement for Lease (if applicable). Payment of the deposits and fees (as appropriate). Approval of the detailed design. Acceptance of the pre-start information. Induction of all site personnel by the Centre Management Team. Building Regulations plans approval. 8 3.0 - LANDLORD APPROVAL PROCESS STEP 4 COMPLETION AND CONSENT TO TRADE Objective The purpose of this stage is to ensure the work on site has been completed in accordance with the agreed plans, services have been commissioned and interfaced with the Landlord’s systems where appropriate and a Building Regulation Completion Certificate has been issued. Action Five days prior to the proposed works completion date, the Retailer is to notify the Retail Delivery Manager to allow an inspection. The Retail Delivery Manager will issue a list of any snagging for completion. The Retailer will submit the ‘Consent to Trade Submission’ form together with all appropriate documentation (see Appendix C). The Retail Delivery Manager will issue a ‘Consent to Trade’ notice allowing the Retailer to trade. THE UNIT WILL NOT BE PERMITTED TO TRADE WITHOUT THIS. Deposits will be released subject to receipt of the relevant as built information and completion of any snagging/damages (snagging/damages are to be rectified within 14 days of the issue of the notice from the Retail Delivery Manager). WP VG Issue 8 Jan 15 10 4.0 - STORE DESIGN 4.1 INTRODUCTION Where appropriate, Princesshay may involve a design architect to assist the retailers with the concept proposals where this is considered necessary to ensure a high design standard in sensitive areas of the development. Further guidance on the different areas together with design ideas are included within the Design Guide within Appendix B. 4.2 SUSTAINABILITY As noted in the introduction to the guide, Princesshay have a strong commitment to sustainability and every opportunity should be taken to utilise sustainable products, materials, energy and design to achieve both environmental improvement and reduced operational costs. The guide within Appendix D provides detailed guidance however the following are a number of ways where improvements can be achieved: use of heat recovery systems efficient controls to heating and cooling equipment natural lighting and ventilation where possible together with efficient controls improvements to Part L ‘U’ value requirements use of natural quality materials with less intensive manufacturing processes where possible (i.e. natural stone, limestone, ceramic, granite, terrazzo, hardwood timber from FSC approved sources, glass, metals) use of local suppliers to minimise transportation impacts use of ISO14001 accredited supply chains There are numerous sources of advice however www.carbontrust.co.uk provides a useful starting point with links to additional resources. WP VG Issue 8 Jan 15 11 5.0 – TECHNICAL DESIGN 5.1 GENERALLY 5.1.1 Drawing Information from Landlord There are no Landlord’s drawings included in this document. The Retailer’s Design Team are to contact Centre Management to view the existing Health and Safety File. Whilst every care will have been taken in the preparation of the as built information and the Health & Safety File, accuracy cannot be guaranteed. Retailers must undertake their own investigations, inspections, surveys and enquiries. 5.1.2 Queries/Further Information Required Please submit any queries or requests for further information that may be required to the relevant specialist, copied to the Retail Delivery Manager. 5.1.3 Minimum Retailer Shop Fitting Requirements The Retailer shall not interfere with the fabric or structure of the building in any way, whatsoever, without the prior written approval of the Landlord. Work to the fabric includes, but is not confined to the laying of screeds, alterations, connection to services, the cutting of chases, small diameter holes and the like. The Retailer shall not interfere in any way with the integrity of the fire barriers (dividing walls/floor between the Unit and adjacent units or adjacent landlord areas), structural fire protection services or protected escape routes. Specifically in the case of the external (rear) wall of each unit, while the Retailer may be permitted to make openings in the wall for passage of services, these openings must approval for such services penetrations, or for other works which may affect the integrity of fire barriers around the unit (e.g. external walls, dividing walls, floors, wall between unit and services corridor), the Retailer shall submit proposed details of fire stopping/fire resisting construction with supporting fire test documentation as part of the Building Regulation Submission. 5.1.4 Existing Shop Fitting Retailers who retain existing shop fitting elements including services when they take over a unit will be responsible for their full compliance with the Landlord’s requirements and any statutory regulations. 5.1.5 Environmental Policy Retailers should comply with the Landlords Environmental Policy (copy available on request). Retailers are actively encouraged to improve their environmental ambitions. The Retailer should demonstrate consideration of the usage of sustainable products as part of their fit-out proposals. The usage of recycled products from sustainable sources and an environmentally friendly waste disposal strategy will be encouraged. WP VG Issue 8 Jan 15 12 5.0 – TECHNICAL DESIGN 5.2 FLOORS Composite in-situ concrete floor slabs on permanent formwork acting compositely with steel beams, supported on steel columns. Much of the development falls along its length and the retail unit floor will be stepped within each block to follow this slope (see tenancy plans for specific unit). The Tenant should allow for the levelling of the floor within the unit. In these areas the SSL will be stepped, but will always be at or below street SSL. The Tenant, if using make-up floor finishes should allow for any change in level between the service corridors, which will be at the FFL of the unit, and the finished floor level of the unit. Units may receive up to 100mm of floor finish by the Tenant terminating as appropriate to the fall of, and in an approved movement strip against the “Street” finishes. For units on sloping areas of the floor slab this allowance has been measured at approximately the centre of the shop front. The Tenant is required to take all necessary precautions when screeding floor areas as there may be the possibility of screeding operations affecting areas below the Tenant’s demise, especially if the screed is too wet. Water must not be allowed to leak through concrete day work or expansion joints to levels below. Only ready mixed screeds with a low water content delivered to site will be permitted. The mixing of screeds on site will not be permitted. Pumping of screed is not permitted; all screed must be bagged and mixed within the Tenant’s demise. 5.2.1 Mezzanines Due to planning restrictions Mezzanine floors will generally not be allowed. Should these be required these will be limited and subject to a separate early agreement with Princesshay. Stacked storage areas may be permitted, the construction weight loadings and associated stairs shall be provided by the Tenant. Princesshay will confirm acceptance of these loading and fixings. 5.2.2 Internal Walls Walls designated as fire compartment walls are formed to provide a minimum fire resistance of 2 hours. Walls to service corridors, means of escape and some plant rooms etc, are typically formed in 2 7.0N/mm block work. Partition walls between units not designated as fire compartment walls are formed in jumbo stud dry lining to achieve a minimum of 1 hour fire rating (140mm fair faced block work has been used where specific agreement has been reached with the Tenant). The faces of internal walls may contain the projecting steel columns of the structural frame. WP VG Issue 8 Jan 15 13 5.0 – TECHNICAL DESIGN The following types of block work are used throughout the scheme: 1) Medium density fair faced grade block work to form internal partition walls, core walls and shop unit party walls. Thicknesses vary, laid in stretcher bond with flush joints or to suit specific wall type. 2) Medium density common block work to receive a plaster finish forming internal partition walls, core walls and unit party walls. Thickness vary, laid in stretcher bond with flush joints or to suit specific wall type. 3) 100mm thick dense concrete party wall block work laid flat on side to provide 215mm thick party wall. Laid in stretcher bond, or used as standard to form two leaves of 100mm thick blocks for cavity party wall construction (laid in stretcher bond). 4) 140mm thick dense concrete wall block work, to form both leaves of a cavity construction party wall (laid in stretcher bond), between department stores and retail units. 5) Plasterboard partition/party walls constructed using a proprietary ‘jumbo stud’. Thicknesses vary, formed using 2 layers of 12.5mm plasterboard on either side of a metal stud system with a layer of insulation boards plus a layer of steel mesh to one side of the stud behind the plasterboard to provide security. All fire stopping associated with the walls must be maintained. The Tenant must notify the RDM of any fire stopping or mastic which is removed or damaged, and ensure that the works are made good and approved by Princesshay. The Tenant shall take care to ensure walls are not damaged by wet trades. Therefore, should the Tenant install screed, they must provide a damp proof membrane between the wall and screed during construction. The Tenant may take horizontal restraint from partition walls only where all vertical loads are transferred to the slab. Cantilever shelving systems to block work and jumbo stud walls will not be permitted. 5.3 WALLS 5.3.1 External Wall/Façade The Tenant is not permitted to undertake any works to the external wall or unit facades. 5.3.2 Superstructures The structural and services zones above the ceiling are to be kept separate to provide tenants with flexibility in their design of services. Generally, the proposed superstructures are summarised as follows: Column spacing Standard Space User: 7.5m x 7.5m Clear heights (finished floor level to underside of structure) SU and MSU: Ground floor 4.3m Upper floors 3.5m 5.3.3 Structure by the Tenant Shot firing into the base building will not be permitted and all fixings in to the structure are to be submitted for approval as part of any structural alterations package. Due to the structure of the base building, no chasing of the slab will be permitted. The Tenant within their finishes or shop fit works shall allow for all recesses and conduits. WP VG Issue 8 Jan 15 14 5.0 – TECHNICAL DESIGN 5.3.4 Lifts Should the Tenant be installing a lift, counter weight safety gear must be fitted where the lift pits are above any habitable spaces. 5.3.5 Princesshay Loading and Deflection Criteria All deflection limits comply with criteria set out in the latest relevant code practices, which are as follows: 5.3.6 BS 8110 – Structural use of Concrete, Part 1, Code of Practice for design and construction, clause 3.4.6 – Deflection of Beams BS 5950 – Structural use of Steelwork in building, Part 1, Code of Practice for design in simple continuous construction: hot rolled sections, clause 2.5.1 – Deflection Movement Joints The separation of the buildings by Princesshay and Bamfylde Lane create natural movement joints. Two additional movement joints are located between Buildings C and E, and between Building F and Buildings D and E. A further movement joint separates Buildings G and H. The Tenant proposals must take into account any movement or expansion joints installed by the Landlord so as not to render them ineffective. 5.3.7 Stability Stability is generally by steel bracing around cores, along landlord corridor lines and along party walls, combined with movement frames where necessary. Block B uses localised transverse portal frames, provide lateral stability. Block C utilises the concrete bastion tower structure in conjunction with steel bracing and movement frames. The Tenant is not permitted to undertake any works or make fixings to any stability frames. 5.3.8 Fire Protection Structural elements have been designed to meet the specific statutory requirements of the minimum period of fire resistance. This has been achieved by various methods including: 1) Concrete cover to reinforcement in slabs, beams, columns and walls 2) Intumescent paint on steel beams, columns and bracings applied offsite 3) Board or spray applied fire resisting materials on steel beams and columns The Tenant is to familiarise himself with all fire protection systems within the Tenant’s unit. The Tenant is not permitted to undertake any works that might in any way effect the integrity of the applied or installed systems. 5.3.9 Concrete Finishes The following formed concrete finishes are utilised, using the BS 8110 Part 1 type finishes: WP VG Issue 8 Jan 15 Type C: External columns Type B: Visible concrete, e.g. internal columns, walls, structural soffits and sides, up stands Type A: Non-visible concrete, e.g. internal lift shaft faces, surfaces with applied finishes, surfaces within cavities 15 5.0 – TECHNICAL DESIGN The following unformed finishes are utilised: Concrete substrate to receive retail and residential finishes: To suit finishes. 5.3.10 Staircases Staircase elements are designed to meet the specific statutory requirements means of escape (MOE) and of fire resistance. Within the Tenant’s unit, framed openings as appropriate are provided for both front of house public/sales stairs and back of house accommodation stair. In-situ reinforced or pre-cast concrete flights and landings have been provided within the landlord’s common back of house areas. Provision has been made within the base build for the Tenant to install staircases, lifts and escalators. Detail stair designs by the Tenant are to meet with all statutory approvals and must be submitted to the RDM as part of the approval process as out-lined above. 5.3.11 BWIC Holes No builders work holes are to be formed without the written consent of the RDM. In particular, the fire integrity of partition walls is not to be compromised. Chasing of walls and floors will not be permitted. 5.4 WINDOWS AND DOORS Where applicable, a single set of goods entrance doors to individual tenancies shall be provided by Princesshay. They will be a set of double doors solid timber core type with a minimum total opening width of approx. 1600mm and a fire resistance of 1 hour or to statutory requirements. The doors shall swing outward into Princesshay common area. Princesshay provide mild steel hinges and budget lock only. All statutory ironmongery is to be installed by the tenant. Princesshay will also provide the doors to the bin storage areas but not the internal enclosures which remain the responsibility of the Tenant. Windows for retail units include: 1) 2) 3) 4) Untreated hardwood framed open-able windows. Steel thermally broken framed windows. Aluminium thermally broken framed windows. Aluminium framed double glazed tilt turn windows. External doors are: 1) 2) 3) 4) 5) Untreated hardwood doors. Paint finish solid core external doors and frames. Solid core doors clad with stainless steel. Stainless steel faced sliding doors. Roller shutters (open grille non-vented). Where Princesshay provides doors onto service corridors, they will provide the one-hour fire separation required by the developments engineered fire safety design. While it is good practice to provide a separation lobby, this is not required to satisfy the development Fire Strategy. The Tenant will be responsible for the construction of same within the unit demise. WP VG Issue 8 Jan 15 16 5.0 – TECHNICAL DESIGN The Tenant door construction shall ensure that in the event of fire, no smoke will discharge into the service corridor. The Tenant shall provide standard signage at the rear entrance to identify the unit name and unit number to Princesshay specification. Princesshay specified decoration and all ironmongery shall be by the Tenant. 5.5 SHOPFRONTS The Tenant is responsible for the design and construction of the shopfront. The design must be in accordance with separate shopfront design guidelines that will be provided by Princesshay (see Appendix B). All support for unit fronts and fittings must be taken from the structure or floor slab within the demise line. Junctions between the Tenant’s and Developers’ finishes are to be provided with a compression joint and suitable sealer by the Tenant. In the event that the Tenant decides to recess the shopfront behind the demise line the highway/footpath paving material must be extended up to the shopfront by the Tenant. No fixings are to be made into the Landlords finishes. Proposals for display racking, shelves, etc, must be accompanied by calculations showing that imposed loads and fixings both lateral and vertical do not deform or adversely affect the fire integrity or structural stability of the Landlords’ walls and confirmed in writing by the wall manufacturer. All switches, wire ways, transformers and other associated items must be concealed. Glass is to be clear toughened or laminated, and designed complete with its supports, to current regulations and GGF standards. The use of security shutters is discouraged and subject to planning consent. Where their use is a requirement of a tenant’s insurer then open mesh or perforated shutters should be used to secure units and these should be located 2m behind the demise line. All shutters are to have a painted finish. The Landlord requires that reasonable measurers are taken to minimise injury and damage in the event of terrorist actions. As a result, various recommendations made by the Police Architectural Liaison Officer have been incorporated into the scheme. This has included access control measurers, external planning and structural design. One area where tenants’ shopfitting can affect the risk of injury is with glazing. Shopfront glass, if shattered by blast, may break into high speed, sharp edged fragments. Tenants will be required to demonstrate the measurers taken to reduce the risk of injury caused by flying glass. Further advice may be obtained from the Architectural Liaison Officer at the address below: Devon and Cornwall Constabulary Devon and Cornwall Police Heavitree Road Police Station EX1 2LR WP VG Issue 8 Jan 15 17 5.0 – TECHNICAL DESIGN 5.6 ROOFS Roofing materials include: 1) 2) 3) 4) 5) 6) 5.6.1 Insulated Mastic Asphalt roofs and Mastic Asphalt warm roof system Single ply membrane roof Single ply membrane roof Aluminium stand seam saddle roof Zinc alloy canopies and fascias Cantilevered metal/glazed canopies with safety glass Rooflights Rooflights are not permitted. 5.6.2 Roof Drainage Princesshay rainwater roof drainage may use a syphonic system. To allow vertical pipework to drop through Princesshay areas, horizontal runs may pass through some Retail units. There is no separate foul water drainage available for roof plant. The Tenant is responsible for ensuring that their installation works and plant do not release any pollutants/chemicals onto the roof or into the rainwater systems. 5.6.3 Services Plant and Equipment The installation of services plant and equipment by the Tenant is restricted to certain designated and uniquely allocated areas of the building. The details of space allocated will be found in the Agreement for Lease. 5.6.4 Roof Plant Where roof space is allocated, the Landlord will provide each Tenant with a plant installation area with necessary primary structural support. Design loadings are stated in the Agreement for lease and all equipment loads shall, if necessary, be spread so as not to exceed the design provision. The Tenant is responsible for fixing to the steel rails and for providing any further support and/or access steelwork as necessary. The Tenant shall not form other openings in the roof. Should any holes be required then they shall be requested via the procedures set out in this guide. The Tenant shall be responsible for making all penetrations weather tight to the formal consent of the Landlord after the installation of his services. The Landlord will provide lighting on the roof sufficient to allow escape in the event of an emergency. No other lighting shall be installed by the Tenant. The Landlord will not provide electrical power at the roof. Should this be required for the maintenance of the Tenant plant and equipment (e.g. socket for hand held lamp) this shall be provided by the Tenant and incorporated into the plant. Tenant’s electrical equipment shall not be attached to the Landlord’s structure. All power necessary to operate the Tenant plant and equipment shall be taken by the Tenant from his electrical supply within his Tenancy. The above shall also apply to gas, water, communications and any other services required by the Tenant at his plant and equipment. WP VG Issue 8 Jan 15 18 5.0 – TECHNICAL DESIGN The Tenant shall be responsible for submitting details of all roof mounted plant to the Local Planning Authority and gaining any necessary Planning Approvals in respect of the size of the plant. Each Tenant is expected to take all reasonable care so that his services, plant and equipment does not adversely affect his neighbour or the Landlord. Items to be considered, amongst others, not exhausting stale air into the fresh air intake of others, not discharging warm air (e.g. from condensers) into the intakes of others, not restricting installation or maintenance areas of others, not impeding the air flow of others. The Tenant will be responsible for ensuring that his plant is securely located on and attached to the supports provided by the Landlord and designed in such a way as not to cause instability or damage to the building structure. No fixings through the waterproof layer of the roof will be permitted in any circumstance. 5.7 PROHIBITED MATERIALS The Tenant’s contractor shall not specify or use prohibited materials and will use reasonable skill, care and diligence to ensure that others do not specify or use in the construction works materials which are generally known at the time of use to be deleterious to health and safety or to durability in the particular circumstances in which they are used. From time to time, the RDM may issue an advisory prohibited materials listing. 5.8 TENANT’S REFUSE STORAGE Designated bin stores will be provided by the Tenant, located within their unit as close as possible to the service corridors (where provided) and be 1 hour fire rated with ½ hour fire doors. Stores will be sufficiently large enough to accommodate a 1660 litre wheeled bin container which will be supplied by the Centre Management. The Tenant will be responsible for any additional requirements. The Tenant must provide their own wash down facilities and will be responsible for providing suitable finishes allowing wet mopping of the areas. The Tenant will provide all necessary fire safety systems, which will include all necessary sprinklers, smoke detectors, and smoke extract and fire alarm systems. Princesshay has provided a sprinkler main pipe, which terminates outside each unit. Note: Blocks G, H, J, K, L and T do not have access to the landlord sprinkler main pipe. The Tenant must comply with section H6 as set out in The Building Regulations 2000. 5.9 MEANS OF ESCAPE Each tenancy shall have a designated path of travel for servicing their space (to be confirmed at the pre-start meeting), For fire escape purposes, occupancies were generally calculated using a floor space factor of 2 4m per person for the whole area including storage and staff areas. There is no minimum requirement for storage areas of reduced occupancy within the demise of the tenancy. It is however the Tenant’s responsibility to familiarise themselves with the SAFE v8 Fire Engineering documents which sets out in detail the requirements for each block within the development (see Appendix B). WP VG Issue 8 Jan 15 19 5.0 – TECHNICAL DESIGN Apart from demises having an occupancy of 300 people or greater, it is assumed that individual demises utilise both the external streets and service corridors (where available) for fire escape. 2 A small demise/kiosk, which does not exceed 25m in total area and has a maximum depth of 5m, need not be provided with a secondary means of escape and shall be permitted to escape directly into the arcade areas. 5.10 ACOUSTIC CRITERIA 5.10.1 Tenant Activity Noise All design, works, materials, installations and tolerances are to be fully in accordance with the following: 1) Building Regulations 2000 Approved Document E (2003 Edition). 2) NHBC Standards. 3) British Standard BS8233: 1999 “Sound insulation and noise reduction for buildings – Code of Practice”. N.B. Where his standard gives ‘Good’ and ‘Reasonable’ criteria shall be considered to apply. 4) ‘Sound control for homes’ issued by Building Research Establishment and Construction Industry Research and Information Association 5) CIBSE guides issued by the Chartered Institution of Building Services Engineers. 6) Planning Conditions and other requirements of Local Authority. 7) Statutory noise nuisance legislation. 8) Manufacturer’s installation instructions, particularly those relating to acoustic matters. 9) Other relevant British Standards and Codes of Practice. Where more than one standard is applicable, the more onerous shall be achieved. Any relaxation of the acoustic criteria described herein must be agreed in writing by the RDM. The Tenant is warned that in some cases the acoustic criteria contained herein will be difficult to achieve, especially those concerning atmospheric plant noise emissions. Tenants are advised to engage an acoustic consultant at an early stage to identify and address the implications of these acoustic criteria. 5.10.2 Atmospheric Plant Noise Emissions Atmospheric noise emissions are to be controlled to the Local Authority’s requirements. Exeter City Council’s plant noise emission criterion is as follows: “Noise emissions from all buildings services plant operated at full duty shall not exceed 5dB below existing background noise levels when measured at the closest sensitive receptor”. The Tenant must consider the cumulative effect of noise from all sources within the development site. To this end the tenant shall control noise emissions such that the total noise emissions from their unit are below the otherwise prevailing minimum background (L90) noise level at the nearest sensitive receptor, minus the correction factors detailed in the table below. The requirement varies between units and the appropriate criteria, dependent on the Tenant should be selected from those given below. WP VG Issue 8 Jan 15 20 5.0 – TECHNICAL DESIGN Block WP VG Issue 8 Jan 15 Unit No. A SU1-SU8 B SU9-SU16 LS10, 14 C SU18-19 MSU 3&4 D SU20-25 D Debenhams E LS2, 3, 4, 5 F LS6, 7, 8 F Debenhams G SU39, 40, 41 LS9 H SU42, 43, 44 MSU5 J SU45, 46 K SU47 Noise Sensitive Receptor Residential windows overlooking Princesshay Residential windows overlooking Bedford Street Residential windows overlooking Princesshay Residential windows overlooking Southernhay Residential windows overlooking Princesshay Residential windows overlooking Post Office Street Residential windows overlooking Princesshay Residential windows overlooking Post Office Street Residential windows overlooking Princesshay Residential windows overlooking Post Office Street Residential windows overlooking Princesshay Residential windows overlooking Post Office Street Residential windows overlooking Post Office Street Residential windows overlooking Post Office Street Residential windows overlooking Bedford Street Residential windows overlooking Bedford Street Residential windows overlooking Chapel Street Residential windows overlooking Bedford Street Residential windows overlooking Bedford Square (H) Residential windows overlooking Chapel Street Residential windows overlooking Bedford Square (H) Residential windows overlooking Chapel Street (K) Residential windows overlooking Chapel Street Design Criteria relative to background L90 noise level -15 -15 -15 -15 -17 -15 -17 -13 -15 -15 -17 -15 -11 -11 -10 -10 -8 -11 -11 -8 -11 -8 -8 21 5.0 – TECHNICAL DESIGN Block Unit No. Noise Sensitive Receptor L SU48, 49 & 50 Residential windows overlooking Bedford Street (L) Residential windows overlooking Bedford Street (A) R Residential windows overlooking Paris Arcade / Southernhay (facing West) -13 S SU28, 29, 30 & 31 MSU1 &2 Café/Restaura nt SU32-38 -8 -13 T K1 Residential windows overlooking Paris Arcade Residential windows overlooking Southernhay (facing South) Residential windows overlooking Southernhay (facing South) Design Criteria relative to background L90 noise level -10 -10 -13 The correction factors take into account the contribution from the Tenant, plus the 5dB required by Exeter City Council Environmental Health department. The Tenant should however also be aware that the criteria detailed above apply to the Tenant’s total plant noise emissions. Corrections therefore need to be made by Tenant’s for their number of noise sources. Plant noise emissions shall additionally be controlled to a supplementary criterion, so as to ensure acceptable noise levels in pedestrian areas. Noise from such plant shall not exceed 55dBA, or the background (LA90) noise level plus 5dBA (whichever is less onerous), when measured in any pedestrian area 1.8m above ground/floor level at 1m from the grille/façade. Relaxation of the above criteria may be permissible for emergency or standby plant, subject to agreement in writing with the Landlord or his Acoustic Consultant. 5.10.3 Plant Noise and Vibration Transfer to Internal Area The Tenant shall control noise and vibration transfer from their mechanical services such that: a) Noise and vibration transfer to other internal areas does not cause a nuisance, disturbance or annoyance to the Landlord or other occupiers of the development. b) Noise and vibration transfer to other internal areas does not exceed any acoustic criteria specifically agreed between the Landlord and other Tenants. c) Noise and vibration transfer to other internal areas does not exceed the following Noise Rating (NR) levels: Criteria for Activity Noise Transfer to Internal Areas Area Criterion English Heritage NR35 Shop Mobility NR35 TIC NR35 Management Suite NR35 WP VG Issue 8 Jan 15 22 5.0 – TECHNICAL DESIGN Criteria for Activity Noise Transfer to Internal Areas Area Criterion Residences Not exceed the minimum background L90 (15 minutes) noise level in each 1/3 octave band across the audible frequency range. Office NR35 Retail Unit NR35 Car Park NR45 Service Yards/Loading Bays NR50 NR refers to Noise Rating curves as defined in ISO R 1996. d) No noise sources to give rise to audible tones or rattles. e) Vibration transfer to other internal areas does not exceed Curve 1 as defined in BS 6472: 1992 “Guide to Evaluation of human exposure to vibration in buildings (1Hz t 80Hz)”. Unless otherwise agreed criteria (a), (b), (c), (d) and (e) shall be assumed to apply and compliance with whichever is the more onerous taken as being mandatory. Notwithstanding this, criterion (a) is ultimately the overriding requirements. Provided (a) is complied with in full, some relaxation of (b), (c), (d) and (e) would, however, in most cases, be considered as evidence tending to demonstrate compliance with (a). Relaxation of the above criteria may be permissible for emergency or standby plant, subject to agreement in writing with the Landlord or his Acoustic Consultant. 5.10.4 Activity Noise Transfer to External Areas Activity noise shall be controlled such that it does not cause a statutory noise nuisance, and shall also comply with the Local Authority’s requirements. Activity/operational noise shall be controlled such that it does not cause a statutory noise nuisance and shall also comply with the Local Authority’s requirements. Music/entertainment noise transfer to residential properties when measured in terms of Lmax (fast) outside at 1m from open-able windows of habitable rooms shall not exceed the minimum background L90(15 minutes) noise level in each 1/3 octave bands down to and including 40Hz. The Tenant must allow for the cumulative effect of their activities, and also make appropriate allowances for contributing noise from other tenant’s activities. 5.10.5 Activity Noise and Vibration Transfer to Internal Areas The Tenant shall control noise and vibration from their operations such that: a) Noise and vibration transfer to other internal areas does not cause a nuisance, disturbance or annoyance to the Landlord or other occupiers of the development b) Noise and vibration transfer to other internal areas does not exceed any acoustic c) Noise and vibration transfer to other internal areas does not exceed the following Lmax (fast) noise levels d) Vibration transfer to other internal areas does not exceed Curve 1 as defined by British Standard BS6472: 1992 “Guide to human evaluation of exposure to vibration in buildings (1Hz to 80Hz)”. WP VG Issue 8 Jan 15 23 5.0 – TECHNICAL DESIGN Unless otherwise agreed (a), (b), (c) and (d) shall be assumed to apply and compliance with whichever is the more onerous shall be taken as being mandatory. Notwithstanding this, criterion (a) is ultimately the overriding requirement. Provided (a) is complied with in full, some relaxation of (b), (c) or (d) may be permissible but only at the Landlord’s discretion. Compliance with (b), (c) and (d) would, however, in most cases, be considered as evidence tending to demonstrate compliance with (a). 5.10.6 Noise and Vibration External noise criteria: to the requirements of the Local Environmental Health Officer but in any case not to exceed NR 55 at the demise (Refer to CIBSE guides). Internal noise criteria: NR 45 maximum subject to there not being any excessive peaks at any frequency within the audible frequency range that becomes predominant. All the Tenant plant shall be provided with suitable anti-vibration facilities to ensure no vibration from Tenant’s plant is transferred to the structure of the building. Construction work which is likely to cause nuisance to local residents and Tenants should not take place outside the following hours except with the approval of the landlord and Local Authority. 5.11 SERVICES The Landlord’s demise has been provided with a comprehensive Mechanical & Electrical Installation to current CIBSE, British Standards and Codes of Practice, comprising: 1) 2) 3) 4) 5) 6) 7) 8) 9) 10) 11) 12) 13) 14) 15) 16) 17) 18) 19) 20) General lighting Emergency lighting Small power Fire alarms including voice annunciation Intruder detection CCTV Essential supplies Lightning protection Specialist lighting Disabled call system Containment systems Access control (to landlord’s staff areas) Pedestrian monitoring to landlord’s public areas Sprinkler Hot and cold water Gas Mechanical HVAC system Smoke control Surface water drainage Foul water drainage If additional information is required regarding any of the systems detailed above, the Tenant is to make their request in writing to the RDM. The Tenant’s engineering services installation shall be designed and installed in accordance with the same standards. WP VG Issue 8 Jan 15 24 5.0 – TECHNICAL DESIGN No ‘temporary’ services will be provided by the Landlord except as required by the Agreement for Lease/Lease. The Tenant is strongly advised to make an early application to the appropriate authority for services if these are required during the fitting out period. Should the Tenant wish to use a temporary generator, he must obtain prior written consent from the Landlord and Fire Authority and comply with restrictions imposed. 5.11.1 H.V.A.C All Princesshay back of house areas, staff facilities and public amenities will be ventilated to meet statutory requirements. No Landlord provision will be made to the Tenant’s unit. In discussion with the Tenant, Princesshay reserve the right to reallocate any plant area not used. The Tenant is responsible for the design and construction of all works associated with the retail unit. The tenant shall provide appropriate fresh air rates into their unit and shall maintain an adequate conditioned air quality within their demise. If creating smell, such as cooking of food, the Tenant must provide local extract to prevent pollution of the public space. Filtration of exhaust will be mandatory and direction of exhaust must be co-coordinated with intakes to other units. Mechanical drawings shall show layouts for all external plant, supply and return air grills, duct sizes and locations, and detailed plant information and specifications. The Tenant will be required to provide complete details of plant and equipment within their demise and at roof level with respect to size, weight and acoustic performance, together with mounting details and weathering proposals. Princesshay may further request for approval a detailed specification and drawings, method statements for delivery and installation, shutdown procedure for fire alarm link, commissioning figures, maintenance proposals, equipment suppliers and manufacturers details. Heat rejection equipment together with air intake and exhaust is to be located in the designated plant areas located either at roof level or within specified internal plant rooms provided with landlord louvre panels. Evaporative heat rejection systems are not permitted. The Tenant is required to conform to the Environmental Policy of Princesshay with regard to the selection of refrigerant for use in cooling systems. The Tenant is to provide and install a plaque incorporating trading name and unit number. All plant is to be RAL 7035 and planned/installed in a neat and orderly manner and below the top of the plant screens to the roof area. Where required the Tenant plant area is screened to an approved level by Princesshay. Any additional screening requirements shall be subject to the approval of Princesshay/ECC and undertaken at the Tenant’s cost. Any installations using oil shall be bunded and/or double sleeved to protect the public and common areas from leakage. WP VG Issue 8 Jan 15 25 5.0 – TECHNICAL DESIGN The Tenant must control condensate drainage such that it discharges into his own internal foul water system. 5.11.2 Air Conditioning and Ventilation All pipe work must be kept within the Tenant’s demise wherever possible. The type of refrigerant used must be clearly marked on each heat exchanger. Refrigerant pipe runs must be clearly shown on all drawings; double skinned pipes are required in service corridors. Refrigerants must be recovered and not allowed to escape into the atmosphere. Condensate drain routes are to be agreed with the Landlord. Tenant’s exhausting polluted air shall install adequate filtration to prevent nuisance smells or hazard to health. All mechanical ventilation systems shall be designed and installed so that ductwork can be cleaned, tested and maintained. 5.11.3 Smoke Ventilation All smoke evacuation and replacement air systems shall conform to all relevant British Standard’s and other statutory requirements. The Tenant shall specifically note the need for a duplicate and/or a maintained electrical supply, and the need for regular testing to be scheduled with the requirements and provisions in the SAFE fire strategy documents. When in operation the noise level from the Tenant’s plant and equipment shall not interfere with the intelligibility of the Tenant’s own Fire Alarm system nor that of the Landlord’s, including the PA VA System. Discharge from the smoke evacuation system must not interfere in anyway with the Landlord’s smoke vent system, nor the proper and efficient working of the building services systems of others. 5.11.4 Services Riser The Tenant is provided with an agreed designated route for passing all services from within the demise to the external plant area. This will generally be located within the unit but in a few instances space has been secured in Landlords areas to connect services from within the unit to the roof top plant space. Access hatches for resetting fire dampers will be from within the Tenant’s demise. The Tenant will be responsible for maintaining the integrity of the fire compartmentation (at slab level). Each unit is generally provided with a 1.5m x 1m (internal dimension) opening, the positions of which are shown on the leasing plans. The Tenant must ensure that their design team checks the final dimensions for each unit as these may be varied during construction. Should this route pass through another’s’ demise at first floor level, this riser will be a fully enclosed riser, by Princesshay. The riser will be a two hour protected shaft and as such forms part of the fire compartmentation of the building and should not be compromised. The roof opening will be fitted with a temporary cover, which must be replaced with a permanent cover once the Tenant installation is complete. The Tenant is responsible for the integrity of compartmentation of risers within their demise whether by forming a protected shaft or compartmentalising at intermediate floor levels. WP VG Issue 8 Jan 15 26 5.0 – TECHNICAL DESIGN Temporary covers to risers shall be maintained by the Tenant. The Tenant is responsible for providing a permanent weather tight covering to all service risers belonging to their unit to the satisfaction of Princesshay, in accordance with an approved detail, once their mechanical and electrical installations are complete. The Tenant shall also be responsible for providing a permanent weather tight covering to any risers provided for their use within their demise, which they do not require. Access to the risers will generally be from within the Tenant’s demise. 5.11.5 Landlords Services within Units Connection is not to be made into any Landlord services except as permitted by the Agreement for Lease. Landlord’s services are not to be altered or used to support Tenant’s services in any area. The Tenant is to provide, as part of his fitting out, permanent provision for access to such Landlord items as rodding eyes, ductwork access panels etc. The Tenant should ensure that reasonable access to all inspection covers and rodding eyes are maintained during and after the fit out works and ensure no waste, rubbish or materials i.e. screeds are placed down drains. Each unit is generally provided with the following services terminated in the service corridor at the rear of the demise:1) 2) 3) 4) 5) 6) 7) 8) Electrical supply. Water supply. Drainage connection. Fire alarm interface. Sprinkler connection. Communications connection. Provision for IT connection. Gas (as defined below). 5.11.6 Gas Supply Gas is available to a limited number of tenants, mainly the A3 catering units. The supply is distributed via pipework to the Tenants plant platform/area and terminated complete with a gas valve and capped end. Each Tenant shall be provided with a pressure of 18.75mbar (7.5wg), at point of termination. The Tenant will be required to apply for an independent gas meter to serve their demise only. The Tenant is to apply to the gas utility company and pay both connection and any infrastructure charges for this new metered supply. No person shall carry out work on gas installations unless competent to do so and registered with the Gas Safe Register. The Tenant will be responsible for extending the gas supply into their demise if required and for purging and testing of the mains after completion of their work. 5.11.7 Foul Water Drainage Generally 100mm diameter drainage connection(s) and vent will be available. Access hatches need to be provided as part of the fit out to all rodding points and connections. WP VG Issue 8 Jan 15 27 5.0 – TECHNICAL DESIGN Retailers shall be responsible for the installation of foul drainage systems within their demise. The Retailers shall protect Landlord’s systems from blockage or damage. Any damage caused shall be made good at the expense of the Retailer in whose unit it originated. All installations and sanitary accommodation shall meet all Building Regulations and Health requirements. Where applicable, the Retailer will be responsible for grease treatment/interception to protect the below ground drainage system. Any grease traps required as part of the fit out shall be above ground or slab level (as applicable), BBA approved and be of the enzyme converter type. A management regime is required to support this type of installation. No push fit installations are permitted. 5.11.8 Water Supply Each unit will have a cold water service connection (generally 28mm). Retailers shall be responsible for installation of a water distribution system from the metered connection and within their demise. All water connections/pipework must be installed/completed in copper, not plastic and no push fit connections will be permitted. Water distribution installations by the Retailers must be in accordance with the water utility company’s requirements, the Water Regulations and the relevant British Standards. All Domestic Services pipework and fittings fitted within a tenancy shall be chlorinated by the Retailer in accordance with BS6700 and Health and Safety guidance note ACOPL8 and MSE(G) (Prevention or Control of Legionella). No push fit installations are permitted. 5.11.9 Sprinklers The Retailer shall install a sprinkler system within their demise from a connection provided by the Landlord. All sprinkler contractors are to either be Certified or Registered to Loss Prevention Standard (LPS) 1048 and be ISO 9001 Quality Assurance certified. The installation must comply with the LPC regulations and the BS 5306 Part 2 Ordinary Hazard Group III. Please note the Landlord’s areas are generally designed to meet BS 5306 Part 2 Ordinary Hazard Group III. The installation of the sprinkler is to be completed and approved before combustible materials are delivered to the unit. The Retailer must provide all relevant test certificates prior to connection onto the Landlord’s system. WP VG Issue 8 Jan 15 28 5.0 – TECHNICAL DESIGN Charging up of shop unit sprinkler installation is to be carried out under the supervision of the Landlord/Centre Management and following notice is advance of this date. The Fire Officer must be notified. Under no circumstances is the Retailer to operate the isolating valve located in the corridor. The Retailer shall employ the Landlord’s sprinkler specialist to provide the necessary attendance during the ‘charging up’ of the shop unit sprinkler installation. Sprinkler supplies to shop units will incorporate a monitored stop valve. Each Retailer shall install a water flow switch with pumped zone check after the stop valve, connected into the retail unit interface box, so that the fire alarm system will know the location of an activated sprinkler system. The Retailer shall be responsible for installing a test point drain facility within their demise. Certain units in the original centre will require new stop valves to be installed as above, due to the inaccessibility of the existing valves above mall ceilings. Quick response sprinkler heads shall be utilised, therefore concealed heads must not be used. Flexible rapid type drop connectors must not be used. All second fix pipework to comprise rigid construction. The Retailer is encouraged to integrate the range pipework within the fitting-out and to minimise the amount of exposed pipework visible in retail areas. This is particularly relevant to void areas behind the shopfront and under open plan staircases. Dry sprinkler heads must be provided to all cold storage areas. The method(s) of storage, storage heights, and types of goods stored affect the capability of a sprinkler system to control or extinguish a fire. Therefore it is important to ensure that the storage heights do not exceed the limitations imposed by the system design. The maximum storage heights should be clearly indicated on the sprinkler installation drawings. If you are in any doubt or cannot easily access this information you should seek confirmation from the Landlords insurers. In addition, please note that a clear space of 500mm is to be maintained below the sprinkler deflector plates. Obstructions that interfere with the discharge pattern of sprinklers will adversely affect the system’s performance and its capability to control a developing fire. This may not be achieved if appropriate clearances are not maintained. The clear space requirement therefore takes precedence over any storage height limitations which apply. If ceiling heights are restricted, it may be necessary to reduce heights to below the permitted maximums as specified by the system design, in order to achieve the required clear space. Goods stored too close to sprinklers are a major cause of mechanical damage, the consequences of which would be costly repairs; loss of essential fire protection whilst repairs are completed; severe business disruption; significant water damage to buildings and contents. 5.11.10 Electrical For new shell units with no existing meter, it is the Retailer’s responsibility to apply for both the electrical connection and a metered supply. The application for an electricity supply must be made to SSE Power Distribution using their Electricity Connection Request form. WP VG Issue 8 Jan 15 29 5.0 – TECHNICAL DESIGN Retailers taking over existing metered supplies should apply to their preferred electricity shipper for supply. Retailer’s installation to include mains distribution and switchgear fed from the main incoming supply isolator, comprising of all circuit wiring, switching, lighting and any specialist equipment required. All Retailer’s electrical installations will comply with: NICEIC Regulations BS 7671 Health and Safety at Work Act Current Building Regulations All cabling shall be carried out in low smoke and fume rated cabling. Flying leads greater than one meter will not be permitted. All cabling must be contained in: Conduit (metal) or Trunking or Tray (metal) with cabling supported at a suitable pitch. 5.11.11 Lighting Exciting and inspirational lighting design is encouraged. Comply with CIBSE Guide, Codes of Practice and Document L of the Building Regulations. No naked fluorescent or cold cathode tubes will be allowed in the mall without prior approval from the Landlord. Lighting for halo illumination and coving should be continuous, even and concealed. Projections will be permitted as long as no visual disturbance is caused. Lighting to units should be between 200 and 1400 lux in shop display windows and 1000 1400 at entrance. Sufficient lighting to be incorporated for safety purposes for out of hours use. Emergency lighting will comply with BS 5266, Part 1, Category M/2 to provide maintained emergency lighting for 2 hour duration. 5.11.12 Fire Exit Signage The Tenant is required to install signs with graphics in accordance with Council Directive 92/58/EEC and incorporate the word ‘Fire Exit’. 5.11.13 Fire Alarms A defined cause and affect strategy will be adhered to by all fire and life protection installations within the Centre. The Landlord provides a dedicated fire alarm interface point (FAI) at the rear of each Retailers unit for connection of Retailers stand alone systems. WP VG Issue 8 Jan 15 30 5.0 – TECHNICAL DESIGN The Retailers fire alarm system will be fully compatible with the Landlord’s fire alarm system and will provide and receive controlling inputs and outputs from the Landlord’s FAI as follows:Outputs from Landlords FAI to Retailers panel 1) Silence Retailers fire alarm sounds. Inputs to Landlords FAI from Retailers panel 1) Retailers fire alarm system fault 2) Retailers fire alarm system alarm The Retailer will install fire rated interface cabling at a position adjacent the Landlord’s FAI and will employ the Landlord’s fire alarm system specialist to terminate and configure final connections onto the Landlord’s system. It will be the responsibility of each Retailer to extend the Landlord’s voice evacuation systems (VES) within their demise complying fully with the following British Standards: BS 5839: Part 1 1988 Fire Detection and Alarm Systems for Buildings. BS 6259: 1982 Code of Practice for Planning and Installation of Sound Systems. BS 7443: 1991 Specification for Sound Systems for Emergency Purposes. BS 9999: Code of Practice for Fire Safety in the Design, Management and use of Buildings. British Fire Protection Code of Practice for the Design, Installation and System Association Servicing of Voice Evacuation Systems Associated with Fire Detection Systems. The Retailer’s voice evacuation systems (VES) will achieve a minimum sound pressure level of 10dB above typical ambient noise level of 65dB. The Retailer will provide automatic shut down to noise generating equipment, such as music systems, upon the broadcast of VES messages. The Landlord provides a dedicated VES interface at the rear of each Retailers unit for connection of Retailers systems. The voice evacuation system will be fully compatible with the Landlord’s voice evacuation system. The Retailer will install twin fire rated VES speaker circuit cabling to a position adjacent the Landlord’s VES interface unit and will employ the Landlord’s VES specialist to terminate final connections onto the Landlord’s system. Provide a zoned diagram or floor plan adjacent to the fire alarm panel. The Tenant’s fire alarm panel will incorporate a non latching relay allowing remote operation of the Tenant’s alarm/xenon circuits from the Landlord’s system. Approved Fire Alarm Panel Suppliers: Protec Chubb Notifier by Trinity Cerberous Gent Ltd WP VG Issue 8 Jan 15 31 5.0 – TECHNICAL DESIGN 5.11.14 Alarms and Tenant Active System (TAS) Security alarms are not provided by the Landlord. However, if the Tenant installs a security alarm (subject to Landlord consent), the sounder box must be located within his demise. External alarm boxes will not be permitted unless required by the Tenant for insurance purposes and agreed in writing with the RFM. In this instance, locations adjacent to service/delivery doors may be considered, however, proof of the requirement and the exact location of the box should be submitted to the Retail Delivery Manager for approval and must be clearly shown on any application for planning consent. Tenant Active Systems (TAS) TAS is installed throughout the centre as a quick and effective means of communicating between centre management and retailers. It enables: Staff to call Control Room in an emergency to respond to a personal attack or shop theft. Messages to be sent to an individual occupier, group, or to all occupiers simultaneously. Centre Management to inform occupiers of forthcoming events or activities. Emergency situations to be communicated rapidly and effectively. 5.11.15 Smoke Control Princesshay will provide smoke control for certain non-public areas of the development. The design of such measurers does not simply follow the recommendations of BS 5588 Part 10 and variations have been agreed with the Local Authority as part of the fire strategy. The Tenant is required to incorporate any smoke control provision within the design of their demise that may be required by the Local Authority. Demises with specific Princesshay requirements are identified on the tenancy plans. No Units should permit the smoke to be discharged into service corridors or other means of escape. 5.11.16 Lightning Protection Princesshay is protected by a lightning protection system in accordance with BS 6651, comprising a network of aluminium tape at roof level with connections to earth via the building structure and pile support system. The Tenant is required to connect any external plant to the Princesshay structure or plant screen. In accordance with BS 6651 1992 Code of Practice for protection of structures against lightning connected to the Landlord’s system via a proprietary detail cast into a supporting concrete stub. 5.11.17 Communications The public address system is a high integrity general-purpose type, which is also used in conjunction with the fire alarm system for zoned evacuation announcements. The system is capable of providing speech announcement. The public address/voice alarm system shall comply with BS 5839 Part 8 BS EN 54. WP VG Issue 8 Jan 15 32 5.0 – TECHNICAL DESIGN The Tenant will be required to contact their preferred telecoms service provider to arrange all necessary installations and connections. 5.11.18 TV/FM System Individual external aerials and satellite dishes will not be permitted. 5.11.19 Wi-Fi Where Tenant’s wish to use wireless technology they shall submit the details to the RDM. The RDM will allocate a band to the Tenant to ensure that the Tenant’s equipment does not interfere with any other Landlord or Tenant wireless equipment. Wireless equipment that has not been approved, and causes interference to either the Landlord or other Tenant’s shall be disconnected. 5.11.20 External Services by the Tenant Tenant’s services where outside the demised area will be required to be finished to a high standard, as follows: Un-insulated ductwork – galvanised sheet steel. Insulated ductwork – hammer clad aluminium to provide protection against mechanical damage. Un-insulated pipework – painted to BS 1710 base colour. Insulated pipework – hammer clad aluminium to provide protection against mechanical damage. 5.11.21 Food Operator Kitchen Requirements Fire Supressant Systems An ‘Ansul’ type LPS approved fire suppression system must be fitted to all kitchen ranges. Additionally misting systems that are LPS approved such as “Hydramist” can be used. Tenant Kitchen Ventilation Systems To minimise the risk of kitchen-related fires and in compliance with the recommendations of the Insurers, the Landlord at their discretion may choose to engage ‘Extract Awair’ http://www.extract-awair.com/ to carry out a review of the kitchen extract proposals and inspect the installation during and at completion. There is a fee associated with this work chargeable to the Tenant, currently set at £1000.00 + VAT. The Tenant will be made aware of the intention to engage Extract Awair at the initial briefing. It should be noted that the recommendations produced by the review and inspections will be required to be adopted by the Tenant The Tenant shall design and install a kitchen extract system compliant with HVCA Kitchen Ventilation System Specification DW172. Tenant installed kitchen extract ductwork shall be provided with good access for cleaning at a maximum spacing of 3 metres between access points and at every change of direction. The exhaust system serving the Tenant demise shall be designed and commissioned to ensure the restaurant as a whole is under a negative pressure, and allow for make up air rate of 85%, of the exhaust quantity to prevent migration of odours and/or heat to other premises or to public areas. WP VG Issue 8 Jan 15 33 5.0 – TECHNICAL DESIGN Canopy grease filters shall comply with LPS 1263, as required within HVCA Specification for Kitchen Ventilation Systems DW172, and be of non combustible construction. The extract fan shall be located at roof level to ensure the extract system is under a negative pressure; filtration plant shall be located within the Tenant’s demise, either within or after the hood. The Tenant shall install an Ultra Violet technology system, positioned in the restaurant unit/kitchen extract/hood(s), to cover and serve all odour and/or grease producing appliances. Two types of Tenant filtration plant are acceptable; a three stage filtration system from Halton called a Pollustop Ecology unit, and an electrostatic precipitator filtration system (with UV) from Sirius called ESP. The Halton system shall consist of a three stage filtration system to reduce airborne particulate (smoke) to minimum 0,3micron size. The filters shall be designed to remove cooking odours, smoke and grease from the discharge air and be supplied, installed and maintained by the Tenant. The filtration system shall include pre-filter (bag), HEPA filtration to 0.3 microns, and NFX Carbon filter to adsorb any residual ozone. The system shall be designed to ensure the discharge level of ozone does not exceed 0.06ppm as recommended by ‘The World Health Organisation.’ The Sirius ESP system shall consist of a unit with a series of cylindrical anode collection tubes each enclosing a central charging cathode rod, without charged ‘dead spots’ and designed for high capture efficiency in wet, oily, smoke laden and humid cooking conditions. The Ultraviolet odour control unit shall be fitted within the Tenant’s demise, positioned in the restaurant unit/kitchen extract/hood(s), to cover and serve all odour and/or grease producing appliances. Variable ozone generation shall be used to limit ozone production when odour production and cooking activity are low, to ensure that no more than 0.06ppm (parts per million) is present at discharge at all times. These filtration systems shall report filter life status via SMS and/or GSM connection, and shut down the extract fan if filter overload warning is ignored. Tenants plant shall not exceed specified noise limits for the site and local authority limitations. Drawings of the ductwork, UV system and wiring schematic illustrating the interlock system must be submitted to the Landlord or his representative for approval. Tenant extract ductwork shall be high-pressure to DW144 class C standard throughout. Extract ductwork shall also be ‘grease tight’ and where waterwash hoods are used, or extract provided from steam-laden extract air from dishwashers, ductwork shall be to DW172 requirements. The control system shall incorporate: Interface control panel UV control panel UV healthy/maintenance required interlock Extract fan interlock on/off switch interface Cooking range power/main gas solenoid interlock Emergency knock off button/interlock Fire alarm and interlock Fire suppression interlock Landlord’s Controls/BMS interlocks Make up air interlock The performance of the Tenants Ultra Violet technology and Three Stage Filter system must be sufficient to: WP VG Issue 8 Jan 15 34 5.0 – TECHNICAL DESIGN (i) Substantially reduce all cooking smells generated by Tenant's cooking appliances. Prevent the migration of odours, smoke and/or convected heat from the Tenant's demise. Prevent the passage of grease into the Tenant's and Landlord's ductwork. Prevent residual ozone, above 0.06 ppm escaping to atmosphere. Kitchen Canopy/Hood Fire Protection The exhaust hood and system shall be protected by an approved automatic fire detection and suppression system installed in accordance with the requirements of the LPC and the Landlord's property insurers. (ii) Where wood-fired bakery ovens, barbecues fired with charcoal or wood, and water heaters fired with biomass are provided as part of the kitchen fit out, a smoke, grease and soot filtering and spark arrestor system shall be provided. The system shall be an extract hood cold water mist / water wash based system located directly at the point of extract from the source within the extract hood. It shall be fitted with automatic water flow control to minimise water consumption when not required. A Carbon Monoxide sensing system shall be installed in the kitchen/restaurant space local to the charcoal/wood/biomass fired equipment. This sensing system shall enable the ventilation system in the space, to ensure that no build-up of carbon monoxide gases occurs during unoccupied (and occupied) periods. (iii) Kitchen Interlock Controls The system shall be configured so that should the extract fan or a UV lamp fail then the gas/cooking supply shall be disabled. The control system shall be interfaced with the fire alarm. The UV unit lamps shall be monitored for failure and interlocked with the cooking supply/gas solenoid so that if the operating efficiency of the UV lamps drop by 10% the gas or electric supply will shut down and remain isolated until the system is returned to 100% efficiency. A notice period of not more than 24 hours (cooking time) shall be permitted between UV failure and supply shut down for repairs. A minimum 30% redundancy in the number of lamps is recommended. A differential pressure switch or similar approved, across the Tenant's extract fan shall be interlocked with the cooking supply/ gas main supply solenoid valves so that the supply remains off when the extract fan is not operating. The interface panel and the motor control panel shall be interlocked with the fire alarm such that in the event of a fire alarm signal all plant shuts down. A differential pressure switch shall be installed across the ecology unit which shall be interlocked with the main gas solenoid valve, or the electrical supply so that the gas/electric supply remains off when the ecology unit is not operating. (iv) Maintenance Requirements Maintenance requirements are subject to the intensity of use and type of cooking & therefore frequency of cleaning and filter replacement shall be adjusted to suit. The Tenant shall ensure the following minimum levels of maintenance are adhered to: Canopy Grease filters – Daily check/clean Canopy UV equipment - quarterly clean, replace lamps after 8000 hours of operation WP VG Issue 8 Jan 15 35 5.0 – TECHNICAL DESIGN Pre- filter (Bag) - quaterly clean or when remote monitoring indicates dirty filter HEPA filter – Change 6 monthly or when indicated as dirty via the monitoring system Carbon Filter – Change annually or when indicated as dirty via the monitoring system Ductwork – visual inspection quarterly. Clean annually unless required more frequently as a result of quarterly inspections. Note, where high levels of grease, smoke and soot are produced from the cooking process, inspection and cleaning levels shall be increased accordingly to mitigate any risks of fires in the ductwork system, both upstream and downstream of the filtration equipment. Build-up of deposits in extract ductwork shall not exceed 200 microns. Tenant shall provide the Landlord a maintenance report on a quarterly basis detailing checks undertaken, defects noted and works carried out. The report shall note the differential pressures across the filtration systems and compare against manufacturer’s recommended operating and maximum levels. Maintenance checks and cleaning / replacement of filters shall be increased as necessary to ensure odour control system works effectively. The Tenant shall provide a run on timer facility for the kitchen extract fan, variable between 0 and 30 minutes, to allow the extract fan to run on in the event of a fire alarm activation and plant shut down within the unit. The kitchen extract fan shall also be provided with a fireman’s override switch for ‘Hand, Off, Auto’, located adjacent to the Tenant’s fire alarm panel. This shall be presented to the local Building Control to ensure they are in agreement WP VG Issue 8 Jan 15 36 6.0 – FIT OUT 6.1 GENERALLY This section applies primarily to the implementation stage of the fit out and will be of particular relevance to the Principle Contractor and all parties involved in the site phase. Due to the ongoing operational function of the shopping centre it is crucial that the fit out work takes place in accordance with the Princesshay requirements set out in this section and any failure to comply with the requirements may result in the suspension of work. Whilst this section sets out the primary areas of concern, discussion at the Pre-Start Meeting will enable further evaluation of requirements to suit individual needs. 6.1.1 Contractors Site Team Contact Details Contact details will need to be issued by the Retailer prior to commencing work on site noting 24 hour contact details for the following: Principle Contractor Foreman Principle Contractor Contracts Manager Appointed First Aid Person On-Site CDM Co-ordinator Building Control The following must be displayed on the rear door of the unit the during the shop fitting works: 6.1.2 Retailers trading name Retail unit number Name and address of shop fitting Contractor Contact details noted above F10 Notification if appropriate Condition Survey Prior to commencing any work on site the Retailer will be responsible for ensuring a photographic Schedule of Condition is undertaken of all areas with particular regard to back of house (service corridors and agreed compound areas), front of house (shopfront, pilasters, fascia and the like), roof areas and any riser access points as a minimum. Any subsequent damage to these areas not identified within the photographs will be the responsibility of the Retailer and if not attended to will be deducted from the held deposits. 6.1.3 Site Rules As a minimum the following will need to be in place: WP VG Issue 8 Jan 15 All Contractors to wear identity passes at all times. Appropriate PPE must be worn at all times both within the unit and common areas including service yard and corridors although PPE must be removed prior to entering the public mall areas. No radios, cd players or personal stereos will be permitted on site. No smoking is allowed anywhere on the site. Any evidence of alcohol or non-prescription drug consumption will result in removal from the site. All plant and machinery must have suitable records to demonstrate current testing and maintenance. No explosive, flammable or dangerous materials will be permitted without prior agreement from the Centre Management. No materials are to be discharged into the drainage systems. 37 6.0 – FIT OUT 6.1.4 Existing Services It is the Retailers responsibility to establish any existing services supplies available and make necessary arrangements for permanent connections and/or any temporary supplies. The Landlord will not provide any temporary services for the purposes of fitting out. 6.1.5 Insurances We would like to explain our philosophy for tenant’s fit outs so that you are able to make the best decisions when you engage a contractor to work on your premises. Princesshay does include the tenant’s interests in the buildings insurance for your demise but it is not prepared to extend the insurance to your contractors. Therefore, if your contractors negligently cause damage to our buildings, they will need to rely on their own third party insurance to pay the damages. Princesshay have made this decision as we believe it is in the interests of all our tenants as they do not want to pay more for insurance resulting from poor claims experience caused by negligence of contractors. The important consequence of this information is that when a tenant is engaging in a fit out contract, they must make sure the contractor remains responsible for damage to the existing structure. For example, it is not appropriate for a tenant to enter into a contract that makes the tenant as employer responsible for arranging insurance on the existing structure. The tenant does not control the insurance (as per the terms of the lease), so it is not able to fulfil this part of the contract. There are alternative contractual arrangements for insurance that make the contractor responsible for negligent acts that damage the existing structure, which is to be backed off with its public liability insurance. Tenants are prevented by the terms of the lease from taking out insurance for the existing structures. It follows they may be at risk if they agreed with any tenant fit out contractor that the tenant would take out such insurance. Tenants should be aware that any tenant's fit out contractor will not be named or noted on the Landlord's buildings insurance, nor will any tenant's fit out contractor be given a waiver of subrogation by the insurer under that insurance. Tenants should ensure that adequate public liability insurance is taken out and maintained by the tenant and/or any tenant's fit out contractor, following consideration of matters including the potential loss or damage to the existing structures, potential damages from other tenants in the property etc. Princesshay will require evidence of the Contractors Public Liability insurance at least £10m limit of indemnity for each and every claim but you need to realise that your risk may be greater than that. In certain circumstances Princesshay’ insurers are prepared to grant the tenant’s contractors a waiver of subrogation above £50m in respect of damage to the buildings by a specified peril (as defined in JCT contracts). If the tenant would like this consideration for their contractors, the contractor needs to provide evidence of insurance up to a minimum level of £50m. WP VG Issue 8 Jan 15 38 6.0 – FIT OUT Tenants should consider whether any other appropriate insurance, for example nonnegligent liability insurance, should be taken out by the tenant and/or any tenant's fit out contractor. If Princesshay or its insurer of the existing structures has any requirements in connection with the insurance in connection with tenant's fit out, the tenants and/or their fit out contractors will need to comply with the requirements. We know how important it is to all our tenants to keep insurance costs to a minimum and we firmly believe this course of action is the best way of achieving this. After all, you do not want to hear that the building insurance costs have risen sharply as a result of another tenant’s contractors causing significant damage to a building owned by Princesshay. 6.1.6 Retailer Responsibilities The Retailer is responsible for ensuring their fit out works are carried out to the satisfaction of the Centre Management Team and they comply with the approved information in addition to all other statutory requirements. The Centre Management reserves the right to inspect the works at any time and works may be suspended if any contraventions of the approved designs, site rules, codes of practice or Health and Safety requirements are found. Work will not be allowed to recommence until the Centre Management have been satisfied that compliance is or will be forthcoming. 6.2 ROAD ACCESS The service basement is accessed from Paris Street via a two-lane service ramp. The service yard floor has a power float finish/brush concrete finish. Ramp to the service access basement; stiff brush, v-structural column positions within the pattern yard area are located to allow specific vehicle parking movements. The service ramp and basement are constructed to carry slow moving heavy goods vehicles in accordance with ‘volume 7 of the Department of Transport Design Manual for Roads and Bridges’. Further access to blocks Units LS9 and SU46 is available via Chapel Street. Access via the pedestrianised streets within the development will be strictly controlled by the centre management in conjunction with Exeter City Council. 6.3 DELIVERIES/WASTE MANAGEMENT All loading bays are at basement level. Material and plant deliveries are to be notified to the Centre Management in advance to allow co-ordination as appropriate. There is no provision for storage of materials or plant outside of the unit and deliveries will need to be co-ordinated by the Retailer/Principle Contractor. Space will be allocated for a skip, to be provided by the Principle Contractor, where possible and this must utilise an enclosed unit. Any refuse, surplus material left outside of the unit and not removed by the Principle Contractor will be removed by the Centre Management with costs deducted from the deposits. WP VG Issue 8 Jan 15 39 6.0 – FIT OUT The Centre has a policy of recycling all disposable materials with a minimum amount going to landfill and Retailers are expected to comply with this strategy in order to minimise the waste going in to landfill. Evidence of a Site Waste Management Plan will be requested where this is required under the Site Waste Management Plan Regulations 2008. All Tenants shall have access to shared unloading areas for goods delivery via Princesshay lift and service corridor to either the Ground or First levels of the retail unit. These deliveries must be booked in 48 hours prior to delivery (refer to Operations Manager). Any High Street deliveries need to be arranged in the first instance with Exeter Highways authority. Pallet trucks are permitted for use only with pneumatic wheels. 6.4 SERVICE LIFTS Service lifts are rated up to 2,000kg (evenly distributed loads). Lift capacity is provided to allow the Tenant to move goods between his unit and the service yard only. The Tenant will not be permitted to double handle goods via the Princesshay lifts in order to distribute them throughout the levels of the Retail Unit. The Tenant may use lift lobby areas to temporarily store goods whilst moving them through Princesshay in relay but service corridors are to be kept free. Goods lifts may be locked off from the service yard level for a period at night as a security measure. 6.5 ENVIRONMENTAL CONSTRAINTS Fitting out contractors must recognise in all their operations that Princesshay is located in an environmentally sensitive city centre and as such due consideration needs to be exercised. The following factors are all particularly relevant and need to be taken into account in ensuring that suitable working methods are adopted: 1) 2) 3) 4) 5) 6) 7) 8) High Street Trading. Farmers Market. United Reform Church. Local Offices and Businesses. Parking is not allowed on the roads around the development. City Wall Ancient Monument. Pedestrian Access. Local Residencies. Shopfitting Contractors must comply with all environmental requirements of Exeter City Council and it should also be noted that these may be subject to change. Vibration effects of any work in the development must not give rise to ppv in excess of 3mm/s on any adjoining existing structures. Dust monitoring equipment will be in operation and all measures necessary will be put into effect by the fitting out contractor to limit the generation of dust as a result of their shopfitting activities. 6.6 CONTRACTORS PERMIT TO WORK In the interest of Health and Safety, permits to work will be issued by the Princesshay Management Team and/or RDM when appropriate. WP VG Issue 8 Jan 15 40 6.0 – FIT OUT A permit to work will be required in the following circumstances: Contractors requiring access to the roof of a building under the Landlord’s control, for example, to service air conditioning plant. Works likely to affect the fire alarm, shop alert or sprinkler systems. This can include soldering, brazing or welding; painting, especially with sprays; use of blowlamps; any works likely to cause dust. This list is not exhaustive. Works likely to affect the main drainage system of Princesshay. Works likely to affect the Landlord’s electricity supply to Princesshay. Princesshay operates a strict system of permits to work/access for the following operations/areas: Access to Risers Hot Works Outside the unit demise located within Princesshay corridors. Special permission is required to carry out any hot works anywhere on site. Out of Hour Working Permission is required to carry out any works (including deliveries) outside trading hours. For a permit to work application for the above, please contact the Princesshay management team and refer to Appendix F. Applications are to be submitted forty-eight hours in advance. The Tenants shopfitter is still required to operate his permit to work system within the demise. The Princesshay Management Team must be notified of any internal hot works permit issued, in order that Princesshay is aware of any associated risk. A roof inspection will be carried out by Princesshay and the Tenant prior to works commencing, and following the completion of all the Tenant roof works. Materials are not permitted to be stored on the roof. 6.7 SITE WORKING HOURS The core trading hours are:Monday to Saturday Sunday - 09.00 to 18.00hrs 10.30 to 16.30hrs Out of hours work will be permitted only with prior written approval from the Princesshay Management Team. Application must be made by submitting the out of hours work application to the RDM. Noisy works may be allowed to commence between the hours of 18.00hrs and 22.00hrs but will be subject to management approval. 6.8 WELFARE No welfare facilities are available. The Tenants shopfitter should therefore provide any facilities they deem necessary. 6.9 FIRE EVACUATION To comply with the Princesshay Centre Management Health Policy all shopfitters must provide a Nominated Fire Warden and Assistant Fire Warden(s) who will be responsible for collation of personnel names/numbers in the event of an emergency and/or incident on site. We enclose a drawing showing intended contractor assembly points for the various areas. We propose Foremen be appointed as Fire Wardens for ease of personnel checks. WP VG Issue 8 Jan 15 41 6.0 – FIT OUT It is essential that an Assistant to the Fire Warden be appointed in case of absence, holiday, etc. procedures: 6.10 Maintain an updated list of all employee numbers and names on a daily basis. In the event of a fire, all personnel must evacuate the building following Fire Exit signage provided and assemble at the Assembly Points indicated on the plan within Appendix ?. At the relevant assembly point, the Fire Warden collates the names of each operative, subcontractor and visitor. Under no circumstance is anyone to return to their place of work until PMT gives their management approval for their operatives to return to work. When the Centre Managements Fire Marshall visits the fire point, the Warden should be standing next to the fire muster point and make himself/herself known. Once met he/she should report any missing persons. If there are missing persons, their last known location should also be given. Where possible provide details of any hazards local to the fire and fire location. The Centre management Fire Marshall’s will be identified by his/hers signage. PARKING Parking is not available on site and the Tenant should make separate arrangements. 6.11 HOARDING The general requirements for hoardings are: WP VG Issue 8 Jan 15 Projection of no more than 1 metre from the shopfront line, taking care not to block any neighbouring unit visibility lines and avoiding damage to the Landlord’s pilasters. 1 hour fire resistant hoarding with Class 0 surface spread of flame on both sides incorporating an FD60 Emergency Escape Door with vision panel (covered during the day but visible out of hours). The door to be used only as an emergency exit. The mall side to receive a black painted finish with a 150mm skirting with vertical corners/edges clearly identified. Lifestyle graphics are preferred incorporating the date of opening (designs to be agreed with Centre Management). No other signage is to be allowed. Hoarding is to be erected out of hours by prior agreement with the Centre Management and any alterations will also need to take place out of hours. Alterations and/or removal will not be allowed until the sprinkler installation has been installed and commissioned and full removal of the hoarding will not be allowed until, as a minimum, the shopfront has been installed together with operational sprinklers. 42 7.0 – COMMISSIONING 7.1 CHARGES All Retailers must pay the connection charges for connecting their engineering services into the Landlord’s systems (sprinklers – Tyco, fire alarm –Trinity). The Landlord’s specialist Contractors who will undertake the works should be contacted at the earliest opportunity to confirm connection charges and programmes of works for their individual units. 7.2 FIRE ALARM CONNECTION PROCEDURE The Landlords fire alarm systems have been installed by Trinity and connection to the Landlords systems can only be made by them to prevent potential corruption of the system. Note: It is advisable for the sprinkler and fire alarm connections to be carried out by the specialist Contractors at the same time on the same day. Retailers must manage these timings themselves. 1) Retailer to provide the correct trading name two weeks prior to testing to enable the front end graphics to be amended. 2) Trinity to test Retailer cables for earth and continuity. 3) Trinity to connect Retailers cables to the Landlords interface. 4) Trinity tests/witnesses fire and fault signals to the security room. 5) Trinity/Tyco tests/witnesses the sprinkler alarm and isolate signal to the security room. 6) All actions above will have to occur prior to the Retailer being allowed to open for trade. Note: It is the Retailer’s responsibility to ensure that the system installed within the retail unit is compatible with the Landlord’s system. Failure to meet the compatibility requirements may result in a delay in opening of the retail unit and additional costs associated with abortive commissioning visits. Unauthorised connection to the Landlord’s system may result in damage to the Landlord’s system. Any costs associated with damage caused by unauthorised connection will be charged to the Retailer. 7.3 SPRINKLER CONNECTION PROCEDURE The Landlords sprinkler system has been installed by Tyco and includes a monitored isolating valve and zone check flow switch for units less than 800m2 and a monitored isolating valve for units greater than 800m2. Connections to the Landlords system can only be made by Tyco. 1) Sprinkler installation completed within unit demise. The Retailer’s installation is NOT to be connected to the Landlord’s system without authorisation from Centre Management. 2) Retailer Sprinkler Contractor carries out Hydraulic test on installation to at least 15 bar for at least 1 hour. 3) Retailers Sprinkler Contractor completes application for connection form and submits to Tyco together with: Confirmation that payment for connection has been issued. LPCB LPS 1048 Certificate of Conformity. Sprinkler system Hydraulic test certificate. Provides evidence, issued by the Retailer’s insurer, confirming the installation has been approved and is acceptable to the insurer. Note: Copies of the above certificates are to be issued to the Retail Delivery Surveyor. 1) Retailers Sprinkler Contractor back-fills sprinkler system against closed Landlord’s monitored isolating valve to a water pressure of 10 bar. WP VG Issue 8 Jan 15 43 7.0 – COMMISSIONING 2) Retailer Sprinkler Contractor co-ordinates with Tyco to open the retail unit’s isolating valve on a date to be mutually agreed. The Retailers Sprinkler Contractor is to be in attendance. It remains the Retailer’s responsibility to manage the opening of the valve. The Retailer is to ensure adequate notification is given to the landlord/Centre Management on what date the valve is to be opened (so the fire alarm interface can be taken “off watch” to prevent false alarm). 3) Tyco issues certificate confirming Retailer is connected to the Landlords system and the valves are open. Note: Specialist certificate to form part of the R4 submission. 7.4 COLD WATER CONNECTION PROCEDURE 1) Retailer completes Domestic Water Supply installation within unit demise to a standard compliant with all water supply regulation and South West Water Authority requirements. 2) Retailer chlorinates system inside retail unit. 3) Retailer submits the following to Centre Management: Certification confirming pipework is sound and free from leaks. Certification confirming Retailer’s system has been chlorinated in accordance with BS 6700:2006. Issues certificate confirming installation conforms to all water supply ByLaws. Takes reading of water meter and issues reading to Retail Delivery Team. 4) Retailer demonstrates to Centre Management location of non-return valve. 5) Upon receipt of authorisation, Retailer connects internal pipe work to main supply system and turns on water supply. It is the Retailer’s responsibility to ensure all taps and valves within the unit are closed or off to ensure no flooding occurs. 7.5 FOUL DRAINAGE CONNECTION PROCEDURE 1) Retailer completes foul drainage installation within retail unit, undertakes air test and ensures this is witnessed by Building Control Officer. Test is to cover all pipework from top of stack through to lowest cleaning/rodding point. 2) Retailer provides a certificate to Centre Management confirming the installation is complete and has been witnessed by Building Control prior to connection to the landlords system. WP VG Issue 8 Jan 15 44 8.1 – CONSENT TO TRADE The unit will not be allowed to open for trade without a ‘Consent to Trade’ form signed off by the Retail Delivery Team confirming receipt of the necessary documentation. This should be submitted at least 5 working days prior to the anticipated store opening date. Within 28 days from the store opening the Retailer is to provide 1 hard copy set of all as built information toether with 3 full electronic versions on CD to be issued to the Retail Delivery Manager. This is to incorporate:1) 2) 3) 4) 5) WP VG Issue 8 Jan 15 As built drawings (dwg/pdf formats) Health & Safety File Operational and Maintenance Manuals Test & commissioning certificates Statutory approvals 45