Overview of MERSEA Mike Bell & Yves Desaubies The fast-track marine service for GMES The MERSEA Integrated project The MERSEA system www.mersea.eu.org IGST – Exeter - 14 November 2005 GMES – Global Monitoring for Environment and Security A joint project of European Commission and European Space Agency. First conceived in 1998 To support the monitoring needed to pursue European policies for sustainable use and protection of the environment Monitoring system includes space, in situ and modelling components Services delivering benefits are part of GMES GMES is viewed as the European level contribution to GEO Sustainability of monitoring system is a key issue www.mersea.eu.org IGST – Exeter - 14 November 2005 GMES – Fast track workshops 3 fast-track services identified for implementation by 2008 (2012): marine, land and emergency response Workshop held 27-28 October to review fast-track status of marine component Break-out sessions on: needs and requirements Implementation Sustainability (including dependence on observations) Recommendations: Implement a network of regional and global forecast systems Support for content of GMES space component programme Commission is likely to set up an Implementation Group www.mersea.eu.org IGST – Exeter - 14 November 2005 GMES Space Component Programme Two segments: Segment 1: 2006 – 2012; 200 M€ envelope; GMES-1 Segment 2: 2008-2013; 430 M€ envelope; Sentinels 5 Sentinels Sentinel 1 – C-band SAR Sentinel 3 – altimeter; wide-swath optical; “AATSR” GMES-1 – gap-filler C-band SAR; “MERIS”; “AATSR”; + ?? altimeter Programme to be presented in Berlin to ESA Ministerial early December for adoption & subscriptions www.mersea.eu.org IGST – Exeter - 14 November 2005 Policy areas marine service must support Reducing loss of life and property from natural and humaninduced disasters; Oil spills, marine safety, search and rescue, wave forecasts Understanding environmental factors affecting human health and well-being; Harmful Algal Blooms Improving management of energy resources; Offshore oil industry; wind energy Understanding, assessing, predicting, mitigating, and adapting to climate variability and change; Hurricanes, El Niño, global change www.mersea.eu.org IGST – Exeter - 14 November 2005 Policy areas marine service must support Improving weather information, forecasting, and warning; Seasonal forecasting Improving water resource management through better understanding of the water cycle; Evaporation – precipitation, Improving the management and protection of terrestrial, coastal, and marine ecosystems; Understanding, monitoring, and conserving biodiversity Marine ecosystems, deep ocean www.mersea.eu.org IGST – Exeter - 14 November 2005 The fast-track marine service for GMES The MERSEA Integrated project The MERSEA system www.mersea.eu.org IGST – Exeter - 14 November 2005 Development of a European system for operational monitoring and forecasting of the ocean physics, biogeochemistry, and ecosystems, on global and regional scales Mersea Executive Committee (Y. Desaubies, P. Bahurel, M. Bell, E. Buch, J. Johannessen, P.-Y. Le Traon, G. Manzella N. Pinardi, S. Pouliquen, R. Rayner, H. Roquet, U. Send, J.Verron), and many partners …. www.mersea.eu.org IGST – Exeter - 14 November 2005 MERSEA Integrated Project R&D project funded under 6th FP of the European Commission Thematic priority : SPACE - GMES (Global Monitoring for Environment and Security) Ocean and Marine Applications 4-year project (2004 –2008) 38 contractors, 16 countries (or Int. Org.) Coordination : IFREMER (Institut Français de Recherche pour l’Exploitation de la Mer), France ; Y.Desaubies www.mersea.eu.org IGST – Exeter - 14 November 2005 MERSEA Project Participants FDMR Cyprus Denmark DMI Germany AWI GEOB IFM/UNIV. KIEL IFM/UNIV. HAMBURG U.E JRC Greece : HCMR U-HEL ASP BOOST CLS CNRS Finland Ireland : TECHWORKS France IFREMER coordinator MERCATOR OCÉAN MÉTÉO FRANCE CNR-ISAC CNR-ISSIA CONISMA ENEA INGV OGS Italy : Netherlands : DFO [+ Canada :] www.mersea.eu.org MARIS UNIV. UTRECHT MET NO NERSC CSIC ICCM IEO IMS Norway : Spain : Turkey : UK : NERC-SOC OCEAN NUMERICS PML NERC-POL THE MET OFFICE UNIV. READING UNIV. SOUTHAMPTON ECMWF IGST – Exeter - 14 November 2005 International : MERSEA IP objectives Development of a European system for operational monitoring and forecasting of the ocean physics, biogeochemistry and ecosystems A network of regional and global systems Support for coastal systems Nowcasts, forecasts, hindcasts To build the marine component of GMES (2008) To build on expertise and systems developed in national and European programmes www.mersea.eu.org IGST – Exeter - 14 November 2005 MERSEA IP: Work Packages WP2 Develop Satellite products – P Y le Traon WP3 Develop in situ – U Send (& S Pouliquen) WP4 Develop surface flux products – H Roquet WP5 Overall system design & evaluation – P Bahurel WP6 Information system – G Manzella WP7 Research and Development of forecasting systems – J Verron WP9 Implementation and Production of forecasting systems – M Bell WP10 Downscaling – E Buch WP11 Develop applications – N Pinardi WP12 Develop services – R Rayner WP13 Capacity building & overall assessment – J Johannessen www.mersea.eu.org IGST – Exeter - 14 November 2005 The fast-track marine service for GMES The MERSEA Integrated project The MERSEA system www.mersea.eu.org IGST – Exeter - 14 November 2005 The MERSEA Integrated System ARCTIC NE Atlantic GLOBAL OCEAN www.mersea.eu.org BALTIC SEA MED SEA IGST – Exeter - 14 November 2005 An Integrated System Thematic Portals : production services Cross functions : integration, consistency, quality of services Information management : adapt product and delivery to user need Ocean Portal, Catalogue, … Standardisation, Chart, … Overall Assessment,… Monitoring, Supervision, … User Desk, … www.mersea.eu.org IGST – Exeter - 14 November 2005 Classes of service Classes of services (and user classes ): Monitoring and basic mapping; Operational forecasting; Global and main regional areas } Generic,core Downstream services Emergency response and crisis management; On-demand customized products and information To be provided by Agencies or Value adding companies, in support of their mission coastal and local systems,shore processes www.mersea.eu.org IGST – Exeter - 14 November 2005 Services and products –and delivery system, must be customized to user needs GMES input information (raw data) GMES Satellite and in situ networks Core information (ocean state) Marine Core Services User customized information (user products) Marine Downstream Services GMES Service outputs (others) www.mersea.eu.org IGST – Exeter - 14 November 2005 GMES Marine Operational Users Timetable for development Version v.0 v.1 v.2 v.3 Implementation 1st Apr 2004 1st Oct 2005 1st Apr 2007 1st Apr 2008 Two Targetted Observational Periods (TOPs) Oct 05 – Mar 06 Apr 07 – Sep 07 www.mersea.eu.org IGST – Exeter - 14 November 2005