Arlyn Nanat Bagami

advertisement
Arlyn Nanat Bagami
Dammam Kingdom of Saudi Arabia
Sta. Catalina St. Holy Spirit Quezon City 1127 Philippines
Mobile Phone: +966-548043105 / +639495881179
E-mail : arlyn_bagami@yahoo.com
Skype: skypeventure1
______________________________________________________________
Industrial Engineer / Consultant / Asst. Div. Mngr.
Dammam, Kingdom of Saudi Arabia
Current •
Previous •
•
•
•
•
•
•
•
•
•
•
Education•
•
Bedoon Essm Trading Company - MAH Group
Tryco Pharmaceutical Corporation
Limuel Packaging & Industrial Sales
Grace Park International
Bonniriver Industrial Corporation
Hoffen Industries Corporation
Josefina Manufacturing Incorporated
TRCN Enterprises
Limech Garments Manufacturing Corporation
Subic Bay Apparel Corporation
Inspection Consultants International Philippines
New Era University
Bachelor of Science in Industrial Engineering
BACKGROUND
SUMMARY:
Graduated May 1999 with a degree in Bachelor of Science in Industrial Engineering in New Era
University, Milton Hills Subdivision, Diliman Quezon City Philippines. Started working July 1999 as
QA/QC inspector in Malampaya Concrete Gravity Shell Oil and Gas Project. Pursue Industrial
Engineering work July 2001 up to present with positions: Industrial Engineer, Industrial Engineer
Consultant, Assistant Division Manager, Production Supervisor, Accountant (AR), Senior Planner, Cutting
Department Line Leader, Merchandiser, Production Planning & Inventory Control. Into different product
lines such as: Garment / Apparel Manufacturing, Veterinary Medicine (Pharmaceutical), Non Destructive
Testing, Plastic Film Blowing Printing, Wood works.
EXPERIENCE:
Production Supervisor / function as Asst. Division Manager / Industrial Engineer
Bedoon Essm Trading Company
April 25,2011 - Present
Dammam Kingdom of Saudi Arabia
MISSION: Manage multi Nationality introducing New Manufacturing Design Standards.
OBJECTIVE:
• Conducts Manpower Evaluation and Training.
• Develop manufacturing methods, manpower utilization standards, and cost analysis systems to
promote effective facility utilization.
• Recommend methods for improving utilization of personnel, material, and utilities.
• Plan and establish sequence of operations to produce and manufacture products to promote efficient
utilization.
• Regulate and alter workflow schedules according to established manufacturing sequences and lead
times to expedite production operations.
•Oversee whole Production Line Status ,identify key factors that can be improved; make improvements.
• Apply statistical methods and perform mathematical calculations to determine manufacturing processes,
manpower requirements, production standards, and process capacity.
• Observe and monitor the general flow of operations and sense where problems will arise.
• Plan and establish sequence of operations from Cutting Department,Sewing Line,Finishing to Packing
Department.
Industrial Engineer Consultant / Plant Officer In-charge
Tryco Pharma Corporation
March 24,2009 - February 8, 2011
# 117 M. Ponce Street, Edsa Caloocan City, Philippines
MISSION: Formulate and Establish New System Manufacturing Methods applying Quota &
Standardization.
OBJECTIVE:
•Conducts evaluation and analysis on "Existing System" of the company
•Conducts Time and Motion Study on all Products to start with a “DATA“
• Implement effective utilization of equipment, production methods, equipment layout, personnel, and
material flow applying the concept of "One Piece Flow Operation"
• Proposes for Company’s Improvement (Production Planning and Inventory Control /Production
Schedule, Manpower Evaluation and Inventory Status checking)
Attends meeting on top management and conducts Seminars / discuss areas of concerns like
(Conducted Time and Motion Study result (QUOTA/8 HR working time), Production Standards, Lay-outs,
Manpower / Operations balancing.
• Implement methods and procedures for disposition of discrepant material and defective or damaged
parts, and assess cost and responsibility
Production Planning & Inventory Control
Limuel Packaging & Industrial Sales
October 14, 2008 – January 29, 2009
2nd Lot, Manchester Industrial Sub. Manchester Ave. Brgy.Sauyo, Novaliches, Quezon City, Philippines
•
•
•
•
•
•
•
•
•
Prepares Production Schedule and Daily Manpower Schedule.
Does Materials Requirements Planning.
Monitors Stock Inventory Level.
Requests Materials which is in “low stock level. “
Computes Materials Blending before Issuance of Job Orders.
Issues Job Orders on each Process / Operations.
Checks Daily Production Output and Production Status and reports immediately problems
encountered.
Monitor, Encode & Submits Daily Inks / Solvents Consumption.
Maintains PLANT cleanliness / housekeeping.
Senior Planner
Grace Park International
February 22, 2008 – July 12, 2008
# 707 Molina St. Valenzuela City,Philippines
•
Reviews and analyzes SO, Cutting Lists and plans materials and activities required to accomplish job
orders on agreed commitments.
1.1 Prepares Purchase Requisition (PR) for all materials requirements of the projects based on SO from
Sales and Marketing-Local.
1.2 Plans production and delivery of “SINGLES” project based on agreed commitments during
coordination meeting.
1.3 Prepares and submits weekly material order for veneering schedules to other plant by
transmitting data thru fax and sending the original copy to the concern planner.
•
Clarifies/Verifies specifications in the Cutting List and Bill of Materials with technical group.
•
Ensures that all materials are ordered, scheduled for production against plan and shipping, and makes
adjustments accordingly.
•
Monitors production activities by collecting production logs, comparing progress to schedule to ensure
a smooth and controlled flow of materials timed to meet production requirements and finished goods.
•
Resolves scheduling problems by collecting and analyzing information; coordinating solutions.
•
•
•
•
•
Expedites operations that delay schedules and alters schedules to meet unforeseen conditions.
Provides Production Manager daily production Control Information.
Interfaces with key personnel across all primary functions such as engineering, purchasing, production,
sales.
Identifies shortages on incoming orders and work closely with Purchasing and Production to expedite
material or processes to meet delivery requirements.
Provides accurate response to product availability / status to Sales and Marketing Department.
Prepares Weekly Status Report of actual delivery actual production accomplishment against plans,
manpower utilization and labor productivity
Industrial Engineer
Bonniriver Ind'l Corporation
September 28, 2006 - February 27, 2007
# 114 Old Samson Road, Balintawak, QuezonCity, Philippines
•
•
•
•
•
•
Prepares Operations Breakdown as per approved Sample based on designed Production Load Schedule.
Computes Production Line Capacity before production starts.
Conducts Time and Motion Study and focus on critical operations.
Established Standard Manufacturing / Machine Lay-out as per computed Quoata / 8 hour.
Reccomends alternative solutions for backlog operations.
Submits Monthly Capacity / Output Report ( Production and Sub-contractor)
Industrial Engineer
Hoffen Industries Corporation
June 14, 2007 – January 5, 2008
Bo. Paliparan Governors Drive, Dasmarinas, Cavite, Philippines
•
•
•
•
•
•
•
Prepares Operations Breakdown based on the given style of either Ann Taylor or Ralph Lauren
Prepares Line Balancing to know the exact manpower required like sewer, service girl, presser and
to get the
Target Quota per 8 hour as required to determine how many working days a certain style will run.
Attends Pre-Production Meeting and discussed the computed Line Balancing, Quota computed as
per approved sample.
Prepares Production Lay-out and Lay-out revision, manpower additional if the approved lay-out is not
attainable.
Diagnose production problem and recommends/implements alternative solutions.
Monitors production processes so that shipment date is delivered on time.
Conducts Time and Motion Studies specially operations with quotas not attainable.
Industrial Engineer
Josefina Manufacturing Incorporated
February 16, 2006 - August 25, 2006
G. Araneta Ave., Quezon City,Philippines
To provide labor and operation standards for all determined operations covering all aspects of production
and to other department that would require measurements of work activity. Operation elements to be optimized,
feasible and effective thru monitoring their implementation at Production. Compile standard methods and time
study in operation breakdown for reference purposes.
• Study any specified item (Product or Services) that needs method and time study.
• Prepare Routing Sheet or required form of operation on work flow chart., * Prepare the Contractors
Guidelines if applicable for outsourced production.
•
•
•
Prepare Lay-out of stencil on all new design in preparation for operators Pay Ticket on every new
stock number as basis to compute their efficiency.
Initiate Process Engineering with Production Staff to evaluate Cutting Department's performance on
all new design for possible cutting defects or failure to follow Pattern Specifications and so
necessary action can be taken prior to sewing. Process Engineering is also conducted on every new
of special (RO) design to check accessories quality against cut parts so action can be taken in case
of non-conformance.
Conducts thread Consumption Study on every new design or Style.
Industrial Engineer / Merchandiser
TRCN Enterprises
April 19, 2005 - February 15, 2006
Villa Beatriz Subdivision, Diliman, Quezon City,Philippines
•
•
•
•
•
•
•
•
•
•
•
•
•
•
Conduct Time and Motion Study, setting up standards in all manufacturing operations through
Methods Analysis and Time Study procedure.
Analyze machine and manpower requirements for Capacity Time Study Procedure Line Balancing
and Loading.
Conduct work simplifications and methods improvement to optimize production output while
maintaining set Quality Standards
Monitor operator performances and Line Efficiency and productivity .At the same time prepare daily,
weekly and monthly report.
Monitor the full utilization of the machine resources.
Design Production Layout for every model and Layout revision for faster flow of production
Computes Daily Sewers Efficiency, Line Costing, Production Balances on Input / Output of the line.
In-charge in doing the Fabric Shrinkage Test, (get the measurements before / after washing. If some
measurements don't tally with the specs, there should be pattern revision. Sending to washing house
and Embroidery.
Monitor sample making, starting from the Pattern maker pattern based on the given specs, monitor
cutting based from the given pattern before passing to the Sample makers. Assuring that all the
accessories/materials are complete before the operation begins.
Responsible in dispatching sample
Prepares Production details and distributes to concern department,
Computes the consumption, details such as thread, polybag, Cartons, buttons, hanger, hangtag,
pelon, elastic, labels, twill tape.
Can do fabric consumption and product development information, packing list , measuring of carton
for purchasing purpose,
Purchase local Accessories such as thread, polybag, cartons
Industrial Engineer
Limech Garments Manufacturing Corporation
January 6, 2004 - September 11, 2004
# 38 Golden Future St. Lot 65 Subic Bay Industrial ParkPhase I Subic Bay Freeport Zone Olongapo
City,Philippines
Conduct Motion and Time Study on every buyer, customer production sample to meet buyer customer
Standard of Quality.
Monitors and Encode daily production output of every operator of my line to avoid production stoppage
and idle time. Evaluate each operator who is not fit to her operation
Industrial Engineer / Cutting Line Leader
Subic Bay Corporation
July 5, 2001- November 4, 2003
Bldg. 2056/2057 Naval MagazineSubic Bay Freeport Zone Olongapo City,Philippines
*INDUSTRIAL ENGINEER / LINE LEADER*
Sewing Department (July 2001-May,2002 )
•
•
•
Conduct Motion and Time Study on every buyer, customer production sample to meet buyer customer
Standard of Quality.
Monitors and Encode daily production output of every operator of each line to avoid production stoppage
and idle time. Evaluate each section if they are delayed.
Conduct Quality Assurance/ Quality Control by strictly implementing CPAR (Corrective and Preventive
Action Report) by knowing and investigating the root cause of the problem, give corrective action of each
root causes to lessen the reject/defective outputs.
•
*PPIC (Production Planning and Inventory Control)*
April 2002- August 2002
•
•
•
Do Product Information Form base on the cutting instruction given by the Customer/ Buyer and in- Charge
on the checking of the PIF.
Do the checking of the Production Balances to meet the shipment date.
Evaluate and Check all the reports of Accounting, PPIC, HRD Warehouse, Industrial Engineers before
submitting to the company President.
CUTTING DEAPARTMENT
August 2002 - November 4, 2003
The primary responsibility is to plan, supervise and control all, activities relating to fabrics, lining,
cutting and numbering lining stripe and plaids fabrics conform to the Standard and in accordance with the
job order, cutting program and product information form.
Specific Duties:
Carry on activities on the work schedule of the section 2). Records all markers with spreading summary
received from order before actual production starts. 4). Make sure that markers released to spreaders conform
with spreading summary. 5). Disscusses with the spreader the required fabric, lining to spread checking with the
swatches on the PIF. 6). Check splicing/overlap in the marker and check the number of the layers and correct
arrow/face of fabric/cutting. 7). Implement cut goods inspection after cutting by the cutter. 8). Report undercut
quantity per color, per job order. 9). Record daily production of the section in the log book. 10). Endorse
spreading summary to pre plan Clerk for safe keeping. 11). Train, motivate and counsel subordinates to be
more effective and efficient. Ensure that proper lead in time is attained in fabric/lining, cutting. Ensure that
cutting of piece parts of the fabric, lining in accordance with Quality Standard. Ensure that fabric/lining cut-ends
is properly segregated and accounted for repair use. Ensure that all machines, tools and equipment is properly
used. Ensure that line capacity is attained.
QA/QC NDT Inspector
Inspection Consutants International Incorporated
July 1999 - January 2000
Gordon Ave. Olongapo City,Philippines
Does visual and dimensional inspection on materials as per approved drawing and familiarized proper
specification as per conducted magnetic particle inspection on weldments, plates and tubular joints. Does all
necessary documents and no-confirmities met during inspection. Discusses with the project management for
possible corrective measures and it's implementing daily accomplishment report and quality released document
required by the customer.
*MALAMPAYA CONCRETE GRAVITY PROJECT*
JOHN HOLLAND- Green Beach Site, Subic Bay, SBMA
*ELECTRUCK PACIFIC INC. - PACIFIC 2000 Portcrane*
Bldg. 3 Rivera Point, Subic Bay Freeport Zone, Olongapo City,Philippines
*ELECTRUCK ASIA INC. *
Baseco Compound EPZA Mariveles Bataan, Philippines
EDUCATION
NEW ERA UNIVERSITY
BSIE - BACHELOR OF SCIENCE IN INDUSTRIAL ENGINEERING
1994 – 1999
ACTIVITIES AND SOCIETIES: EDUCATION COORDINATOR ASSOCIATION OF INDUSTRIAL
ENGINEERS OF THE PHILIPPINES - NEU CHAPTER
LANGUAGES
•
English
Full professional proficiency
•
Filipino
Full professional proficiency
•
Arabic
SEMINARS:
VALUE ANALYSIS / ENGINEERING1
Metal Industry Research and Development - Association of Industrial Engineers of the Philippines
September 16,1998
SUPERVISORY DEVELOPMENT
Metal Industry Research and Development - Association of Industrial Engineers of the Philippines
September 30,1998
TOTAL QUALITY MANAGEMENT
Metal Industry Research and Development - Association of Industrial Engineers of the Philippines
October 1,1998
QMS AWARENESS BASED ON ISO 9001:2000
SO-EN GARMENTS CORPORATION / JESEFINA MANUFACTURING INC.
May 26,2006
"BE THE BEST YOU CAN BE" EXCELLENCE IN THE WORKPLACE
SO-EN GARMENTS CORPORATION / JESEFINA MANUFACTURING INC.
November 18,2008.
SKILLS & EXPERTISE
•
Lean Manufacturing
•
Leadership Initiatives
•
Management Engineering
•
Strategy
Download