Soil, Manure, and Water Sampling and Analysis Leticia S. Sonon Ag and Env Services Laboratories March 31, 2009 Agenda Manure testing • Sample collection • Tests to request • Reports Lagoon sample Soil testing • Sample collection • Tests to request • Reports Groundwater monitoring Soil sampler Why Test Soil and Manure? Know the soil fertility status Know the fertilizer value of the manure These are the basics for Comprehensive Nutrient Management Planning (CNMP) and Waste Utilization. Manure Testing When? Near to the time of application as possible >1000 animal units (AU) – semi-annual >3000 AU - quarterly for swine operations How? Depends on the type of manure and manure handling system Procedures differ for lagoon effluent, liquid slurry, lagoon sludge, and solid manure. Lagoon Effluent Semiannually for operations over 1000 au Quarterly for swine operations over 3000 au Collect what you intend to pump for crop irrigation; no mixing of the lagoon. Where possible, collect effluent from the spray-system at the point of application. Grab eight 1-pint samples throughout a spray-irrigation event and composite into a plastic bucket. Mix bucket contents and fill a 1pint bottle for lab analysis. Lagoon Effluent (continued) When samples cannot be taken from the spraysystem, collect 8 grab samples at least 6 feet from the lagoon bank and at a depth of about 1 foot or whatever would represent the material pumped for irrigation. Avoid floating debris. Never use galvanized buckets. Tightly cap the manure sample bottles and check for leaks. Rinse or wipe off any manure from the outside of the container. Alternative Lagoon Effluent Sampler plastic tubing float steel pipe thrown into lagoon sample collection using a suction pump suction pump suction reservoir Liquid Slurry If you agitate your storage pond or lagoon, samples can be collected with the equipment and procedure used for lagoon effluent. If you don’t agitate, use the composite sampling device illustrated here. Composite Sampling Device Lagoon Sludge (two methods) Method One Method Two Pump lagoon down to the sludge layer. Agitate and collect a slurry-type sample using the liquid sampler described for sampling lagoon effluent or slurry. You will need a boat or floating dock. Insert a pipe to the bottom of the lagoon. Seal the surface end and extract the pipe from the lagoon. Deposit the sludge portion into a bucket. Composite 12-20 subsamples from various locations around the lagoon. Handling Liquid Manure Samples Container Clean 1-pint plastic wide-mouth bottle NO GLASS Filling Leave 1-inch headspace for gas expansion and to facilitate mixing at the laboratory. Storage Preferably ship or deliver samples immediately after sampling. However, refrigerate or freeze samples that cannot be immediately shipped or delivered to the laboratory. Solid Manure Stockpiled, Surface-scraped, or Composted Solid Manure Sampling Device Composite at least 6 or more cores that represent the average moisture content. Core samples to a depth of at least 18 inches. Sub-sample a 1-quart portion into a plasticbag for the lab. Don’t overfill. Refrigerate if samples are stored for more than 2 days. Sampling In-house Litter Previous sampling recommendation: Collect at least 10 to 12 one pint samples throughout the house, combine and mix them in a plastic bucket, and place one quart into a plastic bag for submission to the laboratory. Research on N content shows that… Center of the house Around the feeders Around the drinkers % Average Minimum Maximum 3.31 2.83 3.68 4.41 4.15 4.75 3.49 2.35 4.50 Around feeders, N was 25% higher than from center of the house and 21% higher than from around drinkers (30 samples) N varied as much as 48% around drinkers Therefore… It is not recommended to sample litter while still being used as a bedding layer in the poultry house. Wait until clean out to sample after mixing the litter by scraping it into a pile. Then, follow the procedure given below for sampling litter from piles, stockpiles, or spreader trucks. If sampling of litter is necessary in the house prior to clean out, use the sampling procedures as originally provided. Solid Manure: Tests to Request Essential Total nitrogen (N) Phosphorus (P) Potassium (K) Other Tests Calcium (Ca) Magnesium (Mg) Sodium (Na) Sulfur (S) Aluminum (Al) Iron (Fe) Boron (B) Copper (Cu) Manganese (Mn) Zinc (Zn) Liquid Manure Test (Lagoon Effluent) for Nutrient Management and Reg. Compliance Non-swine and swine except new and expanding swine operations over 3000 AU • Nutrients listed for solid manure In Addition • • • Total Kjeldahl nitrogen (TKN) Nitrate nitrogen (NO3-N) Ammonium nitrogen (NH4-N)- not required on your permit but good for predicting available nitrogen Liquid Manure Test (Lagoon Effluent) for new and expanding swine operations over 3000 AU Quarterly Monitoring 5-day Biochemical Oxygen Demand (BOD) Total Suspended Solids (TSS) Total Kjeldahl Nitrogen (TKN) Ammonia-Nitrogen (NH4-N) Nitrate-Nitrogen (NO3-N) pH Nitrogen Analysis Total Nitrogen by Combustion for Solids All forms of Nitrogen Organic-N Ammonium-N Nitrate + Nitrite-N Total Kjeldahl Nitrogen for Liquids Only Organic-N + Ammonia-N Total-N is TKN + NO3 Lagoon sample Litter sample Solid Manure Report Units provided on UGA reports are Percent Pounds per ton Phosphorus and potassium are reported as P2O5 (P2O5 divided by 2.29 = P) K2O (K2O divided by 1.20 = K) All concentrations are reported on an “as received” basis and not on a “dry matter” basis. Solid Manure Report Litter Broiler % lbs/ton Liquid Manure Report Units provided on UGA reports are Parts per million (ppm) Pounds per 1000 gallons Pounds per acre inch Phosphorus and potassium reported as P2O5 (P2O5 divided by 2.29 = P) K2O (K2O divided by 1.20 = K) Liquid Manure Report Lagoon - Dairy ppm lbs/1000 gal lbs/acre-inch Soil Testing When? Annually Fall is a good time, but samples can be taken during any season. For year to year comparisons it is best to sample at approximately the same time each year. Where to Soil Sample Divide large fields according to obviously different: soil types management drainage crop productivity slope erosion. Collect separate samples from these smaller areas. Composite 10 to 20 soil cores while traveling in a zigzag pattern. How to Collect Soil Sample depth plowed fields 6 inches or plow depth no-till or pastures 4 inches Composite 10 to 20 cores in a plastic bucket and mix well. Fill a 1-pint soil test bag that has been clearly labeled with the field identification and the area within that field that this sample represents. Basic Soil Test Phosphorus (P) Potassium (K) Calcium (Ca) Magnesium (Mg) Zinc (Zn) pH Lime requirement Soil Nitrogen Tests for residual soil nitrogen are usually not able to reliably predict available soil nitrogen and crop response. Therefore, recommended nitrogen amendments are based on long-term research conducted to determine the nitrogen rates that produce the optimum yield for specific crops and forages. Soil Extractants Mehlich I (P, K, cations, micronutrients) Georgia and other Southeastern States Mehlich III (P, K, cations, micronutrients) many other labs Bray-1 (P only) older extractant may still be used by some labs Olsens (P only) used by Western States on calcarious soils Soil Test Reports (Not a P Index) Soil test results are concentrations of nutrients that are extracted from your soil using extractants designed to measure various forms of each nutrient. These concentrations are know as “Soil Test Indices.” These “Soil Test Indices” are correlated to crop or forage yield and then calibrated using fertilizer trials so that they can be converted into a pounds per acre fertilizer recommendation. Soil Fertility Recommendations Nitrogen is based on forage or crop species and management. P and K are based on “Soil Test Indices”. Recommended N, P, and K may be supplied from either Commercial fertilizer Animal manure Lagoon effluent Green manure crops Or a combination of sources. Test Questions? Questions Why is manure tested for developing a CNMP? When should manures be sampled for lab analysis? How should manure be sampled? How do you calculate the rate of manure to apply? Why should soil be tested when developing a CNMP? Questions How should soil samples be taken in the field? Which nutrients are measured in the routine soil test? Which nutrients are of primary environmental concern and why? Monitoring Well Testing Who must do groundwater Monitoring? Animal feeding operations over 1000 animal units Agenda Well location Well construction Monitoring requirements Sampling and analysis Guidance documents Locating Wells Up-gradient wells Up-gradient monitoring is not required in the swine or non-swine rules But, a minimum of three wells are needed to determine the gradient of the groundwater In many cases the groundwater gradient will follow the slope of the land surface, but not always Down-gradient wells At least 25 feet from the outer downgradient edge (toe) of the lagoon or manure storage structure Should not be installed into fill material Into the shallowest saturated zone that is the first saturated water bearing unit saturated yearround Stay Away From: Septic tanks – 50 ft Leach Fields – 100 ft Dead animal burial pits – 150 ft Animal or fowl enclosure – 100 ft Pesticide storage, mixing, or loading – 100 ft Fertilizer storage – 100 ft Petroleum storage – 100 ft Using Existing Wells Must be in the water bearing unit influenced by the lagoon or spray field If used for a down-gradient well it must be immediately down-gradient of the water bearing unit influenced by the lagoon or spray field. Must be approved by the Georgia EPD Well Construction Details are in EPD’s Manual for Groundwater Monitoring. Must be installed by a licensed well driller that is supervised by a licensed geologist or professional engineer Following installation you should have: well log land surface contour map Monitoring Requirements (Except new and expanding swine operations over 3000AU) Parameter Frequency Tolerance Nitrate-N (mg-N/L) Twice/Year 10 Holding Times 14 days Total Kjeldahl-N (mg TKN/L) Twice/Year - 28 days Depth to Groundwater (not required) Twice/Year - On-site New and expanding swine operations over 3000 AU Parameter Frequency Tolerance Holding Time Specific Conductance Quarterly - On-site Nitrate-N Quarterly 10 mg/L 28 days pH Quarterly 1 pH unit change On-site Depth to Groundwater Quarterly - On-site Written Sampling Plan Procedures for sample collection Sample preparation and collection Analytical procedures Chain-of-custody Sampling Procedure Measure water depth. Purge well bail dry or bail three well volumes. Sampling Procedure (continued) Allow well to recover. Collect sample for TKN nitrate-N. Guidance Documents Manual for Groundwater Monitoring. Monitoring Well Construction for Hazardous-Waste Sites in Georgia Rules and Regulations for Water Quality Control The Water Well Standards Act of 1991 Locating These Documents These documents can be found at the Georgia Department of Natural Resources. Contact: Thomas E. Hopkins, 4220 International Parkway, Atlanta, GA 30354. Phone: (404) 362-4916 or (404) 362-2680 Email: Tom_Hopkins@dnr.mail.state.ga.us Test Questions? Questions What monitoring parameters are required by the Animal Feeding Operations Permit on lagoon effluent and groundwater? How frequently must wells be sampled? What well monitoring parameter needs to be determined on-site? Questions Where is the proper location for the monitoring well? Who is responsible for constructing the monitoring wells? How many wells are required to determine the groundwater gradient?