MONTE RIO POWER PLANT Monte Rio – Original 3 Dimensional Drawing – Actual Plant NOV 2001 2 MONTE RIO POWER PLANT Basic Project Specifications – 101 MWe Owner: Contractors: Engines: Fuel: Application: Generator: Switchyard: Switchgear: Waste Heat Boiler: NOV 2001 Monte Rio Power Corporation, Ltd. Energy International, HMV Engineers, Caterpillar International Power systems, and SEG/AVK 13 Cat Gensets model 9CM43 manufactured in Germany, with rated output of 8100 kW @ 514 RPM 700 cSt/50 C heavy fuel oil Independent Power Plant to Public Utility 3 Phase synchronous generator 9,758 kVA, 13.8 kV, 60 Hertz 138 kV double bus bar substation, 3 transformers 47/70 MVA ONAN/ONAF, 13.2/138 kV, 2 line bays, control and monitoring High Voltage, low voltage, control and monitoring Exhaust gas fired steam boiler 7493 kg/h (4849 kW) at 8 bar(g) 3 MRPC - Chronological Progress Report 4 MONTERIO 100 MW POWER PLANT PERSONAL EN OBRA CONTRACTOR HMV ENERGY INTER. CODEMON TERMOTECNICA METAL AMERICA CONELCA CEMEX SECURITY TOTAL NOV 2001 DAY STAFF 97 2 43 2 6 12 11 NIGHT LABOR TOTAL STAFF LABOR TOTAL 263 279 23 26 49 12 8 360 2 322 25 32 61 23 8 833 2 62 64 8 8 72 MRPC - Chronological Progress Report SITE LOCATION NOV 2001 5 Site Preparation DEC 2001 6 MRPC - Chronological Progress Report 2001 JAN 2002 7 MRPC - Chronological Progress Report 2001 JAN 2002 8 MRPC - Chronological Progress Report 2001 FEB 2002 9 MRPC - Chronological Progress Report 2001 MAR 2002 10 MRPC - Chronological Progress Report Base No. 10 2001 MAR 2002 Base No. 9 Base No. 8 11 MRPC - Chronological Progress Report 2001 MAR 2002 12 MRPC - Chronological Progress Report 2001 APR 2002 13 MRPC - Chronological Progress Report 2001 APR 2002 14 MRPC - Chronological Progress Report 2001 MAY 2002 15 MRPC - Chronological Progress Report 2001 MAY 2002 16 MRPC - Chronological Progress Report 2001 MAY 2002 17 MRPC - Chronological Progress Report 2001 JUN 2002 18 MRPC - Chronological Progress Report 2001 JUN 2002 19 MRPC - Chronological Progress Report 2001 JUN 2002 20 MRPC - Chronological Progress Report 2001 JUL 2002 21 MRPC - Chronological Progress Report 2001 JUL 2002 22 MRPC - Chronological Progress Report 2001 AUG 2002 23 MRPC - Chronological Progress Report 2001 AUG 2002 24 MRPC - Chronological Progress Report 2001 AUG 2002 25 MRPC - Chronological Progress Report 2001 SEP 2002 26 MRPC - Chronological Progress Report 2001 SEP 2002 27 MRPC - Chronological Progress Report 2001 OCT 2002 28 MRPC - Chronological Progress Report 2001 OCT 2002 29 MRPC - Chronological Progress Report 2001 OCT 2002 30 MRPC - Chronological Progress Report 2001 NOV 2002 31 MRPC - Chronological Progress Report 2001 NOV 2002 32 MRPC - Chronological Progress Report 2001 NOV 2002 33 MRPC - Chronological Progress Report 2001 DEC 2002 34 MRPC - Chronological Progress Report 2001 DEC 2002 35 MRPC - Chronological Progress Report 2001 DEC 2002 36 MRPC - Chronological Progress Report 2001 2002 37 2003 MRPC - Chronological Progress Report 2001 2002 38 JAN 2003 MRPC - Chronological Progress Report 39 Testing of Units 2001 2002 FEB 2003 MRPC - Chronological Progress Report 40 Commercial Operations – April 2003 2001 2002 MAR 2003 41 MRPC - QUANTITIES OF MATERIALS SUPPLIED ITEM 1 CIVIL WORKS DESCRIPTION EARTHMOVING UNIT M3 QUANTITY 69,015.0 2 PILINGS (3,872 M3 OF CONCRETE) 2 CONCRETE M3 8,616.2 2.1 2.2 2.3 CONCRETE FOR ENGINE BASES STRUCTURAL CONCRETE CONCRETE FOR INTERNAL ROADS (8,800 M2) M3 M3 M3 2,188.0 5,108.2 1,320.0 3 REINFORCED STEEL TON 1,212.6 4 METAL STRUCTURES TON 995.2 4.1 4.2 4.3 4.4 4.5 4.6 METAL STRUCTURE FOR POWERHOUSE STRUCTURES FOR SMOKESTACKS STRUCTURES FOR THE SUB-STATION STRUCTURES FOR SIDING ESTRUCTURE TO SUPPORT SILENCERS PLATFORMS AND LADDERS TON TON TON TON TON TON 620.0 216.2 52.9 33.9 7.2 65.0 M (linear) 17,400.0 MRPC - QUANTITIES OF MATERIALS SUPPLIED ITEM 5 CIVIL WORKS DESCRIPTION BUILDINGS 5.1 5.2 5.3 5.4 5.5 5.6 5.7 5.8 5.9 5.10 5.11 5.12 ADMINISTRATIVE BUILDING GUEST HOUSE FUEL TREATMENT HOUSE POWER HOUSE SUBSTATION GATE HOUSE INCINERATOR ENCLOSURE SOLID WASTE MATERIAL ENCOLOSURE WATER PUMP HOUSE ENCLOSURE FOR SUBESTACION - GUEST HOUSE EMERGENCY GENSET ENCLOSURE ENCLOSURE EMERGENCY BATTERYS–POWER HOUSE 6 PERIMETER FENCING 42 UNIT M2 QUANTITY 6,402.6 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 455.4 352.1 184.0 5,008.0 176.8 15.3 26.0 33.4 60.0 31.0 43.2 17.5 M (linear) 1,175.0 43 MRPC - QUANTITIES OF MATERIALS SUPPLIED ITEM 1 MECHANICAL ERECTION DESCRIPTION UNIT QUANTITY PIPING 1.1 1.2 PREFABRICATION OF PIPING PIPING ERECTION TON TON 169.1 289.8 2 MECHANICAL ERECTION OF EQUIPMENT TON 2,962.1 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.9 2.10 2.11 ERECTION OF ENGINES (9CM43-13 UND) ERECTION OF GENERATORS (13 UND) CHIMENEY STACKS (DIAMETER 1,220 MM) EXHAUST DUCTS COMBUSTION DUCTS VENTILATION DUCTS ERECTION AUX. EQUIPMENT SKID MODULES AIR DUCTS BOILER ASH TANK RADIATORS FOR COOLING WATER VENTILATION FANS MECHANICAL ANNEX, FUEL TREATMENT ENCLOSURE AND OTHERS VENTILATION FANS FOR POWER HOUSE TON TON TON TON TON TON TON TON TON TON TON 1,599.0 455.0 129.4 27.7 12.2 33.4 372.5 3.9 1.4 214.9 6.0 TON 89.6 2.13 44 MRPC - QUANTITIES OF MATERIALS SUPPLIED ITEM 2.14 3 MECHANICAL ERECTION DESCRIPTION DIESEL EMERGENCY GENEREATOR ERECTION OF PROCESS TANKS UNIT TON TON QUANTITY 3.1 76.4 MRPC - QUANTITIES OF MATERIALS SUPPLIED ITEM 1 2 6 4 3 5 6 ELECTRICAL ERECTION 45 UNIT QUANTITY DESCRIPTION LAYING OF MULTI-CONDUCTOR CABLE Km 72.9 LAYING OF MV CABLE IN CABLE TRAYS Km 7.6 Km INSTALLATION 600V CABLE 0.3 MANOCONDUCTOR #3 + 1, 2 AWG INSTALLATION GROUNDING SYSTEM CABLE 1/0 Km 2.5 M (linear) INSTALLATION & ERECTION CABLE TRAYS 3,598.0 INSTALLATION OF CONDIUT & ACCESSORIES M (linear) 2,600.0 MOVEMENT AND INSTALLATION OF ELECTRIC EQUIPMENT: INCLUDING A LARGE GROUP OF DIFFERENT EQUIPMENTSUCH AS CURRENT TRANSFORMERS, POWER TRANSFORMERS, VOLTAGE TRANSFORMERS, ISOLATORS, HOUSINGS AND CABINETS, INSTRUMENT PANELS, CONTROL PANELS, SWITCHES, CIRCUIT BREAKERS, ETC., ECT., ETC., THE INDIVIDUAL WEIGHTS OF THIS EQUIPMENT WAS NOT AVAILABLE.