GENERAL CONTRACTOR / DESIGN BUILDER PREQUALIFICATION QUESTIONNAIRE LABORATORY REPURPOSING PROJECTS UNIVERSITY OF CALIFORNIA, SAN DIEGO VARIOUS PROJECTS DESIGN-BUILD DELIVERY ISSUE DATE: MAY 14, 2015 @ 4:00 P.M. MANDATORY PREQUALIFICATION CONFERENCE: MAY 21, 2015 @ 10:00 A.M. SUBMITTAL DUE DATE: MAY, 28, 2015 @ 4:00 P.M. University of California, San Diego Facilities Design & Construction 10280 N. Torrey Pines Rd. Ste. 465 La Jolla, CA 92037 Rhonda Mitchell UCSD FD&C Contracts Manager (858) 822-3126 rcmitchell@ucsd.edu LABORATORY REPURPOSING PROJECTS UNIVERSITY OF CALIFORNIA, SAN DIEGO W4806 VARIOUS PROJECTS (Where a time period is given, such as the last ten [10] years, the period is to be measured backwards from the date this prequalification questionnaire is required to be submitted to the University of California at San Diego.) Note: Submission of an incomplete and/or unclear Prequalification Questionnaire may result in the determination of the prospective Contractor as NON-PREQUALIFIED. SUBMITTED BY: (Name and Title) Printed or Typed (Signature) (Firm Name. If a Joint Venture, state name if JV Entity) (Contact Name for all notices and correspondence) (Address) (City, State, Zip Code) (Telephone Number) (Facsimile Number) (E-mail Address) Each prospective Proposer must have the following California Contractor’s License, License Code: General Building Contractor, B, current, active and in good standing with the California Contractor’s State License Board on the date and time of the Prequalification Questionnaire submittal is due and must submit this Prequalification Questionnaire with all portions completed, including required attachments. _____________________________________________________________________________________________ __ April 11, 2002 Prequalification Questionnaire Rev. 5/14/15 FDC DB:PQ 2 LABORATORY REPURPOSING PROJECTS UNIVERSITY OF CALIFORNIA, SAN DIEGO W4806 VARIOUS PROJECTS Each prospective Proposer must answer all of the following questions and provide all requested information, where applicable. Any prospective Proposer failing to do so may be deemed to be not responsive and not responsible with respect to this prequalification at the sole discretion of the University of California. All information submitted for prequalification evaluation will be considered official information acquired in confidence, and the University of California will maintain its confidentiality to the extent permitted by law. Any prospective Proposer found to be not prequalified as a result of the Proposer's answers to this Prequalification Questionnaire will receive written response from the University Facility explaining the Facility's decision. If the Proposer can refute some of the facts upon which the decision was based, the Proposer can request a hearing at the Facility to appeal the decision. The appeal shall state the basis of the appeal and must be submitted in writing within three (3) working days of receipt of notification and must request a hearing or a written response from University. The decision of the Facility is final and not appealable within the University of California. Each prospective Proposer must submit five (5) printed sets and one (1) flash drive with complete submittal of the questionnaire. The Design Build contracts will require the successful Proposers to provide both design and construction services. The entity that provides these services is the Proposer, but the actual structure of the entity is up to each Proposer. The Proposer may, as an example, be a construction company with a design firm as a subcontractor or it may be a joint venture between a construction company and a design firm. In such cases, each member of the Proposer shall submit project experience as required below and such design firms shall comply with the laws of the State of California, applicable to such firms. However, all information required herein shall be submitted within the following parameters: 1. The Proposer shall hold all required licenses. 2. The Proposer shall be the financially responsible entity for bonding and insurance. Prequalification approval will remain valid for one (1) calendar year from the date of the first RFP advertisement. However, the University reserves the right during that calendar year to adjust, increase, limit, suspend or rescind the prequalification status based on subsequently learned information. University shall notify Proposer of their change in prequalification status in writing. Upon receipt of said notice, Proposer has the opportunity to request a hearing consistent with the hearing procedures described below for appealing a prequalification determination. _____________________________________________________________________________________________ __ April 11, 2002 Prequalification Questionnaire Rev. 5/14/15 FDC DB:PQ 3 LABORATORY REPURPOSING PROJECTS UNIVERSITY OF CALIFORNIA, SAN DIEGO W4806 VARIOUS PROJECTS PREQUALIFICATION QUESTIONNAIRE, POINT SYSTEM LABORATORY REPURPOSING PROJECTS UNIVERSITY OF CALIFORNIA, SAN DIEGO VARIOUS PROJECTS DECLARATION Each prospective Proposer must have a current and active California contractor's license at the time of the proposal opening and must submit this Prequalification Questionnaire with all portions completed, including any required attachments. I, hereby declare that I am the Printed Name Title of submitting this Prequalification Questionnaire; that I Company Name am duly authorized to execute this Questionnaire on behalf of Contractor; and that all information set forth in this Questionnaire and all attachments hereto are, to the best of my knowledge, current, accurate, and complete as of its submission date. I declare, under penalty of perjury, that all of the prequalification information submitted with this form is true and correct and that this declaration was executed at: County of Location and City State of County on State . Date Signature Printed Name If signed by other than the sole proprietor, a general partner, or corporate officer, attach original notarized power of attorney or corporate resolution. _____________________________________________________________________________________________ __ April 11, 2002 Prequalification Questionnaire Rev. 5/14/15 FDC DB:PQ 4 LABORATORY REPURPOSING PROJECTS UNIVERSITY OF CALIFORNIA, SAN DIEGO 1. W4806 VARIOUS PROJECTS License (Total Points Available = PREREQUISITE) Proposer must be a licensed contractor in California with a B – GENERAL BUILDING CONTRACTOR classification. Submit license number, classification, date issued, and expiration date. Does your firm have the required California State Contractors license? Yes No (Name of Licensee as it appears on record with the California Contractors State License Board) License No. Issue Date: Expiration Date: License Classification(s): _____________________________________________________________________________________________ __ April 11, 2002 Prequalification Questionnaire Rev. 5/14/15 FDC DB:PQ 5 LABORATORY REPURPOSING PROJECTS UNIVERSITY OF CALIFORNIA, SAN DIEGO 2. W4806 VARIOUS PROJECTS Surety (Total Points Available = PREREQUISITE) A. List below all Surety companies used by your company for the past ten (10) years and state whether the Surety had to complete any part of your work including, but not limited to warrantyrelated repairs or other defective workmanship on any contract within the past ten years:. Surety Company #1: Surety’s Name Street Address: , Street Address Period Covered Telephone , City & State Has listed Surety Company #1 completed work for your Company within the past ten years? Zip Code Yes No Surety Company #2: Surety’s Name Street Address: , Street Address Period Covered Telephone , City & State Has listed Surety Company #2 completed work for your Company within the past ten years? Zip Code Yes No Surety Company #3: Surety’s Name Street Address: , Street Address Period Covered Telephone , City & State Has listed Surety Company #3 completed work for your Company within the past ten years? Zip Code Yes No Surety Company #4: Surety’s Name Street Address: , Street Address Period Covered Telephone , City & State Has listed Surety Company #4 completed work for your Company within the past ten years? Zip Code Yes No (If more space is needed, provide the information on your company’s letterhead with reference to the project name and number and attach it to this Questionnaire.) _____________________________________________________________________________________________ __ April 11, 2002 Prequalification Questionnaire Rev. 5/14/15 FDC DB:PQ 6 LABORATORY REPURPOSING PROJECTS UNIVERSITY OF CALIFORNIA, SAN DIEGO W4806 VARIOUS PROJECTS B. Attach a notarized declaration from surety or sureties (sureties must be listed in the latest published State of California, Department of Insurance list of “Insurers Admitted to Transact Surety Insurance in this State”) proposed to be used on the LABORATORY REPURPOSING PROJECTS certifying that Proposer's bonding capacity available for these projects is $25,000,000. Attach a copy of the surety's power of attorney. C. Has Proposer had a surety finish work on a contract in the last ten (10) years? YES NO If “Yes,” explain: _______________________________________________________________ _____________________________________________________________________________________________ __ April 11, 2002 Prequalification Questionnaire Rev. 5/14/15 FDC DB:PQ 7 LABORATORY REPURPOSING PROJECTS UNIVERSITY OF CALIFORNIA, SAN DIEGO 3. W4806 VARIOUS PROJECTS Insurance (Total Points Available = PREREQUISITE) The successful Proposer for this project will be required to furnish certificates of insurance on the University’s form in the amounts below. COMMERCIAL FORM GENERAL LIABILITY INSURANCE – Limits of Liability Minimum Requirements Each Occurrence - Combined Single Limit for Bodily Injury and Property Damage: $2,000,000 Products-Completed Operations Aggregate: $5,000,000 Personal and Advertising Injury: $2,000,000 General Aggregate: $5,000,000 PROFESSIONAL (ERRORS AND OMISSIONS) LIABILITY – Limits of Liability Minimum Requirement Contractor’s Professional Liability (Each Occurrence & Aggregate) $2,000,000 BUSINESS AUTOMOBILE LIABILITY INSURANCE – Limits of Liability Minimum Requirement Each Accident - Combined Single Limit for Bodily Injury and Property Damage: $1,000,000 WORKERS’ COMPENSATION – As required by Federal and State of California law EMPLOYER’S LIABILITY – Limits of Liability Minimum Requirement Each Employee: $1,000,000 Each Accident: $1,000,000 Policy Limit: $1,000,000 EXCESS/UMBRELLA – Limits of Liability Minimum Requirement Each Occurrence: N/A Aggregate: N/A 1. Is your firm able to obtain the insurance in the required limits and ratings from companies that meet the criteria stated above? Yes No 2. If “yes,” provide notarized declaration(s) from your insurance agent/broker/carrier stating that your firm is able to obtain insurance coverage in the limits and ratings stated above from the insurance companies required for this Project. _____________________________________________________________________________________________ __ April 11, 2002 Prequalification Questionnaire Rev. 5/14/15 FDC DB:PQ 8 LABORATORY REPURPOSING PROJECTS UNIVERSITY OF CALIFORNIA, SAN DIEGO 4. W4806 VARIOUS PROJECTS Construction Experience (Total Points Available = 100) Provide information concerning your firm’s experience with design-build contracts. Complete the following information for LAB RENOVATION projects completed within the last ten (10) years. A maximum of five (5) projects will be evaluated. (Copy additional sheets as needed.) _____________________________________________________________________________________________ __ April 11, 2002 Prequalification Questionnaire Rev. 5/14/15 FDC DB:PQ 9 LABORATORY REPURPOSING PROJECTS UNIVERSITY OF CALIFORNIA, SAN DIEGO W4806 VARIOUS PROJECTS CONSTRUCTION EXPERIENCE – TYPE OF PROJECT Verify all contacts prior to submittal. Do not leave any spaces blank. Responses such as “N/A” are not acceptable. If not applicable, state “Not Applicable” and explain why. If none, state “NONE.” Project Name: Project or Contract Number: Project Location: , Street Address Owner Information: , City & State Zip Code Contact Person: Owner’s Name Name & Title Address: , Street Address Telephone: , City & State Zip Code Email: Address of Contractor’s Office that Performed the Work: , , Street Address City & State Contact Person: Zip Code Telephone: Name & Title Email: Name of Contractor’s Project Manager for project: Name of Contractor’s Superintendent for project: Design Firm: Contact Person: Name & Title Address: , Street Address Telephone: , City & State Zip Code Email: Name of Design Firm’s Project Manager for project: _____________________________________________________________________________________________ __ April 11, 2002 Prequalification Questionnaire Rev. 5/14/15 FDC DB:PQ 10 LABORATORY REPURPOSING PROJECTS UNIVERSITY OF CALIFORNIA, SAN DIEGO W4806 VARIOUS PROJECTS CONSTRUCTION EXPERIENCE (Cont.) Contract Time: Initial Contract Time (days): Time Extensions (days): Start Date: Scheduled Completion Date: Month/Day/Year Month/Day/Year Actual Completion Date: Days Extended due to Unexcused Delays: Month/Day/Year Contract Amount: $ Base Amount Project Information: Type of Project: New Type of Facility: Commercial $ Adjustment Due to Change Orders $ Final Contract Amount Remodel/Renovation Industrial Public Agency Was a Design Build Contract Delivery used for this project? Institutional Yes No Yes No If not, what delivery method was used on this project? Was this Project designed and constructed within the past ten (10) years? Project Description: (Provide a brief description & insert representative photograph) _____________________________________________________________________________________________ __ April 11, 2002 Prequalification Questionnaire Rev. 5/14/15 FDC DB:PQ 11 LABORATORY REPURPOSING PROJECTS UNIVERSITY OF CALIFORNIA, SAN DIEGO 5. W4806 VARIOUS PROJECTS Design Experience (Total Points Available = 100) Provide information concerning your firm’s experience with design-build contracts. Complete the following information for LAB RENOVATION projects completed within the last ten (10) years. A maximum of five (5) projects will be evaluated. (Copy additional sheets as needed.) Provide a list of all design professionals who were used on the Projects, including but not limited to the following categories: Architect Landscape Architect Other(s) The following information shall be provided for each design professional: Name and Title Firm Name Address City, State and Zip Code Telephone Number Experience on projects of type/scope of this Project Specific experience on Design Build projects Complete a Type of Project form (see next page) for each of your firm's five (5) comparable laboratory renovation projects that were designed and constructed in less than one (1) year in the last ten (10) years. If the design for this Project will be by a separate entity (subcontractor, joint venture partnership, etc., the experience should so indicate. _____________________________________________________________________________________________ __ April 11, 2002 Prequalification Questionnaire Rev. 5/14/15 FDC DB:PQ 12 LABORATORY REPURPOSING PROJECTS UNIVERSITY OF CALIFORNIA, SAN DIEGO W4806 VARIOUS PROJECTS DESIGN EXPERIENCE – TYPE OF PROJECT Verify all contacts prior to submittal. Do not leave any spaces blank. Responses such as “N/A” are not acceptable. If not applicable, state “Not Applicable” and explain why. If none, state “NONE.” Complete the following information for laboratory renovation projects. (Copy additional sheets as needed.) Project Name: Project or Contract Number: Project Location: , Street Address Owner Information: , City & State Zip Code Contact Person: Owner’s Name Name & Title Address: , Street Address Telephone: , City & State Zip Code Email: Address of Design Firm’s Office that Performed the Work: , , Street Address City & State Contact Person: Zip Code Telephone: Name & Title Email: Name of Design Firm’s Project Manager for project: Contractor: Contact Person: Name & Title Address: , Street Address Telephone: , City & State Zip Code Email: Name of Contractor’s Project Manager for project: _____________________________________________________________________________________________ __ April 11, 2002 Prequalification Questionnaire Rev. 5/14/15 FDC DB:PQ 13 LABORATORY REPURPOSING PROJECTS UNIVERSITY OF CALIFORNIA, SAN DIEGO W4806 VARIOUS PROJECTS DESIGN EXPERIENCE – TYPE OF PROJECT (Cont.) Contract Time: Initial Design Contract Time (days): Time Extensions (days): Start Date: Scheduled Completion Date: Month/Day/Year Month/Day/Year Actual Completion Date: Days Extended due to Unexcused Delays: Month/Day/Year Contract Amount: $ Base Amount Project Information: Type of Project: New Type of Facility: Commercial $ Adjustment Due to Change Orders Remodel/Renovation Industrial $ Final Design Contract Amount (with your firm) Public Agency Was a Design Build Contract Delivery used for this project? If not, what delivery method was used on this project? Was this Project designed and constructed within the past ten (10) years? Institutional Yes No _____________________ Yes No Project Description: (Provide a brief description & insert representative photograph) _____________________________________________________________________________________________ __ April 11, 2002 Prequalification Questionnaire Rev. 5/14/15 FDC DB:PQ 14 LABORATORY REPURPOSING PROJECTS UNIVERSITY OF CALIFORNIA, SAN DIEGO 6. W4806 VARIOUS PROJECTS Design-Build Experience (Total Points Available = 100) Provide information concerning your firm’s experience with design-build contracts. Complete the following information for LAB RENOVATION projects completed within the last ten (10) years. A maximum of five (5) projects will be evaluated. (Copy additional sheets as needed.) _____________________________________________________________________________________________ __ April 11, 2002 Prequalification Questionnaire Rev. 5/14/15 FDC DB:PQ 15 LABORATORY REPURPOSING PROJECTS UNIVERSITY OF CALIFORNIA, SAN DIEGO W4806 VARIOUS PROJECTS DESIGN-BUILD EXPERIENCE Verify all contacts prior to submittal. Do not leave any spaces blank. Responses such as “N/A” are not acceptable. If not applicable, state “Not Applicable” and explain why. If none, state “NONE.” Project Name: Project or Contract Number: Project Location: , Street Address Owner Information: , City & State Zip Code Contact Person: Owner’s Name Name & Title Address: , Street Address Telephone: , City & State Zip Code Email: Address of Contractor’s Office that Performed the Work: , , Street Address City & State Contact Person: Zip Code Telephone: Name & Title Email: Name of Contractor’s Project Manager for project: Name of Contractor’s Superintendent for project: Design Firm: Contact Person: Name & Title Address: , Street Address Telephone: , City & State Zip Code Email: Name of Design Firm’s Project Manager for project: _____________________________________________________________________________________________ __ April 11, 2002 Prequalification Questionnaire Rev. 5/14/15 FDC DB:PQ 16 LABORATORY REPURPOSING PROJECTS UNIVERSITY OF CALIFORNIA, SAN DIEGO W4806 VARIOUS PROJECTS DESIGN-BUILD EXPERIENCE (Cont.) Contract Time: Design Duration: Construction Duration: Weeks Weeks Start Date: Scheduled Completion Date: Month/Day/Year Month/Day/Year Actual Completion Date: Days Extended due to Unexcused Delays: Month/Day/Year Contract Amount: $ Base Amount Project Information: Type of Project: New Type of Facility: Commercial $ Adjustment Due to Change Orders $ Final Contract Amount Remodel/Renovation Industrial Public Agency Was this Project designed and constructed within the past ten (10) years? Institutional Yes No Design Description: (Provide a brief description & insert representative photograph) _____________________________________________________________________________________________ __ April 11, 2002 Prequalification Questionnaire Rev. 5/14/15 FDC DB:PQ 17 LABORATORY REPURPOSING PROJECTS UNIVERSITY OF CALIFORNIA, SAN DIEGO 7. W4806 VARIOUS PROJECTS Proposed Design-Build Team Members (Total Points Available = 100) Provide the following information concerning each of the listed personnel. If the title/job function envisioned differs from the listed title provide the closest match and an explanation of the differences. Résumés shall be submitted in addition to this form. Résumés shall NOT be submitted in lieu of this form. If more space is needed, provide the information using the format below and attach it to this Questionnaire. Providing résumés of typical superintendents and project managers who will be made available when required. Résumés of superintendents and project managers will be requested with the request for proposal for each project. NOTE: We require staffing information for: Design-Build Executive Design Manager Preconstruction Manager Construction Manager _____________________________________________________________________________________________ __ April 11, 2002 Prequalification Questionnaire Rev. 5/14/15 FDC DB:PQ 18 LABORATORY REPURPOSING PROJECTS UNIVERSITY OF CALIFORNIA, SAN DIEGO W4806 VARIOUS PROJECTS NAME OF PROPOSED DESIGN-BUILD TEAM EXECUTIVE: NAME AND TITLE: COMPANY: ADDRESS: RELATIONSHIP TO DESIGN BUILDER (e.g. employee, consultant, etc.): List and briefly describe five (5) previous projects of similar size and complexity for this individual giving scope, name and point of contact for Owner: Project Name & Location: Contract Amount: Owner: Point of Contact Role Responsibilities: Telephone: $ Project Description: Project Name & Location: Contract Amount: Owner: Point of Contact Role Responsibilities: Telephone: $ Project Description: Project Name & Location: Contract Amount: Owner: Point of Contact Role Responsibilities: Telephone: $ Project Description: Project Name & Location: Contract Amount: Owner: Point of Contact Role Responsibilities: Telephone: $ Project Description: Project Name & Location: Contract Amount: Owner: Point of Contact Role Responsibilities: Telephone: $ Project Description: _____________________________________________________________________________________________ __ April 11, 2002 Prequalification Questionnaire Rev. 5/14/15 FDC DB:PQ 19 LABORATORY REPURPOSING PROJECTS UNIVERSITY OF CALIFORNIA, SAN DIEGO W4806 VARIOUS PROJECTS NAME OF PROPOSED DESIGN MANAGER: NAME AND TITLE: COMPANY: ADDRESS: RELATIONSHIP TO DESIGN BUILDER (e.g. employee, consultant, etc.): List and briefly describe five (5) previous projects of similar size and complexity for this individual giving scope, name and point of contact for Owner: Project Name & Location: Contract Amount: Owner: Point of Contact Role Responsibilities: Telephone: $ Project Description: Project Name & Location: Contract Amount: Owner: Point of Contact Role Responsibilities: Telephone: $ Project Description: Project Name & Location: Contract Amount: Owner: Point of Contact Role Responsibilities: Telephone: $ Project Description: Project Name & Location: Contract Amount: Owner: Point of Contact Role Responsibilities: Telephone: $ Project Description: Project Name & Location: Contract Amount: Owner: Point of Contact Role Responsibilities: Telephone: $ Project Description: _____________________________________________________________________________________________ __ April 11, 2002 Prequalification Questionnaire Rev. 5/14/15 FDC DB:PQ 20 LABORATORY REPURPOSING PROJECTS UNIVERSITY OF CALIFORNIA, SAN DIEGO W4806 VARIOUS PROJECTS NAME OF PROPOSED PRECONSTRUCTION MANAGER: NAME AND TITLE: COMPANY: ADDRESS: RELATIONSHIP TO DESIGN BUILDER (e.g. employee, consultant, etc.): List and briefly describe five (5) previous projects of similar size and complexity for this individual giving scope, name and point of contact for Owner: Project Name & Location: Contract Amount: Owner: Point of Contact Role Responsibilities: Telephone: $ Project Description: Project Name & Location: Contract Amount: Owner: Point of Contact Role Responsibilities: Telephone: $ Project Description: Project Name & Location: Contract Amount: Owner: Point of Contact Role Responsibilities: Telephone: $ Project Description: Project Name & Location: Contract Amount: Owner: Point of Contact Role Responsibilities: Telephone: $ Project Description: Project Name & Location: Contract Amount: Owner: Point of Contact Role Responsibilities: Telephone: $ Project Description: _____________________________________________________________________________________________ __ April 11, 2002 Prequalification Questionnaire Rev. 5/14/15 FDC DB:PQ 21 LABORATORY REPURPOSING PROJECTS UNIVERSITY OF CALIFORNIA, SAN DIEGO W4806 VARIOUS PROJECTS NAME OF PROPOSED CONSTRUCTION MANAGER: NAME AND TITLE: COMPANY: ADDRESS: RELATIONSHIP TO DESIGN BUILDER (e.g. employee, consultant, etc.): List and briefly describe five (5) previous projects of similar size and complexity for this individual giving scope, name and point of contact for Owner: Project Name & Location: Contract Amount: Owner: Point of Contact Role Responsibilities: Telephone: $ Project Description: Project Name & Location: Contract Amount: Owner: Point of Contact Role Responsibilities: Telephone: $ Project Description: Project Name & Location: Contract Amount: Owner: Point of Contact Role Responsibilities: Telephone: $ Project Description: Project Name & Location: Contract Amount: Owner: Point of Contact Role Responsibilities: Telephone: $ Project Description: Project Name & Location: Contract Amount: Owner: Point of Contact Role Responsibilities: Telephone: $ Project Description: _____________________________________________________________________________________________ __ April 11, 2002 Prequalification Questionnaire Rev. 5/14/15 FDC DB:PQ 22 LABORATORY REPURPOSING PROJECTS UNIVERSITY OF CALIFORNIA, SAN DIEGO 8. W4806 VARIOUS PROJECTS Financial Data (Total Points Available = PREREQUISITE) For the purposes of this prequalification questionnaire, "business construction revenue" shall be defined as payments to prospective contractor’s license holder. A. Can you truthfully state that your firm has had an average annual business construction revenue of at least $25,000,000 (excluding any and all legal awards) over the last five (5) consecutive years? YES B. NO Can you provide audited financial statements for the last ten (10) years? YES NO DO NOT INCLUDE FINANCIAL STATEMENTS WITH THIS PREQUALIFICATION QUESTIONNAIRE. The University reserves the right to request and require approval of acceptable financial statements. 9. Arbitration and Litigation Claims History (all Owners) (Total Points Available = 100) A. List any and all CURRENT AND/OR PENDING disputes with project owners. B. Have there been any claims between any entity of proposed Design-Build team and University of California? YES C. NO Is Proposer presently disqualified from performing work for the University of California or another Contract Entity? YES NO _____________________________________________________________________________________________ __ April 11, 2002 Prequalification Questionnaire Rev. 5/14/15 FDC DB:PQ 23 LABORATORY REPURPOSING PROJECTS UNIVERSITY OF CALIFORNIA, SAN DIEGO 10. W4806 VARIOUS PROJECTS Prior Disqualification (Total Points Available = 100) Provide the following information if your firm has ever been disqualified from performing work for any contracting entity: Name of Contracting Entity: Telephone No. of Contracting Entity: Project name: Date of Disqualification: Duration of Disqualification: Reason for Disqualification: (Repeat items above for each disqualification.) _____________________________________________________________________________________________ __ April 11, 2002 Prequalification Questionnaire Rev. 5/14/15 FDC DB:PQ 24 LABORATORY REPURPOSING PROJECTS UNIVERSITY OF CALIFORNIA, SAN DIEGO 11. W4806 VARIOUS PROJECTS Provide Proposed Rates for Additional Design Services for the following categories (Total Points Available = PREREQUISITE): Labor Category Direct Hourly Rate Overhead/Profit Percentage _____________________________________________________________________________________________ __ April 11, 2002 Prequalification Questionnaire Rev. 5/14/15 FDC DB:PQ 25 LABORATORY REPURPOSING PROJECTS UNIVERSITY OF CALIFORNIA, SAN DIEGO 12. W4806 VARIOUS PROJECTS SAFETY PROGRAM A. Does your firm have a written Injury and Illness Prevention Program (IIPP) that complies with California Code of Regulations, Title 8, Sections 1509 and 3203? YES NO Brief Description: _________________________________________________________ B. Does your firm have a written safety program that meets CAL/OSHA requirements? YES C. NO Will your firm have personnel permanently assigned and dedicated to Safety on this project? YES D. NO If “Yes,” state the names of all such personnel who will be assigned and individually list their specific duties: Name, Title Specific Duties Attach résumés (include certification and safety related training received.) E. Have you had accidents, which resulted in a construction fatality on any of your projects over the last 2 years? YES NO If the answer is “Yes,” please explain. F. Is your firm’s current Workers’ Compensation Experience Modification Rate (EMR) equal to 1.0 or less? YES NO Provide your California Workman’s Compensation Modifier for each of the last three (3) years. G. Provide EMR verification (regardless of whether EMR is under or over 1) from State of California or from insurance company for the most recently completed year. _____________________________________________________________________________________________ __ April 11, 2002 Prequalification Questionnaire Rev. 5/14/15 FDC DB:PQ 26 LABORATORY REPURPOSING PROJECTS UNIVERSITY OF CALIFORNIA, SAN DIEGO H. W4806 VARIOUS PROJECTS Has your firm been cited by OSHA in the past 5 years? YES NO If the answer is “Yes,” please explain. ________________________________________________________________________ ________________________________________________________________________ I. Does your firm have a Small Business/Underutilized Business Outreach Program? YES NO If “Yes,” please include a summary of your efforts (up to one [1] page). _____________________________________________________________________________________________ __ April 11, 2002 Prequalification Questionnaire Rev. 5/14/15 FDC DB:PQ 27 LABORATORY REPURPOSING PROJECTS UNIVERSITY OF CALIFORNIA, SAN DIEGO 13. W4806 VARIOUS PROJECTS Proposer's Comments The following space is provided for further explanations of the answers to any questions asked in this Prequalification Questionnaire. _____________________________________________________________________________________________ __ April 11, 2002 Prequalification Questionnaire Rev. 5/14/15 FDC DB:PQ 28 LABORATORY REPURPOSING PROJECTS UNIVERSITY OF CALIFORNIA, SAN DIEGO W4806 VARIOUS PROJECTS Rating Information Up to eight of the highest scoring proposers, based on an established scoring system, will be invited to participate in the Level II Interview step. A Proposer who falls under any of the following categories, will be excluded from further consideration in the prequalification process and from participating in the Level II Interview: 1. 2. 3. 4. 5. 6. 7. Proposer does not have the proper license. Proposer does not meet established minimum standards for bonding capacity (as described in the Prequalification Questionnaire). Proposer is not able to obtain required insurance. Proposer does not have the required financial information. Proposer has had a surety finish work on a contract in the last ten (10) years. Proposer is presently disqualified from performing work for the University of California or another Contract Entity. Proposer did not submit required information. Prequalification Categories/Tentative Points CATEGORY POINTS 1. California Contractor’s License Prerequisite 2. Surety and Bonding Capacity Prerequisite 3. Insurance Prerequisite 4. Construction Experience 100 5. Design Experience 100 6. Design-Build Experience 100 7. Design-Build Team Members 100 8. Financial Data 9. Arbitration and Litigation Claims History 100 10. Prior Disqualification 100 11. Rates for Additional Design Services Prerequisite 12. Safety Record Prerequisite Prerequisite _____________________________________________________________________________________________ __ April 11, 2002 Prequalification Questionnaire Rev. 5/14/15 FDC DB:PQ 29