March 2009

advertisement
March 2009
doc.: IEEE 802.15-08-0253-00
59th Session of meetings of the
IEEE 802.15 Working Group for
Wireless Personal Area Networks
March 8-12, 2009
Hyatt Regency Vancouver
655 Burrard Street
Vancouver, BC V7X, Canada
Submission
Slide 1
Robert F. Heile, ZigBee Alliance
March 2009
doc.: IEEE 802.15-08-0253-00
802.15 Organization Chart
802.15 WG
WG Chair-Bob Heile, ZigBee
Vice Chairs-Rick Alfvin and Pat Kinney
Task Group 4g
Smart Utility Nets
Phil Beecher, Chair
Independent
Task Group 3c
mmWave Alt PHY
Reed Fisher, Chair
Oki
Secretary
Pat Kinney
Asst. Secretary
Mike McInnis, Boeing
Technical Editor
James Gilb, SiBeam
Interest Group
TerraHertz
Rick Roberts, Chair
Intel
New Projects (WNG)
Interpretaions/Rules
Pat Kinney, Chair
Kinney Consulting
Task Group 4f
Active RFID
Mike McInnis, Chair
Boeing
Task Group 4c
15.4 Alt PHY-China
Clint Powell, Chair
Freescale
Task Groups
Task Group 4d
15.4 Alt PHY-Japan
Phil Beecher, Chair
Integration
Task Group 7
Visible Light Comm
Eun Tae Won, Chair
Samsung
Task Group 4e
MAC Enhancements
Pat Kinney, Chair
Kinney Consulting
Task Group 6
Body Area Networks
Art Astrin, Chair
Astrin Wireless
Task Group 5
- Mesh Networking
Myung Lee, Chair
Samsung
To add your name to the WG/SG/TG reflectors
please go to www.ieee802.org/15
Submission
Slide 2
Robert F. Heile, ZigBee Alliance
March 2009
doc.: IEEE 802.15-08-0253-00
Objectives of the Vancouver Session
March 8-12, 2009
TASK GROUP 3c –mmWave PHY for 15.3
1.
Comment Resolution
2.
Obtain Approval to proceed with Sponsor Ballot
3.
Finalize Coexistence Assurance Document
4.
Hold joint meeting with 802.11 TGad
5.
Update Project Timeline
TASK GROUP 4c Alternate PHY layer for China:
1.
CWPAN Status/Update
2.
Manage RevCom Submission issues, if any
TASK GROUP 4d Alternate PHY layer for Japan:
1.
Manage RevCom Submission issues, if any
Submission
Slide 3
Robert F. Heile, ZigBee Alliance
March 2009
doc.: IEEE 802.15-08-0253-00
Objectives of the Vancouver Session
March 8-12, 2009
TASK GROUP-4e MAC Enhancements
1.
Discuss and affirm application spaces
2.
Hear Revised Proposals
3.
Review proposals based upon Application Spaces
4.
Continue proposal adoption discussion
TASK GROUP-4f Active RFID
1.
Discuss and affirm application spaces
2.
Hear Revised Proposals
TASK GROUP-4g Smart Utility Networks
1.
Hear Initial Proposals
2.
Review Regulatory Environment
3.
Review Coexistence Issues
Submission
Slide 4
Robert F. Heile, ZigBee Alliance
March 2009
doc.: IEEE 802.15-08-0253-00
Objectives of the Vancouver Session
March 8-12, 2009
TASK GROUP 5 –Mesh Networking Recommended Practice:
1.
Manage RevCom Submission issues, if any
TASK GROUP 6 –Body Area Networking:
1.
Establish Top Level Editorial Team
2.
Hear voluntary responses to Call for Proposals
(mandatory response due at the May 2009 Session)
3.
Update TRD, Regulatory, Application, Channel Model,
and Comparison Criteria docs as needed
4.
Document process for draft development
5.
Update Project Timeline
Submission
Slide 5
Robert F. Heile, ZigBee Alliance
March 2009
doc.: IEEE 802.15-08-0253-00
Objectives of the Vancouver Session
March 8-12, 2009
TASK GROUP 7-VISIBLE LIGHT COMMUNICATIONS
1.
Finalize a draft TRD
2.
Issue a follow-up CFP
3.
Hear new presentations
- Call For Use Case
- Call For Technology and Regulatory Issues
INTEREST GROUP- TERRAHERTZ COMMUNICATONS
•
Seek additional contributions
•
Review current contributions
•
Review and update objectives as required
NEW PROJECTS SUBCOMMITTEE
1.
Report on WNG progress
2.
Hear new presentations
Submission
Slide 6
Robert F. Heile, ZigBee Alliance
March 2009
Submission
doc.: IEEE 802.15-08-0253-00
Slide 7
Robert F. Heile, ZigBee Alliance
March 2009
doc.: IEEE 802.15-08-0253-00
Vancouver Session Results for
Submission
Slide 8
Robert F. Heile, ZigBee Alliance
March 2009
doc.: IEEE 802.15-08-0253-00
TG3c mm Wave
24th Session
Vancouver, BC, Canada
Closing Report
March, 2009
Submission
Slide 9
Robert F. Heile, ZigBee Alliance
March 2009
doc.: IEEE 802.15-08-0253-00
1. 10.30am Monday, March 9. Call to order.
2. TG3c Leadership:
Chair: R. Fisher.
Vice Chair: A Mathew, S. Kato
Secretaries : C.S. Sum, T. Baykas
Technical Editor: J. Gilb
Sub Editors: C. Ngo, T. Baykas, C.S. Sum, B. Gaffney, Z. Lan
3. Eight 2-hour time slots were allocated, 5 of them were used
March 9
(Mon)
AM1
Cancelled
AM2
Cancelled
PM1
X
PM2
Submission
March 10
(Tue)
X
March 11
(Wed)
March 12
(Thu)
X
Cancelled
X (with
11.TGad)
X
Slide 10
Robert F. Heile, ZigBee Alliance
March 2009
doc.: IEEE 802.15-08-0253-00
Meeting Accomplishments
• Recirculation LB 49 completed.
• Coexistence assurance document modified according 802.19
comments.
• Joint meeting with 802.11TGad; 5 contributions from 15.3c
presented regarding common mode signaling, sync frame,
beamforming, 15.3c channel model and coexistence document.
• TG3c will have 1 joint session with TGad in Montreal and 3
conference calls before Montreal meeting.
• Motion approved to request 802.15 WG to ask permission from
802 EC to start sponsor ballot
• Motion subsequently approved by both the 802.15WG and the
802EC to begin Sponsor Ballot
Submission
Slide 11
Robert F. Heile, ZigBee Alliance
March 2009
doc.: IEEE 802.15-08-0253-00
Ballot plan
• March 2009-Sponsor ballot started
• May 2009 – 802 sponsor ballot completed, comment
resolution, Recirculation ballot started
• July 2009 – 802 sponsor ballot re-circulation
completed and submitted to RevCom for final approval
• September 2009 – Approval by RevCom
Submission
Slide 12
Robert F. Heile, ZigBee Alliance
March 2009
doc.: IEEE 802.15-08-0253-00
Liaison report on IEEE 802.19
•TG3c officers met with 802.19 on Tuesday AM2.
•TG3c had received 19 comments from
802.19 on the TG3c coexistence assurance
document 09/22r7.
•All 19 comments were discussed with
802.19 and resolved. Resolutions were
reflected in the modified version of the
coexistence assurance document 09/22r9.
Submission
Slide 13
Robert F. Heile, ZigBee Alliance
March 2009
doc.: IEEE 802.15-08-0253-00
Liaison report on IEEE 802.11TGad
TG3c and TGad had a good opportunity to exchange information on coexistence
and other topics through one joint session and 2 other TGad sessions .
TGad held 4 meetings this week
March 9: TGad ad-hoc meeting
March 10: Presentations on TGad channel models
March 11: TG3c-TGad joint meeting: TG3c presented 3 documents on
coexistence assurance between TG3c and TGad systems. TG3c also
presented a document for beamforming and another document on the
TG3c channel models.
March 12: Presentations on TGad network architecture requirements and
closing
The output of the TG3c-TGad joint meeting
One joint session will be held at the Montreal interim meeting
Three conference calls will be scheduled to work on channel models and other items before
Montreal
Details of the liaison report can be found in 09/244r1
Submission
Slide 14
Robert F. Heile, ZigBee Alliance
March 2009
doc.: IEEE 802.15-08-0253-00
Contributions
# Title
Author
1 TG3c opening introduction
Doc. #
09/155r0
2 Agenda IEEE802.15.3c 24th Meeting
09/94r2-r3
R. Fisher
3 LB 49 Comments
09/104r1
J. Gilb
4 Coexistence Assurance Document
09/22r8
J. Gilb
09/78r1
5 Coexistence Assurance Document CMS
Common Mode Signaling (CMS) for Intersystem Coexistence 09/192r1
6 Enhancement
09/191r1
7 DEV sync frame transmission for ad joint meeting
R. Fisher
J. Gilb
S. Kato
Z. Lan
8 TG3c Beamforming Overview
11-09/355r0
I. Lakkis
9 Introduction of TG3c channel model and beyond
09/195r1
H. Sawada
10 Motion for Sponsor Ballot
09/225r0
R. Fisher
11 Project Timeline
09/245r0
R. Fisher
12 Summary of TG 802.11ad Activities This Week
09/244r0-r1
A. Rahman
Submission
Slide 15
Robert F. Heile, ZigBee Alliance
March 2009
doc.: IEEE 802.15-08-0253-00
Timeline
2007
2008
2009
9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9
Present all final proposals
Present updated/merged proposals
x
Down Selection started
x
Down Selection finished
Draft baseline completed
x
x
x
x
1st letter ballot completed
x
Resolution of comments completed
x
Re-circulation completed
Re-circulation comments
completed
x
x
2nd re-circulation completed
Resolution of the 2nd recirculation comments completed
x
3rd re-circulation completed
Resolution of the 3rd recirculation comments completed
x
Sponsor ballot started
x
x
Sponsor ballot comment resolution.
Re-circulation completed
x
x
RevCom Approval
Submission
x
Slide 16
Robert F. Heile, ZigBee Alliance
March 2009
doc.: IEEE 802.15-08-0253-00
TG4c- PHY Amendment to 15.4 to
Support 780MHz Band in China
Clint Powell, Freescale, Chair
Vancouver, BC, Canada
March, 2009
Group did not Meet-Draft on RevCom
Agenda for Approval March 17
Submission
Slide 17
Robert F. Heile, ZigBee Alliance
March 2009
doc.: IEEE 802.15-08-0253-00
TG4d- PHY Amendment to 15.4 to Support
950MHz Band in Japan
Phil Beecher, Beecher Consulting, Chair
Vancouver, BC, Canada
March, 2009
Group did not Meet-Draft on RevCom
Agenda for Approval March 17
Submission
Slide 18
Robert F. Heile, ZigBee Alliance
March 2009
doc.: IEEE 802.15-08-0253-00
TG4e- MAC Enhancement
Amendment to 15.4
Pat Kinney, Kinney Consulting, Chair
Vancouver, BC, Canada
March, 2009
Submission
Slide 19
Robert F. Heile, ZigBee Alliance
<March 2009>
doc.: IEEE 802.15-08-0253-00
TG4e PAR Scope of Proposed Standard
The intention of this amendment is to enhance and add
functionality to the 802.15.4-2006 MAC to a) better support the
industrial markets and b) permit compatibility with modifications
being proposed within the Chinese WPAN.
Specifically, the MAC enhancements are limited to:
• TDMA: to provide a) determinism, b) enhanced utilization of
bandwidth
• Channel Hopping: to provide additional robustness in high
interfering environments and enhance coexistence with other
wireless networks
• GTS: to increase its flexibility such as a) supporting peer to
peer, b) the length of the slot, and c) number of slots
• CSMA: to improve throughput and reduce energy consumption
• Security: to add support for additional options such as
asymmetrical keys
• Low latency: to reduce end to end delivery time such as needed
for control applications
Submission
Slide 20
<Pat Kinney>, <Kinney Consulting LLC>
March 2009
doc.: IEEE 802.15-08-0253-00
Purpose of Proposed Standard
This functionality facilitates Industrial applications
(such as addressed by HART 7 and the
ISA100 proposed standards), and those
enhancements defined by the proposed
Chinese WPAN standard that aren't included
in TG4c. This amendment addresses
coexistence with wireless protocols such as
802.11, 802.15.1, 802.15.3, and 802.15.4.
Submission
Slide 21
Robert F. Heile, ZigBee Alliance
March 2009
doc.: IEEE 802.15-08-0253-00
Meeting Goals
 Sub-Groups to present:
 Anticipated Changes to Standard
 Backward Compatibility Description
 Application Support Levels
 TG4e will select those efforts to either move
forward, reformulate their proposed effort, or
to discontinue the effort
Submission
Slide 22
Robert F. Heile, ZigBee Alliance
March 2009
doc.: IEEE 802.15-08-0253-00
TG4e Meetings This Week
Mtg
Monday
Tuesday
Wednesday
AM1
Thursday
Discussion
(Plaza B)
AM2
EGTS
Presentation
(Plaza B)
PM1
TSCH
Presentation
(Plaza B)
PM2
Opening Remarks Fact. Auto.
(plaza B, 2nd floor) Presentation
(Plaza B)
Submission
Discussion
(Plaza B)
Chan Diversity
Discussion/Closing
Presentation &
(Plaza C)
Overhead Reduction
Presentation
(Plaza B)
Low Energy
Presentation
(Plaza B)
Slide 23
Robert F. Heile, ZigBee Alliance
March 2009
doc.: IEEE 802.15-08-0253-00
E-GTS
Factory Automation
TSCH ISA, HCF
beacon-enabled
PAN mode
Non-beacon-enabled
PAN mode
Contention Access
ZigBee, 802.15.5
Contention Access
Overhead Reduction/Security
Low Energy
Behavior unique to
specific PAN modes
Behavior common
to all PAN modes
Channel Diversity
802.15.4
Submission
Slide 24
Robert F. Heile, ZigBee Alliance
March 2009
doc.: IEEE 802.15-08-0253-00
Technical Editing Path Forward
1. Editor and subgroup work on each proposal
to provide necessary detail as to specific
changes to 802.15.4-2006
2. Subgroups work with other subgroups to
merge their proposals
3. Coordination between proposal editors and
subgroups with goal of
unification/harmonization of changes
4. Collect all changes into rough draft of
amendment
Submission
Slide 25
Robert F. Heile, ZigBee Alliance
March 2009
doc.: IEEE 802.15-08-0253-00
Editor Assignments
Sub-Group
Lead
Editor
Enhanced GTS
M Lee
L Li
Time Slot Chan Hop
C S Kang
L Winkel
Factory Automation
M Bahr
Z Sahinoglu
Channel Diversity
W C Jeong
L Winkel
Overhead Reduction
R Struik
L Li
Low Energy
W Hong
Z Sahinoglu
Submission
Slide 26
Robert F. Heile, ZigBee Alliance
March 2009
doc.: IEEE 802.15-08-0253-00
Proposed TG4e Baseline Schedule
2008
1
Task Group Form ed
2
3
4 5
6
7
2009
8
9 10 11 12 1
2
3
4
5
6
7
2010
8
9 10 11 12 1
2
3
4
5
6
7
8
9
X
Call for application Dec 2007 X
Selection criteria docum ent
X
Call for intent to propose
X
Call for proposal issued
X
Prelim inary Proposals
Present final proposals
X
X
X
X
X
Baseline proposal selected
X
Proposal draft com pleted
X
1st letter ballot com pleted
Resolution of com m ents com pleted
X
Re-circulation com pleted
Resolve re-circulation com m ents
X
2nd re-circulation
Resolve 2nd re-circulation com m ents.
X
3rd re-circulation
Resolve 3rd re-circulation com m ents.
X
Sponsor ballot period
X
Sponsor ballot com m ent resolution.
X
Re-circulation com pleted
X
RevCom Approval
Submission
Slide 27
Robert F. Heile, ZigBee Alliance
March 2009
doc.: IEEE 802.15-08-0253-00
IEEE 802.15.4f Active RFID
Closing Report
2nd Meeting as a Task Group
Vancouver, BC Canada
March 12, 2009
Submission
Slide 28
Robert F. Heile, ZigBee Alliance
March 2009
doc.: IEEE 802.15-08-0253-00
802.15.4f PAR Purpose
Paragraph from 802.15.4f Project Authorization
Request (PAR) document.
5.4 Purpose of Proposed Standard:
To provide a standard for low cost, ultra low energy consumption,
flexible and highly reliable communication means and air interface
protocol for Active RFID and sensor applications. The air interface
should be able to support a wide range of needs for which active RFID
systems can be useful and enable improved performance and flexibility
for future mass deployments of active RFID systems around the world.
Submission
Slide 29
Robert F. Heile, ZigBee Alliance
March 2009
doc.: IEEE 802.15-08-0253-00
IEEE 802.15.4f Active RFID Meeting Overview
1.
Chair:
Mike McInnis
Secretary: George Cavage
2.
Initially four each meeting time slots were allocated during this session.
1. However we expanded the number meeting time slots to seven.
3. Relative Documents during this meeting session:
0150-01 -Agenda-Mar-2009.xls
0151-03 -Opening-Introduction-Mar-2009.ppt
0239-00 -Active-RFID-Minutes-Vancouver-Mar-2009.doc
4.
Presentations during this meeting session:
0174-00 -Applications for Active RFID Systems
0198-00 -Ubisense Case Studies
0200-00 -EPCglobal RFID Supply Chain and Operations Improvements
0203-03 -TG4f Draft Key Applications and Requirements Summary
0219-01 -Active RFID Problems to Solve
Submission
Slide 30
Robert F. Heile, ZigBee Alliance
March 2009
doc.: IEEE 802.15-08-0253-00
TG4f Meeting Sessions March 2009
Mtg
Monday Tuesday
AM1
Wednesday
Thursday
Technical
Requirements and
Selection Criteria
Technical
Requirements
and Selection
Criteria
AM2
Technical
Requirements
and Selection
Criteria
PM1
Agenda / Objectives /
Minutes/ Officers /
Timeline / PAR / Listen
to CFA Responses
Technical
Requirements and
Selection Criteria
PM2
Listen to CFA
responses / Begin
discussion of
requirements
Technical
Requirements and
Selection Criteria
Submission
Slide 31
Robert F. Heile, ZigBee Alliance
March 2009
doc.: IEEE 802.15-08-0253-00
Active RFID Meeting Achievements
March 2009
• Heard four Call for Application (CFA) response presentations
• Developed draft 802.15.4f Requirements Document
• Decided to release another Call for Applications request
Responses will be heard during the May 2009
meeting in Montreal, Canada.
•Updated the 802.15.4f Timeline
Submission
Slide 32
Robert F. Heile, ZigBee Alliance
March 2009
doc.: IEEE 802.15-08-0253-00
Next Meeting Goals and Agenda
May 2009 in Montreal, Canada
• Hear Call For Application responses to March 2009
CFA release
• Continue discussion and development of technical
requirements documentation
• Develop Selection criteria documentation
• Develop proposal down selection method
• Discuss coexistence criteria.
• Determine need for, suitability of, channel models
• Write and release Call for Intent (CFI) to propose
and/or Call for Proposal (CFP) release(s).
Submission
Slide 33
Robert F. Heile, ZigBee Alliance
March 2009
doc.: IEEE 802.15-08-0253-00
802.15.4f Timeline
Timeline could shorten if you know what you want to do/propose and there is little disagreement
PAR and 5C approved
Call for Applications (as SG)
Task Group Formed
Call For Applications (as TG)
Technical Requirements
Guidance
Selection Criteria
Discussion of Coexistence
Criteria
Call for intent to propose
Call for Proposals issued
Down Selection Mechanism
Determine need for, suitability of,
Channel Models
Prelim proposals heard
Present Final Proposals
Baseline proposal selected
(selection/merge complete)
Draft Work
Draft Ready for 1st letter ballot
1st letter ballot complete
Resolution of comments, 1st
recirc
1st re-circulation complete
Resolve comments, 2nd re-circ
apprv
2nd re-circulation complete
resolve comments, 3rd re-circ
apprv.
3rd re-circulation complete
resolve commnets, approv.
Sponsor
Sponsor Ballot
comments relolved
re-circ sponsor bolot
Submission
2008
2009
2010
2011
9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4
x
x
x
x
x
X
X
X
x
X
x
X
X
X
X
x
x
x
x x x x x x
x
x
x x x
x
x x
x
x x
x
x x
x
x x
x x
Slide 34
Robert F. Heile, ZigBee Alliance
March 2009
doc.: IEEE 802.15-08-0253-00
TG4g- PHY Amendment to 15.4 supporting
Smart Utility Networks
Phil Beecher, Beecher Consulting, Chair
Vancouver, BC, Canada
March, 2009
Submission
Slide 35
Robert F. Heile, ZigBee Alliance
March 2009
doc.: IEEE 802.15-08-0253-00
TG4g-SUN PAR
Scope
This Standard defines an amendment to IEEE 802.15.4. It addresses principally outdoor Low
Data Rate Wireless Smart Metering Utility Network requirements. It defines an alternate
PHY and only those MAC modifications needed to support its implementation.
Specifically, the amendment supports all of the following:
• Operation in any of the regionally available license exempt frequency bands, such as
700MHz to 1GHz, and the 2.4 GHz band.
• Data rate of at least 40 kbits per second but not more than 1000 kbits per second
• Achieve the optimal energy efficient link margin given the environmental conditions
encountered in Smart Metering deployments.
• Principally outdoor communications
• PHY frame sizes up to a minimum of 1500 octets
•
Simultaneous operation for at least 3 co-located orthogonal networks
• Connectivity to at least one thousand direct neighbors characteristic of dense urban
deployment
• Provides mechanisms that enable coexistence with other systems in the same band(s)
including IEEE 802.11, 802.15 and 802.16 systems
Submission
Slide 36
Robert F. Heile, ZigBee Alliance
March 2009
doc.: IEEE 802.15-08-0253-00
TG4g-SUN PAR
Purpose
To provide a global standard that facilitates very large scale process control applications
such as the utility smart-grid network. This amendment supports large,
geographically diverse networks with minimal infrastructure. Smart Metering Utility
Networks can potentially contain millions of fixed endpoints. The communication
range, robustness, and coexistence characteristics required for this class of
application have not been met with existing 802 standards (See explanatory notes in
Section 8.1 Doc#15-08-705).
Submission
Slide 37
Robert F. Heile, ZigBee Alliance
March 2009
doc.: IEEE 802.15-08-0253-00
Meeting Goals and Achievements
 Hear Presentations
 3 responses to Call for Applications 
 9 responses to Call for Preliminary Proposals 
 4 presentations of Regulatory Considerations 
 Review Required Supporting Documentation
 PHY Parameters Guidance 
 Coexistence Requirements – discussed scenarios,
but more work is required on scenarios and
metrics
 Review Timeline 
Submission
Slide 38
Robert F. Heile, ZigBee Alliance
March 2009
doc.: IEEE 802.15-08-0253-00
SG4g-SUN Meetings This Week
Mtg
Monday
Tuesday
AM1
AM2
Open,
Presentations
(apps)
PM1
PM2
Presentations
(apps & prelim
proposals)
Wednesday
Thursday
Presentations
(prelim proposals)
Presentations
(prelim proposals)
Midweek Plenary
Presentations
(prelim proposals)
Presentations
(prelim proposals)
Presentations
(regulatory)
Coexistence
(joint meeting with
802.19)
Discussion of
proposals
+ Next Steps
Closing Plenary
Evening
Submission
Slide 39
Robert F. Heile, ZigBee Alliance
March 2009
doc.: IEEE 802.15-08-0253-00
Presentations heard
15-09-0113-00-004g-battery-operated-applications.ppt
15-09-0114-01-004g-trends-in-sun-capacity.ppt
15-09-0118-03-004g-narrow-band-phy-preliminary-proposal.ppt
15-09-0120-02-004g-coronis-ft-preliminary-proposal.ppt
15-09-0121-01-004g-market-potential-of-sun.ppt
15-09-0124-02-004g-multi-rate-phy-proposal.ppt
15-09-0126-01-004g-signal-processing-options.ppt
15-09-0127-02-004g-smart-grid-communications-preliminary-proposal.ppt
15-09-0128-01-004g-ultra-link-processing-preliminary-proposal-to-tg4g.ppt
15-09-0129-01-004g-battery-operated-sensing-device-requirements-for-802-15-4g.ppt
15-09-0131-00-004g-design-considerations-for-the-sun-network.ppt
15-09-0135-01-004g-preliminary-proposal-for-a-multi-regional-sub-ghz-phy-for-802-154g.ppt
15-09-0175-01-004g-european-regularity-considerations.ppt
15-09-0189-00-004g-korean-regulatory-considerations.ppt
15-09-0193-01-004g-802-15nan-phy-considerations.ppt
15-09-0207-00-004g-spectruminchinalicenseexempt-pdf.xls
15-09-0208-00-004g-chinaregsummary0309.ppt
15-09-0235-01-004g-technical-requirements-of-japanese-regulation-for-950mhz-low-poweractive-radio-systems.ppt
Submission
Slide 40
Robert F. Heile, ZigBee Alliance
March 2009
doc.: IEEE 802.15-08-0253-00
Between Now and May 2009
• Teleconference calls: to be held weekly on
Wednesdays at 10pm GMT, starting March
25, 2009 (details to be posted to reflector)
• Continue to refine Technical Guidance
Document (15-09-0075-004g)
• Refine Coexistence Scenarios, define
Coexistence Metrics
• Work on Proposals –merging and enhancing.
• Preparatory work for May meeting
Submission
Slide 41
Robert F. Heile, ZigBee Alliance
March 2009
doc.: IEEE 802.15-08-0253-00
• Next Steps
– Sign up for 802.15.4f Active RFID e-mail reflector
• http://grouper.ieee.org/groups/802/15/pub/Subscribe.html
• STDS-802-15-4f@listserv.ieee.org
• Next Meeting
– May 10-15, 2009 in Montreal, Canada.
• Fairmont The Queen Elizabeth Hotel
– Register for next meeting at:
• http://ieee802.facetofaceevents.com/sessions/56/index.php
Submission
Slide 42
Robert F. Heile, ZigBee Alliance
March 2009
PAR and 5C approved
Call for Applications (as SG)
Task Group Formed
Review Applications
Technical Guidance framework
Selection Criteria
Coexistence Criteria
Call for Proposals issued
Prelim proposals heard
Present Final Proposals
Baseline proposal selected
(selection/merge complete)
Draft Work
Draft Ready for 1st letter ballot
1st letter ballot complete
Resolution of comments, 1st
recirc
1st re-circulation complete
Resolve comments, 2nd re-circ
approval
2nd re-circulation complete
resolve comments, 3rd re-circ
approval.
3rd re-circulation complete
resolve comments, Sponsor Ballot
Approval
Sponsor Ballot
comments resolved
re-circ sponsor ballot
comments resolved
re-circ sponsor ballot
RecCom Approval
Submission
doc.: IEEE 802.15-08-0253-00
2008
9 10 11 12 1
x
x
x
x
x
x
x
x
x
2009
2010
2011
2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4
5 6
x x
x x
x x
x
x
x
x
x
x x x x x x
x
x
x x x
x
x x
x
x x
x
x x
x
x x
x x
x
Slide 43
x
x
x
Robert F. Heile, ZigBee Alliance
March 2009
doc.: IEEE 802.15-08-0253-00
TG5- Recommended Practice
for Mesh Networking
Myung Lee, CUNY, Chair
Vancouver, BC, Canada
March, 2009
Group did not Meet-Draft on RevCom
Agenda for Approval March 17
Submission
Slide 44
Robert F. Heile, ZigBee Alliance
March 2009
doc.: IEEE 802.15-08-0253-00
IEEE 802.15 TG6
Body Area Network
Closing Report
8th Meeting as a Task Group 6
Vancouver, BC
March 12, 2009
Submission
Slide 45
Robert F. Heile, ZigBee Alliance
March 2009
doc.: IEEE 802.15-08-0253-00
Purpose of Proposed Standard
(PAR 07-0575)
The purpose of the proposed standard it to provide an
international standard for a short range (ie about human
body range), low power and highly reliable wireless
communication for use in close proximity to, or inside, a
human body. Data rates, typically up to 10Mbps, will be
offered to satisfy an evolutionary set of entertainment and
healthcare services. Current PANs do not meet the medical
(proximity to human tissue) and relevant communication
regulations for some application environments. They also
do not support the combination of reliability (QoS), low
power, data rate and noninterference required to broadly
address the breadth of body area network applications.
Submission
Slide 46
Robert F. Heile, ZigBee Alliance
March 2009
doc.: IEEE 802.15-08-0253-00
Need for the Project (PAR 07-0575)
There is a need for a standard optimized for ultra low power devices and operation
on, in or around the human body to serve a variety of applications including
medical and personal entertainment.
Examples of the applications served by the proposed standard are: EEG, ECG,
EMG, vital signals monitoring (temperature (wearable thermometer),
respiratory, wearable heart rate monitor, wearable pulse oximeter, wearable
blood pressure monitor, oxygen, pH value , wearable glucose sensor,
implanted glucose sensor, cardiac arrhythmia), wireless capsule endoscope
(gastrointestinal), wireless capsule for drug delivery, deep brain stimulator,
cortical stimulator (visual neuro-stimulator, audio neuro stimulator,
Parkinson’s disease, etc…), remote control of medical devices such as
pacemaker, actuators, insulin pump, hearing aid (wearable and implanted),
retina implants, disability assistance, such as muscle tension sensing and
stimulation, wearable weighing scale, fall detection, aiding sport training.
This will include body-centric solutions for future wearable computers. In a
similar vein, the same technology can provide effective solutions for personal
entertainment as well.The existence of a body area network standard will
provide opportunities to expand these product features, better healthcare and
well being for the users. It will therefore result in economic opportunity for
technology component suppliers and equipment manufacturers.
Submission
Slide 47
Robert F. Heile, ZigBee Alliance
March 2009
doc.: IEEE 802.15-08-0253-00
IEEE Celebrates:
May 21, 1873: Birth date of Hans Berger, the first person
to record human electroencephalograms (EEG).
Submission
Slide 48
Robert F. Heile, ZigBee Alliance
March 2009
doc.: IEEE 802.15-08-0253-00
Heard 17 BAN proposals
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
Submission
NICT MAC1 proposal
09-0162
NICT MAC2 proposal
09-0161
NICT PHY1 proposal
09-0166
NICT PHY2 proposal
09-0163
NICT PHY3 proposal
09-0160
Combined proposal Motorola and Kairos Microsystems
France Telecom / CEA / Thales preliminary proposals
Preliminary IMEC proposal
09-0138
09-0172
09-0156
Prelimanary WBAN proposal using IR-UWB
09-0141
PSSK Proposal for High-data-rate In-body WBAN PHY
Pattern-Based WBAN System with Bridging Mechanism
Meiji University Proposal
09-0179
09-0145
09-0165
Yokohama National University Proposal
09-0164
Elements of an IR-UWB PHY for BANs
09-0181
Samsung PHY proposal
09-0171
Fujitsu proposal
09-0188
Casuh MAC candidate for WBAN
09-0142
Slide 49
Bin Zhen
Changle Li
Igor Dotlic
Marco Hernandez
Shinsuke Hara
Fred Martin
Jean Schwoerer
Guido Dolmans
Jae Ho Hwang (ETRI)
Cheolhyo Lee (ETRI)
Sana Ullah (Inha Univ)
Tesuhi Ikegami
Ryuji Kohno
Olivier Rousseaux
Kiran Bynam
Hind Munzer-Chebbo
Seung-Moon Ryu
Robert F. Heile, ZigBee Alliance
March 2009
doc.: IEEE 802.15-08-0253-00
Session Results
• Send out a proposal evaluation form
• Updated TG6 Call for Proposals (CFP) 08-0811-03
• Updated TG6 Comparison Criteria Document. 08-0831-05
• CFI reduction from 65 to 64, thank you NiCT.
• Asked for input with dealing with 64 proposals.
• Proposals in May 4 on server
• First presenters on May 11 from: CSEM (1), IMEC(1) and Samsung (10)
• Lottery: May 11, for rest of participants for May and July
Submission
Slide 50
Robert F. Heile, ZigBee Alliance
March 2009
doc.: IEEE 802.15-08-0253-00
Additional Session Results
• Added one more editor volunteer.
• Filled a channel model hole. Thanks: NICTA
• Update from Medical ICT Consortium alliance
• Update from ETSI EP eHEALTH alliance
Submission
Slide 51
Robert F. Heile, ZigBee Alliance
March 2009
doc.: IEEE 802.15-08-0253-00
Teleconferences
Will have teleconferences when needed
These will be announced at least a week in advance
on the BAN reflector
Submission
Slide 52
Robert F. Heile, ZigBee Alliance
March 2009
doc.: IEEE 802.15-08-0253-00
Plans for May 2009 meeting
• Hear up to 48 proposals
• Encourage and facilitate mergers
Submission
Slide 53
Robert F. Heile, ZigBee Alliance
March 2009
doc.: IEEE 802.15-08-0253-00
Timeline 09
2009
1
2
3
4
5
6
7
8
9
10
>
>
^
>
>
>
>
>
>
>
11
12
Issue CFP (Call for Proposals)
v
Close CFP (Call for Proposals)
Hear Proposals
>
>
^
Base line
^
Technical editorial team in place
Technical Comments Resolution
>
>
Draft ready for Letter Ballot
>
Letter Ballot (#1)
Recirculation
Letter Ballot (#2)
Draft ready for Sponsor Ballot
Sponsor Ballot
Sponsor Ballot Recirculation
WG/SEC approval
REVCOM approval
Submission
Slide 54
Robert F. Heile, ZigBee Alliance
March 2009
doc.: IEEE 802.15-08-0253-00
TG7-Visible Light Communications
2nd Meeting, Vancouver
Eun Tae Won, Samsung, Chair
Closing Report
12 March, 2009
Submission
Slide 55
Robert F. Heile, ZigBee Alliance
March 2009
doc.: IEEE 802.15-08-0253-00
Objectives of Meeting
• Call for presentation of VLC
• Hearing for presentation of VLC issues
• Hearing from subcommittee
– VLC Applications
– VLC Regulation
– Technical Requirement Document
Submission
Slide 56
Robert F. Heile, ZigBee Alliance
March 2009
doc.: IEEE 802.15-08-0253-00
Meeting Achievements
1. Six 2-hour time slots was held in Monday, Tuesday, Wednesday and Thursday.
- Monday PM2 slot
- Tuesday AM1, AM2 slot
- Wednesday AM1 slot.
- Thursday AM1, AM2 slot
2. Relative Documents:
17 Presentations
15-09-0123-00-0007-the-omega-use-case
15-09-0111-00-0007-some-thoughts-on-vlc
15-09-0159-00-0007-considerations-for-getting-a-delicate-vlc-application-summary
15-09-0117-01-0007-vlc-potential-use-cases-and-technical-requirements
15-09-0180-00-0007-mac-design-considerations-for-vlc
15-09-0173-00-0007-consideration-on-vlc-application
15-09-0125-05-0007-vlc-application-definitions-and-summary
15-09-0182-00-0007-green-it-regulation
15-09-0194-00-0007-tg7-vlc-regulation-document-list-and-summary
15-09-0202-00-0007-ieee-802-15-7-vlc-regulation-document-configuration
15-09-0205-01-0007-vlc-application-category-terms-mobility
Submission
Slide 57
Robert F. Heile, ZigBee Alliance
March 2009
doc.: IEEE 802.15-08-0253-00
Meeting Achievements
2. Relative Documents:
17 Presentations
15-09-0209-00-0007-technical-requirements-for-vlc-applications
15-09-0218-00-0007-vlc-device-classification-and-mobility-considerations
15-09-0221-01-0007-consideration-for-minimum-phy-data-rate-requirement-for-trd
15-09-0226-00-0007-vlc-experimental-test-and-results-ii
15-09-0204-00-0007-a-standardized-led-infrastructure-lighting-interface
15-09-0136-00-0007-qualitative-spectral-analysis-of-common-household-light-sources
3. Subcommittee achievement:
- VLC Applications
* Draft of application summary document
. Terminology / application matrix
- VLC Regulation
* Draft of application summary document
. Call for volunteer about spectrum frequency each contry or continent
- Technical Requirement Document
* Draft of application summary document
. Hearing comment about VLC channel modeling and contents of TRD
Submission
Slide 58
Robert F. Heile, ZigBee Alliance
March 2009
doc.: IEEE 802.15-08-0253-00
Plans for May Meeting
•
•
•
•
Presentation of “Call for Application” response
Completion of application summary document
Presentation of “Call for Technology” response
Presentation of “Call for Regulatory” response
Submission
Slide 59
Robert F. Heile, ZigBee Alliance
March 2009
doc.: IEEE 802.15-08-0253-00
Other 802.15 Activities
• The WG kicked off the process to update its
P&P based on the recently issued template
for WGs from Audcom. Target is to complete
at the November 2009 Session and submit to
the 802EC
• WNG had no contributions and did not meet
• No activity on Interpretations
Submission
Slide 60
Robert F. Heile, ZigBee Alliance
March 2009
doc.: IEEE 802.15-08-0253-00
Upcoming Sessions
• May 10-15, 2009, Fairmont The Queen Elizabeth, Montreal,
Canada, 802 Wireless Interim Meeting*
• July 12-17, 2009, Hyatt Regency San Francisco, CA, USA , 802
Plenary Meeting.
• September 20-25, 2009, Hilton Waikoloa Village, Big Island, HI,
USA, 802 Wireless Interim Meeting*.
• November 15-20, 2009, Hyatt Regency Atlanta, GA, USA, 802
Plenary Meeting.
• January 17-22, 2010, Hyatt Regency-Garden Grove, CA, USA
802 Wireless Interim Meeting*. -pending
• March 14-19, 2010, Caribe Royale Suites, Orlando, FL, USA,
802 Plenary Meeting.
• May 16-21, 2010, Shangri-La Beijing, Beijing, PRC 802 Wireless
Interim Meeting*.
Submission
Slide 61
Robert F. Heile, ZigBee Alliance
Download