Field Study: Nablus CBD City 2 3 Building traffic database for Nablus CBD city (using GIS program) Traffic Analysis (Capacity and level of service) at intersections Achieving a comparison between two volume counts (Before Tunnel (BT) & After Tunnel (AT) ) Attempting to connect HCS with GIS program automatically 4 Building Of Database Database may be defined as data collection that stored in computer or in other forms that enables the users to use these data when they needed; as in GIS program in this project. 6 Scope of the Project • First Step: Studying the available data • Second Step: Using AutoCAD maps in planning • Third Step: Manual Counting at several intersections before opening the tunnel (BT) • Fourth Step: Manual Counting at several intersections after opening the tunnel (AT) • Fifth Step: Using Microsoft Office Excel • Sixth Step: Growth factor calculations • Seventh Step: Using Highway Capacity Software (HCS) • Eighth Step: Using Geographic Information System Program (GIS) • Final Step: Using AutoCAD program in presentation 7 Previous Data 8 Traffic Volume Counts (BT & AT) • Manual counts at several intersections in Nablus CBD city. • These counts were done by students in civil engineering department. • The resulting data were arranged and studied well in special forms. • Studying the Variations that were occurred after opening the tunnel • Manual counts at several intersection after opening the tunnel • 42 intersections data are available for analysis Continue to see more… 9 Using Microsoft Office Excel 10 11 Traffic Growth Factor • Calculating Traffic Growth Factor For 2 years of counts. • Result: 13.8% ( in two years of counts) Continue…There are more! 12 Operation Analysis • HCS was used to fulfill the requirements of analysis at the intersections. • The Intersections are as follow: In general: 42 intersections are available BT and AT Signalized Intersections : 11 intersection BT and 12 intersection AT. Unsignalized intersection: 29 intersections AT and 30 intersection BT. Downtown Roundabout. 13 GIS Program… • GIS was used for building database for Nablus CBD city. • The collected data are available now using this program. • The following Figures explain some outputs of GIS: Press Enter To See more ... 14 PHV in Intersections 15 Conclusions • • • • • • • • 16 42 main intersections 114 traffic links The length of traffic network about 11240 m Area of ROW for Nablus CBD city about 162,ooo square meter Total CBD area is about 377,000 square meter The contribution area of ROW =%43 About 71,780 vehicles visited 42 intersections BT About 75,920 vehicles visited 42 intersections AT We really appreciate your time and consideration Thanks for listening to us 17