North Colonie Central Schools March 6, 2014 Shaker High School Media Center Welcome Review of Our Facilities Planning Process and Physical Plant Maintenance Projects (Schedule D) Transfer to Capital Fund Projects (Schedule E) Tax Levy Cap Debt Service Enrollment The Mission Statement is the Litmus Test. All students are provided the opportunity and necessary support to engage in relevant, challenging work which contributes to their academic and social growth and development. All staff, teachers and administrators are part of a larger learning community, working together to build collective capacity in order to provide a high-quality, relevant, equitable education for all. They must be “mission-tested” They must address a problem defined as follows: Does the facilities work address an immediate or looming health, safety, maintenance or security issue? This will be addressed by the Building Conditions Survey(BCS). Does the facilities work address a program issue or problem that has substantially compromised our capacity to provide our students the opportunity and necessary support to engage in relevant, challenging work which contributes to their academic and social growth and development? Does the facilities work address a problem that has substantially compromised the capacity of all staff, teachers, and administrators to effectively and efficiently directly deliver or support the delivery of a high-quality, relevant, equitable education for all? The Role of the Building Conditions Survey NYS Education Law (Section 155.1 Educational Facilities, Part a.4) and regulations require a Building Conditions Survey (BCS) to be conducted every five years. The Building Conditions Survey purpose is to provide an overview of the general condition of each building the district owns and rank urgent and future replacements and renovations work identified by our Architects. A separate state aid formula reimburses districts for part of the cost of this survey. There is also a required Annual Visual Inspection (AVI). The BCS is not the AVI. However, the BCS will suffice for the AVI for the year in which the BCS is conducted. The Building Conditions Survey includes: Building Systems Conditions Ratings and Definitions: Excellent: System is in new or like-new condition and functioning optimally; only routine maintenance and repair is needed Satisfactory: System functioning reliably; routine maintenance and repair is needed Unsatisfactory: System is functioning unreliably or has exceeded its useful life. Repair or replacement of some or all components is needed Non-Functioning: System is non-functioning, not functioning as designed, or is unreliable in ways that could endanger occupant health and/or safety. Repair or replacement of some or all components is needed. Critical Failure: Same as “NF” with the addition that the condition of at least one component is so poor that at least part of the building or grounds should not be occupied pending needed repairs/replacement or some or all components is needed The District includes: 12 district locations with over one million square feet of occupied space and roof area 4 natural gas stand-by generators 14 additional buildings/storage structures 13 security camera systems with 25 DVR’s and over 200 cameras 30 heating system boilers Over 120 air handling, roof top, energy recovery units Over 150 heating system pumps Over 175 heating and domestic water pumps Over 200 rooftop exhaust fans Over 300 interior motors Over 2,500 doors, locksets and associated door hardware Over 3,000 windows and associated door hardware Over 10,000 plumbing fixtures Over 20,000 electrical fixtures and components 284 acres of property 8 playgrounds 21 interscholastic practice/playing fields 5 premier interscholastic fields 20 parking lots Over 3 miles of roadway and walkway maintained Work Orders On average between 3,000 and 4,000 per year What do we currently do? Complete BCS every five years. We take BCS seriously and approach it methodically/ thoughtfully to address the “unsatisfactories.” All projects identified through this process are placed on a master list for future consideration and reviewed annually. Summary of projects identified as Priority 1-3 in last BCS that are completed or scheduled to be completed before next BCS: Building Blue Creek Boght Hills Forts Ferry Latham Ridge Loudonville Southgate SJHS SHS Percentage Complete/Scheduled 82% 99% 100% 88% 99% 29% 61% 73% We take care of identified issues through our annual budget process through three areas: Daily Maintenance Maintenance Budget Projects Transfers to Capital Fund This has accounted for $1.445 million in each of the two previous year’s budgets. We plan to increase this to $2.535 million in 14-15. Such a practice is not the “norm” among school districts. We believe in taking care of issues timely vs. deferring maintenance. It drastically mitigates or even eliminates the need to bond for standard projects identified in the BCS. A means to address program needs and enhancements identified by district administrators. How do we Address our Identified Needs? General Maintenance – included in the base operating budget. Maintenance Budget Projects – separate listing is presented to BOE during budget process for inclusion in proposed budget within overall Maintenance Department section. e.g. These are projects of programmed maintenance type or identified by building principal/supervisor Small-Medium Size Capital Projects – separate listing is presented to the BOE during budget process for inclusion in proposed budget as an Interfund Transfer to the Capital Fund. e.g. Normal day-to-day wear and tear repairs within the buildings e.g. Projects typically over $10,000 that are aidable through the State Education Department that can be accomplished within a year of being approved by the Commissioner Large Capital Projects – separately voted on bond issuances. e.g. Projects of a larger magnitude that typically may need to be accomplished throughout the year or over a longer period of time and may impact the operations within the school building to varying degrees. Projects are also Building Aid eligible. $300,000 $250,000 $200,000 $150,000 Budgeted Amount $100,000 $50,000 $0 2009-10 2010-11 2011-12 2012-13 2013-14 2014-15 Proposed Maintenance Budget Projects for 20142015 school year total $170,000 This is an increase over 2013-14 budget ($20,000) These projects are either not aidable (GR, MW & Maintenance Shop), require immediate attention or are typically minor enhancements/repairs to the buildings that are not easily aidable through a capital project because of cost thresholds or are required to be coupled with a larger project of like type. Replace Pressure Treated Stairwell to Playground at LR Addition of tack boards in hallways at SG, BH, LR Goodrich Cafetorium Goodrich Curriculum Training Center Alternative Education Classroom SHS G211 Art Room Cabinetry Loudonville Basketball Court Maplewood Annex Window Abatement/Replacement Concrete Leveling of Walks and Flagpoles SHS C108 Classroom SHS Gym Fire Pull Relocation Station Replacement SHS Hot Water Heater Replacement Maintenance Department BC Boiler Pumps Lower Door Panels Replacement SHS Pool Pump Room Valve Replacements Blue Creek Boght Hills Install window air conditioner in Nurse’s Office Replace 3 Boiler Pumps Replace carpeting in computer lab Replace delaminating corkboards in main hallway Forts Ferry Replace pneumatic control on primary wing exhaust fan Replace exhaust fan for 1991 addition Replace lithium batteries in GPS clock system Maintenance Department Maplewood Annex (Custodial) Replace rusted lower panels on 2 overhead doors and install electric motorized door openers Abate asbestos caulk from windows and replace with energy efficient windows or insulated panels Shaker Junior High School Replace overhead “can” lights in auditorium Replace original heating valves under auditorium seating area Goodrich Latham Ridge Install ducted air conditioning system in public information office area Install eight bulletin boards in north 1991 addition hallway Run permanent power on stage above lights for production equipment Mount LCD projector in Art Room Southgate School Build small storage area that meets fire code in 1991 hallway for Special Education equipment Shaker High School Reorganize walls in K115 to better support special education instructional needs Relocate walls and electrical in classroom C108 for improved ventilation High pressure water jet pool main drain and re-sleeve pipe with epoxy coating Replace 16 heat valves and 6 check valves original to building heating system Replace air dryer for heating system compressed air Replace water heater in main boiler room (750,000 BTU) Districtwide Upgrade 3 security camera DVR’s Replace 10 security cameras for district security systems Install 4 LCD projectors per building Replace worn carpet around the district Restripe crosswalks, fire lanes, loading zones and student drop-off areas Replace steam traps and related piping in FF, LV, GR, MW Level concrete walkways and flag poles at district buildings $3,000,000 2,535,000 $2,500,000 $2,000,000 $1,500,000 $1,000,000 1,525,000 1,445,000 1,445,000 860,000 Budgeted Amount 750,000 $500,000 $0 2009-10 2010-11 2011-12 2012-13 2013-14 2014-15 BC Hallway Cabinet Heater Replacement Transportation Exterior Panel Rust Pool Renovations: Ventilation, Chemical Control, Water Filtration, Electrical and Plumbing Replacement FF Exterior Door and Frame Replacement LV Exterior Wood Door Replacement Mill and Repave BC to SHS Walkway/ Roadway Blue Creek Elementary Improve crawl space ventilation/dehumidification under building Estimated Cost: $175,000 Replace original corridor convector heaters Estimated Cost: $20,000 Install automatic door opener at main entrance for handicapped access – tie in swipe card system Estimated Cost: $8,000 Abate asbestos floor tile in Room 9, 14 and PT room; install VCT in Room 9 & 14 and rubberized flooring in PT room Estimated Cost: 25,000 Reduce size of bathroom in Room 7 to increase size of classroom area Estimated Cost: $10,000 Classroom modifications to accommodate for all day Kindergarten in future Estimated Cost: $7,500 Boght Hills Elementary Remove gym partition & replace with pull curtain Install handicapped accessible automatic door opener at main entrance & tie into swipe card system Estimated Cost: $13,000 Estimated Cost: $8,000 Classroom modifications to accommodate for all day Kindergarten in the future Estimated Cost: $7,500 Forts Ferry Elementary Replace 7 rusting exterior doors and frames with energy efficient FRP doors Install handicapped accessible automatic door opener at main entrance & tie into swipe card system Estimated Cost: $35,000 Estimated Cost: $8,000 Classroom modifications to accommodate for all day Kindergarten in the future Estimated Cost: $7,500 Latham Ridge Elementary Remove, reconstruct or replace and reflash/seal 6 sections of leaking front windows Estimated Cost: $30,000 Install handicapped accessible automatic door opener at main entrance & tie into swipe card system Estimated Cost: $8,000 Replace kitchen exhaust and ductwork Estimated Cost: $35,000 (Funded by Food Service Fund) Classroom modifications to accommodate for all day Kindergarten in the future Estimated Cost: $7,500 Loudonville Elementary Install handicapped accessible automatic door opener at main entrance and tie into swipe card system Estimated Cost: $10,000 Replace exterior doors in kitchen, gymnasium and gym/auditorium hallway entrance with FRP doors Estimated Cost: $15,000 Classroom modifications to accommodate for all day Kindergarten in the future Estimated Cost: $10,000 Southgate Elementary Install handicapped accessible automatic door opener at main entrance and tie into swipe card Estimated Cost: $8,000 Classroom modifications to accommodate for all day Kindergarten Estimated Cost: $7,500 Shaker Junior High School Replace rippling carpet in Library and deteriorating carpet in auditorium: install expansion joint in auditorium Estimated Cost: $30,000 Air condition Room A209 (Tech. Ed/Home & Careers lab) and abate a small portion of floor tile Estimated Cost: $15,000 Replace AHU with RTU for fitness room including asbestos abatement Estimated Cost: $60,000 Install handicapped accessible automatic door opener at main entrance and tie into swipe card system Estimated Cost: $9,500 Shaker High School Mill and repave student walk path/road from Blue Creek to H-Gym Estimated Cost: $150,000 Remove original F Gym folding partition and replace with pull curtain Estimated Cost: $15,000 Replace air handling units for boys & girls H-Gym locker room with RTU & F-Gym locker rooms exhaust unit Estimated Cost: $120,000 Reconstruct Library office area into computer lab; relocate library support staff and accommodate new power, IT cabling and ventilation as required Estimated Cost: $100,000 Replace univents in upper/lower M and K wings; improve climate control in Taft Cafeteria Estimated Cost: $550,000 Shaker High School Phase I – Pool Renovations – installation of pool deck air evacuation system and UV water filtration system to address chloramine issues with pool water Estimated Cost: $100,000 Phase II – Pool Renovations – Replace pool climate air system, exhaust & associated ductwork to bring ventilation to current standards, replace electrical for pool filtration system; replace water filtration, plumbing system & chemical distribution system; rebuild walls of pool pump pit area Estimated Cost: $750,000 Install dedicated exhaust system to roof for CIM lab material cutting room Estimated Cost: $35,000 Transportation Repair/replace rusted exterior wall panels; re-secure all exterior panels to building structure; paint exterior of metal building Estimated Cost: $100,000 Replace ceiling mounted infrared heaters in wash and mechanics bays Estimated Cost: $45,000 Project identified during Fall 2013-Winter 2013-14. Project reviewed and prioritized Winter 2013-14. Superintendent and Facilities Director determine if project should be included in 14-15 budget request. Board of Education approve projects to be included in 1415 budget. Architect does preliminary plans of project Spring 2014. Budget Vote May 2014 which includes funding for project. Architect finalizes plans (May-June 2014) and submits to Facilities Planning Summer 2014. (Currently 5-6 month review process). Facilities Planning approves plans January-March 2015. Projects bid March-April 2015. Bid awards approved by BOE and work begins Summer 2015. Not really a “cap” Sets a higher threshold for voter approval of budgets if proposed tax levy increase exceeds the “tax levy limit” - 60% or more would be required versus simple majority (more than 50%) Tax levy limit calculated and will vary by district Tax levy limit is not a limit – just a threshold for what level of voter support is required See Tax Levy Cap Handout A B AxB=C Real Property Tax Levy Tax Base Growth Factor D Payments in Lieu of Taxes Receivable During Prior Year E Capital Expenditure Exclusions Yr. 1 C+D-E=F Adjusted Prior Year Tax Levy G Allowable Levy Growth Factor F*G=H Tax Levy Limit before Exclusions I Less: Payment in Lieu of Taxes Receivable J Pension Exclusion: TRS/ERS K Capital Expenditure Exclusion Yr. 2 H - I + J + K = L Tax Levy Limit Adjusted for Exclusions (L-A)/A Estimated Tax Levy Increase 73,621,583 1.0065 74,100,123 100,000 2,977,595 71,222,528 1.0146 72,262,377 100,000 0 4,130,952 76,293,329 3.629% Yr. 1 Yr. 1 Yr. 1 Yr. 1 Yr. 1 Yr. 1 Transfers to Capital (actual exp. in H fund) Debt Service - Bonds Transportation Equipment Total Capital Expenses Less Related Aid Regular Building Aid & Reorg Incentive Aid Less Building Conditions Survey Aid Total Building Aid Yr. 1 State Share Ratio for Trans Aid Yr. 1 Assumed Capital Trans Expenses (Line 79 of TRA Run) Total Trans Aid Capital Exclusion Transfers to Capital (actual exp. in H fund) Debt Service - Bonds Transportation Equipment Total Capital Expenses Less Related Aid Regular Building Aid & Reorg Incentive Aid Less Building Conditions Survey Aid Total Building Aid State Share Ratio for Trans Aid Yr. 1 Yr. 2 Yr. 2 Yr. 2 Yr. 2 Yr. 2 Yr. 2 Yr. 2 Yr. 2 Yr. 2 Assumed Capital Trans Expenses (Line 137 TRA-Est Run) Total Trans Aid Capital Exclusion 1,172,246 4,162,094 797,000 6,131,340 (2,814,788) (2,814,788) 0.499 679,273 (338,957) 2,977,595 2,548,500 4,115,632 754,000 7,418,132 (2,923,326) (2,923,326) 0.494 736,547 (363,854) 4,130,952 Purchase with cash whenever fiscally sound Interest cost savings Debt issuance costs avoided Building Aid is generated based on estimated debt service costs. With Transfers we don’t incur interest costs so the % of the project that is funded by Building Aid is increased For example, a recent capital project funded with a Transfer to Capital was approx. 83% paid for by Building Aid, although our aid ratio is approx. 69%) Limit length of borrowings as much as possible Review outstanding debt regularly for refunding opportunities/interest recalibration waivers Review of Debt Service Schedule Handout Bonds Five Serial Bonds Outstanding Installment Debt Leases for IT Equipment Installment Lease-issued 2013-14 Proposed Installment Leases 2014-15 400 380 360 340 320 300 280 260 240 220 200 1988-1992: 366 1993-1997: 320 1998-2002: 295 2003-2007: 292 2008-2012: 280 Grades K-6 Grades 7-8 Grades 9-12 Total 2008-09 2,642 968 2,038 5,648 2013-14 2,505 878 1963 5,346 Difference -137 -90 -75 -302 Grades K-6 Grades 7-8 Grades 9-12 Total 2013-14 2,505 878 1,963 5,346 2014-15 2,505 838 1,950 5,293 2015-16 2,479 858 1,925 5,262 2016-17 2,448 878 1,884 5,211 2017-18 2,418 861 1,923 5,202 2018-19 2,387 853 1,901 5,141 2019-20 2,403 825 1,904 5,132 Grades K-6 Grades 7-8 Grades 9-12 Total 2,505 878 1,963 5,346 2018-19 2,387 853 1,901 5,141 Difference -118 -25 -62 -205 2013-14 Grade 9 Grade 10 Grade 11 Grade 12 Total Change 2012-13 505 498 509 534 2,046 2013-14 451 499 486 527 1,963 -83 2014-15 504 451 494 501 1,950 -13 2015-16 466 504 446 509 1,925 -25 2016-17 460 466 499 459 1,884 -41 5-Year Change -45 -32 -10 -75 -162 -162 March 13 Equipment—includes Technology (Schedule C) March 17 Summer Curriculum Development Schedule G Use of Fund Balance Contingency Budget March 20 New Programs & Initiatives, including Special Ed. Program Reconfigurations (Schedule F) Staffing Changes (Schedule B) March 27 Further discussion, if needed March 31 Voting by Board * All meetings will begin at 7:00 p.m. in the SHS Media Center Budget page on District website contains many resources Past presentations and videos from earlier this year Detailed information on tax levy cap, GEA, sequestration cuts Relevant budget news articles from around the area Timeline of events for the remainder of budget season Follow along online – participate in the budget process from home via the live-stream feed Full budget meeting recaps available on District website