Consultancy Services – M/s Unihorn India Pvt Ltd Monthly O&M Inspection Report No. 42/June 2014 NATIONAL HIGHWAYS AUTHORITY OF INDIA (MINISTRY OF SHIPPING, ROAD TRANSPORT & HIGHWAYS) DEPARTMENT OF ROAD TRANSPORT & HIGHWAYS (G – 5 & 6, Sect – 10, Dwarka, New Delhi – 110075) (CONSULTANCY SERVICES – M/S UNIHORN INDIA PRIVATE LIMITED) Consulting Services as Independent Engineer during Operation & Maintenance and Fee Collection of 4-Lane dual Carriageway from km. 407.100 to km. 456.100 of NH – 3 (Old NH – 1) {Jalandhar-Amritsar Section} in the State of Punjab on Build, Operate and Transfer (BOT) basis through a Concessionaire. MONTHLY OPERATION & MAINTENANACE INSPECTION REPORT NO. 42 (June 2014) CONCESSIONAIRE: M/s HEAD OFFICE JALANDHAR AMRITSAR TOLLWAYS LTD, P–2, 1st Floor, Green Park Extension, New Delhi – 110 016 SITE OFFICE JALANDHAR AMRITSAR TOLLWAYS LTD, Toll Plaza-1 at Km. 410 NH-3(Old NH1), G. T. Road, Dhilwan 144804 INDEPENDENT CONSULTANT: HEAD OFFICE M/S UNIHORN INDIA PRIVATE LIMITED, Unit No. 404, 4th Floor, IRIS Tech Park, Sector – 48, Sohna Road, Gurgaon (Haryana) – 122 002 SITE OFFICE # 584 (D – II), Housefed Complex, Nr. G T Road Bypass, New Amritsar, Amritsar–143 010 (Punjab) Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 1 Consultancy Services – M/s Unihorn India Pvt Ltd Monthly O&M Inspection Report No. 42/June 2014 CONTENTS Sr. No. Descriptions 1. Project Details 03 1.1 Executive Summary 03 1.2 Contract Details 04 - 05 1.3 Scope of Works 05 1.4 General Specifications 05 1.5 Service Roads 06 1.6 Junction (At Grade) 06 1.7 Bridges 1.8 Road Over Bridge (ROB) 08 1.9 Underpasses 09 1.10 Culverts 2. Organization Chart of Independent Consultant 12 3. Independent Consultant's Review during O&M Period 13 3.1 Traffic Sampling 13 3.2 Project Equipment 13 3.3 Service 14 3.4 Traffic Operation and Safety Requirement 14 3.5 Toll Plaza and Fees Collection System (Tollable Traffic Detail) 14 – 16 3.6 Landscaping, environmental issues and way side amenities 17 – 20 3.7 Accident Report 21 – 22 3.8 Incident of Lane Closure 23 3.9 Damage Report (Km. 407.100 To Km. 456.100) 23 3.10 Status of Encroachments Removal as on 30.06.2014 3.11 Material Modification Along With Numbers Of Test Conducted Report Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page No. 07 – 08 10 – 11 23 – 25 25 Page - 2 Consultancy Services – M/s Unihorn India Pvt Ltd Monthly O&M Inspection Report No. 42/June 2014 1. PROJECT DEAILS 1.1 Executive Summary National Highway NH -3 (Old NH-1) from Delhi to Pakistan border at Wagha is an important link passing through states of Haryana and Punjab. This link also serves some major industrial areas of Panipat, Ambala, Ludhiana, Jalandhar and holy city of Amritsar. Some of the sections between Delhi and Jalandhar have already been converted into four lane configurations. In order to provide a safe and better service to both Commercial and Defense related vehicular traffic, the National Highways Authority of India (NHAI) decided to wide four lane configurations from exiting two lane from Km 407.100 to Km 456.100 under NHDP in the districts of Kapurthala and Amritsar in the state of Punjab which includes Major & Minor Bridges, ROBs, Underpasses, Service Roads and improving junctions etc on Build, Operate and Transfer (BOT) basis. This section of road passes through urban areas like Dhilwan, Beas, Rayya and Jandiala etc. Index map of the Project Road is as below: End at Km. 456.100 Start at Km. 407.100 The Project Highway traverses through plain terrain from Chainage km 407.100 on Jalandhar side to km 456.100 at Verka Chowk, Amritsar and generally lies between latitudes 31.19 N – 31.38 N and longitudes 74.53 E – 75.78 E respectively. The climatic features highlight the variation of temperature from – 20C in winter to a maximum of 460C during peak summer and recorded normal rainfall is 813 mm. The Detailed Engineering Report was prepared by M/s ICT, New Delhi. The work awarded to M/s Jalandhar Amritsar Tollways Limited (JATL), New Delhi on 30th November 2005. JATL appointed M/s NICE, Delhi as their Structural Consultants and M/s IVRCL Infrastructure Projects Ltd., Hyderabad as EPC-Contractor. The Structural consultants M/s NICE, Delhi as appointed by JATL worked in the project initially three months and then got demobilized. NHAI has appointed M/s Consulting Engineering Services (India) Private Limited, New Delhi (CES) to act as Independent Consultants for Construction and O&M Phase for this project vide Agreement No. IC/PhIIIA/NH1/Pb/009 dated 13th April 2006. NHAI again awarded this project for O&M Phase to M/s Unihorn India Private Limited, Gurgaon to act as Independent Consultant for this project vide NHAI/BOT/11023/11/2006/23318 dated 23.11.2011 Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 3 Consultancy Services – M/s Unihorn India Pvt Ltd Monthly O&M Inspection Report No. 42/June 2014 1.2 Contract Details 4-Laning of Jalandhar-Amritsar BOT Project of NH-1 Project name : Concessionaire : Jalandhar Amritsar Tollways Limited State : Punjab Component : National Highway No. 1 Location : Dhilwan (Km 407.100) to Verka Chowk (Km 456.100) (Km 407.100 to Km 456.100) Rs 263 Crores Estimated Project Cost : (In Financial Document Rs. 237.75 Crores Original + 105.8 Crores Additional total Rs. 343.55 Crores as per the Concessionaire MPR ) Estimated Completion Date : 30th November 2008 EPC Contractor : M/s IVCRL Limited Contract Limit : Km 407.100 to Km 456.100 Contract Length : 49.000 Km Contract Location : Dhilwan to Verka Chowk State : Punjab District : Kapurthala / Amritsar Concessionaire Agreement Signed : 30.11.2005 Completion of Pre-Construction Activity : 30.05.2006 Commencement Dated : 29.05.2006 Original Completion Date : 30.11.2008 Provisional Completion Date : 29.04.2010 Original Construction Period : 30 months Revised Construction Period : 43 months Original Concession Period : 20 Years (Including Construction Period) Initial Operation & Maintenance Period : 17.5 Years Revised Operation & Maintenance Period : 16.4 Years Performance Security : 3% of Contract Price Civil Contract Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 4 Consultancy Services – M/s Unihorn India Pvt Ltd Monthly O&M Inspection Report No. 42/June 2014 Independent Consultant Contract Limit Contract Signed Commencement Date Original Contract Period : : : : : M/s Unihorn India Private Limited Operation & Maintenance - 36 months 22.11.2011 07.12.2011 36 months for O&M Period Original Contract Amount : Rs. 2,76,98,000/- Performance Security (BG No. ININ1DL11G320474 for Rs. 692,450/- : (BG No. ININ1DL11G320474 for Rs. 692,450/- being 2.5% of Contract Value valid till 31 January 2015 1.3 Scope of Works Length of Road Sector - 49 Km Completed (Km 407+100 to Km 456+100) Service Road - 14 Km Completed Culverts - 51 Nos. Completed Minor Bridge - 10 Nos. Completed Major Bridge (Including Beas Bridge) - 4 Nos. Completed Under Passes (One Double Cell) - 8 Nos. Completed ROB - 3 Nos (2 Carriageway) Completed 1 Nos (4 Carriageway) Completed Major Road Junctions - 7 Nos. Completed Toll Plazas - 2 Nos. Completed - Four Lane Divided Carriageway 2 x (7.0m + 1.5m + 2.0m shoulder) 1.4 General Specifications Main Road wide separated by 4.5m wide median Design Speed - 100 kmph Cross slope - 2.5% Maximum Super Elevation - 5% Service Road (Carriageway) - 5.5 / 7.0 m Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 5 Consultancy Services – M/s Unihorn India Pvt Ltd Monthly O&M Inspection Report No. 42/June 2014 1.5 Service Roads Service roads provided at the followings stretches. Location SL NO Length (m) Width (m) Side 409+320 420 7.00 LHS Dhilwan (New ) 409+050 409+320 270 7.00 RHS Dhilwan (New ) 3 413+380 414+565 1185 7.00 LHS Beas (Urban) 4 413+650 414+400 750 7.00 RHS Beas (Urban) 5 417+250 418+680 2860 5.50 LHS&RHS Umranangal (Semi Urban) 6 419+400 420+260 1720 7.00 LHS&RHS Rayya (Urban) 7 425+500 426+350 1700 7.00 LHS&RHS Khalchian (Urban) 8 430+500 431+100 600 7.00 RHS Tangra (Urban) 9 438+600 439+650 1050 7.00 LHS Jandiyalaguru (Urban) 10 438+750 439+650 900 7.00 RHS Jandiyalaguru (Urban) 11 448+300 449+050 1500 5.50 LHS&RHS Daburji ( Semi Urban) 12 452+320 453+000 680 7.00 RHS Walla ( New ) 13 452+400 453+000 600 7.00 LHS Walla ( New ) From (Km+m) To (Km+m) 1 408+900 2 Total 14235 Remark (5.5m Width – 4360m & 7.0m Width – 9710m) 1.6 Major Junction (at grade)– Major Junctions (at grade) provided at following locations: Sl. No. Location (New Chainage) Name of Junction 1. Km. 413.630 Beas 2. Km. 416.775 Batala 3. Km. 440.875 Taran Taran 4. Km. 449.530 Bypass 5. Km. 452.200 Mehata Chowk 6. Km. 452.400 Vallah Chowk 7. Km. 455.800 Verka Chowk Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 6 Consultancy Services – M/s Unihorn India Pvt Ltd Monthly O&M Inspection Report No. 42/June 2014 1.7 Bridges Details of Major and Minor Bridges Sr. No. Structure New Constructed Type of Structure Span Arrangements Length of Structure (in mtr) Chainage Remarks Existing Type of Structure Span Arrangements Length of Structure (in mtr) RCC Slab over PSC Girder 1x10.04.14x37.81.1x3 1.953.1x10.40 581.73 2-lane 5x20.00 100.00 2-lane 2x16.532.2x15.746 64.556 2-lane I. Major Bridges 1 2 3 4 413/1 (Beas) 412+294 RCC Slab over PSC Girder 2x6.8+15x37.81 580.75 415/4 (Dera Baba Jaimal Singh bridge) 414+644 RCC T-Beam and Slab 5x19.87 99.35 434/1 (Patti nallah bridge 433+523 RCC T-Beam and Slab 447/1 (Kasur nallah bridge) RCC T-Beam and Slab 4x15.72 62.88 (Skew 38) RCC T-Beam and Slab 446+049 RCC T-Beam and Slab 6x13.5 81 PSC Voided Slab 3x27.00 81.00 2-lane II. Minor Bridges 1 409/1 408+081 RCC T – Beam and Slab 2x20 40.00 RCC T – Beam and Slab 2x20 40.00 4-lane 2 421/4 420+476 RCC T – Beam and Slab 1x28.397 28.397 RCC Slab over PSC Girders 1x28x397 28.397 4-lane 3 421/6 420+618 RCC Solid Slab 1x11.216 (Skew) 8.45 Box Bridge 1x11.216 (Skew) 11.216 4-lance Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 7 Consultancy Services – M/s Unihorn India Pvt Ltd Monthly O&M Inspection Report No. 42/June 2014 4 428/1 427+072 RCC Solid Slab (Khalchian drain) 4x7.00 28.00 RCC Solid Slab 4x7.00 28.00 2-lane 5 428/2 427+123 Arch Bridge 1x10.70 10.0 Box Bridge 1x10.70 10.70 4-lane 436+609 Arch Bridge 1x36.50 (Skew) 9.75 RCC Slab Over PSC Girders 1x36.50 (Skew) 36.50 4-lane 437/1 6 (Kasurcanal bridge) 7 443/2 442+067 RCC Solid Slab 1x27.00 28.32 PSC Voided Slab 1x27.00 27.00 4-lane 8 447/2 446+466 RCC Solid Slab 1x7.02 7.00 Box Bridge 1x7.02 7.02 2-lane 9 453/1 452+258 RCC, T – Beam & Slab 1x10.02 10.02 Box Bridge 1x10.02 10.02 6-lane 10 453/2 452+300 RCC T-Beam and Slab 3x15.14 45.42 RCC T-Beam and Slab 3x15.50 45.50 3-lane 1.8 Road Over Bridge (ROB) Details of ROBs Sr. No. Structure 1 409/2 2 New Constructed Type of Structure Span Arrangements Length of Structure (in mtr) 408.500 RCC Slab over steel girders 1x36.423.1x45.77 (Skew) 68.97 RCC Slab over PSC girders 1x36.423.1x45.77 (Skew) 82.193 4-lane 416/1 415.208 RCC Solid Slab 1x10.90 (Skew) 10.90 RCC Slab over PSC girders 1x37.05 (Skew) 37.05 2-lane 3 452/1 451.273 RCC Slab over steel girders 1x12.90 (Skew) 12.90 RCC Slab over PSC girders 1x27.79 (Skew) 27.79 2-lane 4 456/2 455.686 RCC Slab over steel girders 1x6.75 6.75 RCC Slab over PSC girders 1x23.10 23.10 2-lane Chainage Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Type of Structure Span Arrangements Length of Structure (in mtr) Remarks Existing Page - 8 Consultancy Services – M/s Unihorn India Pvt Ltd Monthly O&M Inspection Report No. 42/June 2014 1.9 UnderpassesDetails of Underpasses New Constructed Sr No Structure Chainage Type of Structure Span Arrangements Length of Structure (in mtr) Type of Structure Span Arrangements Length of Structure (in mtr) 1 410/1 (Dhilwan) 409+050 - - - Box 1x7.00x3.80 7.00 2 415/1 (Beas) 414+120 - - - Box 1x10.00x3.80 10.00 3 415/2 (Beas – Dera) 414+565 - - - Box 2x10.00x3.80 20.00 4 420/1 (Rayya) 419+765 - - - Box 1x7.00x3.80 7.00 5 426/3 (Khalchian) 425+950 - - - Box 1x7.00x3.80 7.00 6 440/1 (Jandiala village) 439+100 - - - Box 1x7.00x3.80 7.00 7 448.675 (Daburje) 448+675 - - - Box 1x7.00x3.80 7.00 8 453/7 (Vallah) 452+710 - - - Box 1x7.00x3.80 7.00 Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 9 Remarks Existing Consultancy Services – M/s Unihorn India Pvt Ltd Monthly O&M Inspection Report No. 42/June 2014 1.10 Culverts – Details of Culverts Sl No Structure No. Chainage Type Size (m) Type of Construction 1 410/2 409+275 B 1.2x1.2 RE Construction 2 410/3 409+463 1x1.0 New Construction 3 411/1 410+207 1.2x1.2 RE Construction 4 413/2 412+900 2x0.9 New Construction 5 414/1 413+100 B 2.0x2.0 RE Construction 6 414/2 413+632 B 1.5x1.5 New Construction 7 418/1 417+483 S 5.25 New Construction 8 419/1 418+190 1x1 New Construction 9 420/1 419+000 S 1.5 New Construction 10 421/1 420+322 B 1.5x1.2 RE Construction 11 421/2 420+425 S 4.0 RE Construction 12 421/3 420+443 B 4.0 RE Construction 13 421/5 420+520 B 2.0x1.2 RE Construction 14 421/7 420+900 1x1 New Construction 15 422/1 421+900 1x1 New Construction 16 423/1 422+400 1.2x1.2 New Construction 17 424/1 423+400 1x1 New Construction 18 425/1 424+277 B 1.5x1.2 New Construction 19 426/1 425+075 B 1.5X1.2 RE Construction 20 426/2 425+510 1x1 New Construction 21 427/1 426+490 1.5X1.2 New Construction 22 428/3 427+700 1x1 New Construction 23 429/1 428+500 1x1 New Construction 24 430/1 429+000 1x1 New Construction 25 430/2 429+600 1x1 New Construction 26 433/1 432+800 1.2x1.2 New Construction B B B B Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Remarks Page - 10 Consultancy Services – M/s Unihorn India Pvt Ltd Monthly O&M Inspection Report No. 42/June 2014 Sl No Structure No. Chainage Type Size (m) Type of Construction 27 435/1 434+494 S 3 RE Construction 28 438/1 437+400 B 2x(1.5x1.5) New Construction 29 440/2 439+230 1x1 New Construction 30 442/1 441+100 1x1 New Construction 31 442/2 441+363 B 2x(2x1.2) RE Construction 32 443/2 442+780 B 1.2x1.2 New Construction 33 444/1 443+845 B 3x1.2 RE Construction 34 445/1 444+700 B 2x (2x1.2) RE Construction 35 448/1 447+177 2x(1.5x1.2) New Construction 36 449/1 448+210 5 RE Construction 37 449/2 448+625 2x (2x1.2) RE Construction 38 450/1 449+070 2x(1.5x1.5) RE Construction 39 450/2 449+693 1x1 RE Construction 40 451/1 450+602 1x1 RE Construction 41 451/2 450+920 1x0.6 RE Construction 42 452/2 451+906 1x1 New Construction 43 453/3 452+370 3x1.2 RE Construction 44 453/4 452+435 1x1 RE Construction 45 453/5 452+484 B 2x1.2 RE Construction 46 453/6 452+696 B 1.2x1.2 RE Construction 47 453/8 452+765 B 1.5x1.2 RE Construction 48 453/9 452+965 B 1.2x1.2 RE Construction 49 454/1 453+254 S 2 RE Construction 50 456/1 455+140 B 1.2x1.2 RE Construction 51 457/1 456+037 S 6 Widening Legend: - S - Slab B - Box - Pipe S B Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Remarks Page - 11 Consultancy Services – M/s Unihorn India Pvt Ltd Monthly O&M Inspection Report No. 42/June 2014 2 ORGANIZATION CHART OF INDEPENDENT CONSULTANT MR G. S. Gill TEAM LEADER CUM SR. HIGHWAY ENGINEER Mr. N Dharamrajan Mr. Ajay Singh Col (Retd) Dharampal Senior Pavement Specialist Financial Expert Legal Expert Mr. Aniruddha Swami Bridge Engineer PROPOSED for balance 08 months Mr. Praveen Kr. Jain TBN Mr. Harbans Singh Quality / Material Engineer Traffic & Transport Engineer Asstt Highway Engineer Mr. Satish Kr Verma Mr. C. S. Thakur (Additional Staff under COS for Grade Separator) (Additional Staff under COS for Grade Separator) Asstt Bridge Engineer Quantity Surveyor Survey Engineer Mr. Anil Kumar Mr. Vikash Sharma Office Manager cum Accountant Secretary cum Computer Operator Mr. Mangat Singh Office Boy Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 12 Consultancy Services – M/s Unihorn India Pvt Ltd Monthly O&M Inspection Report No. 42/June 2014 3 INDEPENDENT CONSULTANT'S REVIEW DURING O&M PERIOD: IC’s responsibility during O&M Phase has been clearly mentioned vide Clause 3.3 along with sub causes 3.3.1 to 3.3.8. Reporting criteria has been en-framed in Clause 5 ©, Page O 16 of CA VOL II during O&M Phase. Monthly reporting requirement is envisaged covering all aspects of O&M, Toll Booths, Bridges or other structures, Traffic Management and Safety, Telephone and Ambulance etc. This monthly report for O&M period (June 2014) has been prepared maintaining inline of guidance as depicted above. 3.1 Traffic Sampling (Vide Schedule P of Page P1 Concession Agreement VOL II): As Independent Consultant is authorized / obligated vide Clauses referred above to undertake traffic sampling for the purpose of determination and / or verification of the actual traffic plying on project highways, Automatic Traffic Count cum Classifier is to be procured by Concessionaire earlier i. e. as ensured by Concessionaire vide letter no 3198 dated 02.02.2011by 25.02.2011.In compliance to the Schedule – P of Concession Agreement, Concessionaire mobilized IRD (CANADA) make Automatic Traffic Count – cum – Classifier and had put up the same on trial for two days in June 2011 but subsequently it was found that the equipment is lacking from proper functioning and needs repair / replacement. The replacement of Calibrated Equipment is being placed at site from 1st week of July 2011. Traffic Sampling / Recording System (TRS) conducted by Concessionaire in presence of IC at Km. 416.500 from date 22.12.2011 to 25.12.2011 as per Schedule – P of Concession Agreement Vol II and next has been done in the month of June 2012 from Km. 407.100 to Km. 456.100. 3.2 Project Equipment (Independent Consultant’s Involvement is validated vide Clause 3.3.3, Page O – 14 Under Head of IC’s TOR of Concession Agreement Vol – II): IC's review is based on the list of Equipments as submitted by the Concessionaire Sl. No. Particulars Numbers Review of IC At present, only one water tanker is in working order for watering This is very much insufficient during this Hot dry weather & as already asked for vide our letter no. Unihorn/Jal-Asr/O&M/W29&30/513, dated 05.03.2013, that 2 no. additional water tankers should be put in to service for watering the plants to save them from severe hot wave. More tractors are required depending on nature of emergency situation arise. 1 Water Tankers 4 2 Tractors 2 3 JCB 1 More JCBs are required depending on nature of emergency situation arise. 4 Bolero/Camper 1 - 5 Roller 1 - 6 Motor Cycle 2 - 7 Hydra 1 8 Recovery Van 1 9 Ambulance 1 Recovery Van, Ambulance and Patrolling Vehicles have been painted in 20cm wide and white diagonal strips on entire properly as per latest guidelines provided by NHAI circular vide letter no. 640 dated 30.06.2011. 10 Patrolling Vehicle 1 Electrically Illuminated board measuring 30 cm by 100cm fixed on top of the vehicle with text “Highway Patrol”, “Highway Ambulance” and “Highway Crane “ on both sides which can be viewed by Vehicles moving in both directions and prominently displayed / painted on all the four sides of the vehicle. “NHAI” have written on all the four sides of the Vehicle Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 13 Consultancy Services – M/s Unihorn India Pvt Ltd Monthly O&M Inspection Report No. 42/June 2014 3.3 Service (Independent Consultant’s Involvement is validated vide Clause 3.3.3, Page O – 14 Under Head of IC’s TOR of Concession Agreement Vol – II): Independent Consultant opines that the Concessionaire shall operate and maintain the Project Highway by itself, or through O&M Contractors and if required, modify, repair or otherwise make improvements to the Project Highway to comply with Specifications and Standards, and other requirements set forth in this Agreement. Effective toll systems are specifically required maintaining Good Industry Practice, Applicable laws / Permits, manufacturer’s guidelines and instructions to be followed setforth in the agreement. 3.4 Traffic Operation and Safety Requirement (Independent Consultant’s Involvement is validated vide Clause 3.3.8, Page O – 14 Under Head of IC’s TOR of Concession Agreement Vol – II): Independent Consultant is effective by minimizing disruption to traffic in the event of accidents or other incidents affecting the safety and use of the Project Highway by providing a rapid and effective response and maintaining liaison procedures with emergency services. The Concessionaire's adherence to the safety standards set out in Schedule ‘S’ are strictly complied with in the event of any lane closure or diversion of traffic. Compliance with Schedule ‘S’ gets monitored by the Independent Consultant and a breach by the Concessionaire of its obligations in respect of this Schedule identified by the Independent Consultant gets notified immediately and is required to be cured within 24 hours of its notification notwithstanding inspection, reporting procedures outlined elsewhere in this Agreement. In addition, each notified breach shall lead to the award of a penalty point to the Concessionaire. A total of five penalty points in any continuous period of 365 days shall constitute a Material Breach of this Agreement. 3.5 Toll Plaza and Fees Collection System (Independent Consultant’s Involvement is validated vide Clause 3.3.3, Page O – 14 Under Head of IC’s TOR of Concession Agreement Vol – II): Concessionaire is charging / collecting and retaining the Fees in accordance with the Agreement by refurbishment of tolling system and hardware and other equipment. The revised rate of Toll Collection Fee commencing w.e.f 01 st Sept 2013 at Toll Plaza 1&2 along with substance of Gazette Notification no. S.O. 1592(E) dated 30.06.2009 was got published for the information in two local Newspapers i. e. "The Tribune" in English and "Daily Jagbani" in Punjabi language both on dated 29.08.2013 as follows: Sr No Particulars Car LCV Truck / Bus Multi Axle Vehicle (>2 Axles) EME / HCM 1 Fee for the Traffic Crossing any one Plaza 23.00 41.00 82.00 132.00 176.00 2 Fee for the Local Personal Traffic 6.00 - - - - 3 Fee for the Local Commercial Traffic 12.00 20.00 41.00 66.00 88.00 4 Fee for Multiple Journey within a day for each Plaza 35.00 61.00 123.00 198.00 263.00 5 Fee for Monthly Passes for Frequent Journey for each Plaza 702.00 1229.00 2459.00 3951.00 5268.00 Remarks Details is being submitted as “Monthly Audit Report on Traffic – June 2014” Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 14 Consultancy Services – M/s Unihorn India Pvt Ltd Monthly O&M Inspection Report No. 42/June 2014 IC presents the monthly tollable traffic statement for both the toll plazas as submitted by the Concessionaire: Grand Total of Traffic at Toll Plaza – 1 Earth moving Light Multi Axle Car, Passenger equipments and Date Commercial Truck/Bus Vehicle Van or Jeep heavy construction Vehicle (>2 axle) machinery Grand Total 1-June-14 11576 2268 1328 676 2 15850 2- June-14 9792 2327 1664 764 0 14547 3- June-14 9422 2403 1711 790 3 14329 4- June-14 9663 2646 1691 728 8 14736 5- June-14 9410 2766 1721 794 9 14700 6- June-14 9506 2522 1720 775 3 14526 7- June-14 10419 2513 1735 781 1 15449 8- June-14 11569 2341 1328 689 5 15932 9- June-14 9850 2367 1614 753 5 14589 10- June-14 9539 2836 1713 760 6 14854 11- June-14 9941 2602 1759 764 8 15074 12- June-14 9899 2645 1821 772 6 15143 13- June-14 12358 3155 1801 754 10 18078 14- June-14 14985 2949 1689 744 6 20373 15- June-14 17724 3105 1539 575 2 22945 16- June-14 10342 2474 1665 674 2 15157 17- June-14 9355 2386 1624 723 3 14091 18- June-14 10030 2394 1675 787 0 14886 19- June-14 9769 2655 1741 776 5 14946 20- June-14 10109 2402 1883 727 5 15126 21- June-14 11038 2285 1769 757 3 15852 22- June-14 12498 2160 1334 675 3 16670 23- June-14 10303 2146 1771 712 11 14943 24- June-14 9773 2386 1801 825 1 14786 25- June-14 10242 2562 1751 762 4 15321 26- June-14 10447 2416 1794 836 4 15497 27- June-14 11630 2451 1724 796 2 16603 28- June-14 11883 2540 1721 695 2 16841 29- June-14 13585 1917 1505 559 6 17572 30- June-14 10445 2402 1630 563 5 15045 Total 327102 75021 50222 21986 130 474461 Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 15 Consultancy Services – M/s Unihorn India Pvt Ltd Monthly O&M Inspection Report No. 42/June 2014 Grand Total of Traffic at Toll Plaza –2 Earth moving Date Car, Light Passenger Commercial Van or Jeep Vehicle Truck/Bus Multi Axle equipments and Vehicle heavy (> 2 axle) construction Grand Total machinery 1-June-14 12454 1826 1219 510 8 16017 2- June-14 11794 2075 1322 571 3 15765 3- June-14 8402 1787 1058 532 2 11781 4- June-14 9537 1966 1091 548 2 13144 5- June-14 9611 1907 1252 530 5 13305 6- June-14 9463 1830 1046 527 7 12873 7- June-14 10850 1931 1138 539 4 14462 8- June-14 10910 1714 930 506 5 14065 9- June-14 9854 1758 1058 633 6 13309 10- June-14 9505 2155 1156 581 6 13403 11- June-14 10162 2036 1217 556 2 13973 12- June-14 9637 1899 1146 620 6 13308 13- June-14 10329 2030 1125 715 10 14209 14- June-14 12208 1921 1042 532 5 15708 15- June-14 12102 1630 886 616 4 15238 16- June-14 10391 1744 1035 584 0 13754 17- June-14 9541 1881 987 623 4 13036 18- June-14 9931 1871 1001 617 7 13427 19- June-14 9773 1961 1166 564 3 13467 20- June-14 10194 1782 1167 642 7 13792 21- June-14 10877 1870 1119 595 2 14463 22- June-14 11643 1594 992 488 7 14724 23- June-14 10594 1753 1221 520 3 14091 24- June-14 10263 1844 1211 572 6 13896 25- June-14 10189 1882 1155 558 3 13787 26- June-14 10159 1884 1214 587 1 13845 27- June-14 10974 1990 1111 657 7 14739 28- June-14 11389 1879 1089 603 2 14962 29- June-14 12707 1467 1037 496 1 15708 30- June-14 10834 1800 1117 496 5 14252 1-June-14 316277 55667 33308 17118 133 422503 Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 16 Consultancy Services – M/s Unihorn India Pvt Ltd Monthly O&M Inspection Report No. 42/June 2014 3.6 Landscaping, Environmental issues and Way Side Amenities: (IE’s Involvement is validated vide Clause 3.3, Page O – 14 Under Head of IC’s TOR of Concession Agreement Vol – II): Landscaping / horticultural, environmental issue and way side amenities maintenance and also upkeep of all Project Assets in good order / working condition are being carried out by Concessionaire on routine basis and reports are being submitted to NHAI by 15th and by 30th /31st end of every month positively From 01.06.2014 to 15.06.2014 SUMMARY STATEMENT FORTNIGHT REPORT ON ROAD AESTHETICS WORKS (MEDIAN AND AVENUE PLANTATION) Median Plantation Avenue Plantation 14 15 16 17 18 19 20 0.000 0 49.000 24210 407.100 456.100 49.000 2000 0 0 0 To Total Km Jalandhar 1 407.100 456.100 49.000 24210 0.000 Total No. of Plants From 7 21 22 23 24 Median Avenue 25 Eucalyptus,tali, Neem,Peppal,K ikker,Mango,Pu tranjiva Total Km 13 6 17+2 1 Kaner ,Ficus & Bouganvalia To 12 5 Cumutative No. of Plants From 11 4 16+2 0 2000 Total Km 10 3 Total (Km.) upto 15.06.2014 To 9 2 Chainage 49.000 From 8 1 Chainage Total No. of Plants Cumutative No. of Plants upto 15.06.2014 7+11 Completed as on 31.05.2014 (in Km.) 0 Total No. of Plants Total (Km) upto 15.06.2014 Total Km 6+10 Chainage 1 Chainage New Plantation done after 01.06.2014 and upto 15.06.2014 (In Km) To New Plantation done after 01.06.2014 and upto 15.06.2014 (In Km) Completed as on 31.05.2014 (in Km.) Remarks (Name of Plant) 0.000 NH No. From PIU/ CMU Total No. of Plants SUMMARY STATEMENT FORTNIGHT REPORT ON ROAD AESTHETICS WORKS (SIGNAGES AND LANDSCAPING WORKS) Chainage in Km Signages as per IRC : 67 Gantry Mounted Shoulder Mounted Total No. of spots Area in sqm No. of spots Area in sqm No. of spots Area in sqm Total upto 15.06.2014 Total 1 6 New Installation (01.06.2014 to 15.06.2014) Total Jalandha r 5 As on 31.05.2014 Shoulder Mounted 1 4 Total upto 15.06.2014 Gantry Mounted 3 Total 2 To 1 From NH No. 407.10 0 456.10 0 PIU/CMU Gantry Mounted Shoulder Mounted New Installation (01.06.2014 to 15.06.2014) As on 31.05.2014 SN Landscape Works 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 49 S N 3 587 590 0 0 0 3 587 590 1 1256 0 0 1 1256 Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 17 Remarks 22 Consultancy Services – M/s Unihorn India Pvt Ltd Monthly O&M Inspection Report No. 42/June 2014 SUMMARY STATEMENT FORTNIGHT REPORT DEBRIS REMOVAL, ROW ENCROACHMENT AND CLEANLINESS Cleanliness of kerbs/carriageway/central verge achieved Encroachment removal Chainage (Km.) Debris Removal Upto on 31.05.2014 NH No. Upto on 31.05.2014 After 31.05.2014 upto 15.06.2014 (in Kms) Total In Kms) as on 15.06.2014 Total as on 15.06.2014 (in Km.) Total Upto on 31.05.2014 After 31.05.2014 upto 15.06.2014 (in Kms) To PIU Total as on 15.06.2014 (in Km.) From SN After 31.05.2014 upto 15.06.2014 (in Kms) Nos. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 Jalandhar 1 407.100 456.100 49.000 339.48 5.00 344.48 2900 11049 0 0 2900 11049 316.85 5.00 321.85 Chianage From To Total length 427.250 429.750 2.50 Description Debris Removal 452.100 454.600 2.50 0.000 0.000 0.00 Total Area Nos. Area Nos. Area Length in Kms Length in kms length in kms Chainage Cleanliness of kerbs/carriageway/central verge achieved To 453.550 456.050 2.500 415.500 418.000 2.500 0.000 0.000 0.000 Total 5.00 Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab From Total Length Description Page - 18 5.00 Consultancy Services – M/s Unihorn India Pvt Ltd Monthly O&M Inspection Report No. 42/June 2014 From 15.06.2014 to 30.06.2014 SUMMARY STATEMENT FORTNIGHT REPORT ON ROAD AESTHETICS WORKS (MEDIAN AND AVENUE PLANTATION) Median Plantation Avenue Plantation 14 15 16 17 18 19 20 0 49.000 24210 407.100 456.100 49.000 2000 0 0 0 To Total Km Jalandhar 1 407.100 456.100 49.000 24210 0.000 Total No. of Plants From 7 21 22 23 24 Median Avenue 25 Eucalyptus,tali, Neem,Peppal,K ikker,Mango,Pu tranjiva Total Km 13 6 17+2 1 Kaner ,Ficus & Bouganvalia To 12 5 Cumutative No. of Plants From 11 4 16+2 0 2000 Total Km 10 3 Total (Km.) upto 30.06..2014 To 9 2 Chainage 49.000 From 8 1 Chainage Total No. of Plants Cumutative No. of Plants upto 30.06.2014 7+11 Completed as on 15.06.2014 (in Km.) 0 Total No. of Plants Total (Km) upto 30.06.2014 Total Km 6+10 Chainage 1 Chainage 0.000 Completed as on 15.06.2014 (in Km.) Remarks (Name of Plant) New Plantation done after 15.06.2014 and upto 30.06.2014 (In Km) To New Plantation done after 15.06.2014 and upto 30.06.2014 (In Km) 0.000 NH No. From PIU/ CMU Total No. of Plants SUMMARY STATEMENT FORTNIGHT REPORT ON ROAD AESTHETICS WORKS (SIGNAGES AND LANDSCAPING WORKS) Chainage in Km Signages as per IRC : 67 Total Gantry Mounted Shoulder Mounted Total No. of spots Area in sqm No. of spots Area in sqm No. of spots Area in sqm 1 6 Total upto 30.06.2014 Total Jalandha r 5 As on 15.06.2014 Shoulder Mounted 1 4 Total upto 30.06.2014 New Installation (15.06.2014 and upto 30.06.2014) Gantry Mounted 3 Total 2 To 1 From NH No. 407.10 0 456.10 0 PIU/CMU Gantry Mounted Shoulder Mounted New Installation (15.06.2014 and upto 30.06.2014) As on 15.06.2014 SN Landscape Works 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 49 S N 3 587 590 0 0 0 3 587 590 1 1256 0 0 1 1256 Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 19 Remarks 22 Consultancy Services – M/s Unihorn India Pvt Ltd Monthly O&M Inspection Report No. 42/June 2014 SUMMARY STATEMENT FORTNIGHT REPORT DEBRIS REMOVAL, ROW ENCROACHMENT AND CLEANLINESS Cleanliness of kerbs/carriageway/central verge achieved Encroachment removal Chainage (Km.) Debris Removal Upto on 15.06.2014 NH No. To Total Upto on 15.06.2014 After 15.06.2014 and upto 30.06.2014 (in Kms) Total In Kms) as on 30.06.2014 PIU From SN Nos. 1 2 3 4 5 6 7 8 9 10 1 Jalandhar 1 407.100 456.100 49.000 344.48 8.00 352.48 Chianage Debris Removal From To 429.750 433.750 4.00 430.000 0.000 434.000 0.000 Total as on 30.06.2014 (in Km.) Total as on 30.06.2014 (in Km.) Area Nos. Area Nos. Area Length in Kms Length in kms length in kms 11 12 13 14 15 16 17 18 2900 11049 0 0 2900 11049 321.85 4.50 326.35 4.00 From To Total Length 418.000 420.250 2.250 430.000 432.250 2.250 0.000 0.000 0.000 Description Cleanliness of kerbs/carriageway/central verge achieved 0.00 Total Total Upto on 15.06.2014 After 15.06.2014 and upto 30.06.2014 (in Kms) Chainage Total length Description After 15.06.2014 and upto 30.06.2014 (in Kms) 8.00 Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 20 4.50 Consultancy Services – M/s Unihorn India Pvt Ltd Monthly O&M Inspection Report No. 42/June 2014 Nil 1Fine Car 0 1 0 No. of Animals killed if any 1Straig ht Road Non Injured H Minor G Grievous F No. of Affected Person Fatal E 4- Four lane or more with divider Vehicle responsible 8- Others 2Grievous Injury 4 - Fault of Driver of Motor Vehicle / driver of other vehicle / cyclist / pedestrian / passenger 4 - Fault of Driver of Motor Vehicle / driver of other vehicle / cyclist / pedestrian / passenger Weather Condition Causes 8- Others 2Grievous Injury, 1 Minor Injured 2 - Over speeding Intersection Type and Control Classification of Accident 4 - Collision Brush / Side Wipe 2Grievous Injury, 3 Minor Injured, 4 - Non Injury Road condition Nature of Accident 2 - Over speeding Road Failure Accident Locations Km-424+760 RHS 2Grievous Injury Km-440.855 LHS 4 - Collision Brush / Side Wipe Km-410+760 RHS D Km.407.120 RHS 10:45 PM C 6:20 AM 5-Jun-14 Month: June- 2014 B 1:10 PM 4 NH - 1 A 4:15 AM 3 6-Jun-14 2 8-Jun-14 1 Dat e 14-Jun-14 Sr. No. Time of Accident National Highway No.: Help Provided by Ambulance/tr auma Vehicle / Patrolling 0 Ambulance / Route Patrol Vehicle Car Coming from Amritsar in full speed, Car driver hit the Bike rider flew away. The Bike Rider fallen down. Bike Rider got serious injury shifted to Amritsar Amandeep Hospital. Remarks 3.7 ACCIDENT REPORT 4- Four lane or more with divider 1Straig ht Road 1-TJunctio n 1Fine, Car 0 1 2 0 0 Ambulance / Recovery Van Car struck with LCV. Car coming from Taran Taran side and tried to took right turn for Jalandhar side in the mean time one LCV coming from Jalandhar side got struck with Car. Car driver got serious injury and co-passenger got minor injury, shifted to Guru Ramdass Hospital Amritsar. Call recieved from Jandiala Police Station to Helpline no. 4- Four lane or more with divider 1Straig ht Road Nil 1Fine, Bike 0 2 1 0 0 Ambulance / Route Patrol Vehicle Bike struck with median Kerb due to Fent, Two no. got serious injury and one child got minor injury, injurds shifted to Dera Beas Hospital 4- Four lane or more with divider 1Straig ht Road Nil 1Fine, Ambulance Auto hit the women while she was standing at shoulder side, Three nos. got serious injury. Two nos. shifted to SGL Hospital Subhanpur & lady Shifted to Dera Beas Hospital Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Auto 0 3 0 Page - 21 0 2:30 PM Km-417.870 LHS 1Overturning 5:40 PM Km-410.433 LHS 6 22-Jun-14 5 16-Jun-14 Consultancy Services – M/s Unihorn India Pvt Ltd Monthly O&M Inspection Report No. 42/June 2014 4 - Collision Brush / Side Wipe 3 - Minor Injured 2Grievous Injury 2 - Over speeding 4- Four lane or more with divider 1Straig ht Road Nil 1Fine, Car 0 1 0 0 0 Ambulance / Recovery Car struck with the truck while overtaking. Car driver got minor injury, shifted to Anand Hospital Rayya 2 - Over speeding 4- Four lane or more with divider 1Straig ht Road Nil 1Fine, Car 0 3 0 0 0 Ambulance Car struck with Bike. Three nos. serious injured, shifted to Guru Nanak Hospital Amritsar 0 11 3 0 0 - Total A. Urban / Rural and Details of Surrounding Landuse. B 1- Overturning, 2- Head in Collision, 3- Rear End Collision, 4 - Collision Brush / Side Wipe, 5 - Right Turn Collision, 6 - Skidding, 8- Others C 1- Fatal, 2 – Grievous Injury, 3 - Minor Injured, 4 - Non Injury D 1- Drunken, 2 - Overspeeding, 3 - Vehicle out of Control, 4 - Fault of Driver of Motor Vehicle / driver of other vehicle / cyclist / pedestarian / passenger, 5 - Defect in Mechanical Condition of motor Vehicle / road condition. E 1- Single lane, 2 - Two Lane, 3- Three lane or more without central divider (Median) 4- Four lane or more without divider F 1 - Straight Road, 2 - Slight Curve, 3 - Sharp Curve, 4 - Flat Road, 5 - Gentle Incline, 6 - Steep Incline, 7 - Hump, 8 - Dip G 1 - T - Junction, 2- Y - Junction, 3 - Four Arm Junction, 4 - Staggered Junction, 5 - Junction with more than 4 arms, 6 - Roundabout Junction, 7 - Manned rails Crossing, 8 - Unmanned Rail Crossing H 1 - Fine, 2 - Mist / Fog, 3- Cloudy, 4 - Light Rain, 5 - Heavy Rain, 6 - Hail / Sleet, 7 - Snow, 8 - String Wind, 9 - Dust Strom, 10 - Very Cold, 11 - Very Cold, 12 - Other extraodinary Weather condition. 4* Traffic has been put both way in same caiirageway due to temporary blockage of other carriageway for construction purpose. Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 22 Consultancy Services – M/s Unihorn India Pvt Ltd Monthly O&M Inspection Report No. 42/June 2014 3.8 INCIDENT OF LANE CLOSURE Sr. No. Date & Time Chainage No Lane Closed Direction From To Total Time (In Min / Hours) Reasons 3.9 DAMAGE REPORT (Km. 407.100 To Km. 456.100) Sl. NO. Date Chainage No. Direction Damaged Items Remarks 3.10 Status of Encroachments Removal as on 30.06.2014 Removal of Hoardings put up by the Political Parties and Commercial Organization on National Highway: Project Director, NHAI instructed / advised to form a special task force comprising sufficient machine and manpower and commence the hoarding removal operation from Km. 407.100 to Km. 456.100 (B/S) Notice issued to Illegal Accesses over Side Drains on Jalandhar - Amritsar Project Sr. No. Chainage Notice Issued to Violators Received by Not Signed Violator by Violator Illegal Access by Description / Type of Violations BEAS L.H.S 1. 413.515 2. 413.750 3. 413.810 Banta Singh House Arya Dental Clinic and Hospital Surjit Auto Electrician (Shop) Yes Yes Yes 4. Prince Cold Drinks Ramp made by Concrete on new drain. Ramp made by Concrete on Existing Drain. Ramp made by Concrete on Drain. Slab Made by Concrete by lowering the sides walls of existing drain. Ramp made by Concrete. Slab Made by Concrete by lowering the sides walls of existing drain. Yes Yes 413.865 Not BEAS R.H.S 1. 413.940 Satnam Jewellers Shop 2. 414.020 Maninder Cold Drinks 3. 414.060 4. 414.080 Gopi Electrical & Arvind S.T.D P.C.O Shop J.V Properties & Builders (Shop) 5. 414.090 Bhardwaj Infotech (Shop) 6. 414.000 Beas Enterprises (Shop) 7. 414.160 Dhillon Guest House 8. 414.190 J.J Enterprises 9. 414.210 Beas Homeopathic Clinic 10. 414.240 Amul Bister Bandhar 11. 414.265 Sadhu Ram House 12. 414.320 Star Electronics Shop 13. 414.340 Bawa Niwas 14. 414.400 Bawa’s House RAYYA L.H.S 1. 419.810 2. 419.860 Maan Market Bawa Steel Shop Ramp made by Concrete. Ramp made by concrete. Chipped existing drain wall on road side and placed the slab cover in slanting position. Chipped existing drain wall on road side and placed the slab cover in slanting position. Chipped existing drain wall on road side and placed the slab cover in slanting position. Chipped existing drain wall on road side and placed the slab cover in slanting position. Slab Made by Concrete by lowering the sides walls of existing drain Slab Made by Concrete by lowering the sides walls of existing drain. Slab Made by Concrete by lowering the sides walls of existing drain. Slab Made by Concrete by lowering the sides walls of existing drain. Slab Made by Concrete by lowering the sides walls of existing drain. Slab Made by Concrete by lowering the sides walls of existing drain. Ramp made by Soil and Bricks Material. Slab Made by Concrete by lowering the sides Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Yes Not Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Not Page - 23 Consultancy Services – M/s Unihorn India Pvt Ltd Monthly O&M Inspection Report No. 42/June 2014 3. 419.865 Raju Hardware Shop 4. 419.920 Bawa Gurmukh & Sons 5. 419.990 Kaliya Cloth Collection Shop walls of existing drain. Ramp made by Soil & Aggregate. Slab Made by Concrete by lowering the sides walls of existing drain. Ramp made by Soil & Concrete. 6. 420.140 Amit Tent House Slab Made by Concrete on existing drain. Yes Yes 7. 8. 420.190 420.220 Pardhan Jewellers Guru Kirpa General Store Ramp made by Soil. Ramp made by Soil. Yes Yes Chipped existing drain wall on road side and placed the slab cover in slanting position. Ramp made by Concrete. Yes Yes Yes RAYYA R.H.S 1. 419.655 Raju Karyana Store 2. 419.700 3. 419.760 4. 419.790 to 800 6. 419.885 7. 419.960 Bobby Electronics Shop Society Market & Shanker Medical Store Anmol Garments & Cheema Cloth House Hundal Studio, New Trends Readymade Garments (Market) Bikaner Sweets 8. 419.970 Raja Ice Factory 9. 420.000 to 040 10. 11. 420.090 420.100 Chawla Medical Store. Jain Machine Tool, Ludhiana General Store & Purba Auto Parts Taxi Stand House (Locked) 12. 420.125 Shri Ganesh Tractor Shop Ramp made by Concrete. 13. 420.140 Deepak Traders Slab Made by Concrete. 14. 420.180 Binder Market Slab made by Bricks and concrete. 15. 420.200 G.S Photostat Enterprises Yes Not Slab Made by Concrete on existing drain. Ramp made by Concrete. Chipped existing drain wall on road side and placed the slab cover in slanting position. Ramp made by Concrete. Yes Not Yes Not Ramp made by Soil. & Kaler KHALCHIAN L.H.S 1. 425.820 Taxi Stand Satish Tyre Works & Kalara 2. 425.860 Cold Drinks 3. 426.000 Nikka Chicken Shop 4. 426.010 A-One Meet Shop Dhillon Sweets & G.M. Welding 5. 426.050 Works 6. 426.065 Virdhi Welding Work Ramp made by Soil and Aggregate. Ramp made by Brick / Soil. Ramp made by Concrete. Ramp made by Concrete. Yes Not Yes Yes Yes Not Yes Slab Made by Concrete on existing drain. Slab Made by Concrete on existing drain. Yes Not Ramp made by Soil on Existing Drain. Ramp made by Concrete. Ramp made by Concrete. Yes Yes Yes Ramp made by Soil and Aggregate. Not Not 7. 426.140 Tractor Work Shop 8. 426.180 Dhanju Motors Chipped existing drain wall on road side and placed the slab cover in slanting position. Chipped existing drain wall on road side and placed the slab cover in slanting position. 9. 426.200 Kuldeep Motor Garage Ramp made by Concrete. Not 10. 426.220 Aman Painter Chipped existing drain wall on road side and placed the slab cover in slanting position. Not Ramp made by damage Cover Slab. Ramp made by Concrete on Existing Drain. Ramp made by Concrete. Ramp made by damage cover slab & Concrete. Ramp made by Concrete. Ramp made by Concrete. Not KHALCHIAN R.H.S 1. 425.980 J. K. Paint Store (Market) 2. 426.040 Houses 3. 426.150 Sharma Service Station 4. 426.180 Star Khadar Bhandar 5. 426.230 Sharma Service Station Sikh National Public Senior 6. 426.260 School Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Not Not Yes Not Not Not Page - 24 Consultancy Services – M/s Unihorn India Pvt Ltd Monthly O&M Inspection Report No. 42/June 2014 TANGRA R.H.S 1. 430.640 Tractor Work Shop 2. 430.660 N.S Tractor Work Shop 3. 430.665 Kamboj Motors 4. 430.800 Kamboj Mobile Repair Gagan Jewellers & Dr. 5. 430.820 Sarabjeet Singh Ramp made by damage cover slab & Concrete. Ramp made by damage cover slab & Concrete. Ramp made by Soil. Ramp made by Concrete. Ramp made by Concrete. 6. 430.840 Harpartap Singh House Ramp made by damage Concrete Electrical Poles. 7. 8. 9. 10. 11. 430.850 430.860 430.910 431.000 431.010 Harpal Scooter Works Inder Iron Store Shiv Shankar Khad Store Thukral Karyana Store Tony Scraper Ramp made by damage Concrete Electrical Poles. Ramp made by damage Concrete Electrical Poles. Ramp made by Concrete. Ramp made by Concrete. Ramp made by damage cover Slab. 12. 431.040 S.S. Auto Mobile Ramp made by Concrete. M. Arif House Samra Complex & Chandi Auto Mobiles Bamrah Complex Dashmesh Bhatta Store & Guru Nanak Agro Industries Slab Made by Concrete on existing drain. Chipped existing drain wall on road side and placed the slab cover in slanting position. Slab Made by Concrete on existing drain. Guru Nanak Tyres Slab Made by Concrete on existing drain. Not Not Yes Not Yes Not Not Yes Not Not Not Not JANDIALA L.H.S 1. 438.670 2. 438.700 3. 438.720 4. 438.840 5. 438.890 6. 438.930 7. 439.070 8. 439.140 9 439.180 10. 439.500 11. 439.540 Bhullar Goods Transport Company English Wine Shop (Harjinder Kaur & Company) Shulakul Sweets Shop, Jagdish Chandar Malhotra Tyre Store Tractor Work Shops New Azad Tractor Work Shop & Onkar Agriculture Works Gobind Engineering Work Ramp made by Concrete. Yes Yes Yes Yes Yes Yes Slab Made by Concrete on existing drain. Yes Ramp made by damage cover Slab. Ramp made by damage cover Slab and Concrete. Ramp made by damage cover Slab and Concrete. Chipped existing drain wall on road side and placed the slab cover in slanting position. Yes Yes Yes Yes Slab Made by Concrete on existing drain. JANDIALA R.H.S 1. 438.900 2 438.980 T.R. Transport & Company & Guru Nanak Diesal Services Gill Motor Mechanic 3 439.000 Hansraj Tyre service (MRF) 439.580 Shera Electrical, Sukh Motor Garage, Pal Denting Panting), Maruti Car House (Devi Car Wash) 4 Yes Drain filled with Earth material. Yes Ramp made by Concrete. Yes Ramp made by damage cover Slab Yes Ramp made by Soil and Bituminous Material. 3.11 MATERIAL MODIFICATION ALONG WITH NUMBERS OF TEST CONDUCTED REPORT Sl. No. 1 2 Description Road Roughness Test Benkelman Beam Deflection Test Remarks from May to 06th May 14 from 16th May to 18th May 14 04th Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 25