ONLINE EOT PROCESSING 1 Work Flow Chart 2 Portal User Guide ONLINE EOT PROCESSING – WORK FLOW NO Contractor submits EOT proposal to EE Does the Proposal need modification? EE evaluates proposal YES Modifies Proposal Submit Proposal to SE SE evaluates proposal NO Submit Proposal to CE Modify Proposal YES Does the Proposal need modification? Submit Proposal to CE YES Modify Proposal Does the Proposal need modification? NO Does the Proposal need modification? YES Modify Proposal Update Proposal in Portal and submit to SLSC Coordinate Proposal approval between SLSC and Govt. CE updates Portal with Final EOT Date once approved by Govt. LEGEND NO Contractor Role Offline Processing Online Processing Login Page in the PPMS Portal Portal Address: http://irrigation.ap.go v.in/ppms/jsp/login/lo gin.jsp Enter User ID and Password obtained from SE/EE First Page after Login for Contractor Click on the Tab for EOT Proposal Submission Link for downloading the Excel formats of EOT proposal to be filled First Page on Login Click on the Tab for EOT Status Page on clicking EOT Status Select relevant Project from dropdown menu for uploading proposal Select the relevant Package for uploading Proposal Relevant Project and Package selected Click view after selecting Package and Project EOT Status page view of selected Package Input the proposed EOT date Input remarks, if any Keep this unchecked till all files are finally uploaded & ready for final submission. After submission with this box checked, contractor will not be able to make any edits Click Submit/Update Page view on Submitting EOT date Select the relevant Project Click View to see EOT Status of Package and Upload Files Select the relevant Package EOT Status page for uploading filled in Formats Proposed EOT date visible Draft Status to continue till all files are uploaded correctly Click to Upload the filled Excel Files Page view for Uploading filled in Formats Select the relevant Project Browse to select the relevant filled in excel file Click to select the relevant File to upload Select the relevant Package Page view for Uploading filled in Formats Sample Selected Details for Uploading Click Submit after attaching the file above Page view for Uploading filled in Formats Confirmation of File Upload Similarly, upload all 8 files for the EOT Proposal EOT Status Page after uploading all Files View Report to check correctness of all uploaded files Page for Viewing Uploaded Project Plan file Red font indicates error and needs correction Page for Viewing Uploaded Project Plan file Error message highlighted Page for Viewing Uploaded Project Plan file Page for Viewing Uploaded Project Status File All columns need to be filled in with appropriate details Page for Viewing Uploaded Bottleneck Report file All columns need to be filled in with appropriate details Page for Viewing Uploaded Schedule of Drawings file All columns need to be filled in with appropriate details Page for Viewing Uploaded Schedule of Land Plan file All columns need to be filled in with appropriate details Page for Viewing Uploaded Schedule of Manpower file All columns need to be filled in with appropriate details Page for Viewing Uploaded Schedule of Materials file All columns need to be filled in with appropriate details Page for Viewing Uploaded Schedule of P&M file All columns need to be filled in with appropriate details Uploaded Files can be Downloaded for Correction Page for Final Submission After uploading all correct files, check the final submission tickbox Once the OK is clicked, it is considered the final submission. After Final submission, no change can be made and the proposal is with the Department for processing. EOT Status Page after Final submission by Contractor On Final Submission by Contractor, Status changes to “Reviewed and Submitted to EE” Logout Page THANK YOU