FORCEnet – Engineering & Architecting The Navy’s IT Future NMCI - Industry Symposium 19 Jun 2003 RADM Mike Sharp, USN Vice Commander Space & Naval Warfare Systems Command Agenda • SPAWAR Review • SeaPower 21 & FORCEnet • FORCEnet and NMCI SPAWAR - A Quick Review One of the Navy’s three major acquisition commands with 7,700 employees What we do… • Partner with PEO- C4I & Space to deliver C4ISR capability to the joint warfighter • Partner with PEO-IT & DNMCI • Develop Navy, Joint and Coalition Interoperability • Navy C4ISR Chief Engineer • Navy FORCEnet Chief Architect/Assessor • Combined TOA $4.7 Billion The Mission We deliver FORCEnet to the Joint Warfighter through the DEVELOPMENT, ACQUISITION, and LIFE CYCLE SUPPORT of effective, capable and integrated command, control communication, computer, intelligence, surveillance and reconnaissance, IT, and space systems. Functional Organization Function Responsibility C4I & FORCEnet Architecture / Objectives Systems Design and Engineering Functional Allocation/Financial Planning Chief Engineer (05) Science & Technology/Advanced Development Space Tech Systems C2 + Combat Support Apps Networks + Info Comms Systems Assurance PEO C4I & Space Defense In Depth Navy / Marine Corps Intranet Systems Integration and Testing PEO IT / DNMCI Chief Engineer (05) Integrated Implementation Planning Battle Group Test/Training/Support Financial Management / Contracting Support Chief Installer (04) Comptroller (01) Contracts (02) The Navy’s Vision FORCEnet Operational View • Sea Power 21 – “Naval” • Joint from Inception – – – – – GIG-BE TCA NCES JTR Others • Commercial Standards • Spiral Development with Sea Trial • Warrior Focused FORCEnet Schedule SPAWAR Other SYSCOMs & Commands OPNAV Fleet Engagement = CNO Guidance 2003 Focus Areas CY 2003 24 Apr: Assessment Team Identify Milestones Assessment C C Wk of14 Apr: POM05 Data Link Assessment 22 May: M&S and Cost Analysis Results C 5 Jun: POM 06 Assessment Draft for Review by Stakeholders 5 6 8 May: Stakeholder Buy-in to Assessment Domain & Approach 3 Jun: FBE KILO Input to Fn C C 8-11 Apr: Campaign Plan Build Conf Quick Successes (Warfighting Capabilities) C 6 9 C 30 Sep: 22 Oct: IPD N6-N7 POM Execution 06 Brief to Assessment CNO 27 Jun: POM 06 Assessments to CNO 704B 5 6 10 15 Jun: Fn Architecture & Standards V1.0 31 May: Campaign Plan Completed C 5 Wk of 21 Apr: Brief Fn Leadership 4-8 Aug: Fn IPD Final Planning Conference 28 Apr – 9 May: Fn LOE 03-2 C C 22-23 Apr: Fn IPD Initial Planning Conference 10 1 Oct: Fn Master Plan V1.0 1 May: 15 May: Fn Architecture & Fn GRA Standards Vision V1.1 Preliminary Draft Document Campaign Plan 6 5-7 May: NNWC Architecture Conference 2 Apr: Fn GRA Vision V1.0 Architecture / Standards C Completed CY 2003 6 17-18 Jun: Fn IPD Mid Planning Conference 8 25-30 Sep: Fn IPD Execution 9 9 3-10 Sep: IPD in JTFW Regional Test 2 Architectural Process Govt. Ref. Arch. Vision Version 1.0 – 02 Apr 03 Version 1.1 – 15 May 03 Master Plan Version 1.0 – 1 Oct 03 Architecture & Standards Version 1.0 – 1 May 03 OPNAV & ASN(RDA) Review Distributed Services IP- Based Network Industry Review & Comment Network Data Integration Application GCCS C2P JSWS GALE Language OTH-G TADIL J GMTI SENSOREP Transport UHF SATCOM HF LOS/L-BAND UHF LOS UHF SATCOM (OTCIXS) (Link 16) Radio/Term GFCP JTIDS MUST JTT Language OTH-G TADIL J GMTI/NATO EX SENSOREP •• • IT-21 Application GCCS C2P JSWS GALE Network Data Integration Area 0 Area 0 Area 0 SIS SHF 2 TC AEHF Transport Area 0 DL Mobile Qos Radio/Term Services, not Platforms Language XML or Language Translation Service C4I Service C2 Link Service Separation of Interface from Implementation Protocol Neutral MTI Service SIGINT Service Architectural Process Govt. Ref. Arch. Vision Version 1.0 – 02 Apr 03 Version 1.1 – 15 May 03 Master Plan Version 1.0 – 1 Oct 03 Architecture & Standards Version 1.0 – 1 May 03 OPNAV & ASN(RDA) Review Distributed Services IP- Based Network Industry Review & Comment JTF Connectivity Today: Based on Wireline Networking Principles UAV Tier II+ Tier 3 - Mobile SATCOM / Microwave (Trunk Links) Tier 2 - Mobile LOS Network (Backbone Subnet Links) Tier 1 - Mobile Handheld (Subscriber Subnet Links) Air Force Area 0 G Army Area 0 G Navy Area 0 G Sub ARG G BG ARG Marines Area 0 This is the way we will fight, this is the communications capability we want! UAV Tier II+ Tier 3 - Mobile SATCOM / Microwave (Trunk Links) Tier 2 - Mobile LOS Network (Backbone Subnet Links) Tier 1 - Mobile Handheld (Subscriber Subnet Links) G G G G BG OBJECTIVE FORCEnet Challenges • • • • • • Multi-Level Security Information Assurance IP Quality of Service IP for Mobile Users Leverage Experimentation & Pilots Explore large scale integration approach Agenda • SPAWAR Review • SeaPower 21 & FORCEnet • FORCEnet and NMCI Tying it together Future Readiness Current Readiness INFRASTRUCTURE NMCI + DECISION MAKING IT-21 + Information Fusion = Knowledge FORCEnet Superiority Getting from here to there NMCI & Tactical Networks Interface Base Area Network Metropolitan Area Network NMCI/IT-21 Interface LAN Long Haul (DISN, with Commercial as necessary) BASE CLINIC LAN TRNG CEN Wide Area Network HQ NAVAL AMPHIBIOUS BASE MC AIR STATION DoD TELEPORT BASE NOC IMA FISC NMCI to the pier NCTAMS TRAINING CENTER USN/USMC LOGISTIC BASE Network Operations Center End-to-End Connectivity Deployed/ Mobile Units NMCI will deliver to the Web-enabled Navy Embarkables Business and Operations Navy Marine Corps Intranet Industry Partners Extranet SYSCOM IT21 / Marine Corps Tactical Network Navy Research Learning Network Network “.edu” Defense Information System Network (DISN)/ Global Information Grid (GIG) Training Center HQ Pier Connections TELEPORT Network Operations Clinic Center (DISN Interface) Authoritative Data Centers Replicated Data Bases Per Mission Requirements Fleet & USMC Deployed Forces Common User Access Between Afloat and Shore CNO’s Philosophy “I want everyone here in industry to remember that Vern Clark said here today that we are never ever building another capability that doesn't fit into a FORCENet architecture for the future that ensures everybody is netted and connected. That is the future.” Admiral Vern Clark Sea Air Space Exposition Washington, D.C. April 17, 2003 Backup Building C4I Joint Team DRAFT Service/Agency USMC Army Air Force PEO Interchange, GCCS FoS PM-CESG FIOP MSMT Joint TADIL WG COE/NCES AOG and CRCB Joint GMTI Steering Group, etc etc Services Title X Train, Organize, and Equip - Requirements - Operational Problems - Systems Eng Process - FIOP Coord JBMC2 “Board” Role/Process in definition (MID 912) JVCS ESG* Consultant to JBMC2 Board on C4I Acquisition C4I Collaborative Integration Consultant Services include: - System-of-systems arch - Common components - Software, comms, etc - Synchronized fielding - Interop improvements - Coordinated roadmaps OSD Oversight JFCOM J6 J8/JI&I J9 * Flag-level Executive Steering Group, integrate/transform JCIG, PEO Interchange, etc