Managing Project Scheduling What is Project Scheduling? • The process of: – defining project activities – determining their sequence – estimating their duration • Scheduling activities are part of project time management Types of Project Schedules • The Gantt or bar chart • The Critical Path Method (CPM) • The Program Evaluation and Review Technique (PERT) • The Graphical Evaluation and Review Technique (GERT) Leading Project Teams: The Basics of Project Management and Team Leadership, 2e by Anthony T. Components of Project Schedules • Activities—project tasks – Any activity that will take time and resources • Dependencies – How one task depends on another to start or finish Leading Project Teams: The Basics of Project Management and Team Leadership, 2e by Anthony T. Sequencing • Requires: – – – – – Identification of any project technical constraints Safety or efficiency considerations Environmental politics Availability of required resources Completion of prerequisite processes Scheduling Process Steps 1. Creating a work breakdown structure (WBS) to identify required project components 2. Defining the activities needed to complete each of these components 3. Determining the most efficient sequencing order of these components Schedule Development & Usage • Schedule developed during initiation or planning stage • Followed and updated during the execution stage • Used for project tracking during control stage Project Schedule Modifications • Why? – Business environment changes • Internal – change of strategic objectives • External – reaction to competitor actions – New technologies become available – Reaction to unforeseen events Cone of Uncertainty Project Estimation…fact or fiction 1. Accurate estimates are possible 2. Objective of estimating is to determine the end date 3. Estimate and commitment are the same 4. Historical data is an accurate indicator of productivity 5. Assigning more resources will speed up development of system 6. A defect-free system is possible given adequate time Components of Project Schedules • The project network – The arrangement of project tasks to one another • The critical path – The sequence of tasks within a project network that determines how long a project will last • Slack or float – The amount of time a task can hold off starting without affecting the project’s finish Leading Project Teams: The Basics of Project Management and Team Leadership, 2e by Anthony T. Project Scheduling • Impacted by: – Technologies • New and sophisticated software • Advancements in networking and web capabilities – Team processes • Resource availability • Resource allocation • Resource assignment – Scheduling creation and execution • Developed early • Followed/monitored/changed throughout project • Assist in determination of progress Developing a Network Diagram • Review and revise time estimates – Best guess (optimistic and pessimistic) • Determine dependencies – Which tasks depend on others to be done – Which phases depend on others Leading Project Teams: The Basics of Project Management and Team Leadership, 2e by Anthony T. Developing a Network Diagram • Construct the network of project activities • Gantt charts are done on a project calendar – – – – Each task is represented by a bar Length of bars = length of task time Placement = dependencies Arrows show dependencies • Determine the critical path Leading Project Teams: The Basics of Project Management and Team Leadership, 2e by Anthony T. Activity Sequencing • Network diagram: a schematic display that illustrates the various activities (or tasks) in a project as well as their sequential relationships • Sequential or parallel activity development Possible Sequencing Constraints • Technical requirements and specifications • Safety and efficiency • Preferences and policies • Resource availability Developing a Network Diagram • Develop a WBS in outline form – Arrange them from major to minor, component tasks 1.0 Physical Plant 1.1 1.1.1 1.1.2 1.2 1.2.1 1.2.2 1.2.3 1.2.4 1.2.5 Prepare Plant Rev/Rev Plans Gut Existing Space Dev. Infrastructure Framing Electrical/Wiring Plumbing Dry Wall Finishing Leading Project Teams: The Basics of Project Management and Team Leadership, 2e by Anthony T. Network Diagram Network Diagramming Methods • Precedence diagramming method (PDM) • Boxes and arrows Boxes represent project activity (called nodes) Arrows represent relationships among activities • Arrow diagramming method (ADM) or Activity on Arrow (AOA) Arrows represent project tasks or activities Boxes represent milestones Task Relationships Arrow Diagramming Method (ADM) Network Diagram in Microsoft Project Additional Activity Type & Time Relationships • Mandatory dependencies – Related activities that cannot be performed in parallel • Discretionary dependencies – Relationships of activities based on preference of the project manager • External dependencies – Relationship of project activities and external events Additional Activity Type & Time Relationships (cont.) • Lead Time – Time required by one task before another task can begin • Lag Time – Amount of time delay between the completion of one task and the start of the successor Components of Project Schedules • Lag times – The amount of time a project task must “rest” to be completed • Lead times – How far a dependent task can “lead” the completion of a prior task on which it depends • Milestones – Important events in a project’s life Leading Project Teams: The Basics of Project Management and Team Leadership, 2e by Anthony T. Using the Output of a Project Schedule • Visualizing the project as a whole – Project phases – Project dependencies • Communicating with stakeholders • Revising the project plan – Planning phase – Execution phase • Command and control Leading Project Teams: The Basics of Project Management and Team Leadership, 2e by Anthony T. Questions?