FORCEnet – Engineering & Architecting The Navy's IT Future

advertisement
FORCEnet –
Engineering & Architecting
The Navy’s IT Future
NMCI - Industry Symposium
19 Jun 2003
RADM Mike Sharp, USN
Vice Commander
Space & Naval Warfare Systems Command
Agenda
• SPAWAR Review
• SeaPower 21 & FORCEnet
• FORCEnet and NMCI
SPAWAR - A Quick Review
One of the Navy’s three major acquisition
commands with 7,700 employees
What we do…
• Partner with PEO- C4I & Space
to deliver C4ISR capability to the
joint warfighter
• Partner with PEO-IT & DNMCI
• Develop Navy, Joint and
Coalition Interoperability
• Navy C4ISR Chief Engineer
• Navy FORCEnet Chief
Architect/Assessor
• Combined TOA $4.7 Billion
The Mission
We deliver
FORCEnet
to the Joint Warfighter through
the
DEVELOPMENT,
ACQUISITION,
and
LIFE CYCLE SUPPORT
of effective, capable and
integrated command, control
communication, computer,
intelligence, surveillance and
reconnaissance, IT,
and space systems.
Functional Organization
Function
Responsibility
C4I & FORCEnet Architecture / Objectives
Systems Design and Engineering
Functional Allocation/Financial Planning
Chief Engineer (05)
Science & Technology/Advanced Development
Space
Tech
Systems
C2 +
Combat
Support
Apps
Networks
+ Info
Comms
Systems
Assurance
PEO C4I & Space
Defense In Depth
Navy / Marine Corps Intranet
Systems Integration and Testing
PEO IT / DNMCI
Chief Engineer (05)
Integrated Implementation Planning
Battle Group Test/Training/Support
Financial Management / Contracting Support
Chief Installer (04)
Comptroller (01)
Contracts (02)
The Navy’s Vision
FORCEnet Operational View
• Sea Power 21 –
“Naval”
• Joint from
Inception
–
–
–
–
–
GIG-BE
TCA
NCES
JTR
Others
• Commercial
Standards
• Spiral
Development
with Sea Trial
• Warrior Focused
FORCEnet Schedule
SPAWAR
Other SYSCOMs
& Commands
OPNAV
Fleet Engagement
= CNO Guidance 2003
Focus Areas
CY 2003
24 Apr:
Assessment Team
Identify
Milestones
Assessment
C
C
Wk of14 Apr:
POM05 Data
Link
Assessment
22 May:
M&S and Cost
Analysis Results
C
5 Jun:
POM 06 Assessment
Draft for Review by
Stakeholders
5
6
8 May:
Stakeholder Buy-in to
Assessment Domain &
Approach
3 Jun:
FBE KILO
Input to
Fn
C
C
8-11 Apr:
Campaign Plan
Build Conf
Quick
Successes
(Warfighting
Capabilities)
C
6
9
C
30 Sep:
22 Oct:
IPD
N6-N7 POM
Execution 06 Brief to
Assessment
CNO
27 Jun:
POM 06
Assessments
to CNO 704B
5
6
10
15 Jun:
Fn Architecture &
Standards V1.0
31 May:
Campaign Plan
Completed
C
5
Wk of 21 Apr:
Brief Fn
Leadership
4-8 Aug:
Fn IPD Final Planning
Conference
28 Apr – 9 May:
Fn LOE 03-2
C
C
22-23 Apr:
Fn IPD Initial
Planning Conference
10
1 Oct:
Fn Master
Plan V1.0
1 May:
15 May:
Fn Architecture &
Fn GRA
Standards
Vision V1.1
Preliminary Draft
Document
Campaign
Plan
6
5-7 May:
NNWC Architecture
Conference
2 Apr:
Fn GRA
Vision V1.0
Architecture
/ Standards
C Completed
CY
2003
6
17-18 Jun:
Fn IPD Mid Planning
Conference
8
25-30 Sep:
Fn IPD
Execution
9
9
3-10 Sep:
IPD in JTFW Regional
Test 2
Architectural Process
Govt. Ref. Arch. Vision
Version 1.0 – 02 Apr 03
Version 1.1 – 15 May 03
Master Plan
Version 1.0 –
1 Oct 03
Architecture &
Standards
Version 1.0 – 1 May 03
OPNAV &
ASN(RDA)
Review
Distributed Services
IP- Based Network
Industry
Review &
Comment
Network Data Integration
Application
GCCS
C2P
JSWS
GALE
Language
OTH-G
TADIL J
GMTI
SENSOREP
Transport
UHF SATCOM
HF LOS/L-BAND
UHF LOS
UHF SATCOM
(OTCIXS)
(Link 16)
Radio/Term
GFCP
JTIDS
MUST
JTT
Language
OTH-G
TADIL J
GMTI/NATO EX
SENSOREP
••
•
IT-21
Application
GCCS
C2P
JSWS
GALE
Network Data Integration
Area 0
Area 0
Area 0
SIS
SHF 2
TC
AEHF
Transport
Area 0
DL
Mobile
Qos
Radio/Term
Services, not Platforms
Language
XML or Language
Translation
Service
C4I
Service
C2 Link
Service
Separation of
Interface from
Implementation
Protocol Neutral
MTI
Service
SIGINT
Service
Architectural Process
Govt. Ref. Arch. Vision
Version 1.0 – 02 Apr 03
Version 1.1 – 15 May 03
Master Plan
Version 1.0 –
1 Oct 03
Architecture &
Standards
Version 1.0 – 1 May 03
OPNAV &
ASN(RDA)
Review
Distributed Services
IP- Based Network
Industry
Review &
Comment
JTF Connectivity Today:
Based on Wireline Networking Principles
UAV Tier II+
Tier 3 - Mobile SATCOM / Microwave (Trunk Links)
Tier 2 - Mobile LOS Network (Backbone Subnet Links)
Tier 1 - Mobile Handheld (Subscriber Subnet Links)
Air Force Area
0
G
Army Area 0
G
Navy Area 0
G
Sub
ARG
G
BG
ARG
Marines Area 0
This is the way we will fight, this is the
communications capability we want!
UAV Tier II+
Tier 3 - Mobile SATCOM / Microwave (Trunk Links)
Tier 2 - Mobile LOS Network (Backbone Subnet Links)
Tier 1 - Mobile Handheld (Subscriber Subnet Links)
G
G
G
G
BG
OBJECTIVE
FORCEnet Challenges
•
•
•
•
•
•
Multi-Level Security
Information Assurance
IP Quality of Service
IP for Mobile Users
Leverage Experimentation & Pilots
Explore large scale integration
approach
Agenda
• SPAWAR Review
• SeaPower 21 & FORCEnet
• FORCEnet and NMCI
Tying it together
Future
Readiness
Current
Readiness
INFRASTRUCTURE
NMCI
+
DECISION MAKING
IT-21
+
Information
Fusion
=
Knowledge
FORCEnet
Superiority
Getting from here to there
NMCI & Tactical Networks
Interface
Base Area
Network
Metropolitan
Area Network
NMCI/IT-21 Interface
LAN
Long Haul
(DISN, with Commercial as necessary)
BASE
CLINIC
LAN
TRNG CEN
Wide
Area
Network
HQ
NAVAL
AMPHIBIOUS
BASE
MC AIR
STATION
DoD TELEPORT
BASE
NOC
IMA
FISC
NMCI to
the pier
NCTAMS
TRAINING
CENTER
USN/USMC
LOGISTIC
BASE
Network
Operations
Center
End-to-End Connectivity
Deployed/
Mobile
Units
NMCI will deliver to the
Web-enabled Navy
Embarkables
Business
and
Operations
Navy Marine Corps Intranet
Industry
Partners
Extranet
SYSCOM
IT21 /
Marine Corps Tactical Network
Navy
Research Learning
Network Network
“.edu”
Defense Information
System Network (DISN)/
Global Information Grid
(GIG)
Training
Center
HQ
Pier
Connections
TELEPORT
Network Operations
Clinic
Center
(DISN Interface)
Authoritative
Data Centers
Replicated
Data Bases
Per Mission
Requirements
Fleet & USMC
Deployed Forces
Common
User Access
Between
Afloat and Shore
CNO’s Philosophy
“I want everyone here in industry to
remember that Vern Clark said here
today that we are never ever building
another capability that doesn't fit into a
FORCENet architecture for the future
that ensures everybody is netted and
connected. That is the future.”
Admiral Vern Clark
Sea Air Space Exposition
Washington, D.C.
April 17, 2003
Backup
Building C4I Joint Team
DRAFT
Service/Agency
USMC
Army
Air Force
PEO Interchange, GCCS FoS PM-CESG
FIOP MSMT
Joint TADIL WG
COE/NCES AOG and CRCB
Joint GMTI Steering Group, etc etc
Services Title X Train,
Organize, and Equip
- Requirements
- Operational Problems
- Systems Eng Process
- FIOP Coord
JBMC2
“Board”
Role/Process
in definition
(MID 912)
JVCS ESG*
Consultant
to JBMC2 Board
on C4I Acquisition
C4I Collaborative
Integration
Consultant Services include:
- System-of-systems arch
- Common components
- Software, comms, etc
- Synchronized fielding
- Interop improvements
- Coordinated roadmaps
OSD
Oversight
JFCOM
J6
J8/JI&I
J9
* Flag-level Executive Steering Group, integrate/transform JCIG, PEO Interchange, etc
Download