522 – Post-Assessment Report Community: Country: Chapter: Project ID(s): Submittal Date: Dates Traveled: Authors: Acknowledgements The Project Leads and Mentor Team acknowledge that: (Please initial each line item to acknowledge that each line item has been completed.) The chapter reviewed the accompanying 522 – Post-Assessment Report Instructions for accurate completion of this report This was the first assessment trip for the program, the 901 – Program Plan and Baseline Study was completed by the PMEL lead and is submitted as a separate document with this report. or This was not the first assessment trip for the project, the 901B – Program Impact and Monitoring Report was completed by the PMEL lead and it is submitted as a separate document with this report. The PMEL lead completed the 905 – Program Logic Framework and included it as an appendix to the 901 or 901B report. The team has included the signed 902 – Project Partnership Agreement as an appendix to this report. The most current contact information is updated in this report and all other reports included with this submittal. If there were any health and safety incidents during the trip, a completed 612 - Incident Report document is included as a separate document with this report. © 2015 Engineers Without Borders USA. All Rights Reserved Page 1 of 11 522 – Post-Assessment Report Name of Chapter Country, Community, Project Id(s) Revised 11/2015 We, the project team leadership confirm that the above information and tasks have been completed and that this report accurately reflects our chapter’s collected data and other activities during the assessment trip. _________________________________________________________________________________________________________________________________________ Project Lead Printed Name Project Lead Signature Date _____________________________________________________________________________________________________________________________ ____________ Mentor Printed Name Mentor Signature Date Or _________________________________________________________________________________________________________________________________________ Faculty Advisor Printed Name Faculty Advisor Signature Date It is the responsibility of the Responsible Engineer In Charge (REIC) to ensure that the team’s Post-Assessment report meets reasonable standard of care for a project of this type. I have reviewed the subject document. I am qualified by education and experience to perform the assessment and design for this type of project. In my best engineering judgement, ___ The data collected on this assessment trip will allow the chapter to develop a complete and comprehensive design which will meet a reasonable standard of care for a facility of this type, Or (please delete the statement that does not apply) ____Additional data will be collected during a follow-up assessment trip because the data collected are too preliminary for a final design. _________________________________________________________________________________________________________________________________________ REIC Printed Name REIC Signature © 2015 Engineers Without Borders USA. All Rights Reserved Date Page 2 of 11 522 – Post-Assessment Report Name of Chapter Country, Community, Project Id(s) Revised 11/2015 Table of Contents Part I –Administrative Information .............................................................................................. 4 1.0 Contact Information...................................................................................................... 4 2.0 Budget ......................................................................................................................... 5 2.1 Project Budget .......................................................................................................... 5 2.2 Professional Mentor Team Hours ............................................................................. 5 3.0 Project Discipline(s) ..................................................................................................... 6 Part II – Pre-Assessment Report – Technical Information .......................................................... 7 1.0 Executive Summary ..................................................................................................... 7 2.0 Project Description ....................................................................................................... 7 3.0 Trip Description............................................................................................................ 7 4.0 Data Collection And Analysis ....................................................................................... 7 4.1 Site Mapping ............................................................................................................ 7 4.2 Technical Data Collection ......................................................................................... 7 4.3 Monitoring and Evaluation Data................................. Error! Bookmark not defined. 5.0 Photo Documentation .................................................................................................. 8 6.0 Lessons Learned ......................................................................................................... 9 7.0 Project Phase .............................................................................................................. 9 8.0 EWB-USA Project Monitoring ...................................................................................... 9 8.1 EWB-USA Project Status Table ................................................................................ 9 8.3 Periodic Maintenance Indicators..............................................................................10 8.5 Additional Monitoring Information ............................................................................10 Appendices ...............................................................................................................................11 Appendix A – Signed 902 – Project Partnership Agreement ..................................................11 Appendix B – 612 – Incident Report ......................................................................................11 Appendix C – List of Locally Available Material Costs............................................................11 Appendix D – Additional Information Collected ......................................................................11 © 2015 Engineers Without Borders USA. All Rights Reserved Page 3 of 11 522 – Post-Assessment Report Name of Chapter Country, Community, Project Id(s) Revised 11/2015 Part I –Administrative Information 1.0 Contact Information Correspondence regarding report reviews will be sent to the emails listed below. Project Title T Name r a v e l Email Phone Chapter Name or Organization Name Project Lead Additional Project Lead (if applicable) President Responsible Engineer in Charge Traveling Mentor Faculty Advisor (if applicable) Planning, Monitoring, Evaluation and Learning (PMEL) Lead © 2015 Engineers Without Borders USA. All Rights Reserved Page 4 of 11 522 – Post-Assessment Report Name of Chapter Country, Community, Project Id(s) 2.0 Revised 11/2015 Budget Insert the 508 - EWB-USA Trip Budget Worksheet into this section of the report only including financials pertaining to this trip. Please provide explanation if required below. If it is desired to include further budget details for this trip please include in an appendix to this report. 2.1 Project Budget 2.2 Professional Mentor Team Hours This information helps EWB-USA report its annual value. Name(s) of Professional Mentor(s) Pre-trip hours 1. 2. 3. During trip hours © 2015 Engineers Without Borders USA. All Rights Reserved Post-trip hours Total Hours Page 5 of 11 522 – Post-Assessment Report Name of Chapter Country, Community, Project Id(s) 3.0 Revised 11/2015 Project Discipline(s) Check the specific project discipline(s) addressed in this report. Check all that apply. Water Supply (Project Type) ____ Source Development (Project Discipline) ____ Water Storage ____ Water Distribution ____ Water Treatment ____ Water Pump Sanitation ____ Latrine ____ Gray Water System ____ Black Water System ____ Solid Waste Management Structures ____ Bridge ____ Building ____ Retaining Wall Civil Works ____ Roads ____ Drainage ____ Dams Energy ____ Fuel ____ Electricity Agriculture ____ Irrigation Pump ____ Irrigation Line ____ Water Storage ____ Soil Improvement ____ Fish Farm ____ Crop Processing Equipment © 2015 Engineers Without Borders USA. All Rights Reserved Page 6 of 11 522 – Post-Assessment Report Name of Chapter Country, Community, Project Id(s) Revised 11/2015 Part II – Pre-Assessment Report – Technical Information (Please provide pertinent figures, tables, and photographs with figure numbers, table numbers and photograph numbers in the section where discussed. Full drawing sets, complete lab reports, and any information larger than 2 pages should be included at the end of the report as an appendix.) 1.0 Executive Summary 2.0 Project Description 3.0 Trip Description 4.0 Data Collection And Analysis 4.1 Site Mapping (Highly Recommended) 4.2 Technical Data Collection (Highly Recommended) © 2015 Engineers Without Borders USA. All Rights Reserved Page 7 of 11 522 – Post-Assessment Report Name of Chapter Country, Community, Project Id(s) 5.0 Revised 11/2015 Photo Documentation Label each photo with a photo number and give a full description. © 2015 Engineers Without Borders USA. All Rights Reserved Page 8 of 11 522 – Post-Assessment Report Name of Chapter Country, Community, Project Id(s) 6.0 Lessons Learned 7.0 Project Phase Assessment Continues 8.0 Revised 11/2015 Design Cancelled EWB-USA Project Monitoring 8.1 EWB-USA Project Status Table List all completed and current projects within program, for incomplete projects leave last four columns blank. Project Project ID Type Project Date of Functionality Periodic Discipline(s) Completion (check one range Maintenance (list all in one (mm/dd/yy) per project) (yes or no) 05176cell) 50% 75% Demonstration of Community Capacity (yes or no) 100% 8.2 EWB-USA Project Functionality Indicators Include 3 indicators per project type. Include monitoring results or explain the condition before any EWB-USA implementation. Project ID Project Type Project Functionality Indicator (select from document 906) Monitoring Result (include baseline data where applicable) © 2015 Engineers Without Borders USA. All Rights Reserved Page 9 of 11 522 – Post-Assessment Report Name of Chapter Country, Community, Project Id(s) Revised 11/2015 8.3 Periodic Maintenance Indicators Include 3 indicators per project type. Include a monitoring result or explain the condition before any EWB-USA implementation. Project ID Project Type Periodic Maintenance Indicator (select from document 906) Monitoring Result (include baseline data where applicable) 8.4 Periodic Maintenance Indicators Include 3 indicators per project type. Include a monitoring result or explain the condition before any EWB-USA implementation. Project ID Project Type 8.5 Community Capacity Indicator (select from document 906) Monitoring Result (include baseline data where applicable) Additional Monitoring Information © 2015 Engineers Without Borders USA. All Rights Reserved Page 10 of 11 522 – Post-Assessment Report Name of Chapter Country, Community, Project Id(s) Revised 11/2015 Appendices Appendix A – Signed 902 – Project Partnership Agreement (Required) Appendix B – 612 – Incident Report (If Applicable) Appendix C – List of Locally Available Material Costs (Highly Recommended) Appendix D – Additional Information Collected (Suggested) © 2015 Engineers Without Borders USA. All Rights Reserved Page 11 of 11