Rs.in Crore

advertisement
Poverty is easy to recognize but difficult to define.
“Characteristics of being poor”
"They are invisible and excluded from society, often deformed or in
pain, without hope, unwanted, totally dependent, and vulnerable. It is
a chasm into which many fall. Its width and depth, defining the
chances of falling in and getting out again, depend on the wealth of
the country and its will to distribute it. Like the circles of hell, there
are many levels".
Volkmann
Calendar of Events – VALIDATION OF BPL 2002 SURVEY LIST
Sl.
No.
1.
2.
3.
4.
Item of Activity
Date
13th Oct’09
State level training at Bhubaneswar for PD,
DRDA, APD(admin), District Statistical Officer
Meeting of Collectors
16th Oct’09
Training at District Level
23rd or 24th Oct’09(Either of
the day)
Block level trainings at each block headquarters 28th, 29th, 30th, 31st
Oct’09(any one day to be
decided by the Collector)
5.
Special Meeting of PRIs at ZP/ PS and GP level
6.
Display of detailed list (L-30 form), photography
and recording of biometric identification of the
head of HH of each HH in the GP office
7.
8.
Conduct of validation in each village (house-tohouse) and subsequent cross-checking
Data validation and entry of new HH
9.
Special Pallisabha
10
Preparation of final list and web-hosting
Between 1st to 5th Nov’09 (To
be decided by the Collector)
15th to 30th Nov’09
1st Dec to 15th Dec’09
To be completed by 30th
Dec’09
Any day between 1st to 15th
Jan’10
31st Jan’10
VALIDATION OF BPL 2002 SURVEY LIST
 L-30
forms will be displayed in the G P Office from
15th November 2009 to 30th November 2009
 BPL facilitator will explain about the validation
process, calendar and HH score.
 Verifying Officer would visit house-to-house for
validation /inclusion of new household using blank L-00
forms and L-30 forms for reference.
 Verifying Officer will write the five digit Family ID
(in case of existing household in BPL 2002 Survey list)
or last Family ID of that village/ 01, 02, 03, …,0n (in
case of new household) on the wall/ door of the house of
each HH by using a brick colored chalk.
VALIDATION OF BPL 2002 SURVEY LIST (CONTD..)
 Scheduled
Tribes including the Primitive
Tribal Groups, Scheduled Castes, Women
headed households, daily wage earners,
families having disabled child/ children and
persons with HIV/AIDS will get due priority
during the validation / inclusion process.
 Concurrently,
the Supervisory Verifying
Officer will randomly crosscheck 15% HHs
already verified by the Verifying Officer. SVO
cannot include any new data or make any
correction in the validation forms (L-00) submitted
by the Verifying Officer.
VALIDATION OF BPL 2002 SURVEY LIST (CONTD..)
In case of large-scale discrepancy reported by the SVO,
the BDO can recommend for re-verification of the
some/ entire village.
 Collector may issue order for re-verification through
another Verifying Officer.
 After data entry, village-wise list of family details with
name of the head of HH, social category and total score
obtained will be generated (L-60 forms) (ST-first, SCsecond and Other Caste-third).
 HHs from each village will be ranked in the descending
order of poverty (i.e. the ascending order of scores) in the
list (L-60 forms).
 L-60 forms will be placed in Pallisabha for ratification

PRINTING OF FORMS
 L-00
forms (Blank Application forms), Instructions
to fill up the forms will be printed locally at District
Hqrs.
 L-30
forms will be printed from the CD/ website
either at DRDA or Block office.
 L-60
forms will be printed from the website at
Block office after completion of data entry.
 All
forms should be in A-4 size.
BUDGET
Cost of printing per form
 Remuneration per HH
 Remuneration for
Supervision per HH
 Data entry per HH
 Training cost
per participant per day
 Mobility & P.O.L per District

:
:
Rs.0.40p (maximum)
Rs.1.00p (fixed)
:
:
Rs.0.50p (fixed)
Rs.0.50p (fixed)
:
:
Rs.50/- (fixed)
Rs.25,000/-

Contingency/Misc. per District:
Rs.1.00 lakh

I.E.C cost per GP
Rs.1000/-
:
Total Requirement for the State is
Rs. 292.50 lakhs (approximately)
Families Surveyed – BPL Survey Household List 2002.
SL No.
District Name
1ANUGUL
2BALANGIR
3BALESHWAR
4BARGARH
5BHADRAK
6BOUDH
7CUTTACK
8DEOGARH
9DHENKANAL
10GAJAPATI
11GANJAM
12JAGATSINGHAPUR
13JAJAPUR
14JHARSUGUDA
15KALAHANDI
16KANDHAMAL
17KENDRAPARA
18KENDUJHAR
19KHORDHA
20KORAPUT
21MALKANGIRI
22MAYURBHANJ
23NABARANGAPUR
24NAYAGARH
25NUAPADA
26PURI
27RAYAGADA
28SAMBALPUR
29SONEPUR
30SUNDARGARH
Total
No. of
Block
8
14
12
12
7
3
14
3
8
7
22
8
10
5
13
12
9
13
10
14
7
26
10
8
5
11
11
9
6
17
209
285
289
248
193
63
342
60
199
129
475
194
280
78
273
153
230
286
168
226
108
382
169
179
109
230
171
148
96
262
No. of
Village
1904
1783
3009
1208
1359
1190
1964
805
1059
1551
3030
1293
1813
352
2221
2534
1542
2086
1577
1906
895
3930
894
1691
652
1705
2718
1284
975
1720
314
6234
50650
No. of GP
No. of Families Surveyed
ST
29559
83987
43753
66434
5451
12532
20207
18551
32660
62483
29690
1789
34037
31237
101126
80474
2726
121116
16389
155559
67723
255051
134869
13919
48842
2657
107808
56597
12671
202139
SC
41651
68650
80276
63859
58682
22911
89246
11677
47844
12634
131130
54922
88067
17644
70027
35814
52974
55750
44788
47825
30784
85372
44057
32717
22207
60853
36122
50677
29084
43076
Oth
153735
204944
255573
186628
193880
58118
306799
29014
153141
43237
468904
192437
243132
31188
172358
36748
220089
123222
197142
76782
19193
175657
67153
165300
69044
245855
46738
63831
73584
83782
Total
224945
357581
379602
316921
258013
93561
416252
59242
233645
118354
629724
249148
365236
80069
343511
153036
275789
300088
258319
280166
117700
516080
246079
211936
140093
309365
190668
171105
115339
328997
1852036
1531320
4357208
7740564
DISTRICT-WISE INFORMATION ON BPL CENSUS
1992 SURVEY
1997 SURVEY
BPL 2002 SURVEY
Total
NO. OF
Total
NO. OF Census
BPL
Rural
BPL
2001
Name of the Rural
Families FAMILIES Families FAMILIES
District
HH@ 5
person
BPL 2002
BOUDH
66776
54145
89617
71872 373038
74608
93561
GAJAPATI
87454
82478
112029
68763 518448
103690
118564
GANJAM
452732
340435
548308
301585 3136937
627387
629841
KALAHANDI
241294
206961
307835
193054 1334372
266874
343511
KORAPUT
188169
162931
264707
221846 1177954
235591
280166
MALKANGIRI
79865
67737
108870
89138 480232
96046
116586
NABARANGP
UR
151834
137504
215429
158684 1018171
203634
246080
94039
78652
127022
99465 530524
106105
140093
KANDHAMAL
113741
100802
145335
113970 647912
129582
153036
RAYAGADA
141862
122061
188499
135785 823019
164604
190764
1454162 10040607 2008121
2312202
NAWAPARA
SD
1617766 1353706 2107651
DISTRICT-WISE INFORMATION ON BPL CENSUS (Contd..)
1992 SURVEY
1997 SURVEY
BPL 2002 SURVEY
Total
NO. OF
Total
NO. OF Census
Rural
BPL
Rural
BPL
2001
Name of the
Families FAMILIES Families FAMILIES
District
HH@ 5
person
BPL 2002
ANGUL
183237
126343
203152
120581 1139341
227868
224983
BALANGIR
238968
181195
329700
201310 1332249
266450
357583
BARGARH
210971
147027
291901
176241 1345601
269120
316921
48237
33833
55298
43571 274095
54819
59242
DHENKANAL
163168
137670
203032
127159 1065983
213197
233645
JHARSUGUDA
58439
34158
68164
33415 509056
101811
80069
KEONJHAR
211611
175533
286923
220820 1561521
312304
300089
SAMBALPUR
137286
99155
150799
90141 928889
185778
171105
91909
57250
110098
80396 540659
108132
115339
225696
167622
285141
185969 1829412
365882
328997
1279603 10526806 2105361
2187973
DEBAGARH
SONEPUR
SUNDERGARH
ND
1569522
1159786 1984208
DISTRICT-WISE INFORMATION ON BPL CENSUS (contd..)
1992 SURVEY
Name of the
District
1997 SURVEY
BPL 2002 SURVEY
Total NO. OF BPL Total Rural NO. OF BPL Census
Rural FAMILIES
Families
FAMILIES 2001
Families
HH@ 5
person
BPL 2002
BALASORE
314008
264088
349446
257606
2023056
404611
379598
BHADRAK
199323
179130
205185
136849
1332249
266450
258128
CUTTACK
253293
187783
335998
176002
2340686
468137
416251
JAGATSINGHPU
R
161946
108827
172300
90895
1056556
211311
250929
JAJPUR
252138
179838
280769
169595
1622868
324574
365236
KENDRAPARA
188768
116990
219436
131424
1301856
260371
278657
KHURDA
184484
142850
226800
134192
1874405
374881
257736
MAYURBHANJ
363869
315084
482176
374867
2221782
444356
516080
NAYAGARH
152455
132219
183437
124576
863934
172787
213101
PURI
207887
155279
236721
163639
1498604
299721
309365
CD
2278171
1782088
2692268
1759645
16135996
3227199
3245081
TOTAL
5465459
4295580
6784127
4493410
36703409
7340682
7745256
ND
1569522
1159786
1984208
1279603
10526806
2105361
2187973
CD
2278171
1782088
2692268
1759645
16135996
3227199
3245081
SD
1617766
1353706
2107651
1454162
10040607
2008121
2312202
Performance of Districts
under
2009-10(Sept. 09)
ORISSA
Indicators
Sl.
No
1
No of House Hold Registered (since inception) (in Lakh)
2
% of Job Card Issued to Registered House Holds
3
% Women persondays to Total Persondays Generated
4
Cumulative No. of HH completed 100 days
5
Average no of days of employment provided per HH
6
Total Fund Available (in Lakhs)
7
% of Exp.to TFA
8
% of Expenditure on Contigency
9
Wage Material ratio
10
Cost Per Mandays (in Rs.)
11
Wage Per Mandays(in Rs.)
12
% Wage disb.through Bank & P.O A/c to unskilled wage
13
Farm Ponds Target (Nos.)
14
Farm Ponds Taken up( Nos.)
15
Farm Ponds completed( Nos.)
16
Farm Pond Expenditure (Rs.in Lakhs)
17
Identification of Waterbodies (Nos.)
18
Waterbodies where work has commenced( Nos.)
2009-10(upto sept.09)
53.72
98.38
38.14
7647
31
57665.86
37
2.61
68:32
134.61
92.04
85.26
160000
35708
3036
1894.38
38631
15937
Yearwise TFA and Expenditure under NREGS(Orissa):
2005-06 to 2009-10 (upto Sept. 09)
20000
21512.76
34716.57
40000
57665.86
69059.23
79193.15
60000
37952.61
Rs. in Lakhs
80000
73346.62
89018.66
100000
67829.3
115153.94
120000
0
2005-06
2006-07
2007-08
2008-09
2009-10 (upto
Sept. 09)
ORISSA
Strengths
85% wage disbursement through accounts
100% MIS operationalisation
Concerns:
Overall decline in HHs provided employment: 18%
Districts with low persondays per households (less than 20): Kalahandi (19%),
Sundergarh (17%), Phase III districts except Cuttack (average 16%).
Low work completion rate: Only 2.8% for the State
60:40 wage-material ratio not maintained: Jharsuguda (30%), Kalahandi
(53%), Nawarangapur (49%), Nuapada (41%), Sambalpur (48%) and Bhadrak
(45%)
Avg. wages paid higher than Notified wage: State Average is Rs.92.04 – 22
districts
Less than 50% wage disbursement through accounts: Boudh (10%), Malkangiri
(9%), Jagatsingpur (42%) and Khordha (0%)
ORISSA
New Initiatives
Gaon Saathi for each village GRS for each GP GPTA for each Block
Gram Rojgar Sanjojak-cum-Mate for each work now-weekly payment
SBI-Business Correspondent for each GP for onsite payment
Computers now even at GP level
Training of 25000 PRIs for demand generation
Social Audit at 5000 GP in 2009
Opportunities
Overall decline in involvement of DPCs
Too small works and no visibility
Rumour that agri-wages are up due to NREGA
GoI may include CC Roads in ST/SC Basti and labour component of IAY
Emphasis on convergence with agriculture,forest and water resources
RTI and now Ombudsman who can lodge FIR against “delayed payment of
wages
Improvements
Wage rate of earth work in Orissa & AP for 126cum earth work
PWD Rs 3701/ NREGA-Orissa Rs 4542 NREGA AP Rs14175/
Opportunities for convergenceSept 2009
Department
Fund
exp
UC
Water Resource
18.22cr
6.25cr
1.62cr
Forest
18.19cr
9.18cr
3.38cr
Agriculture
46.89cr
33.35cr
7.41cr
Fisheries ARD
0.77cr
0.19cr
nil
ST SC Deptt
3.13cr
2.07cr
0.88cr
H & Textile
4.37cr
3.40cr
0.57cr
RD
0.99cr
0.64cr
0.63cr
Works
0.94cr
0.68cr
0.50cr
Total
93.53cr
55.77cr
15.02cr
NREGA
576.67cr
215.13cr
17
SGSY
Achievement under SGSY
Year
Total number of
Credit Mobilised
swarozgaris assisted
(Rs. in crore)
Target
Achieve
ment
%
Target
Achieve
ment
%
2008-09 107051
106271
99
235.97
209.92 89.00
2009-10 124522
6817
5
274.48
11.78
4.29
0
DISTRICTS
2
1
1
1
0
BALASORE
BOUDH
NABARANGPUR
DHENKANAL
3
KENDRAPARA
6
RAYAGADA
6
SONEPUR
7
NAWAPARA
8
BARGARH
9
KALAHANDI
10
BALANGIR
11
KEONJHAR
SUNDERGARH
15
PHULBANI
SAMBALPUR
20
MALKANGIRI
20
STATE AVG.
20
PURI
20
KORAPUT
KHURDA
27
NAYAGARH
28
JAGATSINGHPUR
30
DEBAGARH
32
CUTTACK
33
BHADRAK
GAJAPATI
40
JAJPUR
43
MAYURBHANJ
ANGUL
60
GANJAM
80
JHARSUGUDA
PERCENTAGE
90
EXPENDITURE
UNDER
SGSYUPTO
UPTO SEPT,2009
EXPENDITURE
UNDER
SGSY
SEPTEMBER,2009
78
70
60
50
41
36
32
27
23
18
14
6
District
Boudh
Subarnapur
Balangir
Balasore
Jagatsinghpur
Nabarangapur
Gajapati
Kendrapada
Phulbani
Dhenkanal
Ganjam
Puri
Cuttack
Bhadrak
Total
Sambalpur
Kalahandi
0.00
0.00
0.44
0.82
10
4.93
0.00
7.81
3.23
1.47
0.00
1.69
0.00
5.47
1.00
4.29
3.27
0.00
5.95
5.90
5.01
7.25
3.73
5.43
21
33
29
32
22.75
20.65
38
38
39
42
43
44
48
51
51
57
57
57
58
60
Koraput
Deogarh
Sundergarh
Nuapada
Jajpur
Bargarh
Keonjhar
Mayurbhanj
0.73
0.58
0.00
3.11
65
65
67
68
71
75
75
83
79
77
80
Khurda
Rayagada
Malkangiri
Nayagarh
20
14.16
89
94
100
Angul
34.47
40
Jharsuguda
Percentage
110
120
Applications Sponsored & Disbursed under SGSY
upto Sept. 2009
% of Sopnsored
% of Disbursed
0
Major Issues
1.Village Hatt:
Better marketing facility - rural poor to sale their product
though-out the year.
 Shopping platform - strengthen forward and backward
linkage.
 Promotion of growth center-convergence and rural economy.
 Block Level

Three Village hatts in each district -Rs.15 lakh per hatt.
st
 GoI share 1 installment released to all DRDAs,
 DRDAs to 60% to claim 2nd installment of Central Share.
 Collectors may go ahead with construction of Village Hatts as per
GoI Guidelines.


District Level;

District to submit DPR for Hatt at the District headquarters - Rs.1.5
crore.
2.Rural Self Employment Institute ( RSETI)

Structure






GoI to provide Rs. 1.00 crore one time grant for infrastructure.
State Government to provide land free of cost to the Sponsoring Bank.
Each RSETI to train to 70% BPL youth.
Rs. 10.00 lakhs for period of 3 years can be provided for the rent
MoRD to support recurring cost of training(maximum Rs. 4, 000/-).
Issues with Collectors:

Collectors should identify land/site and co-ordinate for setting-up
RSETI .

Land identification should be completed-31st December, 2009.

Committee under the Chairmanship of the Collector shall be
constituted .






PD DRDA.
GMDIC.
AGM of Lead Bank.
AGM, NABARD.
Director RSETI.
Lead District Manager- Member Convener.
3. General Issues







Meeting of BLCC/ DLCC on SGSY to held regularly.
Basic Orientation Training to all Swarozagaries before
Bank Loan.
Collectors are authorized to undertake infrastructure
project under SGSY with approval of the District SGSY
Committee .
10 % of total allocation for swarozgaries of 2009-10.
10 % of total allocation for swarozgaries of previous years.
No Infrastructure/Training Fund to create corpus fund for
micro-finance /managing the SHG federations .
Placement based skill development training programme .
4. Restructuring of SGSY to NRLM


Focus on universal coverage of rural poor into SHGs.
To be launched from 20010-11
DRDA Administration

Merger of DRDA Employees
GoI emphasizing for absorption of DRDA employees in the
line Department.
 DRDA employees be redeployed in Z P.
 On redeployment ZP, they can be deputed to DRDA Cell
of Z P
 After absorption- GoI would sanction grant-in-aid 2010 -11.

 Other
Issues
Computer Programmers not to be transferred (Bhadrak and
Rayagada Districts).
 Outsourced posts should be outsourced, should not be
contractual.
 GRS vacancies be filled-up by with Civil Engineering
background.

GRAM PANCHAYAT AUTOMATION.


Computer hardware and peripheral to be procured
from NICSI for computerization of Gram Panchayats
(one Laptop Computer and one Printer) out of Twelfth
Finance Commission Grant.
Two laptop computers to be procured for each
Panchayat Samiti out of Twelfth Finance Commission
grant.
RURAL HOUSING
RURAL HOUSING (IAY)

IAY scheme came into force since 1995-96 as an independent
scheme and now a Flagship programme of Govt. of India under the
banner of “BHARAT NIRMAN”.
TARGET GROUPS

BPL households living in the rural areas belonging to SC/ST, freed
bonded labours and non-SC/ST BPL normal households, widows
and next of Kin to defence personnel /paramilitary forces killed in
action residing in rural areas( irrespective of their income criteria)
ex-service men and retired member of paramilitary forces fulfilling
the other conditions.

60% of the target is meant for SC/ST and balance 40% is meant for
non-SC/ST beneficiaries.

15% reservation for Minority Community.

3% reservation for physically and mentally challenged persons &
the funding pattern is 75:25 between Central Govt. and State Govt.
SPECIAL PROVISION FOR NATURAL CALAMITY VICTIMS.

10% of the district’s annual target or Rs.70.00 lakhs (including
State Share) whichever is higher during a financial year is
earmarked for Natural Calamities. The district Administration is
authorized to first incur the expenditure and extend assistance to
the victims and submit the proposal to Govt. of India for
reimbursement of the funds.
SELECTION PROCEDURE.

The beneficiaries are selected by “Pallisabha” and the beneficiary
has to construct the house himself/herself and no middle man is
allowed.

The 5 years permanent wait list prepared on the basis of 1997
BPL Survey is the basis of beneficiary selection till date as the
BPL list 2002 has not been finalised.

The eligibility of the potential beneficiaries must be checked by
the Panchayat Executive Officers / Extension Officers (other than
J.Es /GPTAs) before issuing work order.

The unit cost has been revised to Rs.35,000/- w.e.f 2008/09 per unit
instead


of Rs.25,000/-.
Funds will be released at 4 installments.
1st installment
...
Rs. 5,000/- Alongwith work order.
2nd installment
...
Rs. 10,000/- After completion of plinth level.
3rd installment
...
Rs. 10,000/- After lintel level.
4th installment
…
Rs. 10,000/- After roof casting/ laying
No deduction other than royalty and Rs.50/-( for Photo) shall be
made than
the Unit cost.]

RCC slab is not mandatory. Any type of fire proof roofing (RCC
Slab
/AC
sheet /GCI sheet/Tiles) etc. is permissible.

Payment to beneficiaries shall be made through direct credit of
their individual savings Bank Account opened in the
Offices.
Banks
funds to
/Post
2009-2010

The IAY(normal) target is 119649 .

During 2008-09 Govt. of India have allocated 96066 nos. of houses
as additional package and the same target will be
account in
taken into
the year 2009-10, aggregating the total target to
215715.

An amount of Rs.19159.87 lakhs have been released to 28
Districts (except Jagatsinghpur and Kendrapada) by Govt. of
India towards 1st

installment.
An amount of Rs. 7317.567 lakhs has been released towards the
matching State Share till Sept,2009.

Upto Sept-2009, 14208 nos. of houses have been completed out
of
the last year’s spill over houses, 77379 nos. of houses are under
progress.
MO KUDIA
2008-2009

An amount of Rs.10000.00 lakh has been provided in the BE for
An
2008-09.
amount of Rs.9999.85 lakhs was sanctioned to the districts, as against
the physical
target of 28,571. 5000 houses have been provided to
Kandhamal District as a
special package.

216 nos. of houses have been completed by March,2009.

Expenditure till March,2009 is Rs.1140.29 lakhs.
2009-2010.

An amount of Rs.6000.00 lakhs has been provided in the B.E for 2009-10
against a total target of 17142 nos. of houses. 5000 houses have been
provided to Kandhamal District as a special package.

Expenditure upto Sept, 2009 is Rs.2506.76 lakhs as against previous year’s
target and 2493 nos. of houses have been completed.

Rs. 5999.70 lakhs is being released.
MAJOR ISSUES







All the beneficiaries should have their SB account in Bank/ Post
Office so that it will be easier to include all the information in the
database.
All work orders are to be issued immediately so as to facilitate for
getting 2nd installment of Central Share.
Eligible beneficiary having no homestead land, ear-marked fund of
Govt. of India for purchase of land and allotment of the same to the
eligible person be expedited.
Jagatsinghpur district has not availed 2nd installment of Central
share for the year of 2008-09 as the district has not furnished
proposal to Govt. of India.
Kendrapara and Jagatsianghpur districts have not yet received 1st
installment of Central share during 2009-10.
Kendrapara district has not yet complied the objections raised by
Govt. of India.
Should submit proposal to Govt. of India in the prescribed format to
avail 1st installment of funds for the year 2009-10.
BACKWARD REGION GRANT FUND
(BRGF)
BACKWARD REGION GRANT FUND (BRGF)
Convening District Planning Committee (DPC)
for approval of Annual District Plan – 2009-10.
 Preparation of Annual District Plan – 2010-11
well in ahead by 25-12-2009 to enable GoI for
release funds during 1st week of April, 2010.
 Uploading of approved Annual District Plan for
2007-08 & 2008-09 in PlanPlus (Except Boudh,
Bolangir, Malkangiri and Mayurbhanj).
 Proposal for BRGF Resource Centre at Block and
GP level.
 Convergence with NREGA.

FINANCIAL & PHYSICAL
ACHIEVEMENT UNDER
DIFFERENT SCHEMES
DURING 2009-10
( UPTO SEPTEMBER 2009)
FINANCIAL & PHYSICAL ACHIEVEMENT UNDER
DIFFERENT SCHEMES DURING 2009-10
(UPTO SEPTEMBER'09)
ORISSA
Sl.
No.
1
Schemes
NREGA
Financial (Rs.in Crore)
TFA
Exp
%
576.66
215.13
37
Physical
Target
0.00
Ach
%
159.8
2
Unit
Lakh Mandays
2
SGSY
107.21
21.43
20
124522
6817
5
No. of
Swarozgaris
3
I.AY ( Normal)
320.11
75.61
24
215715
14208
7
No. of Houses
4
I.AY ( Naxalite)
34.41
11.29
33
27279
1461
5
No. of Houses
5
Mo Kudia
88.60
25.07
28
28355
2493
9
No. of Houses
6
12th FC
325.84
62.55
19
13769
7807
57
No. of Projects
7
BRGF
273.65
92.90
34
0
2691
8
GGY
104.57
15.60
15
0
1063
1831.06
519.59
28
TOTAL
No. of Projects
ANGUL
Sl.
No
Schemes
Financial
(Rs.in Crore)
TFA
1
NREGA
18.15
Exp
5.24
Physical
%
29
Target
0
Ach
%
Unit
3.52
Lakh Mandays
2
SGSY
1.85
0.80
43
3306
468
14
3
I.AY (
Normal)
6.90
2.43
35
5356
296
6
4
Mo Kudia
1.75
0.62
36
580
63
11
5
12th FC
11.31
2.67
24
136
113
83
6
GGY
8.42
1.07
13
0
54
No. of
Swarozgaris
No. of Houses
No. of Houses
No. of Projects
No. of Works
BOLANGIR
Sl.
No
Schemes
Financial
(Rs.in Crore)
TFA
1
NREGA
2
Exp
Physical
%
Target
Ach
%
Unit
18.69
8.00
43
0
4.70
SGSY
4.73
0.39
8
5483
24
3
I.AY (
Normal)
8.61
0.93
11
6052
325
5 No. of
Houses
4
Mo Kudia
2.21
0.38
17
662
20
3 No. of
Houses
5
12th FC
12.63
1.24
10
704
145
21 No. of
Projects
6
BRGF
14.21
6.39
45
0.00
188
0 No. of
Projects
Lakh
Mandays
0 No. of
Swarozgaris
BALASORE
Sl.
No
Schemes
Financial
(Rs.in Crore)
TFA
1
NREGA
14.24
Exp
5.65
Physical
%
Target
40
0
Ach
%
Unit
3.07
Lakh Mandays
2
SGSY
3
I.AY (Normal)
7.35
-1.84
0.09
1
7217
59
2.47 -134
16714
415
1 No. of
Swarozgaris
2
No. of Houses
4
Mo Kudia
6.17
0.42
7
1826
0
0
No. of Houses
5
12th FC
6
GGY
18.10
2.64
15
1487
1007
9.64
1.06
11
0
64
68
No. of Projects
No. of Works
BARGARH
Sl.
No.
Schemes
Financial
(Rs.in Crore)
TFA
1
NREGA
2
SGSY
3
I.AY (Normal)
4
Mo Kudia
5
12th FC
6
GGY
Exp
Physical
%
Target
Ach
%
Unit
16.71
5.10
31
0
2.83
5.50
0.31
6
4935
358
7 No. of
Swarozgaris
22.28
7.66
34 10407
470
5
3.70
1.15
31
1137
47
4
14.82
2.67
18
677
274
40
8.96
0.43
5
12
Lakh Mandays
No. of Houses
No. of Houses
No. of Projects
No. of Works
BHADRAK
Sl.
No
Schemes
Financial
(Rs.in Crore)
TFA
1
NREGA
2
SGSY
3
Exp
Physical
%
Target
Ach
%
11.78
7.80
66
0
4.44
1.57
0.50
32
3230
0
I.AY
(Normal)
17.56
4.82
27
10966
357
4
Mo Kudia
3.59
0.05
1
1198
17
1
5
12th FC
10.81
1.36
13
414
85
21
6
GGY
8.49
1.49
18
Unit
Lakh Mandays
0 No. of
Swarozgaris
3
No. of Houses
32
No. of Houses
No. of Projects
No. of Works
BOUDH
Sl.
No.
1
Schemes
Financial
(Rs.in Crore)
Physical
TFA
Exp
%
Target
Ach
%
Unit
NREGA
10.72
4.19
SGSY
2.96
0.03
39
1
2014
0
0
No. of
Swarozgaris
I.AY
(Normal)
3.85
0.65
17
2044
259
13
Mo Kudia
0.70
0.10
15
223
0
0
12th FC
4.68
0.01
0
194
12
6
BRGF
11.75
0.43
2.52
2
3
4
5
6
No. of Houses
4
28
No. of Houses
No. of Projects
No. of Projects
CUTTACK
Sl.
No.
Schemes
Financial
(Rs.in Crore)
TFA
Exp
Physical
%
Target
Ach
%
1
NREGA
6.64
4.01
60
0
3.99
2
SGSY
4.81
1.54
32
4760
983
21
3
I.AY
(Normal)
28.82
7.03
24
13792
280
2
4
Mo Kudia
5
6
Unit
Lakh Mandays
No. of
Swarozgari
s
No. of Houses
5.23
0.71
14
1507
19
1
12th FC
24.97
2.52
10
395
358
91
GGY
12.55
4.21
34
249
No. of Houses
No. of Projects
No. of Works
DEOGARH
Sl.
No.
Schemes
Financial
(Rs.in Crore)
TFA
Exp
Physical
%
Target
Ach
%
Unit
1
NREGA
8.02
1.81
23
0
1.12
2
SGSY
0.75
0.21
28
1206
0
3
I.AY (Normal)
3.26
1.33
41
2019
345
17 No. of Houses
3a
I.AY
(Naxalite)
3.12
1.38
44
2846
298
10
4
Mo Kudia
0.77
0.03
4
221
0
0 No. of Houses
5
12th FC
2.88
0.93
32
105
63
60 No. of Projects
6
BRGF
10.61
4.48
42
0
125
No. of Projects
Lakh Mandays
0 No. of
Swarozgaris
No. of Houses
DHENKANAL
Sl.
No.
Schemes
Financial
(Rs.in Crore)
TFA
1
NREGA
2
3
Exp
Physical
%
Target
Ach
%
36.64
7.09
19
SGSY
3.34
0.00
0
3865
0
0
I.AY
(Normal)
8.00
0.66
8
7104
90
1
4
Mo Kudia
0.81
0.18
22
776
7
1
5
12th FC
6.60
0.24
4
592
76
13
13.16
1.06
0
15
6
BRGF
6.54
Unit
Lakh Mandays
No. of
Swarozgaris
No. of Houses
8
No. of Houses
No. of Projects
No. of Projects
GAJAPATI
Sl.
No.
Schemes
Financial
(Rs.in Crore)
TFA
1
NREGA
2
Exp
Physical
%
Target
Ach
%
12.53
7.22
58
6.68
SGSY
1.14
0.38
33
1908
149
8
3
I.AY (Normal)
3.91
0.35
9
3229
74
2
3a
I.AY
(Naxalite)
4.21
0.26
6
4330
11
0
4
Mo Kudia
1.20
0.22
18
343
35
10
5
12th FC
8.82
1.90
21
240
10
4
6
BRGF
12.15
4.41
0
81
Unit
Lakh Mandays
No. of
Swarozgaris
No. of Houses
No. of Houses
36
No. of Houses
No. of Projects
No. of Projects
GANJAM
Sl.
No.
Schemes
Financial
(Rs.in Crore)
Physical
TFA
Exp
%
Target
Ach
%
1
NREGA
31.64
19.84
63
0
27.12
2
SGSY
10.55
6.30
60
8221
1870
Unit
Lakh Mandays
23
No. of
Swarozgaris
3
I.AY (Normal)
4
Mo Kudia
5
6
24.01
1.04
4
17501
1143
7
6.69
0.00
0
1912
0
0
12th FC
16.10
0.00
0
401
0
0
BRGF
19.18
8.20
0
165
43
No. of Houses
No. of Houses
No. of Projects
No. of Projects
JAGATSINGHPUR
Sl.
No.
Schemes
Financial
(Rs.in Crore)
TFA
Exp
Physical
%
Target
Ach
1
NREGA
5.78
2.71
47
0.00
1.76
2
SGSY
1.17
0.32
27
2533
125
%
Unit
Lakh Mandays
5 No. of
Swarozgaris
3
I.AY (Normal)
12.16
2.33
19
8309
469
6 No. of Houses
4
Mo Kudia
3.18
0.00
0
908
0
0 No. of Houses
5
12th FC
9.44
1.38
15
111
58
52 No. of Projects
6
GGY
8.25
1.14
14
141
No. of Works
JAJPUR
Sl.
No.
Schemes
Financial (Rs.in Crore)
TFA
1
NREGA
2
SGSY
Exp
%
Physical
Target
Ach
%
37.83
9.39
25
0
5.44
3.57
1.28
36
4749
238
Unit
Lakh Mandays
5 No. of
Swarozgaris
3
I.AY
Normal)
14.05
1.08
8
12470
1024
8
No. of Houses
4
Mo Kudia
3.38
0.40
12
5
GGY
7.00
0.00
0
6
12th FC
17.36
5.21
30
1363
24
0
711
394
2 No. of Houses
No. of Works
55 No. of Projects
JHARSUGUDA
Sl.
No.
Schemes
Financial
(Rs.in Crore)
TFA
1
NREGA
2
SGSY
Exp
Physical
%
11.58
6.22
54
0.55
0.43
78
Target
Ach
%
1.48
847
292
Unit
Lakh Mandays
34 No. of
Swarozgaris
3
I.AY ( Normal)
2.44
1.09
45
1910
325
17
4
Mo Kudia
0.62
0.45
72
208
86
41
5
12th FC
4.42
0.14
3
16
4
6
31
BRGF
11.23
3.47
0
241
No. of Houses
No. of Houses
92 No. of
Projects
No. of
Projects
KALAHANDI
Sl.
No.
Schemes
Financial
(Rs.in Crore)
TFA
1
NREGA
2
SGSY
Exp
Physical
%
50.55
4.16
8
5.66
0.40
7
Target
Ach
1.98
5436
233
%
Unit
Lakh
Mandays
4 No. of
Swarozgaris
3
I.AY (Normal)
4
Mo Kudia
5
12th FC
11.75
4.14
35
6105
367
6 No. of Houses
2.13
0.94
44
667
118
18 No. of Houses
15.84
7.24
46
44
19
6
10
BRGF
17.80
1.80
0
42
43 No. of
Projects
No. of
Projects
KENDRAPARA
Sl
No
Schemes
Financial
(Rs.in Crore)
TFA
Exp
Physical
%
Target
Ach
1
NREGA
1.53
1.01
66
0.00
0.81
2
SGSY
1.99
0.03
2
3472
112
%
Unit
Lakh
Mandays
3 No. of
Swarozgaris
3
I.AY ( Normal)
2.99
0.58
19
5604
20
0 No. of Houses
4
Mo Kudia
2.14
0.09
0
612
0
0 No. of Houses
5
12th FC
14.44
4.39
30
169
136
6
GGY
12.37
1.40
11
90
80 No. of
Projects
No. of Works
KEONJHAR
Sl.
No.
Schemes
Financial
(Rs.in Crore)
TFA
1
NREGA
2
SGSY
Exp
Physical
%
Target
Ach
30.70
6.87
22
0
4.27
6.08
0.52
9
6028
225
%
Unit
Lakh Mandays
4 No. of
Swarozgaris
3
I.AY
(Normal)
4
Mo Kudia
5
6
12.93
2.31
18
7022
454
6
No. of Houses
2.46
0.94
38
768
20
3 No. of Houses
12th FC
14.57
4.01
28
200
49
25 No. of Projects
BRGF
21.01
3.46
16
0
169
No. of Projects
KHURDA
Sl.
No
Schemes
Financial
(Rs.in Crore)
TFA
Exp
Physical
%
Target
Ach
1
NREGA
3.01
1.42
47
0.00
1.20
2
SGSY
2.29
0.52
23
3701
27
%
Unit
Lakh Mandays
1 No. of
Swarozgaris
3
I.AY (
Normal)
26.15
3.00
11
11529
556
20
No. of Houses
4
Mo Kudia
4.41
0.44
10
1261
29
2 No. of Houses
5
12th FC
8.85
1.30
15
54
21
39 No. of Projects
6
GGY
8.16
0.86
11
91
No. of Works
KORAPUT
Sl.
No.
Schemes
1
NREGA
2
SGSY
Financial
(Rs.in Crore)
Physical
TFA
Exp
%
46.70
11.03
24
7.03
1.40
20
Target
Ach
7.57
6277
205
%
Unit
Lakh Mandays
3 No. of
Swarozgaris
3
I.AY ( Normal)
13.97
3.80
27
5595
625
11 No. of Houses
4
Mo Kudia
2.14
0.47
22
611
75
12 No. of Houses
5
12th FC
9.54
1.09
11
659
80
12 No. of Projects
6
BRGF
15.06
4.48
30
0
233
No. of Projects
MALKANGIRI
Sl.
No.
Schemes
Financial
(Rs.in Crore)
TFA
Exp
Physical
%
1
NREGA
9.05
1.60
18
2
SGSY
2.21
0.40
18
Target
Ach
%
1.40
2496
0
Unit
Lakh Mandays
0 No. of
Swarozgaris
3
I.AY ( Normal)
8.61
3.40
40
4189
972
23 No. of Houses
3a
I.AY (
Naxalite)
9.42
0.94
10
6492
266
4
Mo Kudia
1.38
0.42
30
460
120
26 No. of Houses
5
12th FC
5.04
0.74
15
60
9
15 No. of Projects
6
BRGF
11.95
2.00
17
0
21
No. of Projects
4
No. of Houses
MAYURBHANJ
Sl.
No.
Schemes
1
NREGA
2
SGSY
Financial
(Rs.in Crore)
Physical
TFA
Exp
%
52.67
33.49
64
7.37
3.00
41
Target
Ach
30.18
10512
571
%
Unit
Lakh Mandays
5 No. of
Swarozgaris
3
I.AY (Normal)
17.64
7.61
43
11771
1933
16 No. of Houses
4
Mo Kudia
2.63
1.63
62
1188
366
31 No. of Houses
5
12th FC
15.98
2.60
16
2087
1343
64 No. of Projects
6
BRGF
13.72
6.98
51
0
291
No. of Projects
NAWARANGPUR
Sl.
No.
Schemes
1
NREGA
2
SGSY
Financial
(Rs.in Crore)
Physical
TFA
Exp
%
41.34
14.91
36
4.98
0.04
1
Target
Ach
7.41
4446
0
%
Unit
Lakh Mandays
0 No. of
Swarozgaris
3
I.AY (Normal)
6.70
3.20
48
4443
800
18 No. of Houses
4
Mo Kudia
1.08
0.90
83
406
177
44 No. of Houses
5
12th FC
8.40
2.53
30
240
156
65 No. of Projects
6
BRGF
12.84
4.20
33
0
120
No. of Projects
NUAPADA
Sl.
No.
Schemes
Financial
(Rs.in Crore)
TFA
1
NREGA
2
SGSY
Exp
Physical
%
12.54
4.66
37
2.27
0.13
6
Target
Ach
1.65
2932
173
%
Unit
Lakh Mandays
6 No. of
Swarozgaris
3
I.AY (Normal)
4.30
1.91
44
1747
228
13 No. of Houses
4
Mo Kudia
0.67
0.22
33
191
31
16 No. of Houses
5
12th FC
6.09
0.00
0
1
0
0 No. of Projects
6
BRGF
13.04
5.02
38
0
168
No. of Projects
NAYAGARH
Sl.
No.
Schemes
Financial
(Rs.in Crore)
TFA
1
NREGA
4.48
Exp
1.59
Physical
%
35
Target
0.00
Ach
%
Unit
1.18
Lakh Mandays
2
SGSY
2.11
0.58
27
3276
102
3 No. of
Swarozgaris
3
I.AY (Normal)
9.81
0.57
6
8242
80
1 No. of Houses
4
Mo Kudia
2.99
0.92
31
900
62
7 No. of Houses
5
12th FC
10.25
3.27
32
421
376
89 No. of Projects
6
GGY
9.27
1.59
17
116
No. of Works
KANDHAMAL (PHULBANI)
Sl.
No.
Schemes
Financial
(Rs.in Crore)
TFA
1
NREGA
2
Exp
Physical
%
Target
Ach
%
21.32
5.01
24
SGSY
1.85
0.26
14
3192
47
3
I.AY (Normal)
7.07
2.37
34
3453
208
6
4
Mo Kudia
16.44
10.70
65
5377
872
16
5
12th FC
7.01
0.56
8
172
3
2
0
174
6
BRGF
14.87
1.83
12
3.39
Unit
Lakh Mandays
1 No. of
Swarozgaris
No. of Houses
No. of Houses
No. of Projects
No. of Projects
PURI
Sl.
No.
Schemes
Financial
(Rs.in Crore)
TFA
Exp
Physical
%
Target
Ach
1
NREGA
2.86
0.89
31
0.00
0.91
2
SGSY
2.95
0.59
20
4720
80
%
Unit
Lakh Mandays
2 No. of
Swarozgaris
3
I.AY (Normal)
14.83
0.37
2
10625
0
0 No. of Houses
4
Mo Kudia
4.06
0.16
4
1161
0
0 No. of Houses
5
12th FC
12.33
1.65
13
135
51
38 No. of Projects
6
GGY
11.45
2.35
21
214
No. of Works
RAYAGADA
Sl.
No
Schemes
1
NREGA
2
SGSY
Financial
(Rs.in Crore)
Physical
TFA
Exp
%
20.21
16.70
83
2.43
0.08
3
Target
Ach
13.82
3804
22
%
Unit
Lakh Mandays
1 No. of
Swarozgaris
3
I.AY ( Normal)
9.66
4.98
52
4324
932
22 No. of Houses
3a. I.AY (Naxalite)
7.95
5.70
72
6702
721
11 No. of Houses
96
20 No. of Houses
4
Mo Kudia
1.62
1.05
65
473
5
12th FC
9.03
4.54
50
2732
6
BRGF
13.83
10.50
76
0
2729 100 No. of Projects
69
No. of Projects
SAMBALPUR
Sl.
No.
Schemes
Financial
(Rs.in Crore)
TFA
1
NREGA
2
SGSY
Exp
Physical
%
16.80
6.88
41
1.53
0.23
15
Target
Ach
2.83
2565
134
%
Unit
Lakh Mandays
5 No. of
Swarozgaris
3
I.AY ( Normal)
5.37
0.82
15
4459
286
6 No. of Houses
3a I.AY ( Naxalite)
9.72
3.02
31
6909
165
2 No. of Houses
4
Mo Kudia
1.49
0.37
25
462
57
12 No. of Houses
5
12th FC
7.12
0.35
5
177
2
No. of Projects
6
BRGF
17.90
7.47
42
0
257
No. of Projects
SONEPUR
Sl.
No.
Schemes
Financial
(Rs.in Crore)
TFA
1
NREGA
2
SGSY
Exp
Physical
%
10.92
7.57
69
1.51
0.09
6
Target
Ach
4.63
2182
10
%
Unit
Lakh
Mandays
0 No. of
Swarozgaris
3
I.AY ( Normal)
3.63
0.47
13
2172
275
13 No. of Houses
4
Mo Kudia
0.78
0.12
7
237
39
16 No. of Houses
5
12th FC
4.53
1.18
26
49
28
57 No. of
Projects
6
BRGF
10.94
1.45
13
0
27
No. of
Projects
SUNDERGARH
Sl.
No.
Schemes
Financial
(Rs.in Crore)
TFA
1
NREGA
2
SGSY
Exp
Physical
%
11.04
3.07
28
5.10
0.57
11
Target
Ach
%
1.38
5209
310
Unit
Lakh Mandays
6 No. of
Swarozgaris
3
I.AY ( Normal)
10.70
2.21
21
6562
600
4
Mo Kudia
5
6
9 No. of Houses
2.18
0.99
45
717
113
16
12th FC
13.87
4.21
30
386
206
53 No. of Projects
BRGF
18.43
15.29
83
0
277
No. of Projects
No. of Houses
Form L-30

First Page

From Second Page Onwards (L30)
There will be a row with numbers (1-13) as heading for the
13 scoring criteria.
 From the 2nd page of the print out no table headings will
be required. Only number heading is enough.
 Records will be order by Social Group (ST, SC, Oth), Total
Score, Name of HOH wise.
Back
Form L-00
Back
Instructions to fill up L-00 forms by Verifying Officers
Back
TIMELINE MATRIX - VALIDATION OF BPL SURVEY HOUSEHOLD LIST - 2002
23-102009 to
01-12-2009 to 15-12- 04-12-2009 to 31-1208-10-2009 to 22-10- 27-102009 15-11-2009 to 30-11-2009
2009
2009
2009
(5 Days)
(16 Days)
(15 Days)
(15 Days)
(28 Days)
Printing of Application Distribu Display of L-30 list and
Data Entry of
Data validation in
form
tion of Objection Invitation at GP villages (House-to-house) Validated forms
Applicat
Office
ion
Form
01-01-2010 to 15-012010
(15 Days)
Pallisabha
Phases
Phase-I
Phase-II
Phase-III
Phase-IV
Phase-V
Phase-VI
6
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 4 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80
Form L-60
Back
Back
Download