CASE STUDY SAP ERP Configuration Phase IV – Production Product MOTIVATION PREREQUISITES SAP ERP GBI Release 6.04 You will configure the enterprise structure and business processes for Production. You should be familiar with navigation in the SAP system. Revised 6/24/2014 Focus Production Authors Simha R. Magal Stefan Weidner Tom Wilder Version 2.23 After setting up the organization units and process parameters, you will create necessary master data and test the business process. It is also recommended that you have gone through the fulfillment exercise. ACKNOWLEDGEMENT This material was prepared with the assistance of student interns at the Seidman ERP program at Grand Valley State University and the SAP Club at CSU Chico as well as student and research assistants at SAP UCC Magdeburg. Also, thanks to Corrie Fiedler (Senior Lecturer, Information & Decision Sciences, Carlson School of Management, University of Minnesota) for her assistance in improving this exercise. © SAP AG Phase IV – Production CASE STUDY Overview and Table of Contents Enterprise Structure Rules and Parameters Master Data Process Execution Table of Contents General Notes and Cautions ...................................................................................................... 1 Part IV.1 – Enterprise Structure ................................................................................................. 3 Part IV.2 – Rules and Parameters .............................................................................................. 5 Part IV.3 – Master Data.............................................................................................................21 Part IV.4 – Process Execution...................................................................................................41 © SAP AG Phase IV – Production CASE STUDY General Notes and Cautions Warning: When working with other classmates at the same time in the same transactions within “SPRO”, tables will tend to lock up and you will only be able to display them. This is due to the fact that the system does not allow multiple users in the same transaction at the same time. To get passed this message, simply wait until the current user in the transaction is finished and then proceed. Attributes: At times, certain attributes or fields may not appear to have the name of them in front of the user. To display the full name of the attribute or field, simply click within the field and then press the F1 key. This will bring up not only the title of the field, but it will bring up the full description of it to read. The ## Symbol: When working with other classmates at the same time, you will be assigned your own unique identifier which is called the ## Symbol or the “Pound Pound” Symbol. This will be your identifier and is ASSIGNED FOR YOUR OWN USE ONLY!!! Please be cautious about other classmates attempting to use your identifier whether it is on purpose or not and if you suspect other classmates using it, inform your professor immediately so that fixes can be made accordingly. For example, if Ashley has an identifier of 09, Ashley’s company code will be US09. The Search Tool: At times in this document, the instructions will ask you to search for something to put in a field. When it does this, simply click on the field itself and click on the icon to the right of it (it looks like a white square). Clicking on it will bring up another window and you will search from there. You may also search other field by clicking on the downward arrow that may be on the left or right of the field. It will bring up a drop down menu that will have options to choose from and click. Where do I start? : There are three ways to proceed within the SAP system: Using the “SAP Easy Access” menu, using the “SAP Menu Bar”, and using the “SAP Customizing Implementation Guide” menu. All three of these are explained below: 1. The SAP Easy Access menu appears when you start a new session. 2. The SAP Menu Bar also appears when you start a new session at the very top of the screen. 3. In the SAP Customizing Implementation Guide, there are two ways you may use to get here: a. The first is to simply type “SPRO” in the transaction field at the top of the screen. b. Proceed through the path to get there. The path consists of the following: (In the main menu of SAP, click on the black arrows on the left of these names) SAP menu ► Tools ► Customizing ► IMG ► Execute Project (double-click on “Execute Project”) In the “Customizing: Execute Project” screen, click on the icon. Saving: When the instructions to tell you to save data, always press the “Enter” key to validate. If there are error(s) that occur, they must be corrected before continuing to the next task. You will find errors from a transaction when there are red icons that appear in the message area. Messages that are yellow contain warnings and not errors. At times, these must be fixed in order to move on. However, most of the time, they do not need to be fixed and you can simply enter through them. Green messages are obviously showing that nothing went wrong with the transaction and that you may proceed to the next task. © SAP AG Page 1 Phase IV – Production CASE STUDY Set Controlling Area Pop-Up: At times throughout this phase, there will be times when the system asks you enter your controlling area to clarify which controlling area you are configuring for. If this should happen, in the “Set Controlling Area” pop-up, enter the following information: Attribute Controlling Area Click on Description Uniquely identifies a controlling area. Data Value NA## (CONTINUE (ENTER)). This will get you into the next screen where the instructions will then tell you what to do for the task. Enter Chart of Accounts Pop-Up: At times throughout this phase, there will be times when the system asks you enter your chart of accounts to clarify which chart of accounts you are configuring for. If this should happen, in the “Enter Chart of Accounts” pop-up, enter the following information: Attribute Chart of Accounts Click on Description Key that uniquely identifies a chart of accounts. Data Value GL## (CONTINUE (ENTER)). This will get you into the next screen where the instructions will then tell you what to do for the task. Differences in Font: Throughout this phase you will see tables with different fonts used in the Data Value column. The normal Times New Roman indicates you enter exactly what is typed out except for the ## Symbol where you would put in your identifier. The italicized Times New Roman font indicates the data is looked up or found. Attribute Times New Roman Times New Roman (Italicized) © SAP AG Description Font that tells you to enter what is written. Font that tells you the data that needs to be looked up. Data Value Times New Roman Times New Roman (Italicized) Page 2 Phase IV – Production CASE STUDY Part IV.1 – Enterprise Structure Enterprise Structure Rules and Parameters Master Data Process Execution Table of Contents IV.1.1: Determine Work Center Location .................................................................................... 4 © SAP AG Page 3 Phase IV – Production CASE STUDY IV.1.1: Determine Work Center Location Description: You will define a Work Center Location within the city of Dallas, TX. A Work Center Location contains Work Centers and identifies the physical location where work is carried out. A Work Center Location can be a general place description (Philadelphia) or a very specific place description (office 105, desk III). Please note that a Work Center Location ≠ Work Center. Rather a Work Center Location contains Work Centers. Warning: See “General Notes and Cautions” about table locks. Navigation: SAP Customizing Implementation Guide ► Enterprise Structure ► Definition ► Logistics – General ► Define Location Tasks and Data Entry: In the “Change View “Locations”: Overview” screen, click on the icon. In the “New Entries: Overview of Added Entries” screen, enter the following information: Plnt Your Plant Dallas Click on Location DALLAS TX Name GBI N42## (ENTER). In the “Edit address: DL## DALLAS TX” pop-up, enter the following information: Attribute Country Region Description The country key contains information which the system uses to check entries such as the length of the postal code or bank account number. In some countries, the region forms part of the address. In the “Street Address” part, click on the Data Value USA Texas icon. Enter the following information: Attribute Jurisdict. code Click on Description Specifies the tax jurisdiction. Data Value Texas Jurisdiction Code (ENTER (CONTINUE)). You will receive a message that says “One entry chosen”. In the “New Entries: Overview of Added Entries” screen, click on the icon. You will receive a message that says “Data was saved”. © SAP AG Page 4 Phase IV – Production CASE STUDY Part IV.2 – Rules and Parameters Enterprise Structure Rules and Parameters Master Data Process Execution Table of Contents IV.2.1: Define Production Scheduling Profile .............................................................................. 6 IV.2.2: Define Production Scheduler .......................................................................................... 7 IV.2.3: Configure Automatic Postings ......................................................................................... 8 IV.2.4: Activate Material Requirements Planning........................................................................ 9 IV.2.5: Define Checking Control ................................................................................................10 IV.2.6: Define Scheduling Parameters ......................................................................................11 IV.2.7: Define Order Dependent Parameters .............................................................................12 IV.2.8: Define Confirmation Parameters ....................................................................................13 IV.2.9: Carry Out Maintenance of Materials ...............................................................................14 IV.2.10: Carry Out Maintenance of Production ..........................................................................18 IV.2.11: Define Valuation of Goods Received ...........................................................................20 © SAP AG Page 5 Phase IV – Production CASE STUDY IV.2.1: Define Production Scheduling Profile Description: You will create the Production Scheduling Profile used at your Dallas plant. GBI management wants to improve plant efficiency by automatically taking the following action when a production order is created. The order is: automatically released and scheduled without manual intervention. not scheduled unless all materials are available (e.g., partial orders are not allowed). A production scheduling profile can be associated either with specific materials or to a production scheduler. Warning: See “General Notes and Cautions” about table locks. Navigation: SAP Customizing Implementation Guide ► Production ► Shop Floor Control ► Master Data ► Define production scheduling profile Tasks and Data Entry: In the “Change View “Production Scheduling Profile”: Overview” screen, click on the icon. In the “New Entries: Details of Added Entries” screen, enter the following information: Attribute Plant Prod. Sched. Profile Description Release Schedule Order Click on © SAP AG Description Key uniquely identifying a plant. Specifies which transactions are carried out in parallel, can trigger an automatic goods receipt, or specify an overall profile for capacity leveling. Description of production scheduler profile. Specifies an order is to be released when it is created. Specifies an order is to be scheduled as it is released. Data Value Your Plant Dallas 10 ## Release & Schedule Selected Selected (SAVE). You will receive a message that says “Data was saved”. Page 6 Phase IV – Production CASE STUDY IV.2.2: Define Production Scheduler Description: You will create a Production Scheduler and associate this scheduler with the production schedule profile created in the previous step. The Production Scheduler is responsible for the day-today scheduling activities for a set of manufactured materials across a plant or plants. Warning: See “General Notes and Cautions” about table locks. Navigation: SAP Customizing Implementation Guide ► Production ► Shop Floor Control ► Master Data ► Define production scheduler Tasks and Data Entry: In the “Change View “Production Scheduler”: Overview” screen, click on the icon. In the “New Entries: Overview of Added Entries” screen, enter the following information: Attribute Plant ProdSched. Description ProdProfile Click on © SAP AG Description Uniquely identifies a plant Scheduler responsible for a material in production. Description of Production Scheduler Specifies which transactions are carried out in parallel, can trigger automatic goods receipt, or specify an overall profile for capacity leveling. Data Value Your Plant Dallas 0## ## DL Production Scheduler 10 (SAVE). You will receive a message that says “Data was saved”. Page 7 Phase IV – Production CASE STUDY IV.2.3: Configure Automatic Postings Description: This is the first of two steps in which you configure SAP to automatically post General Ledger transactions associated with the Production business process. You will specify the General ledger accounts associated with the Issue Materials process step. For example, when Raw Materials (Valuation Class = 3000) are issued to a production order (Transaction Key = VBR) financial transaction will post to Inventory – Raw Materials (specified in a previous step) Raw Material Consumption (the offsetting account, specified in this step). Notice that the general ledger account for ‘inventory from heaven’ is also specified here. Warning: See “General Notes and Cautions” about table locks. Navigation: SAP Customizing Implementation Guide ► Materials Management ► Valuation and Account Assignment ► Account Determination ► Account Determination Without Wizard ► Configure Automatic Postings Tasks and Data Entry: In the “Automatic Posting” screen, click on the icon. In the “Maintain FI Configuration: Automatic Posting – Procedures” screen, double-click on GBB. You are in the “Maintain FI Configuration: Automatic Posting – Accounts” screen. Enter the following information: Val. modif. 0001 0001 0001 0001 0001 0001 0001 0001 0001 0001 0001 0001 0001 Click on © SAP AG Gen. modif. AUF AUF VBR VBR VBR BSA BSA BSA BSA Valuation class 3000 3030 3100 7900 7900 7920 3000 3100 7900 3000 3100 7920 7900 Account Your Raw Material Consumption Expense Your Supplies Expense Your Trading Good Consumption Expense Your Semi-Finished Consumption Expense Your Manufacturing Output settlement Your Manufacturing Output Settlement Variance Your Raw Material Consumption Expense Your Trading Good Consumption Expense Your Semi-Finished Consumption Expense Your Inventory-Suspense (Heaven) Your Inventory-Suspense (Heaven) Your Inventory-Suspense (Heaven) Your Inventory-Suspense (Heaven) (SAVE). You will receive a message that says “Changes have been made”. Page 8 Phase IV – Production CASE STUDY IV.2.4: Activate Material Requirements Planning Description: You will activate your three Plants to use material resource planning (MRP). MRP is used to plan manufacturing, purchasing, and delivering activities. MRP’s basic functions include inventory control, bill of material processing, and scheduling. This activation allows for the execution of single-item and multi-level planning in each of the three plants. Warning: See “General Notes and Cautions” about table locks. Navigation: SAP Customizing Implementation Guide ► Materials Management ► Consumption-Based Planning ► Planning ► Activate Material Requirements Planning Tasks and Data Entry: In the “Activation” screen, click on the icon. You are in the “Change View “Activate Requirements Planning”: Overview” screen. Enter the following information: Plnt Your Plant Dallas Your DC Miami Your DC San Diego Click on © SAP AG Activate requirements planning Selected Selected Selected (SAVE). You will receive a message that says “Data was saved”. Page 9 Phase IV – Production CASE STUDY IV.2.5: Define Checking Control Description: This is the first of four steps in which you specify parameters guiding the creation and release of production orders in your Dallas plant. You will copy checking control parameters from Company Code US00 to your Company Code US##. These parameters identify which inventory should be considered as available for use in a production order. GBI management has determined that production orders should be checked for inventory availability at both creation and release. This ensures that no order will be sent to the plant floor for production unless all materials (both raw materials and semi-finished goods) are available. Warning: See “General Notes and Cautions” about table locks. Navigation: SAP Customizing Implementation Guide ► Production ► Shop Floor Control ► Operations ► Availability Check ► Define Checking Control Tasks and Data Entry: In the “Change View “Order Control”: Overview” screen, highlight the “DL00 PP01 1” row. Highlight the “DL00 Plant PP01 2” row. Click on (COPY AS…). You will receive a message that says “Specify target entries”. In the “Change View “Order control”: Details of Selected Set” screen, enter the following information: Attribute Plant Click on Description Key uniquely identifying a plant. Data Value Your Plant Dallas (ENTER). You will receive a message that says “Specify target entries”. Enter the following information: Attribute Plant Click on Description Key uniquely identifying a plant. Data Value Your Plant Dallas (ENTER). You will receive a message that says “Number of entries copied: 2”. In the “Change View “Order control”: Overview of Selected Set” screen, click on the icon. You will receive a message that says “Data was saved”. © SAP AG Page 10 Phase IV – Production CASE STUDY IV.2.6: Define Scheduling Parameters Description: This is the second of four steps in which you specify parameters guiding the creation and release of standard production orders in your Dallas plant. You will specify scheduling parameters associated with the Dallas Plant and your Production Scheduler. This step implements GBI management’s strategic decisions regarding production order scheduling: orders are backwards scheduled, rather than forward scheduled. orders cannot be scheduled to begin in in the past (and hope that production can ‘catch up’). order lead time will not be automatically reduced (in the case the order is ‘running late’). Warning: See “General Notes and Cautions” about table locks. Navigation: SAP Customizing Implementation Guide ► Production ► Shop Floor Control ► Operations ► Scheduling ► Define Scheduling Parameters for Production Orders Tasks and Data Entry: In the “Change View “Specify scheduling parameters”: Overview” screen, click on the icon. In the “New Entries: Details of Added Entries” screen, enter the following information: Attribute Plant Order type Prodn Superv. Scheduling Type Automatic Scheduling Click on © SAP AG Description Key uniquely identifying a plant. Identifies the usage of the orders. Scheduler responsible for a material. Specifies the scheduling type. Specifies that orders or networks are automatically scheduled when saved. Data Value Your Plant Dallas Standard Production order Your DL Production Scheduler Backwards Selected (SAVE). You will receive a message that says “Data was saved”. Page 11 Phase IV – Production CASE STUDY IV.2.7: Define Order Dependent Parameters Description: This is the third of four steps in which you specify parameters guiding the creation and release of standard production orders in your Dallas plant. You will specify production order parameters associated with the Dallas plant. This step implements GBI management’s tactical decisions regarding standard production orders: production orders require a routing both planned (standard) costs and actual production costs are calculated for each production order. Warning: See “General Notes and Cautions” about table locks. Navigation: SAP Customizing Implementation Guide ► Production ► Shop Floor Control ► Master Data ► Order ► Define order type-dependent parameters Tasks and Data Entry: You are in the “Change View “Order Type-Dependent Parameters: Overview”: Overview” screen. Click on (NEW ENTRIES). In the “New Entries: Details of Added Entries” screen, enter the following information: Attribute Plant Order Type Description Key that uniquely identifies a plant. Key that differentiates orders according to their purpose. Routing Selection Controls per plant and order type how the selection of a routing/reference operation set is to be carried out. Represents a process for automatic determination of alternatives in the different areas within a company. BOM Application Data Value Your Plant Dallas Standard Production order Routing Mandatory (automatic selection) Production – General Click on the “Cost Accounting” tab. Enter the following information: Attribute Cstg variant planned Cstg variant actual Click on © SAP AG Description Key that specifies which costing variant is used to determine the planned costs. Key that specifies the costing variant that is used to determine the actual costs. Data Value Production Order: Planned Production Order: Actual (SAVE). You will receive a message that says “Data was saved”. Page 12 Phase IV – Production CASE STUDY IV.2.8: Define Confirmation Parameters Description: This is the fourth of four steps in which you specify parameters guiding the creation and release of standard production orders in your Dallas plant. You will specify confirmation parameters associated with the Dallas Plant. This step implements GBI management’s tactical philosophy regarding the confirmation of standard production orders: at final confirmation, all production order components (raw materials and semi-finished goods) are ready for issue and thus open reservations are cleared. Warning: See “General Notes and Cautions” about table locks. Navigation: SAP Customizing Implementation Guide ► Production ► Shop Floor Control ► Operations ► Confirmation ► Define Confirmation Parameters Tasks and Data Entry: You are in the “Change View “Parameters for Order Confirmation”: Overview” screen. Click on (NEW ENTRIES). In the “New Entries: Details of Added Entries” screen, enter the following information: Attribute Plant Order Type Description Key that uniquely identifies a plant. Key that differentiates orders according to their purpose. Data Value Your Plant Dallas Standard Production order Click on the “Individual Entry General” tab. Enter the following information: Attribute Confirmation Type Clear Open Reservations Click on © SAP AG Description Specifies what sort of confirmation is to be automatically proposed. Specifies that with a final confirmation the indicator “Final issue” is also set for components that are not backflushed. Data Value Final Confirmation Selected (SAVE). You will receive a message that says “Data was saved”. Page 13 Phase IV – Production CASE STUDY IV.2.9: Carry Out Maintenance of Materials Description: This is the first of two steps in which you specify MRP parameters. In this step you will: specify the number scheme by which production orders and other production-related transaction will be numbered. For example, your first Planned Production Order in Dallas will be Planned Order #1, create an MRP controller (0##). The MRP controller is a planner (or group of planners) responsible for the day-to-day planning activities, specify other analytical measures (float, for example) that guide the MRP algorithm. Warning: See “General Notes and Cautions” about table locks. Navigation: SAP Customizing Implementation Guide ► Materials Management ► Consumption-Based Planning ► Plant Parameters ► Carry Out Overall Maintenance of Plant Parameters Tasks and Data Entry: You are in the “Plant Parameters for Material Requirements Planning” screen. Click on (CREATE). In the “Create Plant Parameters” pop-up, enter the following information: Attribute Plant Description Key that uniquely identifies a plant. Click on Data Value Your Plant Dallas (CREATE). In the “Create Plant Parameters” pop-up, click on the icon. You will receive a message that says “Plant Parameters for Plant DL## can now be maintained”. In the “Plant Parameters for Material Requirements” screen, click on the In the “Maintain Plant Parameters” pop-up, click on the icon. icon. In the “Maintain Plant Parameters” screen, click on the In the “Assign Number Ranges” screen, click on the icon. icon. You will receive a message that says “One entry chosen”. You are in the “Change View “Number Ranges for Planned Orders”: Overview” screen. Enter the following information: © SAP AG Page 14 Phase IV – Production Plnt Your Plant Dallas CASE STUDY Name 1 ## Plant Dallas NRge pl.orders 01 Click on (SAVE). You will receive a message that says “Data was saved”. Click on (BACK). In the “Assign Number Ranges” screen, click on the icon. You will receive a message that says “One entry chosen”. You are in the “Change View “Number Ranges for Reservations”: Overview” screen. Enter the following information: Plnt Your Plant Dallas Name 1 ## Plant Dallas NR: StkTrns Res. 01 Click on (SAVE). You will receive a message that says “Data was saved”. Click on (BACK). In the “Assign Number Ranges” screen, click on the icon. You will receive a message that says “One entry chosen”. You are in the “Change View “Number Ranges for Purchase Requisitions”: Overview” screen, Enter the following information: Plnt Your Plant Dallas Name1 ## Plant Dallas NR - PReq 01 Click on (SAVE). You will receive a message that says “Data was saved”. Click on (BACK). In the “Assign Number Ranges” screen, click on the icon. You will receive a message that says “One entry chosen”. You are in the “Change View “Number Ranges for MRP Lists”: Overview” screen. Enter the following information: Plnt Your Plant Dallas Click on © SAP AG Name 1 ## Plant Dallas No. Range –MRP 01 (SAVE). You will receive a message that says “Data was saved”. Page 15 Phase IV – Production Click on CASE STUDY (BACK). In the “Assign Number Ranges” screen, click on the icon. You will receive a message that says “One entry chosen”. You are in the “Change View “Number Range for Sim. Dependent Requirements”: Overview” screen Enter the following information: Plnt Your Plant Dallas NR. SimDepRs 01 Click on (SAVE). You will receive a message that says “Data was saved”. Click on (BACK). In the “Assign Number Ranges” screen, click on the icon. In the “Maintain Plant Parameters” screen click on the icon. You will receive a message that says “No entries found that match selection criteria”. In the “Change View “MRP Controllers”: Overview” screen, click on the icon. In the “New Entries: Details of Added Entries” screen, enter the following information: Attribute Plant MRP Controller Name of MRP Controller Description Key uniquely identifying a plant. Specifies the number of MRP controller or group of MRP controllers responsible for material planning for the material. Specifies the name of the MRP controller or group of MRP controllers responsible for material requirements planning. Data Value Your Plant Dallas 0## ## DL Controller Click on (SAVE). You will receive a message that says “Data was saved”. Click on (BACK). You will receive a message that says “Only one entry chosen”. In the “Change View “MRP Controllers”: Details” screen, click on the In the “Change View “MRP Controllers”: Overview” screen, click on the icon. icon. In the “Maintain Plant Parameters” screen click on the In the “Change View “Floats for Scheduling”: Overview” screen, click on the © SAP AG icon. icon. Page 16 Phase IV – Production CASE STUDY In the “New Entries: Overview of Added Entries” screen, enter the following information: Plnt Your Plant Dallas Marg. 001 Opening Period 1 Fl Bef. 1 Fl After 1 Rel. Per. 1 Click on (SAVE). You will receive a message that says “Data was saved”. Click on (BACK). You will receive a message that says “Only one entry chosen”. In the “Change View “Floats for Scheduling”: Overview” screen, click on the icon. In the “Maintain Plant Parameters” screen, click on the icon. You will receive a message that says “One entry chosen”. In the “Change View “Availability Check”: Overview” screen, enter the following information: Plnt Your Plant Dallas Rule for Availability Check PP Checking Rule Click on (SAVE). You will receive a message that says “Data was saved”. Click on (BACK). In the “Maintain Plant Parameters” screen, click on the icon. You will receive a message that says “One entry chosen”. You are in the “Change View “Default Values Purchasing/MRP”: Details” screen. Enter the following information: Attribute Scheduling: Info Rec/Agreemt Schedule lines Unknown Acct Assignment Click on © SAP AG Description Determines whether the planned delivery time in the record is used for scheduling in the planning run. Indicator controls whether, during the planning run, the system never creates schedule lines, only creates schedule lines in the opening period, or whether it creates schedule lines in the planning horizon. Account assignment for materials not valuated. Data Value Selected Schedule lines Unknown (SAVE). You will receive a message that says “Data was saved”. Page 17 Phase IV – Production CASE STUDY IV.2.10: Carry Out Maintenance of Production Description: This is the second of two steps in which you will specify MRP parameters. You will specify that: planned production orders will be converted to Production Orders with Order Type = Standard. if multiple Bills of Materials (BOM) or Routings are available, SAP will automatically assign the production BOM and the production Routing. Warning: See “General Notes and Cautions” about table locks. Navigation: SAP Customizing Implementation Guide ► Production ► Material Requirements Planning ► Plant Parameters ► Carry Out Overall Maintenance of Plant Parameters Tasks and Data Entry: You are in the “Plant Parameters for Material Requirements Planning” screen. Click on (MAINTAIN). In the “Maintain Plant Parameters” pop-up, enter the following information: Attribute Plant Description Key uniquely identifying a plant. Click on Data Value Your Plant Dallas (MAINATIN). In the “Maintain Plant Parameters” screen, click on the icon. In the “Conversion” screen, click on the icon. You will receive a message that says “One entry chosen”. You are in the “Change View “Conv. Planned Ord. -> Prod.Ord., MRP Customizing”: Overview screen. Enter the following information: Attribute Production order Description Key that differentiates orders Data Value Standard Production Order Click on (SAVE). You will receive a message that says “Data was saved”. Click on (BACK) twice. In the “Conversion” screen, click on the © SAP AG icon. Page 18 Phase IV – Production CASE STUDY In the “Maintain Plant Parameters” screen click on the icon. In the “Plant Parameters: Reporting” screen, click on the icon. You will receive a message that says “One entry chosen”. In the “Change View “Run-Time Statistics”: Overview” screen, enter the following information: Attribute Display list Frequency Description Instructs the system to create a list of the planned materials. Determines if an entry is made in the runtime statistics. Click on (SAVE). You will receive a message that says “Data was saved”. Click on (BACK). In the “Plant Parameters: Reporting” screen, click on the Data Value Selected 1 icon. In the “Maintain Plant Parameters” screen click on the icon. You will receive a message that says “One entry chosen”. In the “Change View “BOM/Routing Selection”: Overview” screen, enter the following information: Attribute BOM Sel ID Routing Sel ID Description Determines which BOM is to be used and with which priority for BOM selection. Determines which routing is to be used and with which priority for routing selection. Data Value 01 Production 01 Released (general) Click on (SAVE). You will receive a message that says “Maintain selection ID in the parameters”. Click on (ENTER). You will receive a message that says “Data was saved”. © SAP AG Page 19 Phase IV – Production CASE STUDY IV.2.11: Define Valuation of Goods Received Description: This is the first of two steps in which you configure SAP to automatically post General Ledger transactions associated with the Production business process. You will specify the General ledger accounts associated with the Receive Finished Goods process step. For example, when a Production Order is completed, and Finished Goods are received, the inventory is valued at: the actual cost as posted to the production order (if the Finished Good has moving average price control), or standard cost (if the finished good has standard price control). Warning: See “General Notes and Cautions” about table locks. Navigation: SAP Customizing Implementation Guide ► Production ► Shop Floor Control ► Integration ► Define Valuation of Goods Received Tasks and Data Entry: You are in the “Change View “Valuation variants for order costing”: Overview” screen. Click on (NEW ENTRIES). In the “New Entries: Overview of Added Entries” screen, enter the following information: Attribute Val. Area Val. Var. Click on © SAP AG Description Organizational level at which the material is valuated. Determines the price of goods receipts for materials. Data Value Your Plant Dallas Production Order: Actual (SAVE). You will receive a message that says “Data was saved”. Page 20 Phase IV – Production CASE STUDY Part IV.3 – Master Data Enterprise Structure Rules and Parameters Master Data Process Execution Table of Contents IV.3.1: Create Activity Type .......................................................................................................22 IV.3.2: Change Activity Output/Prices .......................................................................................23 IV.3.3: Determine Person Responsible .....................................................................................25 IV.3.4: Create Capacity .............................................................................................................26 IV.3.5: Create Work Centers .....................................................................................................28 IV.3.6: Create Raw Materials ....................................................................................................30 IV.3.7: Create Semi-Finished Good...........................................................................................32 IV.3.8: Create Finished Good ....................................................................................................34 IV.3.9: Create Bills of Materials .................................................................................................36 IV.3.10: Create Product Routings ..............................................................................................38 © SAP AG Page 21 Phase IV – Production CASE STUDY IV.3.1: Create Activity Type Description: This is the first of three steps in which you will define the labor needed to manufacture products. You will create activity types which describe the various forms of activity that can be performed at a cost center. For simplicity, GBI uses only one activity type: LABOR. You will implement GBI management’s tactical decisions that LABOR is: measured in Hour (H), evaluated for each cost center, and distributed to the Labor secondary cost element for management accounting. Navigation: SAP menu ► Accounting ► Controlling ► Cost Center Accounting ► Master Data ► Activity Type ► Individual Processing ► Create Tasks and Data Entry: In the “Create Activity Type: Initial Screen” screen, enter the following information: Attribute Activity Type Valid From Click on Description Key uniquely identifying an activity type. Date indicating as of when an entry is valid. Data Value LABOR First Day of Current Year (ENTER). In the “Create Activity Type: Basic Screen” screen, enter the following information: Attribute Name Activity Unit CCtr categories ATyp category Allocation cost elem Price indicator Description General description of the object. Time or quantity unit used to post the consumed activity quantities. Indicator determining for which cost center types an activity type is allowed for planning and as a sender in activity allocation. Determining the method of activity planning and allocation. A secondary cost element under which the activity type business process is allocated. Indicator showing how the system calculates the price of a business process or activity type. Data Value ## Labor Hours Hour All Cost Center Cate Manual entry, manual allocation Your Labor Allocation Plan price, automatically based on activity Make sure to use Hour(H) and not Hours(HR) for the Activity Unit. Click on © SAP AG (SAVE). You will receive a message that says “Activity type has been created”. Page 22 Phase IV – Production CASE STUDY IV.3.2: Change Activity Output/Prices Description: This is the second of three steps in which you will define the labor needed to manufacture products. You will specify how the LABOR activity is distributed between – and among – Cost Centers. In Phase I, you created an Operations Cost Center Group composed of several Cost Centers. For each of these Cost Centers, you will define the price of LABOR which will be used for product cost calculations. Navigation: SAP menu ► Accounting ► Controlling ► Cost Center Accounting ► Planning ► Activity Output/Prices ► Change Tasks and Data Entry: In the “Change Activity Type/Price Planning: Initial Screen” screen, enter the following information: Attribute Version From Period To Period Fiscal year Cost Center group Activity Type Click on Description A collection of year-dependent indicators for planning data. A planning period is the smallest closed unit of a fiscal year in which plan data can be entered and stored in the system. A planning period is the smallest closed unit of a fiscal year in which plan data can be entered and stored in the system. Period when a company creates inventory. Organizational unit for grouping together cost centers. A description of the activity produced by a cost center. Data Value Plan/Act – Version 1 12 Current Year Your Operations LABOR (OVERVIEW SCREEN). In the “Change Activity Type/Price Planning: Overview Screen” screen, enter the following information: Activity LABOR Click on Plan Activity 100000 Distribution key Distribution key Distribution as before Distribution as before Variable price 10 (NEXT COMBINATION). Repeat this for the rest of the cost centers within the group. Click on (SAVE). You will receive a message that says “Changed data has been posted”. In the “Change Activity Type/Price Planning: Initial Screen” screen, enter the following information: Attribute Fiscal year Click on © SAP AG Description Period for which a company creates its inventory and balance sheet. Data Value Year After Current (OVERVIEW SCREEN). Page 23 Phase IV – Production CASE STUDY In the “Change Activity Type/Price Planning: Overview Screen” screen, enter the following information: Activity LABOR Click on Plan Activity 100000 Distribution key Distribution key Distribution as before Distribution as before Variable price 10 (NEXT COMBINATION). Repeat this for the rest of the cost centers within the group. Click on © SAP AG (SAVE). You will receive a message that says “Changed data has been posted”. Page 24 Phase IV – Production CASE STUDY IV.3.3: Determine Person Responsible Description: You will create a person (## Steve Barton) responsible for maintaining Work Center master data. Note that this person is not responsible for Work Center planning, but rather for maintaining Work Center parameters. Warning: See “General Notes and Cautions” about table locks. Navigation: SAP Customizing Implementation Guide ► Production ► Basic Data ► Work Center ► General Data ► Determine person responsible Tasks and Data Entry: You are in the “Change View “Person Responsible for Work Center”: Overview” screen. Click on (NEW ENTRIES). In the “New Entries: Overview of Added Entries” screen, enter the following information: Plnt Your Plant Dallas Click on © SAP AG Pers. Respons. 0## Person responsible for work center ## Steve Barton (SAVE). You will receive a message that says “Data was saved”. Page 25 Phase IV – Production CASE STUDY IV.3.4: Create Capacity Description: In order to plan production, GBI must understand the manufacturing capacity at each Plant and Work Center. GBI has two types of capacity: person hours and machine hours. GBI’s Dallas plant has three people and three machines, both available during day shift only. Navigation: SAP menu ► Logistics ► Production ► Master Data ► Work Centers ► Capacity ► Create Tasks and Data Entry: In the “Create Capacity: Initial Screen” screen, enter the following information: Attribute Plant Capacity Capacity category Click on Description Key uniquely identifying a plant. Description by which the capacity is created. Key which describes capacity in more detail. Data Value Your Plant Dallas SHIFT Person (ENTER). In the “Create Capacity: Header” screen, enter the following information: Attribute Capacity short text Capacity planner grp Base unit of meas. Start Finish Length of breaks Capacity utilization No. of indiv. cap. Relevant to finite scheduling Click on Description Describes the capacity in more detail. Key referring to the capacity planner group. Unit in which capacity is maintained. Start of the shift. End of the shift. Total break time per shift. The relationship between a machine’s actual capacity and its theoretical capacity. Number of elements which make up a group. Specifies that the system should take the available capacity and the load of this capacity into account during finite scheduling. Data Value ## Standard Day Shift Planner group A Hour 08:00:00 17:00:00 01:00:00 100 3 Selected (SAVE). You will receive a message that says “Capacity SHIFT plant DL## category 002 created”. In the “Create Capacity: Initial Screen” screen, enter the following information: Attribute Capacity category © SAP AG Description The capacity category enables you to determine whether it is machine or labor capacity. Data Value Machine Page 26 Phase IV – Production Click on CASE STUDY (ENTER). In the “Create Capacity: Header” screen, enter the following information: Attribute Capacity short text Capacity planner grp Base unit of meas. Start Finish Length of breaks Capacity utilization No. of indiv. cap. Relevant to finite scheduling Click on Description Describes the capacity in more detail. Key referring to the capacity planner group. Unit in which capacity is maintained. Start of the shift. End of the shift. Total break time per shift. The relationship between a machine’s actual capacity and its theoretical capacity. Number of elements which make up a group. Specifies that the system should take the available capacity and the load of this capacity into account during finite scheduling. Data Value ## Standard Day Shift Planner group A Hour 08:00:00 17:00:00 01:00:00 100 3 Selected (SAVE). You will receive a message that says “Capacity SHIFT plant DL## category 001 created”. © SAP AG Page 27 Phase IV – Production CASE STUDY IV.3.5: Create Work Centers Description: You will create Work Centers at your Dallas plant and associate each Work Center with a Work Center Location, Cost Center, and Person Responsible. Work Centers are locations at which value-added work associated with the manufacturing process is carried out. GBI has identified five work centers at the Dallas plant. Each Work Center is associated with Activity Types and Capacity Categories in order to carry out production and capacity planning. Navigation: SAP menu ► Logistics ► Production ► Master Data ► Work Centers ► Work Center ► Create Tasks and Data Entry: In the “Create Work Center: Initial Screen” screen, enter the following information: Attribute Plant Work center Work center cat. Click on Description Key uniquely identifying a plant. Key identifying the work center. Key which distinguishes the work centers. Data Value Your Plant Dallas ASSY10## Labor (ENTER). In the “Create Work Center: Basic Data” screen, enter the following information: Attribute Description Person responsible Location Usage Standard value key Click on Description Description The person or group who is responsible for the work center. Physical location of the work center. Controls which type of task list used. Dimension to one of up to six values. Data Value ## DL Assembly Your Person Responsible DALLAS TX Only routings Normal production (ENTER). Enter the following information at the bottom of the screen: Key Word Setup Labor Rule for Mant. should be entered should be entered Click on the “Default Values” tab. In the “Create Work Center: Default Values” screen, enter the following information: Attribute Control key © SAP AG Description Determines which business transactions should be executed for the object that belongs to the order. Data Value Routing/Ref. op. set – internal proc. Page 28 Phase IV – Production CASE STUDY Enter the following information at the bottom of the screen: Parameter Setup Labor Standard Value Unit Minute Minute Click on the “Scheduling” tab. In the “Create Work Center: Scheduling” screen, enter the following information: Attribute Capacity category Capacity Setup formula Processing formula Description Enables the determination of whether it is machine or labor. Capacity name Formula used in scheduling to calculate the setup time. Formula used in scheduling to determine the processing time. Data Value Person SHIFT Prod.: Setup time Prod.: Labor time Click on the “Costing” tab. In the “Create Work Center: Cost Center Assignment” screen, enter the following information: Attribute Cost Center Description Key uniquely identifying a cost center. Data Value Your Production Costs Enter the following information at the bottom of the screen: Alt activity descr. Setup Labor Click on Activity Type LABOR LABOR Formula key Prod.: Setup time Prod.: Labor time (SAVE). You will receive a message that says “Work center ASSY10## in plant DL## was created”. You have just created your Assembly work center in the steps above. Appendix F contains data about all of the Work Centers in GBI. Use the data in appendix F to create the following Work Centers: INSP10##, MANT10##, PACK10##, and SERV10##. Create each of the work centers using the steps above. © SAP AG Page 29 Phase IV – Production CASE STUDY IV.3.6: Create Raw Materials Description: This is the first of three steps in which you create materials for testing the Production process. You will create Raw Material by copying from the material master in Company Code US00. Raw Materials (Material Type = ROH) are materials purchased from an external source and used in the production process. The material master for Raw Materials therefore contains both purchasing data and MRP data. You will begin by copying Socket Head Bolt 5x20mm (BOLT1000) from Company Code US00. You will renumber the original bolts and change the description. You will associate your Raw Materials with your Purchasing Group (N##) created in Phase II and your MRP Controller (0##) created earlier in this Phase. Navigation: SAP menu ► Logistics ► Materials Management ► Material Master ► Material ► Create (Special) ► Raw Material Tasks and Data Entry: In the “Create Raw Material (Initial Screen)” screen, enter the following information: Attribute Material Industry sector Copy from…Material Click on Description Key uniquely identifying the material. Industry to which the material is assigned. Material you want the system to copy. Data Value BOLT10## Mechanical engineering BOLT1000 (ENTER). In the “Select View(s)” pop-up, highlight the “Basic Data 1” row. Highlight the “Purchasing” row. Highlight the “MRP1” row. Highlight the “MRP2” row. Highlight the “General Plant Data / Storage 1” row. Highlight the “Accounting 1” row. Highlight the “Costing 1” row. Click on Click on (SAVE AS DEFAULT VALUES). (CONTUNUE (ENTER)). In the “Organizational Levels” pop-up, enter the following information: Attribute © SAP AG Description Data Value Page 30 Phase IV – Production Plant Stor. Location Copy from Plant Copy from Stor. Location Click on Click on CASE STUDY Key uniquely identifying a plant. The storage location at which the material is stored. Plant of the reference material. Storage location of the reference material. Your Plant Dallas Your Raw Materials DL00 RM00 (SAVE AS DEFAULT VALUES). (CONTINUE (ENTER)). You will receive a message that says “The material already exists and will be extended”. In the “Create Raw Material BOLT10##” screen, enter the following information: Attribute Material Description (Short Text) Purchasing Group Click on Description Material Description A buyer or a group of buyers. Data Value ## Socket Head Bolt 5x20mm Your Purchasing Group (ENTER). Enter the following information: Attribute MRP Controller Description Specifies the number of the MRP Controller or group of MRP controllers responsible for material planning. Click on (ENTER) until you reach the last tab. Click on (ENTER). In the “Last data screen reached” pop-up, click on the Data Value Your DL Controller icon. You will receive a message that says “Material BOLT10## created”. You have just created your Socket Head Bolt in the steps above. Appendix G contains data about all of the Raw Materials in GBI. Use the data in appendix G to create the following Raw Materials: BOLT10##, BRKT10##, CHAN10##, DGAM10##, HXNT10##, LWSH10##, PCKG10##, PEDL10##, TRFR30##, TRHB10##, TRSK10##, TRTB10##, TRTR10##, TRWH10##, WDOC10##. Create each of the materials with the same views you used above. © SAP AG Page 31 Phase IV – Production CASE STUDY IV.3.7: Create Semi-Finished Good Description: This is the second of three steps in which you create materials for testing the Production process. You will create a Semi-Finished Good by copying from the material master in Company Code US00. Semi-Finished Goods (Material Type = HALB) are produced in-house from other materials (raw materials and/or semi-finished goods) and are used in the production of Finished Goods. The material master for Semi-Finished Goods therefore contains both production data and MRP data. You will copy the Touring Aluminum Wheel Assembly (TRWA1000) from Company Code US00, renumber the original assembly, and change the description. You will associate your Semi-Finished Good with your MRP Controller (0##) and Production Scheduler (0##) created earlier in this Phase. Navigation: SAP menu ► Logistics ► Materials Management ► Material Master ► Material ► Create (Special) ► Semifinished Product Tasks and Data Entry: In the “Create Semifinished Product (Initial Screen)” screen, enter the following information: Attribute Material Copy from…Material Click on Description Key identifying the material. Material you want to copy from. Data Value TRWA10## TRWA1000 (ENTER). In the “Select View(s)” pop-up, highlight the “Basic Data 1” row. Highlight the “MRP1” row. Highlight the “MRP2” row. Highlight the “Work Scheduling” row. Highlight the “General Plant Data / Storage 1” row. Highlight the “Accounting 1” row. Highlight the “Costing 1” row. Click on Click on (SAVE AS DEFAULT VALUES). (CONTUNUE (ENTER)). In the “Organizational Levels” pop-up, enter the following information: Attribute Stor. Location Copy from Stor. Location © SAP AG Description Location at which the material is stored. Storage location of the reference material. Data Value Your Semi-Finished Goods SF00 Page 32 Phase IV – Production Click on Click on CASE STUDY (SAVE AS DEFAULT VALUES). (CONTINUE (ENTER)). You will receive a message that says “The material already exists and will be extended”. In the “Create Semifinished Product TRWA10##” screen, enter the following information: Attribute Material Description (Short Text) MRP Controller Click on Description Material Description Controller responsible for material planning. Data Value ## Touring Aluminum Wheel Assembly Your DL Controller (ENTER). Enter the following information: Attribute In-house production Click on Description The time in workdays needed to produce the material in-house. Data Value 1 (ENTER). Enter the following information: Attribute Prodn Supervisor Description Responsible for materials in production. Click on (ENTER) until you reach the last tab. Click on (ENTER). Data Value Your DL Production Scheduler In the “Last data screen reached” pop-up, click on the icon. You will receive a message that says “Material TRWA10## created”. © SAP AG Page 33 Phase IV – Production CASE STUDY IV.3.8: Create Finished Good Description: This is the third of three steps in which you create materials for testing the Production process. You will create a Finished Good by copying from the material master in Company Code US00. Finished Goods (Material Type = FERT) are produced in-house from other materials (raw materials and/or semi-finished goods) and are sold to a Customer. The material master for Finished Goods therefore contains production data, MRP data, and sales data. You will copy the Deluxe Touring Bike (red) (DXTR3000) from Company Code US00, renumber the original assembly, and change the description. You will associate your new Finished Good with your MRP Controller (0##) and Production Scheduler (0##) created earlier in this Phase. Navigation: SAP menu ► Logistics ► Materials Management ► Material Master ► Material ► Create (Special) ► Finished Product Tasks and Data Entry: In the “Create Finished Product (Initial Screen)” screen, enter the following information: Attribute Material Copy from…Material Click on Description Key identifying the material. Material you want to copy from. Data Value DXTR30## DXTR3000 (ENTER). In the “Select View(s)” pop-up, highlight the “Basic Data 1” row. Highlight the “MRP1” row. Highlight the “MRP2” row. Highlight the “Work Scheduling” row. Highlight the “General Plant Data / Storage 1” row. Highlight the “Accounting 1” row. Highlight the “Costing 1” row. Click on Click on © SAP AG (SAVE AS DEFAULT VALUES). (CONTINUE (ENTER)). Page 34 Phase IV – Production CASE STUDY In the “Organizational Levels” pop-up, enter the following information: Attribute Stor. Location Copy from Stor. Location Click on Click on Description Location at which the material is stored. Storage location of the reference material. Data Value Your Finished Goods FG00 (SAVE AS DEFAULT VALUES). (CONTINUE (ENTER)). You will receive a message that says “The material already exists and will be extended”. In the “Create Finished Product DXTR30##” screen, enter the following information: Attribute Material Description (Short Text) MRP Controller Click on Description Material Description MRP Controller responsible for material planning for the material. Data Value ## Deluxe Touring Bike (red) Your DL Controller (ENTER). Enter the following information: Attribute In-house production Click on Description The time in workdays needed to produce the material in-house. Data Value 1 (ENTER). Enter the following information: Attribute Prodn Supervisor Description Responsible for materials in production. Click on (ENTER) until you reach the last tab. Click on (ENTER). Data Value Your DL Production Scheduler In the “Last data screen reached” pop-up, click on the icon. You will receive a message that says “Material DXTR30## created”. © SAP AG Page 35 Phase IV – Production CASE STUDY IV.3.9: Create Bills of Materials Description: You will create Bills of Material (BOM) for use at Dallas by copying from Company Code US00. A BOM is a structured list of all the components and their quantities that make up a manufactured good. You will create BOMs for both your Semi-Finished Good and your Finished Good. Note that the Bill of Material is developed for an individual plant, so GBI can use different Bills of Materials for the same manufactured good as local plant needs dictate. You will copy the BOM from the Dallas Plant (DL00) in Company Code US00; and change each component from the original material (example, BOLT1000) to your material (example, BOLT10##). Navigation: SAP menu ► Logistics ► Production ► Master Data ► Bills of Material ► Bill of Material ► Material BOM ► Create Tasks and Data Entry: In the “Create material BOM: Initial Screen” screen, enter the following information: Attribute Material Plant BOM Usage Click on Description Key uniquely identifying the material. Key uniquely identifying a plant. Defines the area where a BOM can be used. Data Value Your Touring Aluminum Wheel Assembly Your Plant Dallas Production (COPY FROM…). In the “Copy From…” pop-up, enter the following information: Attribute Material Plant Click on Description Key uniquely identifying the material. Key uniquely identifying a plant. Data Value Original Touring Aluminum Wheel Assembly Original Plant Dallas (CONTINUE (ENTER)). In the “Create material BOM: Copy From” screen, click on the Click on icon. (COPY). You will receive an error that says “Material TRTR1000 not maintained in plant DL##”. In the “Create material BOM: Item: General data” screen, enter the following information: Attribute Component Click on © SAP AG Description Material number of the components that you enter. Data Value Your Touring Tire (ENTER). Page 36 Phase IV – Production CASE STUDY You will receive an error that says “Material TRTB1000 not maintained in plant DL##”. Repeat this to add the rest of your raw materials to your touring wheel assembly bill of materials. You are now in the “Create material BOM: General Item Overview” screen. Click on (SAVE). You will receive a message that says “Creating BOM for material TRWA10##”. In the “Create material BOM: Initial Screen” screen, enter the following information: Attribute Material Click on Description Alphanumeric key uniquely identifying the material. Data Value Your Deluxe Touring Bike (red) (COPY FROM…). In the “Copy From…” pop-up, enter the following information: Attribute Material Description Alphanumeric key uniquely identifying the material. Key uniquely identifying a plant. Plant Click on Data Value Original Deluxe Touring Bike (red) Original Plant Dallas (CONTINUE (ENTER)). In the “Create material BOM: Copy From” screen, click on the Click on icon. (COPY). You will receive an error that says “Material TRWA1000 not maintained in plant DL##”. In the “Create material BOM: Item: General data” screen, enter the following information: Attribute Component Click on Description Number of the components that you enter. Data Value Your Touring Aluminum Wheel Assembly (ENTER). You will receive an error that says “Material TRFR3000 not maintained in plant DL##”. Repeat this to add all of your raw materials to your deluxe touring bike (red) bill of materials. You are in the “Create material BOM: General Item Overview” screen. Click on © SAP AG (SAVE). You will receive a message that says “Creating BOM for material DXTR30##”. Page 37 Phase IV – Production CASE STUDY IV.3.10: Create Product Routings Description: This is the third of three steps in which you will define the labor needed to manufacture products. You will create Product Routings for use at Dallas by copying from Company Code US00. A Product Routing describes the sequence of operations required to produce a manufactured good. Examples of operations include assembly, inspection, and packing. Each operation is associated with a Work Center. Note that: the Routing is developed for an individual plant, so GBI can use different Routings for the same manufactured good as local plant needs dictate. each operation includes setup time, machine time, and labor time. This data allows GBI to do capacity planning and product costing. You will copy the Routing from the Dallas Plant (DL00) in Company Code US00; and change each Work Center from the original Work Center (example, ASSY1000) to your Work Center (example, ASSY10##). Navigation: SAP menu ► Logistics ► Production ► Master Data ► Routings ► Routings ► Standard Routings ► Create Tasks and Data Entry: In the “Create Routing: Initial Screen” screen, enter the following information: Attribute Material Plant Click on Description Key uniquely identifying the material. Key uniquely identifying a plant. Data Value Your Touring Aluminum Wheel Assembly Your Plant Dallas (COPY FROM…). In the “Select Type” pop-up, click on the icon. You are in the “Create Using Copy Function: Select Object to be Copied” pop-up. Enter the following information: Attribute Material Plant Click on Description Key uniquely identifying the material. Key uniquely identifying a plant. Data Value Original Touring Aluminum Wheel Assembly Original Plant Dallas (CONTINUE (ENTER)). In the “Create Routing: Header Data Check” screen, enter the following information: Attribute © SAP AG Description Data Value Page 38 Phase IV – Production Status Click on CASE STUDY You use the status key to indicate the processing status of a task list. Released (general) (ENTER). You will receive an error that says “Work center ASSY1000 does not exist in plant DL##”. In the “Create Routing: Operation – Check” screen, enter the following information: Attribute Work center Click on Description Key identifying the work center. (ENTER). In the “Information” pop-up, click on the Click on Data Value ASSY10## icon. (CONTINUE (ENTER)). You will receive a message that says “Enter standard value Setup”. In the “Create Routing: Operation – Check” screen, click on the icon. You will receive a message that says “Enter standard value Setup”. Click on (ENTER). Repeat this to add the rest of your work centers to your touring wheel assembly product routing. In the “Create Routing: Operation Overview” screen, click on the icon. You will receive a message that says “Routing was saved with group and material TRWA10##”. In the “Create Routing: Initial Screen” screen, enter the following information: Attribute Material Plant Description Alphanumeric key uniquely identifying the material. Key uniquely identifying a plant. Data Value Your Deluxe Touring Bike (red) Your Plant Dallas Make sure to clear the “group” field in the “Create Routing: Initial Screen” before creating the DXTR30## routing. Click on (COPY FROM…). In the “Select Type” pop-up, click on the icon. You are in the “Create Using Copy Function1: Select Object to be Copied” pop-up. © SAP AG Page 39 Phase IV – Production CASE STUDY Enter the following information: Attribute Material Description Alphanumeric key uniquely identifying the material. Key uniquely identifying a plant. Plant Click on Data Value Original Deluxe Touring Bike (red) Original Plant Dallas (CONTINUE (ENTER)). In the “Create Routing: Header Data Check” screen, enter the following information: Attribute Status Click on Description You use the status key to indicate the processing status of a task list. Data Value Released (general) (ENTER). You will receive an error that says “Work center ASSY10## does not exist in plant DL##”. In the “Create Routing: Operation – Check” screen, enter the following information: Attribute Work center Click on Description Key identifying the work center. (ENTER). In the “Information” pop-up, click on the Click on Data Value ASSY10## icon. (CONTINUE (ENTER)). You will receive a message that says “Enter standard value Setup”. In the “Create Routing: Operation – Check” screen, click on the icon. You will receive a message that says “Enter standard value Setup”. Click on (ENTER). Repeat these steps to add the rest of your work centers to your deluxe touring bike (red) product routing. In the “Create Routing: Operation Overview” screen, click on the icon. You will receive a message that says “Routing was saved with group and material DXTR30##”. © SAP AG Page 40 Phase IV – Production CASE STUDY Part IV.4 – Process Execution Enterprise Structure Rules and Parameters Master Data Process Execution Table of Contents IV.4.1: Create Initial Inventory Balances....................................................................................42 IV.4.2: Create Planned Order for Semifinished..........................................................................44 IV.4.3: Convert Planned Order for Semifinished ........................................................................45 IV.4.4: Issue Materials to Production Order I .............................................................................46 IV.4.5: Confirm Production for Semifinished ..............................................................................47 IV.4.6: Receive Semifinished Into Inventory ..............................................................................48 IV.4.7: Create Planned Order for Finished Goods .....................................................................49 IV.4.8: Convert Planned Order for Finished...............................................................................50 IV.4.9: Issue Materials to Production Order II ............................................................................51 IV.4.10: Confirm Production for Finished Goods .......................................................................52 IV.4.11: Receive Finished Goods into Inventory ........................................................................53 © SAP AG Page 41 Phase IV – Production CASE STUDY IV.4.1: Create Initial Inventory Balances Description: Testing of the production process is organized into three parts: Create raw material inventory balance (IV.4.1) Produce semi-finished good (Touring Aluminum Wheel Assembly) (IV.4.2 – 6) Product finished good (Deluxe Touring Bike (red) (IV.4.7 – 11) In this step, you create the raw material inventory balance required to produce 10 bikes. Normally, the material planning process would create purchase requisitions for the necessary raw materials. You would then execute the procurement process and receive these materials into inventory. However, for the purpose of this exercise, we will take a shortcut and create “inventory from heaven” using a special movement type (561). Recall that earlier in this Phase, you create the General Ledger accounts required for this special movement type. Navigation: SAP menu ► Logistics ► Materials Management ► Inventory Management ► Goods Movement ► Goods Receipt ► Other Tasks and Data Entry: In the “Enter Other Goods Receipts: Initial Screen” screen, enter the following information: Attribute Movement Type Storage Location Click on Description Goods Movement Type Location at which the material is stored. Data Value Receipt per initial entry of stock balances into unr.-use Your Raw Materials (ENTER). In the “Enter Other Goods Receipts: New Items” screen, enter the following information: Material BOLT10## BRKT10## CHAN10## DGAM10## HXNT10## LWSH10## PCKG10## PEDL10## TRFR30## TRHB10## TRSK10## TRTB10## TRTR10## TRWH10## WDOC10## © SAP AG Quantity 20 10 10 10 20 40 10 10 10 10 10 20 20 20 10 UnE EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA Plant Your Plant Dallas Your Plant Dallas Your Plant Dallas Your Plant Dallas Your Plant Dallas Your Plant Dallas Your Plant Dallas Your Plant Dallas Your Plant Dallas Your Plant Dallas Your Plant Dallas Your Plant Dallas Your Plant Dallas Your Plant Dallas Your Plant Dallas Page 42 Phase IV – Production CASE STUDY You may need to press the (NEW ITEMS) button in order to get to another screen where you can enter the rest of the materials. Click on © SAP AG (SAVE). You will receive a message that says “Document posted”. Page 43 Phase IV – Production CASE STUDY IV.4.2: Create Planned Order for Semi-finished Description: This is the first of five steps to test production of your Semi-Finished Good (Touring Aluminum Wheel Assembly). You will manually create a planned production order for your wheel assembly. Normally, the material planning process (MRP) would evaluate the demand for bikes, and create planned production orders for the correct quantity of wheel assemblies. However, for the purpose of this exercise, you have manually determined that you need 10 bikes (DXTR30##). To manufacture the bikes, you need 20 wheel assemblies (TRWA10##). The planned production order for 20 Wheel Assemblies is sent to the Dallas production schedulers specifying when the wheel assemblies must be available in inventory. Navigation: SAP menu ► Logistics ► Production ► MRP ► Planned Order ► Create Tasks and Data Entry: In the “Create Planned Order: Initial Screen” screen, enter the following information: Attribute Planned order profile Click on Description Profile that determines the order type, the procurement type, the special procurement type, and the account assignment type for processing the planned order. Data Value Stock Order (ENTER). In the “Create Planned Order: Stock order” screen, enter the following information: Attribute Material Order quantity Description Number of the material for the order. Quantity to be produced or ordered according to the planned order. Ord.finish Date that you should expect either the completion or the delivery of the order. Producing plant Plant in which the order quantity of the internally produced material is to be produced according to the planned order. Stor. Location Location at which the material is stored. Click on © SAP AG Data Value Your Touring Aluminum Wheel Assembly 20 One Week from Today Your Plant Dallas Your Semi-Finished Goods (SAVE). You will receive a message that says “Planned order will be created”. Page 44 Phase IV – Production CASE STUDY IV.4.3: Convert Planned Order for Semi-finished Description: This is the second of five steps to test production of your Semi-Finished Good (Touring Aluminum Wheel Assembly). You will manually convert your planned production order (PldOrd) into a production order (PrdOrd). This authorizes that production may begin. Note that after conversion, the production scheduler is able to change components, quantities, or dates. Navigation: SAP menu ► Logistics ► Production ► MRP ► Evaluations ► Stock/Requirements List Tasks and Data Entry: Be sure that the system defaults your wheel assembly into the material field. In the “Stock/Requirements List: Initial Screen” screen, click on the icon. In the “Stock/Requirements List” screen, double-click on PldOrd. In the “Additional Data for MRP Element” pop-up, click on the icon. You will receive a message that says “Release carried out”. In the “Production order Create: Header” screen, click on the icon. You will receive a message that says “Order number saved”. © SAP AG Page 45 Phase IV – Production CASE STUDY IV.4.4: Issue Materials to Production Order I Description: This is the third of five steps to test production of your Semi-Finished Good (Touring Aluminum Wheel Assembly). You will manually release (issue) the raw materials needed to produce the 20 wheel assemblies. This goods issue transaction posts the raw material costs to the production order, and decreases inventory from the Raw Materials storage location. Navigation: SAP menu ► Logistics ► Production ► Shop Floor Control ► Goods Movements ► Goods Issue Tasks and Data Entry: In the “Enter Goods Issue: Initial Screen” screen, enter the following information: Attribute Movement Type Storage Location Click on Description Number the system uses to determine the rules for updating quantities and values in the relevant general ledger accounts. Location at which the material is stored. Data Value Consumption for order from warehouse Raw Materials (TO ORDER…). In the “Reference: Order” pop-up, enter the following information: Attribute Description Order Number of production order to which you issue the materials. Click on Data Value Production Order Number (CONTINUE (ENTER)). In the “Enter Goods Issue: Selection Screen” screen, click on the icon. You will receive a message that says “Document posted”. © SAP AG Page 46 Phase IV – Production CASE STUDY IV.4.5: Confirm Production for Semi-finished Description: This is the fourth of five steps to test production of your Semi-Finished Good (Touring Aluminum Wheel Assembly). In the previous step, you released raw material to the production order. You will now confirm the completion of the wheel assemblies. Your Dallas plant completed all 20 wheel assemblies, so you verify a yield of 20. Navigation: SAP menu ► Logistics ► Production ► Shop Floor Control ► Confirmation ► Enter ► For Order Tasks and Data Entry: In the “Enter Production Order Confirmation: Initial Screen” screen, enter the following information: Attribute Order Click on Description Number which identifies an order number. Data Value Production Order Number (ENTER). In the “Confirmation of Production Order Enter: Actual Data” screen, enter the following information: Attribute Yield to conf. Click on © SAP AG Description Yield that you want to confirm for the operation. Data Value 20 (SAVE). You will receive a message that says “Confirmation of order saved”. Page 47 Phase IV – Production CASE STUDY IV.4.6: Receive Semi-finished Into Inventory Description: This is the last of five steps to test production of your Semi-Finished Good (Touring Aluminum Wheel Assembly). In the previous step, you confirmed the yield of the production process. You will now receive the 20 wheel assemblies into inventory. This goods receipt transaction increases inventory in the SemiFinished Goods storage location. Navigation: SAP menu ► Logistics ► Production ► Shop Floor Control ► Goods Movements ► Goods Receipt Tasks and Data Entry: In the “Goods Receipt for Order: Initial Screen” screen, enter the following information: Attribute Movement Type Order Storage Location Click on Description Goods Movement Type Identifies an order within a client. Location at which the material is stored. Data Value Good receipt for order into warehouse Production Order Number Your Semi-Finished Goods (ADOPT + DETAILS). In the “Goods Receipt for Order: New Items 0001” screen, enter the following information: Attribute Deliv. Compl. Click on © SAP AG Description Indicates that the item is to be regarded as closed. Data Value Selected (SAVE). You will receive a message that says “Document posted”. Page 48 Phase IV – Production CASE STUDY IV.4.7: Create Planned Order for Finished Goods Description: This is the first of five steps to test production of your Finished Good (Deluxe Touring Bike (red)). You will manually create a planned production order for your touring bikes. Normally, the material planning process (MRP) would evaluate the demand for bikes, and create planned production orders for the correct quantity of red touring bikes. However, for the purpose of this exercise, you have manually determined that you need 10 bikes (DXTR30##). The planned production order for 10 bikes is sent to the Dallas production schedulers specifying when the bikes must be available in inventory. Navigation: SAP menu ► Logistics ► Production ► MRP ► Planned Order ► Create Tasks and Data Entry: In the “Create Planned Order: Initial Screen” screen, click on the icon. In the “Create Planned Order: Stock order” screen, enter the following information: Attribute Material Order quantity Ord.finish Producing plant Stor. Location Click on © SAP AG Description Number of the material. Quantity to be produced or ordered according to the planned order. Date, according to the planned order, that you should expect either the completion or the delivery of the planned order quantity. Plant in which the order quantity of the internally produced material is to be produced according to the planned order. Location at which the material is stored. Data Value Your Deluxe Touring Bike (red) 10 One Week from Today Your Plant Dallas Your Finished Goods (SAVE). You will receive a message that says “Planned order will be created”. Page 49 Phase IV – Production CASE STUDY IV.4.8: Convert Planned Order for Finished Description: This is the second of five steps to test production of your Finished Good (Deluxe Touring Bike (red)). You will manually convert your planned production order into a production order. This authorizes that production may begin. Navigation: SAP menu ► Logistics ► Production ► MRP ► Evaluations ► Stock/Requirements List Tasks and Data Entry: In the “Stock/Requirements List: Initial Screen” screen, click on the icon. In the “Stock/Requirements List” screen, double-click on PldOrd. In the “Additional Data for MRP Element” pop-up, click on the icon. You will receive a message that says “Release carried out”. In the “Production order Create: Header” screen, click on the icon. You will receive a message that says “Order number saved”. © SAP AG Page 50 Phase IV – Production CASE STUDY IV.4.9: Issue Materials to Production Order II Description: This is the third of five steps to test production of your Finished Good (Deluxe Touring Bike (red)). You will manually release (issue) the raw materials and semi-finished goods needed to produce the 10 bikes. This goods issue transaction posts the raw material and semi-finished goods costs to the production order, and decreases inventory from the Raw Materials storage location and from the Semi-Finished Goods storage location. Navigation: SAP menu ► Logistics ► Production ► Shop Floor Control ► Goods Movements ► Goods Issue Tasks and Data Entry: In the “Enter Goods Issue: Initial Screen” screen, enter the following information: Attribute Movement Type Storage Location Click on Description Number the system uses to determine the rules for updating quantities and values in the relevant ledger accounts. Number of the storage location at which the material is stored. A plant may contain one or more storage locations. Data Value Consumption for order from warehouse Your Raw Materials (TO ORDER…). In the “Reference: Order” pop-up, enter the following information: Attribute Order Description Order Number Click on Data Value Production Order Number (ADOPT + DETAILS). In the “Enter Goods Issue: New Item 0001” screen, enter the following information: Material Your Touring Aluminum Wheel Assembly Click on Quantity 20 SLoc Your Semi-Finished Goods (ADOPT). In the “Enter Goods Issue: New Item 0002” screen, click on the icon. Repeat this for the remaining materials. Keep in mind that the rest of the materials are all raw materials. In the “Enter Goods Issue: Overview” screen, click on the icon. You will receive a message that says “Document posted”. © SAP AG Page 51 Phase IV – Production CASE STUDY IV.4.10: Confirm Production for Finished Goods Description: This is the fourth of five steps to test production of your Finished Good (Deluxe Touring Bike (red)). In the previous step, you released raw materials and semi-finished goods to the production order. You will now confirm completion of the bikes. Your Dallas plant completed all 10 bikes, so you verify a yield of 10. Navigation: SAP menu ► Logistics ► Production ► Shop Floor Control ► Confirmation ► Enter ► For Order Tasks and Data Entry: In the “Enter Production Order Confirmation: Initial Screen” screen, enter the following information: Attribute Order Click on Description Order of which you wish to confirm production. Data Value Production Order Number (ENTER). In the “Confirmation of Production Order Enter: Actual Data” screen, enter the following information: Attribute Yield to conf. Click on © SAP AG Description Yield that you want to confirm for the operation. Data Value 10 (SAVE). You will receive a message that says “Confirmation of order saved”. Page 52 Phase IV – Production CASE STUDY IV.4.11: Receive Finished Goods into Inventory Description: This is the fifth of five steps to test production of your Finished Good (Deluxe Touring Bike (red)). In the previous step, you confirmed the yield of the production process. You will now receive the 10 bikes into inventory. This goods receipt transaction increases inventory in the Finished Goods storage location. Navigation: SAP menu ► Logistics ► Production ► Shop Floor Control ► Goods Movements ► Goods Receipt Tasks and Data Entry: In the “Enter Receipt for Order: Initial Screen” screen, enter the following information: Attribute Movement Type Order Storage Location Click on Description Movement Number which identifies an order within a client. Number of the storage location at which the material is stored. Data Value Good receipt for order into warehouse Production Order Number Your Finished Goods (ADOPT + DETAILS). In the “Goods Receipt for Order: Items 0001” screen, enter the following information: Attribute Deliv. Compl. Click on © SAP AG Description Indicates that the item is to be regarded as closed. Data Value Selected (SAVE). You will receive a message that says “Document posted”. Page 53