CSR Committee Response to questions from April 24 meeting Types of Supplier Contracts with Supplier Employee on Campus at Time of Service • Delivery of Goods – Gases/Package delivery/misc supplies • Installations – Furniture/Carpet/Windows/Access Systems • Maintenance – Equipment and Systems • Services – Temps/Inspections/ HVAC Systems and Controls • Vending – Canteen Snapshot of services performed on campus, number of supplier employees & time on campus – Bank & Office (furniture design/assembly) – detail: • Product: $3,066,049 (Approx. $300K of this had bundled install and install +design) • Design: $119,037 (this equates to 2380 hours or 1.5 designers per week) • Install: $478,765 (equals 11,399 hours or 5.4 installers per week) I’ve included delivery, installation, reconfiguration, and moves in this figure – Kone (elevator maintenance) – 1 dedicated technician for the Tower – other locations as needed – weekly presence – Canteen (vending) – 2 drivers weekly – 2 techs (twice a months for 3 days/week/4 hrs) – Eden (pest control) – 1 full time employee on campus weekly (additional resources added for baiting, special projects – Xerox (copiers) – info pending – Emerald (hood cleaning) – varies – quarterly 1 – 2 on-site weekly – RFI (access control) – depending on projects – 2-5 on site weekly Examples of Facilities Related Service and Maintenance Purchases Total: $610,193 - 36 suppliers – 12 month period ending 4/30/12 2 suppliers – NC Machinery * Automatic Entries Inc $8267.25 $75,330.67 2 suppliers Assetworks Inc * InControl 31 suppliers annual $273,996.48 daily 1 supplier : Siemens $252,599.09 one time quarterly Examples of Facilities Related Service and Maintenance Purchases 36 Suppliers Supplier SIEMENS INDUSTRY INC Nature of Work Preventative Maiintenance Approximate Cost Time on campus $252,599 daily N C MACHINERY CO Test/ generator load at Foege $6,625 AUTOMATIC ENTRIES INC Preventative maintenance for automated doors Maintenance Agreement $1,643 quarterly ASSETWORKS INC quarterly $68,213 annual INCONTROL EDEN ADVANCED PEST TECHNOLOGIES SIEMENS SIEMENS INDUSTRY INC ROSE MEDIA INC Inspection and calibration of refrigeration alarms Bird Abatement Foege Bldg $7,118 annual $31,610 one time Labor and materials for programming upgrade Labor and materials for software and programming Install low voltage wiring $19,929 one time $16,232 one time $15,330 one time RICHARD SCHOENROCK NATL RESPONSE CORP Labor and Material to sandblast and clean concrete patio Biohazard waste clean up $13,549 one time $12,484 one time Examples of Facilities Related Service and Maintenance Purchases Supplier SIEMENS INDUSTRY INC Nature of Work Materials and labor to install system WELCOME RAMP Labor and materials to install SYSTEMS INC ADA ramp ELITE HARDWOOD Labor and materials to FLOORS CO refinish hardwood floor RFI ENTERPRISES INC Labor and materials to install CAAMS Access System SIMPLEX INC Labor and materials to install fuel port system with controller RFI ENTERPRISES INC Labor and maerials to install CAAMS system NATL RESPONSE CORP Labor to pump out sewer sump HERZOG GLASS INC Labor and materials to install glass CRESSY DOOR CO INC Labor and materials to install roll-up door JOHNSON CONTROLS INC Labor and materials to install and program monitoring equipment for chilled water and condenser water system. CRESSY DOOR CO INC Labor and materials to repair door assembly RFI ENTERPRISES INC Labor and material to install door controller and access control devices Approximate Cost Time on Campus $11,306 one time $10,567 one time $10,129 one time $8,736 one time $6,822 one time $6,787 one time $6,115 one time $5,634 one time $5,460 one time $5,295 one time $5,278 one time $5,033 one time Examples of Facilities Related Service and Maintenance Purchases Supplier Nature of Work NATL RESPONSE CORP Approximate Cost Labor for waste sewage clean up US DEPT OF AGRICULTURE Wildlife control - nutria $4,955 HARDIN & SONS INC $4,869 Time on Campus one time $4,951 one time Labor and material for test and balance services RFI ENTERPRISES INC Labor and material to install door controller and access control devices ALL CITY FENCE CO INC Labor and material to install chain link fence UNIQUE TOUCHUP & Labor and material to provide FINISHES INC wood refinishing service NW HANDLING SYS INC Labor and material to install lift ALL CITY FENCE CO INC Labor and material to repair fencing RFI ENTERPRISES INC Labor and materials to install CAAMS to bike storage NORTON CORROSION LTD Labor and materials to repair LLC Drumheller fountain BUSH ROED & HUTCHINGS Site Surveying and mapping INC NATL RESPONSE CORP Labor to cleanup bird waste one time $4,550 one time $4,371 one time $4,353 one time $4,090 one time $3,632 one time $3,298 one time $3,290 one time $3,285 one time $1,987 one time Examples of Facilities Related Service/Maintenance Purchases Supplier HERZOG GLASS INC EMERALD INC Nature of Work Labor and materials to install skylite glass Labor to clean boilder exhaust stack vent Commissioning Service for humidty control system Labor for bird abatement WILSON JONES COMMISSIONING LLC EDEN ADVANCED PEST TECHNOLOGIES PAC NORTHWEST Labor and materials to repair THEATRE ASSOC automated lighting system ACQUISITION WESTERN ELECTRIC SVCS Labor for service call to test INC breaker HERZOG GLASS INC Labor and materials to install elevator glass COLE INDUSTRIAL INC Labor and materials to troubleshoot and repair boiler CRESSY DOOR CO INC Labor and materials to repair roll-up door CRESSY DOOR CO INC Labor and materials to troubleshoot and repair garage door MC QUAY INTL Labor to reset service alarm on chiller NATL RESPONSE CORP Labor to decontaminate/clean heat reclaim coils Approximate Cost Time on Campus $1,974 one time $1,971 one time $1,862 one time $1,643 one time $1,643 one time $1,533 one time $1,321 one time $1,314 one time $1,095 one time $1,095 one time $1,095 one time $1,073 one time Facilities Related Service/Maintenance Purchases Supplier Nature of Work EMERALD CITY FENCE RENTALS INC ARNOLD KIRBYSON Labor and materials to install temporary fence Labor and materials to clean ceiling SUPRESSION SYSTEMS Labor to disarm and rearm INC fire protection system NORTON CORROSION LTD Labor and materials to repair LLC drumheller fountain EMERALD INC labor to clean range hood vent AUTOMATIC ENTRIES INC Labor to repair entry door Approximate Cost Time on Campus $1,038 one time $821 one time $712 one time $690 one time $570 one time $548 one time HUDSON TECHNOLOGIES Labor to provide hydrostatic CO testing of regrigeration cylinders POPPLETON ELECTRIC & Labor and materials to repair MACHINERY CO INC Ridgid Tool MARVIN JOHNSON Labor to remove bees $420 one time $329 one time $115 one time NORTHWEST DOOR INC Labor and material to install roll up steel door $7,212 one time Travel Agencies – Top Suppliers 12 Month Spend ending 4/30/12 All Suppliers: $11,345,613.23 No employees on campus • • • • • • • • • • • • • • • • • • • • Travizon Classic Connections Travel Carlson Wagonlite Tangerine Travel Ltd Lake Union Travel Turkish Airlines Sta Travel Travel Meetings Passport Tvl And Tours Inc Lake City Travel - Cruises Travel Leaders Azumano Travel AAA Travel Agency US Travel United Connection Compass Travel Scan East West Travel Los Angeles (Delta.com) Royalty Travel C&H International $1,626,871.32 $1,546,431.19 $ 914,411.64 $ 825,247.97 $ 776,844.71 $ 761,384.49 $ 601,307.31 $ 555,534.02 $ 497,645.75 $ 481,748.75 $ 379,614.99 $ 318,776.18 $ 304,176.85 $ 171,226.20 $ 161,133.72 $ 126,106.56 $ 119,961.64 $ 107,632.90 $ 98,218.71 $ 84,916.61 Temporary Service Contracts Outside Temp Agencies 12 Month Spend ending 4/30/12 • Clerical/UW Temp Services Manages - Spend: $125,159.12 - Employees on campus: 47 • Nurses - Spend: $10,876,597.07 - Employees on campus: 125 • Interpreters - Spend: $278,525.15 - Employees on campus: 52 • Subway and Pagliacci are UW franchise suppliers - Employees on campus: No dedicated franchise employees are on site other than for routine training/site visits. Staffed by UW employees - UW pays a franchise fee SPONSORSHIPS (see appendix for additonal information) Contributions in the form of money and/or in-kind products or services, by an organization to support an event, program, or department. The sponsor may be recognized for its contributions, as allowable under federal tax rules, such as appropriate signage thanking the sponsor in the supported facilities and/or written materials. Sponsorship may be exclusive for the category of goods or services involved, or multiple sponsors may be engaged in support of the event, program, or department. Sponsor Sponsorship Annual Value IMG (formerly ISP) • Coordinates sponsorships for ICA $4,500,000.00 Nike $ 955,000.00 Coke - HFS $ 535,000.00 Coke - ICA $ 265,000.00 T- Mobile $ 150,000.00 Microsoft $ 150,000.00 Seattle MINI $ 7,500.00 BECU $ 4,500.00 WSECU $ 4,500.00 Term 7/1/09 – 6/30/19 Appendix . DEPARTMENT OF ADVANCEMENT- SPONSORSHIPS Number of employees on UW campus: T-Mobile -Here for meetings regularly -4 days of activities during Dawg Daze -Worked their Dawg Dash booth -Worked their W Day booth -3 days of huskyfest -Attended the Gala -Will attend the Timeless Awards Microsoft -Here for meetings regularly -4 days of activities during Dawg Daze (some were UW students hired by MSFTto work in their booth) -Worked their Dawg Dash booth -Worked their W Day booth -3 days of HuskyFest (some were UW students hired by MSFT to work in their booth) -Attended the Gala -Will attend the timeless awards • • 2 10 4 6 10 4 4 Total 40 2 30 6 1 25 4 4 Total 72 Appendix DEPARTMENT OF ADVANCEMENT- SPONSORSHIPS Number off employees on campus Seattle MINI 3 days of Husky Fest 8 WSECU 11 day of Husky Fest 10 BECU 2 days of Husky Fest 6 ARAMARK No data. Contract not final. ICA CONTRACTS DATA (Sodexo,Coke,ISP) SODEXO CONTRACT How does the sponsorship payment work? It is not a sponsorship agreement. ICA receives a percentage of products sold Sponsorship Amount: Guaranteed commissions have averaged $680,000 year Total Contract Dollar Value: $3.4 million guarantee over the past five years Number of SODEXO employees on UW campus? Daily: 2 Monthly: 2 Annually: 2 Other: Additional employees hired for events. Concession booths are staffed by volunteers and Sodexo pays the organization or group Appendix ATHLETIC/COKE with Sponsorship How does the sponsorship payment work? Coca Cola pays our multimedia rights partner Sponsorship Amount: $265,000 year Total Contract Value: $1,325,000 Number of COKE employees on UW campus: None HFS COKE CONTRACT W/SPONSORSHIP Sponsorship Amount: $535K yr Total Contract Value: $1,920,662 yr Coke employees on UW campus daily: 4 ISP CONTRACT w/SPONSORSHIP How does the sponsorship payment work? The contract is with IMG which purchased ISP. IMG pays ICA a percentage of the net revenue from sponsorship agreements. Sponsorship Amount: $ 75% to ICA up to net revenue thresholds that vary with each year. ICA’s estimated share averages $4.5 million year. Total Contract Value: $ Estimated to be $13.5 million over three years Number of ISP employees on UW campus: Daily: 5 Monthly: 5 Annually: 5 NIKE CONTRACT w/SPONSORSHIP Effective July 1, 2009 – June 30, 2019 Sponsorship ($500K base compensation, appearances, royalty and other activities: $955,000 Total Contract Value: $3,455,000 year • Unisys Spend: – – 12 orders – 30 invoices – Total $6,299,486.90 (Includes Multi-year Maintenance)