AIRFRAME MEASUREMENTS P09233 – Managerial Design Review Team Structure Team Lead: Michael Skube – Mechanical Engineer Co-Team Lead: James Hunt – Mechanical Engineer Electrical Lead: Joseph Peters – Electrical Engineer Kevin Li – Electrical Engineer William Atkinson – Mechanical Engineer Heidi Morgan – Electrical Engineer John Isely – Mechanical Engineer Project Concept Development Provide Measurements for Controlled Flight • • • • • Provide Measurements Package • Interchangeable Sensors • Single Mounting Structure • Low Impact on Airframe Provide Documentation GPS Velocity IMU Altitude Data Processing • Sensor Function • Measurement System Usage/Implementation • Measurement System Assembly Airframe Measurement System Measurements Box Design IMU GPS Altimeter Ultrasonic Microcontroller Expenses To Date # Item Model Manufacture Part Number QTY 1 Altimeter ZLOG 3 Digital Products #ZLOG3 1 $ 89.95 $ 2 Data Recorder eLogger V3 Eagle Tree Systems MPRV3-LEADS-100 1 3 Altimeter MicroSensor V3 Eagle Tree Systems ALTIMETER-V3 4 Airspeed MicroSensor V3 Eagle Tree Systems 5 Pitot-Static Tube Pitot-Static Tube Kit 6 Microprocessor 7 GPS 8 Altimeter 9 GPS Break Out Board 10 11 12 13 # Item Model Manufacture Part Number QTY 93.74 19 4-40, 3/4" Length Socket Cap Screw McMaster 92196A113 1 $ 4.52 $ 4.52 $ 69.99 $ 77.99 20 4-40, 1" Length Socket Cap Screw McMaster 92196A115 1 $ 5.78 $ 5.78 1 $ 37.99 $ 37.99 21 1/32" X 12" X 12" PTFE Sheet Gasket McMaster 1063T21 2 $ 7.05 $ 14.10 AIRSPEED-V3 1 $ 42.99 $ 42.99 22 1/16" X 12" X 12" PTFE Sheet Gasket McMaster 1063T22 2 $ 13.94 $ 27.88 Eagle Tree Systems PITOT-KIT-V3 5 $ 9.99 $ 49.95 23 IMU 1 $ $ - SAM7-256 Board Spark Fun Electronics DEV-00774 2 $ 71.95 $ 153.69 24 BOX - MOD01 Initial Release of BOX P09233 - 1 $ 29.50 $ 29.50 32 Chan San Jose Nav. Spark Fun Electronics GPS-08266 1 $ 99.95 $ 99.95 25 4 Pack of Bateries AA Radio Shack - 2 $ 2.50 $ 5.00 Ultrasonic Range Finder Spark Fun Electronics SEN-08504 1 $ 27.95 $ 27.95 26 4 Pack of Bateries AAA Radio Shack - 2 $ 2.50 $ 5.00 GPS-00168 1 $ 34.95 $ 48.88 27 Battery Holder 4X AA Radio Shack - 1 $ 1.79 $ 1.79 86375K151 3 $ 8.17 $ 24.51 28 Battery Clips 9V Radio Shack - 1 $ 2.69 $ 2.69 93275K12 1 $ 15.84 $ 15.84 29 Battery Holder 2X AA Radio Shack - 1 $ 1.69 $ 1.69 9311K138 2 $ 10.27 $ 20.54 30 Battery Holder 3X AAA Radio Shack - 1 $ 1.79 $ 1.79 86375K163 3 $ 6.94 $ 20.82 31 Adapter Plug M Radio Shack - 1 $ $ - 20.50 32 AC Adapter 6V 800Ma AC Radio Shack - 1 $ 22.99 $ 22.99 Lassen iQ Eval Board Spark Fun Electronics USB Foam w/ Adhesive Back, McMaster 3/16" X 12" X 12" SOFT Foam w/ Adhesive Back, McMaster 1/8" X 1/2" 39' SOFT .25" Dia, .057" McMaster Vibration Grommet Thick Foam w/ Adhesive Back, McMaster 1/8" X 12" X 12" FIRM Price Shipped Analog Devices Price Shipped - - 14 1/16" ID, 1/8" OD Silicone Tubing McMaster 51135K11 50 $ 0.41 $ 15 4-40, 1/8" H Barrel Thread Plate McMaster 90975A002 1 $ 9.01 $ 9.01 33 SD Memory Card 1Gb Sandisk - 1 $ 12.99 $ 12.99 16 1/16" Single Barb Tee Fitting McMaster 5116K11 1 $ 2.38 $ 2.38 34 Binder 1.5" OFFICE DEPOT - 1 $ 7.79 $ 7.79 17 7mm OD, 3.2mm ID Fiber Washer McMaster 95225A315 1 $ 8.35 $ 8.35 35 Ready Index 5 Tabs OFFICE DEPOT - 1 $ 2.59 $ 2.59 18 4-40, 1/2" Length Socket Cap Screw McMaster 92196A110 1 $ 4.26 $ 4.26 36 Binder 1.5" (2-Pack) OFFICE DEPOT - 1 $ 5.29 $ 5.29 $ 910.73 Bill of Materials # Item Model Manufacture Part Number QTY 1 Altimeter ZLOG 3 Digital Products #ZLOG3 1 $ Price 89.95 $ Shipping 3.79 $ 93.74 2 Airspeed MicroSensor V3 Eagle Tree Systems AIRSPEED-V3 2 $ 42.99 $ - $ 85.98 3 Pitot-Static Tube Pitot-Static Tube Kit Eagle Tree Systems PITOT-KIT-V3 2 $ 9.99 $ - $ 19.98 4 Microprocessor SAM7-256 Board Spark Fun Electronics DEV-00774 1 $ 71.95 $ 9.79 $ 81.74 5 GPS 32 Chan San Jose Nav. Spark Fun Electronics GPS-08266 1 $ 99.95 $ - $ 99.95 6 Altimeter Ultrasonic Range Finder Spark Fun Electronics SEN-08504 1 $ 27.95 $ - $ 27.95 7 GPS Break Out Board Lassen iQ Eval Board - USB Spark Fun Electronics GPS-00168 1 $ 34.95 $ 13.93 $ 48.88 8 3/16" X 12" X 12" Foam w/ Adhesive Back, SOFT McMaster 86375K151 1 $ 8.17 $ - $ 8.17 9 1/8" X 1/2" 39' Foam w/ Adhesive Back, SOFT McMaster 93275K12 1 $ 15.84 $ - $ 15.84 10 .25" Dia, .057" Thick Vibration Grommet McMaster 9311K138 12/25 $ 10.27 $ - $ 4.93 11 1/8" X 12" X 12" Foam w/ Adhesive Back, FIRM McMaster 86375K163 1 $ 6.94 $ - $ 6.94 12 1/16" ID, 1/8" OD Silicone Tubing McMaster 51135K11 20 $ 0.41 $ - $ 8.20 13 4-40, 1/8" H Barrel Thread Plate McMaster 90975A002 17/100 $ 9.01 $ - $ 1.53 15 7mm OD, 3.2mm ID Fiber Washer McMaster 95225A315 31/100 $ 8.35 $ - $ 2.59 16 4-40, 1/2" Length Socket Cap Screw McMaster 92196A110 7/100 $ 4.26 $ - $ 0.30 17 4-40, 3/4" Length Socket Cap Screw McMaster 92196A113 7/100 $ 4.52 $ - $ 0.32 18 4-40, 1" Length Socket Cap Screw McMaster 92196A115 7/100 $ 5.78 $ - $ 0.40 19 IMU ADIS 16350 Analog Devices ADIS 16350 1 $ 550.00 $ - $ 550.00 20 BOX - MOD01 Initial Release of BOX P09233 - 1/4 $ 29.50 $ - $ 7.38 21 AC Adapter 6V 800Ma AC Radio Shack - 1 $ 22.99 $ - $ 22.99 22 SD Memory Card 1Gb Sandisk - 1 $ 12.99 $ - $ 12.99 TOTAL Shipped $ 1,100.79 Projected Project Costs Building a second Measurements Box: Total Project Cost: $1900 (includes IMU cost ~$500) Total Project Cost: $1400 (assumes donated IMU) Measurements Box BOM: $1100 (includes IMU cost ~$500) $600 (assumes donated IMU) The Current Project Cost: $910 Current Risks Ability to Program the MCU Ability to Interface with the IMU Ability to Test the IMU – MAV Test Stand GPS Calibration Airframe A Flight Testing Action Items Program MCU IMU Testing Further Sensor Testing Pitot Static Tube Mounting Design Part Drawings Assembly Instructions Component Documentation Schedule - SDII Team Member WEEK 11 FINALS BREAK WEEK 12 WEEK 13 WEEK 14 Michael Skube (TEAM LEAD) Review Project Status, Meet with team leads, Update EDGE, Individual Sensor Review, Order new Parts, Finalize SD I Documents Complete Documentation, Write Instillation Instructions Complete Documentation, Write Instillation Instructions Meet with Team Leads, Update EDGE, System Integration Review Test complete system on Ground Station Prepare for Individual Sensor James Hunt Review, Revisit Sensor Selection (TEAM / MECHANICAL if needed, Continue Testing, LEAD) Meet with team leads Complete Documentation, Write Instillation Instructions Complete Documentation, Write Instillation Instructions Begin Testing Complete Measurements System, Meet with Team Leads Test complete system on Ground Station Joseph Peters (ELECTICAL LEAD) Prepare for Individual Sensor Review, Revisit Sensor Selection if needed, Continue Testing, Meet with team leads Complete Documentation, Program Microcontroller Program Microcontroller Begin Complete System Integration, Meet with Team Leads Test complete system on Ground Station Kevin Li Prepare for Individual Sensor Review, Revisit Sensor Selection if needed, Continue Testing, present testing results Complete Documentation, Program Microcontroller Program Microcontroller Begin Complete System Integration Test complete system on Ground Station Heidi Morgan Prepare for Individual Sensor Review, Revisit Sensor Selection if needed, Continue Testing, present testing results Complete Documentation, Program Microcontroller Program Microcontroller Begin Complete System Integration Test complete system on Ground Station John Isely Prepare for Individual Sensor Review, Revisit Sensor Selection Complete Documentation, Test Sensors Complete Documentation, Test Sensors if needed, Continue Testing, present testing results Begin Complete System Integration Test complete system on Ground Station William Atkinson Prepare for Individual Sensor Review, Revisit Sensor Selection Complete Documentation, Test Sensors Complete Documentation, Test Sensors if needed, Continue Testing, present testing results Begin Complete System Integration Test complete system on Ground Station Schedule - SDII Michael Skube (TEAM LEAD) James Hunt (TEAM / MECHANICAL LEAD) Joseph Peters (ELECTICAL LEAD) WEEK 15/17 WEEK 16 WEEK 18 WEEK 19 Review/Fix/Re-test Complete Update Documentation, Meet with Team Test complete system on Airframe A, Prepare Measurements System on Ground System, Leads, Update EDGE, Fly Measurements System for IMAGINE RIT, Begin Design of SD Poster Meet with other Team Leads and Document Flight, Prepare for IMAGINE RIT Review/Fix/Re-test Complete Update Documentation, Meet with Team Test complete system on Airframe A, Prepare Measurements System on Ground System, Leads, Update EDGE, Fly Measurements System for IMAGINE RIT, Begin Design of SD Poster Meet with other Team Leads and Document Flight, Prepare for IMAGINE RIT Review/Fix/Re-test Complete Update Documentation, Meet with Team Test complete system on Airframe A, Prepare Measurements System on Ground System, Leads, Update EDGE, Fly Measurements System for IMAGINE RIT, Begin Design of SD Poster Meet with other Team Leads and Document Flight, Prepare for IMAGINE RIT Kevin Li Update Documentation, Update EDGE, Fly Review/Fix/Re-test Complete Test complete system on Airframe A, Prepare Measurements System and Document Flight, Measurements System on Ground System, for IMAGINE RIT, Begin Design of SD Poster Prepare for IMAGINE RIT Heidi Morgan Update Documentation, Update EDGE, Fly Review/Fix/Re-test Complete Test complete system on Airframe A, Prepare Measurements System and Document Flight, Measurements System on Ground System, for IMAGINE RIT, Begin Design of SD Poster Prepare for IMAGINE RIT John Isely Update Documentation, Update EDGE, Fly Review/Fix/Re-test Complete Test complete system on Airframe A, Prepare Measurements System and Document Flight, Measurements System on Ground System, for IMAGINE RIT, Begin Design of SD Poster Prepare for IMAGINE RIT William Atkinson Update Documentation, Update EDGE, Fly Review/Fix/Re-test Complete Test complete system on Airframe A, Prepare Measurements System and Document Flight, Measurements System on Ground System, for IMAGINE RIT, Begin Design of SD Poster Prepare for IMAGINE RIT WEEK 20/21/22 Finalize All Documentation, Update EDGE, Team Lead Meeting IMAGINE RIT FESTIVAL Team Member Finalize All Documentation, Update EDGE, Team Lead Meeting Finalize All Documentation, Update EDGE, Team Lead Meeting Finalize All Documentation, Update EDGE Finalize All Documentation, Update EDGE Finalize All Documentation, Update EDGE Finalize All Documentation, Update EDGE