“Training and Capacity Building Needs Assessment” for the KILORWEMP project Final Report July 2014 by eMJee Consult Tanzania Ltd. Table of Content Abbreviations ................................................................................................. iv Acknowledgements ....................................................................................... vii Executive Summary ...................................................................................... viii 1. Introduction ................................................................................................ 1 1.1. The Projects: .......................................................................................... 1 1.2. Objectives of the current assignment ......................................................... 2 1.3. Concepts ................................................................................................ 2 1.4. Methodology ........................................................................................... 4 1.5. Tools: .................................................................................................... 6 2. Context Analysis.......................................................................................... 8 2.1. History of CBNRM...................................................................................... 8 2.2. Policy and Legal environment ..................................................................... 8 2.3. Stakeholders .......................................................................................... 10 2.4. CBNRM status......................................................................................... 16 3. Result areas: ............................................................................................. 17 3.1. Result area 1: User rights obtained ........................................................... 17 3.2. Result area 2: ........................................................................................ 22 3.3. Result area 3: ........................................................................................ 27 3.4. Focus of capacity building interventions in response to identified performance gaps ............................................................................................................ 31 4. Institutional level: MNRT and Regional Secretariat ................................... 39 4.1. Structure of MNRT .................................................................................. 39 4.2. Role of MNRT in CBNRM: .......................................................................... 43 4.3. MNRT current Capacity Building approach: ................................................. 56 4.4. Collaboration .......................................................................................... 58 4.5. Governance ............................................................................................ 59 4.6. Role of Regional Level: Regional Secretariat, RC’s office. ............................. 59 5. Organizational level: LGAs ........................................................................ 62 5.1. Council management capacities: ............................................................... 62 5.2. CBNRM capacities ................................................................................... 70 5.3. Role of the LGAs: .................................................................................... 77 5.4. Governance: .......................................................................................... 79 6. Lower level (Ward, village and CBNRM) .................................................... 81 7. Civil society ............................................................................................... 85 7.1. Civil Society and social accountability in Tanzania: ...................................... 86 7.2. Civil society and Natural Resource Management: ........................................ 89 7.3. Donors and funding mechanisms: ............................................................. 90 7.4. Role of CSOs in CBNRM: .......................................................................... 90 7.5. Possible options for strengthening Civil Society in CBNRM related approaches: 91 i 8. CB and OD Plan: ........................................................................................ 96 8.1. Capacity Building and organizational development: ..................................... 96 8.2. Principles: .............................................................................................. 96 8.3. Objectives and scope: ........................................................................... 100 8.4. Role of the project ................................................................................ 101 8.5. Strategy and approach .......................................................................... 102 8.6. Type of support and Packages ................................................................ 110 8.7. Possible providers and quality considerations ........................................... 149 8.8. Indicative budget .................................................................................. 149 8.9. M&E process......................................................................................... 150 8.10. Culture of learning .............................................................................. 150 8.11 Sustainability ....................................................................................... 150 Annexes: Annex 1: ToR of assignment ..................................... Error! Bookmark not defined. Annex 2: List of tools ............................................... Error! Bookmark not defined. Annex 3: List of resource persons ............................ Error! Bookmark not defined. Annex 4: M&E framework with capacity building transition indicators ......Error! Bookmark not defined. Tables: Table 1: Key chapters in management plans for the different CBNRM units ................ 5 Table 2: Tourist hunting companies active in Kilombero Game Controlled Area ........ 15 Table 3: CBNRM status ..................................................................................... 16 Table 4: Actors roles and responsibilities in result area 1 ...................................... 18 Table 5. CBNRM issues identified for result area 1: ............................................... 20 Table 6: Actors, roles and responsibilities for result area 2 .................................... 24 Table 7. Issues related to result area 2 ............................................................... 25 Table 8: Actors, roles and responsibilities for result area 3 .................................... 28 Table 9: Issues related to result area 3 ............................................................... 30 Table 10: Overview transitions required and capacity building per result area .......... 33 Table 11: List of responsibilities and staffing levels of Units under WD .................... 40 Table 12: List of Government of Tanzania Guidelines used in CBNRM activities ........ 44 Table 13: Capacity to use the ICMS .................................................................... 64 Table 14: Basic administrative and financial information per district ....................... 65 Table 15: Staffing availability in Rufiji, Kilombero and Ulanga district councils ......... 67 Table 16: List of LGA positions, qualifications available and capacity requirements ... 68 Table 17: List of vacancies in Rufiji district Council 2013/2014 ............................... 68 Table 18: Overview of capacity issues regarding CBNRM per district ....................... 73 Table 19: overview of relevant CSOs .................................................................. 89 Table 20: Capacity building approaches and activities ......................................... 104 Table 21: Overview package 1 ......................................................................... 113 Table 22: Overview package 2 ......................................................................... 117 ii Table 23: Overview package 3 ......................................................................... 122 Table 24: Overview of package 4: SWM mainstreaming ...................................... 128 Table 25: Overview package 5: use of NR ......................................................... 131 Table 26: Overview package 6: village level ...................................................... 137 Table 27: Overview package 7: law enforcement ............................................... 141 Table 28: Overview package 8 ......................................................................... 145 Table 29: Overview package 9 ......................................................................... 148 Table 30: Rough budget per capacity building package ....................................... 149 Table 31: Capacity building transition indicators ......... Error! Bookmark not defined. Figures: Figure 1: Participatory NRM: 6 legal steps ............................................................. 4 Figure 2: Institutional picture of NRM ................................................................... 7 Figure 3: Theory of Change for result area 1 ....................................................... 17 Figure 4: Theory of Change for result area 2 ....................................................... 23 Figure 5: Council management and tools ............................................................. 62 Figure 6: Capacity Building within the Government system .................................... 66 Figure 7: Social Accountability Model .................................................................. 85 Figure 8: Types of capacity needs at different levels ............................................. 98 Figure 9: package 1 ........................................................................................ 111 Figure 10: package 2 ...................................................................................... 115 Figure 11: package 3:..................................................................................... 118 Figure 12: package 4:..................................................................................... 126 Figure 13 Package 5 ....................................................................................... 129 Figure 14 Package 6: ...................................................................................... 135 Figure 15 Package 7 ....................................................................................... 139 Figure 16 package 8 ....................................................................................... 143 Figure 17 package 9 ....................................................................................... 146 iii Abbreviations AA Authorized Association AAC Authorized Association Consortium AAS EPS Assistant Administrative Secretary Economic and Productive Sectors ASDP Agricultural Sector Development Program BDS Business Development Services BKR Beekeeping Reserve BMU Beach Management Unit BTC HQ Belgian Development Agency Headquarters BTC TZ Belgian Development Agency Tanzania BTC Belgian Development Agency CBFM Community Based Forest Management CBOs Community Based Organizations CBNRM Community Based Natural Resource Management CEPA Communication, Education and Public Awareness CFM Collaborative Fisheries Management CMT Council Management Team CSO Civil Society Organization DALDO District Livestock Development Officer DANIDA Danish International Development Agency DPLO District Planning Officer DBO District Beekeeping Officer DC District Commissioner DCDO District Community Development Officer DED District Executive Director DeNRM Decentralized Natural Resources Management DEO District Education Officer DFsO District Fisheries Officer DFO District Forest Officer DGO District Game Officer DLNRED District Lands Natural Resources and Environment Department DHRO District Human Resources Officer DNRO District Natural Resource Officer DPIT District Project Implementation Team DPLO District Planning Officer DSC Directorate for Sector Co-ordination DSM Dar es Salaam DT District Treasurer DWE District Water Engineer EU European Union iv FBD Forestry and Beekeeping Division FR Forest Reserves GEF Global Environmental Fund GoT The Government of Tanzania GR Game Reserve IDCP Indicative Development Cooperation Program IUCN International Union for Conservation of Nature IGA Income Generating Activity JFM Joint Forest Management JWM Joint Wetlands Management JLPC Joint Local Partnership Committee KVTC Kilombero Valley Teak Company LUP Land Use Plan / Land Use Planning M&E Monitoring and Evaluation MAFSC Ministry of Agriculture Food Security and Cooperatives MCS Monitoring, Control and Surveillance MEPE Ministry of Planning and Economic Empowerment MOEVT Ministry of Education and Vocational Training MGCD Ministry of Gender, Women and Child Development MH Ministry of Health MLCA Ministry of Law and Constitutional Affairs MLF Ministry of Livestock and Fisheries MLHSD Ministry of Lands and Human Settlements Development MNRT Ministry of Natural Resources and Tourism MoF Ministry of Finance MoFEA Ministry of Finance and Economic Affairs MoL Ministry of Livestock Development MoU Memorandum of Understanding MOW Ministry of Water MTR Mid Term Review NAFCO National Agriculture and Food Corporation NAFOBEDA National Forest and Beekeeping Database NAWESCO National Wetlands Steering Committee NEMC National Environment Management Council NGO Non Governmental Organization NORAD Norwegian Agency for Development Cooperation NP National Park NR Natural Resource NRM Natural Resource Management NTFP Non Timber Forestry Product NWMS National Wetlands Management Strategy NWWG National Wetlands Working Group v PELUM Participatory Ecological Land Use Management PMO-RALG Prime Minister’s Office of Regional Administration and Local Government PO Project Officer RAS Regional Administrative Secretary REDD Reducing Emissions from Deforestation and forest Degradation RNRA Regional Natural Resource Advisor RNRO Regional Natural Resources Officer RUBADA Rufiji Basin Development Authority RUMAKI Rufiji, Mafia and Kilwa SAGCOT Southern Agricultural Growth Corridor of Tanzania SACCOS Savings and Credit Cooperative Society SWMP Sustainable Wetlands Management Plan TA Technical Assistance TANAPA Tanzania National Parks TANESCO Tanzania Electric Supply Company TFF Technical and Financial File TFS Tanzanian Forest Service URT United Republic of Tanzania USAID United State Agency for International Development VC Village Council VEC Village Environmental Committee VEO Village Executive Officer VICOBA Village Community Banks VLUP Village Land Use Plan VNRC Village Natural Resources Management VPO Vice President’s Office VPO-DE Vice President’s Office-Department of the Environment WBO Water Basin Office WCST Wildlife Conservation Society of Tanzania WD Wildlife Division WDC Ward Development Committee WEO Ward Executive Officer WMAs Wildlife Management Areas WO Ward Office WUA Water Users Association WWF World Wide Fund for Nature vi Acknowledgements It is with much gratitude that we would like to thank the management of the KILORWEMP project, Giuseppe and Pellage as well as the district coordination teams in Rufiji, Adam and Emmanuel, in Kilombero, Zakayia and Julius, and in Ulanga, James and Ole, for the sustained support that we have received to obtain the requested documents, to organize the logistics, and the meetings with the relevant people. We would also like to mention the three drivers, Ngosha, Msumi and Deo, who safely drove us to our destinations. Despite the long discussions and late work hours, the endless car drives, flat tires, either stuck in the mud or stuck at the wrong side of the bridge, the project team has been always very patient with us. We very much appreciate all the respondents in the districts, wards and villages to answer our never-ending questions. We hope that our presentations and questions have helped to deepen the reflection on organizational development and social accountability. Surely, we like to thank the officials at the Ministries and Regions for their responsiveness and contributions. Finally, a big THANK YOU to all those people whom we did not mention, but who have been very kind and supportive to us in preparing this assessment. While all advice and information has been greatly appreciated, sole responsibility for any errors or misrepresentation rests with the authors. Nashukuru sanaa Maureen and Kahana vii Executive Summary The Kilombero and Lower Rufiji Wetlands Ecosystem Management Project (KILORWEMP) started in 2013 and is implemented by the Belgium Technical Cooperation (BTC) in Kilombero, Ulanga and Rufiji District Councils. On request of the KILORWEMP project, a capacity assessment and organizational development assignment in the area of Community Based Natural Resource Management (CBNRM) has been carried out in the first semester of the year 2014. The assessment was based on a number of concepts related to Capacity Building and Organizational Development principles as well as social accountability models. The used methodology included field visits to the three project districts, namely Rufiji, Kilombero and Ulanga as well as interviews with the Ministry Officials at the different divisions of the Ministry of Natural Resources and Tourism (MNRT), and Ministry of Livestock and Fishery and relevant officials at the regional level. In addition, a number of NGOs and Civil Society Organizations have been visited in Dar es Salaam as well as in Morogoro and in the three named districts. The assessment started in most cases at the "bottom" at the Community Based Natural Resource Management (CBNRM) level and zoomed out and built the assessment up from there to the higher levels. Main knowledge areas were: A Land use planning CBNRM (WMA, PFM, BMU) Value Chain development of NR related products Business plans development Conflict management Negotiation and contracting Social accountability desk study assessing the available establishment and management policies and strategies regarding the of Wildlife Management Areas (WMA), Beach Management Units (BMU), as well as Participatory Forest Management (PFM) Units provided for insight in the current legal context, while the identification of the key stakeholders active in CBNRM in Tanzania provided insight in the involvement of government, development partners, service providers and civil society actors (chapter 2). The main observation is that there does not exist an overarching CBNRM strategy at national level. The policies are scattered over the different sectors (wildlife/wetland/TAWA, TFS/Forestry) within different Ministries (MNRT and Ministry of Livestock and Fishery). Though there has been considerable investment from several projects (DANIDA, WWF and GIZ) into the approach, the government is still hesitant to fully adopt this process and integrate it into the mainstream. viii Taking the three result areas formulated by the project as reference point, performance issues were distilled from previous studies (baseline and TFF) and confirmed and enriched in the field. These issues constitute the basis for identification of the capacity gaps and capacity needs at different organizational levels in the three districts where the project is currently active. The aim was to look at the future Beneficial Institution (BI) in a more comprehensive way, less from individual and more from the organizational perspective. From the assessment transpired the following performance gaps related to result area 1: Key resource users (wildlife, forest, fisheries & land) obtain user rights and are organized to manage their resource based on wise principles within the framework of Community Based Natural Resource Management: Staff of each sector (wildlife, forestry, fishery, land, etc.) has sufficiently internalized the legal steps to follow and are able to apply them to establish the concerned CBNRM unit. However, the capacity and ownership of the WEOs and VEOs as well as the communities is very weak. The omission to involve minorities of the population and pastoralists from the beginning leads to conflicts later in the process. Boundary disputes between communities and protected areas are many. Bad documentation, record and map keeping also leads to misunderstandings regarding the boundaries. In result area 2, formulated as follows, Key resource users, transformers and traders (wildlife, forest, fisheries) organized to derive sustainable economic benefits from Community Based Natural Resources Management through access to markets and sound business management, it became clear that the LGAs have not been prepared for developing strategies, understanding and skills regarding creating an enabling business environment, revenue collection, conflict management, contract management, value chain, markets and business plans. There are no clear guidelines to help the DFTs and the communities to sustainably use and manage the units. At the same time, there is an underlying issue of individual benefit versus communal benefit in poor communities for especially the fisheries, which makes it hard for the patrollers to enforce the by-laws and sanction the rules to ensure protection and sustainability. In result area 3, which is formulated as follows, Strengthened capacities of central, regional and local government structures to support and monitor the implementation of policies at local level and improved coordination between Natural Resource governance stakeholders at all relevant levels, the main issue is the lack of a common vision amongst the sectors on wetlands management and CBNRM. There is need for a more holistic approach at the district level. In addition, horizontal linkage of the district with other stakeholders, such as civil society and businesses is not taking place, which makes it hard for the different parties to have access to information, to voice their concerns, to participate in dialogue and debate and to claim rights. ix Based on these identified issues the team has formulated transition states for the project to work towards and which can be considered as milestones on the way to achieving each of the result areas (see Table 10). The different levels in the organization have been assessed in terms of Human Resources availability and quality in chapter 4, 5 and 6 at Ministerial (including Regional), District and Village level respectively. At the MNRT, the project is situated under the Wetland unit as part of the Wildlife division. The project works through the Wetland and Community Based Conservation (CBC) units to strengthen the recently constituted Task Force. Capacity building falls under responsibility of the Research, Training and Statistics Unit of the Wildlife department. Though there exists a solid capacity building plan at the national level, CBNRM does not seem to be integrated yet. Issues to address are related to commitment of the government to pull the process and the difficulty to coordinate across divisions and ministries. The regional level needs to be included in the chain of devolution to the lower levels. They have a role to play in coordinating the sectors, mobilizing the stakeholders as well as M&E follow up and conflict resolution. District level involves many actors that need capacity strengthening. On one hand, the technical staff have been organized into the District Facilitation Team, including specialists from the land, wildlife, forestry and fishery sectors, which is responsible for the establishment of the CBNRM Units and the support to the communities in the management of the units as well as in sustainable use of the natural resources on the units. Most of the professionals are well qualified and capacitated in technical terms to establish the CBNRM Units, however, not so strong in empowering, mentoring and coaching others. At the same time, the DFT do not have the competency to support the CBNRM units in the stock assessments, the preparation of harvesting plans of the natural resources and other requirements in preparation of the sustainable management of the CBNRM units. In addition, the cooperative officer, trade officer, lawyer, DLPO, DT and DHRO amongst others within the LGA have roles to play to create an enabling business environment and to enforce the by-laws. They have not been sufficiently capacitated to deal with this new approach. Since the abrupt stop of the LGRP II program, the generic council management systems are no longer strengthened and new staff is not conversant with the Council Management tools, which hampers the council to operate smoothly, and will need to be considered when the project will gradually integrate into the mainstream of the district council systems. Village level government, Village Natural Resource Committees, and CBOs all need to be reinforced and empowered to be able to select service providers to do stock assessments and to help with the harvesting plans as well as negotiate with investors and suppliers and traders on price setting. One way to strengthen to lower levels is through support from civil society, which is a x new approach for BTC and the government. An assessment of potential CSOs which could play different roles at different levels has been described in chapter 7. The report shortly sketches 3 options to explore for BTC to address this approach. For the formulation of the CB Plan, the strategy was to address organizational capacity building as a package at each level. Based on the identified performance gaps for each of the result areas, the related actors, who play a role to address these performance gaps, and their capacity weaknesses are the basis for the identification of the capacity building activities. The combined improved capacities will address the specific performance gap for that result area. The rearrangement of all CB activities per actor then constitutes the basis for the packages that are developed into a capacity building plan. The packages will be delivered in three phases: Phase 1: Short term To build commitment at national level To keep/revive momentum at local level (quick wins) To respond to demand for concrete actions To start build relationship with civil society Phase 2: Medium term To deepen and expand commitment for CBNRM at WD units To start strengthening CSOs at different levels. To develop regional level facilitating capacities: AAS EPS and RNRO To strengthen capacity of RC and RNRO in sustainable conflict management To build capacity of sector staff at all levels To change mind sets of district teams in facilitating and empowering lower levels To empower lower levels in technical capacities as well as power related negotiations To develop strategy to further explore the 7 commodity chains Phase 3: Longer term To further embed CBNRM in the Ministries To follow up and anchor capacities along the organizational lines To identify and address remaining capacity gaps To address result area 2 To support CSOs in playing their role of service provider, watchdog, social accountability monitor and advocacy organization. Each of the packages addresses a specific outcome of a desired (transition) state of the organization. Per package, one lead service provider will be recruited to organize the complete package, meaning he/she will prepare and organize the modules (trainings or retreats or field visits) by different providers, and will ensure the on-the-job-training, the xi individual and organizational learning from beginning to end and is responsible for the expected outcome of that package. Each package will consist of a series of activities (modules) that include at least the following components: – – the preparation of one (or a series of) : • Course (s), and/or • Training (s), and/or • Work shop (s), and/or • Field visit (s), and/or • Retreat (s) or • any other event (s) on specific topics each event will include the formulation of an organizational and individual action plan, which indicates what the person(s) will work on while implementing his/her “normal” plan. This means it is integrated in the existing work plans, it is not an additional “separate” plan. – follow up support and monitoring of the results and progress in implementation of the action plan, by mentoring or coaching on a regular basis (every 3-6 months). The service provider will visit the districts and jointly assess what went well and what did not work out and will provide “on-the-job training” (on average) 2 times after the event with a few months in between the visits. – learning: jointly developing the lessons learnt and way forward. This means that every 6 months there will a session organized with those who have received capacity building and on-the-job training and lessons learned will be identified and integrated in the next periods. Each package also involves several layers of the organization, where the top layers are supporting lower layers as in a kind of cascade (see figures 9 to 17) of capacity building support (similar to the ToT model). The following packages are foreseen: Package 1: National level: To build commitment within MNRT and capacity for developing a common CBNRM approach Package 2: Regional level: To build capacity of RS staff to respond to concerns and request for support from the LGA levels, Civil Society as well as Private sector. Package 3: District level: xii To mainstream wetland management at district level Package 4: District level: To build facilitation and empowering skills of DFT Package 5: District level: To strengthen capacity to create enabling business environment for DFT plus lawyer, cooperative officer, trade officer, TFS, TCCIA and the project staff Package 6: Village level: To strengthen village leadership in leadership, negotiation, contract management, conflict resolution Package 7: District to village level: To strengthen law enforcement mechanisms Package 8: Civil Society To strengthen several levels of networks to become stronger partners in relation the LGAs and CG (also see chapter 7). Package 9: Project staff To strengthen NTAs and DPCs in specific skills For each package, a lead service provider will be selected through a call for proposals, which can buy-in the technical expertise from elsewhere or organize the participation of the relevant target persons in already available training at existing institutions or organize a retreat program or site visits while ensuring quality and tailor made follow up and backstopping after the main events. Each package will clearly indicate the quality criteria to which the lead provider has to adhere, as well the time frame and calendar, which has been developed in participation with the target group. The quality criteria for the service provider include: Relevance of the team composition in terms of competency Academic level of the team members Experience with similar assignments in similar context Innovative aspects in the proposal Booked results in relations to capacity building with LGAs References responses Finally, it is recommended that the Director of Research, Training and Statistics of the Wildlife Division will be involved in the development of the packages at national level, while the HROs of the three councils will be involved in the development of the details at district level so that the change for sustainability is increased. xiii xiv 1. Introduction The Belgium Technical Corporation (BTC) focuses in its current IDCP (2010-2013) on two sectors, namely: Local Government Reform and Natural Resource Management. Within that context, amongst others, two potentially complementary projects were recently formulated: BTC Scholarship Program and the Kilombero and Lower Rufiji Wetlands Ecosystem Management Project (KILORWEMP-NRM). Since the strengthening of the organizational capacity/development of the local and central actors is key for the success of the KILORWEMP, it seems only logical that the scholarship program will support the capacity strengthening part of the project in the concerned districts and concerned regional and central departments with the intention to upscale and enlarge the scope of the capacity building activities to the other selected districts for the scholarship project, where relevant. 1.1. The Projects: 1.1.1. KILORWEMP project The KILORWEMP project was formulated in mid 2011 and implementation started in 2013. It takes into account the lessons learned in previous BTC supported projects such as Kilombero Valley RAMSAR Site Project (KVRS) and the Eastern Selous project. It strives to support the implementation of existing policy framework of Decentralized Natural Resources Management (DeNRM) around the key concept of Community Based Natural Resource Management (CBNRM). It has been designed to support further consolidation of such processes in three target districts, namely Kilombero, Ulanga and Rufiji, while at the same time addressing key issues of policy environment such as stakeholder’s coordination and monitoring of policy implementation. Its specific objective is “strengthened capacities to implement the sustainable management policy and regulations to the Wetlands Ecosystem of the Kilombero Valley and Lower Rufiji, fostering sustainable livelihoods development and more effective natural resources governance within the decentralization framework”. In May-June 2013, a Baseline study was conducted to: 1. Validate the project strategy as described in the TFF (updated review including ToC) 2. Elaborate an M&E system 3. Elaborate the criteria for selection of priority interventions and areas 4. Propose quantitative targets of the project and a preliminary selection of priority intervention sites An extensive participatory assessment of the situation and the formulation of the Theory of Change for the three result areas of the project have been conducted and provided for the first inventory of capacity needs based on the problem analysis and intermediate state formulation within each result setting. 1 1.1.2. Scholarship program: The Belgium Government has supported the Tanzanian Government in capacity development of its officials for many years in providing a scholarship program for undergraduate and graduate students. Recently, the focus of the project was reoriented from providing individual scholarships in Belgium or Tanzania to focus on long-term investments and sustainability through organizational development of national institutions (Beneficiary Institutions, BIs) related to the targeted sectors, namely Local Government Reform and Natural Resource Management. BIs are identified at the level of Ministries, Regional administration and LGAs in the following districts: Kigoma MC, Kigoma DC, Kibondo DC, Kasulu DC, Kilombero DC, Ulanga DC, Rufiji DC, Mkuranga DC. This identified geographical concentration is related to the presence of other BTC projects. The new scholarship program started in July 2013 and ends in April 2018. Three of the identified districts in this program overlap with the concerned districts of the KILORWEMP project, which provides for the opportunity to complement each other, create scope for up scaling and find synergy. 1.2. Objectives of the current assignment The main objective of the assignment is: “Prepare an assessment of training and capacity development needs in selected sectors (NRM and Local Government) of the Beneficiary Institutions (BI), taking into consideration relevant organizational level performance goals. The identification of needs will inform a plan for training and capacity development support”. 1.2.1. Specific tasks: Finalization of the assessment methodology based on literature review and feedback from BTC and counterparts, fine tuning tools and final report outline, finalization of the calendar Site visits to the target institutions: collection and review of documents, structured interviews and staff survey, including interviews with senior LGA staff, focus group discussions with teams/units, full team meeting on organizational level regarding capacity building objectives Reporting: submission of draft report and submission of final report. 1.3. Concepts 1.3.1. Capacity Building There exists a multitude of definitions regarding capacity and capacity building, of which the consultants propose the following as most relevant for this assignment: 2 Definitions: Capacity 1 : the ability or power of an organization to apply its skills, assets and resources to achieve its goals. Capacity Building2: an on-going evidence driven process to improve the ability of an individual, team, organization, network, sector, or community to create measurable and sustainable results. Organizational Capacity Building 3 : the strengthening of internal organizational structures, systems, and processes, management, leadership, governance and overall staff capacity to enhance organizational, team and individual performance. A more dynamic perspective of “capacity” is described by ECDPM 4 : a continuous process by which individuals, groups, institutions, organizations and societies enhance their abilities to identify and meet development challenges in a sustainable manner. Greater emphasis is placed on questions of role and relationships, attitude and responsibilities at inter-organizational and societal levels. 1.3.2. Community Based Natural resource management (CBNRM): Community Based Natural Resource Management is a concept, which is only recently introduced in Tanzania. Community Based Natural Resource Management (CBNRM) refers to the goal of “sustainable natural resource management at the lowest appropriate governance level”. CBNRM is very much about local community governance of natural resources on village lands. Lessons learnt to date show that the principles of CBNRM work fairly well when it relates to subsistence use, however, as soon as natural resources are treated as “economic goods”, where they have value, are traded and enter commercial markets to be exploited for profit, empowering local community management is simply not enough. There is a need for more holistic management by involving the “whole value chain” (ie the private sector, the traders, transporters and value added markets). This means an element of “co-management” must prevail, a partnership between communities, the state, resource users and traders. In Tanzania CBNRM currently entails three forms of natural resources units to be managed by the communities: Wildlife Management Areas (WMA), Participatory Forest Management (PFM), and Beach Management Units (BMUs). CBNRM units are most often started up after communities have established and approved their village land use plans, so that exercise is intrinsically part of the whole process. 1 Organizational Capacity Building Framework, USAID and Aidstar Two, Technical brief no2, January 2011 2 idem 3 idem 4 Land, A. 2000. Implementing institutional and capacity development conceptual and operational issues, (EDCPM Discussion paper 14) Maastricht, ECDPM.2 3 1.3.3. Governance and Social Accountability Social Accountability is another concept that is still relatively new in Tanzania. The dimensions of social accountability are manifold. They have been conceptualized by several stakeholders developing different models/approaches. It is understood that social accountability mechanisms complement and enhance conventional internal (government) mechanisms of accountability. Therefore, the project wishes to explore possibilities for complementing its current approach with the strengthening of the role and possible involvement of civil society. Some basic concepts on social accountability have been presented in chapter 7. 1.4. Methodology The framework for the methodology is based on what already has been done during the baseline and further developed in the mean time, as presented in the annual report, especially regarding Theory of Change, the intermediate states and mitigating measures to address assumptions and the log frame performance indicators. The starting point and core of the assignment is the participatory process to establish, manage and harvest NR products from the Community Based Natural Resources Management (CBNRM) areas, for which the following legal steps have to been made: Figure 1: Participatory NRM: 6 legal steps Par cipatory NRM : 6 legal steps towards CBNRM Target 1 Target 2 Target 3 priority site included in DDP resource brought under CBNRM wise use of resources Step 1 Priori ze sites through district resource inventory Step 2 Site strategic Plan included in DDP Step 1 Resource user group formed Step 2 Boundary described and mapped Step 3 Resource assessment Step 4 Resource management and plan prepared Step 5 Village by-laws approved Step 6 User rights obtained Step 1 Implementa on of Management plan There are three forms of CBNRM under consideration, namely Wildlife management Areas (WMA), Participatory Forest Management (PFM) areas, which include Community based Forest management (CBFM) as well as Joint Village Forest reserve (JVFR), and Beach Management Units (BMU). 4 Target 3: The development and implementation of the management plan differs for the different type of Units. Table 1: Key chapters in management plans for the different CBNRM units WMA BMU PFM Surveillance (patrolling) Surveillance (patrolling) Like PFM and WMA (on the left) Census/harvesting plan Census/harvesting plan Landing site improvement Resource management Resource management Improved sanitation Mitigating pressure (fire Mitigating pressure (fire Artificial reefs and poaching) and poaching) Community development Community development Re-stocking Value Value Protection added economy added economy development development grounds Capacity development Capacity development Improved of breeding processing, storage and marketing M&E M&E Trading legal for illegal gears Marketing Marketing CEPA campaigns The red line throughout the assignment was: Performance Roles and organization response al level bilities Capacity Capacity need gap Package Capacity support Institutional Embedding The assessment started in most cases at the "bottom" at the CBNRM level and zoomed out and built the assessment up from there. The reason was to make the aimed Capacity Building and Organizational Development Plan as practical and feasible as possible. Main knowledge areas were: Land use planning CBNRM (WMA, PFM, BMU) Value Chain development of NR related products Business plans development Conflict management Negotiation and contracting Social accountability 5 Key issues at almost all levels are: institutional arrangements (systems, processes, etc.) roles and responsibilities, knowledge and skills accountability inter-level communication and connection For LGAs the CB assessment was mostly NRM specific regarding: Capacity to plan, budget and implement NRM plans Capacity to manage and support NRM related staff Capacity to monitor progress and be accountable to higher and lower levels Capacity to support the lower levels (access to information, participation and mobilization of the villagers, guidance in the regulations and legal aspects, etc.) capacity to provide enabling environment for CBNRM, land use planning as well as Value Chain Development and business development of NR related products. capacity to generate revenue without killing the businesses. capacity to coordinate amongst departments capacity to deal with conflict management For the CSOs, NGOs and CBOs the following axes were assessed: capacity to support the villages in land use planning capacity to support CBOs in the creation of CBNRM capacity to provide access to information capacity to empower the CBOs and villagers to hold LGA accountable capacity to mediate, avoid and address conflicts capacity to mobilize voice and generate space for dialogue capacity to influence policies capacity to enforce and make sanctions happen 1.5. Tools: The tools that were be used are detailed in the annexes. The main tools were: o Introduction to the concepts in power point presentation o Discussion points for Focus Group Discussions o Organizational Capacity Assessment (OCA) adapted for each audience o Mind mapping o Questionnaires (LG generic) o Workshop guidelines and programs o Stakeholder debriefing agenda See annex 2 for the list of tools For the governance and harmonization part, the links between organizational and institutional levels and processes have been assessed. 6 Figure 2: Institutional picture of NRM Advocacy CSOs: TNRF TFCG Bunge MNRT PMO-RALG MPs NGOs RS Full Council CSOs MoL Commi ees CBOs LGA CMT Water Agric NRM Livest ock Ward WEO, WDC, ward tribunals Village VLUC, VNRC Trade magis trate Private Sector CBNRM Institutional level between CBNRM and MNRT: o Capacity to connect the different levels: o Facilitate and guide lower levels o Report to higher levels Organizational at LGA level: o Vertical between RS and ward to CBNRM o Horizontal between departments o Horizontal with full council o Horizontal with other stakeholders 7 2. Context Analysis 2.1. History of CBNRM In the past 20 years, there have been many lessons learnt with pilot CBNRM programs like Participatory Forest Management (PFM in over 3000 villages), Sustainable Wetlands Management (SWM in 200 villages), Wildlife Management Areas (WMA in 300 villages), Beach Management Units (BMU in 700 villages), Water Users Associations (100s), Beekeeping Associations (100s), etc. Based on this experience, each sector is still developing/pioneering/piloting its approach, although some toolkits, training aides, materials, guides and “how to do manuals”, do exist, especially after SWMP, much work is still needed to make them SMART and communicable to local users. Tanzania has since the late 1980’s been in the process of developing a policy framework for Community Based Natural Resources Management (CBNRM). Recognized as a key feature of its long-term development and poverty reduction strategy (referred to as MKUKUTA), is the importance to engage in citizen participation. A policy of Decentralization by Devolution (DxD) has been seen as of crucial importance to pass more responsibility to the appropriate decision making level, the Local Government Authorities (LGA), at both district, village and user level, in what is known as a “bottom-up approach”. The development strategies of Tanzania, stress the basic importance of sustainable management of natural resources for Local Economic Development (LED), of relevance in a number of national strategies, such as: 2.2. Policy and Legal environment A whole array of sector level policies is also relevant to CBNRM, notably: National Land policy (1997): The overall aims of the National Land Policy(NLP)are to promote and ensure a secure land tenure system, to encourage the optimal use of land resources, and to facilitate broad-based social and economic development without upsetting or endangering the ecological balance of the environment. The NLP promotes protection of natural resources and the environment. Village lands and some communal areas can be reserved for conservation purposes (e.g. forests on village land). Highly sensitive areas such as water catchment areas, areas of biodiversity, national parks, wetlands, etc. are also protected. Furthermore, the NLP states that the government will ensure that permits, licenses, claims and rights for exploitation of natural resources are issued in line with land use policies, and environment conservation policies and programs. 8 Wildlife Policy (2007): The mission in the Wildlife Policy is to conserve, manage and develop wildlife and wetland resources, and sustainable utilization that will contribute towards poverty reduction. Government will not engage itself in conducting business in the wildlife industry, but is creating a semiautonomous body, Tanzania Wildlife Authority (TAWA) to manage its estates. District Councils have been assigned a decentralized role to provide extension service, formulate and enforce by-laws, provide conservation education to villages and prepare development plans that protect wildlife and wetlands. Local communities on village lands have a role of protecting and benefiting from these resources. Some of the Wildlife Policy strategies that have significance for CBNRM (ie of wildlife and wetlands) include: Wildlife Management Areas (WMA), which provide joint management opportunities between state and communities; RAMSAR Sites as places on international important biodiversity. National Fisheries Sector Policy and Strategy Statement (1997): The objectives of the policy are to ensure effective use of fish resources to increase production, and enhance fish knowledge base, to contribute to the local economic growth. Amongst the main objectives of the policy are to improve involvement of fisher communities in the planning, development and management of fishery resources and to incorporate gender perspectives. CBNRM is encouraged through Beach Management Units (BMU) which provide means for users to apply for fishing rights and efforts are underway to adopt a more ecosystem based approach through Collaborative Fisheries Management Areas (CFMA), where several BMUs share fishery units under one association to collectively manage the fishery. The National Forest Policy (1998): The policy calls for ensuring ecosystem stability through conservation of forest biodiversity, water catchments and soil fertility and enhance national capacity to manage and develop the forest sector in collaboration with other stakeholders. It introduces a decentralized system, which includes village land forest reserves (VLFR) and mandates district councils to manage national forest reserves on behalf of the central government. There are also local government forest reserves, managed by local authorities, specialized executive agencies or even by the private sector. Ramsar Convention on Wetlands: the Government of Tanzania ratified the Ramsar Convention on Wetland in 2000. It is an important treaty for the conservation and sustainable utilization of wetland resources. It recognizes the fundamental ecological functions of wetland and their economical, cultural and scientific value. Under SWMP (2013) support to the Ramsar Convention has seen the development of Guidelines and Toolkits for sustainable wetlands covering sectors like fisheries, wildlife, irrigation, pastoralism, resource inventory, strategic economic assessments, and CEPA materials and resource books for schools and training centers. 9 2.3. Stakeholders 2.3.1. Government institutions Apart from the Government Institutions involved in NRM under the combined umbrella of MNRT and PMO-RALG, which will be discussed in chapters 4 to 6, other institutions can be listed/summarized as: Vice President’s Office –Division of Environment The Division of Environment (DoE) was transferred to the Vice President’s Office in 1995 to give in the requisite priority and attention in promoting management of the environment. DoE is responsible for the overall environmental policy and regulation, coordination and monitoring of the environment policy implementation in the country. The institutions which have enforcement roles in environmental matters and which are coordinated by the DoE, include sector ministries, Local Government Authorities and the National Environment Management Council (NEMC). DoE coordinates these institutions by reviewing Environmental Action Plans from ministries, district councils and villages. Ministry of livestock and fisheries Development The Ministry of Livestock and Fisheries Development (MLFD) 2 mandates that are critical to CBNRM, firstly is the responsibility to provide guidelines, capacity building and designation of areas for sustainable rangeland management, thereby reducing the threat of pastoralists clashing with other land uses such as agriculture, fisheries and natural resources conservation. Another important role of MLFD is to patrol inland waters and facilitate revenue collection. Improved fisheries law enforcement will create a more conducive environment for BMUs to operate. The MLFD’s capacity to fulfill these roles is thought to be limited. National Land Use Planning Commission The National Land use Planning Commission (NLUPC) is enshrined in the Act of 2007. The Commission was established so as to harmonize and co-ordinate land use policies and legislation, to promote effective management and enhancement of land quality with the aim of ensuring sustainable utilization of land, so that it can provide optimal production to enhance socio-economic development and maintenance of land quality for long term productivity. The NLUPC is required by the Act to register VLUPs throughout the country and to provide advice and build capacity for the proper implementation of Land Use Plans. NLUPC also has a role in building district capacity to conduct VLUPs as well as facilitating their preparation. RUBADA The Rufiji Basin Development Authority (RUBADA) is a philanthropic government organization established by Act of Parliament in 1975 charged with multi-sectoral 10 responsibility of promoting, regulating, and coordinating sustainable ecological and socio-economic development in the energy, agriculture, fisheries, forestry, tourism, mining, industry, transport and environment sectors within the Rufiji River Basin. According to RUBADA the Rufiji Basin has significant potential for both irrigated and rain-fed agriculture. The suitable area for irrigated agriculture is estimated at 622,400 as shown below. The RUBADA website ranks the Kilombero Valley as the first priority zone in the Rufiji Basin because of its fertility. The Lower Rufiji Valley is ranked second with the Ikwiriri Block occupying about 15,000 ha as suitable for irrigated agriculture. 2.3.2. NRM Development Partners WWF WWF is working with MNRT as well as local communities and the private sector to protect the Udzungwa Mountains National Park (UMNP), which occupies part of northeastern Kilombero District. Protection includes conservation and management support, ecological monitoring and research, infrastructure development and ecotourism initiatives. With financing through WWF Norway, a conservation project will focus on supporting management of forests outside the UMNP, including improvement of land use practices in village lands and enhancement of alternative livelihood options. The United States Agency for International Development (USAID) and MCA-Tanzania have partnered together with WWF in Tanzania to support Wildlife Management Areas (WMA’s). WWF intends to build the capacity of Community Based Organizations (CBOs) to earn income through ecotourism, attract investment and improve living standards for families. WMA’s are also instrumental in protecting and managing the environment. Over the past five years, USAID has been supporting the development of WMA’s in Tanzania by providing nearly $2 million for WWF to work with rural communities. WWF implemented a project in the EAME area with funding from WWF – Norway, which aimed to improve the well-being of coastal Rufiji-Mafia-Kilwa communities through participatory management of marine resources and establishment of local level institutions for fisheries co-management. The project trained 25 change agents, enabling the establishment of 23 new Beach Management Units (BMUs) and 6 Collaborative Fisheries Management Areas (CFMAs). Four VICOBA groups were established with over 120 members (55 female and 65 male) enrolled and provided with a capital loan. Loans issued through the VICOBAs had a repayment rate of 100% and increase on profit of 90%. DANIDA/ Finnish Embassy From the year 2000 up to 2013 wetland management was part of the Embassy of Denmark’s Environmental Sector Programme Support. Outputs of the wetlands component related to improved integration of wetland issues into planning processes and on the ground implementation in Iringa and Mbeya Regions, with more focused 11 improvement of sustainable wetland management in 3 selected wetland sites within the two Regions. Other field-based outputs were directed at management planning process and livelihood support in the Lake Natron Ramsar Site and consolidation and replication of sustainable wetland management in the Malagarasi-Muyovozi Ramsar Site. In addition to the Sustainable Wetlands Programme, from 2003 – 2013 Danida also supported the national Participatory Forest Management programme in 4 Regions of Mbeya, Iringa, Morogoro and Lindi. Districts supported in Morogoro included Kilombero, Kilosa, Mvomero and Morogoro Rural. Danida support was provided through local government structures, employing the use of a District Facilitation Team that would promote and facilitate PFM planning, budgeting and implementation in selected villages. From 2006 to 2009 Danida supported CBFM initiatives in 6 Village Land Forests in Kilombero District, although not a single forest was able to complete the 6 steps. GIZ The Conservation and Sustainable Use of Biodiversity program me is implemented through GIZ and KfW. The program aims to contribute to stabilizing globally significant natural ecosystems, while improving the livelihoods of the local population. The program will focus on the following activities, reforming wildlife management; strengthening district authorities in natural resource management; enhancing community-based conservation and benefit-sharing; ameliorating the management of the Selous Game Reserve; and improving social and economic infrastructure in selected districts. The lead executing agency is the MNRT’s Wildlife Division in charge of wildlife protection, and for the management of the Selous Game Reserve (SGR. 2.3.3. Service Providers Currently there exists a wide range of service providers in the area of NRM, which can be summarized as follows. A more detailed analysis is provided in chapter 7 and annex XXX a) CBNRM Advocacy Groups: These NGOs, based in Dar es Salaam or Arusha, could be used to advocate for the benefit of the CBOs, notably HAKIARDHI, Tanzania Natural Resources Forum (TNRF), Tanzania Forest Conservation Group (TFCG), MJUMITA, Lawyers for Environmental Action in Tanzania (LEAT), and Association of Local Authorities of Tanzania (ALAT), etc. b) Microfinance institutions are active in the districts and could be important partners to support financial services needed for the NR based livelihood activities (e.g. SACCOS, VICOBA, Primary Societies, etc.). c) Training centres: MNRT wildlife training centres at Mweka, Pasiansi and Lukuyu Sekemaganga, forest and beekeeping at Olmontonyi and Moshi, Local Government Training Institute (LGTI) at Hombolo as well as fisheries centres in Nyegesi 12 (Mwanza) are active in key sectors relevant for the project and could be venues for formal training of district staff and communities in the area. d) Universities and research centres are active in relevant aspects of the NRM issues in the project area; this includes the local campus of the Moshi University College of Cooperatives and Business Studies (MUCCoBS), the University of Sokoine (SUA) (Morogoro) and University of Dar Es Salaam (UDSM), as well as wildlife research at TAWIRI (Arusha), forestry at TAFORI (Morogoro), fisheries at TAFIRI, etc. e) School Wildlife Clubs play an important role in educating the next generation on sustainable livelihoods and could be involved, such as Malihai Clubs of Tanzania (MCT), 2.3.4. Private Companies Important actors include private companies investing in agriculture (eg rice), irrigation (eg sugar), tourism (eg sport hunting) in the Landscape. A common, landscape wide integrated Land Use Planning (LUP) framework is still lacking to ensure that common criteria are used before land allocation processes can go forward, however some initiatives are underway to prepare district investment profiles (eg Kilombero and Ulanga), and land banks are being set aside for Private, Public Partnerships (PPP). Forestry Kilombero Valley Teak Company (KVTC): KVTC was established in 1992 with an 8,000 ha teak plantation at the heart of the project and the protection and management of 20,000ha of native forests, wetlands and a wide range of wildlife and flora within the project area. KVTC is designed to deliver high value teak, sustainably sourced from Kilombero and Ulanga Districts. The main objective of KVTC is to establish a processing industry in the area where the timber is sourced. In mid 2009, KVTC established a modern sawmill, drying facility and value adding plant. At present the plants process around 30,000m3 of logs per annum and this is expected to increase to around 80,000m3 once the plantations have reached rotation age. In 2002 KVTC embarked on a Village Out Grower Project where annually teak plantations are being established in the associated villages. KVTC finances the establishment and maintenance of these new teak plantations and guarantees a market at a minimum age of 15 years for the trees. KVTC is a stakeholder in the Kilombero Valley Ramsar Site, with large areas of natural woodlands under its area of operations. There are currently discussion ongoing between KVTC and KILORWEMP on piloting the implementation of a Joint Forest Management arrangement under a private forest regime. KVTC also has wildlife resources and biodiversity areas under its area of jurisdiction. 13 Agriculture [rice; sugar]: Kilombero Sugar Company Limited (KSCL) of ILOVO Kilombero Sugar Company Limited (KSCL),is Tanzania's biggest sugar firm that operates from Kilombero District in Morogoro Region, and is part of Ilovo Sugar Group. KSCL is an integrated sugar estate covering about 23,000 hectares. KSCL works with 8,000 out growers. KSCL only grows sugar cane, farming 10,000 hectares, 65% of which is under irrigation. The out-growers handle the remaining 13,000 hectares. As a major user of land and water resources in the Kilombero Valley, KSCL is a very important stakeholder with regards to sustainable management of the Ramsar Site. The use of irrigation water, chemical fertilizers and the production of agricultural wastes are obviously areas by which KSCL can impact the valley. The expansion of sugar farming, through the expansion of the outgrower schemes, also needs to be monitored and well coordinated by the relevant authorities. Kilombero Plantations Limited (KPL) of Agrica Limited Agrica Limited was founded in September 2005 to develop model sustainable agribusinesses in East Africa. In 2010, Agrica was awarded National Strategic Investor Status by the Tanzania Government. Kilombero Plantations Limited (KPL) is the Tanzania subsidiary of Agrica Limited, developing the 5,818 ha Mngeta Farm, situated in the fertile Kilombero Valley, one of best agro-eco zones for rice farming in East Africa. As with KSCL, KPL is a large-scale user of land and water resources. The expansion of their outgrower SRI scheme may have major impact on the ecology of the Ramsar Site. There is a need for the authorities to monitor and coordinate the future ppans of KPL in connection to the sustainable management of the wetlands in the Kilombero Valley. Tourism: Wild Frontiers Tanzania (WFT) Wild Frontiers Tanzania (WFT) has been fully operational for four years. Based in Arusha, WFT have a fleet of vehicles and offer mobile camps, seasonal permanent camps in Serengeti and Ngorongoro, walking safaris and Kilimanjaro hikes. Wild Frontiers Tanzania is a subsidiary of Wild Frontiers, which has operated safaris in Africa since the early 1980's. Wild Frontiers has offices or representation in South Africa, Uganda, Tanzania and now also in Zimbabwe. A broad range of products from luxury lodges to camping, diving, climbing, bird-watching, adventure activities and special interest safaris are available. The Wild Frontiers Tanzania does not appear to be active in the Kilombero Valley at this point in time. Kilombero North Safaris Limited amongst other activities also runs a fishing camp, located on the Mnyera River. The camp comprises four tents, which accommodate twin bed arrangements. All tents are built upon raised wooden decking, with a private 14 viewing deck overlooking the river and are tastefully decorated with locally made furniture and soft furnishings. A mess area, also on a raised wooden deck overlooks the river, and a covered lounge and sitting area completes the main camp. KNSL fly camp, is built on the banks of the Ruhudji River. This camp comprises three of the “traditional” safari tents. KNSL is still active in the Kilombero Valley. Table 2: Tourist hunting companies active in Kilombero Game Controlled Area as of 2011 Name Hunting Company Area of Operation Location of Hunting Block Kilombero North Safaris Kilombero Game Controlled Mlimba Ward, Kilombero District Limited Area (North) Wild Frontiers Limited Kilombero Game Controlled Area (South) Mngeta Ward, Kilombero District Boma Ulanga Ward, Ulanga District Malinyi Ward, Ulanga District Source: Tanzania Professional Hunters Association website 2011 The presence of at least one tourist hunting company in the Ramsar Site is an opportunity for stakeholders to involve them in sustainable management of natural resources. The hunting companies are expected to have experience with the tourism value chain and may be convinced to share their insights with the developers of the WMAs and fishing camps. The companies may even have capacity that can be shared with other stakeholders. 15 2.4. CBNRM status Table 3: CBNRM status Resource Wildlife Forests Inland Legal Delimitation and System of framework organization of users internal rules WMA Boundary disputes with By laws developed WWF model: Fines and permits Conflicts referred to Not enough support Timely and protected areas and and process is reporting by enforced by By- legal system of local from national level costly process investors implemented communities to the Laws drafted as government Unclear policy on according to 6 legal AAC part of WMA buffer zone steps CBFM and JFM VNRCs are managers By laws developed NAFOBEDA is not Fines and permits Conflicts referred to Weak Forest Law and BKR of VLFRs and process is functional, PFM-MIS system enforced by legal system of local Enforcement from implemented being developed, By-laws government central government according to 6 legal NAFORMA is national steps forest inventory No control possible in By laws developed Some LGA monitoring Fines and permits Conflicts referred to Very little support current setting and process is of fish landings, enforced by By- legal system of local from MLFD and other implemented licensing of vessels is Laws drafted as government national actors according to 6 legal monitored by LGA part of BMU process BMUs fisheries Monitoring Sanctions Conflict resolution Enabling environment process steps Agricultural Village land use Shifting cultivation still Fragmented, not LGA and MAFC Almost no system Conflicts referred to Crop marketing land plan the biggest deforesting rule based, monitor crop yields of sanctions beyond legal system of local boards exist mainly mechanism independent for food security quarantines during government for traditional export households acting purposes pest outbreaks crops, food crops freely suffer from periodic export bans Grazing Village land use Based on carrying Fragmented, based LGA and MAFC Quarantines during Conflicts referred to RC support to land plan but not for capacity which is on customary rules, monitor livestock pest outbreaks, legal system of local evacuate pastoralists migrant doubtful criteria for independent numbers for food evacuateions and government, though Very little support pastoralists only sedentary cattle households acting security purposes, restrictions from often overruled by from MLFD freely MLFD and LGA local land use plans central government monitor auction sales and by-laws directives 16 3. Result areas: As said before, the aim of the KILORWEMP project is to support the implementation of existing policy framework of Decentralized Natural Resources Management (DeNRM) around the key concept of Community Based Natural Resource Management (CBNRM). The project has developed result areas and its approach to reach these objectives in the form of a Theory of Change for each of the result areas, which are visualized hereunder. In this chapter, the team has assessed the roles and responsibilities of the relevant actors and emerging issues against these result areas. In the next chapters (4 to 6), the actors will be assessed within their organizational context and possible capacity building approaches discussed. 3.1. Result area 1: User rights obtained Key resource users (wildlife, forest, fisheries & land) obtain user rights and are organized to manage their resource based on wise principles within the framework of Community Based Natural Resource Management. The strategy to attain this result is visualised below in figure XXX, describing the impact drivers, the intermediate outcomes, the assumptions and the interconnection with the other result areas. Figure 3: Theory of Change for result area 1 17 3.1.1. Actors, their roles and responsibilities In order to address this result area it is important to know who are the actors responsible for the smooth implementation of the CBNRM establishment and what are their roles. Based on the exercises with the DFT and LGA staff during the field visit workshops in the three districts, the team has been able to establish the following roles per actor per result area. Table 4: Actors roles and responsibilities in result area 1 Actor Roles and responsibilities Villagers: Village Assembly, Define community and development priorities especially the village chairperson Establish VEC/VNRC committee and the sub village leaders Participate in the 6 legal steps Indicate boundaries of village land Develop land use plan Develop management plan Draft by-laws Approve revenue and expenditure Submit all to the WEO Correction of plans and by-laws on return from district Approve VLUP and CBNRM Approve by-laws Village standing committees, VLUP, Protection of the land and the CBNRM unit VGS, VEMP, VLC, Excluding wrongdoers CBO member (WMA), VNRC chairperson Resisting corruption Benefit sharing Financial management Secretary of the village assembly Financial management of village development activities Mobilise villagers and sub village members Participate in 6 legal steps process Monitor progress Report on progress Collect revenue VEO Village land council WEO Mediate in land conflicts Monitor progress Report on progress Collect revenue WDC Scrutinize by-laws Ward tribunal Mediate in land and domestic conflicts and reference to primary court at district level DFT: DFO, DFsO, DGO, DLO, Initiate the CBNRM process to the village communities DALDO, Dlivestock, DCDO, town Include the budget for the support to the process into planner, DLENRO, DEMO . District Integrated Development Plan Support villages in the 6 legal steps 18 Support to develop land use plan Support to develop management plan Support to draft by-laws District Advisory Board (DNROB) Coordination between departments, DEMO DED, DHRO, DLPO and DT Ensure staffing and budget for the implementation of the support to the 6 steps Ensure vision and strategy of CBNRM at district level Coordinate between departments for CBNRM Ensure adequate support to lower levels, such as WEOs and VEOs District lawyer Scrutinize by-laws on overlap Councilors and standing committees Approval of by-laws DC Moral support to the process Mediate in case of conflicts RNRO, RLO, RAS, RC Mediate in conflict situations PMO-RALG/PO-PSM Ensure sufficient staffing Approval of positions for recruitment Approval of replacement Order the recruitment of staff to CG Monitoring of the progress of the 6 steps Ensure linkage between central government and local government MNRT (TFS and WD) Support to RS and LGA staff Policy, laws, regulations, formulation of Acts Provide user right and the AA status Law enforcement (KDU-Wildlife department) Coordination The assessment team has observed that not all the actors are aware or have an indepth understanding of their roles and also that not all the actors are fully committed to play their roles. 3.1.2. Specific issues observed: During the desk study, many issues have been identified, especially based on the Baseline Study. However, it was important for the team to feel the reality, confirm what are key issues in the process and to understand what can be possibly addressed by capacity building and what are governance and policy or other problems. The following issues have been confirmed, that need to be addressed to improve performances related to the result areas. Regarding the CBNRM process see table 5. 19 Table 5. CBNRM issues identified for result area 1: General VLUP o Generally, each sector WMA o Generally, knows its own 6 Steps are guidelines guidelines o Demarcating zones as part of VLUP is understood in a mechanical way but management planning for each individual zone is lacking o There district familiar staff o Although WMA with started many and years procedures in all districts o Updates of guidelines not necessarily widely known (different applications on membership in VLUM team, training to VLUM is no documented district CBNRM vision in any of the 3 districts Team and time spent in village) o VLUP documents are reasonable of a quality, in NRM, even in order appropriate for making to increase revenues management o Project supported actions take too long, process is bureaucratic between, too and in- follow up visits are too far apart o VGS training needs to expanded recruits some to and refresher new even for plans, started DANIDA projects or interest, not funded investor part of district strategy o Efforts involve are made majority dispute to enforce o Although boundary with villagers is the biggest PFM source of conflict in the during floodplain area support from Underlying tension still incomplete in management blocked the WMA between individual Kilombero according to the process versus communal Reserve has in Rufiji interest District support from national level to establish the entity o Evacuations of encroachers have effective 2004-2012 o Ramsar o Capacity sufficient amongst DFT No principles to is support villages to taking produce just protection- reassert control centered of PFM place, trying the to KGCA management boundary plans, problem is o The business planning Ramsar Site is Kilombero more o Enforcement of by- than laws is difficult due 7,000 the police and the to only 500 km2 of courts interests in Rufiji, Iluma WMA insufficient support being patrolled of legal structures and managed structures such as Donor The of by-laws with Selous Game support from legal of Forest o Rufiji District to in all community WEO dispute 1 Officer for the VEO and o Boundary KGCA incentive for local districts lacked part o Only There is no clear start up BMU, nor coordinates and areas of o VLUP is only done as still maps are useful, include zones PFM incomplete in all 3 o Inadequate reviewed o Little funds reinvested ago BMU in Ulanga (Iluma WMA) individual elsewhere to (Kilombero of Ulanga). o and km2 but is Cooperation between KGCA the Manager 20 existing personnel villagers through the use and of chairs, KILORWEMP mounted stakeholders sub-village loudspeakers the is on bicycles/motorcycles, good but mainly drums to alert remote informal residents of VLUP o The KGCA meetings, include sub- Manager village uncomfortable residents on is VLUM Team. However, being difficulties facilitator and a in involving marginal groups, especially immigrant pastoralist (probably both controller o Fishers turned into enemies of o Enforcement of VLUP is the Ramsar Site difficult due to outside by interference, handed political opportunism enforcement are being resident pastoralist also) o VLUP a heavy patrolling is ineffective because Legal tactics o In Ulanga Officers are involved at wherever there too late a stage is o Compensation of agreement with KGCA over villagers after VLUP is the difficult where there are there is willing border, no funds (e.g Kibegere participation Village in Kilombero) CBNRM, in particularly with WMA and BMU initiatives. 21 Regarding governance issues the team identified the following issues: The ownership of the process is with the DFT (and not with community), which undermines continuity and sustainability. Villagers are involved in the process but not really trained and even less empowered. The participation of the majority of villagers in the process is not always ensured, especially the participation of livestock holders is rarely ensured, which leads to problems in the acknowledgement of grazing lands. The multitude of committees, such as Village Natural Resource Committee (VNRC), Village Environmental Committee (VEC), Village Environmental and Natural Resource Committee (VENRC), Village Land Use Planning Team (VLUP), Village Land Use Management Committee (VLUMC), Community Based Organization (CBO) and the Authorized Association (AA) at village level confuses the communities. o It is not clear for the villagers how the committees relate to each other, eg. VEC/VNRC/VENRC, VLUM, etc. and what the specific roles and responsibilities are. For example, what is the role of the VNRC in PFM, is it a standing committee or just a CBO? Another example: It is not clear whether the VLUM Team is permanent, hence a standing committee, or just for the period of land use planning? The committees are not empowered enough to claim their rights, when it comes to directives from above, eg. pastoralists, boundary setting, overruling of village plans by investors, as well as the interference of Park Officials on village land, etc. The documentation, records and maps are not well organized and kept, which leads to misunderstandings regarding the boundaries or issues such as buffer zones, etc. 3.2. Result area 2: Key resource users, transformers and traders (wildlife, forest, fisheries) organized to derive sustainable economic benefits from Community Based Natural Resources Management through access to markets and sound business management. 22 Figure 4: Theory of Change for result area 2 3.2.1. Actors, their roles and responsibilities In this result area, the new concepts of communities doing business, value chains and marketing are coming in. Many different actors will be involved that are not currently known yet. The value chains of the following products need to be assessed and further developed to identify the actors in each of the following value chains: Charcoal Timber Honey Trophy hunting Photography tourism Fish Some of these actors will need to be involved in dialogue platforms between government and communities to negotiate contracts, to solve issues regarding rules an regulations, investments, etc. Nevertheless, the following actors can already be identified at LGA and community level. 23 Table 6: Actors, roles and responsibilities for result area 2 Actor Roles and responsibilities CBO for WMA Protection of natural resources VEC/VNRC for PFM Development of harvesting plans Procurement of business services Business contract management Management of revenues Benefit sharing CFMU for BMU Village government (including Village Management of benefit sharing standing committees) Develop community development plans Approve budget of CBO Adherence to Fair trade Adherence to by-laws and regulations Refrain from corruption Revenue collection Traders and transporters VEOs and WEOs DFT: DFO, DFsO, DGO, trade officer, Creating enabling business environment cooperative officer, DCDO. Preparation of business strategy Understanding the value chains needs Providing for required infrastructure Facilitating dialogue between value chain actors Provide link to business community Provide skills Negotiate for contracts Link with financial institutions Revenue collection Use revenue for reinvestment into NRM Create enabling business environment Provide infrastructure for business Create dialogue platform Define the optimal regulations for taxation versus Cooperative Officer DED, DLPO and DT business attraction Councilors and standing committees Supporting the business mechanism in priority setting DC Refrain from political interference Facilitate Business Council RAS, RC Conflict management MNRT (TFS and WD) Develop strategy and guidelines for harvesting plans and business development NMB bank Provide for seed money to enable the committees/CBOs to do assessments and prepare the plans. 24 3.2.2. Specific issues observed: Some issues need to be addressed before the project can engage in capacity building, because this result area has hardly been addressed yet at the central or district level. For example, there are no detailed guidelines or capacity (at any level) on stock assessments, harvesting, business plans, contract negotiations, processing, financing. The bottleneck seems to be at the national level, while it is not clear what is really the reason for blocking the process. One possible reason might be the fact that it is currently not clear where CBNRM should be rooted, in the agencies such as Tanzania Forest Service (TFS) and Tanzania Wildlife Agency (TAWA) or under the Community Based Conservation (CBC) Unit of the Ministry it self. As a result the districts are also not guided, lack the required business oriented mind set and have no clear directions on how to address this part of the CBNRM approach and therefore are struggling to implement this national policy. Table 7. Issues related to result area 2 Management WMA PFM BMU plans General No detailed guidelines or No detailed guidelines or No detailed guidelines or capacity capacity capacity on stock on stock on stock assessments, harvesting, assessments, harvesting, assessments, harvesting, business plans, contract business plans, contract business plans, contract negotiations, processing, negotiations, processing, negotiations, processing, financing financing financing Surveillance Low (patrolling) communities the motivation to process, approval since for community of pursue use of no Low motivation communities the to process, the approval the community since for use of pursue no the of conflict over individual versus communal benefits the Natural Resources after Natural Resources after many years many years Census/harvesti Feasibility study is Communities ng plan conducted late in able to pay for these Institutes studies. TAWIRI, etc.) to conduct process. Depend Institutes on are There is an underlying not Depend the Research on stock Research (TAFIRI, assessment and resource valuation, (TAFIRI, which is costly. TAWIRI, etc.) to conduct the stock assessment and resource valuation, which is costly. Resource local management leaders completely lack communities leaders completely lack leaders completely lack the knowledge and skills the knowledge and skills the knowledge and skills for for for negotiation and and local communities negotiation and and local communities negotiation and and 25 Mitigating pressure (fire and poaching) contract management contract management Communities and district Communities and district staff staff are unable both are unable contract management both technically and socially to technically and socially to deal with wild fires and deal with wild fires and illegal off take. illegal off take. Community CBO do not gain development income during the set up income during the set up of the units, while there of the units, while there are costs to go through are costs to go through the processes the processes Contracts are any not well understood Value CBO do not gain any Contracts are not well understood added economy : development o Creating : an enabling o Creating an : enabling o Creating an enabling business environment, business environment business environment, o revenue enhancement, o revenue enhancement o revenue enhancement, o conflict management, o conflict management, o conflict management, o contract management, o contract management, o contract management, o value o value chain development, chain o value development, chain development, o markets and o markets and o markets and o business plans o business plans o business plans LGAs have no LGAs have no LGAs have no understanding of the link understanding of the link understanding of the link between between between activity, economic taxes and services at LGA level. taxes services at LGA level. and activity, economic taxes and services at LGA level. Capacity depends on depends entirely on the development support of the DFT for support of the DFT for stock stock M&E entirely activity, economic assessment, the assessment, the preparation of harvesting preparation of harvesting and management plans, and management plans, without them being well without them being well prepared to do so. prepared to do so. Ward level staff is used in WEOs do not have monitoring CBNRM, but willingness to fine or restrained resources collect revenue of already very poor people, especially in the BMUs. 26 Governance issues are: LGAs are not guided for developing strategies, understanding and skills regarding creating an enabling business environment, revenue collection, conflict management, contract management, value chain, markets and business plans In addition, the LGAs have no understanding of the link between economic activity, taxes and services at LGA level. Most DFT are graduates posted in Ulanga, Kilombero and Rufiji as their first posting, therefore, lacking in practical experience. 3.3. Result area 3: Strengthened capacities of central, regional and local government structures to support and monitor the implementation of policies at local level and improved coordination between Natural Resource governance stakeholders at all relevant levels. Figure 5: Theory of Change for result area 3 27 3.3.1. Actors, their roles and responsibilities This result area involves actors involved in the horizontal and vertical linkages between the different levels as well as accountability, coordination, collaboration, and interaction between the stakeholders. Table 8: Actors, roles and responsibilities for result area 3 Actor Roles and responsibilities Village Assembly, especially the village Mobilization of community chairperson and the sub village leaders Coordination Village standing committees, VLUM, VGS, CBO, VNRC/VEC, Regular meetings to address concerns Feedback to their constituencies Monitoring of progress Secretary of the committees and village council Interconnect between the different levels Village land council Conflict mediation WEO Mobilization of communities WDC Ensure integrated development Prioritize development activities Conflict mediation Reference to primary court Division Conflict management DFT: Planning of NRM DFO, DALDO, planner, VEO Ward tribunal DFsO, Dlivestock, DGO, DCDO, DLO, town Facilitation CBNRM M&E DLENRO, DEMO District Advisory Board (DNROB) Only for WMA DED, DHRO, DLPO and DT Councilors and standing committees Provide access to information Share experiences Address issues Coordination Include NRM into planning and budget Know their role on CBNRM both regarding support to protection and conservation as to business development DAS Supports the DC in monitoring of district development DC Responsible for the general security situation in the district District NGO network and CSOs Ensures enforcement of the law Conflict management Provide access to information to the communities Create space for communities to express their 28 concerns and needs Create dialogue platforms with LGAs and also with market actors in the value chains Ensure involvement of communities in influencing decision making at LGA level Empower communities to claim their rights Social accountability monitoring in the area of CBNRM RAS, RC, AAS Economic and Productive Provide services to the communities Coordinate between CSOs and LGAs Advocacy for community issues to LGAs Sectors Ensure functionality of management systems at LGA level (financial, HR, planning, budgeting, procurement, M&E, etc.) RNRO, RLO, Regional NGO network and CSOs M&E Conflict management Interlink district level issues to national level advocacy Support the district networks in their role to support lower levels PMO-RALG/PO-PSM Organize dialogue platforms at regional level Ensure staffing and performance measurement Ensure functionality of management systems (financial, HR, planning, budgeting, procurement, M&E, etc.) MNRT (TFS and WD) MoL, Commissioner of Land Ministry of Livestock and Fishery Policy formulation and harmonization Coordination M&E Processing of requests for certificates Collaboration Rangeland policy 3.3.2. Specific issues observed: These issues are mostly related to policy or governance problems, which will be hard to address with capacity building interventions. However, they need to be addressed in order to allow capacity building to be effective. 29 Table 9: Issues related to result area 3 Vision and strategy Horizontal Vertical Stakeholder Social Laws Enforcement linkages linkages collaboration Accountability mechanisms and dialogue There is a lack of Ministry of Livestock No CBNRM and mainstreaming in the visioning 3 district councils Fisheries Development absent is from good the of programs downwards and supporting BMUs in also bad reporting the inland fisheries upwards Programs are not Coordination The really integrated between within the government system, projects. sectors NRM is project driven mainly mainly top approach down within No dialogue To get access to Absence of impartial between information the mechanism to claim rights communities communities are or to mediate in the case of and LGAs entirely dependent conflicts. on the DFT. No DFT not necessarily No mechanism or power to pressurize institutionalize have government is not d for and competency to government to respect the conducive for the the business empower lower level existing land use plans when participation of the community to officials imposing communities which dialogue villagers. leads to conflicts in government space with commitment, and the central new acts or sending directives to lower levels the end Weak civil society at Many conflicts result from low level to organize boundary disputes between and protected empower the areas and the communities and to communities, between negotiate with local villagers and government. between investors/RUBADA pastoralists, and villagers, where maps play crucial role in determining final boundary. 30 3.4. Focus of capacity building interventions in response to identified performance gaps Result area 1: In order to address these issues, the project can use a number of capacity building strategies. The focus of the CB can be summarized as follows: In case of the 6 legal steps (RA 1), the emphasis should be on the strengthening and empowerment of the lower levels. This includes the strengthening of the village committees and leaders, ward level leaders and ward extension staff as well as the councilors at district level regarding the process and the guidelines. The strengthening can be effectuated by training these actors on CBNRM guidelines, by-laws drafting, document management from the start and by providing hard copies of relevant documents such as guidelines in Kiswahili. Secondly, the district officials need to change their attitude and mindset in their support to the lower levels: the DFT officials are supposed to provide the technical expertise to establish the CBNRM, but even more to mentor and coach the lower level actors to take over the roles and responsibilities to manage the CBNRM as opposed to do most of the work themselves. The purpose is to create more ownership and control over the land use and management plans as well as to empower the villages to stand up against external forces, such as invading park patrols, investors, immigrant pastoralists and to enable them to implement their land use plans. In previous paragraphs, the key performance gaps have been identified per result area. In order to address these gaps, there is need to build capacity of the relevant actors. These capacity targets have been identified in the following table together with possible indicators for capacity improvements. Result area 2: The communities are entirely depending on the DFT for this part of the process and need to be empowered to find the proper support in this process. This is first priority and should be enhanced through the involvement of civil society and eventually private sector (see chapter 7). One of the focus areas for the project should be to create space for the communities to sit at the negotiation table with traders and transporters or other business men/women while being professionally advised. Second priority is on LGA’s capacity to provide an enabling environment for businesses in general, and for CBNRM product developers in particular. There does not seem to be a strategy, guidelines, instructions or any support for LGAs on how to tackle this, which is a big obstacle. The project can contribute to this result area in collaboration with others, such as the scholarship program or other donors and civil society. Especially the trade and cooperative officer, as well as community development officer need to be capacitated (VICOBA’s). 31 On the other hand, the district management, with the DT and councilors in the lead, needs to be introduced to a shift in mindset regarding the creation of an enabling environment and the link between economic activities, taxes and services. First of all NRM can provide for a considerable amount of revenue, once it has acquired the certificates and approvals to start using the products. Therefore, it is in the interest of the council to smoothly and swiftly facilitates that process. However, once the NRMs are generating income, the council needs to re-invest part of that revenue back into the NRM sector to make it sustainable. Hick-ups in the market chain need to be addressed through a joint approach with sellers, transporters, processors and buyers to be facilitated by the DC (Business Council, including TCCIA and Trade officer). The project could develop a mechanism where communities get access to the relevant links on market information through mobile phone system, and also develop framework per commodity on what is mainstream and where to find the expertise. It should be explored what is the most reliable information regarding markets and how the villagers can be linked to that information. Result area 3: In this result area the Civil Society needs to start playing a more prominent role. However, the locally based CSOs are all still rather weak and need substantial capacity building support. At the same time, one can see that there is possible interconnection between communities and the national level via the different levels of NGOs and networks present, which is an encouraging situation. In the case of Kilombero and Ulanga, a chain of networks linking community CBOs to national level advocacy membership organizations. For example the CBO SEGTO, based in Ulanga, is supported by and linked to the district network UNGOU in Ulanga, which is linked to the regional network UNGO in Morogoro, which is linked to the advocacy network Policy Forum at national level. Based on the above-described findings, the team has formulated transition states that are required to address the performance gaps for each result area. Transition states can be considered as milestones/markers of progress/stepping stones that are needed to reach the intermediate states and ultimately the result area objectives. The transition states have been the starting point to identify the capacity issues and the capacity targets to reach those states. This sequence and line of thinking has been presented in table 11. 32 Table 10: Overview transitions required and capacity building targeted per result area Result area Intermediate states Indicators CBNRM: Key CBOs established No user rights obtained of WMA, structures in place and BMU, functioning and registered with LUP CBFM, and accountability while established compliance increases. CBFM, BMU, LUPs of WMA, CG conflicts improved mitigate and of CBO. slows degradation and conflicts between then recovers of ensure farmers, LGAs and leadership to participation pastoralists and CBNRM units Increased confidence and initiative of population village leadership and committees to participation of the process act in the interest and on behalf of from the start. Increased recognition of The multitude of and of minority relevant in the capacity of LGAs to involve pastoralists collective in the VLUP process responsibility for own resources support performance Resource Less capacity community their constituencies responses and provide capacity, Increased ownership of process by communities Effectiveness facilitate Targeted capacity building gazetted increased transparency LGAs Transition required committees is capacity of LGAs to empower reduced at village level and clear (inform, between them) and devolve powers to members on roles and train coach responsibilities WEOs, The documentation, records and maps leaders to play their roles are well organized and kept, which VEOs and and local capacity of LGAs to have leads to reduced misunderstandings harmonized approach on the regarding the boundaries or issues creation of committees and related to buffer zones, etc. explain the difference between them capacity district of and village, regional ward, level officials to document, record, store, share and manage information CBNRM CBOs are working in a transparent way and Compliance with CBNRM by laws (LUP, The community members are better informed and therefore will adhere to by-laws better capacity councillors of WEOs, VEOs, and village leaders to share information 33 accountable to constituencies compliance their while with by- CBFM, WMA, BMU) Gender ratio directory/board in of laws increases. each Gender balance in CBO committee supported CBO/village Women’s needs for natural resources with are respected exchange between villages Improved access to information from Networking among local The gained trust between CSOs and participation National level decision making of women in decision making bodies is empowerment organization and of CBOs and CSOs and between these and regional/national interconnection between the networks at different levels actors’ increases. LGAs mitigate conflicts interaction between LGAs and Civil Society and support improved performance of CBOs recovery capacity of DFT, and village leaders to ensure effective timely responding to local level issues actors (CBOs, villages) and LGAs to CSOs and vice versa LGAs facilitates progress of activities governance improves. Natural constituencies capacity of LGAs, councillors and CSOs to motivate youth Resources and communities to preserve gains the environment and natural momentum resources Derive Communities with LGA Amount of revenues Clear strategies, road maps, guidelines capacity of Wildlife Division, benefits support through generated and manuals are developed for the Forestry from NR partnerships develop CBO/CBNRM different levels in appropriate language division, and by and tangible and legitimate initiatives via business Value chains and market dynamics are department income streams CBNRM plans clear detailed related via contracts No of contracts and therefore accessible for beekeeping and Fishery to develop guidelines showing anchoring for the communities the roadmap/steps on how to and improved access to entered into between The communities are motivated to prepare markets CBOs invest plans and how to address and/or and buyers financial services/capital and progress in the the establishment of the CBNRM units business, Decision making for the harvesting development plans is based on sound data products Quality management plans lead to capacity management market of of the Ministries NR to 34 more successful businesses facilitate the legalization of Reduced conflicts between investors the and communities approve the permits timely The revenue of the communities as capacity of service providers well as the district increases such More reinvestment in the (sub) sectors UDSM or others to conduct leads to better services and increased stock/resource assessments, revenue to the communities and the district CBNRM as process TAFIRI, and TAWIRI, and feasibility studies capacity of prepare the DFT harvesting to and management plans and other elements required for the preparation of the approval for NR exploitation capacity of local communities and leaders knowledge in terms and negotiation skills and of for contract management. capacity of CMT to create enabling business environment and understand value chains capacity understand of LGAs the mechanisms implications to economic and of the revenue collection understanding by LGAs of the link between economic 35 activity, taxes and services at LGA level. Communities are benefitting from the capacity of CBOs to negotiate revenues shared with development activities funded by the benefit sharing with LGAs. generation of revenue through CBNRM CBNRM CBOs distribute Percentage tangible benefits to members through members effective financial invested governance of and/or in related CBO enterprises Financial reports presentation and/or services and enhances capacity of CBO, VEO, and transparent village trust financial and committees management in and credibility governance. Introduction of VICOBAs reduces the capacity of communities to incidences for illegal practices address community benefits The timely return of community money versus allows the CBOs to better protect its through the introduction of individual benefits VICOBAs WMA and reinvest in the business capacity of Ministry to timely send back the community money collected from CBNRM Governance Central, regional, local IMP and government authorities implemented harmonizati and monitored on participate and support stakeholders effectively and management local and Capacity of MNRT Units to capacity of the LGAs to develop local create ownership of national plans level Ministries to implement CBNRM processes of adaptive NR Clear CBNRM strategy enhances the at landscape scales The integration of CBNRM strategy into capacity the district plan provides for more district level NR related staff resources to and increases possible plans monitored, scaled financed and comprehensive are provide for evidence of results and level (MNRT and MoLF) to adapted, economic value and feed into decision develop by and LGA, reliable Increased capacity of national More up and data and systems consistent develop regional strategy sustainability CBNRM of M&E system that cuts across all levels making Increased capacity of PMO- 36 MNRT, PMO-RALG RALG, regional and district level to implement M&E system KGCA is effectively managed on the principle of wise use Clarity on the use, management and Increased community involvement of the KGCA Ministry leads to protection of the biodiversity settlement capacity to of the negotiate based a on consensus and compensation and/or resettlement (e.g. shareholding) with the local communities Stakeholder’s views taken into account in decisions More frequent landscape resources between DC/DED understanding and acceptation of the dialogue different organize allows positions, for which leads to Inclusion of the capacity to create a platform of NRM and stakeholder meetings readiness for consensus Increased mutual stakeholders on interaction voice of the Increased capacity of the CSOs to claim their right to communities leads to less conflicts be involved in decision- making on behalf of their constituencies record, share and manage and increased the boundaries, roles and responsibilities, information and rules and regulations as well as rights, Increased which in the end leads to consensus CMT and development wetland development processes understanding allows the information on information Increased capacity of LGAs to Access knowledge to for Stakeholder access to of capacity of the to collect, store and manage information at district level Increased capacity of the CSOs to claim their right for information 37 A stronger civil society becomes a Increase capacity of the CSOs more equal partner in the dialogue to at local and landscape with evidence- based information levels. benefit of the communities Stakeholder networking increased government in favor/for the and get to organized, develop campaigns to collect advocacy address communities’ needs. 38 4. Institutional level: MNRT and Regional Secretariat 4.1. Structure of MNRT The Ministry of Natural Resource Management (MNRT) is currently made up of 3 separate divisions, 3 agencies, and 2 research institutes. Each division possesses its own policies, legislation and regulations. The divisions are Wildlife, Tourism and Antiquities, whereas the agencies include the Tanzania Tree Seed Agency, the Tanzania Forest Services Agency (TFS) and the parastatal agency Tanzania National Parks (TANAPA). The Ministry of Natural Resources and Tourism (MNRT) will be overall responsible for project coordination, which is delegated at the level of Wildlife Division. The Wildlife Division (WD) is responsible for the management of Game Reserves (GRs), Game Controlled Areas (GCAs) and all wildlife outside protected area boundaries and Wetlands. Also the WD facilitates the establishment of Wildlife Management Areas (WMAs), creates awareness and disseminates information about wildlife management to the village communities on their village lands. The Wildlife Division is headed by the Director of Wildlife who is responsible for overall management of the division. The director coordinates Assistant Directors and heads of sections as part of the division’s management structure. The Wildlife Divisions Sections include, Wildlife Development; Research, Training and Statistics; Wildlife Utilization; and Anti-Poaching/Law Enforcement. The director leads the tasks of planning, budgeting and monitoring of the wildlife component of the overall ministry’s strategic plan. Wildlife utilization The Wildlife Utilization Section is headed by an assistant director with senior management responsibilities. This section is responsible for allocation of hunting blocks and preparing the fee structure for the different licenses and permits. The allocation of hunting blocks is carried out centrally nationwide, including in game controlled areas and WMAs. Anti-poaching The Anti-Poaching Sections is headed by an assistant director and is responsible for monitoring compliance and enforcement of the wildlife legislation. The Section is assisted by Anti-Poaching Units, which are mobile and placed in zones distributed throughout the country. The Anti-Poaching Unit Research, Training and Statistics Training of WD staff is coordinated and monitored by this section, which is made up of an assistant director. This section does not monitor or collect field data but it does participate in the analysis of this data, which is provided by the Wildlife Development Section and the Anti-Poaching Sections. Wildlife Development: The Wildlife Development Section is headed by an Assistant Director who is part of the senior management in WD. The Wildlife Development Section is the largest in WD, with responsibilities for promoting community based conservation, wetlands management , monitoring implementation of CITES, the Ramsar Convention and donor funded projects such as KILORWEMP. The units under the Wildlife Development Section include Community Based Conservation (CBC); Wetlands Management; Environment and Protected Areas (PA); Program me Coordination (PC); and Conservation Education and Publicity. All Game Reserve and Ramsar Site Managers in the country report on progress to the Wildlife Development Section, making it one of the sections with primary monitoring responsibilities. The Section is represented by many young officers who complain of not having been supported by the WD training plan, which favors senior staff over actual requirements based on a development plan. Table 11: List of responsibilities and staffing levels of Units under the Wildlife Development Section of the Wildlife Division Units and their responsibilities Staffing Education 4 total staff; 2 M.Sc. To integrate donor programs into 1 Principle Game 2 B.Sc. development programs in the Wildlife Officer Division; 3 Game Officers Conservation Education and Publicity: - To coordinate implementation of wildlife sector promotional programs; - To develop education materials for schools and colleges and develop wildlife conservation materials for the public. Program Coordination: - - To prepare plans and budgets for the Division and coordinate donor supported programs; - To monitor and evaluate performance of projects and programs. Environment and Protected Areas Development: - 3 Total Staff: 1 M.Sc. To prepare and revise Game Reserves 1 Principle Game 1 B.Sc. General Management Plans (GMP); Officer 1 Diploma To supervise environmental issues 2 Game Officers 40 including monitoring of EIA process within the WD mandate; - To oversee establishment and degazettement of Protected Areas (PA). Community Based Conservation: - 6 Total Staff; To coordinate establishment and 1 M.Sc. 5 B.Sc. management of WMA and to oversee investments; - To facilitate capacity building of WMA actors to deal with problem animals and anti-poaching operations; - To administer cost and benefit sharing schemes in WMAs. Wetlands Management: - To coordinate wetlands activities by 4 Total Staff: 3 M.Sc. 1 B.Sc. managing a wetland database; - To inventory and classify wetlands and supervise the preparation of their integrate management plans; - To undertake valuation of wetlands. The Community Based Conservation Unit is within the Wildlife Development Section. The CBC Unit is made up of 6 officers, one of whom is studying at the M. Sc. level. 2 of the 6 officers are directly involved in the advancement of the WMA program. One of the unit’s officers has now been officially appointed to deal with boundary conflicts, however, there is some considerable overlap between CBC and the division’s Protected Areas Unit on the issue of resolving boundary disputes. There is widespread dissatisfaction throughout the Wildlife Development Section with the divisions training plan, which is felt to favour seniority over actual requirements. Most of the staff of the CBC has attended short courses but mainly through their own efforts and not through the division’s plan. CBC has benefited in its relationship with the donor supported WMA process in the country. The unit’s staff has received much on the job training in addition to attending many seminars and workshops. Furthermore, the WMA process has developed a WMA Implementation Strategy for 2013 – 2019, with support from WWF and funding from USAID. The strategy itself is still in a draft form and lacks detailed analysis and plans but it does offer a first attempt at preparing a systematic development program for a WD activity. Despite the unit’s responsibilities including overseeing investments in WMAs and administering cost benefit sharing schemes, its staff do not see themselves as being responsible for promoting or marketing WMAs. Instead they see the role of business development in the WMAs to be a responsibility of the fragile AA Consortium. CBC staff does advise the Wildlife Director on WMA plans, which WD approves. As a result the staff recommends being trained on GIS and remote sensing in order to better analyze resource zone assessments. They also 41 require capacity building on contract negotiations if they are required to oversee WMA investments. The Wetlands Management Unit is staffed by four officers, only one of whom is currently active. The Wetlands Unit’s other officers include one who is pursuing further studies, one who is on maternity leave, and another who is currently assigned to the KILORWEMP project as the Project Manager. The Wetlands Unit is responsible for monitoring the nations 4 Ramsar Sites and for advancing a wetlands program. Three of the WU staff possesses post graduate degrees at the M.Sc. level. Two of the post graduate degrees are in wetlands limnology obtained in The Netherlands and the other in integrated environmental management from the University of Dar-es-Salaam. The Fragmentation in WU is caused by the fact that they do not sit together in a single consolidated office. WU is also represented by officers located at each of the nations 4 Ramsar Sites. The Ramsar Manager in Kilombero has a B.Sc. degree in Wildlife Management from SUA but otherwise has never attended a wetlands course. WU are responsible for the inventorying and classification of the nation’s wetlands into a database, an activity which has been recommended to be implemented specifically in the Kilombero Valley as part of a PhD. project for one of the staff. Arguably the biggest challenges to the WU are the low priority given to wetlands by the division because they are non-revenue generating, difficulties in coordinating wetlands stakeholders across different sectors and institutional structures, and competition in drafting wetlands regulations between WD and VPO. A recommended activity meant to reduce these challenges is to hold awareness raising and educational retreats with stakeholders and decision makers in the Ramsar Sites. Environment and Protected Areas Development Unit is staffed by just 3 officers. Relative to other units it is only modestly qualified educationally, with only the head of unit having a post graduate degree. One of the unit’s officers has been attached to an ongoing exercise to assess the viability of Game Controlled Areas. The unit’s degree holder is experienced having participated in aerial surveys of the Kilombero Valley during the cattle evacuation in 2012. In addition to the B.Sc. in Wildlife Science and Conservation from UDSM, this officer has also attended short courses on integrated ecosystem management in Malaysia and Community Based Tourism in South Africa. The unit is responsible for assessing GCAs and it can recommend a GCA to be upgraded to game reserve status. The process of establishing a new protected area or, upgrading an existing one, involves convening village meetings and collaborating with staff at the district level. However, none of the unit’s staff are trained in facilitation, conflict resolution, the relevant land laws or local government procedures. The unit’s staff expresses a desire to have an in house GIS capacity with trained staff and equipment. Currently, 2 officers in the Program me Coordination Unit, with some GIS training are used by the entire WD to assist with mapping exercises in an unofficial capacity. Officially maps are produced for the WD by TAWIRI. 42 4.2. Role of MNRT in CBNRM: The Ministry of Natural Resources and Tourism plays a leading role in Natural Resources Management, with the vision: To conserve natural and cultural resources for the benefit of Tanzanian’s while leading in contribution to the economy”. The MNRT Strategic Plan (2013-16) aims at “Sustainable conservation of natural and cultural resources and development of tourism for the well-being of the nation”. The medium term plan of the MNRT is to create a conducive environment for participation of stakeholders in conservation of wildlife, forestry and wetlands, tourism and beekeeping, both inside and outside of protected areas. The plan addresses duplication of efforts between local and central government levels, and aims at greater synergy between sector policies. 4.2.1. Visioning CBNRM and the Landscape approach There is a fundamental challenge in Tanzania when it comes to managing ecosystems and landscapes. This is because Land Use Planning and Land Tenure are the prerogative of villages and the central government. The central government itself has land tenure and is allowed to implement land use planning only for reserved lands, such as game reserves and forest reserves. The issue of water basins, wildlife corridors and Ramsar Sites do not fit into any legal land planning framework. The Kilombero Ramsar Site, although recognized by the Government of Tanzania, has no legal mandate to plan land and its uses. Without a landscape approach to land use planning it seems unavoidable that conflicts will take place with pastoralists, fishers and wildlife conservationists. This is because all of these groups depend on landscape for the resources on which they rely. Using villages as the sole planning unit will not allow pasture, fish and wildlife to be managed when they exist in areas greater than village or even district boundaries. The answer seems to be a discussion and negotiation process across villages in a landscape. 4.2.2. Integrated CBNRM strategy at ministerial level: The MNRT strategic plan is currently no more than a compilation of the individual divisional plans rather than a holistic plan that attempts to synergize where there are common elements across the divisions. Amongst the divisions, only forestry has produced a development plan, called the National Forest and Beekeeping Programme. The Wildlife Division does not possess a holistic development plan in the same way that forestry has and as a result the intentions of the division are discerned from different documents, including policy, legislation and regulations. Exacerbating the lack of a single CBNRM vision within MNRT is the different rates at which the divisions are implementing institutional reforms. Currently, the Wildlife Division is preparing to launch the Tanzania Wildlife Agency (TAWA), which will be responsible for managing government game reserves and game controlled areas and may be based in Morogoro. There is some uncertainty as to which agency will be 43 responsible for advancing the WMA and Wetlands Management programmes once TAWA has been launched. 4.2.3. Sustainable Wetland Management: KILORWEMP intends to use the Sustainable Wetlands Management Program (SWMP) Guidelines extensively in order to roll out the various elements of CBNRM within the three districts of the project. SWMP was a Danida funded program that was based in the Wildlife Division of MNRT with the aim of strengthening capacities to fulfill obligations of wise use of wetlands as according to the Ramsar Site. The SWMP guidelines are specific to CBNRM activities within wetland areas in Tanzania. In other words community based activities such as forestry, wildlife management and fisheries have been adapted to situations where wetlands make up a significant part of the landscape. The SWM guidelines have been published over the period March 2012 – May 2013 and were introduced to selected districts at Pasiansi Wildlife College in Mwanza. Ulanga and Rufiji Districts each had one individual attending the Pasiansi training session in 2013. The guidelines, which are collectively referred to as the SWM Guidelines are listed below in Table X. As can be seen, some of the guidelines have been developed independently of the SWMP program. However, the list does include the complete list of guidelines that would be required to undertake land use planning, forestry, wildlife management and fisheries on village lands. Table 12: List of Government of Tanzania Guidelines used in various CBNRM activities s/n Title of Guideline Date of Published by Publication Community Based Forest Management April 2007 Forestry and Beekeeping Guidelines: For the establishment of Division – PFM Village Land Forest Reserves and Component Community Forest Reserves Guidelines for Participatory Forest January Forestry and Beekeeping Resource Assessment and Management 2005 Division – PFM Planning User’s Guide to the AFM Tools Component June 2012 Participatory Forest Management/ Sustainable Wetlands Management Programme Administration and Financial June 2012 Participatory Forest 44 Management Manual Management/ Sustainable Wetlands Management Programme National CEPA Resource Book for March Wildlife Division – Sustainable Wetlands Management 2012 Sustainable Wetlands Management Programme A Guide to Wetlands Friendly April 2012 Wildlife Division – Investments: Sustainable Fisheries Sustainable Wetlands Management in Wetlands Management Programme A Guide to Wetlands Friendly February Wildlife Division – Investments: Strategic Economic 2013 Sustainable Wetlands Assessment of Wetlands Management Programme A Guide to Wetlands Friendly February Wildlife Division – Investments: Sustainable Wildlife 2013 Sustainable Wetlands Management in Wetlands – WMA Management Training Manual and User’s Guide Part Programme One A Guide to Wetlands Friendly January Wildlife Division – Investments: Sustainable Wildlife 2013 Sustainable Wetlands Management in Wetlands – WMA Management Training Manual and User’s Guide Part Programme Two A Guide to Wetlands Friendly May 2013 Wildlife Division – Investments: Sustainable Irrigation Sustainable Wetlands Management in Wetlands Management Programme A Guide to Wetlands Friendly May 2013 Wildlife Division – Investments: Sustainable Livestock Sustainable Wetlands Management in Wetlands Management Programme Guidelines for Participatory Village Land Use Planning, Administration and Management in Tanzania. 2 nd April 2013 National Land Use Planning Commission Edition 45 Relevance of the SWM Guidelines: An in depth assessment of the SWMP Guidelines is beyond the scope of this exercise, however, the capacity building implications of using the guidelines is appropriate and will attempted here. All the guidelines are firmly anchored in Tanzanian policies and legislation. The underlying principle of the guidelines is the management of natural resources on village lands. This approach stems from the Land Acts, particularly the Village Land Act, and the Local Government and Miscellaneous Amendments Act. The institutional arrangements referred to in the guidelines are therefore those same arrangements that are defined in the various laws. The main approaches referred to in all of the guidelines, namely participatory planning, market driven economics and decentralized extension services, are rooted not only in the country’s laws but also in the most strategic policy documents beginning with Vision 2025, MKUKUTA I and II and the National Development Program. The forestry guidelines in particular are developed directly from the legislation. There are no CBFM regulations that further frame the law for use on village lands. In fact, in forestry, the regulations that exist to manage trade in government reserves and open lands are largely null and void in Village Lands Forests, Community Forests and Private Forests. As a result the CBFM Guidelines are the first attempt to advise communities on how to manage forest resources for their own benefit. This is true also for the Village Land Use Planning Guidelines, which stem directly from the Village Land Act. Guidelines for wildlife and fisheries in contrast have been developed directly from sector regulations. The regulations, being detailed and prescriptive, have led to these sets of guidelines being more explanatory regarding processes underlying the legal framework. The SWMP Guidelines also exist for livestock and irrigation water management in wetlands, thus making them the most comprehensive of the various guidelines for CBNRM. All the same, the guidelines taken together, are a relevant and useful tool in the process of building capacity to facilitate CBNRM. Features of the SWM Guidelines: The main feature of the SWMP Guidelines is that they are designed more as manuals or toolkits then they are traditional guidelines. As a result these user guides are comprehensive, extending to more than 50 pages in every case, and for two volumes of 100 page each for the WMA User Guide. The content of the user guides is consistent with descriptions of the legal and institutional setting followed by descriptions of the specific resource and its status in Tanzania’s wetlands. The latter part of the user guides then outline a process of developing management plans after a process of identifying threats has been undertaken. It is important to note that the mitigation 46 actions section of the livestock and irrigation investments guidelines are less detailed than for other natural resources. The wildlife and fisheries guidelines go so far as to include tools towards the end of the documents. These tools are in the form of checklists for fulfilling requirements of the sector regulations. The fisheries guidelines include 30 tools, some corresponding to application forms for certain licenses, and the WMA manual lists 23 tools and a 24 th tool in 11 parts that extends for 100 pages. The land use and forestry guidelines are less formulaic than the wetlands user guides. Nonetheless, these two sets of guidelines are equally comprehensive resulting in a plan made in a participatory manner with village by-laws to underpin the plans. 4.2.4. CBNRM policy issues: Forestry The Hammer User rights in forestry are provided through issuing of an official hammer for marking timber. In CBFM this process has been very slow, in that MNRT has not issued more than 5 community hammers although there are more than 2,000 villages participating in PFM over the last 15 years. The issue has posed some problems because MNRT has had misgivings about issuing so many hammers, which could lead to poor monitoring of hammer use. The current solution is for CBFM hammer to be issued to DFOs, who can more easily be monitored by TFS but who acts on behalf of communities. Although this solution may practicable in some cases, many districts are too big for it to be a useful solution in every case. There needs to be a solution where large districts can decentralize hammers to Forest Officer in more remote parts of the District. Otherwise, some villages need to be able to qualify to have their own hammers through a process that is transparent and objectively managed. This issue needs to be addressed in order for marketing and contracting in CBFM to be streamlined. It is doubtful that forest produce can be sold or that forest services can be procured easily without the hammer issue being appropriately resolved. A retreat involving TFS and PMORALG headquarters staff to the KILORWEMP area could be used to bring the issue to the attention of policy makers. Harmonization of Acts One of the main policy failings in the current legislation is the lack of tenure of villagers over their village land trees that are not contained within a Village Land Forest Reserve. When combined with the conservation focus that many DFOs used to facilitate PFM in the early stages, it has meant that villagers have been reluctant to include many of their trees in a VLFR and thereby foregoing potential revenues from these forest resources. The Forest Act should be 47 revised to be in line with the Village Land Act that recognizes that all resources contained within a registered village should be managed by the village in accordance with sustainability principles. The CB plan will target capacity building to village leaders, councilors and district staff to be able to more effectively influence policy makers on fundamental issues of devolution. This capacity may include using district business councils or CSO networks, such as are used in agriculture to lobby for farmers to free to sell grain across borders. There will also be training to WD and the districts on the benefits of taxing businesses after value addition rather than taxing the management of raw products beyond regulating harvesting levels. The part for the LGAs: incentives versus services The CBFM reforms have resulted in revenues being identified that rightly belong entirely to communities. On the other hand, the Forest Act continues to maintain that revenues from royalties on National Forest Reserves and general land belong to the Director of Forestry. The advent of TFS has further marginalized the district in the forest benefits stream. Districts are now only able to benefit from Local Authority Forest Reserves (LAFR) and from a 5% cess or surcharge on royalties collected in their area of jurisdiction. At the same time, districts are expected to provide the main facilitation and extension services to communities undertaking CBFM. The lack of district funding has resulted in districts negotiating an ad hoc and arbitrary fee from villages with VLFRs. In Rufiji it was negotiated at 20% and in other cases it has been negotiated at 10% only. The fact that this facilitation fee is not provided in any legislation means that it is inappropriate. Furthermore, it is negotiated between communities and their primary advisor, which is the district itself, thus making the negotiations a conflict of interest. The CB plan will aggressively target the building of capacity of districts to promote businesses based on natural resources produce and value addition. In this way, districts will understand better their role to stimulate economic activities at a higher value that will lead to a wider tax base and revenue streams that come from business licenses and property taxes. Wildlife: Complex regulations and expensive The WMA regulations remain incredibly complex and stringent, leading to a long process and being too expensive for communities to adhere to without external support. The requirement for Resource Zoning, EIAs and General Management Plans in WMAs is a standard higher than what is required of MNRT’s Game Reserves and Game Controlled Areas. WD believe that the high standards are necessary for WMAs because they are all expected to eventually solicit investor backing and investors will not be interested in WMAs that don’t have these documents. WD on the other hand can continue to rely on government budgets 48 to support their protected area network. The process of establishing a WMA can cost as much USD 100,000, which is beyond the ability of villages and districts. The CB plan will target both WD and district staff to allow them to understand that WMAs in order to be viable must run as businesses. The focus of training will be on contracting and identifying revenue streams so that investors can be identified who will become partners with villagers in developing the WMA. Not easy to get the required capacity The capacity required to develop a WMA is beyond the ability of most districts. In particular stock assessments, resource zoning, EIAs and GMPs are usually undertaken by consultants. In fact, EIAs are required by law to be undertaken by environmental experts who are registered with the National Environment Management Council (NEMC). The result of this is that WMA development is out of the reach of a district, without an investor or an development agency. The CBC Unit of WD believe that they can at least pass on their experiences to DGOs so that they can assist in quality assurance of consultancy reports. A DGO may also be able to be trained to make an early assessment of WMA viability in order to better prepare communities. As it currently stands, WMA viability is undertaken as a latter step in the WMA process but it comes after great time and expense has already been used in the process. Impact of change in legislation Legislation for game controlled areas has been changed retrospectively therefore villages find themselves within the boundaries while the legislation now prohibits human activities within the GCA. The current Wildlife Conservation Act (2009) declared that no GCA will exist on village land. This statement has proved difficult to apply because in the past GCA did not exclude human activities taking place, other than hunting of game. This has meant that all over the country GCAs existed on land claimed by villages. The intention is for the Protected Area Unit of WD to undertake a countrywide assessment of all GCAs to determine which of them is still viable as a game management area. Areas deemed to be too degraded will be permanently relinquished by WD. The assessment is a slow process due to limited financial and human resources. The ongoing process of assessing and agreeing to the borders of the KGCA is a good opportunity for on the job training or action learning to take place in the way of facilitation, conflict management and negotiating. GCA on village land In Kilombero the GCA has been deemed to be viable, based on a wildlife census that was carried out of the Ramsar Site in 2009. However, the process of agreeing a boundary for a revised GCA has not been smooth and remains highly contested. Many villages, albeit not all, claim that the GCA is being located on their traditional customary lands. MNRT has so far proved unable to negotiate a 49 boundary agreeable to all concerned. There is a need for boundary negotiating skills not only in connection with the GCAs but also in connection with protected areas that border with villages such as with Selous Game Reserve and Ndundunyikanza Village in Rufiji District. KILORWEMP already within its work plan intends to undertake policy review and management planning in relation to fisheries within the KGCA, however, it is advised that broader short courses should be arranged in boundary conflict management and resolution as part of capacity building of the DFT. Such courses may be tailor made to be similar to ones already being offered at ESAMI or Mzumbe University. The idea is that treating fisheries in isolation from broader boundary conflict issues may not be as effective. Fisheries: Not clear what is incentive to establish the BMU The BMU guidelines as presently drafted offer limited incentives for communities to participate in this form of CBNRM. This is because entering a BMU does not result in the provision of user rights. In the fishing sector user rights are not regulated, as there is no limit to accessing a fishery. The BMU process appears much more to be a method by which fishers and their communities can be mobilized to capture revenues from traders on behalf of the districts and the MLFD. Management planning is geared towards improved spatial and environmental planning of beach landing sites and fishing camps rather than managing the fishery itself. What is hoped by fisheries authorities is that BMU will exclude fishers with destructive practices and thereby control the resource in this way. However, it is not clear what additional benefit BMUs will receive for preventing their own colleagues from destructive fishing practices. To make matters worse, BMUs and fishing camps in general are poorly monitored by fisheries authorities from either district or ministry level. Whether BMUs adhere to principles of sustainable fishing management or not, is not captured in any meaningful way by the relevant authorities. Need to develop a national vision on who is allowed to fish and how to regulate that Unlike the forestry sector that has developed a National Forest Program me and the WMAs which has regulations and annual targets in the WD plan and budgets, the fisheries sector has no such development plan for BMUs. It is not clear which of Tanzania’s fisheries is a priority area for establishing BMUs and when this area should be developed. In addition to requiring a national vision for BMU development based on stock assessments, threats and risks and economic potential, it may be necessary for the MLFD to strategize on how to regulate access to fisheries resources. At present the prevailing culture is for anyone who wants to fish is allowed but it must be considered that the resource will not support this view. KILORWEMP has an opportunity to raise these issues 50 as part of their work plan to promote BMUs in the KVRS. The work plan recognizes that although many BMU processes have been started there is no specific study to assess whether there is any sufficient economic incentive to support the effort of fisher folk. It is important that a process of assessing economic incentives of BMUs be taken up in policy review work that the project is already planning to do. Wetland management: Think Piece on wetlands regulations: The KILORWEMP project has developed a discussion note, which they have called a Think Piece on Wetland Regulations. It remains unclear what status this document has within MNRT and exactly who was involved in its preparation. Nonetheless, it does state in the document that in order to assist MNRT in conducting policy reviews, KILORWEMP has reviewed the available policy framework for wetlands management while recognizing that there are two separate wetland regulation drafting processes. The note agrees that an up-to-date policy review of wetlands is not available and it therefore puts itself forward as a summary of the questions arising from the present draft regulations process, and which need to be answered to confirm the options for Ramsar Site management. The note specifically intends to list the following issues: 1. The evolution of the framework for wetland management 2. Some critical ongoing policy transitions which are of driect relevance to the sector 3. Some proposals to support discussions on the way ahead The Think Piece then outlines the progress that has been made since 2000 in developing a Wetlands Strategy and national implementation programme. It points to the progress made under the Danida funded SWMP Programme that attempted to implement a decentralized wetlands management model, anchored in local government. At the same time, institutionally wetlands have had to endure changes such as the Environmental legislation allocating responsibility tot eh Vice President’s Office and ongoing reforms to establish the TAWA combined with high turnover of staff in the Wetlands Unit. The Think Piece concludes that the country has now reached a crossroads with the two draft regulations processes. This situation has led to the 3 questions being raised: 1. What is the accepted framework for integrating CBNRM into wetlands management? 2. Without a decentralized natural resources management type programme where will the financial resources ceom from for rolling out SWM nationally? 51 3. Which of the 3 proposed Protected Area based Wetlands Management Categories will, be applied and where? Responding to these questions or even assessing the validity of the questions is beyond the scope of the capacity needs assignment. However, it is possible to assess the impact of the current situation on capacity building needs. Such an assessment will be made here briefly. The issues raised in the Think Piece are presented as being of a technical policy nature however they are in fact more about leadership and vision. The 2 different regulations being developed are a result of two different ministries claiming a single policy space. It is unlikely that simply answering the questions asked by the think piece will by itself resolve these issues. The capacity needs assessment has argued that consensus building is as important a skill as the drawing of maps and the monitoring of ecological parameters. The issues raised within the think piece seem to have at their heart questions over the political will to deal with wetlands challenges in a coherent, evidence based and cross sectoral manner. The response required appears to be one where political will can be influenced and modified rather than building capacity to simply draft laws and regulations, which will have only limited buy in. An appropriate approach to influencing political could be to isolate decision makers together with technical staff in order for consensus building to take place. This would indeed require that technical staff in MNRT would be well acquainted with the technical arguments for collaborative wetlands management. In this respect KILORWEMP could play a useful role by brining examples and best practices from pilot activities in the KVRS to a multi-sectoral dialogue forum where politicians, directors and technicians could be reached with information that would assist them to reach a common understanding. Otherwise, it is beyond the ability of this capacity needs assessment to determine what the likelihood is of resolving the current institutional tug of war, so that wetlands regulations can be drafted and accepted. Limitations of the Guidelines: Sector focus: The guidelines have been developed commendably from the sector legislation but this has led to each sector focusing exclusively to its own resource. This has meant that there is much duplication of processes such as land use planning, participatory planning and mapping. Several stakeholders have claimed that a more holistic natural resources approach would help to streamline the process of obtaining user rights. Ending with the issuance of User Rights: The guidelines for the most part lead to villagers completing a process of developing a plan in a participatory manner and having that plan endorsed by the community and recognized by law. 52 However, with the exception of the forestry resources assessment guidelines and the WMA regulations (and hence WMA user guide), few of the guidelines proceed to assist communities on how to ensure benefit flows from resources on their lands. Value chain development of natural resources products is not included in any of the guidelines. Conservation more than commercial: Related to the above point is the fact that all of the guidelines are geared more towards community based conservation of natural resources rather than sustainable use of those resources. The WMA regulatons have undergone the greatest amount of revisions and it can be argued that these changes have not been fully reflected in the WMA User Guide. The revisions include allowing communities to negotiate location of hunting blocks and lodge lease agreements. The existing guidelines do not provide any guidance on how these commercial arrangements could be carried out. Incomplete decentralization: Because the guidelines are a reflection of the existing legal framework they also reflect the weaknesses of that framework. This means that the weaknesses of the laws in terms of incomplete decentralization are found in the guidelines also. The forestry guidelines do not indicate the process of communities obtaining hammer in order to legalize for themselves their forest products. This step continues to depend on forestry officers. Similarly, the WMA guidelines refer to a District Advisory Board without making it clear how this organs advisory capacity differs from the District game Officer and indeed the Wildlife Division itself. Finally, the BMU regulations and fisheries user guide are unable to provide communities the mandate to fully control a fisheries area by restricting access to excess fishers. Geared towards LGA staff: Although the guidelines universally declare that communities and extension staff are their target, the guidelines are largely meant for the benefit of district staff and NGOs. At a minimum of 50 pages, there are no guidelines that can be used directly by community leaders such as WEOs and VEOs, let alone by any typical villager ion the Tanzanian context. This feature of the guidelines has probably led to the criticism that they are applied too technically without sufficiently recognizing the need for governance and facilitation skills being imparted to communities. Institutions weak: Some of the institutions referred to in the guidelines have proved to bee weak or at least not functional at the level that was expected. This is particularly true for wetlands organs that are defined in the guidelines, such as NAWESCO and the NWWG. These organs do not appear to be convening meetings at this point in time, something which retards the further development of policy. This situation has an impact on the formulation and 53 eventual approval of wetlands regulations. The situation is exacerbated by the fact that the Wildlife Division itself is undergoing institutional changes with the establishment of TAWA. The institutional fate of wetlands is yet to be determined. 4.2.5. Strategizing and prioritizing Although the Division of Policy and Planning is tasked with coordinating MNRT’s strategic plan, a challenge for the DPP is coordinating the two relatively powerful divisions of Wildlife (soon to become Tanzania Wildlife Authority- TAWA) and Tanzania Forest Services (TFS). The creation of TFS in 2010 and the intention to create TAWA as a wildlife agency has meant that these forestry and wildlife executive agencies perceive themselves as being even more independent and self-reliant, needing less to be coordinated by the ministry’s policy division. As a result of the establishment of sectoral executive agencies the management of resources holistically becomes more challenging, as each agency will focus more on the sector from which it derives revenue. The focus on revenues from protected areas also means that promoting CBNRM on village lands will also be less of a priority for the executive agencies, which will have no mandate on village lands. 4.2.6. Support to lower levels: At central level, the national Decentralization by Devolution (DxD) institutional framework, supports the MNRT as NRM leader and to PMO RALG as coordinator of DxD, and relevant CBNRM. Bottlenecks may however arise from the availability of qualified CBNRM officers, their permanence in function and channels of information flow. At PMO-RALG, the supervision of the decentralized processes is a core activity of the Department of Sector Coordination (DSC) Unit, which is limited in capacity as it has only 2 full-time staff to cover 153 districts nation-wide. Local government reforms and DxD to date have focused mainly on the so called priority sectors of education, health, water, agriculture and roads, with more than 85% of government grants going to these areas. Natural resources sectors have suffered as a result of not having undergone DXD, hence have no earmarked funds and are being accorded lower priority within PMO-RALG. 4.2.7. M&E Forestry: Monitoring in TFS involves regular reporting from Forest Managers from each of seven Zones countrywide as well as from Forest Managers placed in many Districts. There is also reporting from Forest Surveillance Units to the headquarters. Reporting is on licenses issued, revenues collected, captures, and law enforcement. The former FBD did establish a database called NAFOBEDA (National Forest and Beekeeping Database) which was designed to systematically and regularly collect this information from 54 central government, district and community forest managers. The system was based on standardized monitoring sheets that could be filled in either manually or electronically and eventually submitted to the headquarters for compiling. The community sheets included information on the steps of the CBFM and JFM guidelines, in this way allowing MNRT to monitor progress on PFM throughout the country. Unfortunately, the NAFOBEDA process proved to be too complicated and unsustainable and has apparently collapsed. There is currently an initiative to develop a PFM Management Information System which will also be based on monitoring sheets from communities, District Forest Officers and Forest Managers. The PFM – MIS will also compile information according to the CBFM and JFM guidelines in addition to information on harvests, contracts, revenues and forest health. The PFM – MIS is being supported by TFS and UNDP. Wildlife: Monitoring in the WD is carried out by routine reporting from Game Reserve Managers and Anti-Poaching Units to the Wildlife Development and Anti-Poaching Sections of the Division. The Anti-Poaching Section has an Excel based database for collecting key information. According to some WD staff access to Anti-Poaching Section information is the most reliable as compared to other sections of WD. The information from these reports is collected and analysed by staff of the Research, Training and Statistics Section, compiled and made available to WD management for discussions and developing actions. The type of monitoring that takes pace tends to be focussed on anti-poaching and law enforcement activities rather than reporting on progress of implementing a strategic plan. There is currently no regular reporting from WMAs beyond reports from adjacent Game Reserves and routine Anti-Poaching Unit patrols. Because many WMAs have been initiated as part of projects there is information that is collected from many of them. There is currently an exercise to collect and compile information from 7 pilot WMAs in order to develop a WMA Monitoring System. The information will be loaded into a computer-based database that will initially be established at the Authorized Association Consortium Headquarters in Msasani, Dar-es-Salaam. Information collected will include law enforcement data but also number of animals and ecosystem health data. In time the database may be expanded and eventually relocated to WD. At this point in time there are no similar plans to develop a Game Reserves or Game Controlled Area Monitoring System. There are 4 Ramsar Sites in Tanzania, each one with a Project Manager who reports to the Wildlife Development Section on a quarterly basis. The KVRS Manager indicated that he was untrained in wetlands management, including issues of monitoring. It is unclear what indicators are being monitored and reported on from the Ramsar Sites, however, in KVRS it is understood that whatever monitoring does take place is for a small part, a few hundred hectares, of the entire Ramsar Site. 55 Fisheries and VLUPs: It appears that monitoring of BMUs is done on a project by project basis rather than in a centralized, systematic manner at MLFD. The same is less true for VLUPs, where the NLUPC is obliged by law to register VLUPs nationally. Once this registration is done, progress on VLUPs is one area where district council Lands Officers report on progress to the Regional Lands Officer for onward reporting to MLHHSD. The progress reported on appears to be more on the number of new VLUPs that are undertaken, as well as, the constraints to undertaking more VLUPs in any particular district. It does not appear that implementation problems of VLUPs are monitored centrally at MLHHSD in a systematic way. 4.3. MNRT current Capacity Building approach: Capacity Needs Assessments (CNA) and in some cases implementation of capacity building have been conducted for several projects (e.g. Tanzania Forest Conservation Management Project (TFCMP), UN-REDD, Forestry Training Institute at Olmotonyi, etc.). OPRAs are conducted in the WD, but they are not widely considered to be effective. In the absence of a more effective capacity needs assessment process in WD, the management of the Division have been supporting capacity building by paying for short courses, diploma courses and in a decreasing manner degree and post graduate degree courses. The annual WD budget allows for capacity building to take place, with as many as 50 staff being trained in any particular year. Training needs are identified by the Research, Training and Statistics Section through a process of analysing staff employment history. Priority is given to staff that have been employed for a long duration. The increase in poaching and habitat destruction has also led to priority being accorded to short-term courses on conflict management, intelligence and investigative techniques. Courses are offered through Mweka, Pasiansi and LukuyuSekamanganga for certificate and diploma level courses. Degree level courses are offered at Sokoine University of Agriculture and the University of Dar-es-Salaam. Increasingly, Game Officers are encouraged to identify degree courses on their own, on the condition that they can attract their own funding. Many Game Officers have been trained in Wetlands Management at various institutions in Kenya, southern Africa and even in Europe. These courses have invariably been funded by projects or scholarships obtained outside the routine MNRT process. Through support of the Danida funded Sustainable Wetlands Management Programme, wetlands management has been integrated into syllabus of Pasiansi and Mweka Wildlife Training Institutions. Some Malihai teachers have also been trained in wetlands awareness. The Malihai clubs are wildlife and ecosystem education clubs that are established at schools throughout Tanzania. Malihai clubs are sustained through funds from the Tanzania Wildlife Protection Fund, which receives funding from tourist hunting 56 fees. In the absence of a ministerial capacity building strategy, the KILORWEMP project produced work plan is the strategic framework against which a capacity building and organizational development plan has been developed. 4.3.1. HR gap in numbers and quality Although TFS has almost 2,000 staff, staffing for CBNRM has been declining in connection with the completion of donor supported projects and the institutional reforms to establish executive agencies. In the former FBD the Extension and Publicity Unit (EPU) of the Forestry Development Section had been responsible for PFM development. At its height, in the mid- 2000s, the Unit had as many as five staff dedicated to promoting and monitoring PFM at the headquarters. The Unit was headed by a Principal Forest Officer, a senior position in the FBD hierarchy. The EPU was further supported by Zonal Extension Offices (ZEO) throughout the country, but in particular those ZEOs that existed where PFM was receiving donor support from Danida, Finland and the World Bank. The EPU was also supported to coordinate PFM issues at district level through collaboration with 2 NRM staff in the Department for Sector Coordination (DSC) in PMO-RALG. Coordination involved planning, budgeting and approval of grants to support PFM in participating villages through District Development Planning. As Danida and World Bank support to PFM ended so have the FBD structures declined in importance. The DSC in PMO-RALG is currently not coordinating PFM at the district level. The EPU has now been absorbed into TFS and no longer promotes and monitors PFM roll out and implementation. The National PFM Coordinator is the only staff responsible for PFM within TFS. Even the ZEOs have been absorbed into the Zonal structure of TFS but PFM has been given low priority. This is largely due to the TFS mandate to manage government reserves and not to infringe on community forests on village lands. The result is that there is only 1 Senior Forest Officer responsible for all of the PFM programme in the p[aren’t ministry. A decision has been made, and a Presidential order passed, to reinstate FBD, which will have responsibility for PFM. Exactly how well staffed PFM officers in the new FBD will be is yet to be determined. An exact number of WD staff has not been determined. However, it is understood that through a process of assessing employment history the Research, Training and Statistics Unit of WD is able to identify between 10 – 50 staff that qualify to be trained at various institutions. The Wetlands Unit (WU) has a history similar to the EPU in TFS. The Wetlands Unit was established at a time when Danida was supporting the Sustainable Wetlands Management Programme (SWMP). At its height the WU had a staff compliment of 4 WD staff, in addition to an International Technical Advisor. The WU has always been a unit under the Wildlife Development Section. However, the WU has not always been headed by a Senior Game Officer. WU currently has 1 Senior Game Officer who is following up the wetlands programme. Another officer is attending studies at University. The collaboration between the KILORWEMP project and WU is not 57 only because of the Kilombero Ramsar Site but also because the KILORWEMP Project Manager is a former staff of the WU. WMA development is the responsibility of the Community Based Conservation Unit (CBC) under the Wildlife Development Section of WD. The Unit currently has 6 staff assigned to it, one of whom is pursuing a MSc in degree Environmental Studies in Australia. Although all the CBC staff are familiar with and participate in WMA development, there are 2 core staff who deal with WMAs on a day-to-day basis. Another member of the CBC is new, having only been transferred in 2 months previous. As with the WU, there is a great deal of staff turnover in the CBC Unit and other members are subject to ad hoc duties assigned by upper management. The head of the CBC Unit is a Senior Game Officer who deals mainly with boundary conflicts and Human – Wildlife Conflicts. As a result the head of unit is often liaising with ministry level officers in pursuit of boundary conflict resolution. The 2 core WMA officers have been able to visit each of the WMAs currently being developed by different communities. The officers are involved in facilitating WMA establishment, advising AAs on leadership challenges, development of monitoring systems, and advising the Director of WD on WMA approval. The staff are largely self taught, having participated in consultancies that have been commissioned by donors to assist WMA establishment. The WMA officers are particularly experienced in WMA resource zoning and preparing of General Management Plans (GMP) because of having participated in several consultancies. The officers have also attended short courses on topics such as monitoring wildlife numbers. KILORWEMP has an opportunity to bring together the CBC and DGOs from the districts in a collaborative learning event. Specific sessions, especially pertaining to policies and regulations, could be delivered by the CBC staff to district staff and thereby develop a ToT capacity amongst WD staff. 4.4. Collaboration 4.4.1.Interdepartmental collaboration Interdepartmental collaboration currently takes place in the field much more than at policy level. In areas where there are forest reserves adjacent to, or in proximity with, game reserves and game controlled areas, patrols can be undertaken together between wildlife and forestry. At MNRT, the Division of Policy and Planning is responsible for compiling strategic plans, annual plans and budgets. The DPP process is very much focussed on compiling rather than making a comprehensive strategy that indicates shared priorities and vision. The DPP also has responsibility for shared monitoring of the MNRT strategic plan, however, this is geared towards assuring adherence to the strategic plan and budget execution. In Kilombero instances of collaboration on patrols were encountered with regards to the Kilombero Game Controlled Area (KGCA) where rangers from the Udzungwa National Park, under 58 TANAPA, collaborated with the KGCA Manager and staff from the mobile Anti-Poaching Units of the Wildlife Division. 4.4.2. Interlinking with other Ministries Inter-ministerial collaboration is even more limited than collaboration within MNRT. There are instances of collaboration between TANAPA, WD and Fisheries Officers from MLFD in connection with patrols within the Kilombero River. However, there is no collaboration between MNRT’s divisions and MLFD with regards to promoting CBNRM. In fact, the Fisheries Department has not developed a BMU Development Programme, so that collaboration with TFS and WD can only take place at an ad hoc filed implementation level. Some collaboration has taken place between MNRT and PMO-RALG with regards to promoting PFM and Sustainable Wetlands Management Programmes (SWMP). These two programmes had both been supported by Danida and had shared similar procedures in planning, financing and monitoring. The Division for Sector Coordination in PMO-RALG had been coordinating between WD, FBD and the districts where these programmes were being implemented. Although there was inter-ministerial collaboration in these programmes, at the strategic level there was no joint planning for the 2 components. The Danida supported SWMP programme did not have any field implementation activities in the Kilombero Valley or the Lower Rufiji River. 4.5. Governance The Governance component of CBNRM at national is very complicated and has several layers of dynamics that can clash. The sectors are scattered over many different Ministries and there is no clear vision to somehow connect them together. This has implications for the coherence in policies and therefore for the implementation of the policies at district level. The way the Ministry is structured and the way that CBNRM is anchored in the different divisions is not conducive for the harmonization and smooth implementation of the CBNRM policies. In addition, with the transition of responsibilities from the Ministry to TFS and TAWA, CBNRM has not been situated to the most logic division/section yet. Because of this unclear situation, access to information, transparency, dialogue and influencing has been seriously obstructed. The best evidence of this incompetency, is that the assessment team had difficulties to obtain requested information and to get insight in the capacity needs of the Ministry. It was not possible in a period of 2 weeks to meet the different sections and units of the Wildlife Division (only 2 out of 6). 4.6. Role of Regional Level: Regional Secretariat, RC’s office. The regional Secretariat is the extend arm of Central Government and therefore still under the Ministry and not yet under Local government. 59 The RAS’s office is to support relevant actions in NRM, by consolidating and supervising reporting, planning and budgeting, giving technical support to the districts, when emphasis is on NRM and its importance in LED plans. However, currently, there are no Regional Fisheries Officers in either Morogoro or Pwani (Coast). Although all other NRM relevant positions are filled, one of the main constraints the Regional office is a lack of financial resources to be able to backstop the districts and provide technical and enforcement support. Regional Commissioner (RC): The Regional Commissioner is appointed by and representing the President in all matters in the region. Therefore, the role of the Regional Commissioner is very important for CBNRM on an ad hoc basis, namely when there are serious conflict and security issues as was the case in Kilombero last year when pastoralists had massively invaded the area. Due to the growing population in Tanzania, the resulting increasing pressure on land and the fact that pastoralism is not an accepted form of livelihood in Tanzania (and therefore no range land management policy) pushes pastoralists for greener pastures elsewhere. The RC has intervened together with the RNRO to evacuate the pastoralists, who were to return to their original location (which was taken by agriculture now) or auction their cattle. A limited number of cattle were branded to indicate that they were allowed to stay, based on the carrying capacity of the location. Many pastoralists moved to the South and to Rufiji and many came back again after a few months. Regional Administrative Secretary (RAS): The RAS is the executive arm of the Regional Commissioner’s Office and the extended arm of Central Government (PMO-RALG). The RAS and his/her team of sector officials have a dual role: Facilitating an supporting the LGAs in the consolidation of the reform process (DxD) Supervision, monitoring and reporting of the progress of the implantation of the approved District Development Plans. They are responsible for the smooth operations of the council management systems, ensuring quality implementation of national policies and for the quality of overall planning, budgeting and reporting of all sectors at district level. There are about 8 clusters in the regional secretariat structure headed by an Assistant Administrative Secretary (AAS) who is coordinating the included sectors. Two of those clusters are relevant for CBNRM namely Local Government (including financial management, administration, service delivery, legal matters and good governance), and the Economic and productive sectors cluster which includes Natural Resources, Fishery, Livestock and Agriculture. 60 Assistant Administrative Secretary Local Government (AAS LG) The sectors in this cluster are all targeting the support to LGAs management systems, including the functioning of the management tools (Epicor, PlanRep, OPRAS, LAWSON, LGMD, etc.). It is not clear if this level has all the competencies necessary to provide that support to LGAs. Performance measurement and capacity building at LGA levels could be improved with help of the RS. OPRAS seem to work well at regional level better then at LGA level. The Region assesses the performance of the LGAs through the CAG reports and the Council Director Performance report, which is generated based on the council OPRAS. Assistant Administrative Secretary Economic and Productive Sectors (AAS EPS) Regarding Natural Resource Management, the regional level is the first level where the sectors of land, environment, NRM, livestock, fisheries, water and agriculture are relatively easy to coordinate in a more comprehensive landscape and wetlands approach. Due to the pressure on land and water as well as the current drive to substantially expand agriculture land through big investments there is need for a platform where the stakeholders can discuss and address issues in a more comprehensive way. In addition, the region could play a more prominent role in not only bringing the relevant sub sectors together but also civil society and private sector. The challenge is to ensure that the line Ministries are recognizing this advantage and are willing to cooperate in the same line of thinking. Also it is not sure if the Region is strong enough to advocate this approach towards the LGA level, which depend on the line Ministries for their finances. For example, in Morogoro, the Region was not supported at all by the Ministry of Livestock and Fisheries in the resolution of the pastoralist problem, only by MNRT and MAIC. The Region has an important role to play in M&E and should be involved in the development of the M&E mechanisms for the different CBNRMs. Currently, Morogoro region receives some limited additional funding ( 5-7 M) from Finnida and Danida for M&E of PFM in Kilombero, Kilosa and Ulanga. Any involvement of the region in M&E activities is/has been driven by projects (e.g. monitoring of Ramsar management plan) 61 5. Organizational level: LGAs The generic council management systems and instruments used at the districts can be systemized as below. Figure 5: Council management and tools This assignment only addressed those systems and instruments that are relevant for the harmonization of the CBNRM and land use planning issues, the improvement of the enabling business environment for the same as well as the value chain development and business development of NR related products. 5.1. Council management capacities: 5.1.1. Planning, Budgeting and Reporting Since the start up of the Local Government Reform Program I (2001) much power has been devolved from central to the district level. Districts have been restructured, systems and processes have been put into place and district staff has been capacitated to use the systems, which is supposed to facilitate the provision of services to the communities. In terms of planning, the national approach is to use the participatory planning process (O&OD) starting at the village level where opportunities and obstacles are being identified and plans are forwarded to the district level to request for support in development activities via the ward development committee. These plans are being compiled, corrected and included in the integrated development plan of the district, to be scrutinized by the Region on quality, approved by the RCC and further moved upward to the parliamentary committee (PAC LAAC). District staff together with regional staff is to defend their proposed budgets at Bunge in 62 preparation of the budget session in May. The districts will know about the amount finally allocated to each of them in July, when the new financial year starts again. The money it self however often does not arrive before September/October and not the full amount that was allocated. Though the district is supposed to have discretionary powers over its budget, the planning and budgeting process is largely dependent on the given MTEF ceilings and instructions by central government on how to divide the (capital) development funds per sector and amongst the different levels. The instructions are dependent on the national priorities (Big Results Now, vision 2025, Mkukuta and donor funding through general budget support and the SWAPs) that might vary per year. For any other activities, the district is supposed to generate its own revenues. As a result of this approach, there are hardly any or no funds available for the implementation of Land Use Planning and CBNRM related activities unless through projects. The little revenue that is generated (own resources) often is used to pay the statutory costs for the councilors (eg. case of Rufiji). 5.1.2. Decentralization of funds to lower levels The decentralization by devolution (DXD) thinking follows the principle of subsidiarity, which means that devolution of power is delegated to the lowest possible level. In the case of Tanzania, it means that the financial devolution goes all the way to the village and in case of health and education sectors even to the facility level. However, the funds for capacity building (Capacity Building Grants) are transferred to the district council, which is supposed to devolve 40% to lower levels. In many cases, the LGAs have used that money to buy motorbikes for the WEOs and bicycles for the VEOs, however no fuel or maintenance money is being provided, which makes the investment ineffective. 5.1.3. Management System Tools: To manage the funds, districts have to use Epicor, which is a financial management system linked to the national server in Dodoma. Epicor as a tool has had many hickups and is still giving problems, which is used widely as an excuse for the LGAs to be less transparent then required. In addition, many department staff are not sufficiently familiar with this system, which results to work overload for the Planning and Finances departments, which have to introduce it into the system for all the departments. Another tool that is used for planning and reporting is called PlanRep, which is linked to Epicor (in most cases). This tool has been well embedded into the whole system and is functioning reasonably good. There seems to be no problems for integrating NRM into this planning tool. However, the quality of planners that was encountered from the DPLO office seemed to be rather weak considering the importance of the department for the overall functioning of the council. The Local Government Monitoring Database (LGMD) system, which is meant to provide for the monitoring of the executed activities, has never functioned so far. Apart from the fact that the responsible staff has not been properly introduced to the use of the computer program it self, the main reason is that the tool depends on the input from 63 the WEOs, VEOs and extension staff at lower levels without the necessary means for them to collect the information. In addition, the LGMD format does not provide space for NRM to include relevant indicators for monitoring and therefore even if the system would work, it would not be sufficient for NRM processes to provide for the required information for adequate decision-making. The only M&E tool developed related to NRM is the National Forest and Beekeeping DataBase (NAFOBEDA). Unfortunately, also this M&E system is never fully implemented. The National Coordinator of TFS mentioned that in anticipation of the reinstatement of the Forest and Beekeeping Division under MNRT, the TFS is developing the PFM information management system (with UNDP support), which will be digitalized. Table 13: Capacity to use the ICMS Rufiji Epicor No Kilombero problem? No information Accountants Ulanga to be trained DT is competent, but accountants are not But problems with priority sufficiently setting for NRM capacitated. Most of Own Sources goes HoDs to Councilors strengthened. Not enough need to be reinvestment in NRM PlanRep No problem No problem No problem LAWSON No mention of the tool Being used Being Succession plan not approved by CG Many vacancies (7 foresters and 3 scouts) used system but is not accommodating HoDs need to be capacitated on how to develop the succession plans of their departments OPRAS Implemented but effective not Implemented, but Implemented but employees don't like it still because and not known to no benefits linked to it. controversial all. HoDs as well as section staff need to be further strengthened. Capacity Last plan 2011/12 Plan available 2013/14 Building Plans Procurement and contract management TNA available 2013/14 No information No information All HoDs need to be introduced to new law. 64 LGMD Not applying Not applying Not applying Not beneficial for NRM Not beneficial for NRM Not beneficial for NRM PFM No information No information No information Need for record keeping Record management capacities staff Information Management System Documentation Many and record keeping record keeping One complaints result is about is of education boundary not dispute of WMA and are to use tools for able digital low record keeping The districts currently report on a quarterly basis, including NRM. The provided information is mainly about progress of planned activities and arisen issues. The staff complains that there are no adequate funds for doing proper monitoring. Only the sectors that have SWAP/LGDG money can go into the field and follow up on progress. Table 14: Basic administrative and financial information per district Rufiji Kilombero Ulanga (2011) 203,102 321,611 234,150 6 5 7 Wards 27 23 31 Villages 96 102 91 2 1 2 40 33 41 21.8 Billion 36.8 Billion 27.7 Billion 4.2 Billion 7.6 Billion 5 Billion 1.25 Billion 4 Billion 2.5 Billion Allocation % for Land 0.2 % 0.8 % 0.4 % Allocation % for NRM 0.5 % 2.7% 1.4 % % of revenue from NRM+ land 60 % 2.4 % 2.5 % % of revenue from agriculture 14 % 70% (rice) 85 % (rice) - - 153,000/= 362,041 (?) - 115,500/= Population Divisions Election constituencies Councilors Total budget Development budget Own resources and livestock District GDP Per capita income In Rufiji there was additional funding for the establishment of Village Land Use Plans in all villages by the National Land Use Planning Commission as well as by Mkurabita. 65 5.1.4. HR and capacity building Figure 6: Capacity Building within the Government system Performance organizational level Roles and Capacity responsibilities need Capacity gap learning OCA Package Capacity OPRAS support CBP Institutional Embedding The Human Resource Management at district level entails, the staffing, in numbers and in qualification, the succession schedule and capacity building of the staff, the allowances and retirement schemes, performance appraisals, etc. Since 2011, the LAWSON tool has been introduced to digitalize the HR system. The main obstacle for the proper functioning of this system is that it is linked to the Epicor system (with the server of PMO-RALG in Dodoma) while it falls under another Ministry (PO-PSM with the server in Dar es Salaam). In addition, as soon as Epicor experiences a technical error, the LAWSON system is also affected. Another obstacle in the HR department is that the performance appraisal tool called OPRAS is not taking into account the difficult financial situation at LGA level. It allows the employee to excuse him/self for non-performance due to non-availability of funding and transport possibilities. This means that the district does not have an effective tool or mechanism that measures performance at organizational level. When referring to the staffing situation in the three districts of the project, there is not enough staff for the sectors as required. Capacity building at district and lower levels is funded through the capacity building grant (LGDG grant system). The grant (on average 35 MThs/=) is supposed to provide for: retooling, temporary staff, career development and skills development. In some districts (Rufiji) the grant has not been received since 2011. Since then, the LGAs are dependent on Own Resources or projects to fund capacity building activities. In Rufiji and Ulanga there were hardly any capacity building activities since 2011, while Kilombero still received that grant. 66 Table 15: Staffing availability in Rufiji, Kilombero and Ulanga district councils District Education Land Wildlife Forestry5 Fisheries Environment 7 11 1 7 11 1 Total Council Rufiji MSc BSc 6 Diploma 10 Certificates Form IV-VI Kilombero Total 6 MSc 1 BSc 1 2 2 2 Diploma 3 2 4 4 Certificates 4 3 2 For IV-VI 2 8 11 12 10 1 1 Total Ulanga (2011) MSc 10 1 1 1 BSc 3 3 4 Diploma 1 1 2 Certificates 35 5 9 1 52 3 1 For IV-VI 4 7 7 4 Total 8 17 14 8 47 Rufiji: The HRO provided a list with vacancies indicating that 17 staff for NRM are missing (32% of the required staff). The district had 94 VEOs and 17 WEOs in 2010/2011 (while 96 villages and 27 wards). The capacity building plan of 2010/2011 indicated an estimated budget of 41,777,000 Ths/=. It is not clear to what extent the plan was implemented and with which funding. 5 including beekeeping officers 67 Table 16: List of LGA positions, qualifications available and capacity requirements Sector Positions Current Qualifications Capacity Requirements available Human Resource 3 Bachelor Degree TNA, HCMIS, Disciplinary officers Handling and Manpower Planning Planning Officer 4 Financial 17 Bachelor Degree PlanRep Bachelor Degree & Diploma EPICOR Management Environment 1 Bachelor Degree Environmental Management Land 6 Bachelor Degree & Diploma GIS and Land use Planning 29 Bachelor Degree & Diploma Environmental Management Agriculture and Food security Water 26 Bachelor Degree & Diploma Water Resource Management Livestock 22 Bachelor Degree & Diploma Livestock and Environment Management Fishery 11 Bachelor Degree & Diploma Water Resource Management Trade 2 Bachelor Degree & Diploma Negotiation Skills Cooperation 4 Bachelor Degree & Diploma Cooperatives Skills and Management Community 13 Bachelor Degree & Diploma Communication Skills Bachelor Degree Legal Procedures Diploma and Certificates Bachelor, Degree, GIS and Development Legal Officers 2 Wildlife 10 Wildlife Management Beekeeping Officer 2 Bachelor Degree Conservation Management Forestry Officer 5 Bachelor Degree & Diploma Forestry Conservation Table 17: List of vacancies in Rufiji district Council 2013/2014 No Sector Vacancies 1 NRM 17 2 Agriculture & Cooperation 15 3 Livestock & Fisheries 16 4 Community Development 10 5 Human Resource Management 1 68 6 Planning 1 7 Financial Management 6 8 Legal Officers 1 Total vacancy 67 Rufiji District Council is not one of the preferred districts to work in for LGAs due to its remoteness and limited development. Therefore, it is hard to find staff willing to stay there. At the same time, the councils are dependent on the approval of PMO-RALG and the recruitment by UTUMISHI to get staff assigned to them, which is not a very transparent and reliable process. Kilombero: Kilombero District Council planned to spend for 110 M on capacity building and 78 M on retooling in the year 2013/2014 according to the MTEF under the LGDG Capacity Building Grant vote. The following Capacity Building activities were included: 4 drivers to participate in logistics and protocol Conduct training of HoD on good governance and administration (Ethics, Principle, Laws and Regulation) Training of councillors on political tolerance, laws and guidelines Training on conducting meetings for ward councillors Conduct training on administration and leadership to 17 hamlet chairpersons However, in the Capacity Building Plan 2013/2014 the ceiling for capacity building is put at 48,7 M with 25M for skills development, 5.8 M for technical assistance and 7.3M career development leaving 9.7M for retooling. One argument forwarded in Kilombero was that district officials don't like to go on long-term training, because they earn more money when they are working with per diems. Ulanga: The requirement for the NRM staff in Ulanga is 43 while there is only 22 staff present. That means 21 vacancies (50%), which is impacting the departments substantially. Despite that the department requested for staff every year, they have not received approval yet from PMO-RALG/UTUMISHI. There is not enough own sources generated in the district to be able to pay for temporary staff to fill the NRM vacancies, also because NRM is not a national priority and not really interesting for the councilors, who prefer to “shine” with social projects. Regarding capacity building: In the staff training needs assessment of 2013/2014 it is foreseen that 16 NRM related staff are planned to receive capacity building between 2013-2017: 69 1 PhD In conservation social sciences in UDSM 9 for MSc varying from forest resources assessment and management, natural resources management to environmental and natural resources economic either at Ardhi University or SUA 2 BSc in Wildlife Management and Forestry 2 diploma’s in Geoinformatics and wildlife management 1 certificate in wildlife management It is not clear in which way the council is funding this plan. The last CBG was received in 2010/11. At the same time, there was a rather substantial budget foreseen for the year 2011/2012 of 463,879,000 Ths/=, the result of combined funding from LGCBG, USAID, SoliderMed, and Pamoja Tuwalee (see Ulanga district Council comprehensive capacity building plan and budget for 2011/12). Currently there are 9 council officials who are doing a MSc of which 2 NRM, 2 Accountants, 3 Community Development, 2 planning officers. 5.2. CBNRM capacities 5.2.1. CBNRM vision and integration in council Community Based Natural Resources Management is synonymous with Decentralized Natural Resources Management (DeNRM) in that both processes refer primarily to communities managing natural resources on village lands. A formal DeNRM program does not exist in Tanzania, where public resources would be channeled through district councils in order to facilitate communities to manage their wildlife, forests and fisheries. In Tanzania each division is promoting its own policy and strategy separately. PFM is promoted by TFS independently of WD or the Fisheries Department and with little collaboration with PMO-RALG. In many cases CBNRM is promoted sectorally from MNRT or MLFD straight to the districts without involving PMO-RALG in a systematic way. This CBNRM vision is lacking at all levels, which is most felt at district level. The principle of a coordinated approach is only being promoted and enacted through the projects. 5.2.2. CBNRM: VLUP, BMU, WMA, PFM guidelines VLUP: Village Land Use Plans have been developed over time by the National Land Use Planning Commission (NLUPC) of the Ministry of Lands, Housing and Human Settlements Development (MLHHSD) 6 . Guidelines have been developed, which are widely known at the district level. VLUP is required for all of Tanzania’s 12,000 or so registered villages, however, in reality budget constraints have resulted in only about 6 National Land Use Planning Commission (NLUPC). 2013. Guidelines for Participatory Village Land Use Planning, Administration and Management in Tanzania. 2nd Edition 70 10% of the villages having land use plans. VLUPs are currently implemented in villages where there is a donor-funded project or where there is investor interest. A national VLUP development plan, with priority areas does not exist. Despite the criticism of the VLUP guidelines contained in the KILORWEMP BSL, the capacity needs assessment found them to be useful in that they promote participatory land use planning at the village level. When properly applied they allow village land uses to be agreed and formalized. However, the guidelines do not cater for intensive and commercial management of land parcels within the village boundaries. Official Land Use Planning guidelines do not exist for any other level than at the village. This is most likely because only villages and the national government are land administering authorities. The result of this is that land use at district, regional or ecosystem level cannot be planned within any legal framework in Tanzania. This is important since by-laws are used to underpin the legality of land use plans and without by-laws that can be recognized in court of law any land management plans for a landscape such as the Kilombero Ramsar site or Lower Rufiji River would lack legal recognition. PFM: Community forestry guidelines are split into two types, JFM where communities manage government forest reserves and CBFM where communities are managing their own forests on village lands. The CBFM guidelines have been in use for more than 7 years and have proved to be appropriate. However, the guidelines suffer from being only in English, requiring a Kiswahili version. The guidelines also suffer because they are drafted for the benefit of district extension staff. Kiswahili guidelines should be produced with communities as their target beneficiaries. The guidelines are aimed at describing the process that leads to legal recognition of community forests but there is no guidance on how to implement management plans. Although there are guidelines in English for Participatory Forest Resources Assessment (PFRA) there are no guidelines on how to do detailed forest stock assessments that integrate NAFORMA data, no guidance on developing harvesting plans, no guidance on drafting market feasibility studies, etc. WMA: The creation of WMAs involves extensive investment of time and resources funded almost exclusively through donor assistance. The cost and relative complexity of the 12 step WMA process, although varying between WMAs, has been beyond the reach of communities. The long period of reliance on facilitators has created a dependency syndrome that persists to the present day. Donor funding of WMA operations, including provision of sitting fees or meeting allowances, results in CBO and village council members accepting unsustainable cost structures. Consequently, the process as currently implemented is conditioning the WMAs to unrealistic expenditure patterns. 71 Despite the lengthy and expensive process of establishing a WMA, a feasibility of its business plan and viability is not required as a pre-condition of the process. The result is that some WMAs achieve formal recognition before they know the level of resources and whether they can be marketed successfully. BMU: BMUs have little capacity to detect illegal fishing practices due to lack of development and operations plans, limited support from districts, and inadequate evaluation by the ministry. There is widespread presence of informal landing sites and the management of fisheries is often inadequate due to poor data collection and analysis. Revenue collection is a district council mandate and is often outsourced to private companies whose interests are in profits alone. The lack of a revenue incentive for BMUs is a major weakness in their guidelines. There is often also poor cooperation between village executive officers and BMU leaders. The Division of Fisheries has not established enforceable plans of switching from open access to limited entry fishing in order to control fish stocks. Licensing in many districts is not effective, as many fishers and vessels are not registered with the BMUs. 5.2.3.Capacity gaps: Based in the interviews and the work sessions with the DFTs in the three districts the following capacity gaps have been identified per CBRNM unit and per district. These performance issues are the basis for identifying the capacity needs of the actors involved. This means that though individual officials may have capacity gaps in their career development, these will not be the basis for the plan. And similarly, though the team has been provided with some capacity building plans prepared by the district councils, these will not be the basis for the proposed plan. As indicated in ToR of the assignment (see annex 1) the consultants will not consider long term Capacity Building: “Long term individual career advancement via postgraduate studies is not considered as a core approach eligible for funding under the present BTC support. This is on the basis of considerations related to the costs, time lag between investment and results achievement, challenges of results measurement, strategic relevancy (i.e. opportunity costs) and alternative sources of funding for this type of activity.” 72 Table 18: Overview of capacity issues regarding CBNRM per district Rufiji Kilombero Ulanga Visioning No CBNRM in district strategic plan No CBNRM in district strategic plan No CBNRM in district strategic plan VLUP VLUP capacity exists, entire PLUM Team trained in VLUP capacity exists, PLUM Team too VLUP capacity exists, inexperienced in use of GPS by MKURABITA, pastoralists a challenge agriculture services detailed zone management plans 2 PLUM District Town Planner prepares VLUP maps together focused, pastoralists/pasture management members with GIS training; PRA to with a challenge. involve marginal groups; pastoralists a coordinates. VLUP Training in Kilombero Valley needs challenge; ineffective by-laws. Villagers prepare sketch maps themselves, district to integrate the flooding of the Kilombero VLUP Training in Kilombero Valley needs staff do not interfere with sketch map preparation. River. to Carrying capacity assessment capacity is weak, can Kilombero do multiple allocations to same piece of land; land formula to determine appropriate livestock Problem of data, no system of capturing is an entry point of everything in NRM; numbers, land use data; the District Surveyor who provides the and community District i.e uses 3.5 the acres hectarage Livestock integrate the flooding of the Kilombero River. Units/Year (for domestic Zebu cattle) and Inadequate storage of documents and 5 maps acres Livestock Units/ Year (for improved breeds). (no land registration “office”/cupboard) KDC expects that pasture management expertise can be solicited from SUA. No GIS specialist No capacity at Village Land Tribunal WMA Aware of 6 steps but have not completed the 6 KDC steps; experiences from Ngarambe-Tapika visited Grumeti WMA; Other District staff inexperienced had trained 1 in WMA; Kilombero stakeholders need to visit other FRONTIER WMA;RDC visited Ikona and MBOMIPA WMAs. WMAs that are successful. ecological monitoring; need support with staff in Lacking someone competent in WMAs at Rufiji KDC need capacity to market for investor business plan to market a remote WMA. District Council, since they are new guys Once user rights are obtained for Iluma Once user rights are obtained for Iluma WMA the expectation is that an investor WMA the expectation is that an investor will be solicited. A Kilombero will be solicited Valley wildlife census is needed No staff experience with WMA. The NGO FRONTIER trained 1 staff in Resource Zone Management Plan and ecological monitoring Business Plans capacity needs to be Capacity is needed on how to market a shared with LGAs; develop a consultancy remote WMA (including ecotourism) where a contractor involves LGA staff so that they can get experience There is a hunting company, capacity needed on how to involve hunting company in WMA development Some staff visited and were inspired by Uyumbu WMA in Ugalla. - Ecotourism and local tourism - VGS lacking skills - CBO lacking skills - Wildlife corridor knowledge imparted to LGA staff PFM Rufiji District Council staff is familiar with CBFM There guidelines and has successfully applied them in awaiting Mtanza streamline PFM steps is needed. interpret marketing is a challenge in the absence of detailed KDC wants to enter into a Joint Forest challenge, even for honey; harvesting guidelines on these topics. Management arrangement in Ihanga Local plans made but of poor quality. Several projects depend on one Forestry staff. Authority NAFOBEDA is not well known, need to share PFM- neighboring villages. IMS with 3 districts KDC Msona Village but harvesting and are 8 VLFRs approval, Forest wants to but the by-laws are Are able to do PFRA but lack NAFORMA capacity to inventory data and lack capacity to Reserve with 3 the marketing a Forest Management Plans have been conservation focused, they now need to review the Forest integrate more Management Plans of 4 Villages in order to marketing provide for harvesting to take place. There Ulanga has forest products. been data; increasing pressure from need harvesting marketing and support communities to start harvesting in their 74 for VLFRs. Understanding of value chain marketing to for timber, charcoal (with improved develop harvesting plans will come from kilns) and honey; modern beekeeping TFS. skills. KDC does not have any expertise on Knowledge marketing of forest products. This capacity charcoal (technical and facilitating) KDC expects that advice on how on improved kilns for needs to be outsourced. BMUs SWMP trained the staff of RDC on Wetlands; Fishers, vessels and traders registered by No capacity to do fish frame survey; fish Rufiji District have experience from WWF-RUMAKI District; frame survey not a priority of councilors; and KVRS projects; management Hosted WWF –RUMAKI project on coastal BMUs; too few staff to effectively monitor fishery. no capacity plan; to SWMP do fisheries trained on need capacity on collaborative beach Wetlands management. KDC has wetlands experience under SWMP UDC has the vision that all fishing camps where some of the staff were included in should become BMUs. the training to Rufiji. There is a need for negotiating skills on KDC expect that capacity to conserve the KGCA boundary. fish breeding grounds will be sourced from There TAFIRI. collected in Malinyi. There needs to be capacity building to DFT Catch on how to develop fisheries management Fisheries but no capacity in Ulanga and plans forms not filled in (track fish sold in There are not enough financial and human market); resources to introduce BMUs to all the capacity. villages that need it. KDC want to use a Change agent (MLFD to LGA and impart ToT approach, with villages training each knowledge); other. specific to river basin (not lake or sea); In Ulanga and Kilombero there is a need expand beneficiaries of training Health for negotiating skills on KGCA boundary. Officer] is some Assessment data limited catch System data used management guidelines on in low BMUs; How to incorporate BMUs into PAs, as in 75 KGCA Mr. Hoza was involved in BMUs and others in MLFD may not be conversant with BMUs – just adopted concepts from PFM and WMAs Need VICOBAs to make BMU sustainable Enabling Marketing of business inexperienced in negotiating contracts. Environment Investment is forest very products limited a and challenge; Lack capacity in value addition and processing of fisheries resources therefore collection from fisheries to facilitate market dynamics. Council staff needs capacity to enhance enabling no business environment infrastructure foreseen to facilitate markets revenue Infrastructure remains biggest obstacle Revenue Poor collection districts, at least Rufiji collects 60% own revenues in all Revenue collection is weak Revenue collection is weak Monitor licenses and revenues in forestry and Monitor licenses and revenues in forestry, Some limited monitoring of fisheries fisheries fisheries and resident hunting catch data at one site; monitor license from natural resources but even here it could be higher M&E and revenue from forestry, fisheries and resident hunting Stakeholder No platform District Advisory Board for WMA District Advisory Board for WMA management Every LGA should have a business council but it No platform No platform seems they are not working. Most persons are Every LGA should have a business council Every aware of TCCIA. but it seems they are not working. Most council persons are aware of TCCIA. working. Most persons are aware of LGA but should it have seems a they business are TCCIA. 76 not 5.3. Role of the LGAs: Regarding CBNRM, the role of the LGAs is to support the Village Councils to establish and embed CBNRM units, and implement Village Land Use as well as CBNRM plans as an on-going activity by the District Facilitation Team (DFT). It is their relevant technical function to guide communities to plan, and then to supervise, support, monitor and consolidate their activities, guided by sector policy and the D x D processes. The DFT then mainstream the community needs and plans in the District Development Plans (DDP) and to ensure this is participatory, they use the LGA planning tool called “Opportunities and Obstacles to Development” (O&OD). This processes is a Participatory Rapid Appraisal (PRA) tool for bottom-up planning. However, the O&OD process is cumbersome, protracted and costly and there is no guarantee that the Village Development Plan (VDP) will be accepted by the District Councils. Often, unless the Village Government involves local Councillors or WEO, to lobby on their behalf, communities can be disenfranchised and political agenda override the allocation or prioritization and top-down decisions prevail as to what enters the DDP. The low political priority accorded to NRM is evident in that, NRM budgets are often less than 0.5% of the district funds, yet as shown in SWMP, NR could contribute more than 45% of district economy. The allocation of such low importance and therefore of resources to NRM, suggests perhaps a low perception and appreciation by the political leaders of the value of NR to poverty reduction. It is the District Councils who will have to address the technical staff requirements (and funding) to support future field implementation. The District Executive Director (DED) is the administrative arm of the DFT, the warrant holder and oversight supervisor that the DDP is implemented as approved by Council. Normally for NRM projects, the DED delegates the coordination to one of the NRM officers as District Focal Point (DFP). The districts are not fully staffed in all the areas of NRM specialization, and there is not always at a senior or village extension level sufficient capacity to ensure quality coordination. Besides, all the officers at district level have multiple tasks, often addressing other (non NRM related) duties assigned by DED or Council. The level of seniority is also an important factor; if NRM officers are not high in the seniority rank, this is likely to further affect their capacity to assume a proactive role, especially when it comes to lobby the Council for resources for investment in NRM. In addition to providing extension services to communities on NRM, districts are also often called upon to manage government NR reserves in protected areas where central government staff are few (eg forest reserves). Despite these multiple roles districts are provided limited resources to carry out their responsibilities. In the forestry sector harvesting licenses are issued and royalties collected by districts however the only revenue that remains locally is the 5% cess, or surcharge, that they are allowed to levy on the royalty. This is a very small sum! Reforms in the natural resource sector that have resulted in greater rights to communities has led to greater potential for revenues for villages but with no parallel increase in district revenues. Where for example 25% of hunting revenues is returned to the District, Councillors often allocate this to other priority areas, and not at source. This situation has sometimes been blamed for making districts uninterested in promoting CBNRM. 5.3.1. Coordination and communication In principle, the DED is responsible for all internal coordination, mainly through the CMT meeting, which takes place once per month and includes all the Head of Departments (HoD). Some of the DEDs have short management meetings with their HoDs every Monday morning and others have “prayers” every morning. People use cell phones and landlines to talk to each other, but most will drop in or pass by the office/desk to quickly consult each other. There is a system of folders with documents that circulate and/or need to be signed, pushed through the offices by office helpers. 5.3.2. Inter level connections The district communicates to the Regional Secretariat directly to the RAS if it needs to report on progress or address issues. The district level staff does not feel much need for the RS support apart from fulfilling the statutory requirements and in case of major conflict such as was the case in Kilombero with the pastoralist invasion. The district communicates with the communities at ward and village level through the WEOs and the VEOs, through mobile phone, letters, circulars and directives. All information coming from “below” is first registered and directed according to topic to the relevant departments. In the case of the CBNRM, the DFT members mostly directly interact with the villages while taking along the WEOs and VEOs in the process. The councilors are also claiming to connect between the council and the communities. 5.3.3. Inter departmental In NRM related issues the District Land Natural Resources and Environment Officer (DLNREO) is responsible for coordinating amongst the concerned departments. Next to this official, there is another called District Environmental management Officer (DEMO) who is responsible for the implementation of the EIA and liaises with the NGOs, VEMCs, and the community. The District Community Development Officer (DCDO) also collaborates with CBOs/NGOs and FBOs to plan for and implement community development activities. VICOBAs are being introduced and supported by the DCDO. In Kilombero instances of collaboration on patrols were encountered with regards to the Kilombero Game Controlled Area (KGCA) where rangers from the Udzungwa National Park, under TANAPA, collaborated with the KGCA Manager and staff from the mobile Anti-Poaching Units of the Wildlife Division. 5.3.4. Support to lower levels Support to lower levels varies per sector. Some sectors do regular visits and support activities while others have no budget for doing field visits. In the case of NRM there is no budget unless from the project. Therefore, the NRM support to lower levels is directly linked to the presence of projects. 78 5.3.5. Stakeholder management Though the notion of stakeholder management exists, most districts do not find the time or the priority to organize stakeholder meetings more than once a year or once in every 2 years. Only for the WMAs in Kilombero and Ulanga a more formal interface structure exists, namely the district advisory board, which address issues related to the WMAs. 5.3.6. Enabling business environment The district staff that is supposed to be expert in local economic development and market development etc. is limited to the cooperative and the trade officers. Others that are indirectly involved are the economist from the DPLO office, and the treasurer. These officials have not been prepared for the creation of an enabling business environment, which includes ensuring relevant infrastructure such as electricity, water and roads, regulatory services in the form of by-laws, permits and licenses etc. Currently, the councils do not know very well how to deal with the dilemma of enhancing revenues while also being conducive to attract investors. Without knowing the businesses, or business environment, the council risks to overburden them and obstruct them from further growing. Though this is crucial for the further development of CBNRM, it is difficult for the project to invest capacities regarding this issue, since it is a national problem, which first need to be addressed at national level. 5.3.7. Revenue enhancement The district does not invest in the collection of revenue of CBNRM, which means they have to enable the WEOs and VEOs to go and collect the revenues, which is not possible if they don't have transport or fuel for their transport means. Currently, revenue is mainly being collected from agricultural cess and property (land rent) tax, while there is quite some potential to collect from fish and other natural products (charcoal). The districts don't have a thorough of these principles and dynamics as well a way to reinvest the taxes for services and transparently inform the public on what happens with their tax so that are more willing to comply. 5.3.8. Conflict management There is this general feeling of disconnection and disempowerment regarding disputes and conflicts resulting from pastoralist invasion, boundary disputes and volatile investors at the district and lower level. Despite years of commitment to the process of land use planning, the communities are overruled by government directives (eg. pastoralists’ invasion in Rufiji, investor’s change of crop in Rufiji, border with Selous for the approval of the WMA in Rufiji). The LGAs do not seem to take a stand for the communities, but passively wait till the project is making an effort by advocating through its connection in the MNRT. 5.4. Governance: The district council is at the spill of all the CBNRM activities and therefore requires strong capacities in interconnecting between higher (region, line ministries and PMO- 79 RALG) and lower levels (WEOs, VEOs, village council and CBNRM committees) as well as with civil society and private sector. It also needs to support the lower levels to enable them playing their role. This calls for especially strong skills in amongst others facilitating, negotiating, networking, mentoring, coaching and brokering skills as well as technical insights. However, the emphasis in capacity building within the LGA system seems to be on more sector specific capacities. At the council level the councilors also play a specific role especially regarding the approval of the budget (allocation to NRM) and the prioritizing of the district management plan. In some CBNRM cases councilors are also involved in resolution of conflicts. However, in general, the councilors have been hardly informed or involved in the CBNRM process, while their support could be crucial for increased district support to the process. Regarding access to Information, creating Voice for the communities, Influencing decisions and Sanctions (IVIS), the LGAs can play only a limited role. The communities currently depend fully on the willingness and commitment of the DFTs to be informed and supported in the whole process. This potentially unfair situation could be addressed by involving civil society as service providers, whistleblowers, social accountability monitors, and advocacy players. See chapter 7 for more details. Across the institution (from Ministry to the village committees and vice versa) there is an issue of scattered documentation and information storage and incapability of sharing. In the digital era, one would expect to have solved this problem at least at the highest till district level, but even there it is difficult to get easily access to key documents, studies and basic information. At district level, the office staff, involved in registration of documents and their storage, needs to have a minimum standard of education, which is currently often NOT the case. At lower level, there is need for availability of the basic documents, storage space and clear responsibilities for who is to provide the information to whom. One of the biggest obstacles for communities to claim their rights, e.g. in case of intrusion by pastoralists or the enforcement of their land use plan when investors are brought in by RUBADA, or the park rangers are entrenching on village land, is the very weak mechanism for law enforcement. The current system of village land council, ward tribunals and primary courts at the district are not functioning or being misused for personal gain. The absence of paralegals or qualified staff at lower levels is one of the reasons, but also the commitment of the district level support to these lower levels is insufficient. It is often the DC, who will call upon the security committee, who is solving these problems. This is not the ideal situation considering the political and not always impartial stand of the DC. 80 6. Lower level (Ward, village and CBNRM) At ward level: The Ward Development Committees approve the inclusion activities, including NRM into the Village Development Plans (VDP). However, they are motivated by political aspirations of the Councillor or local MP, and sometimes must assure alignment with party manifestos. Often, NRM is seen as a low priority and its contribution to incomes, livelihoods and poverty reduction are often taken for granted, that NRM projects get relegated as low priority. At village level, The user groups all compile their various needs and plans into the village development plan (VDP), supported by inputs from the relevant participatory processes of: O&OD, VLUP and CBNRM management plan. Here they must compete during the Village Assembly meetings for priority, given that resources are limited, and often NRM are seen as “God Given”, they will always be there and therefore afforded low political priority by the village community as they are not perceived as “poverty reduction investments”, unless the initiatives are related to Income Generation Activities (IGA) that can produce revenue streams for the community. The village Council, supported by the Village Natural Resource Committee (VNRC) and DFT, is supposed to backstop and protect the rights of the NR CBOs. The DFT are also supposed to facilitate both the LUP and O&OD process so that, amongst others, the NRM matters enter the VDP and are mainstreamed in the DDP. Identified issues can be listed as follows: CBNRM: VNRC and standing committees, CBO etc. no clear guidelines on how NRM committees are structured and how reporting should be done to village council eg. AA reports to VNRC or VEC or the VC ? Forest committee or existing committee? There remains uncertainty and confusion with regards to the roles, responsibilities and mandates of the different committees under CBNRM. The reason for the confusion stems from the fact that the committees are called for under differing legislations. The Village Council (VC) itself is established under the Local Government Authorities legislation from 1982. The VC is required to have three standing committees and is allowed to establish other committees on a needs basis. All the village committees are sub committees of the VC with reporting requirements to the Village Council, which itself is led by the VC Chair and the Village Executive Officer is the Secretary. The Forest Act provides for a committee at village level to support the VC to manage the Village Forests. The Forest Act does not insist that a new committee be established to fulfil this role, rather, it simply recognizes that a committee either existing or to be established will play this role. Beginning in the late 1990s the donor funded projects, such as the Danida funded PFM, proceeded to support the establishment of Village Natural Resources Committees (VNRC) that would be able to manage village forests. 81 When the Forest Act was enacted in 2002 these previously donor supported project VNRCs were formalized under the Act. In 2004 the Environmental Management Act was enacted as a framework legislation, superseding all other legislation on environmental matters. The EMA required that a Village Environment Committee be established as a mandatory committee at the village level. The resulting plethora of legislation regarding committees at the village level has led to multiple committees with varying, but nonetheless, overlapping roles. The involvement of donor funded projects has also meant that, instead of VNRCs being converted into VECs, some VNRCs have been so well facilitated and supported, that it has led to the VNRC being better supported than the Village Council itself. To date the reporting line between the VNRCs, VEC and the VC has remained confused. In the project area it was observed that the VNRC and the VEC had been combined into VNRECs (i.e Village Natural Resource and Environment Committees). In all villages visited it was observed that the VNRECs were reporting directly to the VC, acting for all intents and purposes as a standing committee of the VC. Reporting from the VNRECs was to the VEOs in all the cases encountered in the field. The exact role of the VNREC with regards to managing natural resources in the village is not clear. In many cases VNRECs are acting directly as managers, involved directly in patrolling, monitoring, licensing and sometimes even harvesting. In other cases VNRECs are less directly involved in managing, instead overseeing the functions assigned to other villagers. As part of the VLUP process Village Land Use Management Teams (VLUM) are established at the village. These VLUM Teams have in many cases begun to act as standing committees of the VC on land issues. The permanent establishment of VLUM Teams is not a requirement of the VLUP guidelines and neither is a provision for VLUM Teams made in the Village Land Act. The WMA regulations further add to the confusion by requiring a CBO to be formed for the purposes of establishing a WMA. The regulations require that the VC request the Village Assembly set aside an area for a WMA and concurrently agree to the establishment of a CBO to manage the WMA. There is no requirement in the WMA Regulations for the CBO to report to a VEC, VNRC, or VNREC. In the project area it was observed that CBOs were reporting to the VC but not necessarily to the VNREC. There were also some complaints that CBOs were acting as “governments” within the WMA areas. Compensation for implementation of land use plan (eg. Kibegere), no process or funding to compensate One of the challenges of implementing a VLUP is the issue of compensating villagers for land that has been reassigned to another land use. This situation was found to exist in Kibegere Village in Kilombero District where, because the VC did not have resources, a villager had not been compensated for relinquishing his land. As a protest the villager proceeded to bury his relative in the area that was in dispute, converting it into a cemetery. In many villages, compensation is paid through providing alternative cultivation plots but the threat of not having adequate compensation always exists. 82 No capacity to approach the use of resources (business and harvesting plan), potential revenue etc. price setting The ability to convert natural resources into benefits represents a package of capacities that are lacking in the districts. Most district council staff, and therefore stakeholders at lower levels as well, are missing information on natural resource stocks. Inventory data tends to be collected by the central government level. Wildlife census data is collected almost exclusively by Tanzania Wildlife Research Institute (TAWIRI) but this information is not collected in a routine and regular manner. The information from the Kilombero Valley is now almost 5 years old and probably needs updating. TAWIRI data from the Rufiji probably don’t exist. In any event, DGOs and lower level staff have not been introduced to TAWIRI data and have not been shown how to interpret it. Similarly, TFS possesses the national forest inventory data called NAFORMA. This data has not yet been made public and therefore DFOs and lower levels have not been made aware of this information and how to use it. MLFD has been undertaking Fish Frame Surveys, apparently such a survey has been done for the Kilombero River in 2009 but the information remains with the ministry and has not been shared. Without reliable information on stock it is impossible to make a harvesting plan. All of the CBNRM guidelines require a stock assessment to be undertaken but in reality such assessments are rarely done in any detail. Knowledge of the stock also allows a calculation to be made of the allowable harvest, which in turn leads to determining how much resource can be offered to the market. These capacities are lacking at the district council and at the lower levels. The capacity to be able to understand these ideas is important to be provided to ward and village leaders since in the end the villagers are the owners of the resources. Beyond the technical capacity required to harvest and trade in natural resources there is an urgent need to strengthen capacities at district and village level to undertake business planning. This type of capacity includes knowing traders and markets and regulations that must be fulfilled in order for traders to carry out their activities. Villagers are currently selling forest produce for the royalty rate, not comprehending that they are allowed to sell at a market rate, which should be higher and more beneficial. In wildlife the trophy fees are set by the WD itself. Negotiating and contracting capacities Similarly to business planning, villagers also require to understand negotiation strategies. At present villagers remain completely dependent on district staff to assist them with contract negotiations. This situation sometimes involves risk because district staff themselves may not be sufficiently knowledgeable about market dynamics and how to negotiate favourable contract terms. The reliance on district staff is risky also because traders are often constituents of the council and may be patrons of councillors. Putting the negotiations of villagers in the hands of district staff provides opportunities for conflict of interest. 83 The WEOs and VEOs have a specific role to play in empowering CBNRM at the community level as explained in chapter 3. They depend for the implementation of their roles on the funds from the LGAs: 40% of the LGA capital as well Capacity Building Budget. In general, this money is hardly sufficient for the tasks allocated to this staff, especially regarding monitoring and revenue collection. 84 7. Civil society All governments have internal mechanisms in place to promote or ensure accountability of public servants. These can be related to: Political mechanisms such as separation of powers, the legislature, and legislative investigative commissions; Fiscal mechanisms including formal systems of auditing and financial accounting; Administrative mechanisms, for example hierarchical reporting, public service codes of conduct, rules and procedures regarding transparency and public oversight; Legal mechanisms like corruption control agencies, ombudsman, and judiciary (Gaventa and Goetz, 2001). Internal (government) and external (citizens/civil society) mechanisms of accountability can and should be mutually reinforcing. One way to visualize the accountability relationships is given in the figure 3. The added value of this model is that it includes the enabling environment of social accountability. It also highlights the key elements of each of the key factors. Figure 7: Social Accountability Model7 The model describes 4 key factors to address in order to improve the social accountability situation: 7 World Bank Source book on Social Accountability, 2005 85 the bridging mechanisms between the citizens and government in the demand and supply relationship, the willingness and capacity of the citizens to demand for accountability, the willingness and capacity of the government to respond and be accountable, the enabling environment for citizens’ demand and government to supply accountability. Ideally, Social Accountability is focusing on the demand as well as the supply side of accountability and the bridging in between. Secondly, the framework emphasizes the core elements of social accountability by looking in particular at the following elements: Access to information Voicing for citizens Influencing Negotiations and Sanctions Enabling environment for the above And thirdly, the Social Accountability Monitor model is reviewing and analysing at national as well as local level the following steps of the service delivery cycle: Planning and resource allocation Expenditure management Performance management Public Integrity Oversight 7.1. Civil Society and social accountability in Tanzania: Civil society in Tanzania is still in its infantine shoes. In 2000, the Government of Tanzania issued a national policy on NGOs intended to provide for a new institutional and legislative framework, which was translated into the NGO law [Act No.24 of 2002]. Civil Society Organizations (CSO), nowadays, exist in a multitude of forms and legal entities with various purposes, situated and operational from all levels. The most common forms are the following: NGO networks and apex organizations Membership based organisations, CBOs and NGOs Voluntary and self-help groups, community based groups and societies Social movements and networks of organisations, professional associations, foundations and non-profit companies Faith based organisations Trade unions Private sector associations Employers’ associations Co-operatives Research institutes working in economic and policy analysis 86 Non-profit media organisations Multi-party organisations The majority of CSOs are advocacy, service delivery or member representative oriented. Most advocacy organizations are based in Dar es Salaam. At local level, the majority of organizations are service delivery oriented. The relationship between Civil Society and Government has for a long time been characterized by mistrust and suspicion. Currently it is improving, evidenced by increased communication, interaction and trust. Especially at national level there seems to be more openness: CSOs are invited to participate in policy influencing working groups and are consulted in the process for Mkukuta, MDGs, GBS and sector working groups. At local level, however, the LGAs still tend to see the NGOs as briefcase organizations, which are there for attracting funds from donors for personal gain of the director and associates only, while the local NGOs accuse the LGAs of corruption and mismanagement of public funds. Through the use of Social Accountability Monitoring (SAM) and other tools, this situation can be turned around into a WIN-WIN relationship as some CSOs have proven 8. Regarding the social accountability factors of access to information, voice and influence, negotiation and sanctions, the following can be said. Access to information: Despite the rapid growth of social media and the expansion of the digital and mobile phone evolution into Tanzanian society, access to information remains a huge obstacle to communities, especially in rural areas. On one hand, in most cases the LGAs are not willing to share information as part the cultural resistance within government as part of the socialist heritage. Through campaigning a number of CSOs have been able to convince PMO-RALG of the necessity to provide the citizens with relevant information. However, despite the circular from PMO-RALG to the Regional Secretariats to direct the LGAs to provide Civil Society with requested information according to a list of 20 different documents (including MTEF, expenditure, etc.), the impact has been minimal so far. On the other hand, the LGAs are also not always capable of producing the requested information due to lack of data, bad documentation or record keeping, inability to manage the council systems properly, etc. Information is mostly not available in the right language, or written and presented in a very inaccessible way. The information collected at lower levels for monitoring purposes is channelled to the higher levels without keeping copies at each level. At national level, obtained data are aggregated, mostly according to the needs of the Ministries at the National level. The end reports have lost the details, which are crucial for the lower levels. The lack of a central point, at national or regional or district level, where all gathered information is stored, arranged according to relevance for each level and made accessible is 8 Forum Syd, Policy Forum, Sikika and ANSAF 87 hampering information availability. Especially NGOs, CBOs, lower level leaders, and councillors who are supposed to inform the communities do not have access to the information themselves. Voice: At national level, there is currently some space for the “citizen-state dialogue”, like in the Constitutional Review Preparation Process, as well as in public debates in the media and the newspapers. CSOs are invited to participate in policy making as well as technical working groups and task forces. The biggest challenge for the Civil Society here is to ensure relevant representation of the citizens they are representing. At local level, there are rarely opportunities for CSOs to present concerns to or discuss issues pertaining their target group’s daily lives, with the LGAs. Though formally the CSOs are allowed to present their case through the statutory meetings (mainly via WDC and chair persons) in reality most will directly ask for an appointment with the DC or meet officials informally at the local pub. Influence: Through the dialogue platforms as well as their relationship with Parliamentarians CSOs are making a difference in policy influencing. Their most used strategy is to build cases by using their members or consultants to collect evidence on specific topics from all over the country and present this evidence in a variety of platforms as well as the media and the parliamentary standing committees. The launch of publications and radio programs further are used to enforce the concerned campaign. Negotiations/Sanctions: So far the Civil Society has not been very successful in enforcing promises and agreements with the government. When the doctors went on strike one year ago because of unfulfilled promises and mismanagement by their Ministry, the movement leader was tortured and left for dead in the woods of Dar es Salaam. Teachers have been rarely successful in their actions to claim for unpaid or delayed salaries. Newspapers have been banned for 2 months (Wananchi) as well as TV spots (Policy Forum) for supposedly asking critical questions. Impunity and inaction towards corrupt leaders are still the general status quo in Tanzania. However, the media and the middle class of Tanzania are less tolerant for such practices and it is foreseen that towards election time more scandals will be used to discredit each other amongst political parties. Capacity gaps and challenges of CSOs in Tanzania: As said Civil Society is just beginning to become a credible partner in the policy arena of Tanzania at national. A growing number of advocacy organizations have established their position at the negotiation table with government. Their biggest challenges are to link to the lower levels and represent the communities, to ensure core funding and 88 become more sustainable in their strategy, and to maintain a joint approach in addressing/confronting government. Their internal organization often needs strengthening in order to ensure timely accountability towards donors as well as to their own constituencies. Smaller NGOs/CBOs struggle even more with these issues. They are easily overruled and not empowered enough due to lack of information on acts and regulations and not informed enough on their rights or ways how to enforce their rights. Many donors are hesitant to fund similar organizations, because of the risk for failure, while at the other hand the only way for these organizations to grow is through substantial initial capacity building support and through learning by doing. 7.2. Civil society and Natural Resource Management: In the field of Natural Resource Management and related environmental sectors, a growing number of CSOs are active in Tanzania. The most relevant for this study are the following: Table 19: overview of relevant CSOs National level Service delivery oriented organizations: WWF District level level CSOs/CBOs Research Network: Networks: Rufiji: UDSM UNGO KIUNGO JUHIWA SUA Institutes: (carbon NGUMWA (WMA) UNGOU (RUMAKI, Coastal Regional trade, MUNGATA forests, Prof. (WMA) AAC) RUBEYA (WMA) Munishi- TFCG Mpakaya KIVEDO) Mjumita Conservation TAWIRI MCDI group TAFORI JUVIHUMTU (CARE)/UMAKI Advocacy oriented organizations: Kilombero: TNRF MANET (based in ILUMA (CBO/WMA) CHAWAKI Morogoro) (fishermen’s Haki Ardhi association) Traffic KIVEDO, PELUM UMAKI, Mama Misita (project/WWF?) beekeeping Mang’ula ? Possible mechanisms: funding Ulanga: ILUMA 89 FCS (CBO/WMA) TFF MIBA (NGO) TWPF KVOC (NGO) Projects Kivukoni Fishery SACCOs SEMA (NGO) Ujamao, (CBO) MASEC (?) SEGTO (CBO) CEMDO, (NGO) 7.3. Donors and funding mechanisms: Through the years a considerable number of donors have invested in the Natural Resources and Environmental sectors either directly or through other organizations. The most important ones that emerged during the assignment are: WWF, IUCN, EU, BTC, Norwegian Embassy, DANIDA, Eastern Arc Mountains Conservation Endowment Fund, Tanzania Forest Fund, Tanzania Wildlife Protection Fund, FINNIDA, KEPA, Finnish Embassy, UNDP (fishery SACCOs). 7.4. Role of CSOs in CBNRM: CSOs could potentially play an important role in all four key elements of social accountability: 1. Access to information, leading to improved awareness of CBNRMs and villagers on their rights AND responsibilities: Production of popularized guidelines of CBNRM as well as, by-laws, acts and regulations in Kiswahili Dissemination of the same guidelines, by-laws, acts and regulations, taxation and Mama Misitu newsletter Use the TFS mobile vans with videos (road show) Training of local drama groups on specific themes/topics to perform on market days and schools Development of community radio program Develop “how to claim my rights” manual Environmental education to schools Training of VEC/VNRCs, Village council in SAM Training of village leaders and VEC/VNRC in negotiation and contracting techniques Creation of information Centre (or CRCs sees Forum Syd) at ward/district level (with paralegals). 2. Voice, leading to better representation and improved active participation in the village, ward and council meetings. 90 Regular village and ward meetings and follow up Bring in community radio recordings Ensure connection/communication/involvement of all relevant leaders (including pastoralists) between sub village, village, ward and district levels Support CBOs in the implementation of SAM 3. Influence, leading to better informed decisions as well as less conflicts Monitoring through SAM and Dashboard tools Create district dialogue platform (environment and natural resources) with LGA and private sector Engage with the media for launching of campaigns and advocacy issues Collect evidence and feed into regional and national civil society processes Ensure representation of the local CBOs in national dialogue 4. Sanctions leading to enforcement of the rule of law and respect of people’s rights Introduce Tanzania Forest Justice project at all levels Develop similar mechanism for Wildlife Train the local Police and other law enforcement institutions to respond timely Strengthen village land councils and ward tribunals, paralegals and primary courts Collect evidence of local issues to feed into national debate/dialogue and policy influencing Build up cases/campaigns to present at national level (to advocacy networks as well as to parliamentarians) 7.5. Possible options for strengthening Civil Society in CBNRM related approaches: Option 1: Call for proposal to select several CSOs to form a consortium: one lead and 2-3 others with specialization in WMA, BMU, PFM and VICOBAs. Core funding for 3 years for each and funding of the following capacity building activities: Capacity building in how to conduct IVIS activities (see chapter 7.4) Organization of dialogue platforms at different levels (ward and district) Conflict mediation, rule of law and Tanzania Forest Justice (land right monitors) Training in SAM and Dashboard Service delivery of VLUPs and CBNRM Whistle blowing Support to set up and embedding of VICOBAs and link to CBNRMs Strengthening national, regional and local networks in advocacy and membership management (MANET, TNRF, TFCG, MJUMITA, UNGO, UNGOU, KIUNGO). 91 ID/OD of CSOs (financial management, project management, leadership, proposal writing, facilitation skills, GET Real training (?) and advocacy) Support in linking to funding agencies (FCS, TFF, TWPF, etc.) Possible service providers Mjumita VLUM and PFM, WWF for WMA and BMUs, and CARE for Vicoba’s MJUMITA will be the spill of the program in this option, supporting/strengthening other organizations and also providing services it self. National level: TNRF, WWF, MANET and Policy Forum: advocacy role MJUMITA (in collaboration with TFCG?): managers of project: SAM, Dashboard and Forest Justice introduction to all. Regional and district level: MJUMITA: set up of platforms, set up whistle blowing mechanism, M&E Village/ward/CBNRM level: MJUMITA/WWF: Implementation of VLUPs Connection to the village councils, VEC/VNRC/CBO committees Training of committees in M&E CARE: Introduce VEC/VNRC to VICOBA and ensure link to CBNRM KILORWEMP: Development of similar tools as Dashboard, and forest justice for wildlife and fishery Introduce the newly developed tools to the CSOs to further disseminate 92 Option 2: Call for proposal to select several CSOs to form a consortium: one lead and 2-3 others with specialization in WMA, BMU, PFM and VICOBAs. NO core funding but only capacity building funding for the following: Capacity building in how to conduct IVIS activities (see chapter 7.4) Conflict mediation, rule of law and Tanzania Forest Justice (land right monitors) Training in SAM and Dashboard and other relevant tools Service delivery of VLUPs and CBNRM Whistle blowing mechanism Support to set up and embedding of VICOBAs and link to CBNRMs Strengthening national, regional and local networks (MANET, TNRF, TFCG, Mjumita, UNGO, UNGOU, KIUNGO) in advocacy and membership management ID/OD of CSOs (financial management, project management, leadership, proposal writing, facilitation skills, GET Real training (?) and advocacy) Support in linking to funding agencies (FCS, TFF, TWPF, etc.) Possible service providers Via UNGO: VLUM and CBNRM and local networks, including CEMDO The recommendation is to concentrate on Kilombero and Ulanga to pilot a model for Social Accountability and in Rufiji for VICOBA’s: Focus is more at regional level with UNGO as starting point. UNGO however will need strengthening itself (strategic plan, staff introduction to CBNRM and internal organizational development). UNGO links between national and local levels through PF on one hand and the district networks at the other hand. It introduces SAM, and mainstreams DashBoard and Forest Justice within the NRM and Environmental CSOs. CEMDO could have a specific role for VICOBAs in the 2 districts. National level: TNRF, MANET and Policy Forum: advocacy role Mjumita (in collaboration with TFCG?): managers of project: SAM, Dashboard and Forest Justice introduction to all. Kilombero and Ulanga: Regional and district level: Connection to UNGO, UNGOU and KIUNGO: communication outreach, training of trainers, set up of resource/information centre, installation of M&E system, and set up of data base, monitoring of progress Use of locally based member NGOs (CEMDO, KVOC, MIBA, SEMA, etc.) implementation of information dissemination, radio program, organization of platforms and monitoring, SAM/Dashboard implementation 93 Rufiji: District and village level: CARE or WWF: could introduce the VICOBAs in Rufiji Option 3: Combination of all through FCS and TFF as funding mechanism to manage the grants to deliver to the locally based organizations including an IDOD budget. A special “pot” for this program will be provided to FCS to manage it for KILORWEMP. CSOs have to respond to invitations to respond to calls for proposals by FCS for this specific “pot”. These CSO have to qualify for the funding according to the regular standards and systems of FCS. A capacity building organization is recruited to strengthen the other organizations to apply for funding at FCS and to empower them in their capacities to play the following roles: Conduct IVIS activities (see chapter 7.4) Organization of dialogue platforms at different levels (ward and district) Conflict mediation, rule of law and Tanzania Forest Justice (land right monitors) Training in SAM and Dashboard Service delivery of VLUPs and CBNRM Whistle blowing mechanism Support to set up and embedding of VICOBAs and link to CBNRMs Strengthening national, regional and local networks in advocacy and membership management (MANET, TNRF, TFCG, MJUMITA, UNGO, UNGOU, KIUNGO). ID/OD of CSOs (financial management, project management, leadership, proposal writing, facilitation skills, GET Real training (?) and advocacy) 94 95 8. CB and OD Plan: 8.1. Capacity Building and organizational development: In order to enhance the capacity of people, teams and organizations in terms of knowledge, competencies, skills, attitude and behavior, capacity building needs to be approached from different angles, namely from the technical/sectorial angle to governance and political angles. For an organization to perform and operationalize its functions, it needs capable people who individually have technical knowhow and relevant skills as well as established and functional processes and systems at organizational level facilitating those people to perform adequately. The socio-political angle addresses the institutional setting in which the organization operates ensuring the long term impact and sustainability of the model. 8.2. Principles9: The reason for building organizational capacity is to contribute to sustainability, ownership, improved delivery of services and a sense of common purpose. It can also enhance institutional flexibility in responding to change, problem solving and learning. Incorporating certain principles in the design, implementation and monitoring of organizational capacity building initiatives and programs is critical to successful capacity building processes and sustainable results. Eight principles regarding capacity building and organizational development have been identified to support the conceptual framework of the assignment. These principles are adapted from existing organizational capacity building frameworks enriched with the contextual situation in Tanzania. These principles include”: 9 Ownership and leadership: Demand driven technical support Participation Context specificity: Evidence based capacity building practices Results-oriented capacity building: Institutional versus organizational capacity development in NRM: Learning and knowledge exchange. Adjusted from Organizational Capacity Building Framework, USAID and Aidstar Two, Technical brief no2, January 2011 96 1. Ownership and leadership: For the capacity building to be effective, the organization subject to the capacity building must own the process and make sure that those who have received support will be able to apply what has been acquired in insight, knowledge, understanding, skills and practices. The organization must simultaneously create an enabling environment for the enhanced capacities to be used so that overall performance improves. This means that the leadership and decision-makers need to own the process and are the drivers of progress. In the case of KILORWEMP, the question is who should be the driver of the Capacity Building process. Within the Ministry the project falls under the Wildlife Development section and its wetland unit. While the research and training section is responsible for the capacity building of the Wildlife Division. At the same time, fishery is not included in this Ministry. This scattered responsibility for the different CBNRM units makes it difficult to fully adhere to this Capacity Building principle. Therefore, the team advises for the project to ensure that a core group of officials within the Ministry is taking ownership of CBNRM, including responsible departments of other Ministries (Livestock and Fishery). It is well understood that the nature of CBNRM, which transfers benefits from the government to communities, is not priority to central government to support as a policy. However, considering the rapidly increasing pressure on land and natural resources in Tanzania and in anticipation of programs, such as SAGCOT and Big Results Now (BRN), it is of utmost importance that communities are involved in the conservation and sustainable management of these resources to ensuring future livelihoods. 2. Demand driven technical support The organization needs to work closely and collaboratively with the technical assistance to identify, participate and endorse the key concepts that are being internalized so that when the external assistance phases out, the organization is capable of continuing without hick-ups. When external local, and international technical assistance is provided, the way the assistance is offered and facilitated is key to the effectiveness and sustainability of the interventions. The provided support must directly benefit those who are supposed to implement changes, as a team, department, LGA or community and also in terms of decreased workload, recognition for improved performance, status and image, and/or other incentives. In the case of KILORWEMP, the same situation as described above prevails for the collaboration with and demand for technical assistance at national as well as district level. Both at national and district council level there is no clear demand for the implementation of the CBNRM approach, since the LGAs as well as the Ministries loose the benefits of current revenue from the natural resources. However, the technical officials related to NRM at district level seem to be 97 motivated and willing to learn since the project provides for the main budget in the NRM sector, which allows them to go to the field. 3. Participation Within any organization, each department and each level has its own roles and responsibilities and related to those, it has its own knowledge, skills and attitude requirements. The levels are interdependent. These requirements are formulated in terms of combined capacities, performance indicators. Therefore, within organizations the team is more important than the individuals. Within the teams, individuals complement each other. In addition, the organization can only achieve its objectives if it is well embedded in the institutional setting, which is constituted by its dynamic surroundings and other stakeholders. The organization needs to be able to deal with these power dynamics therefore requires the skills and competencies to get informed, knows its rights and responsibilities, claims for accountability, influences decisions, negotiates, etc. Figure 8: Types of capacity needs at different levels Source: eMJee Consult 2014 Capacity Building ideally addresses all organizational levels, including other relevant stakeholders, in order to ensure buy-in and commitment, build real local capacity and enhance sustainability. Participation of individuals from different organizational levels in the assessment of capacity needs is therefore required, as well as in the identification of the gaps. In the case of this project, the support will be strongly targeted to the relevant levels, and departments within the Ministry, and adjusted to each level of 98 requirements identified, based on performance issues. Participants will be selected based on their roles and responsibilities to achieve identified results and their potential contribution to change. 4. Context specificity: The selection of approaches, tools and methodologies are based on the context in which the organization, team and individuals operate, its current level of capacity and the available supply of capacity building support in Tanzania. The situation regarding Council management Systems, Human Resources and Council Official Capacities differ in the three districts. However, related to CBNRM, the technical capacities are quite similar. Therefore, there is room for a more general approach for Organizational Capacity Building, meaning that proposed capacity building packages may be offered simultaneously to the three districts. The availability of resources, for example the combined approach with the scholarship program and eventual EU support, may enlarge options for a more institutional approach (especially regarding M&E). 5. Evidence based capacity building practices The wide range of possible capacity building practices may not always be working effectively every where, therefore, the organizational capacity building plan will build as much as possible on established best practices with proven impact in Tanzania and comparable situations. The experience regarding Capacity Building of LGA staff within the LGRP program has shown that mass-training sessions at national level (130 staff at the same time) as well as the mechanism with the standardized courses for the councils to use with the Capacity Building Grants has not been very effective. Most of the Councils tended to invite the training facilitators to the district location instead of going to the training centres for shorter periods and for less specific courses. At the same time, the backstopping support form the Zonal Reform Teams that passed by the councils on a regular basis to provide tailor made solutions to problems, has proven more effective. This and other experiences inspired the team to look at packages and modules that are tailor-made by existing professional organizations and will allow for regular support at the locations over a longer period of time. The packages will consist of a mix and combination of training courses, retreats, site visits, mentoring and coaching sessions. 6. Results-oriented capacity building: The starting point for the conceptual capacity building approach will be the developed performance framework and Theory of Change (as described for each result area in the baseline study), which provides for the indicators to measure progress in achieving the capacity building results. Monitoring these indicators, 99 analysing the impact and identifying the lessons learned will determine if the organization’s capacity building practices were effective. As proposed in chapter 3.4 the capacity building activities will be monitored according to certain indicators that have been identified in direct relation to the 3 project result areas. 7. Institutional versus organizational capacity development in NRM: NRM involves many different sectors and disciplines, which are not necessarily well aligned and coordinated in Tanzania, especially not at ministerial level (though better at the LGA level). There is a clear need to address NRM issues from a more holistic approach, for example either starting from the sustainable wetland management concept, or ecosystems, so that separate sectors can fit into a bigger framework to create synergy and impact, due to their interdependence. Therefore, landscape coordination needs to be integrated into the framework. Hence, the organizational development will need to be directly embedded into institutional development of the concerned sector (which in itself is to be linked to the overall vision) in order to be able to address specific issues from top to bottom and vice versa. 8. Learning and knowledge exchange. Most dividends are gained by documenting, disseminating the information, and applying the lessons learned in follow-up interventions, as well as brokering the knowledge and sharing this information with others. The gain is two fold: It creates the possibility for up scaling to other districts through the scholarship program and other stakeholders. It provides evidence-based information for civil society organizations and policy makers in addressing policy reviews. The project can create learning moments within the project, at district level, at regional and ministerial level and amongst other stakeholders by organizing yearly knowledge exchange events at each level. 8.3. Objectives and scope: The Objective of this Capacity Building/Organizational Development Plan is to strengthen the relevant units in the MNRT Ministry, Regions, Districts and communities in the implementation of the combined CBNRM policies for the benefit of the communities and to contribute to the sustainability of the natural resources. However, capacity building will not be the final answer to all the issues that the team has identified. There is equally need for political will and commitment to use the already available capacities, systems and processes. The plan is focusing on the current outreach of the KILORWEMP project, namely the collaboration with the CBC and Wetlands Units within the Ministry of Natural Resources 100 Management and Tourism, Morogoro and Coastal regions, Rufiji, Kilombero and Ulanga districts, wards, and the villages linked to the selected project sites. However, it is hoped that the staff at district and higher level will use their gained competencies in the rest of the district and region and where relevant even at national level to the benefit of areas and populations outside the project scope. The project is also currently exploring in which way civil society organizations can be included in the project support to the CBNRM process, which include those organizations that can have direct impact on the above-mentioned areas and the involved stakeholders. 8.4. Role of the project The KILORWEMP project has the task to ensure that CBC and Wetlands Units within the Wildlife Division and recently created Task Force at the Ministry, are strengthened and capacitated to take over the developed model by the project after 4 years. Furthermore, the project will guide and facilitate the Regional Secretariat, especially the Assistant Administrative Secretariat for Economic and Productive Sectors (AASEPS), including the RNRO, to provide support regarding CBNRM to the LGAs. Role at national level: • To motivate and capacitate the WD department through the CBC and Wetlands units to take the lead in the CBNRM policy implementation • To guide and facilitate the RS support regarding CBNRM to the LGAs The project teams based at the district level will have to: • To capacitate the LGAs and DFTs to support the lower levels in the establishment and management of the CBNRM units • To facilitate the support to national, regional and district levels CSOs to ensure Social Accountability regarding CBNRM The project team itself will also have to provide substantial capacity building support at district level and lower. Therefore, the project staff itself also need to be strengthened in capacities to mentor, coach, facilitate and strengthen others. The project is currently assessing the scenario of expanding the existing project management team with additional technical assistance in order to do so. The management of the capacity building activities as well as the support to the CSOs will be ensured by the project management at national level with delegated tasks to the district project teams related to the regional and district level activities. At the same time, it needs to be understood that the project has its limitations and it will not be possible for the two BTC projects to absorb all the recommended activities. Another limitation is the setting in which the project operates within the Ministry and therefore, the project will need to find the appropriate mechanism and platforms to engage with other stakeholders and interested parties to address the landscape 101 approach. Due to the enormous complex situation and involvement of many actors the project has decided to focus on specific target sites with the goal of showcasing that CBNRM can deliver actual benefits. Though the capacity building, which is needed to make that goal happen, will also be beneficial for other sites, the project is not able to go beyond those limits. The institutional and organizational approach of the presented Capacity Building Plan is to serve the Ministry and the LGAs (with some help of the KILORWEMP project) in their planning for capacity building in the future. 8.5. Strategy and approach 8.5.1. The strategy The strategy is to address organizational capacity building as a package at each level. Based on the identified performance gaps for each of the result areas, the related actors, who play a role to address these performance gaps, and their capacity weaknesses are the basis for the identification of the capacity building activities. The combined improved capacities will address the specific performance gap for that result area. The rearrangement of all CB activities per actor then constitutes the basis for the packages that are developed into a capacity building plan. The packages will be delivered in three phases: Phase 1: Short term To build commitment at national level for CBNRM and sustainable wetland management mainstreaming To keep/revive momentum at local level (quick wins) To respond to demand for concrete actions To start build relationship with civil society Phase 2: Medium term To deepen and expand commitment for CBNRM at WD units To start strengthening CSOs at all levels. To develop regional level facilitating capacities: AAS EPS and RNRO To strengthen capacity of RC and RNRO in sustainable conflict management To mainstream wetland guidelines throughout the district To build capacity of sector staff at all levels To change mind sets of district teams in facilitating and empowering lower levels To empower lower levels in technical capacities as well as power related negotiations To develop strategy to further explore the 7 commodity chains Phase 3: Longer term To further embed CBNRM in the Ministries To follow up and anchor capacities along the organizational lines To identify and address remaining capacity gaps To address result area 2 102 To support CSOs in playing their role of service provider, watchdog, social accountability monitor and advocacy organization. 103 Table 20: Capacity building approaches and activities on short, medium and long term per BI level Short-term BI Levels National level CB Outcome/approach Medium term Activities CB Outcome/approach Long-term Activities CB Outcome/approach Activities Outcome: Outcome: Outcome: Commitment to CBNRM Deepen and expand commitment for Further embed CBNRM in the Ministries CBNRM within MNRT and create larger commitment of CBNRM for the government, by expanding to a larger stakeholder group. CBC and Build commitment and Package Develop and mainstream Strengthen the capacity of the Package 1c wetland unit ownership at the Ministry, 1a M&E system that cuts across Package 1b Wildlife Division, Forestry and and d through strengthening the CBC all levels by strengthening Beekeeping Division as part of and Wetland Unit within WD, by the capacity of the Wildlife the development of a strategic starting “informally” building a Division plan for CBNRM to develop M&E relationship with the Task Force of key officials. Build commitment and develop Package Implement strategy to roll Package 4b Follow up on implementation of Package 4b strategy for the roll out of the 4a out the SWM guidelines to e the SWM guidelines roll out to 4e Create understanding for the Package Improve the support from Package 1c Address policy issues by Package 1e importance of the CBNRM 1b Wildlife Division to lower and d strengthening the capacity of Sustainable Wetland Management guidelines Task force approach, by using programs, levels the Ministry to negotiate a which are high on the national Strengthen WD to identify settlement regarding the KGCA agenda, such as SAGCOT and obstacles for timely sending based on consensus and Big Result Now, as an entry back the community money compensation and/or point for the Task Force to start collected from CBNRM resettlement (e.g. shareholding) developing a more common with the local communities. vision. 104 Regional level Outcome: Strengthened capacity of Outcome: Mainstreaming of the (to-be) Regional Assistant Administrative developed M&E systems for each Secretariat (AAS) economic and subsector. productive sectors, and RNRO AAS-EPS Strengthen the capacity of Package 2a the AAS-EPS in sustainable Introducing AS-EPS to success Package 2a stories elsewhere. conflict management RNRO Strengthen the capacity of Package 2b Strengthen the capacity of the the RNRO in CBNRM RNRO in M&E of CBNRM Units management and per sector Package 2b sustainable conflict management RS (RC/RAS/ AAS EPS Strengthen the capacity of Package 2c Strengthen the capacity of the the RS (RC/RAS/AAS EPS) to RS (RC/RAS/AAS EPS) to organize for organize a platform for regular between dialogue between stakeholders regular a platform dialogue stakeholders Package 2c and representatives of the lower and levels. representatives of the lower levels. District level Outcome: Respond to demand for Outcome: Strengthen the capacity of Outcome: CBNRM integrated into District concrete actions the DFT to help committees to prepare Development Plans harvesting and management plans and other elements required for the preparation of the approval for NR exploitation DC/ DED Support the development of a Package To understand the benefits comprehensive CBNRM 3a of CBNRM units, the Create NRM dialogue platform relationship between by organizing stakeholder strategy, involving all relevant Package 5a Functional Business council and Package 5d 105 district departments services to business and the meetings revenue enhancement DED/CMT/DPLO To strengthen a limited number Package of LGA management staff (staff 3b To strengthen the capacity of Package 5a Allocation of funds to NRM Package CMT members, Treasurer, related sectors in relation to tax 5c and c DT economists and councilors of paid. Enabling environment to the relevant standing attract investors and traders the committees to understand has improved management systems such as the economic mechanisms Epicor, and the implications of from the DHRO, offices) DPLO, in utilization/application Plan Rep, of OPRAS, Procurement regulations and revenue collection as well as other the will understanding of the link tools, project provide funds to allow the LGA between economic activity, staff taxes and services at LGA to use standardized the relevant courses level. as developed by LGRP. DFT Strengthen the LGA in devolving Package Change mind sets of district Package 3c Follow up and anchor capacities powers to lower levels and to teams in facilitating and and 6b along the organizational lines 3d and 3g strengthen the capacity of the Package 3d empowering lower levels WEO, VEOs Mainstreaming of SWM into Package 4c district to e Package 5a Strengthen the capacity of DFT Package Get insight into business Strengthen the LGA in devolving Package 5b and community leadership to 3g and 3h dynamics to be able to powers to lower levels of village ensure participation of properly advice the CBNRM governments to take minorities and relevant units (via the WEOs, and responsibility population. VEOs) and c 6a 106 Get insight into business Package To strengthen the capacity of Package 3c Strengthen the village Package 5b dynamics to be able to properly 5a DFT to help the committees government and committees to and 6a and 5b advice the CNRM units (via the involve service providers deal with Conflict management, WEOs, and VEOs) such as TAFIRI, TAWIRI, contract negotiation and benefit UDSM or others to conduct sharing stock/resource assessments, Gender mainstreaming and feasibility studies District and village by-laws Support in the preparation of the harvesting and management plans LGA to improve access to Package LGA to improve Package Response to CSOs holding LGA information of the lower levels, 3d and 8c responsiveness to CSOs 3i accountable for transparency as well as civil society Package 3j and accessibility of information Trade officer/ To strengthen the capacity of Package Cooperative Cooperative Officer, Trade 5c dynamics regarding timber, investors and traders has Officer Officer, treasurer and members honey, charcoal, trophy improved of standing committee of hunting, photographic economic and productive tourism, and fishery Understand the Business Package 5c Enabling environment to attract Package 5c sectors to create enabling business environment and understand value chains Lawyer To formulate by-laws and Package Strengthen the involved staff Package 7b Enhance capacity of the primary Package understand the implications 7a to be able to refer community court at district level to enforce 7a To facilitate empowerment of members to the enforcement the by-laws the lower levels bodies such as the police or the DC or the PCCB, PPRA, etc. 107 Chair person To understand the concept of Package Strengthen the capacity to and standing CBNRM and the role to play 3c increase budget allocation to committee Package 3c CBNRM chairs Ward level WEO Strengthen capacity to Package Strengthen capacity to collect document, record, store, share 3f revenue Package 3f Package 3f financial management and and manage and share with M&E constituencies Mainstreaming SWM Village level Strengthen capacity to conduct Package 4d Outcome: To keep/revive momentum at Outcome: Empower lower levels in Outcome: Identify and address remaining local level (quick wins) technical capacities as well as power capacity gaps related negotiations VEO Strengthen capacity to Package To strengthen the capacity of Package 6b To empower the committees to document, record, store, share 3f local communities, own the process and manage and manage and share with committees and leaders in the units constituencies terms of knowledge and Package 6b skills as well as confidence and empowerment for negotiation and contract management. VNRC/VEC/VGS Technical training for VGS Package Strengthen capacity to Package 8d 6c address community benefits and 8h Embedding of VICOBAS Package 8h versus individual benefits (introduction of VICOBAs) CBNRM/CBO Create ownership for CBNRM Package To empower the committees Package 6 a Empowerment for negotiation Package 6a 6a and 6 to own the process and and 6 b and contract management and 6 b b manage the units 108 civil society Outcome: Start build relationship with Outcome: Strengthening of CSOs at all Outcome: Jointly developed action plans civil society levels started. (Knowledge and skills). between CSO and other actors at the district, like CBOs, VEO, LGA, Strategy developed for grant Package 8a Support CSOs in playing their Package 8c, management, strengthen role of service provider, 8d, 8e, 8f internal organization, watchdog, social accountability and 8g present success stories on monitor and advocacy activities in NRM and organization. VICOBAs Civil Society Strategy developed Package Holding LGA representatives, Package by assessing availability and 8a WEO and VEO accountable. 8c,d,e,f,g quality of CSOs in grant management, internal organization, success stories, activities in NRM and VICOBA’s 109 8.6. Type of support and Packages Despite that the DPT had been very clear about the scope of the capacity building plan to the LGA staff, there were still high expectations regarding possibilities for long-term training and career development. However, the consultants confirm that considering the short lifetime of the project (4 yrs), it is not opportune to send officials for scholarships abroad. Most of the technical staff has been through a wide range of technical trainings during the previous projects, either with BTC, WWF or DANIDA, Finnish Embassy, etc. It does not make sense to subject them to the same type of capacity building. Therefore, this capacity building plan will focus (next to basic technical knowledge) more on relationships with and empowerment of lower levels, the interconnecting aspects of organizational development, and facilitation skills. The expected traditional type of capacity building support, such as training courses, workshops and seminars on technical topics will be embedded in packages of support modules complemented by on-the-job mentoring and coaching sessions that support operationalization of the insights, experiences and learning gained during to those events. Per package, one lead service provider will be recruited to organize the complete package, meaning he/she will prepare and organize the modules (trainings or retreats or field visits) by different providers, and will ensure the on-the jobtraining, the individual and organizational learning from beginning to end and is responsible for the expected outcome of that package. Each package will consist of a series of activities (modules) that include at least the following components: – – the preparation of one (or a series of) : • Course (s), and/or • Training (s), and/or • Work shop (s), and/or • Field visit (s), and/or • Retreat (s) or • any other event (s) on specific topics each event will include the formulation of an organizational and individual action plan, which indicates what the person(s) will work on while implementing his/her “normal” plan. This means it is integrated in the existing work plans, it is not an additional “separate” plan. – follow up support and monitoring of the results and progress in implementation of the action plan, by mentoring or coaching on a regular basis (every 3-6 months). The service provider will visit the districts and jointly assess what went well and what did not work out 110 and will provide “on-the-job training” (on average) 2 times after the event with a few months in between the visits. – learning: jointly developing the lessons learnt and way forward. This means that every 6 months there will a session organized with those who have received capacity building and on the job training and lessons learned will be identified and integrated in the next periods. Each package also involves several layers of the organization, where the top layers are supporting lower layers as in a kind of cascade (see figures 9 to 17) of capacity building support (similar to the ToT model). At national level: Package 1: To build commitment and capacity for developing a common CBNRM approach Figure 9: package 1 The required transition: The CBC and Wetland Units will be strengthened to be able to motivate the Wildlife Department (WD) and create commitment regarding CBNRM. These units will be supported by the Task Force to create momentum and policy support for the required change. In a later stage, the WD will involve other departments within the Ministry to commit to CBNRM as well and eventually other Ministries as 111 well. The WD will also be strengthened to support and stimulate commitment of lower levels namely RS and LGAs. The CB activities (as part of the action learning package): At national level the proposed type of capacity building support is as follows: a) To strengthen the Wildlife Division internally, starting with CBC and Wetlands Units, in their capacity to convince the sections and units with the Division, on the community aspect of the management in CBNRM and the WIN-WIN situation for WD. CBC and Wetlands units will be supported in developing a strategy to do so. Facilitate site visits for the Task Force and directors within WD division plus DPP to existing WMAs with successful resource uses (one in Tanzania: Idodi-Pawaga/Enduimet (and eventually one in Nambia)). Purpose is to create understanding on the benefits of the community approach to government and especially to the WD. The project can use the SWM guidelines as the starting point to team building in the Wildlife Division. b) To strengthen and facilitate the Task force to formulate a Kilombero Wetland Management Plan in response to SAGCOT and BRN interventions in especially the Kilombero Valley, during a retreat (2-3 days) on a location where they can visit, WMA, BMU and PFM units. Purpose is to develop common vision and jointly strategize, get organized amongst the divisions and build trust. c) To strengthen a wider group of stakeholders such as technical officials from MNRT (3 directors), Livestock and Fisheries (2 Directors), Land (3 directors), VPO (director environment), Agriculture (director irrigation), Water (director water catchment), and PMO-RALG (sector coordination, plus RNRO/AAS EPS) in a common vision, joint approach and action plan during retreat (2-3 days) on a location where they can visit PFM units such as Kiteto and Kilwa PFMs to understand the potential for CBNRM. d) To strengthen technical and management officials, as well as Civil Society and Private sector representatives around the CBNRM sub sectors and have 4 participants per subsector to join in a tour of site visits to create mutual understanding for possible collaboration and be inspired by other subsectors to further develop one’s own subsector. Facilitation of 12 people to visit one WMA, one PFM and one BMU in Tanzania (e.g. Kilombero: KVTC, Kiteto, Kilwa, Iringa for PFM, Idodi-Pawaga WMA (Iringa) and for the BMU (need to find out location of successful river basin BMUs). Potential service providers: (to be recruited through call for proposal) Tanzanian Consultants: ESAMI, MS-TCDC, AMKA Universities: Sokoine, Ardhi Institutes: CBNRI (Likuyu Sekamanaga), IRDP (Dodoma) 112 Table 21: Overview package 1 Who: BI Why: outcome a) Convince Wildlife Division sections and units internally starting within the Division. management Create CBNRM with CBC Wetlands Units and What: content the How: activities and core modules within the package Output on the community Facilitate site visits for Common aspect the of the in directors strategy, Consultants (AMKA, Force and jointly developed, ESAMI, MS-TCDC) within WD for roll out of SWM Belgium University the division WIN situation for existing the benefits of the WD. successful community Sustainable uses (one in Tanzania: CBNR Institute Likuyu Wetland Idodi-Pawaga/Enduimet Sekamanga Pasiansi understanding approach on to and Task Potential providers plus WMAs government and Management and especially the Guidelines Nambia) to WD. DPP to with resource possibly one guidelines and CBNRM Sokoine University Ardhi University, harmonization in training institute Development of short courses and tailor made training sessions regarding SWM guidelines b) formulate Task force Kilombero Wetland vision Management strategize, in response develop Plan to SAGCOT and BRN common jointly get Organize days) WMA, the units build trust. and on a (2-3 location where they can visit, organized amongst divisions retreat BMU and PFM Common vision, Consultants (AMKA, strategy and action ESAMI, MS-TCDC) plan Belgium University ?? Sokoine University Ardhi University, CBNR Institute Likuyu 113 Sekamanga c) to understand the common Directors MNRT (3), potential joint approach and days) Livestock CBNRM. action plan where and for vision, Organize retreat on a they can Consultants such Fisheries (2), Land (3), Kiteto and Kilwa PFMs Belgium University ?? as Sokoine University Ardhi University, (environment), CBNR Institute Likuyu Agriculture (irrigation), (water (AMKA, ESAMI, MS-TCDC) visit PFM VPO units (2-3 location Sekamanga Water catchment), and PMO-RALG (sector coordination, plus RNRO/AAS EPS) d) Create Technical and mutual understanding management possible officials, as well as collaboration Civil be society Private and sector representatives; participants subsector 4 per for CBNRM sectors: BMU, inspired and by VLUPs PFM sub Organize visit to one WMA, WMA, one PFM and one ESAMI, MS-TCDC) and BMU in Tanzania (e.g. Belgium University ?? Kilombero: KVTC, Kiteto, Kilwa, Iringa for Consultants (AMKA, Sokoine University Ardhi University, other subsectors to PFM, further WMA (Iringa) and for CBNR Institute Likuyu the BMU Sekamanga one’s develop own Idodi-Pawaga CBNRM action plans subsector. 114 At regional level: Package 2: to build capacity of RS staff to respond to concerns and request for support from the LGA levels, Civil Society as well as Private sector. Figure 10: package 2 Package 2: RS support to LGA RS Crea on Dialogue pla orm for CBNRM AAS EPS Crea on Business Council Ensure applica on of M&E system RNRO RLO Conflict management LGA DFT The required transition: The regional secretariat will need to play its role in creating a dialogue platform, which will provide space to accommodate the concerns of the private sector, civil society and the CBNRM governance structures. Therefore, it needs to be well informed and familiar with the CBNRM concepts and practical implementation at lower levels. The business council, which is to be driven by the RC, needs boosting and the agenda needs to be developed in joint action with the stakeholders. There are several M&E efforts ongoing. It is hoped the project will be able to strengthen some of the existing M&E systems and develop simple tools for the lower levels to use these systems. The RS has the task to closely follow the M&E for all NRM sectors and needs to be strengthened in the existing and new systems for Land, Forestry, Fishery and Wildlife. Strengthen the capacity of the AAS EPS and RNRO to understand, support and develop a common CBNRM approach into their own thinking as well as their development plans and their support to the LGA level. The CB activities (as part of the action learning package): a) Strengthen the capacity of the AAS EPS and RNRO to connect not only to LGAs but also to civil society and private sector to meet and create space for 115 the stakeholders to voice their concerns. Facilitate training on multistakeholder processes and support them to apply the concept in their daily life. This will include working towards empowering lower levels by facilitating and strengthening their capacities rather then directing, as well as more skills development in trust building, conflict management and negotiation. b) Strengthen the capacity of the AAS-EPS and RNRO to coordinate and implement the application of the M&E systems per sector between the different levels c) Strengthen the capacity of the RS (RC/RAS/AAS EPS) to organize a platform for regular dialogue between stakeholders and representatives of the lower levels. This will include creating understanding of these types of dynamics and keep it issue based and practical. This capacity needs to be built by external facilitators or experienced local consultants. Potential providers: Consultants: AMKA, ESAMI, MS-TCDC Universities: Belgium Universities, Sokoine, Ardhi Institutes: CBNRI, IRDP 116 Table 22: Overview package 2 Who: BI Why: outcome What: content How: activities Output Potential providers a) AAS EPS To understand, support Common CBNRM approach Coaching on CBNRM included in LGA ESAMI, MS-TCDC and RNRO and develop a common and coordination skills, integrated development Belgium Universities, CBNRM approach into CBNRM integration into Training in plans own thinking as well as LGA development plans, strategic planning, Relevant M&E reports Sokoine, Ardhi Strategic planning, CBNRM SWM and CBNRM SWM guidelines applied CBNRI, IRDP, M&E system and indicators common approach Sustainable Wetland Training in M&E Management system, collection development plans and support to the LGA level. To support the mainstreaming of the SWM guidelines Pasiansi of data and To monitor and evaluate aggregation of CBNRM data b) AAS EPS To implement the M&E per sector: to be Training in existing Skills in multi- and RNRO application of the M&E developed and existing, institutes followed stakeholder management systems per sector eg. by mentoring and Skills in trust building, NAFOBEDA coaching conflict management and ESAMI, MS-TCDC negotiation. c) RS To create understanding Coordination and To organize a Functional Dialogue Belgium (RC/RAS/AAS of CBNRM dynamics and stakeholder management platform for Platform Universities, EPS) keep it issue based and (skill) regular dialogue practical. Issue based dialogue between (skill) stakeholders and CBNRM issues (technical knowledge) Sokoine, Ardhi representatives of the lower levels. 117 At district level Package 3: facilitation and empowering skills of DFT Figure 11: package 3: Package 3: LGA support to village CMT NTA DPC Visioning and ac on plan Resources and staff management DFT Internal team building, informa on flow facilita on Facilita on, suppor ng, empowering lower levels WEO Ensure par cipa on, and monitoring Village chair VEO VLUP and CBNRM guidelines Conflict management Village assembly VGS VEC VNRC Clarify commi ees, NR protec on The required transition: The project (NTA and DPC) will strengthen the DFT to enhance the CMT’s capacity to integrate the CBNRM activities into its council development plan so that it can provide for resources and staff. Secondly, in order for the Council to function and support properly the NRM sectors, the departments need to be able to manage the generic management systems such as PlanRep, Epicor, LAWSON, OPRAS etc. on one hand and improve their capacity to coordinate, empower and support lower level on the other hand. The establishment and management of the specific CBNRM units need specific knowledge and capacity from all the layers of actors involved: from the DPT to the DFT to the WEOs and VEOs to the communities. The DFT staff has to be strengthened in terms of facilitation skills to support the WEOs and VEOs in helping the villages to establish their CBNRM units and committees. Especially the capacity to involve and seek the participation of the community and minorities is crucial for the rest of the process, which should be done in close collaboration or through the WEOs and VEOs. The council’s capacity to collect data for monitoring purposes and to measure performance will equally be enhanced. KILORWEMP already within its work plan intends to undertake policy review and management planning in relation to fisheries within the KGCA, however, it is 118 advised that broader short courses should be arranged in boundary conflict management and resolution as part of capacity building of the DFT. Such courses may be tailor made to be similar to ones already being offered at ESAMI or Mzumbe University. The idea is that treating fisheries in isolation from broader boundary conflict issues may not be as effective. The CB activities (as part of the action learning package): a) To strengthen the CMT in application of CBNRM strategy and action plan by organizing a workshop with the relevant HoDs, during which the DFT will support the CMT to generate the action plan. b) To strengthen a limited number of LGA management staff (staff from the DHRO, DPLO, DT offices) in the utilization/application of the management systems such as Epicor, Plan Rep, OPRAS, Procurement regulations and other tools, the project will provide funds to allow the LGA staff to use the relevant standardized courses as developed by LGRP. c) To strengthen the DFT in less technical skills such as: Visioning and CBNRM action plan development at CMT and full council level to: i. Understand benefits of CBNRM and the implications for council management. ii. Strengthen the councillors of the standing committee of Economics, Works and Environment as well as the chairperson of the council to understand the concept of CBNRM and the role for them to play: iii. Facilitate a site visit to a success story of closest CBNRM d) Internal strengthening: Interconnecting between levels, information flow facilitation, team building and trust building with stakeholders CBRNM governance and leadership: transparency, facilitation, accountability, leadership, organization development, and financial management. Land use planning: identification, design, appraisal, and M&E Negotiation, communication, and coordination Quality indicators for CBNRM M&E Linking CBNRM and conservation e) Development of broader short courses should be arranged in boundary conflict management and resolution as part of capacity building of the 119 DFT. Such courses may be tailor made to be similar to ones already being offered at ESAMI or Mzumbe University. f) Facilitation and empowering of lower levels including strengthening the WEOs and VEOs in specific skills such as: 1. Awareness creation for CBNRM manual for VNRC and councillors 2. Documentation and record keeping 3. Revenue collection 4. Financial management 5. Interconnection between levels 6. Monitoring g) Ensure participation and community engagement consultation of minority, negotiation, Conflict resolution h) Clarify committees and NR protection In the line of civil society support the DFT also needs to be introduced to social accountability, including the importance and response to: i) Request for information j) Advocacy activities by CSOs (eg. SAM etc.) To strengthen DFT in specific technical knowledge and skills: k) In each of the sectors, the relevant professionals need to be strengthened in the interpretation of the respective stock assessments (fish frame survey, forest inventory, and wildlife survey based on areal photographs) l) At least one DFT member in each district should be capacitated in the application of GIS through existing courses in the country. Potential service providers: Consultants: ESAMI, MS-TCDC AMKA Universities: Ardhi University of Sokoine (SUA) University of Dar es Salaam (UDSM) University of Dodoma (UDOM) University College of Cooperatives and Business Studies (MUCCoBS) Research institutes: wildlife research at TAWIRI (Arusha), forestry at TAFORI (Morogoro), fisheries at TAFIRI, etc. Training centres: Wildlife training centres at Mweka, Pasiansi and Lukuyu Sekemaganga, Forest and beekeeping at Olmontonyi and Moshi, 120 Fisheries centre in Nyegesi (Mwanza) Local Government Training Institute (LGTI) at Hombolo Standardized LGA courses providers LGA systems support: Epicor, PlanRep, etc. (see scholarship program) 121 Table 23: Overview package 3 Who: BI Why: outcome What: content How: activities Participants per unit WMA a) CMT Vision Benefits of each Workshops of 2 days development on of the CBNRM per topic, theory and common units, business exercise to practice approach CBNRM concepts and Followed by coaching revenue over 6 months period collection (see DFT to be BMU PFM DED, HoDs Possible inter district modules 3 districts combined) b) LGA To Epicor, Plan Relevant standardized management utilization/applica Rep, OPRAS, courses as developed tion Procurement by LGRP. c) DFT enhance of the management regulations and systems other tools To understand DPLO, DT, HRO, DIA Benefits of each Workshops of 2 days DFT, DFsO, DFO, DGO, benefits of of the CBNRM per topic, theory and DHRO, DNRO, legal, DLPO, CBNRM and the units, business exercise to practice DLNRO, DLFO, DPT DCDO, implications for concepts and Followed by coaching DT, DCDO, DFsO, council revenue over 6 months period DFsO, DHRO, DPT management. collection CBRNM DGO, DFO, DPLO governance and leadership Quality indicators for 122 CBNRM M&E Linking CBNRM and conservation d) DFT Interconnecting Facilitation Workshops of 2 days DED, DFT, DED, DED, DLPO, between levels, Team building per topic, theory and DLNRO, DFsO, DFO, DGO, information flow Communication exercise to practice DT, DCDO, DNRO, DLPO, Followed by coaching DFsO, DLFO, DPT DCDO, over 6 months period DGO, DFO, DFsO, DPLO DHRO, DPT facilitation, team building and trust building with stakeholders Coordination Trust building Stakeholder management Negotiation, communication, coordination e) DFT To increase Conflict Short courses or tailor DGO, DFsO, DCDO, capacity to avoid management made courses DCDO, DNRO, DNRO, and settle and resolution DNRO, DLFO, DFO DLFO, DFO conflicts skills in DLFO, boundary disputes f) DFT able to Awareness CBRNM manual Workshops of 2 days DFT, DFsO, DHRO, DFO, strengthen creation on to Documentation per topic, theory and DHRO, DNRO, DGO, DLPO, WEOs and VNRC and record exercise to practice DLNRO, DLFO, DPT, DLO, DCDO, Interconnection keeping Followed by coaching DT, DCDO, DCDO between levels Revenue over 6 months period DFsO, VEOs collection Financial DGO, DFO, DPLO 123 management M&E g) Ensure VLUP and Workshops of 2 days participation and CBNRM per topic, theory and community guidelines exercise to practice Officer, engagement Negotiation, Followed by coaching DHRO, DFO, consultation of Conflict over 6 months period minority resolution Gender DCDO DFsO, DCDO, DCDO Cooperative Study tours on step 4, 5 and 6 of VLUP mainstreaming District by-laws h) Clarify Committee Workshops of 2 days DFO, DLO, DFsO, Legal, differences guidelines per topic, theory and DGO, DFsO DNRO, DHRO, NR protection exercise to practice DGO, DFO DCDO, DLO, between committees and Followed by coaching NR protection over 6 months period DFO, i) Standing To understand CBNRM concept Workshop of 2 day Standing Standing Standing committee of the concept of Roles and Facilitate a site visit to committee committee committee Economics, CBNRM and the responsibilities a success story of Council Council Council Works and role for them to for councilors in closest CBNRM chairperson chairperson chairperson Environment play: CBNRM DGO DFsO DFO To be able to Access to Workshops of 2 days DPT, DGO, DCDO, DFO, DLO, respond to CSOs information per topic, theory and HoD, DFo, DFsO, DCDO, legal, and council chairperson j) and k) DFT 3 districts 124 Advocacy exercise to practice DFsO, DLO, DFsO, activities by Followed by coaching cooperative, CSOs (eg. SAM over 6 months period DPT etc. j) and k) DFT To be able to Stock Existing facilitate the assessment course/training with committees to interpretation follow up on the job establish, (Fish frame training over a period manage and survey, Forest of 6 months monitor VLUP, inventory, Areal WMA, BMU and Photographs for PFM wildlife) DFO/DGO/DFsO/DLO/ GIS 125 Package 4: Mainstream wetland management throughout district management Figure 12: package 4: The required transition: The limitations of the SWM guidelines described in chapter 4.2.4. can be overcome in a capacity building process by ensuring that project interventions focus on leadership by both the Wildlife Division and the District CMT’s to place CBNRM activities at the heart of district development. There is also a need to undertake team building amongst district staff and in the Wildlife Division. The guidelines can be used as the starting point of team building. Although many staff have attended wetlands and sector natural resources training in the past, it is now time that short courses or even tailor made training sessions should be held with a cross sector team from each district. The guidelines can then be introduced and discussed in a team setting. A popularized version of the SWM guidelines could be developed in collaboration with organizations such as WWF or other CSOs competent and equipped for such activities. The utilization of that version need to be absorbed by the relevant DFT staff for them to introduce to the lower levels. The capacity building must also be result-oriented so that problems, which persist can be dealt with by project management. In the absence of monitoring results, the guideline elements that offer the least impact will continue without being revised. 126 CB activities: a) To strengthen the CMT in the roll out of the SWM guidelines by organizing a workshop with the relevant HoDs, during which the DFT will support the CMT to generate an action plan. b) To strengthen a limited number of LGA management staff (staff from the DHRO, DPLO, DT offices) in the utilization/application of the guidelines by organizing a workshop and use the guidelines to strengthen the DFT in teambuilding. c) To organize short courses in SWM to district staff that have not been trained in SWM yet. Potential service providers: Universities: University of Sokoine (SUA) University of Dar es Salaam (UDSM) Research institutes: wildlife research at TAWIRI (Arusha), forestry at TAFORI (Morogoro), fisheries at TAFIRI, etc. Training centres: Wildlife training centres at Mweka, Pasiansi and Lukuyu Sekemaganga, Forest and beekeeping at Olmontonyi and Moshi, Fisheries centre in Nyegesi (Mwanza) 127 Table 24: Overview of package 4: SWM mainstreaming Who: BI Why: outcome What: content How: activities Output Potential providers a) WD To support and SWM guidelines develop a strategy to Training in strategic Action plan to roll Pasiansi Training planning and SWM out SWM to the centre roll out the SWM districts guidelines b) AAS EPS To implement the and RNRO c) DFT Short courses for Joint sector Pasiansi Training application of the introduction to SWM and approach centre SWM guidelines the use of the guidelines To create SWM issues SWM short courses to Functional Pasiansi Training understanding of SWM Coordination and stakeholder untrained DFT staff Dialogue Platform centre dynamics and keep it management (skill) Regular team meetings Team building amongst DFT To introduce WEOs SWM guidelines Workshops with WEOs and VEOs Pasiansi Training and VEOs to SWM Coordination and stakeholder WEO/VEOs on SWM and have permanent centre management (skill) how to use the guidelines access to the issue based and practical. d) WEO/VEO SWM guidelines guidelines as reference e) VEC/VNRC/ To introduce the DFT visits and work CBNRM Pasiansi Training WMA/BMU/ CBNRM communities SWM guidelines session for introduction communities have centre PFM to SWM to SWM and the use of permanent access the guidelines to the guidelines as reference 128 Package 5: Strengthen capacity to create enabling business environment for DFT plus (with lawyer, cooperative officer, trade officer, TFS, TCCIA and the project staff) Figure 13 Package 5 The required transition: The DFT members need to be strengthened in the business side (value chain dynamics) of the Natural Resources products (timber, honey, etc.) so that they can facilitate the connection of the communities with the businesses and help the communities to find their way to the markets. The DFT, however, should not do the studies themselves (though it is beneficial for the project if they participate in the field visits) nor become the formulators of the plans. At lower level the DFT needs to facilitate the WEOs and VEOs to support the communities in the benefit sharing, conflict management and the negotiation and contracting skills. The Management of the LGA needs to be strengthened to understand and implement its role in creating an enabling business environment, including providing services and goods: infrastructure, legal regulations, permits, licenses, law enforcement, etc. It also needs to gain insight in the council role regarding the revenue collection and the services to provide. The CB activities: a) To be capacitated in terms of insight into business dynamics and see opportunities for revenue enhancement against the relevant service delivery, the project should first conduct a series of studies on the natural resource product value chains, the active actors involved, the market issues, and the possible connection to the CBNRMs to begin with. During 129 the implementation of the study the DFT can be involved to gain insight and to be able to facilitate the communities later. By using the field visit notes in preparation of their visits to the communities, the DFT can develop a booklet with guidance on how to support the CBNRM units in this business approach. b) For the harvesting plans the DFT should be able to support the CBRNM units by inviting MNRT and MLFD to assist with conducting and interpreting stock assessments. c) To become facilitating/conducive instead of bureaucratic in order to attract investors and businesses to invest in the council. The Cooperative Officer, Trade officer and the TCCIA chairperson need to be supported through tailor made on-the-job training. d) To create a platform for businesses to discuss obstacles and issues, by supporting the DC and the Lawyer to organize stakeholder meetings that can be institutionalized to address issues related to doing business in the district. To bring stakeholders from different angles and levels together to address issue based topics related to CBNRM management. e) To get insight into business dynamics by DPLO/DT and see opportunities for revenue enhancement against the relevant service delivery Revenue enhancement Potential service providers: Consultants: ESAMI, MS-TCDC AMKA Universities: Ardhi SUA UDSM UDOM Research institutes: wildlife research at TAWIRI (Arusha), forestry at TAFORI (Morogoro), fisheries at TAFIRI, etc. Training centres: Wildlife training centres at Mweka, Pasiansi and Lukuyu Sekemaganga, Forest and beekeeping at Olmontonyi and Moshi, Fisheries centre in Nyegesi (Mwanza) Local Government Training Institute (LGTI) at Hombolo 130 Table 25: Overview package 5: use of NR Who: BI Why: What: content How: activities Participants per unit outcome a) DFT WMA BMU Possible inter PFM Get insight Business Participation in DGO, Trade DGO, DFO, DFsO, DFO, trade , into business dynamics surveys of each of officer, DFO, DCDO, DLO DNRO, DT, dynamics to regarding the commodities, DFsO, HoD be able to timber, honey, starting with DCDO, properly charcoal, trophy timber, honey, and Beekeeping , DPT advice the hunting, fishery CNRM units photographic Visits to KVTC (via the tourism, and (timber), honey WEOs, and fish (Singida, Dodoma) VEOs) How to prepare fishery (Mufindi) field notes and hunting lodges development of (KNSL, Wild guidelines per frontiers limited) CBNRM Workshop of 2 day district modules 3 districts Cooperative, on each of the commodities dynamics and relevant issues for the CBNRM units b) DFT To support Preparation of DFT trains the reps DFO, HoD, DGO, committees/ the harvesting from the DCDO CBOs and committees at management district level and DFsO, DGO, DFO DFO, DBO, DCDO, cooperative, DLO 131 plans provides coaching during field trips To Conflict DFT trains the reps Legal officer, DCDO, legal officer, DLO, DFO, legal, strengthen management, from the HoD, DLO, DGO, divisional secretary, DT, DCDO, the village contract committees at DHRO, (DFO, WEO DHRO, trade government negotiation and district level and DFsO Ulanga, and benefit sharing provides coaching because BMU in committees Gender during field trips WMA) 3 districts mainstreaming District and village by-laws c) Cooperative Get insight Business Visits to KVTC DGO, Trade Trade officer, DFsO, DPLO, Trade, officer into business dynamics (timber), honey Officer, DLO, CBO leaders DFO, DBO, legal, Trade officer, and dynamics regarding (Singida, Dodoma) Economist, HoD TCCIA and see timber, honey, fishery (Mufindi) opportunities charcoal, trophy hunting lodges for revenue hunting, (KNSL, Wild enhancemen photographic frontiers limited) t against the tourism, and Workshop of one relevant fish day on each of the service Value chains commodities delivery and dynamics and stakeholders relevant issues for Village and the CBNRM units DLO, DCDO, cooperative district by-laws To become Business Visits to KVTC DGO, Trade Trade officer, DFsO, DPLO, Trade, 2 districts /1 132 facilitating/ dynamics (timber), honey Officer, DLO, conducive to regarding (Singida, Dodoma) Economist, HoD attract timber, honey, fishery (Mufindi) investors charcoal, trophy hunting lodges and hunting, (KNSL, Wild businesses photographic frontiers limited) to invest in tourism, and Workshop of one the council fish day on each of the CBO leaders DFO, DBO, legal, district (Rufiji) DLO, DCDO, cooperative commodities dynamics and relevant issues for the CBNRM units d) DC, lawyer To create a Issue based Organize joint DGO, Trade Trade officer, DFsO, DCDO, trade, platform for topics identified meeting of Officer, DLO, HoD CBO leaders, NGO DHRO, DLO, businesses by stakeholders stakeholders from legal, DFO, to discuss different angles cooperative, obstacles and levels together and issues to address issue based topics e) DPLO/DT To get Revenue Workshop of one insight into enhancement day on each of the business Economic commodities dynamics principles dynamics and and see opportunities for revenue enhancemen Service delivery related to value chains DGO, Trade Officer, DLO, Economist, HoD, DFsO, CBO leaders, DPLO, DFO, DBO, legal, DCDO, cooperative relevant issues for the CBNRM units Workshop of 2 days on how to 133 t against the strategize on relevant revenue service enhancement delivery based on the use of the NR products 134 At Village level: Package 6: To strengthen village leadership in leadership, negotiation, contract management, conflict resolution Figure 14 Package 6: The required transition: This transition situation is about the strengthening of the lower levels by the DFT via the WEOs and VEOs. There is, however, still need for external service providers for providing on-the job training in mentoring and coaching skills for the DFT members. In this package, the Village Game Scouts and lowest level of community members can be easily and rather quickly supported by training at existing institutions. The official training for village level participants could boost the motivation of the villagers and therefore be considered as a quick WIN. The CB activities (as part of the action learning package): a) The project staff and DFT to train the VNCR/VEC, Village chairs in (to be developed) CBNRM/SWM guidelines and leave them with a copy of the Kiswahili manual. b) To strengthen the village leaders, village chairs, committees chairs, VEO, WEO, ward chairperson at a training institute such as Lukuyu – Sekemaganga or Pasiansi on the short term and support them through the project team and DFT with backstopping and mentoring to implement the skills at the long term. 135 To motivate the communities and the committees and to empower them in their roles to play c) Training of all untrained VGS at Lukuyu –Sekemaganga or Pasiansi and provide them with some basic materials such uniforms and boots (eventually also tents) d) To strengthen the DFT in facilitation, coaching and mentoring skills through on-the-job training. Potential service providers: Wildlife training centres at Mweka, Pasiansi and Lukuyu Sekemaganga, Forest and beekeeping at Olmontonyi and Moshi, Fisheries centre in Nyegesi (Mwanza) Local Government Training Institute (LGTI) at Hombolo 136 Table 26: Overview package 6: village level Who: BI Why: outcome What: content How: activities Participants Possible inter district modules WMA BMU PFM Development of DEMO, All DFTs DFO, Difficult to combine a) Game officer, To empower the WMA, BMU and PFM Forester, Fishery committees to own guidelines user friendly DGO, DEMO, because very Officer, DCDO, the process and Facilitation skills on guidelines for DFO, DPT legal, context specific manage the units empowerment of lower level lower levels officials and communities in Coaching and mentoring skills DHRO, DPT Kiswahili Workshops on facilitation, coaching and mentoring skills to empower others b) WEOs and To empower the WMA, BMU and PFM Workshop on DEMO, VEOs committees to own guidelines latest version of DGO, DEMO, the process and Facilitation skills on the WMA, BMU DFO, DPT legal, manage the units empowerment of and PFM lower levels guidelines Patrolling practices All DFTs DFO, DHRO, DPT Workshops of two days on facilitation skills empower others Village leaders, To empower the Leadership, Training at DGO, DFsO, DFO, legal, 137 village chairs, committees to own conflict resolution Lukuyu- DFO, DGO, DLO, committee the process and Benefit sharing Sekemaganga/Pa HoD, DFO DCDO, chairs manage the units siansi DHRO, DHRO, DEMO, VNRC/CBOs To empower the Leadership, committees to own conflict resolution the process and manage the units Benefit sharing Training at DGO, DFsO, DFO, legal, Lukuyu- DFO, DGO, DLO, Sekemaganga/ HoD, DFO DCDO, Pasiansi DHRO, DHRO, DEMO, c) VGS To motivate en Best practices in capacitate VGS NR patrolling, and law Training at Lukuyu- protection enforcement Sekemaganga/ DGO, DGO, DFO, DFsO, DHRO, DBO, Pasiansi 138 Package 7: strengthening law enforcement mechanisms Figure 15 Package 7 The required transition: The current existing system to enforce the land use plans as well as the CBNRM plans is highly necessary and needs serious strengthening. The system as such is well defined, but the staff involved is not well capacitated and the roles and responsibilities are not well understood by all. At district level the staff availability is very limited while very much needed to support all the levels. There is need to clarify the direct link between law enforcement and CBNRM and Land use planning on one hand and referring the way to other enforcement bodies at the district on the other hand. The CB activities: a) Develop a package with a service provider and LGA lawyers to strengthen LGAs staff, primary court staff, ward tribunals, and village land councils as well as district land councils in which the system is applied according to the regulations and where each level understands and know how to play its role and knows where to go for further support. b) Strengthen the involved staff to be able to refer community members to the enforcement bodies such as the police or the DC or the PCCB, PPRA, etc. 139 c) Strengthen community members to protect their land and their natural resources, by providing them with the training to learn how to patrol and how to enforce the regulations. Potential service providers: Legal secretariat (DANIDA) Lawyers for Environmental Action in Tanzania (LEAT) TAWLA (Tanzania Women and Legal association) Legal Human Rights Centre (LHRC) 140 Table 27: Overview package 7: law enforcement Who: BI Why: outcome What: content How: activities Participants WMA a) LGA To formulate by-laws Importance and benefit of lawyers and understand the implications To facilitate the district, PFM Workshop of one Legal NGO, DLO, rules and regulations for day on rules and officer, DGO, legal, CBNRM implementation for regulations of DLO, DFsO, DHRO, legal, DFO, empowerment of the How to formulate by-laws lower levels Village and district By-laws Facilitation to empower BMU Possible inter CBNRM Training on by- DCDO, laws formulation DBO Workshop of one laws enforcement a) Primary Enhance capacity of Clarification of roles and Workshop of one Legal NGO, DLO, court, ward the primary court at responsibilities day on rules and officer, DGO, legal, tribunals, and district level to Legal instructions on how regulations of DLO, DFsO, DHRO, village land enforce the by-laws to enforce by-laws legal, DFO, Village and district by-laws 3 districts day on local by- others in CBNRM law councils district modules CBNRM Training on law DCDO, enforcement DBO 3 districts Workshop of one day on local bylaws b) DC, DED To strengthen existing Importance and benefits of law enforcement rules and regulations for Participation in organized CBNRM implementation for workshops with HoD LGAs on the 141 the district, subject Village and district By-laws c) to enforce the by-laws Clarification of roles and Workshop of one Legal NGO, DLO, VGS/VNRC/ or to refer responsibilities day on rules and officer, DGO, legal, CBO communities to higher Legal instructions regulations of DLO, DFsO, DHRO, legal, DFO, levels. To negotiate and manage contracts Village and district by-laws Negotiation skills Contract management CBNRM Training on law DCDO, enforcement DBO 3 districts Workshop of one day on local bylaws 142 At civil society level: Package 8: to strengthen several levels of networks to become stronger partners in relation the LGAs and CG (also see chapter 7). Figure 16 package 8 The required transition: Most civil society organizations need internal strengthening in terms of individual competencies in service delivery (VLUP or CBNRM) as well capacity building of their organizational processes and systems. The NGO networks that reach out from regional to community level need to be strengthened in terms of CBNRM knowledge and application of the tools. Because most organizations are service delivery oriented, they need to be strengthened in the competencies to facilitate access to information, their capacity to mobilize community members around an issue, to organize the people to meet and get organized in order to select representatives. The regional and district level CSOs need to be strengthened to implement transparency and accountability tools such as Dashboard and SAM. At the same time, there already exist whistleblowing models in forestry sector that can be introduced in the project area by training the CSOs and developing similar tools for Wildlife and Fishery. Finally, in order to be able to paly their advocacy role at national level CSOs need to be able to collect relevant information at the local level to build their case for policy influencing. 143 The CB activities (as part of the action learning package): a) Capacity building in internal ID/OD development b) Prepare them to provide CBNRM services, c) Strengthen them to implement IVIS activities, (is large: access to information, voice and influence, negotiations and sanctions) which will require to develop mechanism to whistle blow, to set up debates and dialogue platforms, and empower village and ward tribunals d) Train them in SAM to improve services and e) Train them in Dashboard to monitor NRM accountability, f) Train them to prepare advocacy evidence and g) Support them to interconnect to upper and lower levels h) Introduction or strengthening of VICOBAs Potential service providers: International NGOs: WWF CARE National NGOs: TFCG Mjumita TNRF Haki Ardhi 144 Table 28: Overview package 8 Who: BI Why: outcome What: content How: activities Possible inter district modules Regional and a) To strengthen the Internal ID/OD district level organizations in development NGOs ID/OD b) To prepare them to CBNRM legal steps and provide CBNRM management To be developed 3 districts To be developed 2 districts (Kilombero and services, such as Ulanga) VLUP, WMA, BMU, and PFM establishment c) Strengthen them to IVIS To be developed 2 districts hold government Dash board and SAM (Kilombero and accountable implementation Ulanga) whistle blowing dialogue platforms advocacy d) Empowerment of law enforcement village leaders and VICOBAs To be developed (Kilombero and ward tribunals Ulanga) e) Support them to Information sharing and interconnect to upper communication techniques and lower levels 2 districts To be developed 2 districts (Kilombero and Ulanga) 145 At project level: Package 9: NTAs and DPCs need to be strengthened in specific skills Figure 17 package 9 The transition required: The DPC and NTAs need to participate in a minimum of the district packages in order to be able to give backstopping services. In addition, the project team needs to be strengthened in specific skills such as mentoring and coaching, which is an important part of their task in strengthening the DFT. In addition, they need to be introduced and become familiar with council management systems (PlanRep and Epicor, etc.) to be able to align the project program to the existing systems. The CB activities (as part of the action learning package): a) To capacitate the project staff (district coordinators and technical assistants) in mentoring and coaching skills b) To introduce the DPT to Epicor, PlanRep, OPRAS, procurement and M&E systems c) To capacitate the project staff in social accountability concept and tools d) To capacitate the staff to facilitate information availability for different levels, eg. regular presentations at LGA level, promote learning sessions, use of media, community radios and theatre groups 146 There are a number of studies and surveys that need to be done before capacity building can take place such as: e) Joint development of CBNRM manual with WEOs, VEOs and for VNRC and councillors f) Value chains of 6 commodities for LGAs: DFTs, cooperative and trade officers g) Revenue enhancement manual for LGA: Treasurer, DPLO, councillors, lawyer (by-laws) h) Revenue collection manual for WEOs/VEOs Potential service providers: Consultants: ESAMI, MS-TCDC, Make (mentoring and coaching), eMJee (social accountability) Universities: Ardhi University (GIS) Training institutes: standardized courses (LGA systems) 147 Table 29: Overview package 9 Who: BI Why: outcome What: content How: activities Possible inter district modules Project staff To capacitate in (NTA and DPC) mentoring and Coaching and mentoring Tailor made training 3 districts DPT coaching skills To integrate project Epicor, PlanRep, OPRAS, Training in 3 districts program into district procurement and M&E standardized courses development plans systems To capacitate in Social accountability responding to civil concept and tools Tailor made training 3 districts Tailor made training 3 districts society demands To capacitate to Access to information facilitate information Information sharing availability at different levels Learning Use of media, community radio and theatre groups 148 8.7. Possible providers and quality considerations Considering the above ideas, the follow approach is recommended: For each package, a lead service provider will be selected through a call for proposals, which can buy-in the technical expertise for elsewhere or organize the participation of the relevant target persons in already available training at existing institutions or organize a retreat program or site visits while ensuring quality and tailor made follow up and backstopping after the main events. Each package will clearly indicate the quality criteria to which the lead provider has to adhere, as well the time frame and calendar, which has been developed in participation with the target group. The quality criteria for the service provider include: Relevance of the team composition in terms of competency Academic level of the team members Experience with similar assignments in similar context Innovative aspects in the proposal Booked results in relations to capacity building with LGAs References responses There are a number of institutions in Tanzania that are able to provide such tailor made programs for example MS-TDCD or ESAMI. A more informed recommendation can be provided after insight in the report developed by the Scholarship Program. 8.8. Indicative budget A rough estimate of the costs for each package is presented in table 28. The total costs for the capacity plan is estimated at 750,000 $ over the next three years. Main costs involve consultancy fees, training and course fees, transport costs, facility costs for workshops and trainings, accommodation and per diems. Table 30: rough budget per capacity building package Capacity building activity package 1 package 2 package 3 package 4 package 5 package 6 package 7 package 8 package 9 Level of intervention National level Regional level DFT Wetland management LGA Village level Law enforcement Civil society Project team Accumulative $ in 3 years 30,000 45,000 150,000 45,000 120,000 60,000 200,000 100,000 750,000 149 8.9. M&E process On a six monthly basis the project staff will collect information to report on the indicators of the table 29 in Annex 5. Most of the information will be derived from the field visits and the WEOs. The activities and indicators are integrated into the existing work plan of KILORWEMP. 8.10. Culture of learning Institutionalize the organization of learning sessions on every last Friday of the month early in the morning. In principle all present staff participates. There will be sanctions for those who don't participate for no good reason. The learning session will consist of the presentation of a selected success story of one sector, including the description of what happened and what/how the sector had contributed, what made it a success and what challenges had been encountered and overcome. Every month another sector presents its success story. The audience is invited to ask critical questions and to jointly identify the lessons learnt. The presentation will not take more then 30 min and discussion not more then one hour. A taskforce from HRO will ensure that each month one session will be organized, prepares the agenda in a participative way and will be the secretariat of the meeting. 8.11 Sustainability Embedding in the ministry system for capacity building The MNRT has already established an innovative capacity plan that is currently being implemented. It only seems logic to gradually embed the capacity building activities into the existing system. KILORWEMP needs to liaise with WD through the Research, Training and Statistics Unit to better develop their training plan to make it more systematic and targeted to strategic objectives. It is recommended that the Director of research, training and statistics of the Wildlife Division will be involved in the development of the packages at national level, while the HROs of the three councils will be involved in the development of the details at district level. Lower level support responsibilities within job descriptions The ministry as well as the HRO at the LGA level should ensure that interconnecting tasks such as support to lower levels are well described in the job descriptions of the LGA staff so that though the OPRAS staff can be hold accountable for the continued support to lower levels. Of course will each level always complain that there are not enough enabling resources to travel and to monitor, etc. Each level has to establish a mechanism to ensure that at least once per month there is a field visit, eg. by taking the opportunity to join teams (ASDP, works, etc.) that have the means and resources to go to the field. 150 Performance measurement Capacity building should be linked to performance assessment, which is at the level of the head of departments OPRAS for the organizational performance. In practice it means that even if there is not much funds to implement the planned activities, the head of department should find ways to ensure results at lower level by guiding his team in a smart way. This means on one hand that the HoD needs to negotiate for his/her staff to be better integrated in the district plans and for example to combine field visits with sectors that have funds for monitoring. On the other hand, the HoD and HRO should be clever in the development of the OPRAS by avoiding that performance indicators depend too much on available resources. 151