Energy Audit and Energy Savings Project Review Tipp City Exempted Village Schools HB264 Energy Savings & Facility Improvement Project February, 2012 1 Today’s Agenda Introductions Open Forum and Discussions “The bitterness of poor quality remains long after the sweetness of low price is forgotten” – Benjamin Franklin “I am not very smart, I just know a lot of smart people.” Facility & Energy Savings Opportunities 2 Energy Optimizers, USA Greg Smith, President Exclusive Focus with Ohio K-12 Schools and Energy Conservation Projects Pre-Approved OSFC Vendor Certified Energy Managers, Lighting Efficiency Professionals, Certified Energy Auditors, LEED AP’s & mechanical Contractors $20,000,000+ of Successful Energy Savings Projects 3 Energy Optimizers, USA HB 264 Success 2011 - Most HB 264 Projects in Ohio!! Successful Projects: School District Annual Savings Eaton Community Schools $249,562 Jackson City Schools $163,822 Ontario Local Schools $130,971 Springfield City Schools $105,300 Edgerton Schools $59,826 Bethel Local Schools $58,411 Covington Schools $42,832 Fort Recovery Schools $42,510 4 Facilities Audited Facilities Included High School (185,000 sq. ft.) LT Ball Intermediate School (86,806 sq. ft.) These facilities were chosen due to the assumption that these facilities will be utilized by the district for many years. These facilities represent 71.2% of the utility cost for the district. 5 Electric Usage and Cost Summary Electricity Usage kBtu/Sq.Ft. Electricity Cost High School 51.51 $ 243,942 LT Ball 32.79 $ Facility 84,167 Average K-12 kBtu/Sq.Ft. is 37.81 for full A/C facility 8.5% less cooling demand than the average year (February 2011 – January 2012) 6 Natural Gas Usage and Cost Summary Facility Natural Gas Usage kBtu/Sq.Ft. Natural Gas Cost High School LT Ball Intermediate School 44.05 44.10 $ 90,825 $ 45,415 <1% less heating demand than the average year (February 2011 – January 2012) Avg. kBtu/Sq.Ft is 42.28 7 Total Utility Usage and Cost Summary Total Usage kBtu/Sq.Ft. Total Cost High School 95.56 $ 334,767 LT Ball Intermediate School 76.89 $ 129,272 Total 89.60 $ 464,039 Facility 8 Energy Star Overview Tipp City School Facility EnergyStar Rating National Avg. (1 - 100) Difference High School 4 77% LT Ball Intermediate School 22 30% 100 is Highest Rating 9 Positive Community & Voter Response 10 Potential Energy Savings Opportunities Building Automation Enhancements & Integration LT Ball Upgrade control systems with Direct Digital Controls (DDC) Include all HVAC equipment (Chiller, boiler, air handlers, VAV boxes, etc) High School Utilize all existing control wire, sensors, open protocol sensors, etc. with enhancements Enable the High School to communicate with potential new schools Web-Based and Vendor-Neutral 11 Potential Energy Savings Opportunities Advanced Energy Management Programming Demand Ventilation and Demand Limiting Humidity Control Optimized Schedules Optimum Start/Stop Chiller Start-up Domestic Hot Water Pump Control 12 Potential Energy Savings Opportunities Lighting Gymnasium Retrofit - HS Less wattage (455 watts vs. 221 watts) Better Light De-Lamp Fluorescent Fixtures Reduce the number of lamps Re-Lamp Fluorescent Fixtures Facility-wide (32 watts to 25 watts per bulb) T-12 to T-8 @ LT Ball Occupancy Sensors Automatically turns lights off when area is unoccupied Vending Misers Turns machine lights off and cycles compressors less 13 Potential Energy Savings Opportunities Energy Management Services Install Direct Digital Gas and Electric Meters Allows for real-time and historic usage information and modifications Demand Limiting School Board and OSFC Updates 14 Potential Energy Savings Opportunities Energy Management Services 15 Potential Energy Savings Opportunities Ice Storage Reduced Electrical Demand (approximately 45% of Bill) Operate Chillers at Night Utilize New Controls to Operate 16 Potential Energy Savings Opportunities Boiler Plant Upgrades Burner optimization controls to limit excess combustion air to recommended levels Less wasted heat leaving through exhaust Domestic hot water pump controls Regulate flow based on demand 17 Potential Energy Savings Opportunities Mechanical Commissioning & Repairs Inspect, Analyze and Perform Preventative Maintenance on HVAC Equipment Air Handlers, Chiller, Boilers, etc. Repair Equipment as Necessary $25,00 budget (“checkbook”) Kitchen Equipment Enhancements Exhaust Hood Controls Reduce the amount of conditioned air exhausted Freezer/Cooler Backup Generator Tie-In Remain cool even during power outages Less chance for food to spoil 18 Potential Energy Savings Opportunities PC Power Management System Work with District’s IT Department IT control of systems Automatic shut-down with override HVAC/Controls Service and Energy Management Agreement 3-Year Program Use Permanent Improvement and Maintenance Funds for other projects Dynamics Air Filtration Systems Improved Indoor Air Quality Reduced Energy Costs and Reduced Maintenance Costs 19 Potential Energy Savings Opportunities District-Wide Energy Manager & Education Program Continue the District Energy Management Plan Change behaviors and establish expectations District “Green Team” Establish District Energy Goals Student and Staff Incentive Programs “Green Suggestions” Program “Energy Waste Patrol” Program 20 True Turn-Key Project Turn-Key Project Project Development With District Project Engineering Energy Mechanical Electrical Structural Project Management Full Warranty Parts & Labor 21 Financial Analysis Project Cost: $1,011,220 (includes estimated AMP rebates) $ 16,790 Project Annual Savings: $ 118,910 Simple Payback: 8.5 Years Electrical Savings: Natural Gas Savings: Maintenance Savings: $ 80,780 $ 18,340 $ 19,790 Annual Cash Flow (after loan payment): $ 31,531 22 Grants/Rebates Grants & Rebates Utilize the Ohio Dept. of Development’s Renewable Energy Grants to implement solar electric and solar thermal projects AMP Ohio Rebates Demand Response 23 Why Choose Energy Optimizers, USA? Why HB264 and Why Energy Optimizers, USA? Implement all Opportunities at One Time Positive Effect on Current Budgets (Operating, PI, etc.) Positive PR if completed and presented correctly Enhanced District Involvement Ensure project integrates with new construction project OSFC, OASBO, OSBA & BASA Supported Program Vendor - Neutral Does not Count Against the Districts Indebtedness OSFC and Dept. of Energy Oversight 24 Why Choose Energy Optimizers, USA? Resolution Safety Contingencies All Contingencies MUST be met to proceed: 1. Project cost must be the same or less than the budget; 2. Project savings must be the same or more than the budget; 3. The OSFC and the Dept. of Energy must review and approve the proposed project as submitted. If any of these contingencies are not met, the district has no obligation to proceed, nor any monetary obligation. 25 Potential Timeline / What Next if We Want to Proceed? Review & Modify Project: February, 2012 Board Review of Project: March, 2012 Board Presentation & Approval: March 26 Detailed Engineering: March 26 – May 20 HB264 Project Delivered to OSFC: May 20 HB264 Project Approval by OSFC: May 20 – July 15 Financing Finalized: July 30 Project Implementation: August 2 – December 30, 2012 26 Q&A Questions & Answers Thank You 27