Planned Moves and Changes

advertisement
Planned Moves, Changes,
Issues
Library Administrative Council
All-Staff Meeting
September 10, 2013
Overview of Issues by Unit
• Melville: moves to improve functions, workflow and services
• Health Sciences Library: address facilities and maintenance issues
• Southampton: maintain library space and identity
Melville Library
Departmental Moves
Space Utilization
 Adjust space to route user flow through single service area
 Move employees closer to necessary technology and/or public areas
 Relocating staff / co-location of services
 Create one centralized service area in the Melville Library that encompasses
public service operations
Guiding Principles
• 1st floor of Melville should be devoted to user services (no private offices
or technical services), and not collections.
• Make use of Galleria space on 1st floor as part of overall plan to create
welcoming, useful, multifunctional space for users, events
• Prime space (such as 2nd floor NRR map cabinets by north-facing windows)
should be repurposed for student/faculty seating.
• Devote entire upper floor of NRR or significant section of floor to quiet
study. This may be accomplished when some offices/depts. on periphery
of building move out after Union Building renovation.
Collection Strategy and Management
• Move Melville Interlibrary Loan operation from Resource Management area to
the Circulation area on the third floor
• Logical combination of two operations with similar objectives: getting requested
resources to user
• Higher visibility for ILL and easier for users to find it
• Users could pick up and return borrowed items during evening and weekend
library hours
• Cross-training opportunities for more efficient staff use in both public and
operational services
First Floor Items
• 1st floor CRR: Move Microforms collection off of first floor to an upper floor,
possibly 2nd floor in the area currently used for government documents, after
major weeding project. This will open up CRR space for people, not collections
• 1st floor CRR: Move academic journals to 3rd floor stacks area or storage area;
keep recreational reading in CRR "reading area“
• Classroom B furniture replacement
• Other 1st floor: Former ILL office should be converted to ______?
First Floor - Learning Commons
• Coordinated library and technology support (i.e., library, TLT, GIS, etc.),
various types of seating and functions
• Single service desk
• New flooring
• Upgrade electrical supply, HVAC for additional seating and computer
workstations
• Painting
• New furniture for different types of seating (275 seats)
• Add 30 additional networked stations
• Add café to learning commons or Galleria
Second Floor Items
• All science monographs in the Melville Library will be shelved on the
2nd floor in one call number sequence
• QRB room will be for documents/maps processing and the
night/weekend supervisor's office
• QRB room can also serve as common room for the 2nd floor library
staff
Second Floor (Continued)
• Prepare government documents area on the second floor for
chemistry/science collection
• Current Government Documents processing room to become a
staging area for chemistry and documents materials during the move
• Possible microforms area after the move of the Chemistry Library
• 2nd floor core offices converted to group study rooms
Resource Management -- Melville
• Move Serials and Continuations Dept. to area now occupied by ILL
• Redesign Institutional Repository for growth
• Space in IR for additional staff and equipment
Plans for Expansion of the Institutional
Repository
• Relocate Jason Torre’s office to Melville RM area
• Relocation/expansion of the existing Scanning Lab equipment to the
current Serials are
• Current scanning station to become office and conference room
• Develop a reprographics station for reformatting oversized maps,
documents, etc.
• General copy stand/reprographics station
IR Expansion (continued)
• Micrographics station (microfilming area)
• Scanning stations and plotter
• Space for RM to use for staging area
• Office space for new hires (e.g., Digital Humanities Librarian)
• Installation of an interactive SMART workstation for staff professional
development
• Overall goal is to develop a more robust IR
Health Sciences Library
Facilities Issues
Categories of HSL Issues
• Security
• Electrical
• Facilities
• Lighting
• Structural
HSL Issues (Continued)
• Furniture
• Maintenance
• Classrooms and Barry Collier Computer Lab
• Group study areas and student seating
Southampton Library
• New building in excellent condition
• Problem is keeping it a library
• Group study rooms assigned to teaching faculty for offices
• Second library office not assigned to the library
• Library work area assigned as a common meeting area
Next Steps
• Present the Melville plans to the new dean
• Need approval of new dean
• If approved, ILL and Serials moves are planned for January intersession
• HSL renovations and costs would need to be determined by new dean
• Southampton space issues are difficult
Download