NATIONAL SKILLS FUND TENDER BRIEFING SESSION TO APPOINT A SYSTEM INTEGRATOR TO IMPLEMENT AN INTEGRATED MICROSOFT DYNAMICS BASED SYSTEM 15 December 2015 1 Content 1. PURPOSE OF TENDER 2. BACKGROUND 3. SCOPE OF WORK AND TIMEFRAME 4. SUBMISSION OF PROPOSAL 5. TECHNICAL SUBMISSION 6. FINANCIAL SUBMISSION 7. EVALUATION CRITERIA 8. QUESTIONS AND ANSWERS 9. ANNEXURE A – NSF OPERATING MODEL 2 1. PURPOSE OF TENDER TO APPOINT A SYSTEM INTREGRATOR TO: PART1: IMPLEMENTATION (12 MONTHS) Implement a scalable Microsoft Dynamics based system comprising of: • Enterprise Resource Planning (ERP) system; • Customer Relationship Management (CRM) system; • Programme, Project and Portfolio Management Solution; and • An integrated Enterprise Content Management (ECM) system. The implementation of the integrated system(s) must be phased as follow: Phase 1 (6 months): NSF’s core functional processes and critical support services processes; Phase 2 (3 months): NSF’s executive office processes; and Phase 3 (3 months): NSF’s other support services processes. 3 1. PURPOSE OF TENDER TO APPOINT A SYSTEM INTREGRATOR TO: PART 2: MAINTENANCE AND SUPPORT (36 MONTHS, WITH OPTION TO EXTEND WITH 24 MONTHS) Provide maintenance and support for a period of 36 months after the system(s) goes live, with the option to extend the maintenance and support for an additional period of 24 months. 4 2. BACKGROUND LEGISLATIVE BACKGROUND ON NSF The NSF was established in 1999 in terms of section 27 of the Skills Development Act, 1998 (Act No. 97 of 1998). . The NSF has the primary function of funding: • National priority skills development programmes and projects as identified in the National Skills Development Strategy (NSDS); • Skills development programmes and projects in support of the Skills Development Act; and • Any activity undertaken by the Minister of Higher Education and Training to achieve a national standard of good practice in skills development. 5 2. BACKGROUND OPERATIONAL BACKGROUND ON NSF NB! Operationally, in order for the NSF to fulfil this mandate, it must develop skills development grant disbursement criteria and procedures, monitor the actual output (deliverables) against targets in relation to grants disbursed, evaluate the outcome and impact of its investment in skills development and steer the development of internal and external structures and systems to effectively and efficiently achieve its goals. NB! Monitoring and evaluation of skills development initiatives funded by the NSF has become key in ensuring that the NSF remains well aligned to its mandate and strategy and efficient and effective in the funding of skills development. 6 2. BACKGROUND OPERATIONAL BACKGROUND ON NSF The following are key enablers towards strengthening monitoring and evaluation within the NSF: • Clear and robust processes within which execution, governance, compliance and management are embedded; • Skilled and capable employees; • A strong technology backbone; and • A transparent performance management regime. 7 2. BACKGROUND CURRENT OPERATIONAL ENVIRONMENT NSF is currently mainly operating in a manual paper-based environment, with systems in the main being limited to government’s transversal systems namely BAS, PERSAL and LOGIS. The NSF must continue to make use of PERSAL as all NSF employees are employed by the DHET in accordance with the Skills Development Act, 1998 (Act No.97 of 1998). 8 2. BACKGROUND CURRENT OPERATIONAL ENVIRONMENT The current manual paper-based environment in itself constrains the NSF in a number of ways, some of which are listed below: • • • Significant and time-constraining manual intervention is required to perform all NSF reporting (monthly, quarterly and annual reporting). This includes financial reporting, performance reporting, human resource reporting and compliance reporting; NSF processes are mainly re-active rather than pro-active as there are limited early warning signs and timely information to inform early mitigating actions; Performance at organisational, project, programme, departmental and individual level is not clearly linked. Shortcomings in the objective monitoring of performance at an individual, project and programme level on a timely and continuous basis exists due to the objective evidence of performance not being readably available, but contained in hardcopy documents. 9 2. BACKGROUND TO PRODUCE THIS REPORT TOOK THE NSF 4 MONTHS, WITH 2 DEDICATED PEOPLE BEING ALLOCATED TO IT RESPONSIBLE FOR COLLECTING AND COLLATING THE DATA FROM ALL THE NSF PROJECTS (HARD COPY FILES AND EXCEL). DESPITE ALL THE HARD WORK, THE DATA STILL HAS A +-15% ERROR ON IT, LEADING TO A QUALICATION FROM THE AUDITOR-GENERAL. 2. BACKGROUND AUTOMATION OF PROCESSES > MOVE TO MORE PAPERLESS AND REAL-TIME ENVIRONMENT The implementation of the systems should therefore automate processes to improve efficiency and effectiveness within the NSF and assist NSF to move to a more paperless and real-time environment. It should contribute towards implementing: • Clear and robust processes within which execution, governance, compliance and management are embedded; • A strong technology backbone; and • A transparent performance management regime. 11 2. BACKGROUND NEW OPERATING MODEL AND RE-ENGINEERED BUSINESS PROCESSES NSF has recently developed a new operating model for the Fund and reengineered its business processes. The new operating model and re-engineered business processes informs the NSF’s business needs and requirements from an IT perspective and the way forward. The new business processes have been mapped in extensive detail in an operating modelling tool called Enterprise Architect. The detail report containing the mapped processes will be made available to the successful bidder (It is a +-664 page document). 12 2. BACKGROUND NEW OPERATING MODEL AND RE-ENGINEERED PROCESSES The detail report containing the mapped processes will provide detail of each component of the operating model (Level 1), providing details of Levels 2 to 3 and detailed activities at Level 4. The Level 4 activities are matched to a specific role / ‘swim lanes’ (appearing as vertical partitions), providing guidance as to the responsible resource to perform the associated activity. 13 2. BACKGROUND NEW OPERATING MODEL AND RE-ENGINEERED PROCESSES 14 2. BACKGROUND NSF Operating Model Executive Office Processes Marketing & Communication Governance, Risk and Compliance Secretariat Core Functional Processes Integrated Skills Planning Projects Bursaries Fund Management A Performance Planning, Monitoring and Reporting Support Service Processes Finance Management Content Management Human Resources Legal IT Support Supply Chain Management Internal Audit 15 Facilities & Occupational Health & Safety Asset Management 2. BACKGROUND PROJECTS (Level 2) Level 2: End-to-End Process (Projects) Initiate Execute Close - Out Rev iew Initiate NSF Project initiation involves the translation of strategic objectives, outcomes and outputs into detailed activities to be included as part of a Operating project scope. It further addresses the planning for and soliciting of suitable partners and service providers in preparation for the Model execution/implementation phase. Project initiation is managed by the Projects Initiation Team. Execute During the execution phase the Service Provider commences with implementation while the NSF's Project Monitoring Team monitors the project's performance on the achievement of outputs as well as adhering to the planned expenditure and schedule/programme. Close - Out During the close-out phase the NSF's Project Monitoring Team performs a final assessment on the project's achievement of outputs prior to issuing the relevant certificates and performing financial close-out. Review Subsequent to project close-out a post implementation review/impact assessment is performed according to the agreed metrics (outcomes) of the project. 16 2. BACKGROUND PROJECTS (Level 3) Projects Level 3: Sub-Process (Execute) Project Set Up The Project Monitoring Team proceeds to orientate the service provider for project implementation. All monitoring and evaluation measures and events are communicated and scheduled. ActivityInitial Monitor Performance (Monthly) Proj ect Set Up The Project Monitoring team monitors the performance of the Service Provider on the achievement of project outputs and outcomes within the agreed time frame and budget on a monthly and or ad hoc basis as required. Monitor Performance (Quarterly) The Project Monitoring team monitors the performance of the Service Provider on the achievement of project outputs and outcomes within the agreed time frame and budget on a quarterly basis. Invoice verification forms part of this process. Monthly Quarterly Monitor Performance (Monthly) Monitor Performance (Quarterly) Perform Learner Verification Site Visit Verification of learner details / achievements against the service provider's report is performed by the project manager during the site visit. The selection of the sample size to verify the site is done randomly by the project manager at his/her discretion. Site Visit? Yes Learner Verification Site Visit Type? Perform Progress Verification Site Visit Progress Verification Perform Learner Verification Site Visit A progress verification site visit is performed by the project manager to assess the progress of the project against a Service Provider's reported metrics. This may be done on an ad hoc basis subject to the project manager's discretion or in response to an incident. Monthly progress verification may be required for high risk projects. Invoice Verification Perform Progress Verification Site Visit Perform Inv oice Verification Site Visit Perform Invoice Verification Site Visit An invoice verification site visit is performed on a quarterly basis by the project manager, entailing an assessment of progress of the project as well as verification of the project expenses. The selection of the sample size of the invoices / financial documentation to verify the site is done randomly by the project manager at his or her discretion. If Required Dev elop Rescue Plan If Required If Required Develop Rescue Plan Renegotiate / Teminate Project Contract? Terminate In cases where the service provider is unable to meet project requirements or contractual obligations and termination of their services occurs, a rescue plan must be implemented. The rescue plan applies only in cases where learners will become disenfranchised due to termination of the project. Renegotiate Project Contract Renegotiate Terminate Proj ect Contract Renegotiate Proj ect Contract Renegotiate the project contract based on the requirements of the NSF. Terminate Project Contract Change Request? FlowFinal Terminate the project contract based on the requirements of the NSF. No Administer Change Request (Minor Change) Yes Major? Minor? Minor All changes to the project scope, budget and time frames are assessed and managed accordingly. Major Administer Change Request (Minor Change) Administer Change Request (Maj or Change) Administer Change Request (Major Change) All changes to the project scope, budget and time frames are assessed and managed accordingly. Perform Interim Evaluations Perform Interim Ev aluations No Interim project evaluations are performed to assess performance on outcome indicators where applicable. ActivityFinal Proj ects 17 2. BACKGROUND Swimlanes = responsible person(s) Prepare Quarterly Progress Report The SP prepares a quarterly progress report as per pre-determined requirements. If a remedial action plan exists, Quarterly reports must include progress updates against the agreed remedial actions plan. The Quarterly Progress Report for the Service Provider must include a Pro Forma Invoice. Projects Level 4: Activities (Monitor Performance - Quarterly) Serv ice Prov ider Team Lead/s: Proj ect Partner: Finance Portfolio Head/s: Regional Head: Initiation & Ev aluation Acti vi tyIni ti al Perform Desktop Review of Quarterly Report PROJECTS (Level 4) The project manager reviews the quarterly report as submitted by the SP. This report is compared against items listed in the M&E Matrix (where relevant) together with any major deviations from the agreed schedule and cash flow. If a remedial action plan exists, Quarterly reports must include progress updates against the agreed remedial actions plan. Quarterl y Perform Desktop Review of Quarterly Report Prepare Quarterly Progress Report Finance reviews the quarterly report as submitted by the SP. This report is compared against planned and valid expenditure. If a remedial action plan exists, Quarterly reports must include progress updates against the agreed remedial actions plan and strict assessment of planned vs actual expenditure. Perform Desktop Review of Quarterly Report Perform Desktop Rev iew of Quarterly Report Review the quarterly report as submitted by the SP. Approved? Yes Perform Desktop Rev iew of Quarterly Report Amend Quarterly Progress Report The Service Provider amends the Quarterly Progress Report to incorporate any suggested changes and/or updates. Perform Desktop Rev iew Yes of Quarterly Report Approved? No Amend Quarterly Progress Report Determine if a Site Visit is Required No Approved? No Based on the content included in the progress report, a site visit may be required. Yes Determine if a Site Visit is Required Determine Type of Site Visit Required The type of site visit to be performed by the project manager is determined from the detail contained in the Service Provider’s Quarterly Report. An invoice Verification site visit will always be required on Quarter-end and Learner Verification and / or Progress verification may be required on Quarter-end, but only on isolated instances. When the type of Site Visit has been determined, a team must be established to conduct the site visit including representatives from the following: Projects Initiation ISP Finance Requi red? Yes Determine Type of Site Visit Required Prepare Site Visit Report and Update M&E Matrix with Quarterly Indicators T ype? A site visit report, learner verification report and the monitoring section of the M&E matrix is updated with information obtained from the site visit(s). Learner Veri fi cati on Progress Veri fi cati on Invoi ce Veri fi cati on Review Site Visit Report and M&E Matrix for Accuracy, Completeness and Validity Proj ects (Perform Learner Verification Site Visit) Proj ects (Perform Progress Verification Site Visit) Proj ects (Perform Inv oice Verification Site Visit) Review all relevant site report(s) and M&E Matrix prepared by the project manager. Amend Site Visit Report and or M&E Matrix No Prepare Site Visit Report and Update M &E M atrix w ith Quarterly Indicators Update the relevant report and/or matrix. Determine if Project Performance is On Track Rev iew Site Visit Report and M &E M atrix for Accuracy, Completeness and Validity Amend Site Visit Report and or M &E M atrix No Determine if Proj ect Performance is On Track Yes Based on the findings listed in the site visit report(s) and M&E Matrix, the project manager determines if project performance is on track. Approved? Determine if Existing Remedial Action Plan is in Place Should the performance not be on track, the project manager confirms if a remedial action plan is currently in place on the project (i.e. from a previous iteration). Proj ects (Perform Interim Ev aluations) Determine if Remedial Action Plan Requires Amendment Perform ance on T rack? In the event that a previous remedial action plan is being implemented, it is confirmed by the project manager if any updates and/or changes should be effected. No Determine if Rescue Plan is Required Determine if Existing Remedial Action Plan is in Place The project manager determines if a rescue plan is required. This is for cases where learners and/or infrastructure need to be reallocated or transferred. A risk assessment needs to be performed during the contract termination process which will inform this rescue plan. Pl an i n Pl ace? Request Remedial Action Plan from Service Provider Yes In the event of under-performance on outcomes, outputs, expenditure and/or schedule, the project manager requests the SP to prepare a remedial plan to expedite progress on the project. The project manager further includes terms and conditions of the action plan and facilitates a way forward session. Determine if Remedial Action Plan Requires Amendment Prepare and Submit Remedial Action Plan No Request Remedial Action Plan from Serv ice Prov ider Am endm ent? Yes The SP prepares a remedial action plan to address and resolve items raised by the NSF. No Proj ects (Terminate Proj ect Contract) Determine if Change Request is Required The content of the remedial action plan may result in a change on the project. In this case a change request needs to be prepared by the project manager. Determine if Rescue Plan is Required Review Remedial Action Plan Prepare and Submit Remedial Action Plan Proj ects (Dev elop Rescue Plan) The project manager reviews the SP's remedial action plan to determine if suggested interventions will be successful in addressing areas of concern. Requi red? Yes Review Remedial Action Plan and Recommendations No Fl owFi nal Review the SP's remedial action plan together with the project manager's observations/comments on the perceived effectiveness of the proposed recovery plan. Determine if Change Request is Required Review Proposed Remedial Plans Ability to Address Under-Performance on Outputs and Outcomes Reviews the assessment performed by the Project Monitoring team on the SP's remedial action plan. The effect on the project's outcomes and outputs as envisaged/developed during the portfolio planning process is assessed to determine if this plan will result in material deviations. Proj ects (Administer Change Request M inor or M aj or) Requi red? Yes Amend Remedial Action Plan The Service Provider incorporates any requested amendments into the remedial action plan. No Rev iew Remedial Action Plan Update Cash Flow, Programme and M&E Matrix Approved? Yes Rev iew Remedial Action Plan and Recommendations The project manager updates the M&E matrix, cash flow and programme where relevant. Implement Remedial Action Plan Rev iew Proposed Yes Remedial Plans Ability to Address UnderPerformance on Outputs and Outcomes Approved? The SP implements the remedial action plan as accepted by the NSF. No Amend Remedial Action Plan No Approved? No Prepare Final Invoice The SP prepares an invoice based on the agreed items during the site visit. The invoice, with all relevant supporting documentation, is submitted to the project manager for approval. Update Cash Flow , Programme and M &E M atrix Yes Prepare Payment Pack The project manager prepares a cover report outlining the review and main findings on the SP's quarterly report. A payment certificate and payment advice is prepared in support of the invoice together with all supporting documentation. Implement Remedial Action Plan Review Payment Pack Yes Prepare Final Inv oice Review the payment advice with all supporting documentation (payment certificate and cover report) for accuracy and adequacy. Amend Payment Pack Prepare Payment Pack The project manager amends the payment pack to incorporate any suggested changes and/or updates. Forward Notification of Payment to Service Provider Rev iew Payment Pack The project manager receives notification that payment has been effected. Proof of payment is forwarded to the SP. Amend Payment Pack Approved? No Forw ard Notification of Payment to Serv ice Prov ider Fund M anagement (Disburse Funds to Proj ects / Bursaries) Yes Acti vi tyFi nal Execute (Implement) Proj ect Set Up Perform Learner Verification Site Visit Perform Progress Verification Site Visit Perform Inv oice Verification Site Visit 18 2. BACKGROUND NEW OPERATING MODEL AND RE-ENGINEERED PROCESSES The detail report also contains the following: Process Controls: a summary of emerging risks and controls required on Level 1-4 processes in the operating model; Process Documentation: a summary of standard documents supporting / enabling Level 1-4 processes in the current operating model. These documentation has also been developed and is in the process of being finalised; Process Key Performance Indicators (KPI’s): a summary of performance indicators for Level 1-4 processes in the current operating model informing organisational performance; and Process Calendar: a high level view of important dates emerging from the detail behind Level 1 processes. 19 3. SCOPE OF WORK & TIMEFRAME PART 1: IMPLEMENTATION (12 MONTHS) PHASE 1: NSF’S CORE FUNCTIONAL PROCESSES AND CRITICAL SUPPORT SERVICE PROCESSES (6 MONTHS) The NSF’s core functional processes consist of the following main groups: • Integrated Skills Planning • Programmes and Projects • Bursaries • Fund Management • Performance Planning, Monitoring and Reporting The NSF’s critical support service processes consist of the following main groups: • Finance Management (incl. Asset Management) • Supply Chain Management • Content Management • Legal 20 3. SCOPE OF WORK & TIMEFRAME PART 1: IMPLEMENTATION (12 MONTHS) PHASE 2: EXECUTIVE OFFICE PROCESSES (3 MONTHS) The NSF’s executive office processes consist of the following main groups: • Secretariat • Governance, Risk and Compliance • Marketing and Communication 21 3. SCOPE OF WORK & TIMEFRAME PART 1: IMPLEMENTATION (12 MONTHS) PHASE 3: OTHER SUPPORT SERVICE PROCESSES (3 MONTHS) The NSF’s other support service processes consist of the following main groups: • Internal Audit • IT Support • Facilities, Occupational Health and Safety • Human Resources 22 3. SCOPE OF WORK & TIMEFRAME PART 1: IMPLEMENTATION (12 MONTHS) The project will not continue automatically from one phase to the next phase. The continuation of one phase to the next is subject to approval thereof by the NSF and upon successful completion of work in the previous phase by the System Integrator (SI). The NSF reserves the right to continue to the next phase or not to continue to the next phase. More detailed information on the NSF’s business processes are provided further in this presentation. 23 3. SCOPE OF WORK & TIMEFRAME PART 1: IMPLEMENTATION (12 MONTHS) The System Integrator will be required to do the following: • Install and configure the proposed systems according to the NSF requirements as listed in the NSF’s requirements. The System Integrator will be required to provide software solution design, system planning, project management and implementation services relative to the deployment of the systems; and • Provide user and administrator training through a combination of classroom, online, train the trainer and/or on-the-job training. 24 3. SCOPE OF WORK & TIMEFRAME PART 1: IMPLEMENTATION (12 MONTHS) The following are key deliverables: • Agreement between NSF and the successful bidder on the detailed, phased implementation and deployment plan to configure and install the software solution within agreed timeframes; • Agreement between NSF and the successful bidder on the deployment option: Onsite hosting vs Off site hosting vs Software as a Service (SaaS). Please note: Special consideration should be given with regards to integration of the proposed solution with the DHET’s active directory; • Design and implement a software solution to support NSF’s core functional processes and critical support service processes. This includes support to in-field NSF project managers and support to perform back-office financial and legal functions at the NSF; • Design and implement a software solution to support NSF’s executive office processes and NSF’s other support service processes; • Conduct gap analysis to identify custom vs configurable desired functionality; • Detailed design of software configuration; • System and user acceptance testing as per agreed upon strategy; and • User and administrator training. 25 3. SCOPE OF WORK & TIMEFRAME PART 1: IMPLEMENTATION (12 MONTHS) Initially the system must support 150+ users, but must be scalable to support 10 000+ users. Timeframe: PHASE PHASE 1: NSF’s core functional processes and critical support service processes PHASE 2: NSF’s executive office processes PHASE 3: NSF’s other support service processes TIMEFRAME Must be completed within six months from date appointment. Must be completed within three months from date of approval by NSF to proceed with phase 2. Must be completed within three months from date of approval by NSF to proceed with phase 3. The phases do not run concurrently. Continuation to the next phase will be dependent upon successful completion of the previous phase. 26 3. SCOPE OF WORK & TIMEFRAME PART 2: MAINTENANCE AND SUPPORT (36 MONTHS, WITH THE OPTION TO EXTEND WITH 24 MONTHS) For part 2 of the work the successful bidder will be appointed for a period of 36 months after the system(s) goes live, with the option to extend the maintenance and support for an additional period of 24 months. The appointment of part 2 of the work is conditional upon the successful completion of part 1 of the work. 27 4. SUBMISSION OF PROPOSAL Two envelope procedure: • Technical Submission – Refer to paragraph 5 of the RFP • Financial Submission – Refer to paragraph 6 of the RFP Tender Box: Department of Higher Education and Training, 123 Francis Baard Street, Pretoria Deadline: 15 January 2016, 11h00 Contact Persons: Technical Name Email Address Wean Minnie Minnie.W@dhet.gov.za Department of Higher Education and Related Bid Related Training Wicky Mkhize Mkhize.W@dhet.gov.za 123 and 178 Francis Baard Street Pretoria 28 5. TECHNICAL SUBMISSION Title A Executive Summary B Proposed Solution Content Ref This part of the proposal contains an Executive Summary, which should outline a brief overview of the bidder’s understanding of the engagement, and should identify the main features and benefits of the proposed work. This part of the proposal should contain the bidder’s proposed system solution highlighting the proposed solution set and applicable modules as follow: B1: Proposed system solution highlighting the proposed solution set and applicable modules; B2: How the proposed solution will support and improve the efficiency and effectiveness of the NSF’s business process requirement as contained in Annexure A; and B3: Responses to the questionnaire as contained in Annexure B. Annex A Annex B C Approach and This part of the proposal should contain the bidder’s proposed approach and Methodology methodology to the project as follow: C1: A summarised and detailed project work plan to configure and install the solution at NSF with major milestones and deliverables (Including any assumptions made in developing your proposed approach); and C2: Responses to the questionnaire as contained in Annexure C. 29 Annex C 5. TECHNICAL SUBMISSION D Title User and Administrator Training Content Ref This part of the proposal contains the bidder’s proposed approach and methodology with regards to user and administrator training on the systems. The bidder is required to outline the following as part of this part of the proposal: Annex D D1: An outline of the approach with regards to user and administrator training and skills / knowledge transfer plan; and D2: Responses to the questionnaire as contained in Annexure D. 30 5. TECHNICAL SUBMISSION E Title Experience and Capacity of Bidder’s Employees Content Ref This part of the proposal should contain the bidder’s experience and capacity with regards to the bidder’s employees as follow: E1: The contact information of the project manager, who will be the single point of contact for this part of the work. E2: The level of experience and expertise of the bidder’s project manager, with inclusion of the project manager’s curriculum vitae and relevant qualifications. The bidder must guarantee that the level of experience and expertise as proposed with regards to the project manager are maintained throughout the project, should it be necessary to change the project manager from the original submission. E3: The technical submission for this part of the work should include a summary of the experience, qualifications and expertise of the bidder’s Annex E entire project team. The bidder must guarantee that the level of experience and expertise as proposed with regards to the project team are maintained throughout the project, should it be necessary to change the project team members from the original submission. E4: Responses to the questionnaire as contained in Annexure E. 31 5. TECHNICAL SUBMISSION F G Title Experience of Bidder with regards to similar projects Content Ref This part of the proposal contains the bidder’s experience with regards to similar projects. The bidder is required to outline contactable references for similar work Annex F performed by the bidder (include name and contact number) as required per Annexure F and include reference letters. Compulsory Compulsory tender documents completed in full together with tender documents supplementary bidder documents as required. This includes an original and valid tax certificate and completed SBD forms for all the bidders and consortium members, where applicable; Failure by the bidder to furnish information as requested above will lead to the bidder being disqualified from the tender process. 32 5. TECHNICAL SUBMISSION THE FOLLOWING ANNEXURES MUST BE SUBMITTED AS PART OF THE TECHNICAL SUBMISSION: ANNEXURE A: A comprehensive response on how the proposed solution, once configured, will improve and support the NSF business processes. ANNEXURE B: Compliance to the NSF’s requirements below and provide brief responses to each requirement where applicable. ANNEXURE C: Technical specifications - Methodology and approach, Implementation, Timeline, Solution Hosting, System Documentation, Testing, Solution Integration, Disaster Recovery and Business Continuity, Maintenance and Support, Hardware, Network and Infrastructure, Data, Security and Control ANNEXURE D: Knowledge Transfer / Training ANNEXURES E and F: Experience, qualifications and capacity of the bidder 33 6. FINANCIAL SUBMISSION The financial submission must include the following deployment options, where possible: • Software as a Service (SAAS) • On premises hosting • Off premises hosting Initially the system must support 150+ users, but must be scalable to support 10 000+ users. The work should be costed separately as follow: • A. Part 1: Implementation • B. Part 2: Maintenance and Support • C. Licence Fees • TOTAL COST OF OWNERSHIP (Over 3 to 5 year period) The three different phases under Part 1: Implementation, should also be costed separately: • Phase 1: Core Functional Processes and Critical Support Service Processes • Phase 2: Executive Office Processes • Phase 3: Other Support Service Processes 34 6. FINANCIAL SUBMISSION The cost of Part 1 and Part 2 should include all costs (including travel and subsistence) related to implementation of the systems. The total cost of Part 1 and Part 2 should include VAT and all applicable taxes as indicated above. A fixed price contract for the installation and configuration of the software solution will be agreed on. 35 6. FINANCIAL SUBMISSION TO BE TAKEN INTO CONSIDERATION FOR PART 1 COSTS Costs Additional information Initial software license cost Assume that the NSF requires 150 users. Technical installation cost This includes the cost to configure hardware, install software and perform basic system testing. Include costing per module or in total. Provide total fee schedule for implementation consultants. Include Implementation number of consultants required to implement each module. Detail any other implementation cost. Customisation/ If any software customisation/development is required to meet NSF's development requirements please indicate the cost implication as part of the total costs. Include the cost of interfacing with other systems. If separate please detail Interfaces cost of each proposed interface if this is not included in the implementation/technical cost. 36 6. FINANCIAL SUBMISSION TO BE TAKEN INTO CONSIDERATION FOR PART 1 COSTS Costs Testing Third party costs Additional information Detail the cost of testing encompassing unit, system and user acceptance testing. If any part of your proposed solution uses products/services from a third party please state these costs here. Include the cost of training the staff on the various system modules in line Staff training with your proposed training strategy. Include the cost of training manuals. Other implementation costs Detail any other implementation costs that have not been included in the above categories as no hidden costs will be accepted. 37 6. FINANCIAL SUBMISSION TO BE TAKEN INTO CONSIDERATION FOR PART 2 COSTS Costs Additional information Assume NSF requires 150 users. In addition, provide the cost Ongoing software license cost implications involved in an incremental increase of 100 users, until a total of 10 000 users has been reached. Detail the cost of annual maintenance per module or in total. Annual maintenance cost If version and patch upgrades are not included in the maintenance cost please specify these costs separately. Detail percentage increase in annual maintenance cost. Please include helpdesk and system support fixed and variable costs. Support State how the fees are structured (e.g. per call). Detail anticipated percentage increase in support fees. 38 6. FINANCIAL SUBMISSION TO BE TAKEN INTO CONSIDERATION FOR PART 2 COSTS Costs Additional information Please include the full costs of hosting the solution on premise (at NSF) On premise hosting vs Off premise hosting vs SaaS vs hosting the solution off premise vs providing the solution as SaaS. Please provide details of SaaS. State how the fee is structured per solution (E.g. per user license). Detail percentage increase in annual fees per solution. Detail any maintenance costs applicable. Also indicate the hourly rate to Maintenance be charged for maintenance or any time and materials work that may be required from time to time (e.g. development of reports). Other recurring cost Detail any other recurring costs that have not been included in the above categories. 39 6. FINANCIAL SUBMISSION TO BE TAKEN INTO CONSIDERATION FOR LICENSE COSTS Provide the basis for software license costs (i.e. are they based on transaction volumes, number of concurrent users, number of total users, a user per month fee, monthly or annual license costs per module). Please include any sign-on or once-off costs, if applicable. If possible, provide a few alternatives for software end user licensing arrangements with different costs. Please detail each scenario and highlight the proposed scenario. Assume NSF requires 150 users to determine the Total Cost of Ownership. The license fees should be calculated based on the following MS Dynamics CALS: · Enterprise 6 · Functional = 21 · Task = 58 · Self serve = 65 · Total = 150 In addition, provide the cost implications involved in an incremental increase of 100 users, until a total of 10 000 users has been reached. 40 6. FINANCIAL SUBMISSION TO BE TAKEN INTO CONSIDERATION FOR LICENSE COSTS It is important to note that the NSF is included in the DHET’s enterprise agreement with one of Microsoft’s Partners. The DHET enters into an enterprise agreement with one of Microsoft’s Partners on a three year rolling cycle. The enterprise agreement should be taken into consideration with costing the licenses for the Microsoft Dynamics system. 41 7. EVALUATION CRITERIA Proposals will be evaluated as follow: 1st – MANDATORY CRITERIA: Adherence to mandatory criteria as outlined in paragraphs 4 to 8 in the RFP. Failure to comply will result in disqualification. 2nd – FUNCTIONALITY EVALUATION: Bidders must score at least 75 points on functionality to proceed to the final phase of the evaluation. Refer to paragraph 11 of the RFP for the functionality evaluation criteria. 3rd – PRICE AND BBBEE EVALUATION: Bids will be adjudicated on the 90/10 point system. Price will be calculated out of 90 and the remaining 10 points will be allocated in accordance with the BBBEE status level of contribution. 42 8. Questions and Answers QUESTIONS? Note – More details on the NSF’s operating model is included as follow: 1) Annexure A as part of this presentation 2) NSF Operating Model Overview (Document also included on the DHET website) This presentation and the Overview of NSF Operating Model - Document will be made available to bidders through the DHET website: www.dhet.gov.za 43 7. FINANCIAL OVERVIEW Ngiyabonga. Ndi a livhuwa. Enkosi. Baie dankie. Re a leboga. Siyabonga kakhulu. Hi khense ngopfu. Ke a leboha. Thank you. Annexure A - OPERATING MODEL NSF Operating Model Executive Office Processes Marketing & Communication Governance, Risk and Compliance Secretariat Core Functional Processes Integrated Skills Planning Projects Bursaries Fund Management A Performance Planning, Monitoring and Reporting Support Service Processes Finance Management Content Management Human Resources Legal IT Support Supply Chain Management Internal Audit 45 Facilities & Occupational Health & Safety Asset Management 3. OPERATING MODEL Executive Office Processes Marketing & Communication Marketing and Communication cover all aspects of marketing (communication plans, marketing campaigns); brand awareness; standardisation of documentation as well as planning and steering all communication relevant stakeholders identified. Level 2: End-to-End Process (Marketing and Communication) Marketing Branding Communication / Stakeholder Management NSF Operating Model 46 Annexure A - OPERATING MODEL Executive Office Processes Governance, Risk and Compliance Governance, risk and compliance (GRC) includes all policy development; maintenance, communication and training of procedures; risk planning, measurement and management and ultimately reporting to the Audit Committee with regards to state of GRC within the Fund. Level 2: End-to-End Process (Governance, Risk and Compliance) Gov ernance Risk Management Compliance GRC Reporting NSF Operating Model 47 Annexure A - OPERATING MODEL Executive Office Processes Secretariat The Secretariat function incorporates the creation and maintenance of the NSF calendar, supports and /or facilitates the formation and functioning of committees relevant within the governance structure. Level 2: End-to-End Process (Secretariat) Setup and Maintain NSF Calendar Maintain Committee Appointments Meeting Administration NSF Operating Model 48 Annexure A - OPERATING MODEL Core Functional Processes Integrated Skills Planning Integrated Skills Planning is the ‘control room’ of the core business. It incorporates all research and analysis required to enable robust strategic planning, translating demand into a Fund portfolio (a collection of projects and bursaries) that will upon delivery aid in achieving strategic objectives listed in the Strategic Plan. It further spearheads innovation, ensuring that the fund responds appropriately towards trends within the skills environment. Level 2: End-to-End Process (Integrated Skills Planning) Demand Forecast Supply Planning Strategy Contextualisation Portfolio Initiation Innov ation NSF Operating Model 49 Annexure A - OPERATING MODEL Core Functional Processes Projects The Projects process includes all activities required to deliver a programme/project throughout its lifecycle. It takes its cue from the Integrated Skills Planning process, executing on the portfolio guidelines on a more granular level. It contains aspects of project initiation, monitoring and evaluation of execution and close-out. Finally it prompts a post implementation review processes where all lessons learnt are captured and redirected into the organisation to support enterprise intelligence and increase future efficiencies and effectiveness. Level 2: End-to-End Process (Projects) Initiate Execute Close - Out 50 Rev iew NSF Operating Model Annexure A - OPERATING MODEL Core Functional Processes Bursaries The Bursary process includes all activities required to deliver a bursary from inception to a point where the beneficiary obtains the associated qualification. It takes its cue from the Integrated Skills Planning process, executing on the portfolio guidelines on a more granular level. It includes the identification of focus areas, soliciting proposals, contracting, disbursement, monitoring and evaluation of the bursary process (beneficiaries and service provider (NSFAS)) and close-out. Bursaries Level 2: End-to-End Process Determine Bursaries Focus Areas and Programmes Institutions Bursaries Bursary Proposals Budget Consolidation and Allocation Bursaries Disbursements NSF Outreach Programme Bursary Monitoring 51 Close Out Annexure A - OPERATING MODEL Core Functional Processes Fund Management Fund management deals with the management of the revenue (receipts from DHET) of the NSF. This includes budgeting, accounting for incoming funds/levies, investment of surpluses, controlling fund expenditure on projects and bursaries as well as expending on administrative costs. Management of administrative costs is however included under the Finance Management support service process. actions. Level 2: End-to-End Process (Fund Management) Budgeting Incoming Funds Funds Inv estment Outgoing Funds (Disbursements) Outgoing Funds (Administrativ e) Monitor and Report 52 NSF Operating Annexure A - OPERATING MODEL Core Functional Processes Performance Planning, Monitoring and Reporting Planning and monitoring performance is one of the most important processes within the NSF. This process includes planning for performance reporting, finalising performance and reporting requirements which is followed by the solicitation, finalisation and distribution of relevant information. The management of performance content (i.e. identification of poor performance, crafting of expediting measures to improve performance) is an ongoing process, creating a platform for early detection and proactive remedial actions. Level 2: End-to-End Process (Performance Planning, Monitoring and Reporting) Planning Performance Requirements Reporting Requirements Reporting Templates 53 Reporting Performance Management NSF Operating Model Annexure A - OPERATING MODEL Core Functional Processes Performance Planning, Monitoring and Reporting Planning and monitoring performance is one of the most important processes within the NSF. This process includes planning for performance reporting, finalising performance and reporting requirements which is followed by the solicitation, finalisation and distribution of relevant information. The management of performance content (i.e. identification of poor performance, crafting of expediting measures to improve performance) is an ongoing process, creating a platform for early detection and proactive remedial actions. Level 2: End-to-End Process (Performance Planning, Monitoring and Reporting) Planning Performance Requirements Reporting Requirements Reporting Templates 54 Reporting Performance Management NSF Operating Model Annexure A - OPERATING MODEL Support Service Processes Finance Management Finance management includes all financial processes that support the business requirements of the NSF and includes processes such as performing a financial due diligence on a bidder, issuing a fund certificate for a project, financial orientation of service provider, change request and financial transaction processing on projects. Beneficiary Management covers the financial processes supporting the creation, amendment and removal of beneficiaries on the associated NSF payment system. Level 2: End-to-End Process (Finance Management) Finance Management Cost Centre Management Beneficiary Management NSF Operating Model 55 Annexure A - OPERATING MODEL Support Service Processes Human Resources The Human Resource process includes planning, recruitment and management of the employees (both full time and permanent) of the NSF. Management processes provides practices for performance management, time management (and leave) and remuneration. It further structures learning and development and systematise disciplinary procedures and contract termination. Level 2: End-to-End Process (Human Resources) Workforce Planning Recruitment Performance Management Time Recording Succession Planning Leav e Management Learning & Dev elopment Griev ance & Disciplinary Terminations Temporary Appointments Work Integrated Learning Payroll NSF Operating Model 56 Annexure A - OPERATING MODEL Support Service Processes Legal Legal processes outlines all activities associated with the development of the NSF legal framework and associated policies and structures legal support on the development and execution of contracts. It further entrench legal awareness with targeted and structured training across the Fund. Level 2: End-to-End Process (Legal) Legal Orientation and Planning Legal Support Legal Aw areness NSF Operating Model 57 Annexure A - OPERATING MODEL Support Service Processes Supply Chain Management Supply chain provides structure for the planning, soliciting, contracting and management of vendors (excluding service providers and bursars). Level 2: End-to-End Process (Supply Chain Management) Tender Management Contract Management Procurement Vendor Management NSF Operating Model 58 Annexure A - OPERATING MODEL Support Service Processes Asset Management Asset management include the planning, acquisition and maintenance of moveable assets of the NSF. Level 2: End-to-End Process (Asset Management) Planning and Acquisition Maintenance Decommissioning NSF Operating Model 59 Annexure A - OPERATING MODEL Support Service Processes Content Management Content management involves the creation, amendment and removal of master data. Master data include, but are not limited to, policies, procedures and processes of the NSF. Level 2: End-to-End Process (Content Management) Master Data Management NSF Operating Model 60 Annexure A - OPERATING MODEL Support Service Processes IT Support IT Support processes outlines activities involved in development of the strategy which will provide direction to the establishment of the important functions within IT. It further structures technology enablement by designing, developing and implementing IT services to improve overall business key business processes and functions, as well as supporting the delivery of IT services to the Fund. Level 2: End-to-End Process (IT Support) IT Strategy & Planning IT Enablement IT Serv ice Deliv ery NSF Operating Model 61 Annexure A - OPERATING MODEL Support Service Processes Internal Audit The Internal Audit process supports the systematic and independent review of the efficiency and effectiveness of the NSF. It outlines the identification of a service provider, structures the planning, execution and reporting of audits performed within the Fund. Level 2: End-to-End Process (Internal Audit) Appointing a Serv ice Prov ider Audit Planning Audit Engagement Progress Reporting NSF Operating Model 62 Annexure A - OPERATING MODEL Support Service Processes Facilities & Occupational Health & Safety Facilities and Organisational Health and Safety Management process enable a safe, enabling work environment for the employ of the NSF and supports business continuity. Facilities Management involves the coordination of space and people associated with the administration of the office space of the Fund. Occupational Health and Safety includes all activities concerned with the safety, health and welfare of NSF employees within the working environment. Level 2: End-to-End Process (Facilities & Occupational Health & Safety) Facilities Management Occupational Health & Safety NSF Operating Model 63