World Meteorological Organization WMO OMM Working together in weather, climate and water STRUCTURES AND OUTLINES OF WMO STRATEGIC AND OPERATING PLANS 2020-2023, ISSUES TO CONSIDER, AND THE PROCESS FOR PREPARING THE PLANS EC WG/SOP-I(2016)/Doc.3.1(2) Dr William Nyakwada First Session of EC WG/SOP 16-19 February 2016 Geneva, Switzerland WMO www.wmo.int WMO OMM Presentation layout • Congress decisions • WMO Results-based Strategic Planning • WMO Strategic Plan 2020-2023 – Structure, outline and relevant international issues • WMO Operating Plan 2020-2023 – Result chain and outline • Proposed process and timelines • Issues to consider 2 WMO OMM Decisions of seventeenth World Meteorological Congress • Global Societal Needs (GSNs) and expected results in SP 2016-2019 form the base of SP 2020-2023 • Strategic and operational planning for 2020–2023 should follow: – Follow integrated planning process; – Build on programme and management - related experiences; – Improve the Key Performance Indicators; and – Take advantage of various regional association management groups. 3 WMO OMM Cg-17 Requests to EC • To organize a planning process; • To continue to improve the structure, focus and performance metrics; • To effectively engage regional associations and technical commissions; • To develop better means of integrating and supporting the development of regional and technical components of the WMO-wide Operating Plan; • To identify areas that need further improvements and address them in the order of priority; 4 WMO OMM Cg-17 Requests to RAs and TCs • Regional associations – To provide regional needs and priorities; – To coordinate, as necessary, national contributions; – To develop their own Operating Plans; • Technical commissions – To lead the formulation of the scientific and technical aspects of WMO Programmes and activities; – To develop their own Operating Plans; 5 WMO OMM WMO Results-based Strategic Planning • It is an integrated strategic planning process involving all Members, RAs, TCs and Secretariat; • SP is the foundation of WMO RBM Framework with OP, RBB and M&E as the other blocks; • The result chain GSNs ►Priorities► Expected Results (ERs) ►Key Outcomes (KO) ►Output/Deliverables ►Activities is used; • Starts with gathering priorities of Members and TCs, together with relevant international decisions. 6 WMO OMM WMO STRATEGIC PLAN 2020-2023 • Structure : GSNs→Priorities→ERs. • To take into consideration the evolution of societal and economic needs of Members; 7 WMO OMM WMO STRATEGIC PLAN 2020-2023 cont’d • Relevant international issues(Annex): – The Sendai Framework for Disaster Risk Reduction 20152030 – Transforming our world: the 2030 Agenda for Sustainable Development - Sustainable Development Goals; – Conference of the Parties, Twenty-first session, Paris, 30 November to 11 December 2015 – Engaging the Private Sector; A growing interest in weather and climate issues; Advances in information and technology; Budget cuts experienced by NMHSs 8 WMO OMM WMO STRATEGIC PLAN 2020-2023 cont’d • The proposed outline of the SP 2020-2023 (Table 1) is based on SP 2016-2019 9 WMO OPERATING PLAN 2020-2023 WMO OMM • The result chain Expected Results(ERs) ►Key Outcomes(KO) ►Deliverables►Activities is proposed; • To define the Key Performance Indicators(KPI), baselines and Key Performance Targets; • To include funded activities through RBB and those of RAs and TCs; • The proposed outline for the OP 2020-2023 is provided in Table 2. 10 WMO OMM Proposed Process and Timelines for the preparation of WMO SP and OP 2020-2023 • Process and timelines involving the preparation of WMO SP and OP (Table 3). 11 WMO OMM Issues to consider • Structure of the SP (GSNs→Priorities→ERs) • The outlines, process and timelines for preparing the SP and OP; • The adequacy of priorities as means or processes to address GSNs to achieve the ERs; • Improvements in the logical relationships in GSN, Priorities and ERs; • If the ERs represent what should be achieved; and • The influence of the issues in the Annex 12 WMO OMM Thank you 13