MANDATORY DISCLOSURES 1.1 ENGINEERING/TECHNOLOGY/PHARMACY PROGRAMMES The following information is to be given in the Information Brochure besides being hosted on the Institution's official Website. "The information has been provided by the concerned institution and the onus of authenticity lies with the institution and not on AICTE." 1. NAME OF THE INSTITUTION: G.E.S.POLYTECHNIC COLLEGE VILL: LOHAR KANGNA, P.O: NAINOWAL JATTAN, DISTT: HOSHIARPUR (PB)-146001, PHONE: 01882-276082, 9478725682 FAX: 01882-276083. E-MAIL:gespoly@gmail.com II. NAME & ADDRESS OF THE DIRECTOR/PRINCIPAL: Er. Y.S.SAINI 094640-56837 Address including telephone, Fax, e-mail. III. NAME OF THE AFFILIATING BOARD. : P.S.B.T.E IV. GOVERNANCE: GLOBAL EDUCATIONAL & WELFARE SOCIETY 1 Members of the Board and their brief background S. No. 1. Name & Address SH. Satish Aggarwal S/o SH. Roshan Lal Aggarwal Moh. Mahajana Mukerian, Distt. Hoshiarpur 2. Miss. Sonia Saini D/o S. Gurmukh Singh Saini, 183/1, Tagore Nagar, Hoshiarpur Er. Gurmukh Singh Saini, S/o S. Dalip Singh Saini, 183/1 Tagore Nagar, Hoshiarpur Smt. Ritu Puri W/o Sh. K.K. Puri, Opp. DFO Office, Hoshiarpur Er. Anil Aggarwal, S/o Sh. Satish Aggarwal, 576-Model Town, Jalandhar Er. V.M. Mahajan, S/o Sh. Punnu Ram, 69, Adarsh Nagar, Satnampura, Phagwara Sh. Sudhir Aggarwal, S/o SH. Satish Aggarwal, Moh. Mahajana Mukerian, Disst. Hoshiarpur Director Technical education or his representative Member A.I.C.T.E. or his Representative Yudhvir Singh Saini S/o Sh. G.S.Saini 183/1,Tagore Nagar Hoshiarur 3. 4. 5. 6. 7. 8. 9. 10. Occupation Industrialist & Vice President Of SPN Nursing GNM School, Executive Member of SPN Charitable Hospital & SPN Maha Vidyala, Mukerian Teacher Designation Chairman cum President Industrilist Gen. Secy. Business Cashiar Industrialist Manager Retd. Principal Technical Advisor. Industrialist Executive Mamber Educationist Sr.Vice President Ex-offico Member Ex-offico Member Principal 2 S. No. Name & Address Occupation 11. Mrs. Nippy Aggarwal W/o sh. Sanjay Aggarwal 592, Basant Avenue Amritsar Mr. Avtar Singh S/o S. Sahan Singh Vill. Pathial PO Lachowal Distt. Hoshiarpur Mr. Munish Aggarwal S/o Sh. Satish Aggarwal 576, Model Town, Jalandhar Mr. Pawan Kumar S/o Sh. Tek Chand 105, Basant Vihar, Hoshiarpur Mr. Kamal Kant Puri Opp. D.E.O. Office Hoshiapur Avtar Singh St. No. 5, Krishna Nagar, Hoshiarpur S. Tarsem Singh 219, Basant Vihar, Hoshiarpur Mrs. Poonam Sehgal W/o Swapnil Sehgal Civil Line, Hoshiarpur Harminder Kaur W/o Yudhvir Singh 183, Tagore Nagar, Hoshiarpur Summan Aggarwal S/o SH. Roshan lal Aggarwal 221, Lajpat Nagar, Jalandhar Rakesh Aggarwal S/o Sh. Roshan Lal Aggarwal 310, G.T.B. Nagar, Jalandhar Business 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. Designatio n Executive Member Agriculturi st Executive Member Business Executive Member Business Executive Member Business Executive Member Agriculturi st Executive Member Teacher Executive Business Executive Member Teacher Executive Member Industrialis t Executive Member Industrialis t Executive Member 3 Members of Academic Advisory Body Sh.Satish Aggarwal Chairman/President Global Educational and Welfare Society Hoshiarpur. Smt. Sonia Saini Vice Chairman/Vice President Global Educational and Welfare Society Hoshiarpur. Sh G.S.Saini Gen Secy Global Educational and Welfare Society Hoshiarpur Sh K.K.Puri Finance Controller Global Educational and Welfare Society Hoshiarpur Er Y.S.Saini Principal GES Polytechnic College Vill Lohar Kangna ,P.O: Nainowal Jattan Hoshiarpur Sh.A.K .Sood HOD Civil Engg GES Polytechnic College Vill Lohar Kangna ,P.O: Nainowal Jattan Hoshiarpur Sh.Gurjit Singh HOD computer Engg GES Polytechnic College Vill Lohar Kangna ,P.O: Nainowal Jattan Hoshiarpur 4 Organization structure of GES Polytechnic College President /Chairman Vice President Gen.Secy. Finance Controller Principal H O D ‘s Faculty Members Supporting Administrative & Technical Staff chart and processes Nature and Extent of involvement of faculty and students in academic affairs/improvements Mechanism/Norms & Procedure for democratic/good Governance 5 Student Feedback on Institutional Governance/faculty performance Grievance redressal mechanism for faculty, staff and students V. Yes Yes PROGRAMMES Name of the Programmes approved by the AICTE (1) CIVIL ENGG, (2) ELECTRICAL ENGG, (3) MECHANICAL ENGG (4) ELECTRONICS & COMM ENGG (5) COMPUTER ENGG Name of the Programmes accredited by the AICTE N/A For each Programme the following details are to be given: Name of Diploma No. of seats at the time of admission Duration Diploma in Civil. Engg 120(1st yr)+24(Leet)+6(FW) 3 Years Diploma in Elect Engg. 60(1st yr)+12(Leet)+3(FW ) 3 Years Diploma in Mech Engg 180 (1st yr)+36(Leet)+9(FW ) 3 Years Diploma in ECE Engg 60(1st yr)+12(Leet)+6(FW ) 3 Years Diploma in Computer Engg st 120(1 yr)+24(Leet)+6(FW ) 3 Years Cut off mark/rank for admission during the last three years Fee :AS PER P.S.B.T.E/PB.GOVT NORMS Placement Facilities: TRAINING AND PLACEMENT CELL ESTABLISHED Campus placement in last three years with minimum salary, maximum salary and average salary Name and duration of programme(s) having affiliation/collaboration with Foreign Board(s)/Institution(s) and being run in the same Campus along with status of their AICTE approval. If there is foreign collaboration, give the following details: NIL Details of the Foreign Institution/Board: N/A Name of the Board /Institution Address Website Is the Institution/University Accredited in its Home Country Ranking of the Institution/ Board in the Home Country Whether the diploma offered is equivalent to an Indian Diploma? If yes, the name of the agency which has approved equivalence. If no, implications for students in terms of pursuit of higher studies in India and abroad and job both within and outside the country. Nature of Collaboration Conditions of Collaboration Complete details of payment a student has to make to get the full benefit of collaboration. For each Collaborative/affiliated Programme give the following: Programme Focus Number of seats 6 Admission Procedure Fee Placement Facility Placement Records for last three years with minimum salary, maximum salary and average salary Whether the Collaborative Programme is approved by AICTE? If not whether the Domestic/Foreign Institution has applied to AICTE for approval as required under notification no. 37-3/Legal/2005 dated 16th May, 2005 VI. FACULTY: AS PER ANNEXURE Branch wise list faculty members: Permanent Faculty Visiting Faculty Adjunct Faculty Guest Faculty Permanent Faculty: Student Ratio 1:20 Number of faculty employed and left during the last three years 7 VII. PROFILE OF DIRECTOR/PRINCIPAL WITH QUALIFICATIONS, TOTAL EXPERIENCE, AGE AND DURATION OF EMPLOYMENT AT THE INSTITUTE CONCERNED. For each Faculty give a page covering 1. Name: YUDHVIR SAINI 2. Date of Birth: 01-10-1972 3. Educational Qualification: M.TECH, Ph.D. (Pursuing) 4. Work Experience • Teaching • Research • Industry • Others 5. Area of Specializations: ELECTRONICS AND COMMUNICATION 6. Subjects teaching at diploma Level Post diploma Level 7. Research guidance No. of papers published in Master’s - National Journals: 01 Ph.D - International Journals - Conferences 8. Projects Carried out 9. Patents 10. Technology Transfer 11. Research Publications 12. No. of Books published with details VIII. FEE Details of fee, as approved by State fee Committee, for the Institution.AS PER P.S.B.T.E/PB.GOVT NORMS Time schedule for payment of fee for the entire programme. Odd Sem in May/June & Even in Dec./ Jan No. of Fee waivers granted with amount and name of students. Number of scholarship offered by the institute, duration and amount Criteria for fee waivers/scholarship.AS PRESCRIBED BY A.I.C.T.E/PSBTE/PB.GOVT Estimated cost of Boarding and Lodging in Hostels .:Rs 16000/-PER SEMESTER IX. ADMISSION Number of seats sanctioned with the year of approval. As per list attached Number of students admitted under various categories each year in the last three years. As per list attached Number of applications received during last two years for admission under Management Quota and number admitted. :As per list attached X. ADMISSION PROCEDURE Joint Entrance Test (JET) held by the PSBTE Number of seats allotted to different Test Qualified candidates separately [JET (State conducted test/Board tests)/Association conducted test] 66.66% through PSBTE & 33.33% Management Quota 8 Calendar for admission against management/vacant seats: Last date for request for applications. As per dead line given by the board from time to time. Last date for submission of application. - do - Dates for announcing final results. - do - Release of admission list (main list and waiting list should be announced on the same day) Date for acceptance by the candidate (time given should in no case be less than 15 days) Last date for closing of admission. Starting of the Academic session. The waiting list should be activated only on the expiry of date of main list. The policy of refund of the fee, in case of withdrawal, should be clearly notified.: As per guidelines of 16.08.2010 AICTE/ DTE XI. CRITERIA AND WEIGHTAGES FOR ADMISSION Describe each criteria with its respective weight ages i.e. Admission Test, marks in qualifying examination etc. Mention the minimum level of acceptance, if any. As per criteria set up by the PSBTE/ AICTE Mention the cut-off levels of percentage & percentile scores of the candidates in the admission test for the last three years. Display marks scored in Test etc. and in aggregate for all candidates who were admitted. As per AnnexureItem No I - XI must be given in information brochure and must be hosted as fixed content in the website of the Institution. The Website must be dynamically updated with regard to XII-XV. XII. XIII. APPLICATION FORM Downloadable application form, with online submission possibilities. LIST OF APPLICANTS List of candidates whose applications have been received along with percentile/percentage score for each of the qualifying examination in separate categories for open seats. List of candidates who have applied along with percentage and percentile score for Management quota seats. XIV. RESULTS OF ADMISSION UNDER MANAGEMENT SEATS/VACANT SEATS Composition of selection team for admission under Management Quota with the brief profiles of members (This information be made available in the public domain after the admission process is over) Score of the individual candidates admitted arranged in order of merit. List of candidates who have been offered admission. Waiting list of the candidates in order of merit to be operative from the last date of joining of the first list candidates. List of the candidates who joined within the date, vacancy position in each category before operation of waiting list. XV. INFORMATION ON INFRASTRUCTURE AND OTHER RESOURCES AVAILABLE LIBRARY: 9 Number of Library books/Titles/Journals available (programme-wise) Journals S.No Course(s) 1. CIVIL 2. ELECTRICAL Number of titles of the books Number of volumes National International 101 1230 06 ___ 33 623 01 ___ 3. MECHANICAL 87 1313 06 ___ 4. E.C.E 209 1182 03 ___ 5. C.S.E/I.T 150 1527 04 ___ 6 FIRST YEAR COMMON (App Sci) 36 3012 10 ___ Total 616 8887 30 ___ 10 LABORATORY: For each Laboratory List of Major Equipment/Facilities ANNEXURE -1 attached ANNEXURE -1 List of Equipments/ Apparatus in Water Supply & Waste Water Engg. Lab (4th Sem.) Sr. No. 1 2 3 4 5 6 7 Particulars Impact testing machine G.I. sieves Cube Mould Slump Cone test apparatus Fine Aggregate Sieves (1 Set) Coarse Aggregate Sieves (1 Set) G.I. Rebound Hammer List of Equipments/ Apparatus in Electrical Machine Lab (3rd Sem.) S. No. 1 2 3 4 Particulars Induction motor-3 phase Induction motor single phase Measurement of Power Factor by two Watt meter method Open Circuit & Short Circuit test 1-Phase Panel for starting & reversing the direction of 3-Phase Induction motor 5 Panel for starting & reversing the direction of Single Phase Induction motor 6 7 Panel for V-I relationship in 3-phase Transformer Speed control of DC shunt motor (Panel+motor) 8 9 Transformer 3-Phase 10 Panel for lamp hot and cold condition 11 Panel for Angular Displacement of 3phase Slip ring Induction motor 11 12 DC Series motor with panel Panel for Measuring power in 3 phase using CT & PT 13 panel for Synchronization +2 Alternator 14 Panel for No Load Terminal Voltage & Excitation + Alternator 15 16 Auto Transformer 3 phase 17 Digital Millimeter 18 Sectional view of DC motor 19 Sectional view of Single Phase Transformer 20 Insulation Tester (Meggar) List of Equipments/ Apparatus in Applied Mechanics Lab (3rd Sem) S. No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Particulars First System of Pulley Second System of Pulley Simply Supported Beam Regular and Irregular Lamina Inclined Plane Apparatus Worm and Worm Wheel Apparatus Winch Crab Single Purchase Apparatus Jib Crane Apparatus Polygon Law of Forces Weight Box Minor Strips Weight 1 Kg Weight 2 Kg Weight 500 mg Screw Jack Apparatus Small Weight of 50 gm set of 5 Nos. List of Equipments/ Apparatus in Material Science Lab (3rd Sem) S. No. 1 2 3 Particulars Alumina Paste Digital Furnace Etching Agerial 12 4 5 6 7 8 9 Emery Paper Metallurgical Microscope Polishing Machine Rubber Gasket Specimens Velvet Cloth List of Equipments/ Apparatus in Hydraulic and Pneumatic Lab (4th Sem) S. No. 1 2 3 4 5 6 Particulars Centrifugal Pump Francis Turbine Hydraulic Bench Pelton Wheel Stop Watch Further Detail of Hydraulic Bench 1. V. Notch and U Notch Apparatus 2. Venturimeter Apparatus 3. Pittot Tube 4. Losses for Pipe Line Friction 5. Bernouli Theorem Apparatus List of Equipments/ Apparatus in Strength of Material Lab (4th Sem) S. No. 1 2 3 4 5 Particulars Universal Testing Machine (20 Tonnes) Rockwell and Brinel Hardness Tester Impact Testing Machine (Izod and Chorpy test) Torsion Testing Machine (100 Kgm) Spring Testing Machine (2000 Kgf) List of Equipments/ Apparatus in Thermodynamics Lab-1 (4th Sem) S. No. 1 2 Particulars Blow Off Cock Emissivity Measurement Apparatus 13 3 4 5 6 7 8 9 10 11 12 13 14 15 Heat Transfer in Natural Convection Heat Transfer in Thermal Conductivity of Metal rod High Steam and Low Water Safety Valve Lever Safety Valve Lancashire Boiler Pressure Gauge Stop Valve Steam Injector Water Gauge Cochran Boiler Thermocouple Pyrometer Infrared Thermometer List of Equipments/ Apparatus in Automobile Lab (5th Sem) S. No. Particulars Wiper Model 1 Head Light Model 2 List of Equipments/ Apparatus in Thermodynamics Lab-II (5th Sem) S. No. 1 2 Particulars Cut Section Two Stroke Petrol Engine Cut Section Four Stroke Diesel Engine LIST OF Equipments /Apparatus in Electronics Workshop (1&2Sem) S. No. Particulars 1 Function Generator (1 MHz) 2 Function Generator (5 MHz) 3 Audio Frequency Function Generator with DC offset control 4 Battery 5 Battery Eliminator 6 Dual Trace Oscilloscope (20 MHz) 7 Oscilloscope (10 MHz) 8 Oscilloscope (30 MHz) 9 DC Regulated Power Supply (CV/CC) 10 DC Regulated Power Supply 11 Digital Multimeter 12 Multitester (Analog Multimeter) 13 Breadboard 14 LDR 15 Capacitor 14 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 10 m 25 V 22 m 40 V Ceramic Capacitor 100 m .25 V Diode Registance 555 IC Toggle Switch VDR T-Socket TV Connecter Fuse LED AV Leads Thermostat Transistor BC - 1088,1078 BC - 148 CL 1100 BC 1078, 881, Resistance 100 W 1.5 K W 2200 W 5600 W 56 K W UJT Variable Resistance List of Equipments/ Apparatus in Basic Electronics Lab (2nd Sem.) S. No. 1 2 3 4 5 6 7 8 Particulars Biasing Techniques of Transistor CE Transistor Amplifier FET Characteristics Apparatus Half Wave/ Full Wave and Bridge Rectifier Apparatus pN Junction diode Characteristics Apparatus Transistor Characteristics with Regulated Power Supply Transistor Characteristics Apparatus Zener Diode Characteristic Apparatus 15 List of Equipments/ Apparatus in Digital Lab (3rd Sem.) S. No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Particulars Digital Adders Subtractor Adder Subtractor Using EX-OR 4 Bit Counter Basic Logic Gate Discrete Trainer Kit Digital IC Kit 8 Bit Analog to Digital BCD to 7 segment Display 4 Bit Decoder Flip-Flop using IC Encoder Decoder Logic Gate using IC Multiplexer and Demultiplexer Shift Register Study of Flip-Flip Tristate Buffer Universal Gate Universal Shift Register Analog to Digital 4 Bit 1 Screw Driver Kit List of Equipments/ Apparatus in EDC Lab (3rd Sem.) S. No. 1 2 3 4 5 6 7 8 9 10 11 Particulars Common Collector Amplifier Push-Pull Amplifier Linear IC Kit Oscillator (Hartley, Calpit, Phase shift) Two stage R-C Coupled amplifier Wein Bridge Oscillator Timmer Multivibrator Function Generator CRO Screw Driver Kit Switch Cable Display Board 16 List of Equipments/ Apparatus in EIM Lab (3rd Sem.) S. No. 1 2 3 4 5 Particulars Digital Storage Oscilloscope DSO CRO 20 MHz Function Generator (Digital) Digital Multimeter Frequency Counter List of Equipments/ Apparatus in PCE Lab (3rd Sem.) S. No. 1 2 3 4 5 6 7 8 9 10 11 12 13 Particulars Amplitde Modulation & Demodulation Kit Balance Modulator Delta Modulation & Demodulation Kit Frequency Modulation & Demodulation Kit PWM Kit PAM Kit PCM Kit PPM Kit PLL Kit PPM Kit TDM Kit CRO Screw Driver Kit List of Equipments/ Apparatus in Microprocessor Lab (4th Sem.) S. No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Particulars 8085 Kit Sound Card 8255 Card 8257 Card ADC Interface DAC Interface 8212 Memory Card Liquid Crystal Display LCD Interface LED Interface 8251 Card 8253 Card Discrete Component Trainer Linear IC Trainer Analog IC Tester 17 15 16 17 18 Digital IC Tester Display Interface Logic Controller 8259 Card List of Equipments/ Apparatus in CS-I Lab (4th Sem.) S. No. 1 2 3 4 5 6 7 8 Particulars AM Transmitter AM Receiver FM Transmitter FM Receiver Fiber Optics Kit Analog & Digital Omni Direction & Directional Antenna Kit AF/RF Signal Generator CRO 2OMHZ List of Equipments/ Apparatus in NFTL Lab (4th Sem.) S. No. 1 2 3 4 5 6 7 8 9 10 Particulars Maximum Power Transfer Theorem Kit M-Drived Filter M-Drived Filter H.P, L.P. Norton Theorem Kit Rc(K) Type High Pass Filter type LPF, HPF, BPF & BSF T Type Filter T & Type Attenuator T Type LPF, BPF, HPF BSF T & type Bridge Attenuator List of Equipments/ Apparatus in Power Electronics Lab (4th Sem.) S. No. 1 2 3 4 Particulars UPS trainer kit DIAC characteristics apparatus Full wave Rectifier using SCR Half wave Rectifier using SCR 18 5 6 7 8 9 10 SCR characteristics apparatus Triac characteristics apparatus UJT Relaxation oscillator UJT characteristics apparatus Triac based AC phase control ckt Speed control AC motor COMPUTER FACILITIES COMPUTER FACILITIES S.No. 1 Config.(i) Configuration Computers Processor-Intel Pentium Dual Core E2160 1.80 GHZ Quantity 320 63 Motherboard-Gigabyte-945 RAM-512 MB HDD- 80 GB SATA Monitor- 17 inches Keyboard,Optical Mouse Config.(ii) Processor-Intel Pentium Dual Core E5200 2.50 GHZ 199 Motherboard-Mercury-945 RAM-1 GB HDD- 160 GB SATA TFT- 18.5 inches Keyboard,Optical Mouse Config.(iii) Processor-Dual Core E-5800 3.20 GHZ Motherboard-Pegatron RAM- 1 GB HDD- 320 GB SATA LED TFT- 18.5 inches Keyboard,Optical Mouse Total 58 320 Total Number of PC's Connected to 2 LAN 320 Total Number of PC's Connected to WAN 320 3 Internet Bandwidth 4 MBps (Optical Fibre Link-BSNL) 19 4 5 Software Packages MSDN Academic Liscence MS-Office-2007 Corel Draw, Pagemaker Photoshop, Macromedia Flash Oracle/SQL ISA-Server Standard C/C++ Java Visual Basic,VB .Net Macromedia Director Auto-CAD 6 Antivirus 7 Operating Systems: Windows Server-2008 LINUX WINDOWS-XP, Windows Seven 8 UPS-Offline UPS-Online 9 Printers 10 11 Printer/Scanner/Copier Scanner Norton Antivirus 64 2 Nos. of 10 KVA, 3 Nos. of 6 KVA 1 Nos. of 3KVA Online UPS with 30 minutes of Backup 31(Laser Printers) 1 (Inkjet Printer) 01(Print/Scan/Cop y) HP-1 List of Equipments/ Softwares available in English & Comm. Skills Lab (1st Sem) 1 4 A compact disc of pre-recorded speech to enhance the listening skill, with RP Mode A compact disc to boost the personality development, formal and situational conversation. A compact disc demosnstrating the enactment of group discussion and public speaking. Internet connection to all PCs. 5 A compact disc demonstrating the mock interview. 2 3 20 6 CD-ROM, Advanced Learner's Dictionary used for Vocabulary build-up. 7 Britannica Encyclopedia, a compact disc of quick references. 8 9 Merriam Webster's collegiate dictionary. A Set of Oxford English Language Reference - 4 Volumes 10 11 12 13 I). Oxford Guide to Plain English II). Oxford A-Z of Spelling III). Oxford A-Z Grammar and Spelling IV). Oxford A-Z of English Usage List of Equipments/ Apparatus in Physics Lab-I S. No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 Particulars Screw gauge Spherometer Searle’ Method apparatus Stroke’s method apparatus Solid cylinder Steam boiler Slotted weights Stop watch Sonometer Astronomical telescope Ammeter OHM’ law apparatus Resistance in series & parallel kit Resistance box Vernier caliper voltmeter Rheostat Capillary rise method Cantilever Conversion of galvanometer into voltmeter and Ammeter Concave lens Convex lens Lee’s disc method apparatus P-N junction diode apparatus He-Ne Laser Hollow cylinder Fortin’s Barometer Gumber apparatus Galvanometer Glycerine Glass slab Parallelogram law apparatus 21 33 34 35 36 37 38 39 40 41 42 43 44 45 46 Thermometer Tuning fork set Wheat stone bridge Mercury metal Mirror strips Metre rod Power strips Pressure water arrangement Borosilicate Glass Optical bench apparatus Energy conversion of rolling cylinder Pendulum bob Resonance apparatus Meter Bridge List of Equipments/ Apparatus in Physics Lab-II S. No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 Particulars Capillary rise apparatus Concave Mirror Beaker Energy Conversion of Rolling Solid Cylinder Fortin's Barometer Gumber Apparatus Glass Slab Hot Plate Heater Hollow Cylinder Lee disc method apparatus Meter Rod Mirror Strips Parallelogram Law apparatus Screw Gauge Solid Cylinder Spherometer Steam Boiler Thermometer Strong Thread Vernier Calliper Sonometer Pendulum bob Astronomical Telescope Ohm's Law apparatus PN Junction Diode apparatus He-Ne Laser Optical Bench apparatus Resistance in Series & Parallel Kit Slotted Weight (250gm) Ammeter Voltmeter Convex Lens Concave Lens 22 34 35 36 37 38 39 40 41 42 43 44 45 46 47 Galvanometer Copper Wire Multimeter Wire Cutter Sand Paper Resistance Box Drawing Board Regulated Power Supply Variable Power Supply Meter Bridge Stoke's method Double Slit Resonance apparatus Laser List of Equipments/ Apparatus available in Chemistry Lab-I S. No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 Particulars Able’s Flash Point Apparatus Burette Stand Burettes China Dish Chemical Balance Conical Flask (Borosil- 250ml) Distillation Plant Dropper Beaker (10ml) Beaker (100ml) Beaker (250ml) Beaker (600ml) Electric Oven Filter Paper Funnel (35mm) Funnel (50mm) Funnel (65mm) Glass Rod Hot Plate Kohlrausch Flask (50ml) Measuring Cylinder (25ml) Measuring Cylinder (50ml) Measuring Flask (100ml) Measuring Flask (250ml) Measuring Flask (500ml) Muffle Furnace Ostwald Viscometer Petridishes Pipettes (5ml) Pipettes (10ml) Pipettes (25ml) 23 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 Pipettes (5ml graduated) Redwood Viscometer Dessicator Rubber Cork Spirit Lamp Spatula Silica Crucible (25mm) Silica Crucible (50mm) Reagent Bottles (1Ltr) Reagent Bottles (10 Ltrs) Sand Bath Stop Watch Test Tube Stand Test Tubes Tongs Test Tube Brush Test Tube Holder Tripod Stand Thermometer Weight Box Watmann Filter Paper Water Bath Wire Gauge Watch Glass Wash Bottle Plastic (500ml) List of Equipments/ Apparatus available in Chemistry Lab-II S. No. Particulars 1 Beaker (100 ml) Beaker (250 ml) Beaker (500 ml) 2 Burette (50 ml) 3 Conical Flask 4 China Dish 5 Dropper 6 Funnel 7 Glass Rod 8 Measuring Flask (100 ml) Measuring Flask (500 ml) Measuring Flask (1000 ml) 9 Measuring Cylinder (5 ml) Measuring Cylinder (10 ml) Measuring Cylinder (50 ml) Measuring Cylinder (100 ml) 10 Pipettes (10 ml) Pipettes (20 ml) 11 Petridish 12 Test tube 13 Reagent Bottle (1 ltr) 24 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 Reagent Bottle (250 ml) Watch Glass Burette Stand With Clamp Boss Head Twice Finger Clamp Dessicator Distilled Water Plant Digital Balance Filter Paper Gloves Hot Plate Periodic Table Chart Charts Sand Bath Spirit Lamp Spatula Rubber Cork Test Tube Brush Test Tube Stand Test Tube Holder Tripod Stand Tong Wire Gauge Wash Bottle Water Bath Spectrophotometer pH- Meter List of Equipments/ Apparatus/ Machinery available in Carpentry Shop Sr. No 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Items Air Compression Claw hammer Nylon hammer 653 Nylon hammer 654 Hand Drill Girmet Marking Gauge Tenon saw Compass Saw 12'' Iron jack plane Iron jack plane 14'' Hand saw 18'' Spray Gun Oil Stone Try square 12'' Carpentry vice 8'' Carpentry vice 9'' Mortise Chisel with handel ½'' Mortise chisel ¾'' Firmer chisel ¾'' Firmer chisel 1'' Firmer chisel 1 ¼'' 25 23 24 Firmer chisel ½'' Half Round wood file 10'' 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 C clamp 6'' Triangular file 6'' Screw driver 929 Screw driver 928 Screw driver kit Steel Scale 12'' Ball pein hammer (800 gm) Cross pein hammer(200 gm) Pincer Hand drill ¼'' Hand drill ½'' Mortise Chisel ½ Handel wooden Drill bit set Adze Flat wood raspe file 10'' C clamp 4'' Wood Working Machine With Accessories Steel Tape 3 m Wood Working Lathe Machine Flat wood raspe file 12'' Half Round Basted File 10" Wood Working Lathe Machine Kit (Chisels) List of Equipments/ Apparatus/ Machinery available in Fitting Shop Sr. No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Items Flat file bastard 10" Flat file bastard 12" Square file 10" Square file 8" Triangular file 6" Triangular file 8" Aluminium file 12" Round file 12" Half round file 10" Bench vice 4" Bench vice 5" Needle file set Try Square 6" Hacksaw frame 12" Adjust hacksaw frame 12" Spanner set Depth gauge 12" O/S micrometer 0.25 Vernier calipers 6" Combination set 12" 26 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 Vernier height gauge Vee block Steel scale 12" Steel scale 6" Inside calliper 6" Outside caliper 6" Divider 6" Filler gauge Hand tap 1/4" Hand tap 5/16" Hand tap 3/8" Figure set Letter set Die handle Tap handle Center punch Granite Surface plate with stand Oil cane Bench drilling machine Scriber Hammer cross pein 200 gm Ball pein hammer 800 gm Ball pein hammer 500 gm Ball pein hammer 200 gm Screw driver 928 No. Screw driver 824 No. Screw driver set Odd leg calipers 6" Pipe vice 2 ½" Pipe vice 3 ½" Pipe die set ½ "to 1" Heavy duty drill vice 6" Hand tap 10x1.5 Hand tap 3/8" Thread gauge H.S.S. T/S counter sinking drill ½" Pipe cutter 1" Drill Machine Vice 4" Pipe Wrench Pipe Die Ratched ½" to 1" Drill Gauge Hand Reamer 8 mm Smooth File 10" Screw Wrench Chisel 1/2" x 6" List of Equipments/ Apparatus/ Machinery available in Welding Shop Sr.no 1 2 Items Bench grinder Angle Grinder . 27 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 Arc Welding set 300 Amp Lead Thimble Screen Clamp Gas Tanki Torch Set Oxy Regulator Lighter Hose clamp Chisel Crosspein hammer 800 gm Anvil 50 Kg Hacksaw frame Try square Bench vice Spot welding set with Accessories Steel scale 12'' Acetylene Regulator D.A. Cylinder Oxygen Cylinder Hand Sheet Cutter TIG Welding Set Gas Cutting Torch Crosspein hammer 500 gm List of Equipments/ Apparatus/ Machinery available in Electrical Shop Sr. No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 Item Wire Stripper and cutting plier Wire Striper Aven Combination plier 8'' Long Nose Plier 6'' Flat Nose Plier 6'' Side Cutter Tenon Saw Screw Driver 824 Screw Driver 928 Ring Spanner set 6-32 Try Square 6'' Cross Pein Hammer 500 gms Ball pein Hammer 800 gms Cross pein hammer 200 gms Pincer Poker Oil can Screw Driver kit Hack saw frame 12'' Flat file basted 10'' Flat file basted 12'' 28 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 Electric Drill machine Hand drill Bench vice 5'' Steel scale 12'' Digital clamp meter Insulation tester Digital Techometer Digital multimeter Single Phase energymeter Solderting iron 35 w Standard Wire gauge(S.W.G) 3 Phase induction motor Neon test pen Hydrometer High Rate Discharge cell tester Battery Charge Voltmeter Ac/Dc 0-500v Ammeter Ac/dc 0-30 Amp Voltmeter D.c (0-30v) Ammeter D.c(0-10 Amp) Screw Gauge Battery 12 v Geyser Desert cooler Automatic electric press 1200 W Electric Oven Wooden Board 8' x4' x ¾'' Wooden Board 6' x 4' x¾'' Stop Watch digital Bearing Pullar 2 ¼'' Pulley Pullar 6'' Denko Earth Tester 100 ohm Frequency meter 48 *96 DPM Wattmeter 96*96 Rev-forward switch 16 A Insulated Screw Driver 100 mm Steel Tape 3 meter Ceiling Fan Crimping Tool "Alcon" Tube Rod - 2' with copper chock List of Equipments/ Apparatus/ Machinery available in Smithy Shop Sr. No 1 2 3 4 5 Items Anvil 50 Kg Cross pein hammer-800gm Cross Pein Hammer-500gm Cross pein Hammer-200gm Ball pein hammer-800gm 29 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 Ball pein Hammer-500gm Tongs Sledge Hammer-5kg Sledge Hammer-2kg Sledge Hammer-1kg Swage Block-10'' x10'' Chisel with Handle Chisel Top Fuller Top fullar with handle Hacksaw Steel Scale 12'' Bench vice 4'' Sledge Hammer-6kg Flatter with Handle Furnace Oil Punch Figure Set Letter Set Bastard File Flat 12" Oil Cane Anvil 100 Kg Open Hearth Furnance List of Equipments/ Apparatus/ Machinery available in Sheet Metal Shop Sr. No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 Items Tin Cutter 8" Tin Cutter 10" Seriber Tray Square 6" Tray Square 12" ODD Leg Caliper 6" Flat Tong Nilon Hammer 652 Mellet Face 652 Nilon Hammer 653 Nilon Face 653 Measuring Tape 3 Meter Center Punch Chisel ¾" x 6" Vernier Caliper 6" Wire Gauge Ball Pein Hammer - 200 gm Ball Pein Hammer - 500 gm Divider Inside Spring Caliber Outside Spring Caliber 30 List of Equipments/ Apparatus/ Machinery available in Machine Shop (Workshop) Sr. No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 Items Lathe Machine 6' Lathe Machine 4½' Shaper Machine 12" Milling Machine Grinder Machine 8" Steel Scale 12" Vernier Caliper 6" Vernier Caliper 0-150 m.m. O/S micrometer 0.25 O/S micrometer 25-50 m.m Vernier Height Gauge 0-300 m.m. Try Square 6" Bevel Protector Ball Pin Hammer 500 gm Smooth File 12" (Flat) Spanner Set 6-32 Graynite Surface Plate 630x630x80 Fabricated Stand For Surface Plate Surface Gauge 12" Dead Centre (M-T3) Dog Carrier Bent Number Punch Oil Can Knurling Tool 1 Gali Knurling Tool 2 Gali Boring Bar with Sleeve 1/4" Power Hacksaw Machine Revolving Centre Grinder Wheel Dresser Star Cutter Sleeve 2-3 Sleeve 3-4 Drill Chuck with Key Arber (Drill Shank) Swivel Milling Machines Vice 4" Angle Plate Tool Post Grinder 6" with (Internal and External) V. Block with clump 75 x50 x 50 Centre Punch 4" Thread Gauge Inside Calliper 6" Outside Calliper 6" Divider 6" Odd Leg Calliper Drill Sleeve 1-2 Boring Bar 1/4" Centre Gauge Qial Gauge Heavy Duty Megnetic Stand 31 49 50 Sucriber 8" 6x14"x12" All Lathe Machine List of Equipments/ Apparatus/ Machinery available in Foundry Shop Sr. No. 1 2 3 4 5 6 7 8 9 10 Items Crucible 25 No. Crucible 8 No. Shovel Trowel Mattock (Kahi) Tasla Riddle Jali Blower with 1 H.P. Motor Boxes (Moulding Box) Cope & Drag List of Equipments/ Apparatus/ Machinery available in Highway Engg. Lab (5th Sem) Sr. No. 1 2 3 4 5 6 7 8 Items Ductility test machine Softening Point App. With electric stirrer and Thermostatically controlled Heater Impact Test Machine C.B.R. Machine Termometer Penetrometer Los Angles Machine Micrometer List of Equipments/ Apparatus/ Machinery available in Automobile Engg. Lab (5th Sem) Sr. No. 1 2 3 4 5 6 7 Items Battery Ignition System Head Light Model Wiper and Indicators Master Cylinder An Automobile Engine (Four Stroke Four Cylinder) Charging of an Automobile Battery and measuring cell voltage and specific gravity of eletrolyte Carburator S.U. Type 32 List of Equipments/ Apparatus/ Machinery available in Thermodynamics-II Lab (5th Sem) Sr. No. 1 2 3 4 5 6 Items a). A Two stroke engine Petrol b). Actual cut section model of two stroke engine petrol a). A two stroke engine diesel b). Actual cut section model of two stroke engine diesel Solex Carburator Model of Coiling Systerm of an automobile Model of Lubrication system of an automobile Model of Steam Turbine List of Equipments/ Apparatus/ Machinery available in Power Lab (3rd Sem) Sr. No. Items 1 Panel for Testing MCB Fuses 2 Panel for under Voltage & over voltage Relay 3 Panel For over current & Earth fault Relay 4 Testing of Transformer Oil Kit List of Equipments/ Apparatus/ Machinery available in Consumer Electronics Lab (5th Sem) Sr. No. 1 2 3 4 Items Microphone & Loudspeaker channel App. Colour TV Demo - Kit Dish Anteena Kit Microwave Oven trainer Kit Tape Recorder Kit 33 List of Equipments/ Apparatus Micro Controller & Embedded System Lab Sr. No. 1 2 Items Microcontroller Kit A to D Convertor List of Equipments/ Apparatus/ Machinery available in Communication System-II Lab (5th Sem) Sr. No. 1 2 3 4 5 6 7 Items ASK Modulation & Demodulation Kit FSK Modulation & Demodulation Kit TDM Circuit Kit Fax Machine Trainer Kit Hamming Code Kit USART KIT CRO 20Mhz List of Equipments/ Apparatus/ Machinery available in I & PLC Lab (5th Sem) Sr. No. 1 2 3 4 5 6 Items Photodiodes Characterstics Kit Photocells Characteristics Kit Photo Transistor Characteristics Kit LDR Characteristics Kit Strain Gauge Tutor Thermocouple Tutor 34 7 8 9 10 11 Linear Displacement and Measurement Kit Angular Displacement Tutor Instrumentation Amplifier Pressure Meaurment Tutor DSO 25Mhz Colour Display List of Equipments/ Apparatus/ TSEE Lab (5th Sem) Sr. No. 1 2 3 4 5 6 7 8 9 10 11 Items Display Board of Capacitor Display Board of Resistar Display Board of Transistor Display Board of Digital IC Desoldring Pump Digital Multimeter Logic Probe & Pulse controller Digital IC Tester Soldering iron Universal IC Tester Soldering Wire List of Equipments/ Apparatus in Survey Lab (Civil Engg.) Sr. No. Name of Item 1 Auto Level 2 Stand for Autolevel 3 Dumpy Level 4 Stand for dumpy level 5 Leveling Staff 6 Plane Table 7 Stand for Plane Table 8 Plane Alidade 9 Prismatic Compass 10 Stand for Prismatic Compass 11 Ranging Rod 12 Ranging rod (Three Fold) 13 Telescopic Alidade 14 Magnetic Compass for Telescopic Alidade 15 U-Fork for telescopic Alidade 16 Metallic Tape (30m) 17 Steel Tape (30m) 18 Steel Tape (15m) 19 Theodolite 20 Stand for Theodolite 35 21 22 23 24 25 26 27 28 29 30 31 32 Planimeter Magnetic Compass Bubble Tube 3” U-Fork Plumb-bob for U-Fork Optical Square Tangent Clinometer Abney Level Ghat Tracer Cross Staff Chain Arrow List of Equipments/ Apparatus in WWE Lab (Civil Engg.) Sr. No. 1 2 3 4 5 6 7 8 9 Details Digital D.O. Meter Jar Test App. Water Meter Digital Nephlometer Ferrule T.D.S. App Digital B.O.D. Test App. Water Analysis Kit Sensor List of Equipments/ Apparatus in C.T Lab (Civil Engg.) Sr. No. 1 2 3 4 5 6 7 Details Slump Cone Compression Test Machine G.I. Trays locally made 26"x17" G.I. Trays locally made 6"x5" G.I. Trays locally made 5"x5" Set of G.I. Sieves with Container ad lid dia (12") 20mm 12.5mm 10mm 2.36mm Set of Brass Sieves with container and lid dia (9") 4.75mm 2.36mm 36 8 9 10 11 12 13 1.18mm 600mic 300mic 150mic 90mic Test Hammer non destructive test of cement Container 3 litre, 15 litre, 30 litre for Bulk density Tickness guage Length gauge Wire Basket Brass sieves 8,10,22,1.18,22,66,66 BNR List of Equipments/ Apparatus in SOIL Lab (Civil Engg.) Sr. No. 1 2 3 4 5 6 7 8 9 10 11 12 13 Details Sand Replacement test Auger 2" Oven 18" x 18" Wash Bottles Plastic Dial Gauge 30 Kg weighing Machine G.I. Locally made trays 17"x 12" G.I. Locally made trays 8"x 5" G.I. Locally made trays 7" x 4" Steel Trays 12" x 10" Steel Trays 8" x 6" Unconfined Compression Testing Machine Direct Shear Testing Machine With Loading Plates 14 15 Core Cutter Liquid Limit App. With casagrande tool and ASTM Tool 16 17 18 19 20 Proctor Test App. Analytical Weight Box Moisture Content Container Moisture Container G.I. Sieves with Lid & Container 4.75mm, 6.3mm, 10mm, 16mm, 20mm, 25mm 31.5mm, 40mm, 50mm, 63mm 21 Set of Brase Sieves with Lid & Container 600 Mics, 150 Mics, 300 Mics, 75 Mics, 4.75mm, 2.36mm, 1.18mm 22 S.P.T Test apparatus i.Standered splite spoon sampler ii. Drill Rods iii. Tripod assembly iv. drive weight assembly ,which consists of a guide rod with driving head and a hammer of 65kg weight. v. Coupling fot A rod 37 List of Equipments/ Apparatus in B.C. Lab (Civil Engg.) Sr. No. 1 2 3 4 5 6 7 Details Spade with Handle Pick Axe with Handle Trowel Wooden Float Iron Float Plumb bob Planks 8'*8"*1.5" List of Equipments/ Apparatus in C.M. Lab (Civil Engg.) Sr. No. Details 1 Beaker 250 ml 2 Measuring Cylinder 250 ml 3 Analytical weight box 4 Washing bottles plastic 5 Stop Watch 6 Vicat apparatus with plunger, initial setting time needle, final setting time needle 7 Measuring Cylinder 500 ml 8 Beaker 1000 ml 9 Le-chatilier app. 10 Cube Mould 3" 11 Cube Molud 15" 12 Branzer's balance with weight 2kg, 1kg, 500g, 200g, 100g, 50g. 13 Electric heater 14 Tray's 15"x 12" 15 Trays 9" x 6" List of Equipments/ Apparatus in Basic Electrical Lab S. No. Particulars KCL-KVL Apparatus 1 Norton’s theorem apparatus 2 Ohm’s law with Power supply 3 Thevenin’s Theorem Apparatus 4 LCR Impedance apparatus 5 6 Ammeter 7 Panel for R.L.C. 8 Reheostate 9 Voltmeter 38 10 11 12 13 14 15 16 17 18 19 20 Watt meter Resistance in series and parllel kit Digital Multimeter LCR Resonant circuit kit Extention board Plier screw driver kit Test Pen charts Screw Driver 8" To verify that Rt = R1+R2+ ……….. Where a). R1, R2 etc. are resistance connected series b). To verify 1/Rt = 1/R1+1/R2+ …… 1/Rn where R1, R2 are resistane connected in parallel. CRO 20 MHz Duel Trace 21 22 To find resonance conditions in RLC series circuit by changing the values of L at C. List of Equipments/ Apparatus in Wireless & Mobile Communication S. No. 1 Particulars Mobile Trainer Kit Internet bandwidth Major software packages available Special purpose facilities available WORKSHOP: 415.94 sqmt List of facilities available. Games and Sports Facilities YES Extra Curriculum Activities YES Soft Skill Development Facilities YES Number of Classrooms and size of each Number of Tutorial rooms and size of each Number of laboratories and size of each Number of drawing halls and size of each ANNEXURE ATTACHED(A) ANNEXURE ATTACHED(A) : ANNEXURE ATTACHED (A) Number of Computer Centres with capacity of each: 08 No’s COMPUTER LABS(A) Central Examination Facility, Number of rooms and capacity of each. Teaching Learning process Curricular and syllabi for each of the programmes as approved by the University. For syllabus visit www.punjabteched.com 39 Sr No Room No. Room Type (Mention Class Room/ Lab/Toilet, etc.) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 L –I L –II L –III L –IV L-V L- VI L- VII L- VIII L- IX L- X L- XI L- XII L- XIII L- XIV L- XV L-XVI L- XVII L- XVIII L- XIX L-XX L- XXI L- XXII L- XXIII L- XXIV L- XXV Class Class Class Class Class Class Class Class Class Class Class Class Class Class Class Class Class Class Class Class Class Class Class Class Class Room Room Room Room Room Room Room Room Room Room Room Room Room Room Room Room Room Room Room Room Room Room Room Room Room 26 L- XXVI 27 L- XXVII 28 L- XXVIII 29 L- XXIX 30 31 32 L- XXX L- XXXI Tut- I 33 Tut -II 34 Tut- III 35 Tut -IV M.M Class Room MMClass Room MM Class Room MMClass Room Class Room Class Room Tutorial Room Tutorial Room Tutorial Room Tutorial Room Carpet area (In Sqm.) Completio n of Flooring Completion of Walls and Painting Completion of Electrification and Lighting 66.88 66.88 71.34 71.34 71.34 66.88 66.88 66.00 66 84.72 66.88 66.88 78.70 78.70 78.70 66.88 69.10 66.10 66 66 66 66 66 66 66 Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes 89.18 Yes Yes Yes 69 Yes Yes Yes 89.18 Yes Yes Yes 89.18 Yes Yes Yes 66 66 33 Yes Yes Yes Yes Yes Yes Yes Yes Yes 33 Yes Yes Yes 33 Yes Yes Yes 33 Yes Yes Yes 40 36 Tut -V 37 Tut -VI 38 Tut -VII 39 Tut -VIII 40 Drawing HallI & II Seminar Hall 41 42 Tutorial Room Tutorial Room Tutorial Room Tutorial Room Drawing Hall Seminar Hall Lab -I 33 Yes Yes Yes 33 Yes Yes Yes 33 Yes Yes Yes 33 Yes Yes Yes 133.776 & 132 132 Yes Yes Yes Yes Yes Yes 112.148 Yes Yes Yes Lab -II 89.184 Yes Yes Yes Lab-I Lab-II Lab 98.8 67 89.184 Yes Yes Yes Yes Yes Yes Yes Yes Yes Lab 89.184 Yes Yes Yes Lab 89.184 Yes Yes Yes Lab 89.184 Yes Yes Yes Lab 78.036 Yes Yes Yes Lab 66 Yes Yes Yes Lab 70 Yes Yes Yes 52 Chemistry Lab Chemistry Lab Physics Lab Physics Lab Mechanical Engg. Lab –I Mechanical Engg. Lab –II Mechanical Engg. Lab -III Mechanical Engg. Lab -IV Mechanical Engg. Lab -V Mechanical Engg. Lab -VI Civil Engg.-I 53 Civil Engg.-II Lab 82.04 Yes Yes Yes 54 55 Civil Engg.-III Civil Engg. – IV Civil Engg. –V Lab Lab 67.34 69.25 Yes Yes Yes Yes Yes Yes Lab 66 Yes Yes Yes Computer Centre ECE- 1 ECE- II ECE- III ECE-IV ECS-I ECS-II Elect. Lab-I Labs 108.70 Yes Yes Yes Lab Lab Lab Lab Lab Lab Lab 66.88 66.88 78.036 66.00 67.35 67 67 Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes 43 44 45 46 47 48 49 50 51 56 57 58 59 60 61 62 63 64 41 65 66 Elect. Lab-II Elect. Lab-III Lab Lab 67 67 Yes Yes Yes Yes Yes Yes 67 Elect. Lab-IV Lab 67 Yes Yes Yes 68 69 70 Fitting Shop Turning Shop Machine Shop Smitty Shop Foundry Shop Carpentry Shop Pattern Making Shop Welding Shop Wiring Shop (Electrical Shop) Staff Room –I Staff Room –II Staff Room – III Staff Room – IV Staff Room –V Staff Room – VI Staff Room – VII Staff Room – VIII Staff Room – IX Staff Room –X Staff Room – XI Staff Room – XII Staff Room – XIII Staff Room – XIV Library Workshops Workshops Workshops Yes Yes Yes Yes Yes Yes Yes Yes Yes Workshops Workshops Workshops Yes Yes Yes Yes Yes Yes Yes Yes Yes Workshops Yes Yes Yes Workshops Workshops Yes Yes Yes Yes Yes Yes 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 415.94 Staff Room Staff Room HOD Office 20 27 15 Yes Yes Yes Yes Yes Yes Yes Yes Yes Staff Room 27 Yes Yes Yes Staff Room Staff Room 27 27 Yes Yes Yes Yes Yes Yes Staff Room 27 Yes Yes Yes HOD Office 21.4 Yes Yes Yes HOD Office 21.4 Yes Yes Yes HOD Office HOD Office 17.83 21.4 Yes Yes Yes Yes Yes Yes Staff Room 21.4 Yes Yes Yes HOD Office 18.39 Yes Yes Yes Staff Room 18.39 Yes Yes Yes 303 Yes Yes Yes Library 42 92 93 94 95 96 97 98 99 10 0 10 1 10 2 10 3 10 4 10 5 10 6 10 7 10 8 Administrative Office 150 Yes Main/Admin Office Management Room Reception Principal Room Examination Room Placement Cell Security Room Pantry Toilet Block-I 10 Toilet BlockII Toilet BlockIII Toilet Block – IV Toilet Block – V Toilet Block VI Toilet BlockVII Toilet BlockVIII 5 No Toilets in Admin Block Girls Common 9 common Yes Yes 80 Yes Yes Yes 110.6 33 Yes Yes Yes Yes Yes Yes 33 Yes Yes Yes 32.55 Yes Yes Yes 11.89 Yes Yes Yes 12.68 Yes Yes Yes Toilets 26.75 Yes Yes Yes 26.75 Yes Yes Yes 26.75 Yes Yes Yes 26.75 Yes Yes Yes 24..43 Yes Yes Yes 26.75 Yes Yes Yes 3.25 Yes Yes Yes 102.25 Yes Yes Yes 30 (Each 6) Yes Yes Yes 132 Yes Yes Yes 101.6 Yes Yes Yes Room Room 11 Boys Common 0 Common Room Room 1 & 2 BOYS HOSTEL 43 11 10 No. Hostel 184.20 Yes Yes Yes 1 Room (Each 18 Yes Yes Yes 7 Yes Yes Yes Room 18.40) 11 Warden 2 Room 11 Warden 3 Kitchen 11 2 Toilets 84.65 Yes Yes Yes Corridor 58 Yes Yes Yes 289.67 Yes Yes Yes 20 Yes Yes Yes 110.00 Yes Yes Yes 185.42 Yes Yes Yes 32.00 Yes Yes Yes 4 11 5 11 College Mess Mess 6 11 Store 7 11 4 No. Toilets 8 11 College 9 Canteen 12 0 Sick Room Canteen CIRCULATION AREA Sqm . Ground Floor Entrance Stair Corridor First Floor 1 x 10' x 24' 2 x 11' x 24' 1 x 10' x 225.5' 22.29 49.00 209.48 280.77 44 Waiting Area Corridor Stair Hall 1 x 10' x 8' 1 x 245' x 10' 2 x 11' x 24' 7.43 227.60 49.00 284.03 Second Floor Corridor Stair Hall 1 x 245' x 10' 2 x 11' x 24' 227.60 49.00 276.60 Third Floor Corridor 1 x 50 x 10 Stair Hall 46.45 1 x 11 x 24 24.52 70.97 New Block Entrance Corridors Stair Hall 350.79 W/s & Laboratory Block Corridors & Stair Hall (G.F & F.F) 296.17 1x 12 x18 1 x 10 x 18 20.07 16.72 2 x 10 x 151 2 x 10 x 18 280.56 33.44 296.17 45 ) Faculty profile :S.N. Name Designati on 1 Mr. Y.S. Saini Principal 2 Mr. Narpinder Singh 4 Mr. Gurminder Singh 5 Ms.Neha Kapoor 6 Mrs.Aniti Sharda Lect. Math. Lect. Math. Lect. Math Lect. Math 7 Mr.Anupam Khana Lect. Math 8 Mr. Sandeep Singh 9 Ms. Archna Nanda 10 Ms. Sandeep Saini 11 Ms. Kritika 12 Ms. Hardeep Kaur Lect Chem Lect Chem Lect Chem Lect. Chem. Lect. Physics 13 Ms. Sandeep Sandhu Lect. Physics 14 Ms. Nidhi Sharma Lect. Physics 15 Mr. Surinder Kumar 16 Mr. Hardeep Singh 17 Mrs. Nitu Budhija 18 Mr. Shiv Kumar 19 Mr. Rakesh Kumar 20 Mr. Arun Kumar Sood 21 Mr. Ramesh Kumar Sharma HOD Applied Sci. Lect. Eng. & C.S. Lect. Eng. & C.S. Lect. Eng. & C.S. Lect. Eng. & C.S. HOD (O) Civil Sr. Lect. Civil 22 Ms.Geena Dogra Lect. Civil Qualifications with passing Division Experience in yrs Industr ial Teaching M.Tech. (ECE) M.Phil M.Sc. (Math) First Division M.Sc. (Math) First Division M.Sc. (Math) Second Division M.Sc. (Math) Second Division M.Sc. (Chem.) First Division M.Sc. (Chem.) First Division M.Sc. (Chem.) First Division M.Sc. (Chem.) First Division M.Sc. (Physics) First Division M.Sc. (Physics) First Division M.Sc. (Physics) First Division M.Sc. (Physics) First Division M.A. (Engnlish) 2nd Division M.A. (Engnlish) FirstnDivsion M.A. (Engnlish) 2nd Division M.A. (Engnlish) 2nd Division B.Tech. Civil First Divison AMIE (Civil) B.E Civil with First Divison Subjects Taught nal informa tion Whether appointm ent regular / adhoc / visiting ECE Regular Mathematics Adhoc 1.6 Years Mathematics Adhoc 2.6 Years Mathematics Part Time Adhoc Mathematics 2 *Additio Mathematics Part Time 2.5 Years Chemistry Adhoc 1.3 Years Chemistry Adhoc 3 Years Chemistry Adhoc Fresh Chemistry Adhoc 3.5 years Physics Regular 1 Year Physics Adhoc 10 Months Physics Adhoc 3 Years Physics Regular 5 Years English & Comm. Skills Adhoc English & Comm. Skills Adhoc 4 years English & Comm. Skills Adhoc 7 Years English & Comm. Skills Adhoc 36 Years Soil Engg Regular 36 Years HWE Regular FM Adhoc 46 23 Mr. Rahul Dev Sayal Lect. Civil B.Arch. BC Part Time 24 Mr. Pawan Kumar Lect. Civil Serveying Part Time 25 Mr. Anil Aggarwal Lect. Civil Mr.Sharan Paul Hans Lect. Civil RCC, Enviromental Engg. W.W.E.S. Drg. Part Time 26 B.Tech. Civil with First Division B.Tech. Civil with First Division B.Tech Civil First Divison 27 Mr.Hardeep Singh Lect. Civil B.Tech Civil First Divison Part Time 28 Mr.Gurinder Singh Lect. Civil B.Tech Civil First Divison Structural Mechanics, Project /RBT CM 29 Mr. Parminder Singh HOD (O) EE 3.6 years EM-II Adhoc 30 Mr. Prabhjit Singh Lect. Electrical 4 months NCES/FOEE Adhoc 31 Mr.Taranpreet singh Lect. Electrical SCA/EEDD Adhoc 32 Mr.Saurabh Rai Lect. Electrical IMEE/ EP-I Adhoc 33 Mr.Jaskaran Singh Sehra Lect. Electrical EEEM Adhoc 34 Mr. Inderpal Singh HOD Mech RAC Adhoc 35 Mr.Sarabjit Singh Lect Mech. MD-I 36 Mr. Kulwant Singh Lect Mech. Part Time/ Visiting Adhoc 37 Mr.Varun Sharma Lect Mech. 38 Mr. Sukhwinder Singh Lect Mech. 39 Mr. Gurvinder Pal Singh Lect Mech. 40 Mr.Amarjit Singh Lect Mech. B.Tech. EE with First Division B.Tech. EE with First Division B.Tech. EE with First Division B.Tech. EE with First Division B.Tech. EE with First Division B.Tech. ME with First Division B.Tech. ME with First Division B.Tech. ME with Second Division B.Tech. ME with First Division B.Tech. ME with First Division B.Tech. ME with First Division B.E ME with First Division 41 Mr.Arvind Bharmaurya Lect Mech. 42 Mr Amritpal Singh Lect. Mech. 43 Mr Jagdeep Singh Lect. Mech. 44 Mr. Parminder Singh Lect. Mech. 10 Years 2 Years 3 Years AM Part Time Part Time MS Part Time 1 Years TD-II Adhoc 1 Year ED Adhoc WT-I Part Time B.E ME with First Division EEE Part Time B.Tech. ME with First Division B.Tech. ME with First Division B.Tech. ME with First Division Applied Mecahnics, CAD Lab WT-I Adhoc MD-I Adhoc 3 Years 10 Months Adhoc 47 45 Mr. Davinder Singh Lect. Mech. 46 Mr. Randeep Singh Lect. Mech. 47 Mr. Kuldip Chhibber Lect. Mech. 48 Mr. Amrinder Singh Lect. Mech. 49 Mr. Sanjit Kumar Lect. Mech. 50 Mr. Hardeep Singh Lect. Mech. 51 Mr.Rohit Dutta Lect. Mech. 52 Mr.Mandeep Singh Lect. Mech. 53 Mr. Rajinder Kumar Sharma Sr. Lect Mech. Diploma ME Mr.Veer Bhadra Pathak Lect Mech. Diploma ME 54 55 Mr.Harsimran Singh Lect Mech. 56 Mr.Ravinder Singh Lect Mech. 57 Mr.Sandeep Kumar Lect Mech. 57 Mr.Gourav Dheer Lect Mech. 58 Mr.Jiwan Kumar Lect Mech. 59 Mr. Ishan Dadwal Lect Mech. Lect Mech. 60 Mr.Hardeep Singh B.Tech. ME with First Division B.Tech. ME with First Division B.Tech. ME with First Division B.Tech. ME with First Division B.Tech. ME with First Division B.Tech. ME with First Division B.Tech. ME with First Division B.Tech. ME with First Division 4 Years TD-II Part Time 1 Year TOM / ED Adhoc Material Science Adhoc Eng. Drg. -I, Adhoc AME, WT-I, WT-III Adhoc Material Science Adhoc ED-I Adhoc AM, FM Adhoc ED-I Adhoc ED, MS Adhoc B.Tech. ME with First Division B.Tech. ME with First Division B.Tech. ME with First Division B.Tech. ME with First Division B.Tech. ME with First Division B.Tech ME M.S, M.S Lab, A.M. Lab, AIM ED, Adhoc Eng. Drg. -II Part Time CAME Part Time PROD .MGT Part Time MS B.Tech ME WT-III Part Time Part Time TOM 61 Mr.Rajinder Singh Lect Mech. B.Tech ME 62 Ms. Harpreet Dhami HOD (ECE) B.Tech. ECE First Division 5 Years TSEE, 63 Mr. Vikas Parashar Lect. ECE B.Tech. ECE First Division 5 years IPLC/DE 64 Mr. Rajwant Singh Lect. ECE B.Tech. ECE First Division 2 Years CE/EVS 1.2 years Part Time Part Time PGDCA , M.Tech. Persuin g Regular Adhoc M.Tech. M.SS(I T) Adhoc 48 65 Ms. Rajvir Kaur Lect. ECE B.Tech. ECE First Division 66 Mr. Pritpal Singh Lect. ECE B.Tech. ECE First Division 67 Mr. Paramvir Singh B. Tech ECE 68 Mr.Vijayender Singh Lect. ECE Lect. ECE 69 Ms.Navjot Kaur Lect. ECE B.E with Second Divison B.Tech. ECE First Division 70 Ms.Daljit Kaur Lect. ECE 71 Mr.Arshdeep Singh 72 1.5 Years 1.3 years PCE / DE 9 Months MCES Adhoc Persuin g M.Tech. Adhoc PCE, IPLCS, EC-I DE/ Adhoc EIM Part Time B.Tech. ECE First Division PCE Part Time Lect. ECE B.Tech. ECE First Division EDC Part Time Mr.Gurwinder Singh Lect. ECE B.Tech. ECE First Division EM Part Time 73 MrGurpreet Kaur Lect. ECE B.Tech. ECE First Division CE Part Time 74 Ms.Parminder Kaur Lect. ECE B.Tech. ECE First Division CPA / TSEE Part Time 75 Mr. Narinder Singh HOD (O) (IT)/CSE B.Tech. CSE First Division 2 Years SAD, IWT, CW, BIT Regular 76 Mr. Gurjeet Singh Lect CSE M.Sc., NPD First Division 3 Years Adhoc 77 Ms. Shilpa Rai Lect CSE 2 Years 78 Mr. Amrinder Singh Lect CSE 3.5 Years 79 Mr. Amritpal Singh Lect CSE 2 Years OS Adhoc 80 Mr. Gurpreet Singh Lect CSE 2.6 Years Ms. Rajandeep Kaur Lect CSE CPA, Minor Project SCA Adhoc 81 82 Ms. Prabhjot Kaur Lect CSE Ms. Hardeep Kaur Lect CSE 84 Mr. Mandeep Singh Lect CSE 4 Years C LANGUAGE RDBMS, RDBMS Lab CPI Adhoc 83 85 Mr. Maninder Kaur Lect CSE 3 Months MM Adhoc 86 Ms. Rajwinder Kaur Lect CSE B.Tech. CSE First Division B.Tech. CSE First Division M.C.A. First Division B.Tech. CSE First Division B.Tech. CSE First Division B.Tech. CSE First Division B.Tech. CSE First Division B.Tech. CSE First Division B.Tech. CSE First Division B.Tech. CSE First Division Multimedia Computer Networks, Operating System. DS, OOP, Using C++ JAVA 8 Months OST Adhoc 87 Ms. Ramanjit Kaur Lect CSE B.Tech. CSE First Division 8 Months CPA Adhoc 88 Ms.Tavleen Kaur Lect CSE B.Tech. CSE First Division SCA Adhoc 1 Year 1.3 Years 1.3 Years 1.2 Years Adhoc Part Time Adhoc Adhoc Adhoc MCSE, CCWA Adhoc 49 89 Mr. Gurpreet Singh Lect CSE B.Tech. CSE First Division CAME Part Time 90 Mr. Jatin Lect CSE B.Tech. CSE First Division DTP, BIT Part Time 91 Ms. Gurpal Kaur Lect CSE Vb.NET Adhoc 92 Ms.Navjeet Kaur Lect CSE OST Adhoc 93 Ms. Jyoti Saini Ms.Mandeep Kaur GSED/ BOM, Managemetn Subjects C.A Adhoc 94 Lect Manage ment Lect CSE B.Tech. CSE First Division B.Tech. CSE First Division MGMT. Frist Division 95 Ms.Chandni Dogra Lect CSE OST 96 Ms.Harwinder Kaur Lect CSE 97 Ms.Nidhi Rana Lect CSE Part Time Part Time Part Time M.Sc (IT) with First Divison B.Tech. CSE First Division B.Tech. CSE First Division B.Tech CSE 4 Months 1.5 Years 9 Months JAVA GSED/ Part Time 50 Internal Continuous Evaluation System and place 3 HOUSE TEST ARE CONDUCTED EVERY SEM & SEMINARS CONDUCTED AND DECLAMATION FOR CONTESTS OVERALL ARE PERSONALITY DEVELOPMENT OF STUDENTS AT THE COLLEGE CAMPUS. Students' assessment of Faculty, System in place. SI For each Post Diploma programme give the following: i. Title of the programme ii. Curricula and Syllabi iii. Faculty Profile Name DESIGNATION - N/A- B. Subject Teaching 1. 2. 3. Brief profile of each faculty. Laboratory facilities exclusive to the PD programme Special Purpose Software, all design tools in case Academic Calendar and frame work Research focus List of typical research projects. Industry Linkage Publications (if any) out of research in last three years out of masters projects Placement status Admission procedure Fee Structure Hostel Facilities Contact address of co-ordinator of the PD programme Name : Address : Telephone : E-mail : NOTE: Suppression and/or misrepresentation of information would attract appropriate penal action. 1 1.2 APPLIED ARTS AND CRAFTS PROGRAMMES The following information is to be given in the Information Brochure besides being hosted on the Institution's official Website. "The information has been provided by the concerned institution and the onus of authenticity lies with the institution and not on AICTE." I. NAME OF THE INSTITUTION II. Address including telephone, Fax, e-mail. NAME & ADDRESS OF THE DIRECTOR Address including telephone, Fax, e-mail. III. NAME OF THE AFFILIATING UNIVERSITY IV. GOVERNANCE Members of the Board and their brief background Members of Academic Advisory Body Frequency of the Board Meetings and Academic Advisory Body Organizational chart and processes Nature and Extent of involvement of faculty and students in academic affairs/improvements Mechanism/Norms & Procedure for democratic/good Governance Student Feedback on Institutional Governance/faculty performance Grievance redressal mechanism for faculty, staff and students V. PROGRAMMES Name of the Programmes approved by the AICTE Name of the Programmes accredited by the AICTE For each Programme the following details are to be given: Name Number of seats Duration Cut off mark/rank for admission during the last three years Fee Placement Facilities Campus placement in last three years with minimum salary, maximum salary and average salary Name and duration of programme(s) having affiliation/collaboration with Foreign University(s)/Institution(s) and being run in the same Campus along with status of their AICTE approval. If there is foreign collaboration, give the following details: 2 Details of the Foreign Institution/University: Name of the University/Institution Address Website Is the Institution/University Accredited in its Home Country Ranking of the Institution/University in the Home Country Whether the degree offered is equivalent to an Indian Degree? If yes, the name of the agency which has approved equivalence. If no, implications for students in terms of pursuit of higher studies in India and abroad and job both within and outside the country. Nature of Collaboration Conditions of Collaboration Complete details of payment a student has to make to get the full benefit of collaboration. For each Collaborative/affiliated Programme give the following: Programme Focus Number of seats Admission Procedure Fee Placement Facility Placement Records for last three years with minimum salary, maximum salary and average salary Whether the Collaborative Programme is approved by AICTE? If not whether the Domestic/Foreign Institution has applied to AICTE for approval as required under notification no. 37-3/Legal/2005 dated 16th May, 2005 VI. FACULTY Branch wise list faculty members: Permanent Faculty Visiting Faculty Adjunct Faculty Guest Faculty Permanent Faculty: Student Ratio Number of faculty employed and left during the last three years 3 VII.PROFILE OF DIRECTOR/PRINCIPAL WITH QUALIFICATIONS, TOTAL EXPERIENCE, AGE AND DURATION OF EMPLOYMENT AT THE INSTITUTE CONCERNED For each Faculty give a page covering 1. Name 2. Date of Birth 3. Educational Qualification 4. Work Experience • Teaching • Research • Industry • Others 5. Area of Specializations 6. Subjects teaching at Diploma Level • Diploma Level 7. Research guidance No. of papers published in Masters's - National Journals Ph.D. - International Journals - Conferences 8. Projects Carried out 9. Patents 10. Technology Transfer 11. Research Publications 12. No. of Books published with details VIII. FEE Details of fee, as approved by State fee Committee, for the Institution. Time schedule for payment of fee for the entire programme. No. of Fee waivers granted with amount and name of students. Number of scholarship offered by the institute, duration and amount Criteria for fee waivers/scholarship. Estimated cost of Boarding and Lodging in Hostels. IX. ADMISSION Number of seats sanctioned with the year of approval. Number of students admitted under various categories each year in the last three years. Number of applications received during last two years for admission under Management Quota and number admitted. 4 X. ADMISSION PROCEDURE Mention the admission test being followed, name and address of the Test Agency and its URL (website). Number of seats allotted to different Test Qualified candidates separately [JET (State conducted test/Board tests)/Association conducted test] XI. Calendar for admission against management/vacant seats: Last date for request for applications. Last date for submission of application. Dates for announcing final results. Release of admission list (main list and waiting list should be announced on the same day) Date for acceptance by the candidate (time given should in no case be less than 15 days) Last date for closing of admission. Starting of the Academic session. The waiting list should be activated only on the expiry of date of main list. The policy of refund of the fee, in case of withdrawal, should be clearly notified. CRITERIA AND WEIGHTAGES FOR ADMISSION Describe each criteria with its respective weightages i.e. Admission Test, marks in qualifying examination etc. Mention the minimum level of acceptance, if any. Mention the cut-off levels of percentage & percentile scores of the candidates in the admission test for the last three years. Display marks scored in Test etc. and in aggregate for all candidates who were admitted. Item No I - XI must be given in information brochure and must be hosted as fixed content in the website of the Institution. The Website must be dynamically updated with regard to XII-XV. XII. APPLICATION FORM XIII. Downloadable application form, with online submission possibilities. LIST OF APPLICANTS List of candidates whose applications have been received along with percentile/percentage score for each of the qualifying examination in separate categories for open seats. List of candidates who have applied along with percentage and percentile score for Management quota seats. 5 XIV. RESULTS OF ADMISSION UNDER MANAGEMENT SEATS/VACANT SEATS Composition of selection team for admission under Management Quota with the brief profiles of members (This information be made available in the public domain after the admission process is over) Score of the individual candidates admitted arranged in order of merit. List of candidates who have been offered admission. Waiting list of the candidates in order of merit to be operative from the last date of joining of the first list candidates. List of the candidates who joined within the date, vacancy position in each category before operation of waiting list. XV. INFORMATION ON INFRASTRUCTURE AND OTHER RESOURCES AVAILABLE LIBRARY: Number of Library books/Titles/Journals available (programme-wise) List of online National/International Journals subscribed. E-Library facilities LABORATORY: For each Laboratory List of Major Equipment/Facilities List of Experimental Setup Status and facilities in Studio/Designing and Art Appreciation disciplines/specializations COMPUTING FACILITIES: Number and Configuration of Systems Total number of systems connected by LAN Total number of systems connected to WAN Internet bandwidth Major software packages available Special purpose facilities available Games and Sports Facilities Extra Curriculum Activities Soft Skill Development Facilities Number of Classrooms and size of each Number of Tutorial rooms and size of each Number of laboratories and size of each Number of drawing halls and size of each Number of Computer Centres with capacity of each Central Examination Facility, Number of rooms and capacity of each. Teaching Learning process Curricula and syllabi for each of the programmes as approved by the University. Academic Calendar of the University Academic Time Table Teaching Load of each Faculty Internal Continuous Evaluation System and place Students' assessment of Faculty, System in place. and other related 6 For each Post Dip programme give the following: i. Title of the programme ii. Curricula and Syllabi iii. Faculty Profile SI Name DESIGNATION B. Subject Teaching SI Name DESIGNATION B. Subject Teaching 1. 2. 3. Brief profile of each faculty. Laboratory facilities exclusive to the PG programme Special Purpose Software, all design tools in case Academic Calendar and frame work Research focus List of typical research projects. Industry Linkage Publications (if any) out of research in last three years out of masters projects Placement status Admission procedure Fee Structure Hostel Facilities Contact address of co-ordinator of the PG programme Name : Address : Telephone : E-mail : NOTE: Suppression and/or misrepresentation of information would attract appropriate penal action. 7 1.3 HMCT PROGRAMMES The following information is to be given in the Information Brochure besides being hosted on the Institution's official Website. "The information has been provided by the concerned institution and the onus of authenticity lies with the institution and not on AICTE." I. NAME OF THE INSTITUTION Address including telephone, Fax, e-mail. II. NAME & ADDRESS OF THE DIRECTOR Address including telephone, Fax, e-mail. III. NAME OF THE AFFILIATING BOARD IV. GOVERNANCE Members of the Board and their brief background Members of Academic Advisory Body Frequency of the Board Meetings and Academic Advisory Body Organizational chart and processes Nature and Extent of involvement of faculty and students in academic affairs/improvements Mechanism/Norms & Procedure for democratic/good Governance Student Feedback on Institutional Governance/faculty performance Grievance redressal mechanism for faculty, staff and students V. PROGRAMMES Name of the Programmes approved by the AICTE Name of the Programmes accredited by the AICTE For each Programme the following details are to be given: Name Number of seats Duration Cut off mark/rank for admission during the last three years Fee Placement Facilities Campus placement in last three years with minimum salary, maximum salary and average salary Name and duration of programme(s) having affiliation/collaboration with Foreign University(s)/Institution(s) and being run in the same Campus along with status of their AICTE approval. If there is foreign collaboration, give the following details: 8 Details of the Foreign Institution/Board: Name of the Board/Institution Address Website Is the Institution/University Accredited in its Home Country Ranking of the Institution/University in the Home Country Whether the degree offered is equivalent to an Indian Degree? If yes, the name of the agency which has approved equivalence. If no, implications for students in terms of pursuit of higher studies in India and abroad and job both within and outside the country. Nature of Collaboration Conditions of Collaboration Complete details of payment a student has to make to get the full benefit of collaboration. For each Collaborative/affiliated Programme give the following: Programme Focus Number of seats Admission Procedure Fee Placement Facility Placement Records for last three years with minimum salary, maximum salary and average salary Whether the Collaborative Programme is approved by AICTE? If not whether the Domestic/Foreign Institution has applied to AICTE for approval as required under notification no. 37-3/Legal/2005 dated 16th May, 2005 VI. FACULTY Branch wise list faculty members: • Permanent Faculty • Visiting Faculty • Adjunct Faculty • Guest Faculty • Permanent Faculty: Student Ratio Number of faculty employed and left during the last three years 9 FACULTY PROFILE: For each Faculty give a page covering Photograph 1. Name 2. Date of Birth 3. Educational Qualification 4. Work Experience • Teaching Signature • Research • Industry • Others 5. Area of Specializations 6. Subjects teaching at Diploma Level • Post Diploma Level 7. Research guidance No. of papers published in Masters's - National Journals Ph.D. - International Journals - Conferences 8. Projects Carried out 9. Patents 10. Technology Transfer 11. Research Publications 12. No. of Books published with details VII. PROFILE OF DIRECTOR/PRINCIPAL WITH QUALIFICATIONS, TOTAL EXPERIENCE, AGE AND DURATION OF EMPLOYMENT AT THE INSTITUTE CONCERNED VIII. FEE Details of fee, as approved by State fee Committee, for the Institution. Time schedule for payment of fee for the entire programme. No. of Fee waivers granted with amount and name of students. Number of scholarship offered by the institute, duration and amount Criteria for fee waivers/scholarship. Estimated cost of Boarding and Lodging in Hostels. IX. ADMISSION Number of seats sanctioned with the year of approval. Number of students admitted under various categories each year in the last three years. Number of applications received during last two years for admission under Management Quota and number admitted. X. ADMISSION PROCEDURE Mention the admission test being followed, name and address of the Test Agency and its URL (website). Number of seats allotted to different Test Qualified candidates separately [JET (State conducted test/Board tests)/Association conducted test] Calendar for admission against management/vacant seats: 10 XI Last date for request for applications. Last date for submission of application. Dates for announcing final results. Release of admission list (main list and waiting list should be announced on the same day) Date for acceptance by the candidate (time given should in no case be less than 15 days) Last date for closing of admission. Starting of the Academic session. The waiting list should be activated only on the expiry of date of main list. The policy of refund of the fee, in case of withdrawal, should be clearly notified. CRITERIA AND WEIGHTAGES FOR ADMISSION Describe each criteria with its respective weightages i.e. Admission Test, marks in qualifying examination etc. Mention the minimum level of acceptance, if any. Mention the cut-off levels of percentage & percentile scores of the candidates in the admission test for the last three years. Display marks scored in Test etc. and in aggregate for all candidates who were admitted. Item No I - XI must be given in information brochure and must be hosted as fixed content in the website of the Institution. The Website must be dynamically updated with regard to XII-XV. XII. APPLICATION FORM XIII. Downloadable application form, with online submission possibilities. LIST OF APPLICANTS List of candidates whose applications have been received along with percentile/percentage score for each of the qualifying examination in separate categories for open seats. List of candidates who have applied along with percentage and percentile score for Management quota seats. XIV. RESULTS OF ADMISSION UNDER MANAGEMENT SEATS/VACANT SEATS Composition of selection team for admission under Management Quota with the brief profiles of members (This information be made available in the public domain after the admission process is over) Score of the individual candidates admitted arranged in order of merit. List of candidates who have been offered admission. Waiting list of the candidates in order of merit to be operative from the last date of joining of the first list candidates. List of the candidates who joined within the date, vacancy position in each category before operation of waiting list. XV. INFORMATION ON INFRASTRUCTURE AND OTHER RESOURCES AVAILABLE LIBRARY: Number of Library books/Titles/Journals available (programme-wise) List of online National/International Journals subscribed. E-Library facilities LABORATORY: For each Laboratory List of Major Equipment/Facilities 11 List of Experimental Setup The Hotel they are attached to/or have access to Special facility in the Hospitality field Special facility in the Kitchen/presentation part. COMPUTING FACILITIES: Number and Configuration of Systems Total number of systems connected by LAN Total number of systems connected to WAN Internet bandwidth Major software packages available Special purpose facilities available Games and Sports Facilities Extra Curriculum Activities Soft Skill Development Facilities Number of Classrooms and size of each Number of Tutorial rooms and size of each Number of laboratories and size of each Number of drawing halls and size of each Number of Computer Centres with capacity of each Central Examination Facility, Number of rooms and capacity of each. Teaching Learning process Curricula and syllabi for each of the programmes as approved by the University. Academic Calendar of the University Academic Time Table Teaching Load of each Faculty Internal Continuous Evaluation System and place Students' assessment of Faculty, System in place. For each Post Diploma programme give the following: i. Title of the programme ii. Curricula and Syllabi iii. Faculty Profile SI Name DESIGNATION 1. 2. 3. Brief profile of each faculty. Laboratory facilities exclusive to the PG programme Special Purpose Software, all design tools in case Academic Calendar and frame work Research focus B. Subject Teaching 12 List of Typical Research Projectgs Note: Industry Linkage Publications (if any) out of research in last three years out of masters projects Placement status Admission procedure Fee Structure Hostel Facilities Contact address of co-ordinator of the PG programme Name : Address : Telephone : E-mail : Suppression and/or misrepresentation of information would attract appropriate penal action.