Supplier Initiated Action Request (SIAR) Form Supplier to Submit Copy of Approved SIAR with Each Applicable Shipment Supplier Completes the Upper Section < ------------------------- > Brooks Sourcing / Location: Supplier Name SIAR1 #: ID #-YYMMDD-01 Select Location from menu Supplier ID# Supplier Contact Supplier Phone E-mail Supplier FAX (opt) Brooks Buyer Date SIAR Initiated Rev Part # Description (If CE! Applies, Please Note in Description Below) SIAR Part # Part # on Purchase Order (PO) or Upper Level Assembly Number or Brooks Product Line (if Known) Rev Description (If CE! Applies, Please Note in Description Below) Issue or Improvement Description (Include Affected / Replacement Part Numbers, Planned Change Date, Cost Impact if applicable) SIAR Type Select from Menu If this is a request for documentation If yes, for how long has the part been correction, does this correction reflect the made this way (provide date) As-Shipped part? Yes No Waiver Description (Explain Deviation from Specifications and expected duration) Waiver Requested Yes No (if Yes, Provide additional Info) Purchase Order/RFQ# PO Qty Bottom Section Completed by Brooks Additional Attachments # Files Provide Additional Comments / Photo’s Below Waiver Start Date Waiver Qty Changes Affect Fit, Form, Function Electronic Collaboration ECR Submitted (if enabled) BROOKS SIAR DISPOSITION DECISION - CE! Impact Analysis Required Prior to Approval Approved/Rejected SIAR Request Type Issue or Improvement Request Response Select from Menu Click to Select In Process EC# / Release # Required for codes (C-E) Waiver Requested Yes No Effectivity /Cut-in date Qualification Lots Only? No Waiver Request Response Approved/Rejected Click to Select Approved Waiver Duration Impact Analysis Attached Yes No Date PCN Required Additional Supplier Instructions Below Brooks Attachments Yes No # Files SIAR Approvals Responsible Engineer/Manager: 1Supplier Date: Self-Assigns SIAR ID # = Supplier ID# - Date as YYMMDD- 01 for first that day, 02 for the second, 03 etc... For assistance on entering any field, TAB to field and click F1 Key for instructions or see last page SCM100109 Rev D DCO002199 Page 1 of 2 Supplier Initiated Action Request (SIAR) Form General Notes 1) Contact your Buyer Directly (No SIAR) to request missing information, documents, or general information. 2) Contact your Buyer for SIAR Issues, status, or escalations. 3) SUBMIT SIAR’s electronically (WORD doc) to SIARSubmittals@brooks.com 4) Use a unique SIAR for each Part/Assembly affected, except for single component/issue on Multiple Assemblies, add list 5) Your Buyer is your Contact for SIAR submittal issues/status/escalations. 6) You can hit the F1 (Help) key on any entry field to get instructional information 7) You must choose a SIAR Type, and request a Waiver anytime you plan to ship any product that deviates from specification. You must receive approval prior to shipping non-conforming materials to Brooks Automation. SUPPLIER SECTION Fields (in order) Description Brooks Sourcing Location SIAR# (self entry) Supplier Name & ID Supplier Contact Name, Phone, Email, Fax Brooks Buyer Select the Brooks Division from Pull-Down list that matches your Purchase Order. Required to quickly route the SIAR Internally to the proper Brooks Engineering Group Follow instructions on at the bottom of page 1. Only one Assembly / Part Number per SIAR Exception, Single part End of Life substitution for multiple assemblies Provide ID (if unknown, contact Brooks Buyer with Supplier Name/Location) Single contact person @ supplier to receive SIAR response and answer any questions that may arise Enter the Buyer’s name associated with the affected Purchase Order (PO) SIAR Part Number Specific Part affected by SIAR, reporting to PO/Upper Level Part # Only one part number per SIAR (except Request for Information) unless for the same problem on multiple components/assemblies. Add a list of parts affected within the attachments section. Brooks reserves the right to split SIARs as determined by the responsible Engineering group. Purchase Order Part # / Upper Level Assembly Part # or Product Line (if Known) Part Number or higher level assembly number listed on the Purchase Order or the Product Line (if known). If a component SIAR affects multiple assemblies, pick one PO & attach assy list SIAR Type (Select one the following SIAR types) A) Request for Information B) Waiver Resolve Supplier difficulties understanding drawings, specifications, standards, or Bills of Materials. No approvals needed beyond SIAR Responder. Brooks approval of a Suppliers temporary deviation vs. specified requirements for materials, processes, testing, or sourcing (Brokers, Gray Market, Non-Approved Distributors) for a specific Purchase Order or length of time. The supplier shall return to the Engineering/Process Standard. C) Existing Engineering Document Change: Correction Request Existing Engineering Document, Material (BOM) or Specification correction to missing, unclear, or incorrect drawings/specifications. D) Engineering Document Change: Suggested Improvement Propose Engineering Document, material (BOM) or Spec change to improve the cost, yield or manufacturability of the part (request > 270 day pre-notification) Specify if Yield, Manufacturability, Cost, Availability or Lead/cycle Time improvement. E) End of Life (EOL) Notification Notify Brooks that a component will no longer be available. Request > 270 days notice and propose a replacement. Use Suggested improvement for all other substitution requests F) POR* –Supplier ASL Sub-Supplier Change, Manufacturing test, process or Location change Change of Sub-Tier Supplier to make Part/Assembly. Provide reason for change. Required Brooks Approval for parts identified as Critical or Supplier Lock (due to potential re-qualification). Notification to allow for re-qualification activities and planning for inventory / shipment levels. Request approval for documented Process Control Plan changes per Brooks Copy Exact CE! Expectations. Critical Parts. Request > 270 days notice. Must include cost impact as part of justification if applicable. Notify Brooks that a component will no longer be available. Request > 270 days notice and propose a replacement. Use Suggested improvement for all other substitution requests Request Existing Engineering Document, Material (BOM) or Specification correction to missing, unclear, or incorrect drawings/specifications. G) PCBA Part Substitution H) PCBA BOM Correction Issue / Improvement Description WAIVER REQUEST (Y/N) Waiver Description Purchase Order # / RFQ # PO Quantity (Qty) Ordered Waiver Quantity Waiver Start Date Changes affect fit, form, function Parallel Electronic Collaboration ECR submit Additional Comments Describe the SIAR change request, including current vs. proposed part, method, or spec. Provide change data/photo/spec/Bill of Materials/etc. as attachment. Provide requested change date, if applicable. Provide Improvement cost/benefit data. - CE! Impact Analysis Required Use to request approval to ship non-conforming materials or manufacturing/test methods, including those implementing requested or pending changes Describe actual deviation & any temporary pass/fail/maximum deviation criteria. Provide Data/Photo’s/Spec sheets etc… as attachment Shipments/Quotations affected by SIAR (RFQ = request for quote) Total Shipment Quantity on Open Purchase Order / Blanket Order Total Parts affected by Waiver Date when Waiver change starts (if not associated with a PO) THIS IS OPTIONAL. Supplier advice only…Brooks review is responsible for this analysis. THIS IS OPTIONAL Limited numbers of suppliers have direct access to Brooks Engineering system for EC drawing change requests. Check if applicable THIS IS OPTIONAL Area for additional comments or Photo Attachments.Larger files should be submitted as a separate document in the e-mail submittal *POR = Process of Record BROOKS SIAR RESPONSE SECTION SIAR Approval Codes In-Process EC/Release # Effectivity / Cut-in Date Qualification Lots Only? Waiver Start / Duration Waiver Request Response SCM100109 Rev C Information Only, Approved, Rejected. Appr-Delayed (Approved-Delay) Appr w/var (approved with variation) identifies changes that require later Brooks/Customer testing/approvals before EC release. Documents planned EC change# Planned Date for EC Implementation Qualification Lots only with Yes response. Advises if permanent EC change is dependent on testing and/or customer approval (yes-customer). Advises if non-conforming material can be sent to pending change requirements Additional response information and/or SIAR implementation instructions DCO001898 Page 2 of 2