LCLS NEH Hutch Protection System E. Michael Saleski; QC Manager Michael G. Harms, Patrick Bong, James Murphy, Alan Hill; Engineers 11AUG09 NEH ARR PPS Hutch Protection Systems (HPS) Utilizes existing PLC system architecture, with some differences. Generally follow SSRL user-interface model Two Access States: ‘Permitted’ and ‘No Access/Search Set’ Experimenters can set access at will and perform their own searches Stoppers controlled from PPS Hutch Users Panel near each Hutch entrance. PPS Hutch Users Panel has one door-release key which may be removed from the panel when stoppers are confirmed ‘in’ SSRL Personnel Hutch door design is utilized Roll-up Equipment Door is interlocked; locked administratively. There is one ‘search preset key’ per hutch, given only to personnel with adequate training Each Hutch has an Online/Offline Keyswitch that prevents completion of the search and removal of stoppers 11AUG09 NEH ARR PPS Flowchart Illustrating X-Ray Beam Steering Controls, Commissioning Config Electron Dump PPS Enclosure Photons from Undulator FEE PPS Enclosure S0 OUT M1S Mirror Hutch 1 Enclosure Hutch 2 Enclosure Hutch 3 Enclosure Beam to XPP in Hutch 3 SH1 IN S1 M3S Beam to AMO in Hutch 1 XPP OUT M3/4S Mirror M4S 11AUG09 NEH ARR PPS S2 Beam to SXR in Hutch 2 SH2 EO Pr Equipment Access Doors Emergency Off Button Search Preset Search Reset/Door Key Annunciator BSOIC PPS Stopper EO ‘S1’ ST1, ST2 Pr EO EO Hutch 1 AMO Pr EO EO Hutch 3 Hutch 2 EO Pr SXR EO Pr EO EO Pr Pr XPP Pr ‘SH1’ ST1, ST2 11AUG09 NEH ARR PPS EO ‘S2' ST1, ST2 Pr EO EO EO Hutch 1 Detailed Floor Plan EO Pr1 Pr2 SH1 S2 S1 KEY EO Pr3 EO Pr4 EO Pr# Emergency Off Button Search Preset (number indicated) Yellow/Magenta Lights HUP RAD Hutch Users Panel Radiation Warning light, strobe, and Sonalert BSOIC RAD HPS Stoppers EO HUP 11AUG09 NEH ARR PPS Hutch Users Panel KEY [b] [a] [c] [d] [e] [n] Reference LED Indicator Push Button [i] Key Switch [j] [f] [g] [h] [n] 11AUG09 NEH ARR PPS [m] [k] [l] Not Used (future expansion) Safety Systems QA Plan New project QA approach Bench and pre-IAT field test of system software NEH Software Bench Test (CD-SS-PPS-06-12-04) NEH Hutch Software Field Test (CD-SS-PPS-06-12-19) Acceptance tests performed for assemblies and chassis’s (such at stoppers) HPS Stopper Acceptance Test (CD-SS-PPS-06-12-03) Cold and energized checkout of installed hardware Hutch 1 PPS Hardware Checkout (CD-SS-PPS-06-12-16) NEH Hutch Software Field Test (CD-SS-PPS-06-12-19) Formal IAT reviews with stakeholders Hutch 1 IAT (CD-SS-PPS-06-12-13) 11AUG09 NEH ARR PPS Established SSS Design Review Process Start Memo to Engineering Group Leader initiating change request NO Notification to ADSO/RSO of job, risk assessment, and review plan Proposal Accepted Drop Request Yes RSO/RSC Review Assign Engineer ECO Initiated Scope Defined Formal Requirements Produced Action Item Management System Engineer/Design Work Implement Action Items Weekly PeerReview ‘as needed,’ including Risk Assessment NO Action Item Closeout Memo Issued RSWCF (and WAF if applicable) Ready for Formal Review? Work is Performed Yes Assessment of work performed during weekly meetings Conduct Formal Review Yes Approve 11AUG09 NEH ARR PPS NO Evaluation by Controls Department Management Strengths: Emphasis on review and development process and documentation Collects development and review docs for auditability PPS Review Status for NEH PPS Major Review to Date LCLS SCR: May 31st 2007 [Bong, Stefan, Horton, Hastings] LCLS PDR: Feb 29th 2008 [Lessard, Tompkins, Schmerge, Anthony] LCLS FDR: Oct 22nd 2008 [Anthony, Mueller(LBNL), Lessard] RSC: Oct 31st 2008 LCLS FDR2: Apr 22nd 2009 [Perry Anthony, Zoe Van Hoover, Luc Lessard, Paul Miller, Robert Mueller, Mike Woods ] Safety Systems Section IAT Review: July 2009 [Zoe Van Hoover, Mike Horton, Mike Stanek, James Murphy, Alan Hill, Michael Harms] RSC: Aug 4th 2009 11AUG09 NEH ARR PPS NEH HPS Readiness Hutch 1 HPS: Is fully commissioned, Initial Acceptance Test (IAT) executed on 06AUG09. Mechanical sliding door improvements needed (all hutches) Hutch 2 HPS: is nearly ready for Software Field Test and IAT Validation (then IAT execution) Hutch 3 HPS: Has some outstanding field hardware installation Will be ready for Software Field Test, etc., in a couple of weeks. Ready for IAT execution by end of this month. 11AUG09 NEH ARR PPS