FirstNet Overview Jeff Johnson, Board Vice Chair May 2, 2015 FirstNet Beginnings FUNDING THE LAW 2.22.12 FirstNet becomes law PL 112-96 GOVERNANCE The FirstNet Board has 15 members, including those with telecommunications and public safety backgrounds Initial funding from spectrum auctions $7B fully satisfied (funded) FirstNet is allowed to lease unused spectrum once operational (worth more than $7B) User fees MUST BE A FULLY SELF-SUSTAINED MODEL BAND CLASS (BC) 14 20MHz of bandwidth has been dedicated to public safety in the prime upper 700MHz frequency range Each Governor appoints 1 Single Point of Contact (SPOC) and governing body to represent the state’s interests to FirstNet BC 17 BC 12 BC 12 BC 13 BC 14 PS Broadband DOWNLINK DOWNLINK DOWNLINK 6 MHz 12 MHz 11 MHz 10 MHz UPLINK UPLINK 6 MHz 11 MHz 10 MHz LMR PS Narrowband Verizon DL 12 MHz BC 14 PS Broadband AT&T DOWNLINK BC 13 Verizon AT&T Dish UPLINK 12 MHz LMR PS Narrowband AT&T UL 6 MHz 40 member Public Safety Advisory Committee (PSAC) advises FirstNet on public safety intergovernmental matters BC 17 BC 29 6 MHz 1 MHz Guard Bands May 2, 2015 2 Public Safety Advisory Committee (PSAC) • 40 members representing public safety and state/local/tribal organizations • Offers guidance, information, and public safety subject matter expertise to ensure that needs, requirements, and operational constructs necessary for critical public safety capabilities are included in the network • For more information, visit http://firstnet.gov/about/publicsafety-advisory-committee May 2, 2015 3 First Responders Deserve the Best Network • FirstNet will ensure the development of a differentiated, reliable and resilient broadband network that is: – Dedicated to public safety – Nationwide: rural and urban – “Ruggedized” to meet public safety standards – Designed to provide access to applications and databases that meet public safety needs – Designed with state of the art devices May 2, 2015 4 FirstNet Network Benefits Dedicated to Public Safety QoS, Priority & Preemption (QPP) Situational Awareness Local Control May 2, 2015 Public Safety Apps / Services Public Safety Grade 5 First Responder Communications Non-Mission Critical The The Near-Term Current State Vision Mission Critical FirstNet will ensure that emergency responders are provided with the first nationwide, high-speed, wireless broadband network dedicated to public safety LTE Service / Devices Data May 2, 2015 Voice Land Mobile Radio (LMR) for Public Safety Voice Source: http://www.nwd-mr.usace.army.mil/rcc/MRFTF/img/ext/mr_house_mod_2_src.png 6 Revenue, Architecture & Priority 1 FirstNet Funding towards initialSpectrum build out of the Nationwide Public Safety Broadband Network **Priority Access** 1. $7B Initial Funding from Auction Proceeds 2. Network User Fee (Service Plan) 3. Lease Fee for Excess Network Capacity 4. Core Network Access Fee 5. Lease Fee for Network Infrastructure EPC SGW MME PDN GW 0101011 1101010 0101101 PCRF EPC 0101011 1101010 0101101 SGW PDN GW MME PCRF 5 EPC SGW PDN GW MME PCRF FirstNet Users Excess Network Capacity May 2, 2015 EPC SGW PDN GW MME PCRF 4 2 010101111010100100010101111 001101001010111100010101010 001101001010110100101111000 3 Core RAN 7 Phase II: Road To Implementation Draft RFP Documents PSAC Recommendations SPOC Calls & Webinars Industry Days PSAC Recommendations Public Notice(s) Federal Consultation Local, State & Tribal Consultation SPOC Calls & Webinars Local, State & Tribal Consultation Final RFP Key Milestones – Phase II • Public Notice(s) & Comment • Expand Outreach and Consultation • Leverage PSAC Recommendations and Early Builder Results • Release Final RFP May 2, 2015 Early Builders in Operation Deliver State Plan/ Governor Approval Network Deployment 8 Stakeholder Inputs State Consultation Public Notice and Comment Process Additional Inputs Public Safety Advisory Committee Public Outreach Acquisition State Additional Comment Consultation Engagements Process Inputs Process (PSAC) Acquisition Process Public Safety Advisory Committee (PSAC) May 2, 2015 Outreach Engagements 1. Construction of a Core and RANlaw •• Tribal Legal State Interpretations Hosted Events of the Market Research 40 members representing build out • Federal Open Association and transparent Events process Public Safety organizations •2. RFIs Placement ofbroad towersstakeholder •• NEPA Inputs Conferences /from NHPA Offer guidance and expertise 3. Coverage areas of the network Industry Day(s) (upcoming) ••• Early group Webinars Builders Assignments include: 4. Adequacy of hardening, security, •• Social Industry Media • •Priority and Preemption Draft RFP (upcoming) reliability, and resiliency • •Public Safety Grade to local PS Associations 5. Assignment of priority • •Human Factors Entities Government users • Eligible • PublicUsers 6. Assignment of priority and • Working Groups: selection of entities seeking • Tribal access toWorking or use ofGroup the network • Early Builder Working Group 7. Training needs of local users 9 Initial Consultation Goals Strengthen Our Relationship May 2, 2015 Provide FirstNet Updates Learn about State’s Unique Needs Discuss Next Steps 10 Data Collection Categories Coverage Objectives • Coverage • Phased Deployment • Applications • Data Usage Users and Operations State / Territory Service Plan Capacity May 2, 2015 • Public Safety Entity Info • Devices • Operational Areas • Procurement Vehicles • Service Plans / Costs • Barriers Current Service 11 Tracker – State Consultation Activities As of 30 April 2015 WA AK ME MT ND MN OR SD ID HI GU MP / CNMI AS State Meeting Date(s) WV 5/5/2015 RI 5/6/2015 NV LA 5/13/2015 CA AR 5/14/2015 VI 5/19/2015 State Meeting Date(s) ME 5/20/2015 AL 7/15/2015 ID 5/21/2015 GA 7/21/2015 CT 5/27/2015 TN 7/23/2015 NH 6/9/2015 CA 07/28-29/2015 NM 6/10/2015 PA 8/4/2015 OH 6/11/2015 HI 08/11-12/2015 VT 6/16/2015 AS 08/13-14/2015 KS 6/17/2015 IN 8/26/2015 WI 6/18/2015 MI 9/1/2015 IL 7/14/2015 NJ 9/3/2015 All May 2, 2015 WI NY PA IA NE IL UT NH MA CT MI WY OH IN WV CO KS MO VA KY NJ DC DE MD RI NC TN AZ OK NM AR SC MS AL GA TX LA FL LEGEND 50 Received Initial Consultation Package From FirstNet VT 53 Initial Consultation Checklist Returned To FirstNet Pre-Consultation Conference Call Closed 23 Initial Consultation Meeting Held Consultation 25 Initial Meeting Scheduled PR VI 12 FirstNet Support for the Regions May 2, 2015 13 Outreach and Education Twitter (@FirstNetGov) Google+ (+FirstNetGov) YouTube (FirstNetGov) Flickr (FirstNetGov) LinkedIn www.firstnet.gov • • • • • Fact Sheets Blogs Presentations Current Events Board meetings and materials May 2, 2015 SPOC List: www.firstnet.gov/consultation PSAC: www.firstnet.gov/about/publicsafety-advisory-committee • State Consultation • State/Local Outreach Activities • Public Comment • Environmental & Historic/Cultural Topics (PEIScomments@firstnet.gov) 14 @FirstNetGov Thank You