Fareham LDF Annual Monitoring Report December 2011 APPENDIX A Fareham Local Development Framework Shaping Fareham’s Future Annual Monitoring Report December 2011 Fareham LDF Annual Monitoring Report December 2011 Further Information and Contacts Information on the general Local Development Framework process, updates on the progress of Fareham’s Local Development Documents and current consultations, are available at the following website: www.fareham.gov.uk/ldf. If you have any questions regarding Fareham’s Local Development Framework including this document, please contact a member of the Strategic Planning & Design Service at Fareham Borough Council. Telephone: 01329 824351 Email: planningpolicy@fareham.gov.uk Address: Strategic Planning & Design Department of Strategic Planning and Environment Fareham Borough Council Civic Offices Civic Way Fareham Hampshire PO16 7AZ For more detailed information and guidance on the planning system, visit the Department for Communities and Local Government website at http://www.communities.gov.uk. This document and all other Local Development Framework documents are available in large print and other languages. Please call 01329 824351 for further information. Fareham LDF Annual Monitoring Report December 2011 Contents Page No. EXECUTIVE SUMMARY 1 1. INTRODUCTION Purpose & Aim of the Annual Monitoring Report Related Visions & Objectives Fareham in Context 4 4 5 5 2. LOCAL DEVELOPMENT SCHEME DELIVERY AND IMPLEMENTATION Local Development Scheme Local Development Document Progress Progress in preparing the Local Development Framework 8 HOUSING MONITORING AND SUPPLY Past Housing Delivery (outside the SDA) Projected housing delivery (outside the SDA) Five Year Housing Land Supply (outside the SDA) Fareham Borough Housing Trajectory 2006-2026 (outside the SDA) Housing Supply at the North of Fareham Strategic Development Area (SDA) 14 14 15 15 16 4. EMPLOYMENT AND RETAIL FLOORSPACE MONITORING Key Findings 21 21 5. POLICY ANALYSIS Development Plan Policies Analysis Methodology Key Findings Conclusion 24 24 24 25 28 6. RECOMMENDATIONS 29 3. 8 8 8 20 For further information on this Document please contact planningpolicy@fareham.gov.ukaaaaaaaaaaaaaaaaaaaaaaaaa Fareham LDF Annual Monitoring Report December 2011 APPENDICES 31 APPENDIX 1 – Development Plan Policy Analysis 32 APPENDIX 2 – List of Saved Local Plan Polices Replaced by the Core Strategy 88 APPENDIX 3 – List of Local Plan Policies not saved in 2007 by Government direction 91 APPENDIX 4 – Schedule of sites comprising the five year housing land supply 92 APPENDIX 5 – List of Sources 94 LIST OF TABLES AND FIGURES Figure 2.1 Structure Diagram for Fareham Local Development Framework 9 Table 2.1 Development Plan Document Progress against the 2011 Local Development Scheme timetables 13 Table 3.1 Past Annual Housing Delivery 14 Table 3.2 Five Year Housing Land Supply 16 Figure 3.1 Fareham Borough Housing Trajectory (outside the SDA) 18 Table 3.3 Fareham Borough Housing Trajectory (outside the SDA) 19 Table 3.4 Housing Trajectory for the North of Fareham Strategic Development Area (SDA) 20 Table 4.1 Net Employment and Town Centre Use Floorspace since 2006/07 to 2010/11 22 Table 4.2 PUSH employment apportionment for Fareham Borough excluding the SDA 2006/07to 2010/2011 23 For further information on this Document please contact planningpolicy@fareham.gov.ukaaaaaaaaaaaaaaaaaaaaaaaaa Fareham LDF Annual Monitoring Report December 2011 Executive Summary i. This is the seventh Annual Monitoring Report (AMR) to be produced by Fareham Borough Council and the first AMR following adoption of the Fareham Borough Core Strategy. The AMR forms part of the Fareham Local Development Framework (LDF) and covers the period 1 April 2010 to 31 March 2011, and considers progress of the LDF up until the publication of this AMR in December 2011. ii. The Localism Bill removes the requirement to submit the AMR to the Secretary of State. However, until the Bill is enacted this requirement will remain. Previous editions of the AMR have been required to report on a number of Core Output Indicators (Core Output Indicators). Core Output Indicators were designed by central government as part of the monitoring framework to achieve a consistent approach to data collection across the national, regional and local level. A ministerial letter of 30 March 2011, sent to Local Authority Chief Planning Officers, removed the requirement to report on Core Output Indicators and withdrew guidance on local plan monitoring. Thus, it is now for individual local authorities to determine what to include in their monitoring reports, providing they are prepared in accordance with relevant UK and EU legislation. iii. Chapter 7 of the Core Strategy provides an indicative monitoring framework in recognition of the importance of retaining an effective monitoring system. Performance measured against Core Output Indicators will still be reported where it is considered to be relevant to the effective monitoring of Core Strategy Policies. The AMR is critical in the understanding of the effect and impact of planning policies in the Borough once they are adopted. iv. This AMR covers four key areas: Progress of all Local Development Documents (LDDs) and any milestones that have been reached against the timetable in the Local Development Scheme (LDS) Analysis of individual development plan policies (Core Strategy & 'saved' Local Plan Review policies; Housing monitoring and supply - providing the most up to date housing land supply for the Borough and setting out housing completions for the past year; and Employment & Retail floorspace monitoring - setting out the employment and retail floorspace completions for the monitoring year. A summary of these sections of the report are provided below. Progress On Local Development Documents v. The Development Plan Documents (DPDs) contained in the 2011 Local Development Scheme (LDS) are in part meeting the milestones indicated in the LDS. Fareham's Core Strategy was adopted a month earlier than anticipated. The Fareham Town Centre Area For further information on this Document please contact planningpolicy@fareham.gov.uk hhhhhhhhh1 Fareham LDF Annual Monitoring Report December 2011 Action Plan is on track to meet the milestones as indicated in the LDS. However the North of Fareham Strategic Development Area (SDA) Area Action Plan and the Site Allocations & Development Management DPD timetables require extension through a review of the LDS. vi. The Supplementary Planning Document (SPD) for the Coldeast Site was adopted in October 2011 and the SPD for the Daedalus Site has been put on hold following the designation of the site as an Enterprise Zone. vii. Work has commenced on the preparation of a charging schedule for the Community Infrastructure Levy. Policy Analysis viii. With the use of indicators1, the saved policy analysis demonstrates how the majority of current local plan policies are working effectively, particularly through the use of development control in pre-application and decision-making processes. ix. The analysis shows how a number of policies, particularly Local Plan policies, cannot be successfully measured through the use of Core or Local Indicators. This raises the issue that future policies should aim to be written in such a manner that they can be assessed in quantifiable terms. Furthermore, a system must be in place to continually collect and assess data in order to provide an effective method of policy analysis. x. This analysis is important and in highlighting policies (or parts of policies) that require revision or deletion in order to reflect current and changing circumstances that the Borough faces. Chapter 6 of this AMR sets out such recommendations. Housing Monitoring and Supply xi. As required under The Town and Country Planning (Local Development (England) Regulation 2004 (as amended), Local Planning Authorities must report on annual housing delivery as part of the AMR. This AMR also provides an update to the November 2011 Strategic Housing Land Availability Assessment housing supply figures, taking into account completions and new permissions only during the monitoring period. xii. During the 2010/11 year Fareham has delivered 364 dwellings. Chapter 3 demonstrates that there is an adequate five year housing land supply in the Borough (outside the North of Fareham SDA) for the period of 2011/12 - 2015/16 with a target of 799 dwellings and a supply of 1,373 deliverable dwellings. Therefore the supply exceeds the target by 574 dwellings which equates to (72%) percent beyond the required five year housing land supply. The sites which form this supply are listed in Appendix 4. xiii. It is anticipated that, assuming normal market conditions, the Borough (outside of the North of Fareham SDA) will meet the required 3,729 dwellings toward the beginning of the 2018/19 monitoring year. However, projected housing delivery will continue to the end of the plan period to 2025/26, through this period the trajectory shows that a further 476 dwellings will be delivered over and above the minimum target. 1 Further information on indicators is provided on pages 22-23. For further information on this Document please contact planningpolicy@fareham.gov.uk hhhhhhhhh2 Fareham LDF xiv. Annual Monitoring Report December 2011 The Core Strategy trajectory for the North of Fareham SDA anticipates that the first dwellings will be delivered at the site in 2014/15, with around 5,350 dwellings completed by the end of the Core Strategy plan period and development continuing until 2031. Recommendations for improved policy monitoring xv. Chapter 6 sets out the recommendations regarding current monitoring processes and potential improvements to data capture mechanisms. The relevant polices addressed under this section are as follows: CS15 Sustainable Development and Climate Change CS16 Renewable Energy CS17 High Quality Design CS20 Infrastructure and Developer Contributions CS4 Green Infrastructure, Biodiversity and Geological Conservation CS21 Protection and Provision of Open Space For further information on this Document please contact planningpolicy@fareham.gov.uk hhhhhhhhh3 Fareham LDF 1. Annual Monitoring Report December 2011 Introduction PURPOSE & AIM OF THE ANNUAL MONITORING REPORT 1.1 This is the seventh Annual Monitoring Report (AMR) produced by Fareham Borough Council covering the monitoring period, 1st April 2010 to 31st March 2011. It forms part of the Fareham Local Development Framework (LDF) reporting upon progress of the LDF up until publication of this AMR and the effectives of LDF policies. Where data is not available for this period, the recommendations section (Chapter 5) clearly identifies the period for which data is available and/or how this data will be secured for future AMRs. 1.2 The purpose and aim of this AMR is to: 1.3 Report progress of Local Development Documents in relation to the timetable and key milestones established in the Fareham Local Development Scheme (LDS); Update the five year housing land supply position and set out the housing trajectory for housing outside of the North of Fareham Strategic Development Area (SDA) and at the SDA. Report progress on current (‘saved’) policies in the Fareham Local Plan Review (2000) and the polices contained within the Core Strategy, where appropriate Previous editions of the AMR have been required to report on a number of Core Output Indicators. Core Output Indicators were designed as part of the monitoring framework to achieve a consistent approach to data collection across the regional and local level. However, the ministerial letter of 30 March 2011, sent to Local Authority Chief Planning Officers, removed the requirement to report on Core Output Indicators and withdrew the following guidance on local plan monitoring: Local Development Framework Monitoring: A Good Practice Guide (ODPM, 2005), Annual Monitoring Report FAQs and Emerging Best Practice 2004-05 (ODPM, 2006), Regional Spatial Strategy and Local Development Framework: Core Output Indicators - Update 2/2008 (CLG, 2008). 1.4 It will now be for individual councils to determine what to include in their monitoring reports, providing they are prepared in accordance with relevant UK and EU legislation. In line with provisions contained within Town and Country Planning (Local Development) (England) Regulations 2004, Local Planning Authorities are still required to report on the following: For further information on this Document please contact planningpolicy@fareham.gov.uk hhhhhhhhh4 Fareham LDF 1.5 Annual Monitoring Report December 2011 The progress of DPD production against the LDS timetable and any suggested associated amendments. Where an authority is not implementing a policy specified in the development plan, the annual report must identify that policy and include reasons why the authority is not implementing the policy; the steps (if any) that the authority intend to take to secure that the policy is implemented; and whether the authority intend to prepare a DPD or a revision of the DPD (as the case may be) to replace or amend the policy. Specify the number of net additional dwellings built in the authority’s area. Chapter 7 of The Core Strategy provides an indicative monitoring framework in recognition of the importance of retaining an effective monitoring system. This framework includes a number of the Core Output indicators contained in the withdrawn guidance listed above. Performance measured against Core Output Indicators will still be reported where it is considered to be relevant to the effective monitoring of LDF Policies. RELATED VISIONS & OBJECTIVES 1.6 The Fareham LDF aims to adopt an integrated approach to monitoring. The AMR has regard to the vision and objectives of related Council strategies and plans which have been taken into consideration in the preparation of the Core Strategy. 1.7 The Council's Corporate Strategy (2011) describes Fareham as, ‘Fareham - the prosperous, safe and attractive place to live and work'. The Strategy is updated annually by the Council and is guided by following corporate priorities: To protect and enhance the environment. To maintain and extend prosperity. To ensure that Fareham remains a safe and healthy place to live and work. To provide a reasonable range of leisure opportunities for health and fun. To work with our key partners to enable and support a balanced housing. market. To build strong and inclusive communities. To be a dynamic, prudent and progressive council. 1.8 Fareham's Core Strategy identifies the Borough's development needs and how they will be met up to 2026 is a key part of the LDF. The Core Strategy was adopted by the Council on 4 August 2011 following public examination of the plan by an independent planning inspector from the Planning Inspectorate. FAREHAM IN CONTEXT Physical Environment 1.9 Fareham lies on the Solent coastline between the cities of Portsmouth and Southampton, covering an area of almost 30 square miles. Rapid development has occurred over the past 50 years, although approximately 60% of the Borough remains as countryside. The Southern and Western boundaries of the Borough are formed by the For further information on this Document please contact planningpolicy@fareham.gov.uk hhhhhhhhh5 Fareham LDF Annual Monitoring Report December 2011 Solent and River Hamble, respectively, which are internationally recognised for their environmental and recreational value. The special character of the Borough’s older settlements is recognised by conservation area designations. Population 1.10 Hampshire County Council's Small Area Population Forecast 2010 2 stated a resident population of 110,995. The figures are the best projections available as at April 1st 2010 on a site by site basis taking account of the current market conditions. This is an increase of 3,018 since the 2001 Census (107,997). In 2001 the average age of residents in Fareham was 40. The retired population is expected to increase by 47% by 2021. Transport 1.11 The M27 South Coast motorway links Fareham to the wider motorway network and provides easy access to Ports and Airports. London is 75 miles away via the M3 or A3M. Two international sea ports lie close to the Borough - Portsmouth European Ferry Port and Southampton cruise liner and container port. The Solent corridor’s regional international airports are also close by - Southampton Eastleigh Airport and Bournemouth Airport. Britain’s leading international airports are little more than an hour away. Economy 1.12 Fareham is located at the heart of urban South Hampshire. The Western Wards and Whiteley, around Junction 9 of the M27, has been a growth sector within South Hampshire over the last 30 years. The availability of high quality employment land has allowed the Borough to become a very buoyant part of the sub-regional economy. In addition, over the last decade, Fareham has become a telecommunications hub served by high capacity fibre optic infrastructure that enables sustained business growth focused on the Cams Estate, close to Junction 11 of the M27. 1.13 The relocation of National Air Traffic Services to the Swanwick Control Centre and to the Whiteley Technical Centre supports about 2500 well-paid jobs, making it the largest employer in the area. 1.14 The Core Strategy provides the framework for the delivery of a strategic employment site at Daedalus airfield. This area has recently been given Enterprise Zone status which is designed to boost local job creation in the area. Housing 1.15 Fareham remains the largest town in the Borough, However the 'Western Wards' (comprising Locks Heath, Sarisbury, Park Gate, Warsash and Titchfield Common) are now almost as large. Portchester and Stubbington and Hill Head have grown from small villages to large residential suburbs containing over 6,000 dwellings in each. Only 2 Source: Hampshire County Environment Department's 2010 based Small Area Population Forecasts For further information on this Document please contact planningpolicy@fareham.gov.uk hhhhhhhhh6 Fareham LDF Annual Monitoring Report December 2011 Titchfield, Lower Swanwick and Burridge retain a village scale and character. The number of dwellings in Fareham Borough has increased from approximately 12,000 in 1951 to about 47,500 in March 2010, with more than 57% of the total housing stock being built since 1961. Information from the Land Registry shows that the average house price in Fareham in the period April to July 2010 was £212,000, compared with £76,536 in January to March 1996. This is a price increase of 277% over a period of 14 years. Average property prices for a detached, semi-detached, terrace or flat are £325,227, £205,623, £169,379 and £127,017, respectively. Whilst past completions of new housing have been healthy in the Borough, the rate of delivery remains insufficient to successfully address the problems of affordability. For further information on this Document please contact planningpolicy@fareham.gov.uk hhhhhhhhh7 Fareham LDF 2. Annual Monitoring Report December 2011 Local Development Scheme Delivery and Implementation LOCAL DEVELOPMENT SCHEME 2.1 The Local Development Scheme (LDS) identifies the preparation stages and timetable for each of the Development Plan Documents (DPD) that the Council is preparing. In accordance with Government Guidance in Planning Policy Statement 12: Local Spatial Planning (2008) and the Town and Country Planning (Local Development) (England) Regulations 2004 (as amended), this section of the AMR reports on the progress of documents against LDS timetable and milestones. Where milestones have not been met a detailed explanation of why this has not been achieved is provided. 2.2 The first iteration of Fareham LDS was published on 19 April 2005 under Regulation 11(3) of the Town and Country Planning (Local Development) (England) Regulations 2004. The LDS has had a number of revisions since the original publication. Updated versions have been published; 28 June 2006; 30 March 2007; 12 March 2009 and more recently; 16 May 2011. The original LDS and its subsequent revisions are later referred to as 2005 LDS, 2006 LDS, 2007 LDS, 2009 LDS and 2011 LDS, respectively. 2.3 Following the amendments in 2008 to the Town and Country Planning (Local development) (England) Regulations 2004, it is no longer necessary to include Supplementary Planning Documents (SPDs) within a LDS. 2.4 The 2010 AMR recommended an update of the LDS. A revised LDS was adopted by the Council in May 2011 and sets out the most up to date published timetables for the production of DPDs. LOCAL DEVELOPMENT DOCUMENT PROGRESS 2.5 The diagram overleaf provides an overview of the documents - existing and those being prepared - that currently make up the Fareham Borough Local Development Framework (LDF). 2.6 This section of the AMR goes on to audit the progress of each LDF document during the period 1 April 2010 to the date of publication of this AMR. The summary table on page 13 sets out the progress of production of DPDs against the 2011 Local Development Scheme (LDS). It also provides a useful indication of any potential need to re-program or reallocate resources where delivery of a Local Development Document (LDD) has missed (or is at risk of missing) its key deadlines/milestones. For further information on this Document please contact planningpolicy@fareham.gov.uk hhhhhhhhh8 Fareham LDF Annual Monitoring Report December 2011 Figure 2.1 - Structure Diagram for Fareham Local Development Framework National Planning Policy (PPGs and PPSs) FAREHAM LOCAL DEVELOPMENT FRAMEWORK Fareham Borough Local Plan Review 2000 Saved Policies Local Development Scheme Core Strategy Including Key Diagram Fareham Town Centre Area Action Plan Affordable Housing SPD Site Allocations and Development Management Development Plan Document Statement of Community Involvement North of Fareham Strategic Development Area Action Plan Annual Monitoring Report Proposals Map Site Development Brief Hunts Pond Rd, Titchfield Common, SPD Coldeast SPD Key Site Development Brief Peters Rd, Locks Heath, SPD Completed Daedalus SPD In Progress Residential Car and Cycle Parking Standards SPD Open Space SPG Key SPD - Supplementary Planning Document SPG - Supplementary Planning Guidance On Hold December 2011 For further information on this Document please contact planningpolicy@fareham.gov.uk a9 Fareham LDF Annual Monitoring Report December 2011 Core Strategy Development Plan Document 2.7 Following submission at the end of February 2011 for examination, the hearing sessions took place during May 2011 and the Inspector's Report was received in July. The Core Strategy was adopted by the Council on 4 August 2011. 2.8 The plan identifies the Borough's development needs up to 2026 and how they will be met. It sets out the spatial vision, a series of objectives designed to achieve the vision; overarching key policy areas which provide focus and link the objectives to the spatial strategy; core delivery policies and an implementation and monitoring framework. The Core Strategy replaces a number of the Local Plan Review 2000 policies. 2.9 The Core Strategy has achieved its milestones as set out in the LDS 2011 from Examination through to adoption and was adopted one month in advance of the expected adoption date. North of Fareham Strategic Development Area, Area Action Plan 2.10 An Area Action Plan (AAP) for the North of Fareham Strategic Development Area (SDA) was added to the LDF in the 2009 LDS. Core Strategy Policy CS13 includes the SDA vision and policy framework for the delivery of the SDA and includes a set of high level development principles. Policy CS13 includes the provision of between 6,500 and 7,500 dwellings and up to 90,750 sq m of employment floorspace. The boundary for the SDA will be defined through the AAP. 2.11 The AAP process has commenced with the production of the Sustainability Appraisal Scoping Report. In addition, the site's landowner consortium produced a Strategic Masterplan for the new community in October 2010, which was based on community masterplanning workshops held in July. 2.12 The Council is currently working on a Community Engagement Plan that will set out how the local community will be involved in developing a draft AAP during 2012 - 2013. Project Teams have been established to identify the key issues and to steer the development of the AAP and detailed masterplan. Also underway are a number of evidence studies needed to provide the detailed justification for the plan its policies and land use designations. The production of an Infrastructure Development Plan in early 2012 will identify the infrastructure needed to support the SDA and liaison with infrastructure providers has and will continue to underpin this. 2.13 It is anticipated that additional time will be needed for all this work such that the AAP would be adopted by Fareham Borough Council in mid 2014, rather than the autumn of 2013 as in the 2011 LDS. A review of the LDS is therefore needed to update the timetable for the production of the AAP. Site Allocations and Development Management Development Plan Document 2.14 Consultation on the first stage of the production of the Site Allocations Development Plan Document (Issues and Options Stage) was undertaken in early 2008. Comment was sought on the suitability, sustainability and contribution identified sites could make towards meeting the requirements set out in the Core Strategy. A summary of the For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaa a10 Fareham LDF Annual Monitoring Report December 2011 responses was published in July 2008. Production of the Site Allocations Development Plan Document paused following the publication of the consultation summary as Officer resources were directed toward the Core Strategy. During this interim period, no further progress on Site Allocations Development Plan Document has been made other than updating of information on employment and housing site options through updates to the Strategic Housing Land Availability Assessment (SHLAA) and the Employment Land Review (ELR). Work on this document is expected to resume in January 2012 following a 'call for sites' exercise in November - December 2011. 2.15 In accordance with recommendations from the Planning Inspector's Advisory Visit 3 the scope of the Core Strategy was altered so the development management policies aspect of the document, that were initially intended to be included as part of the Core Strategy, were moved into the Site Allocations DPD. This prompted revisions to the LDS which now accounts for alterations to the scope of the Site Allocations DPD, now referred to as the Site Allocation & Development Management DPD (SADM DPD). 2.16 With the amount of work needed to assess the submissions and review the site options, together with consultation needed with local communities on the preferred sites, consultation on draft Development Management policies, and issues raised by the Core Strategy in relation to a review of boundaries for the Strategic Gaps and Urban Areas, it is anticipated that more time will be needed to reach the stage of a draft plan. This will add about 6 months to the adoption date of the timetable in the 2011 LDS; a review of the LDS is therefore needed. Fareham Town Centre Area Action Plan (AAP) 2.17 Consultation on Issues and Options was undertaken early in 2008 and a summary of the responses was published in July 2008. Subsequent progress towards a Preferred Approach document was limited by the need to concentrate resources on the Core Strategy. In 2009/10 progress was made on studies related to the potential of extending Bus Rapid Transit and associated land use requirements of a rail-bus interchange and routeing to serve the SDA and surrounding settlements. During 2011 consultation has been undertaken with landowners to identify potential constraints and opportunities to deliver Town Centre development identified in the Core Strategy. Further work on landowner consultation and evidence gathering, site assessment/development approach and policy formulation will be progressed in 2012. 2.18 Public consultation on a Preferred Options document is anticipated from July 2012 in accordance with the current LDS. It is recognised however that this timetable will be subject to potential resourcing and priority constraints. Former Coldeast Hospital Development Brief Supplementary Planning Document (SPD) 2.19 Public consultation concerning the future of the site as part of the preparation of the development brief took place during November and December 2007. Since then the new Community Hospital has been completed on part of the site and the development of 251 dwellings (granted in 2003 and extended in 2005) which commenced in 2008 remains 3 PINS Advisory Visit - 27 July & 11 August 2009 For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaa a11 Fareham LDF Annual Monitoring Report December 2011 ongoing. 2.20 Further development and environmental opportunities have been established with the site owners and developers through allocation in the Core Strategy as a Strategic Site. Broad development proposals for the site contained within the Core Strategy policy CS10 which allows for a further 150-170 dwellings and a sheltered housing scheme of 60 units to be accommodated on land outside the urban area, to the west of Brook Lane, repair/restoration of the historic buildings and land for open space, community and leisure uses. An additional dwelling 30 units and land for future health facilities will also be provided on land within the urban area owned by the Primary Care Trust to the west of the new community hospital. 2.21 Consultation on the final draft of the Coldeast Supplementary Planning Document (SPD) was undertaken from 6 June 2011 to 18 July 2011. The SPD was adopted by the Council 24 October 2011, one year later than the timetable in the 2009 LDS due to the need to await the adoption of the Core Strategy. Daedalus Supplementary Planning Document 2.22 The former HMS Daedalus site was sold by the Ministry of Defence Estates in March 2006. The airfield has been purchased by the Marine & Coastguard Agency which is continuing operational flying from the site. The South East England Development Agency (SEEDA) purchased the remaining area of the site although the land has recently been transferred to the Home and Communities Agency following the dissolution of the Regional Development Agencies including SEEDA. 2.23 Due to the complexity of issues across the Daedalus site, the development proposals need to be considered comprehensively through the LDF process. For this reason, the site is regarded as a strategic site and is an allocation in the Core Strategy with further details to be set out an SPD. Core Strategy Policy CS12 - Daedalus Airfield Strategic Development Allocation allows for between 10,000 and 33,000 sq m of additional employment floorspace to be developed, particularly focusing on aviation and marine related operations, together with the provision of open space and land for biodiversity and habitat creation and management. 2.24 The SPD was being prepared using consultation responses and technical work undertaken by consultants for the South East England Development Agency; however preparation has been placed on hold following the designation of the site as an Enterprise Zone in August 2011. This designation requires that a Local Development Order (LDO) be prepared to specify what development may happen at the site without the need for planning consent. Meanwhile outline planning applications for the site are being considered by Fareham and Gosport Borough Councils. Gosport Borough Council adopted a SPD for the part of the site within its borough. The need to continue with the SPD or delete it from the LDF programme will be reviewed on adoption of the LDO. Community Infrastructure Levy 2.25 The 2011 LDS, stated the intention to introduce the Community Infrastructure Levy; also that a timetable will be set for the preparation of the Community Infrastructure Levy charging schedule and will be published on the Council's website. Following the Core Strategy adoption the Council is able to proceed with the preparation of the Community For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaa a12 Fareham LDF Annual Monitoring Report December 2011 Infrastructure Levy charging schedule and the Executive at its meeting on 7 th November agreed a timetable for this task. Table 2.1 - Development Plan Document Progress against the 2011 Local Development Scheme timetables KEY Achieved Early Achieved On Track At Risk/Need for re-programming Document Title LDS Edition Regulation 25 Consultation and SA Scoping Pre-Submission Consultation Core Strategy DPD 2011 LDS May 2007 – September 2009 13th December 2010 - 31st January 2011 Submission to Secretary of State 28th February 2011 2011 LDS January 2009 July 2012 December 2012 January 2013 2011 LDS January 2008 November 2011 North of Fareham Strategic Development Area AAP Site Allocations and Development Management Policies DPD Fareham Town Centre Area Action Plan 2011 LDS January 2008 August 2012 Examination Adoption 28th February September 2011 February 2013 February 2013 - August 2013 September 2013** May-June 2012 End of August 2012 End of August 2012 - March 2013 May 2013 February - March 2013 End of April 2013 End of April 2013 October 2013 November 2013 Not Achieved * October 2013 if pre-examination meeting is required. For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaa a13 Fareham LDF 3. Annual Monitoring Report December 2011 Housing Monitoring and Supply PAST HOUSING DELIVERY (OUTSIDE THE SDA) 3.1 As 4 per the Town and Country Planning Regulations 2004, Section 38 subsection 3 (ii) (as amended . in 2010), Council's are required to report on housing delivery that has occurred during 1 the past monitoring year, in this case the period April 1st 2010 to 31st March 2011. 3.2 Housing 4 monitoring is undertaken in partnership with Hampshire County Council to ensure that . the housing completion count is accurate and robust. During the 2010/11 year a total of2 364 dwellings (net) have been completed in the Borough. 3.3 It4is perhaps useful to put this figure in the context of housing delivery in previous years so useful . comparisons can be drawn. Table 3.1 below sets out annual housing completions since 3 the beginning of the Core Strategy plan period in 2006/2007. 3.4 Table 3.1 - Past Annual Housing Delivery Year Housing Delivery Housing Provision Target Surplus/ Deficit 2006/07 2007/08 2008/09 2009/10 2010/11 Total 581 548 320 188 364 2001 340 340 340 340 340 1700 241 208 -20 -152 24 +301 Source: Hampshire County Council Housing Land Supply Monitoring 2010-2011 3.5 As 4 the table above demonstrates, housing delivery has nearly doubled since the last monitoring . year, returning to levels that were experienced in the Borough in 2008/09. This trend 4 should perhaps be expected as it is broadly consistent with trend in the UK housing market throughout this period. 3.6 The 4 higher completion figures during the latest monitoring year are encouraging as annual housing . delivery now exceeds the annual target rate of 340 dwellings per annum (initial five 5 year phasing) as set out in the Partnership for Urban South Hampshire - Sub-regional Strategy - Final Advice to SEERA. 3.7 Table 4 4.1 also sets out the Sub Regional Strategy housing provision targets. Comparisons between . housing delivery in table and housing provision targets in the table demonstrate that 6 high delivery rates in previous years (i.e. 2006/07 and 2007/08) have meant that when For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaa a14 Fareham LDF Annual Monitoring Report December 2011 the data is aggregated across the five year period housing delivery has far exceeded housing targets, despite an annual delivery shortfall in years, 2008/09 and 2009/10. PROJECTED HOUSING DELIVERY (OUTSIDE THE SDA) 3.8 In4 addition to looking at past delivery, Council's are also required to maintain a flexible, responsive . supply of land in order to demonstrate its ability to attain housing delivery objectives 7 across the plan period. Housing provision data contained within this AMR draws upon information contained with the Strategic Housing Land Availability Assessment (SHLAA) (November 2010). Where completions have occurred on identified SHLAA sites, these have been discounted from its overall yield and where new information about existing sites has come to light this has been considered and where necessary the delivery phasing of the site has been adjusted accordingly. In addition, new sites that have been granted planning permission, and are above the SHLAA threshold of 5 units, have been included as part of the housing supply. This process up has ensured that this AMR takes account of the most up to date information available (as at the 1 st April 2011) and provides the most current housing land supply position for the Borough. 3.9 In4 the short-term, Council's must be able to demonstrate a robust five year housing land supply . of deliverable sites. In line Planning Policy Statement 3: Housing (PPS3) deliverable 8 housing sites are those that are suitable, available and achievable (a definition of these terms can be found in paragraph 54 of PPS3). The determination of a sites' deliverability has been undertaken through the SHLAA process. 3.10 It4is also important to consider housing supply in the medium to long term (beyond five years). . For the purposes of this AMR (and in light with the format of the SHLAA) the medium 9 to long term supply is presented in two distinct delivery phases; medium-term 610 years and; long term 11+ years. Sites within these two latter phases are considered to be developable: they must be in a suitable location for housing development and there should be a reasonable prospect that the site is available for, and could be developed at the point envisaged. FIVE YEAR HOUSING LAND SUPPLY (OUTSIDE THE SDA) 3.11 Local 4 Planning Authorities must assess and demonstrate the extent to which existing plans . already fulfil the requirement set out in this statement to identify and maintain a 4 five-year supply of deliverable land for housing, particularly in connection with rolling 1 making 0 planning decisions. 3.12 Table 4 3.2 below clearly sets out the housing quantum that is expected to be delivered in the . coming five years on an annual basis. The table also provides the housing target for the 1 same period. It should be noted that the housing target has been adjusted to account for 1 overprovision of housing in the previous years, as set out in Table 3.1 (housing provision targets, before adjustment, are set out in paragraph 4.16 of the Fareham Borough Core Strategy. 4 The supply of land should be managed in a way that ensures that a continuous five year supply of deliverable sites is maintained ie at least enough sites to deliver the housing requirements over the next five years of the housing trajectory. For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaa a15 Fareham LDF Annual Monitoring Report December 2011 Table 3.2 - Five Year Housing Land Supply Year 2011/12 2012/13 2013/14 2014/15 Projected Housing 243 306 281 277 Supply Housing Provision 160 160 160 160 Target Surplus / 83 146 121 117 Deficit *Total supply across the period is not equally divisible by 5. 2015/16 Total 266 1373 159* 799 107 +574 Source: Hampshire County Council Housing Land Supply Monitoring 2010-2011 and Fareham Borough Council Strategic Housing Land Availability Assessment (November 2010) 3.13 As table 3.2 demonstrates, the Borough is in a very strong position in terms of housing supply being able to demonstrate 8.6 years supply of housing (against a government requirement of 5 years). Appendix 4 sets out the schedule of sites that constitute the five year housing land supply. FAREHAM BOROUGH HOUSING TRAJECTORY 2006-2026 (OUTSIDE THE SDA) 3.14 As mentioned above, it is necessary for the Council to be able to demonstrate a robust housing supply that meets the housing provision target across the plan period. Planning Policy Statement 12: Local Spatial Planning (PPS12) sets out the requirement for local planning authorities to provide information on housing policy and performance including the preparation of a housing trajectory. Building upon the five year supply, Table 3.3 below considers housing delivery, past and future, and provides the overall housing trajectory across the plan period5. Figure 3.1 provides a graphical representation of the same data set. 3.15 The 4 trajectory is a forward planning tool, designed to support the plan, monitor and manage . approach to housing delivery by monitoring both past and anticipated completions across 1 a period of time. It demonstrates the quantum of housing already delivered and the number 4 of projected completions for the remainder of the plan period, represented by the blue and red columns respectively. 3.16 The 4 green 'PLAN' line represents the PUSH Sub-regional Strategy annual target and demonstrates . the phased delivery of housing, with the emphasis placed on early delivery in1 the plan period. 5 5 The overall trajectory demonstrates housing delivery and supply across the plan period (2006-26). In order to take into account past delivery the trajectory does not consider the adjusted phasing as described in Table 4.2. For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaa a16 Fareham LDF Annual Monitoring Report December 2011 3.17 The 4 orange 'MONITOR' line demonstrates the number of dwellings above or below the cumulative . target at any one point in time. It is essentially cumulative completions less the cumulative 1 target calculated at each year. It does not take account of the effect of future completions 6 in meeting the overall target. The MONITOR line provides an early warning system to indicate whether housing delivery is likely to deviate from delivery of the PUSH Sub-regional Strategy target. A positive figure demonstrates that a strategy is ahead of the delivery target whereas a negative figure shows a shortfall in housing delivery. As the cumulative rate of delivery remains above the cumulative target (i.e. the line remains above zero throughout the plan period) a shortfall in housing delivery for Fareham Borough is not anticipated. 3.18 The 4 purple 'MANAGE' line represents the annual number of completions needed to meet the . PUSH Sub-regional Strategy total, taking into account any shortfalls or surpluses in completions 1 from both previous and future years. In order to calculate the managed supply it7has been necessary to annualise the housing target across the twenty years the plan will run. To a certain extent this approach will conceal the phased distribution of housing as per the phased strategic allocation. The value of this MANAGE line is that it allows the assessment of whether past shortfalls or surpluses will be addressed through future trends in supply, or whether there is any need for action to allow delivery of the PUSH Subregional Strategy target. The MANAGE line has been calculated using a residual method and is derived from the total plan allocation less cumulative completions in previous years divided by the number of years the PUSH Sub-regional Strategy has to run. 3.19 The 4 conclusion drawn from Figure 3.1 is that Fareham will complete delivery of the required . 3,729 dwellings toward the beginning of the 2018/19 monitoring year. However, projected 1 housing delivery will continue to the end of the plan period to 2025/26, through this 8 period the trajectory shows that a further 476 dwellings will be delivered over and above the minimum requirement. For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaa a17 Fareham LDF Annual Monitoring Report December 2011 Figure 3.1 - Fareham Borough Housing Trajectory (outside the SDA) 800 Past Completions 600 Projected Completions Dwelling Count 400 PLAN - Phased Strategic Allocation 200 MONITOR - No. dwellings above or below cumulative requirement 0 PLAN - Annualised Strategic Allocation -200 -400 -600 MANAGE - Annual requirement taking account of past and projected completions Monitoring Year For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaa a18 Fareham LDF Annual Monitoring Report December 2011 Projected Completions PLAN - Phased Strategic Allocation MONITOR - No. dwellings above or below cumulative requirement PLAN Annualised Strategic Allocation MANAGE - Annual requirement taking account of past and projected completions 2006-2026 2025/26 2024/25 2023/24 2022/23 2021/22 2020/21 2019/20 2018/19 2017/18 2016/17 364 2015/16 188 2014/15 320 2013/14 2010/11 548 2012/13 2009/10 581 2011/12 2008/09 Past Completions 2007/08 Plan Year 2006/07 Table 3.3 - Fareham Borough Housing Trajectory (outside the SDA) 2001 243 306 281 277 266 257 84 24 16 9 88 88 88 88 89 2204 340 340 340 340 340 220 220 220 220 220 94 94 94 94 93 92 92 92 92 92 3729 241 449 429 277 301 324 410 471 528 574 737 727 657 579 495 491 487 483 479 476 476 186 186 186 186 186 186 186 186 186 186 186 186 186 186 186 186 186 186 186 186 3720 186 166 144 134 131 115 106 91 75 56 7 11 2 -1 -4 -7 -31 -70 -150 -387 -476 For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaa a19 Fareham LDF Annual Monitoring Report December 2011 HOUSING SUPPLY AT THE NORTH OF FAREHAM STRATEGIC DEVELOPMENT AREA (SDA) 3.20 The SDA strategic masterplan anticipates that the first dwellings will be delivered at the site in 2014/15, with development continuing until 2031. Table 3.4 below sets out the proposed annual housing delivery rate at the SDA. The Fareham Borough Core Strategy, Policy CS13 - North of Fareham Strategic Development Area, provides the basic policy requirements for the SDA and an Area Action Plan is currently being prepared which will provide more detail on how the SDA will be delivered. 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 50 200 300 400 550 550 550 550 550 550 550 550 550 550 400 400 300 2006-2031 2016/17 0 2015/16 Projected Housing Delivery 2014/15 Year 2006-2014 Table 3.4 - Housing Trajectory for the North of Fareham Strategic Development Area (SDA) 7,500 Source: North of Fareham Strategic Development Area Strategic Masterplan Report, October 2010, URS/Scott Wilson 3.21 As housing construction has not yet started at the SDA, monitoring cannot be undertaken. However, at this stage it is assumed that the projected completion rate will be equal to the target build rate. It remains to be seen whether this planned rate of delivery will be so closely aligned to the actual delivery rate and in reality this is unlikely to occur. Thus, it will be for future editions of the AMR to report on any deviation of delivery from the planned rate of delivery and, where possible, manage any potential discrepancy accordingly. For further information on this Document please contact planningpolicy@fareham.gov.uk aa a20 Fareham LDF Annual Monitoring Report December 2011 4. Employment and Retail Floorspace Monitoring KEY FINDINGS 4.1 An3important aspect of Fareham's strategy is to encourage economic growth. The Strategy seeks to increase Gross Value Added by 3.5% per annum by 2026. However, given the current and recent economic climate this is perhaps an ambitious target. Indeed, the Partnership for Urban South Hampshire (PUSH) commissioned an update to the original Economic Development Strategy (EDS) produced in 2005, which takes account of the current macro-economic situation. It is now thought that average annual Gross Value Added (GVA) growth over the period 2006-26 will be around 2% rather than the PUSH aspiration of growth in excess of 3% (PUSH Economic Development Strategy (October 2010)). 4.2 With 3 regards to employment floorspace (B use class) delivered in the Borough, there were three schemes in the Borough which delivered employment floorspace totalling 313 sqm (gross) B1 floorspace and 1,181 sqm (gross) B2 floorspace however all of these were for redevelopment schemes for replacement employment units and resulted in a net loss of 553 sqm of employment floorspace. Whilst disappointing, this is perhaps not too surprising considering the effects of the recession. 4.3 Turning 3 to 'Town Centre Use' floorspace, completions are also disappointing with just 1,240 sq m (gross) provided in town centres (66 West Street Fareham and Broadlaw Walk Fareham) and a net loss of 82 sq m due to the retail floorspace lost on the Broadlaw Walk redevelopment scheme. 2,706 sq m (net) floorspace was delivered outside of town centres (alterations to Sainsbury store and provision of restaurant, Broadcut, Fareham). All of this development has occurred within the 'A' use class, i.e. retail floorspace. Despite the overall low rates of town centre use development, a concern here is that a greater proportion of town centre development is being built outside of town centre areas. This runs contrary to the Council's 'Town Centre First Strategy' (see PPS4 and Core Strategy Policy CS3). Although the Core Strategy policy was not adopted during this time this trend will be monitored closely to ensure that the Core Strategy policy is effective in directing town centre development to Town Centre areas in line with the hierarchy described in Policy CS3. 4.4 The Retail Health Check, completed biannually in Spring and Autumn, will be an essential tool for measuring the vitality and viability of Fareham Town Centre, the district centres at Portchester and Locks Heath and the local centres at Stubbington, Park Gate, Broadlaw Walk, Highlands Road, Gull Coppice, Titchfield and Warsash. The study will measure: Diversity of main town centre uses (by number, type and amount of floorspace); The amount of retail, leisure and office floorspace in edge-of-centre and out-of-centre locations; The potential capacity for growth or change of centres in the network; Retailer representation and intentions to change representation; For further information on this Document please contact planningpolicy@fareham.gov.uk aa a21 Fareham LDF Annual Monitoring Report December 2011 Proportion of vacant street level property; Pedestrian Flows; Accessibility; Customer and residents' views and behaviour; Perception of safety and occurrence of crime; State of the town centre environmental quality. 4.5 Although 3 2010/11 has been a particular disappointing year in terms of commercial development it is useful to observe the temporal trends in employment uses provision in order to provide an historical context and to allow comparisons to be drawn. Table 3.1 below sets out annual employment uses provision going back to the beginning of the Core Strategy plan period in 2006/07. Employment uses include; B1, B1A, B2, B8 and Town Centre Uses include; A1, A2, B1A, D2. It should be noted that B1A uses (Offices) are generally acceptable in either Town Centre Areas or in Employment Areas. The second row of the table considers B1A uses within the wider B1 use class. To alleviate the possibility of double counting each B1A use has been cross-checked against Town Centre floorspace gains and Non-Town Centre B1A. 4.6 Table 4.1 shows a decrease in employment provision both in terms of uses and its spatial distribution (i.e. within or outside of Town Centre areas). When these figures are compared against the PUSH employment apportionment figures for the period 2006-11, see Table 4.2 below, Fareham exceeds its target for B1 and B2-B8 uses by 5,261 sq m and 855 sq m, respectively. Overall, across the same timeframe Fareham exceeds its total B-use employment target by 6,116 sq m. This is largely due to the high level of employment floorspace gains in 2006/07 and 2008/09. It should be recognised, however, that low employment floorspace gains should not necessarily be attributed to failing policies but are closely linked to the prevailing economic difficulties that have been and continue to be experienced nationwide. Table 4.1 - Net Employment and Town Centre Use Floorspace since 2006/07 to 2010/11 Employment Floorspace (B1 gain sq m) Employment Floorspace (B2/B8 gain sq m) 'Town Centre Use' Floorspace - within Town Centre areas (A1, A2, B1a, D2) 'Town Centre Use' Floorspace Outside of Town Centre areas (A1, A2, B1a, D2) Total Commercial Development Floorspace 2006/07 2007/08 2008/09 2009/2010 2010/11 Total 4,247 1,596 6,108 0 -193 11,758 4,379 1785 3,363 688 -360 9,855 933 (gross figure) 0 833 2,536 -82 4,220 1000 1,216 950 0 2,706 5,872 10,559 4,597 11,254 3,224 2,071 31,705 For further information on this Document please contact planningpolicy@fareham.gov.uk aa a22 Fareham LDF Annual Monitoring Report December 2011 Table 4.2 PUSH employment apportionment for Fareham Borough excluding the SDA 2006/07to 2010/2011 2006-11 B1 6,500 B2 3,000 B8 6,000 Total 15,500 For further information on this Document please contact planningpolicy@fareham.gov.uk aa a23 Fareham LDF Annual Monitoring Report December 2011 5. Policy Analysis DEVELOPMENT PLAN POLICIES 5.1 The development plan policy analysis will help to identify whether a policy requires amendment or replacement in future Development Plan Documents (DPDs) or whether it should be considered for deletion. The development plan currently includes saved polices 6 retained in the Fareham Borough Local Plan Review (Local Plan) and polices contained within the Core Strategy. Appendix 1 of this AMR provides a detailed policy analysis of the existing Development Plan, linking the monitoring framework for the Local Plan with that of the Core Strategy (as set out in Core Strategy Chapter 7) and grouping the policies by theme e.g. 'Development Strategy'. 5.2 Following the adoption of the Core Strategy in August 2011 a number of Local Plan policies have been replaced and hence deleted from the Development Plan and it will no longer be necessary to monitor and report on these policies. Appendix 2 provides a list of the Local Plan policies replaced by the Core Strategy and Appendix 3 lists those polices that were not saved by the Secretary of State's direction in September 2007. 5.3 It is important to note that whilst the adoption of the Core Strategy occurred after the end of the 2010/11 monitoring period for which this AMR is expected to be concerned this AMR does not report on Local Plan policies that are now deleted. ANALYSIS METHODOLOGY 5.4 The analysis identifies, where possible: those policies which have not been implemented, explaining why, and setting out what steps are to be taken to ensure implementation; policies to be amended or replaced; whether policies are achieving objectives, in particular achieving sustainable development; any unintended consequences arising from the implementation of policies; whether the assumptions and objectives behind policies are still relevant; and any identified targets being achieved. 5.5 With regards to the Local Plan, there are a limited number of policies that contain specific time-related wording or targets. Appendix 10 of the Local Plan contains an implementation schedule for a number of the policies. A summary analysis has been made of progress towards meeting this implementation schedule. This is based upon the full assessment in Appendix 1. 6 saved by direction of the Secretary of State in September 2007. For further information on this Document please contact planningpolicy@fareham.gov.uk aa a24 Fareham LDF Annual Monitoring Report December 2011 Core Output Indicators 5.6 As3 mentioned in section 1 of this AMR, the requirements for monitoring and reporting on Core Output Indicators were removed by the Ministerial Letter of 30 March 2011. However, some of these indicators are still considered useful in terms of measuring LDF policies and will therefore be retained. Local Indicators 5.7 Local 3 Indicators help to form a baseline or backdrop covering areas that are not encompassed by the Core Output Indicators. Local Indicators are used to consider the effects of policies and help inform the interpretation of Core Output Indicators. Contextual Indicators and Significant Effects Indicators 5.8 Contextual 3 indicators can help to form a profile of the area, and assist in creating an assessment of the Borough. Significant Effects Indicators are established through the sustainability appraisals process. As the monitoring framework for the LDF matures, as DPD policies are formulated and progressed, a more quantitative framework will be applied to ensure the monitoring and assessment of objectives, targets and indicators is undertaken on a quantifiable basis. Over time contextual and significant effects indicators will be more readily use in the monitoring process. Data Availability and Gaps 5.9 The 3 main sources of data and information on development completions and other indicators of the state of the borough are derived from Fareham Borough Council departments, Hampshire County Council Survey Reports, and Hampshire Biodiversity Information Centre. A full list of sources is provided in Appendix 6. KEY FINDINGS Development Strategy 5.10 The 3 Development Strategy policies set out the proposed distribution of development across the Borough. The Plan area is broad settlement areas, focussed around the established settlements - Fareham, the Western Wards & Whiteley and the smaller settlements of Portchester, Stubbington & Hill Head and Titchfield. The Core Strategy seeks to focus development on previously developed land within the most sustainable and accessible settlements (this was also a key policy approach in the Local Plan). The majority of development is proposed to take place in Fareham and the Western Wards. Site Specific Polices 5.11 The delivery of Core Strategy policy CS6 - Spatial Strategy will be supplemented by the delivery of two Strategic Allocations at Coldeast and Daedalus. Local Plan Policies DG10 Coldeast Hospital and DG12 Daedalus Airfield have now been replaced by Core Strategy, policies CS10 and policy CS12, respectively. For further information on this Document please contact planningpolicy@fareham.gov.uk aa a25 Fareham LDF Annual Monitoring Report December 2011 Development Guideline (DG) Policies 5.12 Existing 3 Local Plan DG policies are difficult to measure. The analysis demonstrates that targets and indicators are predominantly subjective, where only the site specific policies can be measured through Local Indicators. The majority of the DG policies are achieved through consideration during pre-application discussions and development control decision making in general. The remaining DG policies will be revised through the Site Allocations and Development Management Policies DPD. Countryside, Coast and Nature Conservation Policies 5.13 The 3 majority of 'Countryside policies' are measurable through counting the number of applications permitted in accordance with each of the policies. All of the 'Countryside policies' continue to be achieved through consideration throughout pre-application and development management decision-making processes. The principle of maintaining and safeguarding the countryside has been revised and carried through into the Core Strategy DPD. Historic Environment Policies 5.14 All3the existing policies for the historic environment are measurable through counting the number of applications permitted in accordance and not in accordance with the policies. Furthermore, the historic environment policies are continually used throughout preapplication and development management decision-making processes. However, the outstanding issue is the lack of a monitoring system in place to record the exact achievement of these policies. Housing Policies 5.15 Housing 3 policies are predominantly measured through a combination of progress of delivery of housing allocations and Core Output Indicator information. The housing policies will be revised and encompassed within a variety of future LDDs including the Core Strategy, the Area Action Plans and SPDs due to their site specific nature. 5.16 Local Plan Policy H15 Sites for Gypsies and Travellers (now replaced by CS19 Gypsies Travellers and Travelling Showpeople) has historically been a difficult policy to measure. Core Output Indicator H4 now covers this and this indicator has been carried forward. The achievement of policies has been assessed predominantly through the identification of permission granted for such uses. Local Gypsy, Travellers and Travelling Showpeople pitch need and provision will be addressed through the Site Allocations and Development Management DPD. 5.17 Policy 3 H10 Affordable Housing (replaced by Core Strategy policy CS18) has been supplemented by the Affordable Housing Supplementary Planning Document which was adopted in December 2005 and came into effect in January 2006. This SPD has helped to deliver the target level of affordable housing throughout the Borough. Last year low completions in market housing, as a result of the recession, resulted in a significant decline in the number of affordable houses provided. Completions in market housing have still been relatively low through 2011/12, however, as shown in Core Output Indicator H5 there has been a marked increase in the number of affordable homes being delivered in the For further information on this Document please contact planningpolicy@fareham.gov.uk aa a26 Fareham LDF Annual Monitoring Report December 2011 Borough with 133 social rented and 84 intermediate homes being delivered (gross). Facilities, Services Infrastructure and Contributions Policies 5.18 The 3 majority of the existing facilities and services policies are site specific and therefore measurable through the progression of site development. The measurement of the site specific policies can be measured as Local Indicators with implementation established in the saved polices of the Local Plan. The achievement of these polices is analysed through the completion and progress of specific sites. Recreation, Leisure and Tourism Policies 5.19 The 3 analysis of the recreation, leisure and tourism policies show that these policies can be measured through either Local or Core Output Indicators. The achievement of these policies can then be assessed through examples of development or progress toward delivery of identified sites. These policies will be revised and encompassed within the Site Allocations and Development Management DPD. Employment Policies 5.20 The 3 existing employment policies can be measured through Core Output Indicators and Local Indicators where a schedule for their implementation has been established in the adopted Development Plan. Where the policies refer to specific sites their achievement can be assessed using examples. The employment policies will be revised and incorporated into a variety of DPDs including the Area Action Plans. Shopping and the Town Centre Strategy Policies 5.21 The 3 saved policy analysis demonstrates that the majority of existing policies can be measured. The Retail Health Check, completed biannually in Autumn and Spring, will assist with monitoring and measuring the measuring the vitality and viability of centres within the Borough. The achievement of these policies is predominantly though the development management process. Where a policy refers to a particular site, examples have been noted indicating any achievement. The principle of town centre and shopping development is established in the Core Strategy, with any detail to be encompassed within the Site Allocations and Development Management Policies DPD and the Fareham Town Centre Area Action Plan. Transport Policies 5.22 The 3 policy analysis demonstrates how the current transport policies can be measured in a variety of ways, with their achievements assessed through examples and through use within development control. Because the existing policies are varied they will be covered within all future DPDs including Area Action Plans depending upon the nature of the policy. The analysis highlights how transport policies must be dealt with individually in order to form effective policies within the LDF. For further information on this Document please contact planningpolicy@fareham.gov.uk aa a27 Fareham LDF Annual Monitoring Report December 2011 CONCLUSION 5.23 The 3 saved policy analysis demonstrates how the majority of current local plan policies are working effectively, particularly through the use of policies in decision-making processes. 5.24 The 3 analysis shows how a small number of policies cannot be measured through the use of Core Output Indicators or Local Indicators. This raises the issue that future policies should aim to be written in such a manner that they can be assessed in quantifiable terms. Furthermore, a system must be in place to continually collect and assess data in order to provide an effective method of policy analysis. 5.25 This 3 analysis is important and useful in highlighting areas of policies that require revision in order to reflect current and changing circumstances that the Borough faces, in order to derive effective policies. This is shown in the recommendations to a number of saved policies on the grounds that they are repeating other government guidance, or have no further use. A more detailed overview pertaining to the deletion or amendment of polices is provided in the next chapter. For further information on this Document please contact planningpolicy@fareham.gov.uk aa a28 Fareham LDF Annual Monitoring Report December 2011 6 Recommendations 6.1 The following section provides an overview of the recommendations that will improve the monitoring of LDF policies. CS15 Sustainable Development and Climate Change 6.2 There is currently no monitoring system in place to effectively measure the promotion of Sustainable Urban Drainage Systems. Furthermore, defining a Sustainable Urban Drainage System is subjective in itself. A new monitoring system should be devised to address this indicator. 6.3 At present there is no system in place to effectively monitor compliance with this policy. Conditions should be attached to planning consent to ensure relevant Code for Sustainable Homes and BREEAM standards are achieved. Conditions could be devised that that require the applicant to commission a report by an independent licensed code assessor to ensure that the standards are being met post construction/pre occupation. This cost would be the responsibility of the applicant. CS16 Renewable Energy 6.4 There is no monitoring system currently in place to effectively monitor renewable energy production. The policy only seeks renewable energy contributions from developments over a certain threshold. However, renewable energy generation can be undertaken under permitted development rights. Renewable energy installation under pd rights may provide a substantial proportion of the overall production although capturing the contribution will be problematic. The majority of renewable energy installations must to be registered with the district energy supplier, Southern and Scottish Electric (SEE), to ensure sufficient capacity exists within the network. Investigations should be made to see whether SEE have the data to quantify renewable energy output across the Borough. Ofgem provide a schedule of all renewable energy installation that are registered for the Government's Feed in Tariff (FIT) incentive, there is potential to use this data to identify how much energy is being produced. However, as the FIT is reduced in 2012 it is possible that fewer people will register with this Ofgem system which would impact on the reliability of the data. CS17 High Quality Design 6.5 The design principles set out in the policy should form an intrinsic aspect of any development. Where possible, design should be considered from the out-set and should ideally be discussed at the pre-application stage. All residential schemes should be required to meet Lifetime Home Standards. Lifetime Home Standards are closely allied to the design principles set out in the policy. Development Management, in consultation For further information on this Document please contact planningpolicy@fareham.gov.uk aa a29 Fareham LDF Annual Monitoring Report December 2011 with the Design Team, will ensure that the principles are met before the grant of planning consent (with regards to Lifetimes home this will be encouraged up to 2013 and required thereafter). It will be necessary to devise a monitoring system that captures the number of schemes that do not conform to these principles, in order to determine the effectiveness of the policy. CS20 Infrastructure and Developer Contributions 6.6 In order to monitor the effectiveness of this policy, a system will need to be devised that records the number of developments permitted that do not make infrastructure obligations that should be required to do so by the policy. In some instances, where it can be demonstrated that it is not possible (or necessary) to provide contributions this should be justified by the applicant. It will be important to distinguish, through the AMR, which planning applications which have not justifiably provided planning obligations; if the policy is effective this figure should be nil. CS4 Green Infrastructure, Biodiversity and Geological Conservation 6.7 Policy C17 sets out the requirement to contribute to the objectives and targets set out in UK, Regional, County and Local Biodiversity Action Plans, particularly within the identified Biodiversity Opportunity Areas. This indicator cannot be reported on currently due to a lack of data availability. A reliable data source to report on this indicator is required in order to measure the effectiveness of part of the policy. 6.8 It is currently not possible to measure the amount, quality and function of green infrastructure delivered. It will be necessary to devise a monitoring system that captures the number of schemes that do not conform to these principles, in order to determine the effectiveness of the policy. CS21: Protection and Provision of Open Space 6.9 There is no robust mechanism for monitoring the quantum of additional open space being provided or the loss of open space. A mechanism will be required where the quantum of open space is recorded at the point where consent is granted. It will also be necessary to measure the quality and accessibility and spatial location of the addition open space in order to measure the effectiveness of this policy. For further information on this Document please contact planningpolicy@fareham.gov.uk aa a30 Fareham LDF Annual Monitoring Report December 2011 Appendices APPENDIX 1 – Development Plan Policy Analysis APPENDIX 2 – List of Saved Local Plan polices Replaced by the Core Strategy APPENDIX 3 – List of Local Plan Policies not saved in by 2007 Government direction APPENDIX 4 – Schedule of sites comprising the five year housing land supply APPENDIX 5 – List of Sources For further information on this Document please contact planningpolicy@fareham.gov.uk aa a31 . Fareham LDF Annual Monitoring Report December 2011 APPENDIX 1 DEVELOPMENT PLAN POLICY ANALYSIS Core Strategy Polices can be distinguished from Local Plan policies by the usage of the prefix 'CS' in the policy title. Core Strategy and Local Plan policies have been grouped into related policy themes. Policy Indicator Type Indicator Achievement Comments DEVELOPMENT STRATEGY CS6 The Development Strategy Development will be focussed in: Core Output Indicator BD2 Fareham (Policy CS7), the Western Wards & Whiteley (Policy CS9), Portchester, Stubbington & Hill Head and Titchfield (Policy CS11); Total amount of additional employment floorspace - by type and settlement. Land at the Strategic Development Locations to the North of Fareham (Policy CS13) and Fareham Town Centre; (Policy CS8); Land at the Strategic Development Allocations at the former Coldeast Hospital (Policy CS10) and Daedalus Airfield (Policy CS12). In identifying land for development, the priority will be for the reuse of previously developed land, within the defined urban settlement boundaries including their review through the Site Allocations and Development Management DPD, taking into consideration biodiversity / potential community value, the character, accessibility, infrastructure and services of the settlement and impacts on both the historic and natural environment. Opportunities will be taken to achieve environmental enhancement where possible. Core Output Indicator BD4i Total amount of floorspace for "town centre uses" delivered within Town Centre areas - by Use Class B1 Gross (sq m) 313 Net (sq m) -193 B1A B1-B8 B2 B8 Total (sq m) 0 0 1,181 0 0 0 -360 0 1,494 -553 Use Class A1 A2 For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa Gross (sq m) 1,240 0 Net (sq m) -82 0 Total of 313 sq m (gross) B1 employment floorspace and 1,181 (gross) B2 floorspace provided across Fareham Borough. However all of these were redevelopment schemes for replacement employment units and resulted in a net loss of 553 sq m of employment floorspace overall. For employment provision by settlement area see policies CS7, CS9, CS11. CS11. Total of 1,240 sq m (gross) and -82 sq m (net) of 'town centre uses delivered within Town Centre areas. The net loss is due to the A1 a32 Fareham LDF Annual Monitoring Report Policy December 2011 Indicator Type Indicator settlement. Development which would have an adverse effect on the integrity of protected European conservation sites which cannot be avoided or adequately mitigated will not be permitted. This will be informed by the results of ongoing surveys and research, including the Solent Disturbance and Mitigation Project, which may result in adjustments to the scale and/or distribution of development set out in policies CS7-CS13 and could reduce the overall level of development. Core Output Indicator BDii 7 Total amount of floorspace for "town centre uses" delivered outside of Town Centre area - by settlement. Local Indicator Total number of vacant units in centres Core Output Indicator H1 & H2 Core Output Indicator H3 Plan Period and housing targets. Greater than 60% of new dwellings delivered on previously developed land (PDL). Achievement B1a D2 Total (sq m) Comments 0 0 0 0 1,240 -82 Use Gross Net Class (sq m) (sq m) A1 2,706 2,706 A2 0 0 B1a 0 0 D2 0 0 Total (sq 2,706 2,706 m) 42 units were recorded as vacant (2 down from autumn 2009), giving a vacancy for the town centre as a whole of just 10.24%.7 floorspace lost through the redevelopment of the Broadlaw Walk scheme. For 'town centre use' provision by settlement area, see policies CS7, CS9 Total of 2,706 sq m (net) of 'town centre' uses provided outside Town Centre areas. For 'town centre use' provision by settlement area, see policies CS7 See Section 4, Tables 4.1, 4.3 and 4.4. Total Gross Completions % on PDL (Gross) 137 35.68 % There has been a significant drop in percentage of new dwellings completed on PDL when compared with data from the previous Retail health check For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa a33 Fareham LDF Policy Annual Monitoring Report December 2011 Indicator Type Indicator Achievement Comments monitoring year (93.26%). 36% is below the national target of 60% as set out in Planning Policy Statement 3: Housing (PPS3). This reduction is predominately due to a high proportion of completions on greenfield Local Plan housing allocations (mainly at Hunts Pond Road). Local Indicator Net additional dwellings by settlement. This indicator is measured under CS7, CS9, CS11 The effects of the reclassification of garden sites in July 2011 (garden sites are no longer classed as PDL in PPS3) are also apparent but less significant. For total additional dwellings, see Section 4, Table 4.1. For additional dwellings by settlement area see policies CS7, CS9, CS11. For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa a34 Annual Monitoring Report Development will only be permitted where it does not significantly affect the setting and landscape character of the town or diminish the town’s, community, historic, biodiversity and cultural resources nor have an adverse impact on air quality Local Indicator Contribute toward 350 dwellings within Fareham Town Centre between 2010 and 2026. Contribute toward 13,000 sq m of B1 employment floorspace between 2010 and 2026. 89 dwellings delivered within Fareham settlement area. Total 11+ years (2012-2026) Contribute toward 680 dwellings in Fareham settlement area between 2010 and 2026. Comments Housing Delivery 89 - - - 89 Housing Supply - 199 107 310 616 Total 89 199 107 310 705 This indicator is measured under CS8 Net Floorspace Local Indicator Achievement 6-10 years (2016-2021) Development will be permitted within the Fareham settlement boundary where it contributes to one or more of the following: the provision of around 680 dwellings in the period 201026 (including around 350 within the Fareham Town Centre area); employment floorspace for B1 development, in the region of 13,000 sq m; the expansion and strengthening of the role of the town centre, including a new supermarket on the Foundry site, of 3,900 sq m net sales floorspace and additional comparison retail floorspace; sustainable transport measures; facilities for business, education, leisure, culture or community uses; provision of green infrastructure including additional parks and amenity open space, outdoor sport pitches and access to natural greenspace; the delivery of a high quality transport interchange facility at Fareham railway station; development of the Bus Rapid Transit South East Hampshire Harbour Link and improvements to air quality. Local Indicator Indicator 0-5 years (20112016) CS7 Development in Fareham Indicator Type 2010-2011 Policy December 2011 Employment Floorspace Gains Employment Floorspace Lost Fareham LDF Site 1 313 506 -193 Total 313 506 -193 For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa Capacity exists to deliver a further 616 dwellings. See policy CS8 B1 floorspace completions at one sites: 1. 6-10 SPURLINGS INDUSTRIAL ESTATE, SPURLINGS YARD, FAREHAM Loses in employment floorspace exceed gains resulting in a net loss of 193 sq m B1 employment floorspace. a35 Annual Monitoring Report Local Indicator Contribute toward B2 employment floorspace between 2010 and 2026. Comments Net Floorspace Achievement Site 1 832 1318 -486 Total 832 1318 -486 Contribute toward 20,000 sq m of retail floorspace between 2010 and 2026. 0 Net Floorspace Local Indicator Indicator Employment Floorspace Lost The Fareham Town Centre Area Action Plan (see Policy CS8) will identify will identify development sites, transport and environmental improvements and define the town centre boundary. Indicator Type Employment Floorspace Gains Policy December 2011 Retail (Town Centre use) floorspace gains Retail (Town Centre use) floorspace Loses Fareham LDF Site 1 2241 2241 Site 2 350 0 350 Site 3 890 1322 -432 Site 4 465 0 465 Total 3946 1322 2624 B2 floorspace completions at one site: 1. LUCKETTS TRAVEL, BROADCUT, FAREHAM Loses in employment floorspace exceed gains resulting in a net loss of 486 sq m B2 employment floorspace. Retail (A use class) completions at four sites: 1. BROADCUT, FAREHAM - EXTENSIONS AND ALTERATIONS TO SAINSBURYS STORE 2. 66 WEST STREET, FAREHAM - CHANGE OF USE OF GROUND FLOOR/FIRST FLOOR FROM OFFICE TO RETAIL 3. BROADLAW WALK, FAREHAM REDEVELOPMENT FOR MIXED USES INCLUDING RETAIL 4. SAINSBURYS STORE, BROADCUT RESTAURANT EXTENSION TO FRONT OF STORE For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa a36 Annual Monitoring Report December 2011 the provision of around 1,480 dwellings between 2010 and 2026 in the Western Ward settlements and around 180 dwellings at Whiteley; economic development through the provision of 1,000 sq m of B1 and 29,000 sq m of B2/B8 floorspace in the western ward settlements and around 23,000 sq m of B1 floorspace at Whiteley; local facilities for business, leisure, culture or community facilities, including the provision of a community hospital, open space, sports pitches, allotments and cemetery provision at the former Coldeast Hospital site; supports sustainable transport and an enhanced Local Indicator Contribute towards 1,000 sq m of B1 floorspace in the Western Wards between 2010 and 2026. Comments All retail development in the Borough has occurred within Fareham's settlement area. Completions are a result of redevelopment and extensions and change of use to existing developments. However, only Site 2 was delivered within Fareham Town Centre. 243 dwellings delivered within Western Wards settlement area. Total Development will be permitted within the Western Wards and Whiteley settlement boundaries where it protects their setting and the natural, historic, biodiversity and cultural resources and contributes to one or more of the following: Contribute towards 1,480 dwellings in the Western Wards between 2010 and 2026. 11+ years (2012-2026) Local Indicator Achievement 6-10 years (2016-2021) CS9 Development in the Western Wards & Whiteley Indicator 0-5 years (2011-2016) Indicator Type Policy 2010-2011 Fareham LDF Housing Delivery 243 - - - 243 Housing Supply - 939 231 103 1273 Total 243 939 231 103 1516 Capacity exists to deliver a further 1,273 dwellings. This high quantum of housing is consistent with the Core Strategy vision to direct development toward the Western Wards and Whiteley. Nil B1 floorspace completed in the Western Wards. For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa a37 Annual Monitoring Report Contribute towards and 23,000 sq m of B1 floorspace in the Whiteley between 2010 and 2026. Local Indicator Contribute towards 180 dwellings at Whiteley between 2010 and 2026. 223 126 Total - 349 223 126 B2 floorspace completions at one site: 1. R K MARINE LIMITED, BRIDGE ROAD, SWANWICK Gains in employment floorspace exceed losses resulting in a net gain of B2 employment floorspace of 126 sq m Nil B1 floorspace completed in Whiteley Total Local Indicator Net Floorspace 349 Housing Delivery Housing Supply CS11 Development in Stubbington & Hill Head, Portchester and Titchfield Employment Floorspace Lost B2 Total Local Indicator Site 1 6-10 years (2016-2021) 11+ years (2012-2026) Contribute towards and 29,000 sq m of B2/B8 floorspace in the Western Wards between 2010 and 2026. Comments Employment Floorspace Gains Local Indicator Achievement 0-5 years (2011-2016) pedestrian environment; supports the provision of additional access to and/or enhanced biodiversity at Chilling/Brownwich and in the Hamble Valley where possible contributing to the conservation or enhancement of the interest features of nearby sites of national or international importance; expansion of the district centre; a swimming pool in the Western Wards. Indicator Use Class Indicator Type Policy December 2011 2010-2011 Fareham LDF 22 - - - 22 - 170 0 0 170 22 170 0 0 192 Contribute towards 60 dwellings in For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa 22 dwellings delivered within Whiteley settlement area. Capacity exists to deliver a further 170 dwellings. This quantum of housing is consistent with the Core Strategy vision to direct development toward the Western Wards and Whiteley. 8 dwellings delivered within Portchester settlement area. a38 Annual Monitoring Report December 2011 Portchester between 2010 and 2026. protects the setting of the settlement; protects their natural, historic, biodiversity and cultural resources; contributes to the provision of green infrastructure; maintains and strengthens the character, vitality and viability of district and local centres; contributes to the following levels of development. Settlement Area Portchester Residential Development Around 60 dwellings Stubbington & Hill Head Titchfield Around 60 dwellings Around 30 dwellings Employment Development 1,800 sq m B1 300 sq m B2/B8 650 sq m The provision of new community, built sports and cultural facilities will be supported in Stubbington & Hill Head and Portchester through the expansion of existing facilities. Achievement Housing Delivery Housing Supply Total Local Indicator Local Indicator Contribute towards 1,800 sq m B1 employment floorspace between 2010 and 2026 in Portchester. Contribute towards 300 sq m B2/B8 employment floorspace between 2010 and 2026 in Portchester. Comments Total Small scale development will be permitted within the settlement boundaries of Portchester, Stubbington & Hill Head and Titchfield where it: Indicator 0-5 years (2011-2016) 6-10 years (2016-2021) 11+ years (2012-2026) Indicator Type Policy 2010-2011 Fareham LDF 8 - - - 8 - 16 16 28 50 8 16 16 28 58 Capacity exists to deliver a further 50 dwellings. This low quantum of housing is consistent with the Core Strategy vision to direct development toward the Western Wards to and minimise the level of development in lower order settlement area of Portchester. Nil B1 floorspace completed in Portchester. Nil B2/B8 floorspace completed in Portchester. For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa a39 December 2011 Housing Delivery Housing Supply Total Local Indicator Contribute towards 30 dwellings in Titchfield between 2010 and 2026. Housing Delivery Housing Supply Total For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa 2 - - - 2 - 36 20 0 56 2 36 20 0 58 Total Contribute towards 60 dwellings in Stubbington & Hill Head between 2010 and 2026. Comments Total Achievement 0-5 years (2011-2016) 6-10 years (2016-2021) 11+ years (2012-2026) Local Indicator Indicator 0-5 years (2011-2016) 6-10 years (2016-2021) 11+ years (2012-2026) Indicator Type 2010-2011 Policy Annual Monitoring Report 2010-2011 Fareham LDF 0 - - - 0 - 13 16 0 29 0 13 16 0 29 2 dwellings delivered within Stubbington & Hill settlement area. Capacity exists to deliver a further 56 dwellings. This low quantum of housing is consistent with the Core Strategy vision to direct development toward the Western Wards to and minimise the level of development in lower order settlement area of Stubbington & Hill Head. Nil dwellings delivered within Stubbington & Hill settlement area. Capacity exists to deliver 29 dwellings. This low quantum of housing is consistent with the Core Strategy vision to direct development toward the Western Wards to and minimise the level of development in lower order settlement area of Titchfield. a40 Fareham LDF Annual Monitoring Report December 2011 Indicator Type Policy Local Indicator Indicator Contribute towards 650 sq m of employment at Titchfield between 2010 and 2026. Achievement Comments Nil employment floorspace completed in Titchfield. SITE SPECIFC POLCIES CS10 Coldeast Hospital Strategic Site The comprehensive development of the former Coldeast Hospital Site will be achieved through the implementation of the existing residential planning permissions for 250 dwellings and through the preparation and adoption of a Supplementary Planning Document. Development will be permitted where it delivers, or facilitates the delivery of high quality development: Within the urban area the development of a second phase of the community hospital on approximately 1.0 ha of land immediately north of the existing community hospital, or for other health, community, or residential institution uses (use Classes C2, D1 or D2) in the event it is declared surplus to foreseeable NHS requirements; the development of approximately 0.75 ha of land immediately west of the community hospital for up to 30 dwellings including affordable housing, with appropriate links to surrounding development and open space Development outside the urban area the repair, and long term restoration and re-use of the Mansion House, including the repair of the walled garden, Brook Lane Gate Lodge, with the repair and reinstatement of associated Lodge gates, gate piers and Within Urban Area Local Indicator Local Indicator To deliver the 2nd phase of the community hospital (or other uses as described). Deliver up 30 dwellings including affordable housing in between 2010-26. See comment See comment Development at this site (in addition to that already underway) has not yet started however the Supplementary Planning Document has been adopted. Outside Urban Area Local Indicator Local Indicator Local To secure a long term use for the Mansion House. Provision of sport pitches, cemetery extension, allotments, swimming pool and improved built community facilities. Provision of See comment See comment Development at this site (in addition to that already underway) has not yet started however the Supplementary Planning Document has been adopted. See comment For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa a41 Fareham LDF Annual Monitoring Report Policy wing walls, as part of the complex of locally listed buildings on the site. The Mansion House and approximately 3.5 ha of grounds (an historic park and garden) would be suitable for use as a hotel with associated conference and leisure facilities or for employment or care use provided that the permitted use safeguards the integrity of the house and gardens, including the walled garden, whilst enabling some public access. Extensions to the Mansion house and/or satellite buildings in its grounds will be strictly limited in scale to that demonstrated to be necessary to secure the restoration and re-use of the Mansion. The Brook Lane Gate Lodge is suitable for residential re-use; improvements to pedestrian, cycle and public transport access to and through the site, together with appropriate traffic calming and safe routes to schools and links to the footpath network in the local area; the provision of sports pitches and informal public open space, including retention of the existing woodland, and conservation and enhancement of biodiversity and habitat interests on the site, linking with Holly Hill Woodland Park and the wider countryside; the provision of a new cemetery; the provision of new allotments; the provision of a sports pavilion with an integral community meeting room; the provision of a public swimming pool facility; and between 150 and 170 dwellings including affordable housing, of a mix of sizes, together with a sheltered housing scheme comprising private and affordable dwellings of up to 60 units of accommodation and associated communal facilities, will be permitted on approximately 6.0ha gross of the site to facilitate the delivery of the above listed social, environmental and repair/restoration benefits. December 2011 Indicator Type Indicator Local Indicator Indicator between 150 and 170 dwellings including affordable housing between 2010-26. Provision of a sheltered housing scheme comprising private and affordable dwellings of up to 60 units. Achievement Comments See comment Planning Permission will not be granted for residential For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa a42 Fareham LDF Annual Monitoring Report Policy December 2011 Indicator Type Indicator Achievement Comments development outside the urban area in isolation of the repair/restoration of all of the locally listed buildings, and the provision of appropriate financial contributions towards delivery of the identified social and environmental benefits, together with the securing of the publicly accessible open space through the transfer of the land to the Council or an appropriate management company. The dwellings and sheltered housing accommodation, together with related open space would be built in the south-east of the site, to the north and south of the former Mansion House drive. The precise number of dwellings will be subject to detailed site analyses and design and the need to ensure that the integrity of the locally listed buildings, trees and the parkland setting is appropriately protected whilst ensuring the living environment of future occupiers is safeguarded. This development, together with the Mansion House will be accessed via Coldeast Way and Brook Lane. The sports pavilion and pitches, cemetery, allotments and site for the future provision of a public swimming pool facility will be provided in the Southern and Western parts of the site, accessed from Barnes Lane. For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa a43 Fareham LDF Annual Monitoring Report Policy CS12 Daedalus Strategic Site December 2011 Indicator Type Local Indicator The Daedalus Airfield is allocated for strategic employment development. Development will be permitted where: • it is demonstrated that it does not adversely affect the existing or future potential general aviation operation of the airfield; • it does not unacceptably diminish the integrity and function of the strategic gap between Stubbington/ Lee-on-the-Solent and Fareham/ Gosport; • it does not adversely affect the integrity of the landscape character of the countryside; • it can demonstrate that there will be no adverse impacts on European designated sites; • primary access is from Broom Way (Hangars East) and Gosport Road (Hangars West); • it does not have an adverse impact on air quality; • prior consideration is given to the potential extraction of mineral deposits; • it incorporates the site's heritage where feasible; • both archaeological and contamination assessments and evaluations are carried out prior to the commencement of development; • it delivers, or facilitates the delivery of high quality development including: Local Indicator Local Indicator Indicator To provide between 10,00033,000 sq m of industrial and warehousing employment development. Contribute towards provision for recreation and open space accessible to new and existing residents. Provision of landscaping and green infrastructure including allotments together with linkages to the existing footpath network and the Alver Valley. Achievement See comment Comments Development at this site has not yet stated however an outline planning application was submitted in June 2011. See comment See comment a. employment development that retains and strengthens the marine and aviation employment clusters, particularly those that require direct access to an operational airfield; b. between 10,000 sq m and 33,000 sq m of net additional general, or light industrial or warehousing (associated with aerospace or marine) employment floorspace with only ancillary office accommodation, to contribute towards the overall provision set out in Policy CS1; c. the creation of local employment opportunities that take For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa a44 Fareham LDF Annual Monitoring Report Indicator Type Policy d. e. f. g. h. i. December 2011 Indicator Achievement Comments advantage of and develop local skills, including during construction; open space accessible to residents particularly those of Stubbington and Hill Head; landscaping and green infrastructure including allotments together with linkages to the existing footpath network and the Alver Valley; environmental and biodiversity protection and enhancement; minimising increases in traffic levels and congestion, through sustainable transport arrangements; a reorganisation and consolidation of existing and new floorspace, including the phased removal of some existing built structures to create an efficient arrangement of buildings and associated activities sympathetic to the landscape and strategic gap, whilst having regard to the specific space and operational requirements of aviation related employment uses; appropriate utility service provision (water, waste water, energy and communications). Replacement and new buildings will be energy efficient and be designed to reflect existing building heights and mass and take advantage of site topographical and built features that help to reduce adverse impacts upon residential amenity, landscape character and the integrity of the strategic gap. Development must take account of the odour contour on the north of the site from the Peel Common waste treatment works. CS13 North of Fareham Strategic Development Area Local Indicator Permission will be granted for the development of a Strategic Development Area to the north of Fareham following the adoption Local Indicator Provide 6,5007,500 dwellings at the SDA Provide up to 90,750 sq m of See comment See comment For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa Development at this site has not yet stated however the Area Action Plan is in preparation. a45 Fareham LDF Annual Monitoring Report December 2011 Indicator Type Policy of an Area Action Plan and the preparation of a comprehensive masterplan for the development. The development will include provision for between 6,500- 7,500 dwellings, unless it is found that this level of housing cannot be delivered without adversely affecting the integrity of protected European conservation sites. If any potential adverse effects cannot be avoided or adequately mitigated, the level and scale of development would need to be reduced accordingly to ensure that there are no adverse effects on the integrity of any European sites. The development will also provide supporting environmental, social and physical infrastructure, retail and employment floorspace to both support the development and to contribute towards meeting the development objectives of the South Hampshire Sub-Region. The new community will aim to be as self-contained as possible, whilst complementing and supporting the established town centre of Fareham and adjoining settlements. Local Indicator Local Indicator Indicator employment floorspace Provision of road access to the M27 Provision of a Bus Rapid Transit link to Fareham town centre Achievement Comments See comment See comment The high level development principles are: the new development will create an inclusive and cohesive community, built upon the principles of sustainability; the development will be an exemplar of sustainable design, and resource efficiency, and will minimise water consumption and carbon emissions arising from operational energy use in new and existing buildings and infrastructure within the SDA; the development will provide up to 90,750 sq m of employment floorspace, in a range of employment opportunities which contribute to sub-regional economic development objectives and contribute towards creating a high level of self containment and accessibility to reduce the need for commuting; For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa a46 Fareham LDF Annual Monitoring Report December 2011 Indicator Type Policy the layout will create a connected network of Strategic Green Infrastructure, open spaces and recreational facilities that respects and enhances the landscape qualities of the area and meets the needs of the new community; and avoids or mitigates the potential ecological impacts of the development, and provides a net gain in biodiversity in the area. The basis for developing a Green Infrastructure Strategy will be to conserve and enhance the existing landscape, historic and ecological features on the site and adjacent areas, whilst linking new and established green spaces within the built environment and connecting the urban area to its wider rural hinterland; the provision of Green Infrastructure to meet the recreational needs of additional residents, to contribute to the access networks to the natural environment and BAP targets to achieve a net gain for biodiversity, to make a positive contribution towards implementing the Partnership for Urban South Hampshire Sub-Regional Green Infrastructure Strategy, and to ensure that any potential adverse effects on nationally and internationally protected sites identified through the SA/ HRA work are avoided. Where adequate mitigation or avoidance measures cannot be achieved on site through the provision of Green Infrastructure a financial contribution will be sought to provide off-site mitigation measures such as managing access to nationally or internationally important sites or the provision of off-site Green Infrastructure; green buffers will be incorporated into the layout to prevent coalescence with Knowle, Wickham, Funtley and Fareham; the AAP and masterplan will be developed in accordance Indicator Achievement For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa Comments a47 Fareham LDF Annual Monitoring Report December 2011 Indicator Type Policy Indicator Achievement Comments with the Emerging Transport Strategy, which is based on the following key principles; o The SDA will have high levels of self containment; o The SDA will address a significant proportion of trips through the development of robust reduce and manage policies; o Bus Rapid Transit (BRT) will form a key component of the access strategy; o Access will initially be via the A32 and junction 10 of the M27; o At a later stage a link road may be required from the A32 to junction 11 of the M27; o A phasing plan will be agreed, setting out how the rate of development will be linked to the funding and provision of the necessary transport infrastructure. the longer term transport interventions will need to be carefully designed to minimise the impacts on the strategic road network and fully mitigate any environmental or traffic impacts. It will also need to help facilitate an effective Bus Rapid Transit system; a balanced package of measures will be introduced to encourage smarter transport choices to meet the needs of the new development, and maximise the opportunities for sustainable travel; including the provision of a network of footpaths, cycleways and bridleways to enhance permeability within the site and to access the adjoining area; connection to the Bus Rapid Transit system; and effective measures to mitigate the transport impacts of the proposed development on the strategic and local road network; the development will provide supporting social and physical infrastructure; including a range of convenience and comparison shopping, local employment, health, For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa a48 Fareham LDF Annual Monitoring Report December 2011 Indicator Type Policy Indicator Achievement Comments community and leisure facilities centred around a new district centre, together with provision for pre-school, primary and secondary education. Up to three local centres will be provided to act as neighbourhood hubs for the provision of social infrastructure and local employment opportunities; the layout will provide for a range of housing types, sizes and tenures to meet the needs of the new community and aim to provide between 30-40% affordable housing; a Sustainable Drainage System will be fully integrated into the network of open spaces, to mitigate potential flood risk, allowing the SDA to adapt to climate change whilst providing biodiversity benefits and enhanced recreational opportunities. The development must also provide sewerage infrastructure. The detailed framework setting the nature, form and boundary of the new community will be set out in an Area Action Plan. Other locations in the Borough will not be developed in lieu of development at the Strategic Development Area regardless of the eventual capacity or the phasing of the development. An infrastructure phasing plan will be prepared and agreed by the Council, setting out how the rate of development will be linked to the funding and provision of the necessary social and physical infrastructure to ensure that the respective phases of the development do not come forward until the necessary infrastructure has been secured. The masterplan will be produced in partnership with the development interests and will provide an indicative layout showing the disposition and quantity of future land-uses, and give a three dimensional indication of the urban design parameters which will be incorporated into any future planning application; For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa a49 Fareham LDF Annual Monitoring Report December 2011 Indicator Type Policy Indicator Achievement Comments An improved monitoring system must be developed in order to test the effectiveness of this policy in terms of achieving the Code for Sustainable Homes. An improved monitoring system must be developed in order to test the effectiveness of this policy in terms of achieving BREEM standards. together with a phasing and implementation strategy. The masterplan will be accompanied by or incorporate a sustainability strategy which clearly demonstrates how the principles of sustainable development will be incorporated into the proposals and implemented to achieve the aim of an exemplar of a sustainable community. A management plan will be produced as part of the masterplanning process to demonstrate how infrastructure and community assets will be maintained and managed. All the above documents will need to be clear on the expected outcomes, and be sufficiently flexible to respond to changing opportunities and circumstances. They will also need to demonstrate how the National Air Quality Standards will be met. DEVELOPMENT GUIDELINES Local Indicator The Borough Council will promote and secure sustainable development by directing development to locations with sustainable transport options, access to local services, where there is a minimum negative impact on the environment or opportunities for environmental enhancement. Development must not prejudice the development of a larger site. Number of dwellings not meeting the relevant Code for Sustainable Homes standards. Data for this indicator is unavailable CS15 Sustainable Development and Climate Change Local Indicator Amount of multi residential and non-residential floorspace completed that does not meet the relevant BREEAM standards. Number of planning consents granted for non- Data for this indicator is unavailable This will be achieved by: Ensuring that the scale and density of the proposal makes an efficient use of land. With a minimum of 60dph within areas with high multi-modal transport accessibility and good access to a range of social, environmental and economic infrastructure, taking account of the character of Local Indicator None For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa Policy has been effective a50 Fareham LDF Annual Monitoring Report Indicator Type Policy December 2011 the location. Seeking to achieve the following timescale and levels for the Code for Sustainable Homes and the equivalent for non residential development unless it can be demonstrated to be unviable: All residential development achieves at least the following level of Code for Sustainable Homes standard Until the end of 2011 4 From 2012 5 From 2016 6 All multi-residential and non-residential development with a floorspace of over 500m2 must achieve the following BREAM standards. BREEAM ' Until the end of 2011 very good' BREEAM From 2012 'excellent' BREEAM From 2016 'excellent' Core Output Indicator E1 Local Indicator Indicator compatible development (as defined in PPS25) outside of Flood Zone 1. Number of planning permissions granted contrary to EA advice on flooding and water quality grounds Number of developments incorporating Sustainable Urban Drainage Systems. Achievement Comments None Policy has been effective Data for this indicator is unavailable There is currently no monitoring system in place to effectively measure this indicator. Ensuring that there is sufficient capacity available, or will be made available, in existing infrastructure to meet the needs of the new development including adequate land and funding for waste management. Avoiding unacceptable levels of flood risk and proactively managing surface water through the promotion of sustainable drainage techniques. For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa a51 Fareham LDF Annual Monitoring Report December 2011 Indicator Type Policy CS16 Natural Resources and Renewable Energy Local Indicator New development will be expected to safeguard the use of natural resources by: Demonstrating the latest best practice for energy efficiency, passive solar design and water conservation in the construction and use of the buildings; Taking measures to reduce carbon emissions, pollution and waste during the construction and operation of new developments through orientation, layout, design and material selection; Reducing, reusing and recycling waste on-site; Preventing the loss of the best and most versatile agricultural land (Grades 1, 2 or 3a of the Natural England Agricultural Land Classifications System); Protecting mineral resources from permanent development, without first allowing for extraction, which would lead to the sterilisation of the deposit. Development (1 dwelling or more and 500m2 or more of nonresidential floorspace) will be encouraged to contribute to the Fareham target of 12MW of renewable energy by 2020. Major developments (250 dwellings or more or 5,000 sq m or more of non-residential floorspace) should aim to maximise on-site renewable energy production and resource efficiency. In such cases, the extent of contribution should be demonstrated, taking account of viability. The generation of energy from renewable or low carbon sources will be permitted unless there are judged to be unacceptable social, environmental or economic impacts. CS17 High Quality Design All development, buildings and spaces will be of a high quality of design and be safe and easily accessed by all members of the community. Proposals will need to demonstrate adherence to the Indicator Amount of development on the best and most versatile and most agricultural land (Grades 1, 2 or 3a agricultural land). Achievement 1 site granted planning permission (outline and then full consent) on 2 applications granted on grade 2 agricultural land. Core Output Indicator (E3) Contribution toward 12 MW of renewable energy generated by 2012. No data for this indicator available. Core Output Indicator H6 Number of new development achieving the Building for Life (BFL) standard of 10 sites assessed year. 5 were rated as "average", 4 as "good" and one as "very good" (Coach & Horses scheme in Titchfield). For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa Comments Although the site is designated as agricultural the site was in fact determined to be brownfield (formerly occupied b y a number redundant residential buildings used as Children's Residences) The policy has therefore been effective as none best and most versatile agricultural land has been lost. There is no currently no mechanism in place to monitor this indicator. Building for life standards are not a policy requirement. However, the Assessment provides a useful indicator of high a52 Fareham LDF Annual Monitoring Report December 2011 Indicator Type Policy principles of urban design and sustainability to help create quality places. In particular development will be designed to: respond positively to and be respectful of the key characteristics of the area, including heritage assets, landscape, scale, form, spaciousness and use of external materials, provide continuity of built form, a sense of enclosure with active frontages to the street and safety of the public realm, ensure permeable movement patterns and connections to local services, community facilities, jobs and shops, create a sense of identity and distinctiveness and one that is legible, enable and/or encourage a mix of uses and diversity in an area, ensure that the public realm has pedestrian priority77, is safe, secure, functional and accessible, and is constructed of quality materials and well maintained, enable buildings to provide flexible accommodation, which can be adapted to suit all members of a community throughout their lifetime, provide green infrastructure, including landscaping, open spaces, greenways and trees within the public realm, and provide appropriate parking for intended uses taking account of the accessibility and context of a development and tackling climate change. In addition new housing will be required to: Indicator Achievement 'good' or above. Local Indicator Amount of development permitted following design principles No data is available for this indicator Local Indicator Number of dwellings not meeting the relevant Code for Sustainable Homes standards. Amount of multi residential and non-residential floorspace completed that does not meet the relevant BREEAM standards. Number of dwellings meeting the Lifetime Homes from 2013. See Policy CS15 Local Indicator Local Indicator Comments quality design and will be retained to measure this policy. All relevant planning applications should have regard to design principals from the outset. See Policy CS15 Data for this indicator is unavailable There is no currently no mechanism in place to monitor this indicator. secure adequate internal and external space, dwelling mix, privacy, and sunlight and daylight to meet the requirements of future occupiers. Demonstration of adherence to the principles must be set out For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa a53 Fareham LDF Annual Monitoring Report Policy December 2011 Indicator Type Indicator Achievement Comments within design and access statements, and/or where relevant, design codes, briefs, frameworks or masterplans and to include a contextual analysis. Where relevant, a report by a licensed assessor which sets out compliance with the BREEAM and/or Code for Sustainable Homes level operating at the time of any application for planning permission. New housing should seek to achieve the Lifetime Home standard from 2013. Prior to 2013, the Council will encourage developers to meet the lifetime home standard having regard to the viability of the proposal DG4: Site Characteristics Development will be permitted, provided that it: (A) retains any important historic features on the site; (B) does not detract from the natural landform of the site; (C) retains areas or features of landscape or nature conservation value; (D) respects views into and out of the site; and (E) takes proper account of any contamination of the land DG7: Signs and Advertisements Signs and advertisements will be permitted, provided that they: (A) do not adversely affect the character, quality and appearance of the building or the surrounding area; (B) do not combine with existing advertisements to create an unacceptable cumulative impact; (C) do not create a hazard to public safety; and (D) in the case of a listed building or a building in a conservation area, it complies with Policies HE2 and HE7 respectively. DG8: Commercial Frontages Local Indicator Maintaining important site characteristics and features. This policy has been taken into account during pre-application discussions and in the determination of applications. This policy will be replaced in principle as part of the Site Allocations & Development Management DPD. Local Indicator Ensure signs and advertisements in accordance with policy. This policy has been taken into account during pre-application discussions and in the determination of applications. This policy is covered by PPS1 and PPS5 and detail will be incorporated into the Site Allocations & Development Management DPD, and Fareham Town Centre AAP. Local Indicator Effect of policy on appearance of This policy has been taken into account during pre-application This policy is covered by PPS1 and PPS5 and For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa a54 Fareham LDF Annual Monitoring Report December 2011 Indicator Type Policy Development involving the creation of a new frontage, including the erection of blinds, canopies and shutters or the alteration of existing frontages, will be permitted provided that: (A) it takes account of the architectural characteristics of the individual building and its surrounding area; (B) it does not adversely affect the character and appearance of the building or the surrounding area; and (C) in the case of a listed building, it complies with Policy HE2 or in the case of a building in a conservation area, it complies with Policy HE6 and/or Policy HE8. DG11: Seafield Park Proposals for the future use or development of Seafield Park will be permitted provided that: (A) the largely open nature of the site is maintained; (B) the future use and management of the open area is resolved before any planning permission is granted; and (C) any buildings necessary to secure (A) and (B) are restricted to the part of the site within the urban area. Indicator Achievement Comments commercial frontages. discussions and in the determination of applications. detail will be incorporated into the Site Allocations & Development Management DPD and the Fareham Town Centre AAP. Local Indicator Enabling development to support the provision of the open space. Residential development for 51 units was granted in 2001 and is now complete. Policy nearly implemented 24 dwellings under construction. Completion of development expected 2011/12. Local Indicator Development of open space where majority of site remains natural and any buildings necessary are restricted within the urban area. Open nature of site maintained though location on largely previously developed area and within urban area boundary. Remainder left open and is managed as public open space with an equipped children’s playground. COUNTRYSIDE, COAST AND NATURE CONSERVATION CS4 Green Infrastructure, Biodiversity and Geological Conservation Habitats important to the biodiversity of the Borough, including Sites of Special Scientific Interest, Sites of Importance for Nature Conservation, areas of woodland, the coast and trees will be protected in accordance with the following hierarchy of nature conservation designations: Local Indicator Local Indicator Projects completed in line with PUSH GI Infrastructure Strategy. 95% of SSSIs in favourable or recovering condition by 2026. Nil 91.6% of SSSIs in favourable or recovering condition by 2026. Fareham is still 3.4% short of this target, although good progress has For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa Condition of SSSIs: 75.3% Favourable condition; 16.3% unfavourable a55 Fareham LDF Annual Monitoring Report Policy (i) International - Special Protection Areas (SPA), Special Areas of Conservation (SAC) and RAMSAR; (ii) National - Sites of Special Scientific Interest (SSSI) and National Nature Reserves (NNRs); (iii) Local - Sites of Importance for Nature Conservation (SINC), Local Nature Reserves (LNR), other Ancient Woodland (AW) not identified in (ii) above; (iv) Sites of Nature Conservation Value (SNCVs). Where possible, particularly within the identified Biodiversity Opportunity Areas, sites will be enhanced to contribute to the objectives and targets set out in UK, Regional, County and Local Biodiversity Action Plans. Green Infrastructure networks, which buffer and link established sites, whilst also enabling species to disperse and adapt to climate change will be maintained and enhanced. Networks of accessible multi-functional Green Infrastructure will be planned around existing green spaces in urban, urban fringe and rural areas and will be appropriate to the extent and distribution of the existing and proposed population. Development Proposals will be permitted where Green Infrastructure provision in accordance with the Green Infrastructure Strategy has been integrated within the development where this is appropriate. Development proposals will provide for appropriate access to greenspace for informal recreation to avoid adverse impacts from recreation and other impacts on European and Ramsar sites and on nationally and locally important sites. December 2011 Indicator Type Indicator Achievement Comments already been made. Local Indicator Core Output Indicator E2 Amount, quality and function of green infrastructure delivered. Change in areas of Biodiversity Importance (SPAs, SACs, Ramsar, National Nature Reserves, SINCSs, LNRs, Ancient Woodland and SNCVs) recovering; 6.8% unfavourable no change and; 1.6% unfavourable declining. There is currently no monitoring system in place that will enable this indicator to be measured Data unavailable Loss (ha) 0 0 Gain (ha) 0 0 Net (ha) 0 0 Ramsar 0 0 0 NNR SINC LNR AW 0 5 0 0 0 0 51.4 0 0 -5 51.4 0 SNCV n/a n/a n/a SPA SAC 2 new LNRs in Fareham; Holly Hill Woodland Park (28.02 ha) and Warsash Common (23.38 ha). Small loss of SINC at Seafield Park - loss of 6A species8. Greater detail regarding environmental designations is provided by Hampshire Biodiversity Information Centre Annual Monitoring Report. The survey of SINCs includes SNVC. No data is available for 8 '6A Species' are notable species including: Red Data Book species, Nationally Scarce species, species covered under Schedules 1,5 and 8 of the Wildlife & Countryside Act 1981, Annex 1 of the EC Bird Directive 79/409 and Annex II & IV of the EC Directive 92/43/EEC 'The Habitats Directive', and those covered by the Bern, Bonn and Ramsar Conventions. Notable species will also include species which are considered 'County Rare' or 'County Scarce' (County Rare = those species recorded in 1% or less tetrads in Hampshire or either of the two vice-counties (11 & 12) separately. County Scarce = 4% or less tetrads). For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa a56 Fareham LDF Annual Monitoring Report Policy December 2011 Indicator Type Indicator Achievement Comments AW. Green Infrastructure will be created and safeguarded through: Investing in appropriate management, enhancement and restoration, and the creation of new resources including parks, woodland and trees, and wildlife habitats; Not permitting development that compromises its integrity and therefore that of the overall green infrastructure framework In order to prevent adverse effects upon sensitive European sites in and around the Borough, the Council will work with other local authorities (including the Partnership for Urban South Hampshire) to develop and implement a strategic approach to protecting European sites from recreational pressure and development. This will include a suite of mitigation measures, with adequate provision of alternative recreational space for access management measures within and around the European sites and mitigation for impacts on air quality due to road traffic, supported by developer contributions where appropriate. Development likely to have an individual or cumulative adverse impact will not be permitted unless the necessary mitigation measures have been secured. Local Indicator Amount of additional BAP habitat delivered, including buffering and linkages of established sites; Nil additional BAP habitats delivered. Local Indicator Contribution to Biodiversity Opportunity Areas and County and local BAPs. No data available. Local Indicator Condition of SSSIs No development affecting SSSIs Local Indicator Number of planning consents granted which impact upon sites of geological importance. No development impacting upon site of geological importance. Number of planning consents 20 sites granted permission outside of the defined urban areas. The Council will, through its Annual Monitoring Report, Local Air Quality Management and ongoing visitor surveys and related activities, scrutinise the effectiveness of the joint strategic approach to avoidance and mitigation of effects on European sites. It will adjust the rate, scale and/or distribution of housing or employment development across the Borough to respond to the findings of new evidence where appropriate, including the Solent Disturbance and Mitigation Project in order to preserve the integrity of European sites. This policy has been taken into account during pre-application discussions and in the determination of applications. A reliable data source to report on this indicator is required. This policy has been taken into account during pre-application discussions and in the determination of applications. Sites of geological importance will be protected and enhanced. CS14 Development on Land outside Settlements Local Indicator For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa Policy C1 has been replaced by the Core a57 Fareham LDF Annual Monitoring Report Policy December 2011 Indicator Type Built development on land outside the defined settlements will be strictly controlled to protect the countryside and coastline from development which would adversely affect its landscape character, appearance and function. Acceptable forms of development will include that essential for agriculture, forestry, horticulture and required infrastructure. The conversion of existing buildings will be favoured. Replacement buildings must reduce the impact of development and be grouped with other existing buildings, where possible. In coastal locations, development should not have an adverse impact on the special character of the coast when viewed from the land or water. CS22 Development in Strategic Gaps Land within a Strategic Gap will be treated as countryside. Development proposals will not be permitted either individually or cumulatively where it significantly affects the integrity of the gap and the physical and visual separation of settlements. Indicator granted contrary to policy permitted outside of defined urban areas. Achievement This policy has been taken into account during pre-application discussions and in the determination of applications. Comments Strategy policy CS14. As the Core Strategy was not adopted at the point of determination of these applications, the grant of permission must be considered in the context of the Local Plan policies being applied at the time. Although the 20 sites were granted permission despite their countryside location these permissions were in line with other policy exceptions (notably Local Plan policies: C1, C2, C3, H11, H12, H13 and H14). Local Indicator Number of planning consents granted on land in strategic gaps. 3 planning consents granted on land in strategic gaps. This policy has been taken into account during pre-application discussions and in the determination of applications. Strategic Gaps have been identified between Fareham/Stubbington and Western Wards/Whiteley (the Meon gap); and Stubbington/Lee on the Solent and Fareham/Gosport. Their boundaries will be reviewed in accordance with the following criteria: For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa No sites have been granted planning consent contrary to policy. Policy C11 has been replaced by the Core Strategy policy CS22. As the Core Strategy was not adopted at the point of determination of these applications, the grant of permission must be considered in the context of the Local Plan policies being applied at the time. Although the 3 sites were a58 Fareham LDF Annual Monitoring Report Policy December 2011 Indicator Type Indicator Achievement a) The open nature/sense of separation between settlements cannot be retained by other policy designations; Comments granted permission, these developments were acceptable due to other policy considerations (notably Local Plan policies: C1, C2, C3, C11, H11, H12, H13 and H14). b) The land to be included within the gap performs an important role in defining the settlement character of the area and separating settlements at risk of coalescence; c) In defining the extent of a gap, no more land than is necessary to prevent the coalescence of settlements should be included having regard to maintaining their physical and visual separation. C7: New Moorings New moorings will be permitted provided that: (A) they are not located in the Mooring Restriction Areas: (i) Fareham Lake, other than at Upper Quay under Policy R8; (ii) south of Warsash Sailing Club Jetty; (iii) between Warsash Ferry and Hamble Village; (iv) south of Crableck; (v) south of Swanwick Public Hard; and (vi) the Upper Hamble and Curbridge Creek (B) the River Hamble Harbour Authority’s limit on the total number of moorings is not exceeded; and (C) there is no adverse impact on nature conservation and other environmental interests. Local Indicator C8: Existing Moorings within Mooring Restriction Areas The replacement or relocation of existing moorings within the Mooring Restriction Areas will not be permitted unless: (A) there are no alternative locations outside the Moorings Restriction Areas: (B) it will result in improvements to navigation and the appearance of the River Hamble or Fareham Lake; and (C) there is no adverse impact on nature conservation and other environmental interests. Local Indicator C12: Local Gaps Local Number of new moorings permitted in accordance with and not in accordance with the policy. No new moorings have been permitted. This policy has been taken into account during pre-application discussions and in the determination of applications. Number of replacement moorings permitted in accordance with and not in accordance with the policy. No replacement or relocation of existing moorings have been permitted. Number of 4 planning consents granted on This policy has been taken into account during pre-application discussions and in the determination of applications. For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa This policy has been taken into account during pre-application discussions and in the determination of applications. This policy will be reviewed in the Site Allocations and Development Management DPD. This policy has been taken into account during pre-application discussions and in the determination of applications. This policy will be reviewed in the Site Allocations and Development Management DPD. Although the 4 sites were a59 Fareham LDF Annual Monitoring Report Indicator Type Policy Development that would physically and/or visually diminish undeveloped land in the following gaps will not be permitted: Lower Swanwick - Sarisbury; (B) Sarisbury - Locks Heath; Warsash - Locks Heath; (D) Segensworth - Locks Heath; Wallington - Portchester; and (F) Fareham - Portchester. December 2011 the (A) (C) (E) Indicator Indicator planning consents granted in Local Gaps. Achievement land in local gaps. This policy has been taken into account during pre-application discussions and in the determination of applications. Comments granted permission, these developments were acceptable due to other policy considerations (notably Local Plan policies: C1, C2, C3, C12, H11, H12, H13 and H14). This policy will be reviewed in the Site Allocations and Development Management DPD. C15: Local Nature Reserve Allocations The following areas are proposed as Local Nature Reserves and they will be safeguarded from development in order that they can be implemented during the plan period: (A) Hook-with-Warsash (extension to existing); (B) South west of Gull Coppice, Whiteley; (C) North west of Gull Coppice, Whiteley; (D) Quaveys Copse, Whiteley; and (E) Bushy Land, Whiteley. Local Indicator Safeguarding from development of proposed nature reserves to be implemented during the plan period on the following sites: No development A) Hook-withWarsash No development B) South west of Gull Coppice No development C) North west of Gull Coppice, Whiteley; D) Quaveys Copse, Whiteley; No development No development For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa a60 Fareham LDF Annual Monitoring Report Policy C17: Sites of Nature Conservation Value Development which would adversely affect non-designated sites or features of nature conservation value will be not permitted unless, where possible, provision is made to offset the adverse impact. Where appropriate, a legal agreement will be sought to secure the replacement of habitats or features lost to development. December 2011 Indicator Type Core Output Indicator E2 Local Indicator Local Indicator C18: Protected Species Development which would adversely affect species, or their habitats, protected by the Habitats Regulations 1994, the Wildlife and Countryside Act 1981 or other legislation will not be permitted unless measures can be undertaken which prevent harm to the species or damage to the habitats. Where appropriate, permission will be conditioned or a legal agreement sought to secure the protection of the species or their habitats. Local Indicator Indicator E) Bushy Land, Whiteley. Change in areas and populations of biodiversity importance. Change in priority habitats and species (by type). Change in areas designated for their intrinsic environmental value including sites of international, national, regional or sub-regional significance Amount of development permitted which proposes harm to species or damage to habitats, where mitigation is inadequate. Achievement This Core Output Indicator is reported under policy CS4. See Policy CS4 See Policy CS4 No data available. For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa Comments Policy C17 is predominantly covered under CS4. However, unlike CS4, this policy acknowledges the importance of protecting non-designated sites. This policy will be reviewed in the Site Allocations & Development Management DPD. This policy has been taken into account during pre-application discussions and in the determination of applications. This policy will be reviewed in the Site Allocations & Development Management DPD. Additional guidance is contained in the Fareham Biodiversity Action Plan. a61 Fareham LDF Annual Monitoring Report Policy December 2011 Indicator Type Indicator Achievement Comments HISTORIC ENVIRONMENT HE5: Change of Use in Fareham High Street Conservation Area Changes of use to offices (Classes A2 and B1) or non-residential institutions (Class D1) will be permitted within Fareham High Street Conservation Area, provided that: (A) there would be no prejudice to the mixed-use character of the conservation area or the retail character of the shopping area; (B) there would be no loss of a residential unit unless it is essential to protect the fabric of a building or the environment; and (C) provision can be made for off-street car parking on the site or in the vicinity without the loss of gardens and without the creation of vehicular access onto Civic Way. HE6: Conservation Areas - Shopfronts New shopfronts in conservation areas will be permitted, provided that: (A) it does not result in the removal or alteration of features of architectural or historic value; and (B) the new design relates closely to the overall character of the building in terms of scale, style and materials, together with the use of traditional elements. Local Indicator HE7: Conservation Areas - Signs and Advertisements New signs and advertisements in conservation areas which accord with Policy DG7 will be permitted provided that: (A) the size, design and materials are related to the building on which the sign is to be displayed; and (B) if freestanding, they are positioned so that the setting of the building or character of the area is not harmed; and (C) fascias, letters and signage are not internally illuminated. HE8: Conservation Areas - Blinds, Canopies and Shutters Blinds, canopies and security shutters in conservation areas will be permitted, provided that: (A) they are designed as an integral part of a shopfront; and (B) the size, colour, materials and design are appropriate to the character of the building. External security shutters will not be permitted. Local Indicator Local Indicator Local Indicator Amount of development permitted in accordance with and not in accordance with the policy. No applications were granted permission contrary to policy. Number of planning consents granted not in accordance with the policy No applications were granted contrary to policy. Number of planning consents granted not in accordance with the policy Number of planning consents granted not in accordance with the policy. This policy has been taken into account during pre-application discussions and in the determination of applications. This policy has been taken into account during pre-application discussions and in the determination of applications. No applications were granted contrary to policy. This policy has been taken into account during pre-application discussions and in the determination of applications. No applications were granted contrary to policy. This policy has been taken into account during pre-application discussions and in the For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa This policy will be reviewed as part of the Fareham Town Centre AAP. Additional guidance is available in the Fareham High Street Conservation Area Character Assessment. This document was adopted on 9 October 2006. This policy will be reviewed in the Site Allocations & Development Management DPD and is covered by PPS5 This policy will be reviewed in the Site Allocations & Development Management DPD and is covered by PPS5 This policy will be reviewed in the Site Allocations & Development Management DPD and is covered by PPS5. a62 Fareham LDF Annual Monitoring Report December 2011 Indicator Type Policy HE9: Buildings of Local Architectural or Historic Interest Proposals for Buildings of Local Architectural or Historic Interest (that is, buildings not on the Statutory List but contained within the Local List), involving alterations, additions or other development, including changes of use, will be permitted, provided that such development does not adversely affect their character or setting. Local Indicator HE10: Historic Parks and Gardens Development in accordance with the other policies in the Plan will be permitted provided that it does not harm historic parks and gardens, whether of regional or local importance, or their settings. Local Indicator Indicator Number of planning consents granted not in accordance with the policy Number of planning consents granted not in accordance with the policy Achievement determination of applications. No applications were granted contrary to policy. This policy has been taken into account during pre-application discussions and in the determination of applications. No applications were granted contrary to policy. This policy has been taken into account during pre-application discussions and in the determination of applications. Comments This policy will be reviewed in the Site Allocations & Development Management DPD. and is covered by PPS5 This policy will be reviewed in the Site Allocations & Development Management DPD and is covered by PPS5 HOUSING CS2 Housing Provision 3,729 dwellings will be provided within the Borough to meet the South Hampshire sub-regional strategy housing target between 2006 and 2026, excluding the SDA. Priority will be given to the reuse of previously developed land within the existing urban areas. Housing will be provided through; completions between April 2006 and March 2010 (1,637 units); sites that already have planning permission (1,434 units); dwellings on previously developed land; sites allocated in earlier local plans; the Strategic Development Allocation at the former Coldeast Hospital; the Strategic Development Location at Fareham Town Core Output Indicator H2 Core Output Indicator H2 Core Output Indicator H2c Core Output Indicator H3 Achieve 3,729 dwellings in the Borough outside the SDA across the plan period. Plan period housing targets These indicators are discussed under policy CS6 See Section 4 of this AMR for further details. Net additional dwellings New and converted dwellings on previously For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa a63 Annual Monitoring Report Indicator Type The supply of sites will be kept up-to-date through a regular review of the Strategic Housing Land Availability Assessment which will identify sites. Those that are allocated will be done so through the Site Allocations and Development Management Development Plan Document. The Annual Monitoring Report will inform the pace of housing delivery and update the housing trajectory. Development will achieve a mix of different housing sizes, types and tenures informed by the Housing Market Assessment and the Council's Housing Strategy. CS18 Provision of Affordable Housing The Council will require the provision of affordable housing on all schemes that can deliver a net gain of 5 or more dwellings. On sites that can accommodate between 5 and 9 dwellings developers will be expected to provide 30% affordable units OR the equivalent financial contribution towards off-site provision. On sites that can accommodate between 10 and 14 dwellings developers will be expected to provide 30% affordable units. On sites that can accommodate 15 or more dwellings developers will be expected to provide 40% affordable units. Achievement Comments developed land Core Output Indicator H2d Managed delivery target Core Output Indicator H5 Gross affordable housing completions Total Affordable Homes Provided Centre; and new allocations and redesignations to be identified through the Site Allocations and Development Management DPD Indicator Intermediate Homes Provided Policy December 2011 Social Rented Homes Provided Fareham LDF 2010/ 2011 133 84 217 2009/ 2010 14 29 43 Development proposals will be required to provide a mixture of dwelling types, sizes and tenures reflecting the identified housing needs of the local population. Where development viability is an issue, developers will be For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa Fareham targets affordable housing provision of 100 affordable dwellings per annum. This target has been exceeded by some margin. Delivery rate has significant improved since last year where only 43 units were delivered. A significant percentage of the completions 108 social and 28intermediate dwellings were delivered at Hunts Pond Road. Smaller yet still significant contributions were from sites at Osborne Road South and Broadlaw a64 Fareham LDF Annual Monitoring Report December 2011 Indicator Type Policy Indicator Achievement Comments expected to produce a financial assessment in which it is clearly demonstrated the maximum number of affordable dwellings which can be achieved on the site. Walk. The remainder from a number of small sites across the Borough. Should a site fall below the above identified thresholds but is demonstrably part of a potentially larger developable site, the Council will seek to achieve affordable housing on a pro rata basis. The level of affordable housing provision will also be subject to other planning objectives to be met from the development of the site. CS19 Gypsies, Travellers and Travelling Showpeople Population Gypsy and Traveller and Travelling Showpeople pitches will be permitted or allocated in accordance with current government policy to meet the needs identified in the Gypsies and Travellers and Travelling Showpeople Accommodation Assessments updated as necessary Any specific sites identified within the Borough will be allocated in the Site Allocations and Development Management Development Plan Document. Core Output Indicator H4 Number of pitches provided for Gypsies, Travellers and Travelling Showpeople Assessment and any subsequent revisions. Permanent Transit Total 0 0 0 In identifying sites through the Site Allocations and Development Management Development Plan Document for Gypsies and Travellers and Travelling Showpeople, previously developed land within or on the edge of urban areas will be considered before sites in rural locations. The site must be suitable for this type of accommodation in that it meets the criteria below and there is a realistic likelihood it will come forward during the plan period, taking into account site constraints such as flood risk, access to the highway network and infrastructure. No permanent permissions were granted for any permanent pitches, transit sites nor travelling showperson's units. Temporary planning permission was granted on 6th April 2010 for two gypsy caravans in Newgate Lane which will expire on 31 December 2016. Planning permission will be granted where the following criteria can be met: The site is accessible to shops, schools and health For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa a65 Fareham LDF Annual Monitoring Report December 2011 Indicator Type Policy Indicator Achievement Comments East of Botley Road: Construction complete on southern portion, 7 units. Part of allocation to north granted planning consent for 15 units. Completion estimated for 2011/12 North of Whiteley: 227 dwellings completed. Construction on remainder of the site for 113 units has commenced. Completion estimated for 2019/20 facilities by public transport, on foot or by cycle. H1: Housing Allocations The following sites together with existing allocations and sites with planning permission shown on the Proposals Map and listed in Appendix 5 are allocated for residential development. They will be safeguarded from any other form of permanent development in order that they are available for implementation during the plan period: Number of Dwellings (indicative) New Allocations Allocated (1997) Built or Permitted (1997-99) East of Botley Road 25 0 25 North of Whiteley 260 0 260 Peters Road 210 0 210 240 0 240 160 0 160 15 17 0 63 0 Hunts Pond Road Segensworth Road - North East of Whiteley Lane Segensworth Road - South Without Permission (1999) Local Indicator & part of Core Output Indicator H2 Number of Dwellings completed at each Local Plan housing allocation. Peters Road: Outline planning permission for 307 dwellings granted 2008, has lapsed 21/11/11. Four new applications for an alternative hybrid scheme comprising of 288 dwellings submitted in 2011 Hunts Pond Road: Permission granted for phase 1, 248 dwellings; phase 2, 73 dwellings; and permission granted for 4 dwellings to the north. Part of allocation to south and east do not have from planning permission. Development Brief SPD adopted November 2007. Completion estimated for 2017/18. Development Brief SPD adopted January 2007. 170 units completed to date. Segensworth Road - North: 217 dwellings completed Site complete East of Whiteley Lane 17 dwellings completed Site complete Segensworth Road - South Site complete For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa a66 Fareham LDF Annual Monitoring Report December 2011 Indicator Type Policy Catisfield Lane 0 30 Former WT Station 0 75 Former Wicor School 35 Chalk Pit, Hill Road Total 910 Indicator Achievement Comments 63 dwellings completed Catisfield Lane No planning permission Development Brief SPD adopted February 2004 0 Former WT Station 75 dwellings completed Site complete 20 0 Former Wicor School 35 dwellings completed Site complete 263 840 Chalk Pit, Hill Road 24 dwellings completed Site complete Nil planning applications granted which have proposed the loss of residential accommodation. The policy has generally achieved the aim of retaining residential accommodation with losses only being permitted where the use complies with the policy. Conversions of offices and floorspace above shops have been permitted, particularly in Fareham town centre. The policy will be reviewed in the Site Allocations & Development Management DPD. H4: Retention of Housing Change of use or development which results in the loss of residential accommodation will be permitted, provided that: (A) the new use is for the establishment of a small business, a medical or dental practice or another community facility to serve the wider residential area; and (B) a unit of accommodation is retained. Local Indicator & part of Core Output Indicator H2 Number of planning application granted proposing the loss of residential accommodation. H5: Conversions to Flats The conversion and/or extension of offices, existing dwellings and of vacant floorspace above shops to smaller self-contained units of accommodation will be permitted, provided that: (A) the proposal, or the cumulative impact of the proposal with other similar proposals would not adversely affect the character of the area, particularly in conservation areas, or have unacceptable environmental, amenity or traffic implications; (B) intrusive features, for example, rear fire escapes or external access stairways are sympathetically designed and, where there may be problems of overlooking, housed in a covered structure; (C) the property to be converted is not a small family dwelling but is large enough to enable the provision of new dwellings with adequate Local Indicator & Part of Core Output Indicator H2. Number of planning consents granted for the conversion and/or extension of offices, existing dwellings and of vacant floorspace above shops to smaller selfcontained units The policy will be reviewed in the Site Allocations & Development Management DPD. 1 planning consent granted: P/10/0475/FP - CHANGE OF USE FROM SEVEN OFFICE SUITES & ALTERATION TO ROOF TO FORM THREE ONE BEDROOM STUDIO FLATS & ONE , ONE BEDROOM MAISONETTE For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa a67 Fareham LDF Annual Monitoring Report Policy space standards; (D) with the exception of the town centre and other commercial locations, appropriate outdoor amenity space is provided; and (E) where appropriate, the proposal meets the criteria in Policies DG3, HE2, and HE4. H6: Houses in Multiple Occupation The sub-division of existing dwellings within the urban area for the purposes of multiple occupation will be permitted, provided that: (A) the property to be converted is not a small family dwelling; (B) a satisfactory living environment for the occupants is provided; (C) the proposal, or the cumulative impact of the proposal with other similar proposals would not adversely affect the character of the area, particularly in conservation areas, or have unacceptable environmental, amenity or traffic implications; and (D) where appropriate, the proposal meets the criteria in Policies DG3, HE2, and HE4. H8: Community-Based Supported Housing Units Community-based supported housing units will be permitted within existing residential areas within the urban area, provided that: (A) they contain adequate safeguards to protect the residential amenity of the occupiers of neighbouring properties; (B) the cumulative impact of the proposal with other similar proposals would not adversely affect the character of the area or have unacceptable environmental, amenity or traffic implication; and (C) appropriate outdoor amenity space is provided except where the property adjoins an existing public open space. H9: Annexes for Dependent Relatives The provision of self-contained annexes to accommodate dependent relatives will be permitted, provided that: (A) it is not possible to satisfactorily cater for dependent relatives within the existing dwelling;(B) the annexe is capable of incorporation into, or use as, an ancillary part of the existing dwelling when there is no longer a need for the annexe; and (C) adequate gardens and car parking spaces are provided. Where the annexe is detached December 2011 Indicator Type Indicator Achievement Local Indicator & Part of Core Output Indicator H2. Number of planning permission granted proposing the change of use from existing dwellings to HMO and not in accordance with the policy. There has been limited demand for houses in multiple occupations in the Borough. During the 2010/11 monitoring year no planning permissions were granted for HMO. The policy will be reviewed in the Site Allocations & Development Management DPD. Local Indicator Number of community-based supported housing units permitted in accordance with and not in accordance with the policy. There have been no communitybased supported housing units permitted during the 2010/11 monitoring year Permissions have been granted for community based supported housing units in accordance with the policy. Number of selfcontained annexes to accommodate dependent relatives will be permitted in accordance with Permissions have been granted for self-contained annexes in accordance with the policy. Completion of 6 annexes in 2010/11. Local Indicator Comments The policy will be replaced in the Site Allocations & Development Management DPD. For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa It will be difficult to accurately monitor the application of policy in term of criteria A) and B) post development. The policy will be reviewed in the Site a68 Fareham LDF Annual Monitoring Report December 2011 Indicator Type Policy from the original dwelling, a legal agreement will be sought to prevent the use of the annexe as a separate dwelling. H13: Extensions to Dwellings and Ancillary Buildings in the Countryside A residential extension or the erection of an ancillary building be permitted in the countryside, provided that:(A) in the case of an extension, it is of an appropriate size and design and does not adversely affect the character of the area or the wider landscape; or (B) in the case of the erection of an ancillary building, it is of appropriate design and located within or close to an existing group of buildings so that it does not adversely affect the landscape; and (C) in the case of an extension to an agricultural worker’s dwelling, it does not result in a dwelling larger than the unit can sustain in the long term. H14: Frontage Infill in the Countryside Residential development for one or two new dwellings on infill sites within the countryside will be permitted, provided that: (A) it occupies a gap between existing dwellings in an otherwise continuously built-up frontage and would not harm the character of the area; (B) the new dwellings and plots are similar in size and character to adjoining properties; (C) it does not result in the extension of a frontage or the consolidation of an isolated group of dwellings; and (D) it does not involve the siting of dwellings at the rear of existing dwellings. Indicator Achievement and not in accordance with the policy. Comments Allocations & Development Management DPD. Local Indicator Number of planning permissions granted for extension or the erection of ancillary buildings permitted in the countryside, contrary to policy. No new dwellings other than those permitted by policy H13 have been permitted. The policy will be reviewed in the Site Allocations & Development Management DPD. Local Indicator Number of planning permissions granted for one or two new dwellings on infill sites within the countryside, contrary to policy. No new dwellings other than those permitted by policy H14 have been permitted. The policy will be reviewed in the Site Allocations & Development Management DPD. FACILITIES, SERVICES, INFRASTRUCTURE AND CONTRIBUTIONS CS20: Infrastructure and Developer Contributions Development will be required to provide or contribute towards the provision of infrastructure through planning conditions, legal agreement or directly through the service provider. Contributions or provision may also be required to mitigate the impact of Local Indicator Number of developments permitted not making infrastructure No data is available for the indicator. For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa Monitoring system will need to be devised in order to test the effectiveness of this policy. a69 Fareham LDF Annual Monitoring Report Policy development upon infrastructure. Detailed guidance on provision or contributions is or will be set out in Supplementary Planning Document(s) including any standard charges introduced through the Community Infrastructure Levy. FS1: Community Facility Allocations The following sites are allocated for community purposes and they will be safeguarded from development in order that they are available for implementation during the plan period: (A) a new community centre, south of Gull Coppice, Whiteley; (B) an extension to the Fareham Youth Centre, Park Lane, Fareham; and (C) community uses, Hunts Pond Road, Titchfield Common, as part of a larger scheme to include education uses and open space; December 2011 Indicator Type Indicator Comments obligations that are required to do so. Local Indicator Allocated sites to be safeguarded from permanent development: (A) a new community centre, south of Gull Coppice, Whiteley; (B) an extension to the Fareham Youth Centre, Park Lane, Fareham; FS2: Education Allocations The following sites are allocated for education purposes and they will be safeguarded from permanent development in order that they are available for implementation during the plan period: (A) a new primary school, Heath Road/Centre Way, Locks Heath (2.8 hectares); and (B) educational uses, Hunts Pond Road, Titchfield Achievement Local Indicator Whiteley Community Centre now constructed. Part A) of this policy can be deleted. Fareham Youth Centre has not been extended. This site will be reviewed through the Site Allocations DPD. No community uses provided at Hunts Pond Road This site will be reviewed through the Site Allocations DPD. (C) community uses, Hunts Pond Road, Titchfield Common, as part of a larger scheme to include education uses and open space; Sites allocated for educational purposes to be safeguarded: For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa This policy will be reviewed as part of the Site Allocations and Development Management DPD. a70 Fareham LDF Annual Monitoring Report Policy December 2011 Indicator Type Common, as part of a larger scheme to include community uses and open space (7.5 hectares). FS4: Health Facility Allocations, Coldeast Hospital Land is allocated at Coldeast Hospital for the following health facilities and they will be safeguarded from development in order that they are available for implementation during the plan period: (A) a community hospital; and (B) learning disability homes. Local Indicator Indicator Achievement Comments (A) A new primary school, Heath Road/Centre Way, Locks Heath (2.8 hectares); and A. A new primary school has not been developed. This site has been declared surplus to requirements by the education authority. A planning application for residential development was withdrawn 2007. (B) Educational uses, Hunts Pond Road, Titchfield Common, as part of a larger scheme to include community uses and open space (7.5 hectares). Safeguard land for the following uses: B. No educational uses have been developed. The site is owned by HCC. The future of this site remains uncertain. (A) A community hospital; A. This has been implemented in part. See Policy CS10 above Land remains allocated for a 2nd phase through the Coldeast strategic site allocation in the Core Strategy so the designation on the Proposals Map remains in part. (B) Learning disability homes B. No new consents have been granted for this type of development during the Part B) of this policy has been part implemented. The health authority has For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa a71 Fareham LDF Annual Monitoring Report Policy December 2011 Indicator Type Indicator Achievement 2010/11 year (see comment for further details) Comments provide two dwellings for learning disability homes and a further two dwellings are proposed as part of the next phase of development at Coldeast. This policy could potentially be deleted following consultation with the Health Authority. RECREATION, LEISURE AND TOURSIM CS21 Protection and Provision of Open Space The Borough Council will safeguard and enhance existing open spaces and establish networks of Green Infrastructure to add value to their wildlife and recreational functions Development which would result in the loss of or reduce the recreational value of open space, including public and private playing fields, allotments and informal open space will not be permitted, unless it is of poor quality, under-used, or has low potential for open space and a better quality replacement site is provided which is equivalent in terms of accessibility and size. Local Indicator Local Indicator Proposals for new residential development will be permitted provided that, where existing provision is insufficient to provide for the additional population, public open space is provided as follows: Parks and Amenity Open Space 1.5 ha / 1,000 population Outdoor Sport – 1.2 ha / 1,000 population Children’s Play Equipment – 14 pieces of equipment per 1,000 1-12 year olds Youth Facilities – 1 youth facility/MUGA per settlement area Local Indicator Number of planning consent granted where the proposals will result in a net loss of open space and is not in line with the policy provisions. Achieve greenspace standards of 4.7ha per 1,000 population (1.5ha parks and amenity; 2ha accessible natural greenspace; and 1.2 ha of outdoor sport) Amount of additional public open space No data available There is currently no robust mechanism for monitoring the quantum of additional open space being provided. No data available There is currently no robust mechanism for monitoring the quantum of additional greenspace being provided. No data available There is currently no robust mechanism for monitoring the quantum of For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa a72 Fareham LDF Annual Monitoring Report Policy In addition to these types of open spaces, where existing provision is insufficient to provide for the additional population, the Borough Council will seek the provision of accessible greenspace which meets the standards set out in the South East Green Infrastructure Framework including Accessible Natural Green Space standards. R2: Cams Alders Sports Ground Proposals which improve the range and quality of outdoor and indoor sports provision at Cams Alders Sports Ground will be permitted, provided that: (A) they include redevelopment of the stadium to provide a football pitch and other sporting and ancillary facilities; (B) the existing rugby and cricket pitches are relocated within the site; (C) access is provided from Palmerston Business Park and the existing access from Highfield Avenue is closed except for emergency purposes; (D) if necessary, additional parking is provided on-site to an appropriate standard; (E) the nature conservation interest of the site is respected and the existing trees and hedgerows are retained together with an area of public open space; and (F) further landscape screening is provided along boundaries with residential areas. December 2011 Indicator Type Local Indicator Local Indicator Indicator achieved by development ANGSt standards achieved, by reference to scale and accessibility of green space Development at Cams Alders Sports Ground that is in accordance with the policy. Achievement No data available Portchester Football Club have made and continuing to make improvements to the club facilities in line with criterion A) of this policy. Planning permission, P/09/0966/FP, granted in 2010 (amended 23-07-2010, P/10/0453/FP) for: SITING OF PRE-FABRICATED BUILDING FOR USE AS CLUB HOUSE AND A 100 PERSON PRE-FORMED STAND Application submitted in 2011, P/11/0781/FP, proposing: DEMOLITION OF EXISTING SPORTS PAVILION AND ERECTION OF NEW SPORTS PAVILION Comments additional open space being provided. There is no robust mechanism for monitoring the scale and accessibility of greenspace. Future provision of outdoor and indoor sports facilities at sites within the Borough will be usefully informed by recent government guidance (see comment) and a number of subsequent relevant LDF evidence studies that have been completed; Playing Pitch Study; Greenspace Study and; Indoor Sport Study All three studies make informed recommendations of what facilities are needed in the location based upon the most recent evidence and informed by extensive community consultation. This policy will be reviewed as part of the Site Allocations and For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa a73 Fareham LDF Annual Monitoring Report Policy R4: Public Open Space Allocations The following sites are allocated for new public open space and they will be safeguarded from development in order that they can be implemented during the plan period: (A) Informal open space at the Former Orchard Land, north west of Yew Tree Drive, Whiteley (2.8 hectares); (B) Informal open space at Quaveys Copse, Whiteley (4.4 hectares); (C) Sports pitches and informal open space at Hunts Pond Road, Titchfield Common as part of a larger scheme to include Community and Education Uses (5.5 hectares); (E) Sports pitches and informal open space at Seafield Park (10 hectares); (F) Extension to Stroud Green Allotments (0.9 hectares). December 2011 Indicator Type Local Indicator Indicator Achievement The following new public open space allocations safeguarded from development: All allocated sites have been successfully safeguarded from development. (A) Informal open space at the Former Orchard Land, north west of Yew Tree Drive, Whiteley Safeguarded, not implemented (C) Informal open space at Quaveys Copse, Whiteley (D) Sports pitches and informal open space at Hunts Pond Road, Titchfield Common Safeguarded, not implemented Safeguarded, not implemented Development at Seafield Park (Site E) was completed and brought into use in January 2008. Comments Development Management DPD. LDF evidence studies have been completed: (i) The Greenspace Study (ii) The Playing Pitch Study Together these two studies assessed the Borough’s open spaces for quantity, quality and accessibility. They will inform site by site recommendations to be made through the LDF process. An update to the Playing Pitch Strategy and the Greenspace Strategy will be undertaken as part of the Site Allocations and development Management DPD where this policy will be reviewed. Safeguarded, not implemented (E) Sports pitches and informal open space at Seafield Park For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa a74 Fareham LDF Annual Monitoring Report Policy December 2011 Indicator Type Local Indicator R7: New Footpaths Development will be permitted provided that the proposal incorporates the provision of any relevant sections of the following footpaths: (A) the final section of the Portchester Coastal Footpath from the southern end of Wicor Mill Lane; and (B) south-east of Fleet End Road, Warsash. Local Indicator Indicator (F) Extension to Stroud Green Allotments Improvement of the range and quality of outdoor and indoor sports provision. Development of new footpaths incorporating provision in Portchester and Warsash Achievement Comments An application was submitted for the improvements to the facilities at Portchester Football Club. See policy R2 Neither footpath has been completed. In both cases, their development is dependent to a large degree on enabling development and the implementation of schemes on adjacent land. Completion of the Portchester coastal footpath is largely dependent on development of the category B employment land to the north. In the case of Fleet End Road, Warsash, the housing allocation to the north is not wholly built out, so the footpath remains possible. This policy will be reviewed as part of the Site Allocations and Development Management DPD. For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa a75 Fareham LDF Annual Monitoring Report December 2011 Indicator Type Policy R8: Upper Quay, Fareham In the event of the seaborne aggregate depot at Upper Quay, Fareham closing or relocating, development of the site for appropriate leisure uses will be permitted, provided that: (A) any additional moorings or waterside uses are limited to the area currently used by waterside vessels; (B) there is no adverse impact on the Town Quay Conservation Area or buildings of special architectural or historical interest; (C) there is no adverse impact on nature conservation interests; and (D) it would not have unacceptable environmental, amenity or traffic implications. Local Indicator Indicator Development of the site for appropriate leisure uses Achievement The seaborne aggregate depot remains operational, so the detail of this policy is not relevant. Comments This policy remains relevant. This policy will be reviewed as part of the Fareham Town Centre AAP. The facility is included in the Hampshire Minerals & Waste Plan (Draft) November 2011 Policy 16 Safeguarding Minerals Infrastructure. EMPLOYMENT CS1 Employment Provision Additional employment development will be permitted to meet a minimum floorspace target of 41,000 sq m (excluding the SDA) and to contribute to GVA growth. This will be met through: Completed floorspace between April 2006 and March 2010; Safeguarding existing employment areas; Implementing existing commitments; Requiring the inclusion of 10,000 sq m of new B1 development as part of mixed use schemes within Fareham town centre; Daedalus Airfield Strategic Development Allocation to accommodate a minimum of 10,000 sq m and up to 33,000 sq m of net additional23 general, or light industrial or warehousing employment floorspace (Policy CS12); Taking a flexible approach to the redevelopment of existing employment sites for different uses which Core Output Indicators BD2, BD4i and BD4ii Contribute toward 41,000 sq m of employment floorspace by 2026 (excluding the SDA) See policy CS6. Core Output Indicators BD2, BD4i and BD4ii Amount of floorspace lost in existing employment area. See policy CS6. Core Output Indicators BD2, BD4i and Amount of employment floorspace lost by type See policy CS6. For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa a76 Fareham LDF Annual Monitoring Report Indicator Type Policy contribute to economic development. Employment sites and areas will be reviewed through the Site Allocations and Development Management Development Plan Document, informed by the Employment Land Review To support economic and GVA growth, development will be permitted where it: December 2011 Supports the continuing use of an existing employment site for uses which contribute to economic development; Allows for diversification and modernisation; Supports the enhancement of identified local clusters; Supports advances in ICT, and the development of communications technology infrastructure. Development will be permitted where it provides a necessary ancillary service to support the primary business function of the employment area. Indicator Achievement Comments BD4ii Core Output Indicators BD2, BD4i and BD4ii Core Output Indicators BD2, BD4i and BD4ii Core Output Indicators BD3 Total amount of additional employment floorspace - by type See policy CS6. Total amount of additional floorspace on PDL. 100% of additional employment floorspace was delivered on PDL. Employment land available - by type ID. 21 part 39 74 78 78 79 95 103 123 124 154 165 172 198 199 211 Address 43 High Street, Fareham Lucketts Travel, Broadcut 24 Newgate Lane Unit 2100, Talbot Road Kites Croft 30 Brunel Way Funtley Court RK Marine Little Park Farm Solent Business Park, Phase 2 Maytree Road The Walled Garden, Cams Hall Daedalus Civic & Cultural Quarter Market Quay Car Park Fareham Station Yard For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa B1 B2/B8 Total 274 274 197 197 205 205 828 828 3,523 3,523 500 500 461 461 126 126 18,305 18,305 23,526 23,526 620 620 1,843 1,843 8,000 As the table demonstrates Fareham has a significant surplus in identified employment floorspace in all use relevant classes. 25,006 33,006 2,500 2,500 1,000 1,000 6,000 6,000 a77 Fareham LDF Annual Monitoring Report Policy December 2011 Indicator Type Indicator Achievement 1167 1261 1274 1276 1280 1286 E1: Existing Employment Areas in the Urban Area Category 'A' Areas. Within Category 'A' employment areas, listed in Appendix 7 and shown on the Proposals Map, the expansion of existing premises within their curtilages or the redevelopment of existing premises for development within Use Classes B1 (Business), B2 (General Industrial) or Class B8 (Storage or Distribution) will be permitted, provided that: (A) the development includes, where appropriate, a range of sizes and types of premises; (B) where appropriate, sites or accommodation suitable for starter and small businesses constitute at least 10% of the net developable area; (C) only uses within Classes B1 and B8 are located near boundaries with residential areas; and (D) it would not adversely affect the character of the area or have unacceptable amenity or traffic implications. Changes of use or redevelopment of Category ‘A’ employment areas which would result in their loss from employment uses will not be permitted. Core Output Indicators B1, B2 and B3. Amount of development permitted in accordance with and not in accordance with the policy. Coldeast Mansion The Yard, Cranleigh Road 15 Segenswo rth Road Midas Marine, Coal Park Lane Great Brook, Brook Lane West Street West 3,879 Comments 3,879 291 727 291 727 402 402 2,191 2,191 1,700 1,700 TOTAL 50,727 51,377 102,104 Future Requireme nts 14,054 14,587 28,641 Surplus 36,673 36,790 73,463 All category A areas remain largely in use for B1-B8 uses as intended. Two of the E1B sites (Old Turnpike – The Retreat and South of Warsash Road) have been developed solely for residential. Category 'B' Areas. Within Category 'B' employment areas, listed in Appendix 7 and shown on the Proposals Map, the intensification of existing uses will not be permitted if it would result in the over-intensive use of the site. Where appropriate, any permission may be conditioned or a legal agreement sought to For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa The Fareham Borough Employment Land Review considers the extent to which existing employment sites should be protected and for what uses. This policy including the issue of uses that do not fall within use classes B1B8, but often seek to locate within employment areas, e.g. crèches, childcare facilities, vehicle hire operators and health & fitness centres is being considered in the Site Allocations and Development Management DPD in the light of revised PPS4. a78 Fareham LDF Annual Monitoring Report Policy prevent the future intensification of development on the site. Within Category ‘B’ employment areas, the expansion of existing premises within their curtilages or the redevelopment of existing premises will be permitted for either Class B1 (Business) uses or for mixed-use development, including Class B1 (Business) uses, provided that the development would not adversely affect residential amenity, the character of the area or have unacceptable environmental or traffic implications. E2: Employment Allocations Development for employment uses (Classes B1, B2 and B8) will be permitted on the following sites: (A) Kites Croft; (B) Segensworth South; (C) Area 1, Segensworth West; (D) Area 4a, Segensworth West; (E) Little Park Farm Road, Park Gate. Provided that: (i) the development includes, where appropriate, a range of sizes and types of premises; (ii) that sites or accommodation suitable for starter and small businesses constitute at least 10% of the net developable area; (iii) only uses within Classes B1 and B8 are located near boundaries with residential areas; and (iv) it would not adversely affect the character of the area or have unacceptable environmental, amenity or traffic implications. Change of use or redevelopment of the above sites, which would result in the loss of these areas for employment uses, will not be permitted. E3: Solent Business Park - Phase 2 Development of 11 hectares for business uses (Class B1) as part of Phase 2 of the Solent Business Park will be permitted, provided that: (A) at least 40% of the development area is parkland; (B) the development is of a high standard of design; (C) it would not adversely affect the character of the area or have unacceptable environmental, amenity or traffic implications; and (D) the applicants enter into a legal agreement to secure the long term management of the parkland. December 2011 Indicator Type Local Indicator & Core Output Indicators BD1, BD2 and BD3 Local Indicator Indicator Achievement Comments Delivery of allocated sites for employment uses (Classes B1, B2 and B8) in accordance with and not in accordance with the policy. Development has taken place on most of the Borough’s employment allocations. The only notable exception is Little Park Farm, which suffers from serious accessibility problems. Little Park Farm is subject to ongoing investigation and discussion between the Borough Council, Hampshire County Council and the site owners. Amount of development permitted in accordance with and not in accordance with the policy No additional development for business uses (Class B1) as part of Phase 2 of the Solent Business Park. This policy will be reviewed as part of the Site Allocations and Development Management DPD. This policy will be reviewed as part of the Site Allocations and Development Management DPD. Permission has been granted for business uses, subject the satisfaction of a number of conditions The permission has not been implemented. The site is being marketed although For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa a79 Fareham LDF Annual Monitoring Report Policy E4: Fareham Railway Station Yard In the event of the railhead aggregate depot closing or relocating and no suitable alternative rail freight uses coming forward, comprehensive development of the area to the east of Fareham Railway Station for Class B1 (Business) uses or for mixed-use development, including Class B1 ( Business) uses, will be permitted, provided that: (A) the development is part of a comprehensive scheme for the whole site, including the provision of additional station car parking; (B) the scheme includes improved access to the station roundabout; (C) the scheme includes the landscaping of the eastern boundary with adjoining residential areas; (D) the proposal does not prejudice the implementation of the South Hampshire Rapid Transit Scheme; and (E) it would not adversely affect the character of the area or have unacceptable amenity or traffic implications. E5: Open Storage Uses The following sites will be safeguarded for open storage uses: (A) land at Segensworth (approx. 1.2 hectares); and (B) land at Clapgate, Wallington (approx. 0.5 hectare). Provided that: (i) no buildings are located on the site other than ancillary offices or workshops; (ii) the stacking heights of materials and the heights of buildings do not adversely affect the character of the area; and (iii) at Segensworth, screening is provided in the form of mounding and planting belts. December 2011 Indicator Type Local Indicator Local Indicator Indicator Amount of development permitted in accordance with and not in accordance with the policy. Sites to be safeguarded for open storage uses Achievement the developer has also promoted the site for potential residential development. No progress in 2010/11. Aggregates depot still operating so policy has not come into effect. Development of the area to the east of Fareham railway Station for Class B1 uses or for mixed-use development including Class B1 No development contrary to policy in 2010/11. The east side of Segensworth has been developed as the ‘Start Centre’, a B1 office block. The western site of Segensworth is a recycling centre. Comments The facility is included in the Hampshire Minerals & Waste Plan (Draft) November 2011 Policy 16 Safeguarding Minerals Infrastructure. This policy will be reviewed as part of the Fareham Town Centre AAP. This policy will be reviewed in the Site Allocations and Development Management DPD. Clapgate remains largely in open storage use. E11: Boatyards Marine-related development will be permitted at the following boatyards: (A) Eastlands Boatyard, Coal Park Lane, Swanwick; (B) RK Marine, north of Bridge Road, Swanwick; (C) Swanwick Local Indicator Amount of development permitted in accordance with Planning permission was granted for the redevelopment of the boatyard at Swanwick Marina including residential development, For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa This policy will be reviewed in Site Allocations and Development a80 Fareham LDF Annual Monitoring Report December 2011 Indicator Type Policy Marina, South Of Bridge Road, Swanwick; (D) Universal Shipyard, Crableck Lane, Sarisbury Green; (E) Stone Pier Yard, Shore Road, Warsash; (F) Wicor Marine, Cranleigh Road, Portchester; and (G) Lower Quay, Fareham. Provided that: (i) it relates to boat building, repair, maintenance, fitting out and other ancillary uses; (ii) it does not extend beyond the defined cartilage of the boatyard onto undeveloped land; (iii) it would not adversely affect the character of the area or have unacceptable environmental, amenity or traffic implications; and (iv) waterside sites are safeguarded for boatyard uses. Indicator and not in accordance with the policy. Achievement allowed as an enabling element, a material start has been made at this site to prevent the lapse of the permission. Comments Management DPD. . SHOPPING AND TOWN CENTRE STRATEGY CS3 Vitality and Viability of Centres Development proposals within the Borough's identified centres will be encouraged to promote competition and consumer choice, whilst maintaining and strengthening the individual character, vitality and viability of the centre. Development will be permitted provided it maintains the current hierarchy of the retail centres: Core Output Indicators BD4, BD1, BD2 This policy is measured under CS6 See policy CS6 Part of Core Output Indicator BD4 Contribution toward 20,000 sq m of retail floorspace in Fareham town centre. Significant progress made toward the delivery of the new supermarket on the Foundry site. Town Centre - Fareham District Centres - Locks Heath, Portchester, North of Fareham Strategic Development Area Local Centres - Stubbington, Broadlaw Walk (Fareham), Highlands Road (Fareham), Gull Coppice (Whiteley), Titchfield, Warsash and Park Gate Whilst each centre will be developed to promote its unique identity, the overall retail hierarchy should be adhered to. CS8 Fareham Town Centre Strategic Site The sub regional role of Fareham town centre will be strengthened through major proposals for retail, office, leisure and culture facilities which will be directed to this location. Development will be permitted where it is in accordance with the Fareham Town Centre Area Action Plan and makes provision for: For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa a81 Fareham LDF Annual Monitoring Report Indicator Type Policy December 2011 a new supermarket on the Foundry site, of 3,900 sq m net sales floorspace; additional comparison shopping floorspace; around 350 dwellings; approximately 10,000 sq m B1 office floorspace; the replacement of healthcare facilities; the replacement of community centre facilities; other supporting town centre uses; the creation of mixed use buildings and spaces within specific development sites; improved transport links through the development of a public transport hub and priority measures for pedestrians, cyclists and public transport; a high quality public realm including green infrastructure and measures to support biodiversity, where practicable; parking facilities in accordance with adopted standards and ensuring the efficient use of space, particularly underground and multi-level arrangements; the protection and enhancement of conservation areas and historic buildings. The Fareham Town Centre Area Action Plan will identify site specific proposals, which will take into account areas at risk to flooding. The Action Plan will define the town centre S7: Non-Retail Uses in District and Local Centres and Parades In the District and Local Centres and Parades, with the exception of Middle Road, Park Gate, changes of use of the ground floor from Class A1 retail to non-retail will be permitted, provided that: (A) the use would not extend or consolidate existing non-retail uses so that they would dominate the character of the area and shoppers would be discouraged from using the centre or parade; (B) the non-retail use provides a service appropriate to a shopping centre, such as financial and professional services, a launderette, café or restaurant; and (C) a shop window display will be Part of Core Output Indicator BD1 Part of Core Output Indicator Local Indicator Indicator Achievement Contribution toward 10,000 sq m of employment floorspace in Fareham town centre Contribution toward 350 dwellings in Fareham town centre Nil retail floorspace " in Fareham town centre Amount of development permitted in accordance with and not in accordance with the policy. This policy generally continues to serve its intended purpose, although the growing extent of A5 class hot take away uses in one or two parades is a trend that needs to be carefully monitored. Comments 29 dwellings completed in the Town Centre area. For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa This policy will be reviewed in Site Allocations and Development Management DPD. With guidance from PPS4. Issues regarding non Class A1 and active frontages also as with policy S3 need a82 Fareham LDF Annual Monitoring Report Policy maintained. In Middle Road, Park Gate the change of use of any shop to a non-retail use at ground floor level will not be permitted S8: Retention of Local Shops Outside centres and parades, the change of use of local shops from retail to non-retail use will not be permitted unless: (A) there is an alternative local shop which can conveniently serve the area; or (B) the unit is vacant and there have been reasonable attempts to let it for retail use. S9: New Local Shops The provision of local shops within the urban area and in areas of new development to meet the day-to-day shopping needs of the immediate locality will be permitted provided that such development is of a scale and character appropriate to its surroundings and local function. A site of 0.5 hectares (1.25 acres) is safeguarded for a new local shopping centre adjoining the Whiteley Primary School south-west of Gull Coppice, Whiteley. S12: Hot Food Shops Proposals for shops for the sale of hot food (Class A3) will be permitted provided that either by themselves or cumulatively they would not: (A) damage the vitality and viability of the centre or area contrary to Policies S3 and S7; (B) adversely affect the character of the area, particularly within conservation areas; and (C) have unacceptable environmental, amenity or traffic implications, particularly in residential areas. Where proposals involve the cooking of food, the applicants will be required to provide details of odour neutraliser equipment, such details to include the design, location, size and position of the outlet, materials to be used for trunking and pipework and the method of installation. December 2011 Indicator Type Indicator Achievement Comments consideration. Local Indicator Amount of development permitted in accordance with and not in accordance with the policy. This policy continues to serve its intended purpose. This policy will be reviewed in Site Allocations and Development Management DPD. With guidance from PPS4. Local Indicator Amount of development permitted in accordance with and not in accordance with the policy. This policy continues to serve its intended purpose. The new local shopping centre has been developed in Whiteley. This policy will be reviewed in Site Allocations and Development Management DPD. Local Indicator Amount of development permitted in accordance with and not in accordance with the policy. This policy continues to serve its intended purpose. This policy will be reviewed in Site Allocations and Development Management DPD in the light of government guidance on healthy living. TRANSPORT For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa a83 Fareham LDF Annual Monitoring Report Policy CS5 Transport Strategy and Infrastructure The Council will, where necessary, work with the Local Highways Authority, Highways Agency and transport operators to promote, permit, develop and/or safeguard a high quality and sustainable integrated transport system for the Borough. This will include the following measures: 1. Land will be identified and safeguarded in Local Development Documents where necessary for the following: Bus Rapid Transit - Gosport to Fareham to SDA to Portsmouth and towards Southampton Premium Bus Network Corridors; Access to the Strategic Development Area north of Fareham, including land at Junction 10 and 11 of the M27 motorway and from Junction 11 to the A32(subject to the outcome of the sub regional transport modelling); Fareham railway station public transport interchange; Key junctions and links on the strategic and local road network; Pedestrian and cycle corridors and access points including access to the natural environment through Countryside Access Plans and Rights of Way Improvement Plans, to improve people’s health and wellbeing; Wharves and depots associated with the extraction and delivery of aggregates and minerals by non road based transport; Works identified at Newgate Lane, Fareham; Potential for a rail station for the SDA. December 2011 Indicator Type Indicator Achievement Comments Local Indicator Implementation of phase 1 of the Bus Rapid Transit system Significant progress has been made toward the completion of phase 1 of the Bus Rapid Transit system. Local Indicator Identify road access route linking the SDA and M27 No progress made This will be considered in detail through the SDA AAP. Local Indicator Progress made toward the development of Fareham railway station public transport interchange. Progress toward works identified at Newgate Lane, Fareham. No progress made This will be considered in detail through the Fareham Town Centre AAP. A section of Newgate Lane has been altered to facilitate the BRT route. No additional improvements have been made. This will be considered in detail through the Site Allocations and Development Management DPD. Local Indicator 1. Development will not be permitted where this is prejudicial to the implementation of these schemes and associated land. 2. Development proposals which generate significant For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa a84 Fareham LDF Annual Monitoring Report December 2011 Indicator Type Policy Indicator Achievement Comments Local Indicator Safeguard from development line proposed for South Hampshire Rapid Transit System (SHRT). SHRT is no longer being implemented. A replacement strategy which seeks to safeguard land for Bus Rapid Transport (BRT) is being progressed. BRT Phase 1 is under construction. Local Indicator Safeguard land for the following proposals which will improve and maintain the effectiveness of This policy will be reviewed in principle as part of the Site Allocations and Development Management DPD. It will be implemented in line with the policy context provided in the Fareham Town Centre AAP, DPD and Site Allocations and Development Management DPD and the SDA AAP Outstanding elements to be reviewed in the Site Allocations and Development Management DPD. demand for travel and/or are of a high density, will be located in accessible* areas that are or will be well served by good quality public transport, walking and cycling facilities. 3. The Council will permit development which: contributes towards and/or provides necessary and appropriate transport infrastructure including reduce and manage measures** and traffic management measures in a timely way; does not adversely affect the safety and operation of the strategic and local road network, public transport operations or pedestrian and cycle routes; is designed and implemented to prioritise and encourage safe and reliable journey's by walking, cycling and public transport. T3: South Hampshire Rapid Transit The line of the proposed South Hampshire Rapid Transit system will be safeguarded from development which would prejudice its use for this purpose. T7: Improvements to the Strategic Road Network Land is safeguarded for the following proposals which will improve and maintain the effectiveness of the Strategic Road Network: (A) B3385 Newgate Lane, Fort Fareham - Peel Common; (B) Gosport - Fareham Link Road; and (C) A27/A32 Quay Street Roundabout, Fareham. Development will not be permitted where it would be For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa a85 Fareham LDF Annual Monitoring Report Policy December 2011 Indicator Type likely to prejudice future proposals at the following junctions: (i) Segensworth Roundabout; and (ii) A27 west to east flyover, Quay Street, Fareham. T8: Improvements to the Distributor Road Network Land will be safeguarded for the following improvements to serve development: (A) The remaining stages of the Western Local Distributor Road, Warsash; (B) The remaining sections of the Park Gate Short Bypass; (C) The remaining sections of the Local Distributor Roads linking the Whiteley Area Distributor Road to Botley Road; and (D) A new access road to the Knowle Hospital Site. Indicator Achievement Comments the Strategic Road Network: Local Indicator A) Progress scheme at Newgate Lane Not implemented B) Progress Gosport Fareham Link road Not implemented C) Progress scheme at Quay Street roundabout Improvements to the distributor road network at: Alterations to Quay Street roundabout are being implemented as part of the Tesco development on the Foundry Site. A. Western local distributor road Complete Minor section linking Dibles Road with Lockswood Road subject to land purchase B. Park Gate Park Gate bypass abandoned. The Executive confirmed the abandonment of the western and eastern sections of the bypass in May and October 2007 respectively following decisions by the Highway Authority, Hampshire Outstanding elements to be reviewed in the Site Allocations and Development Management DPD. For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa a86 Fareham LDF Annual Monitoring Report Policy December 2011 Indicator Type Indicator Achievement Comments County Council. T9: Access to Whiteley (A) Road connections from Whiteley to Botley Road for general traffic will not be permitted until Whiteley Way is complete between Junction 9 on the M27 and the A3051 north of Curbridge; (B) Bus only access from Botley Road to Yew Tree Drive and/or Rookery Avenue will be permitted provided that it can be demonstrated to be safe and that satisfactory arrangements can be made to exclude other vehicular traffic. Local Indicator C. Botley road link from Whiteley Way No progress made. D. A new access road to the Knowle Hospital Progress toward the delivery of the following infrastructure: Completed A. Whiteley Way Completion is subject to potential development of 3,000 houses to the north of Whiteley within Winchester District B. Bus link Completed Implementation stalled by land acquisition difficulties and related costs. Recent Housing permission at Shetland Rise has allowed for a financial contribution and part of the remaining land towards completion. Outstanding elements to be reviewed in the Site Allocations and Development Management DPD. For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa See T8(C) above The proposal for 3,000 dwellings North of Whiteley is contained in the Winchester Core Strategy which has reached preferred options stage, but is subject to submission and public examination. a87 Fareham LDF Annual Monitoring Report December 2011 APPENDIX 2 List of Local Plan Policies Replaced by the Core Strategy Local Plan Policy C1 C2 C3 Development in the Countryside Conversion of Existing Buildings in the Countryside New Buildings in the Countryside C4 Farm-Based Diversification C5 Coastal Zone River Hamble and Fareham Lake Areas of Special Landscape Character Protection of the Setting of Settlements Strategic Gaps Statutory National and Local Nature Conservation Designations Sites of Importance for Nature Conservation C6 C9 C10 C11 C14 C16 Replacement Policy CS14 Development Outside Settlements CS14 Development Outside Settlements CS14 Development Outside Settlements CS14 Development Outside Settlements Sustainable Development in Rural Areas Development Outside Settlements CS14 Development Outside Settlements CS6 CS14 CS6 CS14 CS22 The Development Strategy Development Outside Settlements The Development Strategy Development Outside Settlements Development in Strategic Gaps CS4 Green Infrastructure, Biodiversity and Geological Conservation CS14 PPS7 CS4 DG1 Environmental Impact CS15 CS16 DG2 Prejudice to Other Development CS15 CS17 DG3 Impact on the Surrounding Area CS15 DG5 Design CS15 CS17 DG6 Landscape Design CS17 DG9 Infrastructure Requirements CS20 DG10 Coldeast Hospital CS10 DG12 Daedalus Airfield CS12 E6 E7 Employment Development in the Urban Area Business Development in Fareham Town Centre Green Infrastructure, Biodiversity and Geological Conservation Sustainable Development and Climate Change Renewable Energy Sustainable Development and Climate Change High Quality Design Sustainable Development and Climate Change Sustainable Development and Climate Change High Quality Design High Quality Design Infrastructure and Development Contributions Coldeast Hospital (Strategic Development Allocation) Daedalus Airfield (Strategic Development Allocation) CS6 The Development Strategy CS8 Fareham Town Centre (Strategic Development Location) For further information on this Document please contact planningpolicy@fareham.gov.uk a 88 Fareham LDF Annual Monitoring Report Local Plan Policy December 2011 Replacement Policy CS1 Employment Provision Development Outside Settlements E10 Employment in the Countryside CS14 FS1 (D) Community Facility Allocations CS10 FS6 Renewable Energy CS16 H2 CS2 Residential Development in the CS6 Urban Area CS15 H3 Areas of Special Residential Character CS15 H7 Elderly Persons' Housing, Rest Homes and Nursing Homes CS2 CS15 Affordable Housing Residential Development in the Countryside Conversion of Existing Buildings in the Countryside to Residential Use Sites for Gypsies and Travelling Showpeople Archaeology Listed Buildings Conservations Areas Setting Conservations Areas - New Development Protection of Existing Open Space CS18 Coldeast Hospital Strategic Development Allocation Renewable Energy Housing Provision The Development Strategy Sustainable Development and Climate Change Sustainable Development and Climate Change Housing Provision Sustainable Development and Climate Change Provision of Affordable Housing CS14 Development Outside Settlements CS14 Development Outside Settlements Public Open Space Allocations H10 H11 H12 H15 HE1 HE2 HE3 HE4 R3 R4 (D) R5 R6 S2 S3 S5 S6 Open Space in New Residential Development Recreation, Leisure and Tourism in the Countryside Shopping in the Retail Core, Fareham Town Centre Non Retail Uses in the Retail Core, Fareham Town Centre Quay Street, Fareham Shopping Development in District and Local Centres CS6 CS6 CS6 Gypsies, Travellers & Travelling Showpeople Population The Development Strategy The Development Strategy The Development Strategy CS6 The Development Strategy CS21 Protection and Provision of Open Space CS10 Coldeast Hospital (Strategic Development Allocation) CS21 Protection and Provision of Open Space CS14 Development Outside Settlements CS19 CS8 CS8 CS8 CS3 CS9 CS11 S10 Out-of-Centre Shopping CS3 Fareham Town Centre (Strategic Development Location) Fareham Town Centre (Strategic Development Location) Fareham Town Centre (Strategic Development Location) The Vitality and Viability of Centres Development in the Western Wards and Whiteley Development In Portchester, Stubbington and Whiteley The Vitality and Viability of Centres For further information on this Document please contact planningpolicy@fareham.gov.uk a 89 Fareham LDF Annual Monitoring Report Local Plan Policy S11 S13 December 2011 Replacement Policy Retail Warehouses Garden Centres CS3 CS14 The Vitality and Viability of Centres Development Outside Settlements Transport Strategy and Infrastructure The Development Strategy Sustainable Development and Climate Change High Quality Design Sustainable Development and Climate Change High Quality Design T1 Location of New Development CS5 CS6 CS15 CS17 T2 Public Transport CS15 CS17 T4 Walking, Cycling and Mobility Impairment CS5 Transport Strategy and Infrastructure T5 Transport Development CS15 CS17 Sustainable Development and Climate Change High Quality Design T6 New or Improved Highway Access CS5 Transport Strategy and Infrastructure For further information on this Document please contact planningpolicy@fareham.gov.uk a 90 Fareham LDF Annual Monitoring Report December 2011 APPENDIX 3 List of Local Plan Policies not saved in 2007 by Government direction C13 Statutory International Nature Conservation Designations FS3 Educational Establishments and Institutions in the Countryside FS5 Garden of Rest, Portchester R1 Recreation, Leisure and Tourism in the Urban Area E8 Business Development in District and Local Centres S1 Fareham Town Centre Strategy S4 Market Quay, Fareham T10 Rear Service Roads, Fareham Town Centre T11 Public Car Park Allocation, Market Quay, Fareham For further information on this Document please contact planningpolicy@fareham.gov.uk a 91 Fareham LDF Annual Monitoring Report December 2011 APPENDIX 4 Schedule of sites comprising the five year housing land supply SHLAA Ref Site Name 0016 0030 0041 0058 0193 1014 1015 1028 1056 1058 1066 1069 1071 1072 Whiteley Area 11 (part) 148 Botley Road Peters Road East of Raley Road Foundry Site (Housing Element) Land North of Whiteley Swinton Hall 14-22 Dibles Road The Hampshire Rose Former Community Facilities 34-36 Portchester Road 239 - 241 Hunts Pond Road St Christopher's Hospital Land at Hunts Pond Road Shetland Rise Whiteley Area 11 (part) Locks Heath Area 4 Housing Allocation Quay Street Whiteley Lane Warsash Road 1074 Bell Davies Road Land between 335-357 Gosport Road East of Northway, Southway and Westway 70 Trinity Street 40-42 Westley Grove 6 -8 Ranvilles Lane Coldeast Hospital Air Training Corps (ATC) Site Newpark Garage Swanwick Marina, Bridge Road 35 - 37 Shore Road Former Keileen Nursery Broadlaw Walk Stubbington 1076 1077 1089 1095 1096 1121 1124 1144 1203 1209 1211 1212 2011/12 Net Gain 2012/13 Net Gain 2013/14 Net Gain 2014/15 Net Gain 2015/16 Net Gain 27 0 0 0 0 10 0 3 0 0 0 25 0 102 0 15 0 10 0 30 0 4 0 0 3 17 0 63 15 0 30 0 0 33 5 0 5 0 7 0 25 0 0 0 60 0 20 30 0 0 0 0 0 0 15 0 0 0 100 0 35 10 0 0 0 0 0 0 0 17 24 0 0 0 0 Fareham 0 0 0 0 7 Western Wards Fareham Fareham Fareham Western Wards Western Wards Western Wards Western Wards Western Wards Western Wards Fareham 0 0 0 0 20 0 0 0 0 3 0 0 23 13 0 30 20 14 0 0 0 14 14 0 0 0 30 14 0 20 8 0 0 0 0 0 0 40 0 0 29 0 0 0 0 0 0 0 40 0 0 0 0 0 0 Site Address 96 Highlands Road Wynton Way Fareham Course Park Farm Wickham Road Fareham Fareham Bridge Road Farm Road Station Road Lower Swanwick Brook Avenue Settlement Area Whiteley Whiteley Western Wards Western Wards Fareham Whiteley Western Wards Western Wards Fareham Fareham Portchester Western Wards Fareham Western Wards Stubbington & Hill Head For further information on this Document please contact planningpolicy@fareham.gov.uk a 92 Fareham LDF SHLAA Ref Annual Monitoring Report Site Name 1232 1249 Polygraphic House East of Lower Duncan Road 1257 Coldeast Strategic Allocation 1258 1259 1288 1294 Coldeast Strategic Allocation Hope Lodge 324-326 Brook Lane 45-47 West Street 1295 1297 Blackbrook Road Coach and Horses Public House 1299 45 Vicarage Lane 1300 1301 9-11 Burnt House Lane 207 West Street Land adjacent to Swanwick Lodge, Glen Rd 69 Botley Road 161 - 155 White Hart Lane Admiral Cunningham Public House Collingwood House Land at Monterey Drive 1303 1305 1308 1315 1316 1319 December 2011 2011/12 Net Gain 2012/13 Net Gain 2013/14 Net Gain 2014/15 Net Gain 2015/16 Net Gain Titchfield Western Wards 0 0 0 0 5 9 0 9 0 0 Western Wards 0 0 50 35 0 Western Wards Fareham Western Wards Fareham 0 0 8 0 0 0 4 9 0 0 0 0 35 0 0 0 50 7 0 0 Fareham Titchfield Stubbington & Hill Head Stubbington & Hill Head Fareham 2 8 4 0 0 0 0 0 0 0 0 0 0 4 0 8 0 0 8 0 0 0 0 0 0 3 0 0 0 0 0 243 3 0 0 7 5 10 306 0 5 6 0 0 0 281 0 0 0 0 0 0 277 0 0 0 0 0 0 266 Site Address 8-10 Southampton Hill 16 Botley Road South West of Coldeast Way North East of Coldeast Way Fareham Park Road Sarisbury Green Blackbrook Industrial Estate South Street Stubbington Settlement Area Swanwick Western Wards Western Wards Portchester Longfield Avenue Fareham Gibralter Close Fareham Warsash Western Wards ANNUAL AGGREGATE TOTAL = For further information on this Document please contact planningpolicy@fareham.gov.uk a 93 Fareham LDF Annual Monitoring Report December 2011 APPENDIX 5 List of Sources Census 2001 http://www.ons.gov.uk/ons/guide-method/census/census-2001/index.html Fareham Borough Council's Corporate Strategy (2011) http://www.fareham.gov.uk/pdf/cxoffice/corporatevision2011_17.pdf Fareham Borough Core Strategy (August 2011) http://www.fareham.gov.uk/pdf/cxoffice/corporatevision2011_17.pdf Fareham Borough Local Plan Review (2000) http://www.fareham.gov.uk/pdf/planning/corestrategy/localplan.pdf Retail Health Checks http://www.fareham.gov.uk/pdf/planning/corestrategy/rtailhthaut10.pdf Strategic Housing Land Availability Assessment (November 2011) http://www.fareham.gov.uk/pdf/planning/corestrategy/shlaavol2.pdf Local Development Scheme (May 2011) http://www.fareham.gov.uk/pdf/planning/ldf/ldsmay2011.pdf Hampshire County Council 2010 Small Area Population Forecast http://www3.hants.gov.uk/factsandfigures/population-statistics/popestimates/small-area-pop-stats.htm PUSH Economic Development Strategy (October 2010) http://www.push.gov.uk/pos-101109-r02-bto-amm-appendix_b.pdf Fareham Borough Employment Land Review (2010) http://www.fareham.gov.uk/council/departments/planning/ldf/landreview.aspx Hampshire County Council Housing Monitoring 2010/11 http://www3.hants.gov.uk/planning/factsandfigures Hampshire County Council Employment / Retail Monitoring returns 2010/11 http://www3.hants.gov.uk/planning/factsandfigures Annual Monitoring Report (December 2010) http://www.fareham.gov.uk/pdf/planning/amr2010.pdf Land Registry http://www.landreg.gov.uk/house-prices PUSH South Hampshire Sub-Regional Strategy - Final Advice to SEERA 2005 http://www.push.gov.uk/partnership/background/content-advice-to-seera.htm For further information on this Document please contact planningpolicy@fareham.gov.uk a 94