No. F./DTL/207 /DGM(SO)/11-12/41 Dated : 10.02.2012

Subject : Minutes of the Meeting held on 03.02.2012 at Bawana CCGT for resolving scheduling and other related issues of Bawana CCGT Station

Dear Sir, /

महोदर्

The copy of the Minutes of the Meeting held on 03.02.2012 at Bawana CCGT with regard to

Scheduling and other related issues of Bawana 1500MW CCGT is enclosed for ready reference and further necessary action please.

It is also available in SLDC website www.delhisldc.org

at Meeting Portal.

Thanking you,

भवदीर् / Yours faithfully

Encl. As above

(

वी .

वेणुगोपाल

)/(V. Venugopal )

(

उपमहाप्रबंधक ( एस .

ओ .)/ Dy. G. M. (SO)

List of addresses

1.

Executive Director (T), DTL, Shakti Deep Bldg. Jhandewallan, New Delhi-110055

2.

Executive Director(Engg.), DERC, Viniyamak Bhawan, Shivalik, New Delhi-17

3.

General Manager (O&M), DTL, Parkstreet, 220kV S/Stn.,New Delhi

4.

General Manager, Badarpur Thermal Power Stn., Badarpur, New Delhi-44

5.

General Manager (Commercial), DTL

6.

General Manager, RPH

7.

General Manager, G.T. Station

8.

General Manager, Pragati Station

9.

General Manager, SLDC, Delhi

10.

CWE (Utilities), MES, Delhi Cantt., New Delhi-110010

11.

Executive Director (NR)-I, PGCIL, B-9, Qutab Institutional Area, Katwaria Sarai,

New Delhi-110016

12.

Executive Director (NR)-II, PGCIL, Bhav Plaza, Block No.0B-26, Grid Bhawad, Rail

Head Compled, Jammu-180012

13.

Executive Director (Commercial), PGCIL

14.

Addl. Vice President, System Operation, BSES, Balaji Estate, Kalkaji, New Delhi

15.

Sh. V. K. Gupta, Chief Engineer (SO&C), Punjab SLDC, PSTCL, SLDC Complex,

Near 220kV Grid S/Stn. Ablowal, Patiala, Punjab-147001

16.

Chief Engineer (System Operation), Haryana SLDC, HVPNL, Shakti Bhawan,

Sector-6, Panchkula-130109

17.

Chief Engineer (Electrical-1), NDMC, Palika Kendra, New Delhi-1

18.

Chief Engineer (Electrical -2), NDMC, Palika Kendra, New Delhi -1

19.

Chief Engineer, Haryana Power Procurement Center, Shakti Bhawan, Sector-6,

Panchkula, Haryana, Fax no. 0172-3019169.

20.

Director (Comml.), NDMC, Palika Kendra, New Delhi-1

21.

Sh. Chander Mohan, Vice President & Head (Network Operation), BRPL, BSES

Bhawan Nehru Place, New Delhi-19

22.

Sh. Ajay Kumar, Addl. Vice President (PP&PMG), BRPL, Bldg. No. 20, Nehru

Place, New Delhi-110019

23.

General Manager (PP&CC), NDPL, Corporate Office, 3 rd

Floor, Sub-Station

Building, Hudson Lines, Kingsway Camp, Delhi-110019

24.

Sh. Sunil Kakkar, Addl. Vice President (PMG), BSES Yamuna Power Ltd., Shakti

Kiran Building, Karkardooma, Delhi 110092

25.

Sh. Sanjay Srivastava, AVP (PMG), BRPL, Bldg. No. 20, Nehru Place, New Delhi-

110019

26.

General Manager (Commercial), National Thermal Power Corporation, NTPC NCR

Headquarter, Sector-24, Noida, UP-201301

27.

DGM(SCADA), Delhi SLDC

28.

S.E. M&P Circle, HVPNL, Vidyut Nagar, Hissar, Haryana-125001, (Fax-01662-

223017)

29.

Manager (SO)-Shift, Delhi SLDC

30.

Executive Engineer (SO), NDMC, Minto Road

31.

DGM (Metering and Protection), DTL.,Parkstreet,220kV S/Stn., New Delhi

32.

Dy.G.M. (Finance)-II, DTL

33.

Dy. Manager(F), Comml., DTL, IP Estate, New Delhi-2

34.

Manager (T), EA, SLDC

35.

Dy. Manager (F), SLDC

Copy for favour of kind information to :

1.

Secretary, CERC, Chanderlok Building, Janpath, New Delhi-110001

2.

Secretary, Punjab Electricity Regulatory Commission, SCO:220-221, Sector-31A,

Chandigarh, Fax No.0172-2664758, 2645163, 2602435

3.

Secretary, Haryana Electricity Regulatory Commission, Bay-33-36, Sector-4,

Panchkula-134112, Haryana Fax No. 0172-2582531, 2572359

4.

Secretary, DERC, Viniyamak Bhawan, C-Block, Shivalik, New Delhi-110017

5.

CMD, DTL

6.

CMD, PSTCL, The Mall, Patiala-147001

7.

CMD, PSPCL, The Mall, Patiala-147001

8.

Managing Director, Haryana Vidyut Prasaran Nigam Ltd, Shakti Bhawan, Sector-6,

Panchkula-134109

9.

Member Secretary, NRPC, 18A, Shaheed Jeet Singh Marg, Opp. Katwaria Sarai, New

Delhi-16

10.

Chairperson, New Delhi Municipal Council, Palika Kendra, Sansad Marg, New Delhi

11.

CEO, BSES Rajdhani Power Ltd, BSES Bhawan, Nehru Place, New Delhi-110019

12.

CEO, BSES Yamuna Power Ltd, Shakti Kiran Building, Karkardooma, Delhi-92

13.

Managing Director, NDPL, 33kV Grid S/Stn, Hudson Lane, Kingsway Camp, Delhi-9

14.

Chief Engineer (Utilities),CWE,MES, Kotwali Road, Near Gopi Nath Bazar, Delhi Cantt

New Delhi-110010

15.

Managing Director, Indraprastha Power Generation Company Ltd (Genco) / Pragati

Power Corporation Ltd (PPCL), Himadri, Rajghat Power House, New Delhi-110002

16.

Joint Secretary (Power), GNCTD

17.

Director (T), PPCL, Himadri, Rajghat Power House, New Delhi-110002

18.

Director (F), PPCL, Himadri, Rajghat Power House, New Delhi-110002

19.

CEO, Power System Operation Corporation (POSOCO), B-9, Qutub Institutional Area,

Katwaria Sarai, New Delhi-110016

20.

Director (Operations), DTL

21.

Director (Operation), PGCIL, Saudamini, Plot-2, Sector-29, Near IFFCO Chowk,

Gurgaon, Haryana-122001

22.

Director (Finance), DTL

23.

G.M., NRLDC, 18A, Shaheed Jeet Singh Marg, Opp. Katwaria Sarai, New Delhi-16

1

DELHI TRANSCO LTD.

(Regd. Office : Shakti Sadan, Kotla Road, New Delhi 110002)

[Office of Dy. General Manager (SO)]

SLDC Building, Minto Road, New Delhi – 110 002

Phone No.23221149, Fax 23221012, 23221059

Subject : Minutes of the Meeting held on 03.02.2012 at Bawana CCGT for resolving scheduling and other related issues of Bawana CCGT

Station

Director (Operations), DTL welcomed all delegates and requested for fruitful discussions and decisions to resolve the issues mentioned in the agenda. He mentioned that this is fifth in the series of the meetings held to resolve the issues regarding Bawana CCGT. The earlier meetings were held on 19.08.2010, 08.09.2010,

11.10.2010 and 22.11.2011. It was also mentioned that the 1 st

GT of Bawana CCGT started operation from 04.10.2010, second GT on 09.02.2011 and the Steam Turbine on 03.10.2011. The Gas Turbine Unit-1 was declared under Commercial Operation from 00.00hrs. of 27.12.2011.

He further mentioned that though all most all issues have been settled in earlier meetings, certain minor issues remain unsettled. To settle the unresolved issues, this meeting was especially convened. As per the request of all beneficiaries in the last meeting, the venue was fixed at Bawana CCGT to understand the operating system of the Gas Turbines and the issues involved.

He thanked Director (Technical) and Director (Finance), PPCL/IPGCL to organize the meeting at Bawana CCGT and the arrangements made for site visit for over all interest of beneficiaries.

With those brief remarks, he advised Dy.G.M. (System Operation), convener of the meeting to take up the agenda.

List of the participants is enclosed as Annexure-A.

Installed capacity of GTs

PPCL vide letter no. GM(T)/T/site/project/F.753 dated 16.01.2012 has requested to treat the installed capacity of unit-1 of Bawana CCGT to 216MW. They have supplied the communication of BHEL (the OEM of project) as proof the claim.

PPCL further informed that the nominal capacity of Bawana Project is 1500MW.

This was the maximum capacity feasible to be installed with different combination of

Gas turbines of various manufacturers as given in feasibility report prepared by NTPC as consultant of PPCL. However Since the gas turbines selected / offered by EPC

contractor BHEL is Frame9FA type. The designed capacity of the Gas turbines as per

Heat Balance Diagram submitted by BHEL for New and Clean Gas Turbine is

221.2MW, accordingly the Module (2 GTs and 1 STG) output with New and Clean

Turbine is 696.20MW. However after 3500 Hours of running (which is corresponding to actual running of Gas Turbine for Commercial Operation after trial operation), at base load, 31.7

O

C ambient temperature, 32

O

C cooling water Temperature, 0% make up, 60% RH, RLNG firing, 25ppmvd NOx, 15% O

2 the output of each Gas Turbine would be 216.00 MW and Steam Turbine output will be 253.6 MW, thus per module output as per HBD (Heat Balance Diagram) would be 685.6 MW and output from all the two modules will be 1371.2 MW. Moreover actual capacity of individual

Turbines and modules will ascertained after performance Guarantee Test by BHEL which will be done after commissioning and trial operation of complete module/station. Accordingly, it was requested to consider the following capacities for all energy accounting activities:-

Unit No.

GT-1

GT-2

STG-1

Module-1

GT-3

GT-4

STG-2

Module-2

Total Station

Installed capacity in MW

216

216

253.6

685.6

216

216

253.6

685.6

1371.2

PPCL informed that at present, the capacity of GT was taken as 220.2MW in the energy accounts issued by SLDC. SLDC clarified that the capacity considered as

220.2MW for GT was as per the information provided by Bawana CCGT in the meeting held on 19.08.2010. In this regard, it was clarified by PPCL that it was an oversight which was informed much before that starting of operation of the Stations.

To a query, it was confirmed by PPCL that the same capacity has been indicated in the Tariff Petition filed by PPCL before CERC.

After the discussions, it was decided to consider the installed capacity of the generating unit as declared now by the owner of the project i.e. PPCL as mentioned above. Accordingly, the allocation of the power from the project has also been modified as under as per the PPAs entered into with beneficiaries with PPCL:

With merchant power

S. No. State

In percentage In MW

1 Delhi

2

3

4

BRPL

BYPL

NDPL

NDMC

MES

Total

Haryana

Punjab

Merchant Power

Total

26.53

16.58

17.77

7.3

1.82

70.00

10

10

10

100

363.82

227.41

243.61

100

25

959.84

137.12

137.12

137.12

1371.20

2 Decision of allocation of Merchant Power.

SLDC informed that even though, one unit of Bawana CCGT has been declared on

Commercial Operation from 27.12.2011, the decision of allocation of Merchant

Power has not been taken by PPCL. As per the Scheduling Principles, 100% capacity should have been allocated to avoid gaming and other scheduling related complications before CoD of the unit. Due to the non decision of allocation of

Merchant Power, the backing down of generation also becomes difficult to maintain minimum technical limit which is 75% of the capacity as decided in the earlier meetings. Since, in the merit order dispatch principle, the Open Cycle Generation of

Bawana is one of the costliest sources of generation after RLNG Fired Generation of other Gas Stations, the backing down is required to be done at almost all times in the present demand – availability scenario.

Director (Technical), PPCL informed that the decision of allocation of Merchant

Power was in the final stage at State Government level. After the State Government has taken the decision, the Distribution Companies of Delhi would be approached to enter the PPAs. He assured that all these exercise would be completed as early as possible as technically and financially PPCL was also affected due to the non scheduling of Merchant Power and disposing the same through UI to maintain minimum technical limit to operate the plant with full operating efficiency and to meet the environmental stipulations.

To a query regarding Combined Cycle operation of the Unit-1 of GT, he informed that certain technical problems were inadvertently erupted with regard to the Heat

Recovery Steam Generator (HRSG) of the unit which has been resolved by BHEL.

The Combined Cycle operation of GT-1 was expected by end of February 2012. With regard to operation of Gas Turbine Unit-2, he informed that against the allocation of

1.564 MCMD which was sufficient for operation of One GT but less than operation of

2 nd

GT on full load, 0.622MCMD was getting. Hence, the first GT is also running on partial load. For getting the assured allocation, they were striving very hard and he requested all utilities to avail full power available from Bawana CCGT, as in case

Bawana CCGT fail to utilized entire allocation of gas due to abnormal demand of the gas in the market, the present level allocation of gas would also be get reduced. .

Distribution Licensees expressed their inability to absorb the entire capacity due the already strained finances and clarified that the bare minimum technical limit was also been absorbed under compulsions. They also requested that while fixing the bare minimum limit, the Merchant Power should also be considered as fully scheduled as

Merchant Power.

SLDC also clarified that they could not schedule more than 75% of the DC including

Merchant Power considering the higher cost of generation. It was also clarified that as per the billing figures, the variable cost of various stations based on December

2011billing was as under:-

Source

Auriya Liqud

Auriya – LNG

Variable cost in Ps/Unit

990.50

948.10

Dadri –LNG

Anta – Liquid

Dadri – Liquid

Anta – LNG

Gas Turbine – OC

Gas Turbine – CC

Pragati – OC

BTPS

929.70

813.50

795.20

753.90

501.96

401.23

371.32

354.50

Dadri (Thermal)-I

Anta – Gas

299.10

282.00

Dadri (Thermal)-II 267.60

Rajghat

Pragati – CC

Auriya Gas

Farakka

Kahalgaon-I

265.19

261.36

261.30

258.30

256.10

Dadri – Gas

Kahalgaon-II

Unchahaar-II

Unchahaar-III

Unchahaar-I

Rihand-I

249.60

241.70

216.80

216.80

214.70

216.70

Rihand-II

Singrauli

126.40

109.80

Note : The variable cost of Bawana CCGT for is Rs. 4.40 per unit at present.

It was also confirmed by Director (Technical), PPCL that there was no provision of

Liquid Fired Generation in the design of Bawana CCGT Generating Station.

NDPL representative brought to the notice that as per the 1 st

amendment to the terms and conditions of Tariff Regulations 2009 notified on 02.05.2011, the provisional tariff of the stations should be 95% of the Annual Fixed Cost of the project subject to the adjustment as per the final tariff. As such, while raising bills PPCL should ensure the above stipulations of the Tariff Regulations.

3

PPCL representative responded that the pro-rata fixed charges for one Gas Turbine is payable as per petition filed with CERC was Rs. 208.14 Crores which comes about

Rs.1.31/unit at 85% availability factor.

Concluding the discussions, Chair advised PPCL to expedite the allocation of

Merchant Power and ensuring combined cycle operation of the Gas Turbine so that the cost of the generation can be optimized and the entire allocation of the gas of the station can be utilized. He also requested PPCL to intimate SLDC tentative cost in advance for effective merit order scheduling of power from Bawana CCGT.

Payment of PoC Charges for power being scheduled to Regional Utility (Punjab and Haryana)

SLDC informed that as per the PoC Charges Regulations notified by CERC on

15.06.2010, the Generators are also required to pay the PoC Charges. Ultimately these charges are again to be borne by beneficiaries in proportion to the allocation.

Matter was come up for discussion in the 21 st

Commercial Sub-Committee meeting of

NRPC held on 21.01.2012 at NRPC.

During the course of the said Commercial Committee meeting, it was emphasized that

Bawana CCGT should precisely declare the upcoming generation plan so that the drawal schedule and injection schedule of Delhi can be suitably taken care for the computation of PoC charges for 2012-13. The injection schedule corresponds to share of Bawana CCGT to outside states of Delhi i.e. Punjab and Haryana at present for the computation of PoC Charges for Punjab and Haryana. Further, the wrong declaration of drawal and injection tantamount to payment of higher charges / penalty to the Delhi beneficiaries in the PoC Charges.

NLDC representative confirmed the need of correct declaration of generation plan of

Bawana CCGT to avoid over charges / penalty on Delhi beneficiaries.

To a query, NLDC representative replied that the PoC Charges billing is the responsibility of CTU based on the open access approvals granted to Punjab and

Haryana for the power allocation from Bawana CCGT Station. In the PoC

Regulations, CTU and the beneficiaries should intimate NLDC, the implementing agency for PoC Charges, the details of long term access granted in this regard.

SLDC clarified that as per the information conveyed by Powergrid vide their letter dated 22.04.2009, the Open Access approval has been granted for Punjab, Haryana and Merchant power to the tune of 140MW each from Bawana CCGT. It was also confirmed that the information has already sent to the Director (Transmission),

HVPNL and Member (Transmission), PSEB by Powergrid. It was also clarified that vide the CERC order dated 25.01.2012 in Petition No. 197/2011 TSA has also been

executed by Punjab and Haryana with Powergrid on 01.07.2011 and 22.07.2011 respectively.

On a query, SLDC confirmed that as per the Open Access approval, the date of commencement of Open Access is from July 2010 for 25 years.

Director (Technical), PPCL assured that all the details would be submitted within a week time.

The representatives of Distribution Licensees requested SLDC to intimate PGCIL with regard to the Commercial Operation of Bawana CCGT and Open Access details.

Copy of the same may also be forwarded to NRLDC, NLDC and all beneficiaries of

Bawana CCGT for taking further necessary action in this regard.

Concluding the discussions Director (Operations), DTL who chaired the meeting thanked all the participants for active discussions and resolutions of the issues in amicable manner.

Meeting ended with thanks to the Chair.

25

26

27

28

29

30

31

11

12

13

14

15

7

8

9

10

20

21

22

23

16

17

18

19

2

3

4

5

6

Annexure-A

The list of the officers attended the meeting held at SLDC on 03.02.2012 with regard to

Scheduling and other related issues of 1500MW Bawana CCGT.

S. N. Name

1 Sh. A.K. Haldar

Designation

Director (Operations)

Utility

DTL

Mobile no.

9650992550

24

Sh. Rajan Chowdhary

Sh. P.K. Ray

Sh. Jagdish Kumar

Sh. Shiva Shunmuga Nathan

Sh. R.K. Jain

Sh. S.M. Verma

Sh. Amit Ahuja

Sh. Naveen Jain

Sh. P. Gupta

Sh. A.K. Jha

Sh. S.K. Raghav

Sh. Satynder Prakash

Sh. R.K. Yadav

Sh. Sanjay Kr. Sharma

Sh. Nitesh Verma

Sh. Roop Kumar

Sh. V.Venugopal

Sh. Sanjeev Kumar

Sh. Deepak Sharma

Ms. Sonali Garg

Sh. Sunilesh Mohari

Sh. Sanjay Sharma

Sh. Vivek Pandey

Director (Finance)

Director (Tech.)

G.M. (Proj)-III

G.M. (Finance)

G.M. (Comml.) / Com.

Secretary

G.M.

DGM (Proj.)

DGM

Manager (T)

Manager (T)

Manager (T) Opn.

Manager (T), Elec.

Manager (Commercial)

AM(T), Comml

IPGCL/PPCL

PPCL

PPCL

PPCL

9910331445

9818357133

9958701234

9910208252

IPGCL / PPCL 9818600955

PPCL

PPCL

PPCL

PPCL

PPCL

PPCL

PPCL

PPCL

IPGCL/PPCL

AM (F&E), P-III,Bawana PPCL

G. M. (SLDC) SLDC

Dy.G.M. (SO) SLDC

AM(T), System Operation SLDC

AM(T), system Operation SLDC

AM(T), SO SLDC

DGM (Commercial)

Manager (T), Comml.

Manager

DTL

DTL

POSOCO

9717694845

9717079333

9810003032

9717694934

9717694790

9717698281

9717694813

9717694845

9717694965

9717694883

9999533629

9871093902

9999533917

9999535008

9999533898

9999533655

9999533795

9910170824

Sh. Mohit Joshi

Sh. Ashis Kumar Dutta

Sh.Sanjay Srivastava

Sh. Anurag Sharma

Sh.Chaman Lal

Sh. V.M. Tripathi

Col. Ballaney RN

Engineer

A.G.M.

AVP

POSOCO

NDPL

BRPL

Manager (PMG) BYPL

Executive Engineer(SO) NDMC

Garrison Engineer

CWE (U)

MES

MES

9650598189

9871798566

9312147045

9313553021

9810034499

9873802301

9999374747

Download