BSB51407 - Diploma of Project Management Manage Project Quality Assessment Activities Page |2 Candidate Details Assessment – BSB51407 - Quality Please complete the following activities and hand in to your trainer for review. This forms part of your assessment. Name: _____________________________________________________________ Address: _____________________________________________________________ _____________________________________________________________ Email: _____________________________________________________________ Employer: _____________________________________________________________ Declaration I declare that no part of this assessment has been copied from another person’s work with the exception of where I have listed or referenced documents or work and that no part of this assessment has been written for me by another person. Signed: ____________________________________________________________ Date: ____________________________________________________________ If activities have been completed as part of a small group or in pairs, details of the learners involved should be provided below; This activity workbook has been completed by the following persons and we acknowledge that it was a fair team effort where everyone contributed equally to the work completed. We declare that no part of this assessment has been copied from another person’s work with the exception of where we have listed or referenced documents or work and that no part of this assessment has been written for us by another person. Learner 1: ____________________________________________________________ Signed: ____________________________________________________________ Learner 2: ____________________________________________________________ Signed: ____________________________________________________________ Page |3 Learner 3: ____________________________________________________________ Signed: ____________________________________________________________ Competency Record to be completed by Assessor Learner Name: _______________________________________________________ Date of Assessment: _______________________________________________________ The learner has been assessed as competent in the elements and performance criteria and the evidence has been presented as; Assessor Initials Authentic Valid Reliable Current Sufficient Learner is deemed: COMPETENT If not yet competent, date for re-assessment: NOT YET COMPETENT (Please circle) ____________________________________ Page |4 Comments from Trainer / Assessor: __________________________________________________________________________________ __________________________________________________________________________________ __________________________________________________________________________________ __________________________________________________________________________________ __________________________________________________________________________________ _______________ Assessor Signature: ____________________________________________________ Page |5 Table of Contents Candidate Details ......................................................................................................................... 2 Assessment – BSB51407 - Cost ........................................................................................................... 2 Competency Record to be completed by Assessor ............................................................................ 3 Table of Contents ......................................................................................................................... 5 Reflections................................................................................................................................... 6 Reflection: Quality Definition Table ................................................................................................... 6 Reflection: Quality Plan...................................................................................................................... 7 Manage Project Quality - Assessment Activities ............................................................................ 8 Element 1 ............................................................................................................................................ 8 Assessment Activity: Quality definition Table ................................................................................... 8 Assessment Activity: Quality Plan ...................................................................................................... 9 Element 2 .......................................................................................................................................... 10 Assessment Activity: Quality Assurance and Control ...................................................................... 10 Element 3 .......................................................................................................................................... 11 Assessment Activity: Quality Review ............................................................................................... 11 Attachments .............................................................................................................................. 12 Quality Management Plan ................................................................................................................ 12 Quality Checklist ............................................................................................................................... 12 Page |6 Reflections Reflection: Quality Definition Table From the case study Perfect Pergolas, identify the quality items required by the client. What other quality areas may need clarification by the client because there is insufficient information provided? List other quality items that you as team member may want included - these could include processes that will impact on your work as a team member such as availability of documentation, team meetings, etc Page |7 Reflection: Quality Plan In the case study Information System it will be important to control quality during the project and to implement both internal external quality assurance processes. Document how you might approach each of these activities at each stage of the project (i.e. proposal, design, implementation, and closure): Quality control Quality Assurance Select a project that you are currently working on, or have worked on, and locate the quality plan for the project. How were quality control and quality assurance to be addressed? Having completed this section, would you make any changes to the plan? Page |8 Manage Project Quality - Assessment Activities The following Assessment activities must be completed, saved and submitted to your Assessor as part of your final assessment for the course. Element 1 Assessment Activity: Quality definition Table Select a project that you are currently working on, or have worked on, and locate the definition of quality for the project. If there is no Quality Definition Table, develop one for the project using the following criteria: What processes were used to develop the quality definitions? List the steps. (You may need to discuss this with people involved in the early stages of the project, including the project manager.) What were the quality items identified? How clearly defined were the measurable items? What information/data would you need to collect to measure quality against the criteria? What quality items were compromised because of time, resourcing or other constraints? Page |9 Assessment Activity: Quality Plan Develop the outline of a Quality Plan for a project you have worked on, using the following headings: 1 Overall statement on project quality 2 Processes used in development of the plan 3 Definition of quality in a table: Quality items 4 Item 5 Measures for each quality item Units to measure each item Existing project tools that will provide quality data Timing of measurement Quality Control processes used to monitor quality: Measure Project stage Quality Assurance Processes used: Ongoing (External and Internal) At the end (External and Internal) P a g e | 10 Element 2 Assessment Activity: Quality Assurance and Control For a project that you have been involved in, respond to the following: What processes were used to ensure quality standards were met during the project? What was your role in this? How were the project sponsor and client involved in quality assurance? Were there any adjustments to quality standards during the project? Were there any areas of the project (people, cost, time) that had a big impact on quality during the project? How was the quality of project products tested for quality? What was your role in collecting and providing quality control documentation? P a g e | 11 Element 3 Assessment Activity: Quality Review For a project that you have been involved in, produce a profile of the quality management issues that could be passed on to other projects. Issues could relate to quality definition and planning, quality assurance throughout the project and quality control processes applied to products of the project. P a g e | 12 Attachments Please insert or attach the following completed templates: Quality Management Plan Quality Checklist