Annual Monitoring Report 2011

advertisement
Fareham LDF
Annual Monitoring Report
December 2011
APPENDIX
A
Fareham Local Development Framework
Shaping Fareham’s Future
Annual Monitoring Report
December 2011
Fareham LDF
Annual Monitoring Report
December 2011
Further Information and Contacts
Information on the general Local Development Framework process, updates on the
progress of Fareham’s Local Development Documents and current consultations, are
available at the following website: www.fareham.gov.uk/ldf.
If you have any questions regarding Fareham’s Local Development Framework
including this document, please contact a member of the Strategic Planning & Design
Service at Fareham Borough Council.
Telephone: 01329 824351
Email:
planningpolicy@fareham.gov.uk
Address:
Strategic Planning & Design
Department of Strategic Planning and Environment
Fareham Borough Council
Civic Offices
Civic Way
Fareham
Hampshire
PO16 7AZ
For more detailed information and guidance on the planning system, visit the
Department
for
Communities
and
Local
Government
website
at
http://www.communities.gov.uk.
This document and all other Local
Development Framework documents
are available in large print and other
languages. Please call 01329
824351 for further information.
Fareham LDF
Annual Monitoring Report
December 2011
Contents
Page No.
EXECUTIVE SUMMARY
1
1.
INTRODUCTION
 Purpose & Aim of the Annual Monitoring Report
 Related Visions & Objectives
 Fareham in Context
4
4
5
5
2.
LOCAL DEVELOPMENT SCHEME DELIVERY AND
IMPLEMENTATION
 Local Development Scheme
 Local Development Document Progress
 Progress in preparing the Local Development Framework
8
HOUSING MONITORING AND SUPPLY
 Past Housing Delivery (outside the SDA)
 Projected housing delivery (outside the SDA)
 Five Year Housing Land Supply (outside the SDA)
 Fareham Borough Housing Trajectory 2006-2026 (outside the
SDA)
 Housing Supply at the North of Fareham Strategic
Development Area (SDA)
14
14
15
15
16
4.
EMPLOYMENT AND RETAIL FLOORSPACE MONITORING
 Key Findings
21
21
5.
POLICY ANALYSIS
 Development Plan Policies
 Analysis Methodology
 Key Findings
 Conclusion
24
24
24
25
28
6.
RECOMMENDATIONS
29
3.
8
8
8
20
For further information on this Document please contact planningpolicy@fareham.gov.ukaaaaaaaaaaaaaaaaaaaaaaaaa
Fareham LDF
Annual Monitoring Report
December 2011
APPENDICES
31
APPENDIX 1 – Development Plan Policy Analysis
32
APPENDIX 2 – List of Saved Local Plan Polices Replaced by the
Core Strategy
88
APPENDIX 3 – List of Local Plan Policies not saved in 2007 by
Government direction
91
APPENDIX 4 – Schedule of sites comprising the five year housing
land supply
92
APPENDIX 5 – List of Sources
94
LIST OF TABLES AND FIGURES
Figure 2.1
Structure Diagram for Fareham Local Development Framework
9
Table 2.1
Development Plan Document Progress against the 2011 Local
Development Scheme timetables
13
Table 3.1
Past Annual Housing Delivery
14
Table 3.2
Five Year Housing Land Supply
16
Figure 3.1
Fareham Borough Housing Trajectory (outside the SDA)
18
Table 3.3
Fareham Borough Housing Trajectory (outside the SDA)
19
Table 3.4
Housing Trajectory for the North of Fareham Strategic Development
Area (SDA)
20
Table 4.1
Net Employment and Town Centre Use Floorspace since 2006/07
to 2010/11
22
Table 4.2
PUSH employment apportionment for Fareham Borough excluding
the SDA 2006/07to 2010/2011
23
For further information on this Document please contact planningpolicy@fareham.gov.ukaaaaaaaaaaaaaaaaaaaaaaaaa
Fareham LDF
Annual Monitoring Report
December 2011
Executive Summary
i.
This is the seventh Annual Monitoring Report (AMR) to be produced by Fareham Borough
Council and the first AMR following adoption of the Fareham Borough Core Strategy. The
AMR forms part of the Fareham Local Development Framework (LDF) and covers the
period 1 April 2010 to 31 March 2011, and considers progress of the LDF up until the
publication of this AMR in December 2011.
ii.
The Localism Bill removes the requirement to submit the AMR to the Secretary of State.
However, until the Bill is enacted this requirement will remain. Previous editions of the
AMR have been required to report on a number of Core Output Indicators (Core Output
Indicators). Core Output Indicators were designed by central government as part of the
monitoring framework to achieve a consistent approach to data collection across the
national, regional and local level. A ministerial letter of 30 March 2011, sent to Local
Authority Chief Planning Officers, removed the requirement to report on Core Output
Indicators and withdrew guidance on local plan monitoring. Thus, it is now for individual
local authorities to determine what to include in their monitoring reports, providing they
are prepared in accordance with relevant UK and EU legislation.
iii.
Chapter 7 of the Core Strategy provides an indicative monitoring framework in recognition
of the importance of retaining an effective monitoring system. Performance measured
against Core Output Indicators will still be reported where it is considered to be relevant to
the effective monitoring of Core Strategy Policies. The AMR is critical in the
understanding of the effect and impact of planning policies in the Borough once they are
adopted.
iv.
This AMR covers four key areas:
 Progress of all Local Development Documents (LDDs) and any milestones that
have been reached against the timetable in the Local Development Scheme (LDS)
 Analysis of individual development plan policies (Core Strategy & 'saved' Local
Plan Review policies;
 Housing monitoring and supply - providing the most up to date housing land supply
for the Borough and setting out housing completions for the past year; and
 Employment & Retail floorspace monitoring - setting out the employment and retail
floorspace completions for the monitoring year.
A summary of these sections of the report are provided below.
Progress On Local Development Documents
v.
The Development Plan Documents (DPDs) contained in the 2011 Local Development
Scheme (LDS) are in part meeting the milestones indicated in the LDS. Fareham's Core
Strategy was adopted a month earlier than anticipated. The Fareham Town Centre Area
For further information on this Document please contact planningpolicy@fareham.gov.uk
hhhhhhhhh1
Fareham LDF
Annual Monitoring Report
December 2011
Action Plan is on track to meet the milestones as indicated in the LDS. However the North
of Fareham Strategic Development Area (SDA) Area Action Plan and the Site Allocations
& Development Management DPD timetables require extension through a review of the
LDS.
vi.
The Supplementary Planning Document (SPD) for the Coldeast Site was adopted in
October 2011 and the SPD for the Daedalus Site has been put on hold following the
designation of the site as an Enterprise Zone.
vii.
Work has commenced on the preparation of a charging schedule for the Community
Infrastructure Levy.
Policy Analysis
viii.
With the use of indicators1, the saved policy analysis demonstrates how the majority of
current local plan policies are working effectively, particularly through the use of
development control in pre-application and decision-making processes.
ix.
The analysis shows how a number of policies, particularly Local Plan policies, cannot be
successfully measured through the use of Core or Local Indicators. This raises the issue
that future policies should aim to be written in such a manner that they can be assessed
in quantifiable terms. Furthermore, a system must be in place to continually collect and
assess data in order to provide an effective method of policy analysis.
x.
This analysis is important and in highlighting policies (or parts of policies) that require
revision or deletion in order to reflect current and changing circumstances that the
Borough faces. Chapter 6 of this AMR sets out such recommendations.
Housing Monitoring and Supply
xi.
As required under The Town and Country Planning (Local Development (England)
Regulation 2004 (as amended), Local Planning Authorities must report on annual housing
delivery as part of the AMR. This AMR also provides an update to the November 2011
Strategic Housing Land Availability Assessment housing supply figures, taking into
account completions and new permissions only during the monitoring period.
xii.
During the 2010/11 year Fareham has delivered 364 dwellings. Chapter 3 demonstrates
that there is an adequate five year housing land supply in the Borough (outside the North
of Fareham SDA) for the period of 2011/12 - 2015/16 with a target of 799 dwellings and a
supply of 1,373 deliverable dwellings. Therefore the supply exceeds the target by 574
dwellings which equates to (72%) percent beyond the required five year housing land
supply. The sites which form this supply are listed in Appendix 4.
xiii.
It is anticipated that, assuming normal market conditions, the Borough (outside of the
North of Fareham SDA) will meet the required 3,729 dwellings toward the beginning of the
2018/19 monitoring year. However, projected housing delivery will continue to the end of
the plan period to 2025/26, through this period the trajectory shows that a further 476
dwellings will be delivered over and above the minimum target.
1
Further information on indicators is provided on pages 22-23.
For further information on this Document please contact planningpolicy@fareham.gov.uk
hhhhhhhhh2
Fareham LDF
xiv.
Annual Monitoring Report
December 2011
The Core Strategy trajectory for the North of Fareham SDA anticipates that the first
dwellings will be delivered at the site in 2014/15, with around 5,350 dwellings completed
by the end of the Core Strategy plan period and development continuing until 2031.
Recommendations for improved policy monitoring
xv.
Chapter 6 sets out the recommendations regarding current monitoring processes and
potential improvements to data capture mechanisms. The relevant polices addressed
under this section are as follows:
CS15 Sustainable Development and Climate Change
CS16 Renewable Energy
CS17 High Quality Design
CS20 Infrastructure and Developer Contributions
CS4 Green Infrastructure, Biodiversity and Geological Conservation
CS21 Protection and Provision of Open Space
For further information on this Document please contact planningpolicy@fareham.gov.uk
hhhhhhhhh3
Fareham LDF
1.
Annual Monitoring Report
December 2011
Introduction
PURPOSE & AIM OF THE ANNUAL MONITORING REPORT
1.1
This is the seventh Annual Monitoring Report (AMR) produced by Fareham Borough
Council covering the monitoring period, 1st April 2010 to 31st March 2011. It forms part of
the Fareham Local Development Framework (LDF) reporting upon progress of the LDF
up until publication of this AMR and the effectives of LDF policies. Where data is not
available for this period, the recommendations section (Chapter 5) clearly identifies the
period for which data is available and/or how this data will be secured for future AMRs.
1.2
The purpose and aim of this AMR is to:
1.3

Report progress of Local Development Documents in relation to the timetable
and key milestones established in the Fareham Local Development Scheme
(LDS);

Update the five year housing land supply position and set out the housing
trajectory for housing outside of the North of Fareham Strategic Development
Area (SDA) and at the SDA.

Report progress on current (‘saved’) policies in the Fareham Local Plan
Review (2000) and the polices contained within the Core Strategy, where
appropriate
Previous editions of the AMR have been required to report on a number of Core Output
Indicators. Core Output Indicators were designed as part of the monitoring framework to
achieve a consistent approach to data collection across the regional and local level.
However, the ministerial letter of 30 March 2011, sent to Local Authority Chief Planning
Officers, removed the requirement to report on Core Output Indicators and withdrew the
following guidance on local plan monitoring:
Local Development Framework Monitoring: A Good Practice Guide (ODPM, 2005),
 Annual Monitoring Report FAQs and Emerging Best Practice 2004-05 (ODPM,
2006),
 Regional Spatial Strategy and Local Development Framework: Core Output
Indicators - Update 2/2008 (CLG, 2008).
1.4
It will now be for individual councils to determine what to include in their monitoring
reports, providing they are prepared in accordance with relevant UK and EU legislation.
In line with provisions contained within Town and Country Planning (Local Development)
(England) Regulations 2004, Local Planning Authorities are still required to report on the
following:
For further information on this Document please contact planningpolicy@fareham.gov.uk
hhhhhhhhh4
Fareham LDF
1.5
Annual Monitoring Report
December 2011

The progress of DPD production against the LDS timetable and any suggested
associated amendments.

Where an authority is not implementing a policy specified in the development
plan, the annual report must identify that policy and include reasons why the
authority is not implementing the policy; the steps (if any) that the authority intend
to take to secure that the policy is implemented; and whether the authority intend
to prepare a DPD or a revision of the DPD (as the case may be) to replace or
amend the policy.

Specify the number of net additional dwellings built in the authority’s area.
Chapter 7 of The Core Strategy provides an indicative monitoring framework in
recognition of the importance of retaining an effective monitoring system. This
framework includes a number of the Core Output indicators contained in the withdrawn
guidance listed above. Performance measured against Core Output Indicators will still
be reported where it is considered to be relevant to the effective monitoring of LDF
Policies.
RELATED VISIONS & OBJECTIVES
1.6
The Fareham LDF aims to adopt an integrated approach to monitoring. The AMR has
regard to the vision and objectives of related Council strategies and plans which have
been taken into consideration in the preparation of the Core Strategy.
1.7
The Council's Corporate Strategy (2011) describes Fareham as, ‘Fareham - the
prosperous, safe and attractive place to live and work'. The Strategy is updated annually
by the Council and is guided by following corporate priorities:
 To protect and enhance the environment.
 To maintain and extend prosperity.
 To ensure that Fareham remains a safe and healthy place to live and work.
 To provide a reasonable range of leisure opportunities for health and fun.
 To work with our key partners to enable and support a balanced housing.
market.
 To build strong and inclusive communities.
 To be a dynamic, prudent and progressive council.
1.8
Fareham's Core Strategy identifies the Borough's development needs and how they will
be met up to 2026 is a key part of the LDF. The Core Strategy was adopted by the
Council on 4 August 2011 following public examination of the plan by an independent
planning inspector from the Planning Inspectorate.
FAREHAM IN CONTEXT
Physical Environment
1.9
Fareham lies on the Solent coastline between the cities of Portsmouth and
Southampton, covering an area of almost 30 square miles. Rapid development has
occurred over the past 50 years, although approximately 60% of the Borough remains as
countryside. The Southern and Western boundaries of the Borough are formed by the
For further information on this Document please contact planningpolicy@fareham.gov.uk
hhhhhhhhh5
Fareham LDF
Annual Monitoring Report
December 2011
Solent and River Hamble, respectively, which are internationally recognised for their
environmental and recreational value. The special character of the Borough’s older
settlements is recognised by conservation area designations.
Population
1.10
Hampshire County Council's Small Area Population Forecast 2010 2 stated a resident
population of 110,995. The figures are the best projections available as at April 1st 2010
on a site by site basis taking account of the current market conditions. This is an
increase of 3,018 since the 2001 Census (107,997). In 2001 the average age of
residents in Fareham was 40. The retired population is expected to increase by 47% by
2021.
Transport
1.11 The M27 South Coast motorway links Fareham to the wider motorway network and
provides easy access to Ports and Airports. London is 75 miles away via the M3 or
A3M. Two international sea ports lie close to the Borough - Portsmouth European Ferry
Port and Southampton cruise liner and container port. The Solent corridor’s regional
international airports are also close by - Southampton Eastleigh Airport and
Bournemouth Airport. Britain’s leading international airports are little more than an hour
away.
Economy
1.12 Fareham is located at the heart of urban South Hampshire. The Western Wards and
Whiteley, around Junction 9 of the M27, has been a growth sector within South
Hampshire over the last 30 years. The availability of high quality employment land has
allowed the Borough to become a very buoyant part of the sub-regional economy. In
addition, over the last decade, Fareham has become a telecommunications hub served
by high capacity fibre optic infrastructure that enables sustained business growth
focused on the Cams Estate, close to Junction 11 of the M27.
1.13 The relocation of National Air Traffic Services to the Swanwick Control Centre and to the
Whiteley Technical Centre supports about 2500 well-paid jobs, making it the largest
employer in the area.
1.14 The Core Strategy provides the framework for the delivery of a strategic employment site
at Daedalus airfield. This area has recently been given Enterprise Zone status which is
designed to boost local job creation in the area.
Housing
1.15 Fareham remains the largest town in the Borough, However the 'Western Wards'
(comprising Locks Heath, Sarisbury, Park Gate, Warsash and Titchfield Common) are
now almost as large. Portchester and Stubbington and Hill Head have grown from small
villages to large residential suburbs containing over 6,000 dwellings in each. Only
2
Source: Hampshire County Environment Department's 2010 based Small Area Population Forecasts
For further information on this Document please contact planningpolicy@fareham.gov.uk
hhhhhhhhh6
Fareham LDF
Annual Monitoring Report
December 2011
Titchfield, Lower Swanwick and Burridge retain a village scale and character. The
number of dwellings in Fareham Borough has increased from approximately 12,000 in
1951 to about 47,500 in March 2010, with more than 57% of the total housing stock
being built since 1961. Information from the Land Registry shows that the average house
price in Fareham in the period April to July 2010 was £212,000, compared with £76,536
in January to March 1996. This is a price increase of 277% over a period of 14 years.
Average property prices for a detached, semi-detached, terrace or flat are £325,227,
£205,623, £169,379 and £127,017, respectively. Whilst past completions of new housing
have been healthy in the Borough, the rate of delivery remains insufficient to
successfully address the problems of affordability.
For further information on this Document please contact planningpolicy@fareham.gov.uk
hhhhhhhhh7
Fareham LDF
2.
Annual Monitoring Report
December 2011
Local Development Scheme Delivery and
Implementation
LOCAL DEVELOPMENT SCHEME
2.1
The Local Development Scheme (LDS) identifies the preparation stages and timetable for
each of the Development Plan Documents (DPD) that the Council is preparing. In
accordance with Government Guidance in Planning Policy Statement 12: Local Spatial
Planning (2008) and the Town and Country Planning (Local Development) (England)
Regulations 2004 (as amended), this section of the AMR reports on the progress of
documents against LDS timetable and milestones. Where milestones have not been met
a detailed explanation of why this has not been achieved is provided.
2.2
The first iteration of Fareham LDS was published on 19 April 2005 under Regulation 11(3)
of the Town and Country Planning (Local Development) (England) Regulations 2004.
The LDS has had a number of revisions since the original publication. Updated versions
have been published; 28 June 2006; 30 March 2007; 12 March 2009 and more recently;
16 May 2011. The original LDS and its subsequent revisions are later referred to as 2005
LDS, 2006 LDS, 2007 LDS, 2009 LDS and 2011 LDS, respectively.
2.3
Following the amendments in 2008 to the Town and Country Planning (Local
development) (England) Regulations 2004, it is no longer necessary to include
Supplementary Planning Documents (SPDs) within a LDS.
2.4
The 2010 AMR recommended an update of the LDS. A revised LDS was adopted by the
Council in May 2011 and sets out the most up to date published timetables for the
production of DPDs.
LOCAL DEVELOPMENT DOCUMENT PROGRESS
2.5
The diagram overleaf provides an overview of the documents - existing and those being
prepared - that currently make up the Fareham Borough Local Development Framework
(LDF).
2.6
This section of the AMR goes on to audit the progress of each LDF document during the
period 1 April 2010 to the date of publication of this AMR. The summary table on page 13
sets out the progress of production of DPDs against the 2011 Local Development
Scheme (LDS). It also provides a useful indication of any potential need to re-program or
reallocate resources where delivery of a Local Development Document (LDD) has missed
(or is at risk of missing) its key deadlines/milestones.
For further information on this Document please contact planningpolicy@fareham.gov.uk
hhhhhhhhh8
Fareham LDF
Annual Monitoring Report
December 2011
Figure 2.1 - Structure Diagram for Fareham Local Development Framework
National Planning Policy (PPGs and PPSs)
FAREHAM LOCAL DEVELOPMENT FRAMEWORK
Fareham
Borough Local
Plan Review
2000
Saved Policies
Local
Development
Scheme
Core Strategy
Including Key
Diagram
Fareham Town
Centre Area Action
Plan
Affordable
Housing
SPD
Site Allocations and
Development
Management
Development Plan
Document
Statement of
Community
Involvement
North of Fareham
Strategic
Development Area
Action Plan
Annual
Monitoring
Report
Proposals Map
Site Development Brief
Hunts Pond Rd, Titchfield
Common, SPD
Coldeast SPD
Key
Site Development Brief
Peters Rd, Locks Heath,
SPD
Completed
Daedalus SPD
In Progress
Residential Car and Cycle
Parking Standards SPD
Open Space SPG
Key
SPD - Supplementary Planning Document
SPG - Supplementary Planning Guidance
On Hold
December 2011
For further information on this Document please contact planningpolicy@fareham.gov.uk
a9
Fareham LDF
Annual Monitoring Report
December 2011
Core Strategy Development Plan Document
2.7
Following submission at the end of February 2011 for examination, the hearing sessions
took place during May 2011 and the Inspector's Report was received in July. The Core
Strategy was adopted by the Council on 4 August 2011.
2.8
The plan identifies the Borough's development needs up to 2026 and how they will be
met. It sets out the spatial vision, a series of objectives designed to achieve the vision;
overarching key policy areas which provide focus and link the objectives to the spatial
strategy; core delivery policies and an implementation and monitoring framework. The
Core Strategy replaces a number of the Local Plan Review 2000 policies.
2.9
The Core Strategy has achieved its milestones as set out in the LDS 2011 from
Examination through to adoption and was adopted one month in advance of the expected
adoption date.
North of Fareham Strategic Development Area, Area Action Plan
2.10 An Area Action Plan (AAP) for the North of Fareham Strategic Development Area (SDA)
was added to the LDF in the 2009 LDS. Core Strategy Policy CS13 includes the SDA
vision and policy framework for the delivery of the SDA and includes a set of high level
development principles. Policy CS13 includes the provision of between 6,500 and 7,500
dwellings and up to 90,750 sq m of employment floorspace. The boundary for the SDA
will be defined through the AAP.
2.11 The AAP process has commenced with the production of the Sustainability Appraisal
Scoping Report. In addition, the site's landowner consortium produced a Strategic
Masterplan for the new community in October 2010, which was based on community
masterplanning workshops held in July.
2.12 The Council is currently working on a Community Engagement Plan that will set out how
the local community will be involved in developing a draft AAP during 2012 - 2013. Project
Teams have been established to identify the key issues and to steer the development of
the AAP and detailed masterplan. Also underway are a number of evidence studies
needed to provide the detailed justification for the plan its policies and land use
designations. The production of an Infrastructure Development Plan in early 2012 will
identify the infrastructure needed to support the SDA and liaison with infrastructure
providers has and will continue to underpin this.
2.13 It is anticipated that additional time will be needed for all this work such that the AAP
would be adopted by Fareham Borough Council in mid 2014, rather than the autumn of
2013 as in the 2011 LDS. A review of the LDS is therefore needed to update the timetable
for the production of the AAP.
Site Allocations and Development Management Development Plan Document
2.14 Consultation on the first stage of the production of the Site Allocations Development Plan
Document (Issues and Options Stage) was undertaken in early 2008. Comment was
sought on the suitability, sustainability and contribution identified sites could make
towards meeting the requirements set out in the Core Strategy. A summary of the
For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaa
a10
Fareham LDF
Annual Monitoring Report
December 2011
responses was published in July 2008. Production of the Site Allocations Development
Plan Document paused following the publication of the consultation summary as Officer
resources were directed toward the Core Strategy. During this interim period, no further
progress on Site Allocations Development Plan Document has been made other than
updating of information on employment and housing site options through updates to the
Strategic Housing Land Availability Assessment (SHLAA) and the Employment Land
Review (ELR). Work on this document is expected to resume in January 2012 following a
'call for sites' exercise in November - December 2011.
2.15 In accordance with recommendations from the Planning Inspector's Advisory Visit 3 the
scope of the Core Strategy was altered so the development management policies aspect
of the document, that were initially intended to be included as part of the Core Strategy,
were moved into the Site Allocations DPD. This prompted revisions to the LDS which now
accounts for alterations to the scope of the Site Allocations DPD, now referred to as the
Site Allocation & Development Management DPD (SADM DPD).
2.16 With the amount of work needed to assess the submissions and review the site options,
together with consultation needed with local communities on the preferred sites,
consultation on draft Development Management policies, and issues raised by the Core
Strategy in relation to a review of boundaries for the Strategic Gaps and Urban Areas, it is
anticipated that more time will be needed to reach the stage of a draft plan. This will add
about 6 months to the adoption date of the timetable in the 2011 LDS; a review of the
LDS is therefore needed.
Fareham Town Centre Area Action Plan (AAP)
2.17 Consultation on Issues and Options was undertaken early in 2008 and a summary of the
responses was published in July 2008. Subsequent progress towards a Preferred
Approach document was limited by the need to concentrate resources on the Core
Strategy. In 2009/10 progress was made on studies related to the potential of extending
Bus Rapid Transit and associated land use requirements of a rail-bus interchange and
routeing to serve the SDA and surrounding settlements. During 2011 consultation has
been undertaken with landowners to identify potential constraints and opportunities to
deliver Town Centre development identified in the Core Strategy. Further work on
landowner consultation and evidence gathering, site assessment/development approach
and policy formulation will be progressed in 2012.
2.18 Public consultation on a Preferred Options document is anticipated from July 2012 in
accordance with the current LDS. It is recognised however that this timetable will be
subject to potential resourcing and priority constraints.
Former Coldeast Hospital Development Brief Supplementary Planning Document
(SPD)
2.19 Public consultation concerning the future of the site as part of the preparation of the
development brief took place during November and December 2007. Since then the new
Community Hospital has been completed on part of the site and the development of 251
dwellings (granted in 2003 and extended in 2005) which commenced in 2008 remains
3
PINS Advisory Visit - 27 July & 11 August 2009
For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaa
a11
Fareham LDF
Annual Monitoring Report
December 2011
ongoing.
2.20 Further development and environmental opportunities have been established with the site
owners and developers through allocation in the Core Strategy as a Strategic Site. Broad
development proposals for the site contained within the Core Strategy policy CS10 which
allows for a further 150-170 dwellings and a sheltered housing scheme of 60 units to be
accommodated on land outside the urban area, to the west of Brook Lane,
repair/restoration of the historic buildings and land for open space, community and leisure
uses. An additional dwelling 30 units and land for future health facilities will also be
provided on land within the urban area owned by the Primary Care Trust to the west of the
new community hospital.
2.21 Consultation on the final draft of the Coldeast Supplementary Planning Document (SPD)
was undertaken from 6 June 2011 to 18 July 2011. The SPD was adopted by the Council
24 October 2011, one year later than the timetable in the 2009 LDS due to the need to
await the adoption of the Core Strategy.
Daedalus Supplementary Planning Document
2.22 The former HMS Daedalus site was sold by the Ministry of Defence Estates in March
2006. The airfield has been purchased by the Marine & Coastguard Agency which is
continuing operational flying from the site. The South East England Development Agency
(SEEDA) purchased the remaining area of the site although the land has recently been
transferred to the Home and Communities Agency following the dissolution of the
Regional Development Agencies including SEEDA.
2.23 Due to the complexity of issues across the Daedalus site, the development proposals
need to be considered comprehensively through the LDF process. For this reason, the
site is regarded as a strategic site and is an allocation in the Core Strategy with further
details to be set out an SPD. Core Strategy Policy CS12 - Daedalus Airfield Strategic
Development Allocation allows for between 10,000 and 33,000 sq m of additional
employment floorspace to be developed, particularly focusing on aviation and marine
related operations, together with the provision of open space and land for biodiversity and
habitat creation and management.
2.24 The SPD was being prepared using consultation responses and technical work
undertaken by consultants for the South East England Development Agency; however
preparation has been placed on hold following the designation of the site as an Enterprise
Zone in August 2011. This designation requires that a Local Development Order (LDO) be
prepared to specify what development may happen at the site without the need for
planning consent. Meanwhile outline planning applications for the site are being
considered by Fareham and Gosport Borough Councils. Gosport Borough Council
adopted a SPD for the part of the site within its borough. The need to continue with the
SPD or delete it from the LDF programme will be reviewed on adoption of the LDO.
Community Infrastructure Levy
2.25 The 2011 LDS, stated the intention to introduce the Community Infrastructure Levy; also
that a timetable will be set for the preparation of the Community Infrastructure Levy
charging schedule and will be published on the Council's website. Following the Core
Strategy adoption the Council is able to proceed with the preparation of the Community
For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaa
a12
Fareham LDF
Annual Monitoring Report
December 2011
Infrastructure Levy charging schedule and the Executive at its meeting on 7 th November
agreed a timetable for this task.
Table 2.1 - Development Plan Document Progress against the 2011 Local
Development Scheme timetables
KEY
Achieved Early
Achieved
On Track
At Risk/Need for re-programming
Document Title
LDS
Edition
Regulation 25
Consultation and
SA Scoping
Pre-Submission
Consultation
Core Strategy
DPD
2011
LDS
May 2007 –
September 2009
13th December
2010 - 31st
January 2011
Submission
to
Secretary
of State
28th
February
2011
2011
LDS
January 2009 July
2012
December 2012 January 2013
2011
LDS
January 2008 November 2011
North of Fareham
Strategic
Development
Area AAP
Site Allocations
and Development
Management
Policies
DPD
Fareham Town
Centre Area
Action Plan
2011
LDS
January 2008 August 2012
Examination
Adoption
28th February
September
2011
February
2013
February
2013 - August
2013
September
2013**
May-June 2012
End of
August 2012
End of August
2012 - March
2013
May 2013
February - March
2013
End of April
2013
End of April
2013 October 2013
November
2013
Not Achieved
* October 2013 if pre-examination meeting is required.
For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaa
a13
Fareham LDF
3.
Annual Monitoring Report
December 2011
Housing Monitoring and Supply
PAST HOUSING DELIVERY (OUTSIDE THE SDA)
3.1
As
4 per the Town and Country Planning Regulations 2004, Section 38 subsection 3 (ii) (as
amended
.
in 2010), Council's are required to report on housing delivery that has occurred
during
1
the past monitoring year, in this case the period April 1st 2010 to 31st March 2011.
3.2
Housing
4
monitoring is undertaken in partnership with Hampshire County Council to ensure
that
. the housing completion count is accurate and robust. During the 2010/11 year a total
of2 364 dwellings (net) have been completed in the Borough.
3.3
It4is perhaps useful to put this figure in the context of housing delivery in previous years so
useful
.
comparisons can be drawn. Table 3.1 below sets out annual housing completions
since
3
the beginning of the Core Strategy plan period in 2006/2007.
3.4
Table 3.1 - Past Annual Housing Delivery
Year
Housing
Delivery
Housing
Provision
Target
Surplus/
Deficit
2006/07
2007/08
2008/09
2009/10
2010/11
Total
581
548
320
188
364
2001
340
340
340
340
340
1700
241
208
-20
-152
24
+301
Source: Hampshire County Council Housing Land Supply Monitoring 2010-2011
3.5
As
4 the table above demonstrates, housing delivery has nearly doubled since the last
monitoring
.
year, returning to levels that were experienced in the Borough in 2008/09. This
trend
4
should perhaps be expected as it is broadly consistent with trend in the UK housing
market throughout this period.
3.6
The
4 higher completion figures during the latest monitoring year are encouraging as annual
housing
.
delivery now exceeds the annual target rate of 340 dwellings per annum (initial
five
5 year phasing) as set out in the Partnership for Urban South Hampshire - Sub-regional
Strategy - Final Advice to SEERA.
3.7
Table
4
4.1 also sets out the Sub Regional Strategy housing provision targets. Comparisons
between
.
housing delivery in table and housing provision targets in the table demonstrate
that
6 high delivery rates in previous years (i.e. 2006/07 and 2007/08) have meant that when
For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaa
a14
Fareham LDF
Annual Monitoring Report
December 2011
the data is aggregated across the five year period housing delivery has far exceeded
housing targets, despite an annual delivery shortfall in years, 2008/09 and 2009/10.
PROJECTED HOUSING DELIVERY (OUTSIDE THE SDA)
3.8
In4 addition to looking at past delivery, Council's are also required to maintain a flexible,
responsive
.
supply of land in order to demonstrate its ability to attain housing delivery
objectives
7
across the plan period. Housing provision data contained within this AMR draws
upon information contained with the Strategic Housing Land Availability Assessment
(SHLAA) (November 2010). Where completions have occurred on identified SHLAA sites,
these have been discounted from its overall yield and where new information about
existing sites has come to light this has been considered and where necessary the
delivery phasing of the site has been adjusted accordingly. In addition, new sites that have
been granted planning permission, and are above the SHLAA threshold of 5 units, have
been included as part of the housing supply. This process up has ensured that this AMR
takes account of the most up to date information available (as at the 1 st April 2011) and
provides the most current housing land supply position for the Borough.
3.9
In4 the short-term, Council's must be able to demonstrate a robust five year housing land
supply
.
of deliverable sites. In line Planning Policy Statement 3: Housing (PPS3)
deliverable
8
housing sites are those that are suitable, available and achievable (a definition
of these terms can be found in paragraph 54 of PPS3). The determination of a sites'
deliverability has been undertaken through the SHLAA process.
3.10 It4is also important to consider housing supply in the medium to long term (beyond five
years).
.
For the purposes of this AMR (and in light with the format of the SHLAA) the
medium
9
to long term supply is presented in two distinct delivery phases; medium-term 610 years and; long term 11+ years. Sites within these two latter phases are considered to
be developable: they must be in a suitable location for housing development and there
should be a reasonable prospect that the site is available for, and could be developed at
the point envisaged.
FIVE YEAR HOUSING LAND SUPPLY (OUTSIDE THE SDA)
3.11 Local
4
Planning Authorities must assess and demonstrate the extent to which existing
plans
.
already fulfil the requirement set out in this statement to identify and maintain a
4 five-year supply of deliverable land for housing, particularly in connection with
rolling
1
making
0
planning decisions.
3.12 Table
4
3.2 below clearly sets out the housing quantum that is expected to be delivered in
the
. coming five years on an annual basis. The table also provides the housing target for
the
1 same period. It should be noted that the housing target has been adjusted to account
for
1 overprovision of housing in the previous years, as set out in Table 3.1 (housing
provision targets, before adjustment, are set out in paragraph 4.16 of the Fareham
Borough Core Strategy.
4 The supply of land should be managed in a way that ensures that a continuous five year supply of deliverable sites is maintained ie
at least enough sites to deliver the housing requirements over the next five years of the housing trajectory.
For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaa
a15
Fareham LDF
Annual Monitoring Report
December 2011
Table 3.2 - Five Year Housing Land Supply
Year
2011/12
2012/13
2013/14
2014/15
Projected
Housing
243
306
281
277
Supply
Housing
Provision
160
160
160
160
Target
Surplus /
83
146
121
117
Deficit
*Total supply across the period is not equally divisible by 5.
2015/16
Total
266
1373
159*
799
107
+574
Source: Hampshire County Council Housing Land Supply Monitoring 2010-2011 and
Fareham Borough Council Strategic Housing Land Availability Assessment (November
2010)
3.13 As table 3.2 demonstrates, the Borough is in a very strong position in terms of housing
supply being able to demonstrate 8.6 years supply of housing (against a government
requirement of 5 years). Appendix 4 sets out the schedule of sites that constitute the five
year housing land supply.
FAREHAM BOROUGH HOUSING TRAJECTORY 2006-2026 (OUTSIDE THE SDA)
3.14 As mentioned above, it is necessary for the Council to be able to demonstrate a robust
housing supply that meets the housing provision target across the plan period. Planning
Policy Statement 12: Local Spatial Planning (PPS12) sets out the requirement for local
planning authorities to provide information on housing policy and performance including
the preparation of a housing trajectory. Building upon the five year supply, Table 3.3 below
considers housing delivery, past and future, and provides the overall housing trajectory
across the plan period5. Figure 3.1 provides a graphical representation of the same data
set.
3.15 The
4 trajectory is a forward planning tool, designed to support the plan, monitor and
manage
.
approach to housing delivery by monitoring both past and anticipated completions
across
1
a period of time. It demonstrates the quantum of housing already delivered and the
number
4
of projected completions for the remainder of the plan period, represented by the
blue and red columns respectively.
3.16 The
4 green 'PLAN' line represents the PUSH Sub-regional Strategy annual target and
demonstrates
.
the phased delivery of housing, with the emphasis placed on early delivery
in1 the plan period.
5
5
The overall trajectory demonstrates housing delivery and supply across the plan period (2006-26). In order
to take into account past delivery the trajectory does not consider the adjusted phasing as described in
Table 4.2.
For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaa
a16
Fareham LDF
Annual Monitoring Report
December 2011
3.17 The
4 orange 'MONITOR' line demonstrates the number of dwellings above or below the
cumulative
.
target at any one point in time. It is essentially cumulative completions less the
cumulative
1
target calculated at each year. It does not take account of the effect of future
completions
6
in meeting the overall target. The MONITOR line provides an early warning
system to indicate whether housing delivery is likely to deviate from delivery of the PUSH
Sub-regional Strategy target. A positive figure demonstrates that a strategy is ahead of the
delivery target whereas a negative figure shows a shortfall in housing delivery. As the
cumulative rate of delivery remains above the cumulative target (i.e. the line remains
above zero throughout the plan period) a shortfall in housing delivery for Fareham
Borough is not anticipated.
3.18 The
4 purple 'MANAGE' line represents the annual number of completions needed to meet
the
. PUSH Sub-regional Strategy total, taking into account any shortfalls or surpluses in
completions
1
from both previous and future years. In order to calculate the managed supply
it7has been necessary to annualise the housing target across the twenty years the plan will
run. To a certain extent this approach will conceal the phased distribution of housing as
per the phased strategic allocation. The value of this MANAGE line is that it allows the
assessment of whether past shortfalls or surpluses will be addressed through future trends
in supply, or whether there is any need for action to allow delivery of the PUSH Subregional Strategy target. The MANAGE line has been calculated using a residual method
and is derived from the total plan allocation less cumulative completions in previous years
divided by the number of years the PUSH Sub-regional Strategy has to run.
3.19 The
4 conclusion drawn from Figure 3.1 is that Fareham will complete delivery of the
required
.
3,729 dwellings toward the beginning of the 2018/19 monitoring year. However,
projected
1
housing delivery will continue to the end of the plan period to 2025/26, through
this
8 period the trajectory shows that a further 476 dwellings will be delivered over and
above the minimum requirement.
For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaa
a17
Fareham LDF
Annual Monitoring Report
December 2011
Figure 3.1 - Fareham Borough Housing Trajectory (outside the SDA)
800
Past Completions
600
Projected Completions
Dwelling Count
400
PLAN - Phased Strategic
Allocation
200
MONITOR - No.
dwellings above or
below cumulative
requirement
0
PLAN - Annualised
Strategic Allocation
-200
-400
-600
MANAGE - Annual
requirement taking
account of past and
projected completions
Monitoring Year
For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaa
a18
Fareham LDF
Annual Monitoring Report
December 2011
Projected
Completions
PLAN - Phased
Strategic
Allocation
MONITOR - No.
dwellings above
or below
cumulative
requirement
PLAN Annualised
Strategic
Allocation
MANAGE - Annual
requirement
taking account of
past and
projected
completions
2006-2026
2025/26
2024/25
2023/24
2022/23
2021/22
2020/21
2019/20
2018/19
2017/18
2016/17
364
2015/16
188
2014/15
320
2013/14
2010/11
548
2012/13
2009/10
581
2011/12
2008/09
Past Completions
2007/08
Plan Year
2006/07
Table 3.3 - Fareham Borough Housing Trajectory (outside the SDA)
2001
243
306
281
277
266
257
84
24
16
9
88
88
88
88
89
2204
340
340
340
340
340
220
220
220
220
220
94
94
94
94
93
92
92
92
92
92
3729
241
449
429
277
301
324
410
471
528
574
737
727
657
579
495
491
487
483
479
476
476
186
186
186
186
186
186
186
186
186
186
186
186
186
186
186
186
186
186
186
186
3720
186
166
144
134
131
115
106
91
75
56
7
11
2
-1
-4
-7
-31
-70
-150
-387
-476
For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaa
a19
Fareham LDF
Annual Monitoring Report
December 2011
HOUSING SUPPLY AT THE NORTH OF FAREHAM STRATEGIC DEVELOPMENT AREA
(SDA)
3.20
The SDA strategic masterplan anticipates that the first dwellings will be delivered at the site
in 2014/15, with development continuing until 2031. Table 3.4 below sets out the proposed
annual housing delivery rate at the SDA. The Fareham Borough Core Strategy, Policy CS13
- North of Fareham Strategic Development Area, provides the basic policy requirements for
the SDA and an Area Action Plan is currently being prepared which will provide more detail
on how the SDA will be delivered.
2017/18
2018/19
2019/20
2020/21
2021/22
2022/23
2023/24
2024/25
2025/26
2026/27
2027/28
2028/29
2029/30
2030/31
50
200
300
400
550
550
550
550
550
550
550
550
550
550
400
400
300
2006-2031
2016/17
0
2015/16
Projected
Housing
Delivery
2014/15
Year
2006-2014
Table 3.4 - Housing Trajectory for the North of Fareham Strategic Development Area (SDA)
7,500
Source: North of Fareham Strategic Development Area Strategic Masterplan Report, October 2010, URS/Scott Wilson
3.21 As housing construction has not yet started at the SDA, monitoring cannot be undertaken.
However, at this stage it is assumed that the projected completion rate will be equal to the
target build rate. It remains to be seen whether this planned rate of delivery will be so closely
aligned to the actual delivery rate and in reality this is unlikely to occur. Thus, it will be for
future editions of the AMR to report on any deviation of delivery from the planned rate of
delivery and, where possible, manage any potential discrepancy accordingly.
For further information on this Document please contact planningpolicy@fareham.gov.uk aa a20
Fareham LDF
Annual Monitoring Report
December 2011
4. Employment and Retail Floorspace Monitoring
KEY FINDINGS
4.1
An3important aspect of Fareham's strategy is to encourage economic growth. The Strategy
seeks to increase Gross Value Added by 3.5% per annum by 2026. However, given the
current and recent economic climate this is perhaps an ambitious target. Indeed, the
Partnership for Urban South Hampshire (PUSH) commissioned an update to the original
Economic Development Strategy (EDS) produced in 2005, which takes account of the
current macro-economic situation. It is now thought that average annual Gross Value Added
(GVA) growth over the period 2006-26 will be around 2% rather than the PUSH aspiration of
growth in excess of 3% (PUSH Economic Development Strategy (October 2010)).
4.2
With
3 regards to employment floorspace (B use class) delivered in the Borough, there were
three schemes in the Borough which delivered employment floorspace totalling 313 sqm
(gross) B1 floorspace and 1,181 sqm (gross) B2 floorspace however all of these were for
redevelopment schemes for replacement employment units and resulted in a net loss of 553
sqm of employment floorspace. Whilst disappointing, this is perhaps not too surprising
considering the effects of the recession.
4.3
Turning
3
to 'Town Centre Use' floorspace, completions are also disappointing with just 1,240
sq m (gross) provided in town centres (66 West Street Fareham and Broadlaw Walk
Fareham) and a net loss of 82 sq m due to the retail floorspace lost on the Broadlaw Walk
redevelopment scheme. 2,706 sq m (net) floorspace was delivered outside of town centres
(alterations to Sainsbury store and provision of restaurant, Broadcut, Fareham). All of this
development has occurred within the 'A' use class, i.e. retail floorspace. Despite the overall
low rates of town centre use development, a concern here is that a greater proportion of
town centre development is being built outside of town centre areas. This runs contrary to
the Council's 'Town Centre First Strategy' (see PPS4 and Core Strategy Policy CS3).
Although the Core Strategy policy was not adopted during this time this trend will be
monitored closely to ensure that the Core Strategy policy is effective in directing town centre
development to Town Centre areas in line with the hierarchy described in Policy CS3.
4.4
The Retail Health Check, completed biannually in Spring and Autumn, will be an essential
tool for measuring the vitality and viability of Fareham Town Centre, the district centres at
Portchester and Locks Heath and the local centres at Stubbington, Park Gate, Broadlaw
Walk, Highlands Road, Gull Coppice, Titchfield and Warsash. The study will measure:
 Diversity of main town centre uses (by number, type and amount of floorspace);
 The amount of retail, leisure and office floorspace in edge-of-centre and out-of-centre
locations;
 The potential capacity for growth or change of centres in the network;
 Retailer representation and intentions to change representation;
For further information on this Document please contact planningpolicy@fareham.gov.uk aa a21
Fareham LDF






Annual Monitoring Report
December 2011
Proportion of vacant street level property;
Pedestrian Flows;
Accessibility;
Customer and residents' views and behaviour;
Perception of safety and occurrence of crime;
State of the town centre environmental quality.
4.5
Although
3
2010/11 has been a particular disappointing year in terms of commercial
development it is useful to observe the temporal trends in employment uses provision in
order to provide an historical context and to allow comparisons to be drawn. Table 3.1 below
sets out annual employment uses provision going back to the beginning of the Core Strategy
plan period in 2006/07. Employment uses include; B1, B1A, B2, B8 and Town Centre Uses
include; A1, A2, B1A, D2. It should be noted that B1A uses (Offices) are generally
acceptable in either Town Centre Areas or in Employment Areas. The second row of the
table considers B1A uses within the wider B1 use class. To alleviate the possibility of double
counting each B1A use has been cross-checked against Town Centre floorspace gains and
Non-Town Centre B1A.
4.6
Table 4.1 shows a decrease in employment provision both in terms of uses and its spatial
distribution (i.e. within or outside of Town Centre areas). When these figures are compared
against the PUSH employment apportionment figures for the period 2006-11, see Table 4.2
below, Fareham exceeds its target for B1 and B2-B8 uses by 5,261 sq m and 855 sq m,
respectively. Overall, across the same timeframe Fareham exceeds its total B-use
employment target by 6,116 sq m. This is largely due to the high level of employment
floorspace gains in 2006/07 and 2008/09. It should be recognised, however, that low
employment floorspace gains should not necessarily be attributed to failing policies but are
closely linked to the prevailing economic difficulties that have been and continue to be
experienced nationwide.
Table 4.1 - Net Employment and Town Centre Use
Floorspace since 2006/07 to 2010/11
Employment
Floorspace
(B1 gain sq m)
Employment
Floorspace
(B2/B8 gain sq m)
'Town Centre Use'
Floorspace - within
Town Centre areas
(A1, A2, B1a, D2)
'Town Centre Use'
Floorspace Outside of Town
Centre areas (A1,
A2, B1a, D2)
Total Commercial
Development
Floorspace
2006/07
2007/08
2008/09
2009/2010
2010/11
Total
4,247
1,596
6,108
0
-193
11,758
4,379
1785
3,363
688
-360
9,855
933
(gross
figure)
0
833
2,536
-82
4,220
1000
1,216
950
0
2,706
5,872
10,559
4,597
11,254
3,224
2,071
31,705
For further information on this Document please contact planningpolicy@fareham.gov.uk aa a22
Fareham LDF
Annual Monitoring Report
December 2011
Table 4.2 PUSH employment apportionment for Fareham Borough excluding the SDA
2006/07to 2010/2011
2006-11
B1
6,500
B2
3,000
B8
6,000
Total
15,500
For further information on this Document please contact planningpolicy@fareham.gov.uk aa a23
Fareham LDF
Annual Monitoring Report
December 2011
5. Policy Analysis
DEVELOPMENT PLAN POLICIES
5.1 The development plan policy analysis will help to identify whether a policy requires
amendment or replacement in future Development Plan Documents (DPDs) or whether it
should be considered for deletion. The development plan currently includes saved polices 6
retained in the Fareham Borough Local Plan Review (Local Plan) and polices contained
within the Core Strategy. Appendix 1 of this AMR provides a detailed policy analysis of the
existing Development Plan, linking the monitoring framework for the Local Plan with that of
the Core Strategy (as set out in Core Strategy Chapter 7) and grouping the policies by
theme e.g. 'Development Strategy'.
5.2
Following the adoption of the Core Strategy in August 2011 a number of Local Plan policies
have been replaced and hence deleted from the Development Plan and it will no longer be
necessary to monitor and report on these policies. Appendix 2 provides a list of the Local
Plan policies replaced by the Core Strategy and Appendix 3 lists those polices that were
not saved by the Secretary of State's direction in September 2007.
5.3
It is important to note that whilst the adoption of the Core Strategy occurred after the end of
the 2010/11 monitoring period for which this AMR is expected to be concerned this AMR
does not report on Local Plan policies that are now deleted.
ANALYSIS METHODOLOGY
5.4
The analysis identifies, where possible:
 those policies which have not been implemented, explaining why, and setting out
what steps are to be taken to ensure implementation;
 policies to be amended or replaced;
 whether policies are achieving objectives, in particular achieving sustainable
development;
 any unintended consequences arising from the implementation of policies;
 whether the assumptions and objectives behind policies are still relevant; and
 any identified targets being achieved.
5.5
With regards to the Local Plan, there are a limited number of policies that contain specific
time-related wording or targets. Appendix 10 of the Local Plan contains an implementation
schedule for a number of the policies. A summary analysis has been made of progress
towards meeting this implementation schedule. This is based upon the full assessment in
Appendix 1.
6
saved by direction of the Secretary of State in September 2007.
For further information on this Document please contact planningpolicy@fareham.gov.uk aa a24
Fareham LDF
Annual Monitoring Report
December 2011
Core Output Indicators
5.6
As3 mentioned in section 1 of this AMR, the requirements for monitoring and reporting on
Core Output Indicators were removed by the Ministerial Letter of 30 March 2011. However,
some of these indicators are still considered useful in terms of measuring LDF policies and
will therefore be retained.
Local Indicators
5.7
Local
3
Indicators help to form a baseline or backdrop covering areas that are not
encompassed by the Core Output Indicators. Local Indicators are used to consider the
effects of policies and help inform the interpretation of Core Output Indicators.
Contextual Indicators and Significant Effects Indicators
5.8
Contextual
3
indicators can help to form a profile of the area, and assist in creating an
assessment of the Borough. Significant Effects Indicators are established through the
sustainability appraisals process. As the monitoring framework for the LDF matures, as
DPD policies are formulated and progressed, a more quantitative framework will be applied
to ensure the monitoring and assessment of objectives, targets and indicators is
undertaken on a quantifiable basis. Over time contextual and significant effects indicators
will be more readily use in the monitoring process.
Data Availability and Gaps
5.9
The
3 main sources of data and information on development completions and other
indicators of the state of the borough are derived from Fareham Borough Council
departments, Hampshire County Council Survey Reports, and Hampshire Biodiversity
Information Centre. A full list of sources is provided in Appendix 6.
KEY FINDINGS
Development Strategy
5.10 The
3 Development Strategy policies set out the proposed distribution of development across
the Borough. The Plan area is broad settlement areas, focussed around the established
settlements - Fareham, the Western Wards & Whiteley and the smaller settlements of
Portchester, Stubbington & Hill Head and Titchfield. The Core Strategy seeks to focus
development on previously developed land within the most sustainable and accessible
settlements (this was also a key policy approach in the Local Plan). The majority of
development is proposed to take place in Fareham and the Western Wards.
Site Specific Polices
5.11 The delivery of Core Strategy policy CS6 - Spatial Strategy will be supplemented by the
delivery of two Strategic Allocations at Coldeast and Daedalus. Local Plan Policies DG10
Coldeast Hospital and DG12 Daedalus Airfield have now been replaced by Core Strategy,
policies CS10 and policy CS12, respectively.
For further information on this Document please contact planningpolicy@fareham.gov.uk aa a25
Fareham LDF
Annual Monitoring Report
December 2011
Development Guideline (DG) Policies
5.12 Existing
3
Local Plan DG policies are difficult to measure. The analysis demonstrates that
targets and indicators are predominantly subjective, where only the site specific policies
can be measured through Local Indicators. The majority of the DG policies are achieved
through consideration during pre-application discussions and development control decision
making in general. The remaining DG policies will be revised through the Site Allocations
and Development Management Policies DPD.
Countryside, Coast and Nature Conservation Policies
5.13 The
3 majority of 'Countryside policies' are measurable through counting the number of
applications permitted in accordance with each of the policies. All of the 'Countryside
policies' continue to be achieved through consideration throughout pre-application and
development management decision-making processes. The principle of maintaining and
safeguarding the countryside has been revised and carried through into the Core Strategy
DPD.
Historic Environment Policies
5.14 All3the existing policies for the historic environment are measurable through counting the
number of applications permitted in accordance and not in accordance with the policies.
Furthermore, the historic environment policies are continually used throughout preapplication and development management decision-making processes. However, the
outstanding issue is the lack of a monitoring system in place to record the exact
achievement of these policies.
Housing Policies
5.15 Housing
3
policies are predominantly measured through a combination of progress of
delivery of housing allocations and Core Output Indicator information. The housing policies
will be revised and encompassed within a variety of future LDDs including the Core
Strategy, the Area Action Plans and SPDs due to their site specific nature.
5.16 Local Plan Policy H15 Sites for Gypsies and Travellers (now replaced by CS19 Gypsies
Travellers and Travelling Showpeople) has historically been a difficult policy to measure.
Core Output Indicator H4 now covers this and this indicator has been carried forward. The
achievement of policies has been assessed predominantly through the identification of
permission granted for such uses. Local Gypsy, Travellers and Travelling Showpeople
pitch need and provision will be addressed through the Site Allocations and Development
Management DPD.
5.17 Policy
3
H10 Affordable Housing (replaced by Core Strategy policy CS18) has been
supplemented by the Affordable Housing Supplementary Planning Document which was
adopted in December 2005 and came into effect in January 2006. This SPD has helped to
deliver the target level of affordable housing throughout the Borough. Last year low
completions in market housing, as a result of the recession, resulted in a significant decline
in the number of affordable houses provided. Completions in market housing have still
been relatively low through 2011/12, however, as shown in Core Output Indicator H5 there
has been a marked increase in the number of affordable homes being delivered in the
For further information on this Document please contact planningpolicy@fareham.gov.uk aa a26
Fareham LDF
Annual Monitoring Report
December 2011
Borough with 133 social rented and 84 intermediate homes being delivered (gross).
Facilities, Services Infrastructure and Contributions Policies
5.18 The
3 majority of the existing facilities and services policies are site specific and therefore
measurable through the progression of site development. The measurement of the site
specific policies can be measured as Local Indicators with implementation established in
the saved polices of the Local Plan. The achievement of these polices is analysed through
the completion and progress of specific sites.
Recreation, Leisure and Tourism Policies
5.19 The
3 analysis of the recreation, leisure and tourism policies show that these policies can be
measured through either Local or Core Output Indicators. The achievement of these
policies can then be assessed through examples of development or progress toward
delivery of identified sites. These policies will be revised and encompassed within the Site
Allocations and Development Management DPD.
Employment Policies
5.20 The
3 existing employment policies can be measured through Core Output Indicators and
Local Indicators where a schedule for their implementation has been established in the
adopted Development Plan. Where the policies refer to specific sites their achievement
can be assessed using examples. The employment policies will be revised and
incorporated into a variety of DPDs including the Area Action Plans.
Shopping and the Town Centre Strategy Policies
5.21 The
3 saved policy analysis demonstrates that the majority of existing policies can be
measured. The Retail Health Check, completed biannually in Autumn and Spring, will
assist with monitoring and measuring the measuring the vitality and viability of centres within
the Borough. The achievement of these policies is predominantly though the development
management process. Where a policy refers to a particular site, examples have been
noted indicating any achievement. The principle of town centre and shopping development
is established in the Core Strategy, with any detail to be encompassed within the Site
Allocations and Development Management Policies DPD and the Fareham Town Centre
Area Action Plan.
Transport Policies
5.22 The
3 policy analysis demonstrates how the current transport policies can be measured in a
variety of ways, with their achievements assessed through examples and through use
within development control. Because the existing policies are varied they will be covered
within all future DPDs including Area Action Plans depending upon the nature of the policy.
The analysis highlights how transport policies must be dealt with individually in order to
form effective policies within the LDF.
For further information on this Document please contact planningpolicy@fareham.gov.uk aa a27
Fareham LDF
Annual Monitoring Report
December 2011
CONCLUSION
5.23 The
3 saved policy analysis demonstrates how the majority of current local plan policies are
working effectively, particularly through the use of policies in decision-making processes.
5.24 The
3 analysis shows how a small number of policies cannot be measured through the use of
Core Output Indicators or Local Indicators. This raises the issue that future policies should
aim to be written in such a manner that they can be assessed in quantifiable terms.
Furthermore, a system must be in place to continually collect and assess data in order to
provide an effective method of policy analysis.
5.25 This
3 analysis is important and useful in highlighting areas of policies that require revision in
order to reflect current and changing circumstances that the Borough faces, in order to
derive effective policies. This is shown in the recommendations to a number of saved
policies on the grounds that they are repeating other government guidance, or have no
further use. A more detailed overview pertaining to the deletion or amendment of polices is
provided in the next chapter.
For further information on this Document please contact planningpolicy@fareham.gov.uk aa a28
Fareham LDF
Annual Monitoring Report
December 2011
6
Recommendations
6.1
The following section provides an overview of the recommendations that will improve the
monitoring of LDF policies.
CS15 Sustainable Development and Climate Change
6.2
There is currently no monitoring system in place to effectively measure the promotion of
Sustainable Urban Drainage Systems. Furthermore, defining a Sustainable Urban
Drainage System is subjective in itself. A new monitoring system should be devised to
address this indicator.
6.3
At present there is no system in place to effectively monitor compliance with this policy.
Conditions should be attached to planning consent to ensure relevant Code for
Sustainable Homes and BREEAM standards are achieved. Conditions could be devised
that that require the applicant to commission a report by an independent licensed code
assessor to ensure that the standards are being met post construction/pre occupation.
This cost would be the responsibility of the applicant.
CS16 Renewable Energy
6.4
There is no monitoring system currently in place to effectively monitor renewable energy
production. The policy only seeks renewable energy contributions from developments
over a certain threshold. However, renewable energy generation can be undertaken
under permitted development rights. Renewable energy installation under pd rights may
provide a substantial proportion of the overall production although capturing the
contribution will be problematic. The majority of renewable energy installations must to
be registered with the district energy supplier, Southern and Scottish Electric (SEE), to
ensure sufficient capacity exists within the network. Investigations should be made to
see whether SEE have the data to quantify renewable energy output across the
Borough. Ofgem provide a schedule of all renewable energy installation that are
registered for the Government's Feed in Tariff (FIT) incentive, there is potential to use
this data to identify how much energy is being produced. However, as the FIT is reduced
in 2012 it is possible that fewer people will register with this Ofgem system which would
impact on the reliability of the data.
CS17 High Quality Design
6.5
The design principles set out in the policy should form an intrinsic aspect of any
development. Where possible, design should be considered from the out-set and should
ideally be discussed at the pre-application stage. All residential schemes should be
required to meet Lifetime Home Standards. Lifetime Home Standards are closely allied
to the design principles set out in the policy. Development Management, in consultation
For further information on this Document please contact planningpolicy@fareham.gov.uk aa a29
Fareham LDF
Annual Monitoring Report
December 2011
with the Design Team, will ensure that the principles are met before the grant of planning
consent (with regards to Lifetimes home this will be encouraged up to 2013 and required
thereafter). It will be necessary to devise a monitoring system that captures the number
of schemes that do not conform to these principles, in order to determine the
effectiveness of the policy.
CS20 Infrastructure and Developer Contributions
6.6
In order to monitor the effectiveness of this policy, a system will need to be devised that
records the number of developments permitted that do not make infrastructure
obligations that should be required to do so by the policy. In some instances, where it
can be demonstrated that it is not possible (or necessary) to provide contributions this
should be justified by the applicant. It will be important to distinguish, through the AMR,
which planning applications which have not justifiably provided planning obligations; if
the policy is effective this figure should be nil.
CS4 Green Infrastructure, Biodiversity and Geological Conservation
6.7
Policy C17 sets out the requirement to contribute to the objectives and targets set out in
UK, Regional, County and Local Biodiversity Action Plans, particularly within the
identified Biodiversity Opportunity Areas. This indicator cannot be reported on currently
due to a lack of data availability. A reliable data source to report on this indicator is
required in order to measure the effectiveness of part of the policy.
6.8
It is currently not possible to measure the amount, quality and function of green
infrastructure delivered. It will be necessary to devise a monitoring system that captures
the number of schemes that do not conform to these principles, in order to determine the
effectiveness of the policy.
CS21: Protection and Provision of Open Space
6.9
There is no robust mechanism for monitoring the quantum of additional open space
being provided or the loss of open space. A mechanism will be required where the
quantum of open space is recorded at the point where consent is granted. It will also be
necessary to measure the quality and accessibility and spatial location of the addition
open space in order to measure the effectiveness of this policy.
For further information on this Document please contact planningpolicy@fareham.gov.uk aa a30
Fareham LDF
Annual Monitoring Report
December 2011
Appendices
APPENDIX 1 – Development Plan Policy Analysis
APPENDIX 2 – List of Saved Local Plan polices Replaced by the Core Strategy
APPENDIX 3 – List of Local Plan Policies not saved in by 2007 Government
direction
APPENDIX 4 – Schedule of sites comprising the five year housing land supply
APPENDIX 5 – List of Sources
For further information on this Document please contact planningpolicy@fareham.gov.uk aa a31
.
Fareham LDF
Annual Monitoring Report
December 2011
APPENDIX 1
DEVELOPMENT PLAN POLICY ANALYSIS


Core Strategy Polices can be distinguished from Local Plan policies by the usage of the prefix 'CS' in the policy title.
Core Strategy and Local Plan policies have been grouped into related policy themes.
Policy
Indicator
Type
Indicator
Achievement
Comments
DEVELOPMENT STRATEGY
CS6 The Development Strategy
Development will be focussed in:
Core
Output
Indicator
BD2
Fareham (Policy CS7), the Western Wards & Whiteley (Policy
CS9), Portchester, Stubbington & Hill Head and Titchfield (Policy
CS11);
Total amount of
additional
employment
floorspace - by
type and
settlement.
Land at the Strategic Development Locations to the North of
Fareham (Policy CS13) and Fareham Town Centre; (Policy CS8);
Land at the Strategic Development Allocations at the former
Coldeast Hospital (Policy CS10) and Daedalus Airfield (Policy
CS12).
In identifying land for development, the priority will be for the
reuse of previously developed land, within the defined urban
settlement boundaries including their review through the Site
Allocations and Development Management DPD, taking into
consideration biodiversity / potential community value, the
character, accessibility, infrastructure and services of the
settlement and impacts on both the historic and natural
environment. Opportunities will be taken to achieve environmental
enhancement where possible.
Core
Output
Indicator
BD4i
Total amount of
floorspace for
"town centre
uses" delivered
within Town
Centre areas - by
Use
Class
B1
Gross
(sq m)
313
Net
(sq m)
-193
B1A
B1-B8
B2
B8
Total
(sq
m)
0
0
1,181
0
0
0
-360
0
1,494
-553
Use
Class
A1
A2
For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa
Gross
(sq m)
1,240
0
Net
(sq m)
-82
0
Total of 313 sq m (gross)
B1 employment
floorspace and 1,181
(gross) B2 floorspace
provided across Fareham
Borough. However all of
these were
redevelopment schemes
for replacement
employment units and
resulted in a net loss of
553 sq m of employment
floorspace overall.
For employment provision
by settlement area see
policies CS7, CS9, CS11.
CS11.
Total of 1,240 sq m
(gross) and -82 sq m (net)
of 'town centre uses
delivered within Town
Centre areas. The net
loss is due to the A1
a32
Fareham LDF
Annual Monitoring Report
Policy
December 2011
Indicator
Type
Indicator
settlement.
Development which would have an adverse effect on the integrity
of protected European conservation sites which cannot be
avoided or adequately mitigated will not be permitted. This will be
informed by the results of ongoing surveys and research,
including the Solent Disturbance and Mitigation Project, which
may result in adjustments to the scale and/or distribution of
development set out in policies CS7-CS13 and could reduce the
overall level of development.
Core
Output
Indicator
BDii
7
Total amount of
floorspace for
"town centre
uses" delivered
outside of Town
Centre area - by
settlement.
Local
Indicator
Total number of
vacant units in
centres
Core
Output
Indicator
H1 & H2
Core
Output
Indicator
H3
Plan Period and
housing targets.
Greater than 60%
of new dwellings
delivered on
previously
developed land
(PDL).
Achievement
B1a
D2
Total
(sq
m)
Comments
0
0
0
0
1,240
-82
Use
Gross
Net
Class (sq m) (sq m)
A1
2,706
2,706
A2
0
0
B1a
0
0
D2
0
0
Total
(sq
2,706
2,706
m)
42 units were recorded as vacant (2
down from autumn 2009), giving a
vacancy for the town centre as a
whole of just 10.24%.7
floorspace lost through
the redevelopment of the
Broadlaw Walk scheme.
For 'town centre use'
provision by settlement
area, see policies CS7,
CS9
Total of 2,706 sq m (net)
of 'town centre' uses
provided outside Town
Centre areas.
For 'town centre use'
provision by settlement
area, see policies CS7
See Section 4, Tables
4.1, 4.3 and 4.4.
Total
Gross
Completions
% on PDL
(Gross)
137
35.68
%
There has been a
significant drop in
percentage of new
dwellings completed on
PDL when compared with
data from the previous
Retail health check
For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa
a33
Fareham LDF
Policy
Annual Monitoring Report
December 2011
Indicator
Type
Indicator
Achievement
Comments
monitoring year (93.26%).
36% is below the national
target of 60% as set out in
Planning Policy Statement
3: Housing (PPS3).
This reduction is
predominately due to a
high proportion of
completions on greenfield
Local Plan housing
allocations (mainly at
Hunts Pond Road).
Local
Indicator
Net additional
dwellings by
settlement.
This indicator is measured under
CS7, CS9, CS11
The effects of the
reclassification of garden
sites in July 2011 (garden
sites are no longer
classed as PDL in PPS3)
are also apparent but less
significant.
For total additional
dwellings, see Section 4,
Table 4.1.
For additional dwellings
by settlement area see
policies CS7, CS9, CS11.
For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa
a34
Annual Monitoring Report
Development will only be permitted where it does not significantly
affect the setting and landscape character of the town or diminish
the town’s, community, historic, biodiversity and cultural resources
nor have an adverse impact on air quality
Local
Indicator
Contribute toward
350 dwellings
within Fareham
Town Centre
between 2010
and 2026.
Contribute toward
13,000 sq m of B1
employment
floorspace
between 2010
and 2026.
89 dwellings delivered
within Fareham
settlement area.
Total
11+ years
(2012-2026)
Contribute toward
680 dwellings in
Fareham
settlement area
between 2010
and 2026.
Comments
Housing
Delivery
89
-
-
-
89
Housing
Supply
-
199
107
310
616
Total
89
199
107
310
705
This indicator is measured under
CS8
Net
Floorspace
Local
Indicator
Achievement
6-10 years
(2016-2021)
Development will be permitted within the Fareham settlement
boundary where it contributes to one or more of the following:
 the provision of around 680 dwellings in the period 201026 (including around 350 within the Fareham Town Centre
area);
 employment floorspace for B1 development, in the region
of 13,000 sq m;
 the expansion and strengthening of the role of the town
centre, including a new supermarket on the Foundry site,
of 3,900 sq m net sales floorspace and additional
comparison retail floorspace;
 sustainable transport measures;
 facilities for business, education, leisure, culture or
community uses;
 provision of green infrastructure including additional parks
and amenity open space, outdoor sport pitches and
access to natural greenspace;
 the delivery of a high quality transport interchange facility
at Fareham railway station;
 development of the Bus Rapid Transit South East
Hampshire Harbour Link and improvements to air quality.
Local
Indicator
Indicator
0-5 years (20112016)
CS7 Development in Fareham
Indicator
Type
2010-2011
Policy
December 2011
Employment
Floorspace
Gains
Employment
Floorspace
Lost
Fareham LDF
Site 1
313
506
-193
Total
313
506
-193
For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa
Capacity exists to deliver
a further 616 dwellings.
See policy CS8
B1 floorspace
completions at one sites:
1. 6-10 SPURLINGS
INDUSTRIAL ESTATE,
SPURLINGS YARD,
FAREHAM
Loses in employment
floorspace exceed gains
resulting in a net loss of
193 sq m B1 employment
floorspace.
a35
Annual Monitoring Report
Local
Indicator
Contribute toward
B2 employment
floorspace
between 2010
and 2026.
Comments
Net
Floorspace
Achievement
Site 1
832
1318
-486
Total
832
1318
-486
Contribute toward
20,000 sq m of
retail floorspace
between 2010
and 2026.
0
Net Floorspace
Local
Indicator
Indicator
Employment
Floorspace
Lost
The Fareham Town Centre Area Action Plan (see Policy CS8) will
identify will identify development sites, transport and
environmental improvements and define the town centre
boundary.
Indicator
Type
Employment
Floorspace
Gains
Policy
December 2011
Retail (Town
Centre use)
floorspace
gains
Retail (Town
Centre use)
floorspace
Loses
Fareham LDF
Site 1
2241
2241
Site 2
350
0
350
Site 3
890
1322
-432
Site 4
465
0
465
Total
3946
1322
2624
B2 floorspace
completions at one site:
1. LUCKETTS TRAVEL,
BROADCUT, FAREHAM
Loses in employment
floorspace exceed gains
resulting in a net loss of 486 sq m B2 employment
floorspace.
Retail (A use class)
completions at four sites:
1. BROADCUT, FAREHAM
- EXTENSIONS AND
ALTERATIONS TO
SAINSBURYS STORE
2. 66 WEST STREET,
FAREHAM - CHANGE
OF USE OF GROUND
FLOOR/FIRST FLOOR
FROM OFFICE TO
RETAIL
3. BROADLAW WALK,
FAREHAM REDEVELOPMENT
FOR MIXED USES
INCLUDING RETAIL
4. SAINSBURYS STORE,
BROADCUT RESTAURANT
EXTENSION TO FRONT
OF STORE
For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa
a36
Annual Monitoring Report
December 2011




the provision of around 1,480 dwellings between 2010
and 2026 in the Western Ward settlements and around
180 dwellings at Whiteley;
economic development through the provision of 1,000 sq
m of B1 and 29,000 sq m of B2/B8 floorspace in the
western ward settlements and around 23,000 sq m of B1
floorspace at Whiteley;
local facilities for business, leisure, culture or community
facilities, including the provision of a community hospital,
open space, sports pitches, allotments and cemetery
provision at the former Coldeast Hospital site;
supports sustainable transport and an enhanced
Local
Indicator
Contribute
towards 1,000 sq
m of B1
floorspace in the
Western Wards
between 2010
and 2026.
Comments
All retail development in
the Borough has occurred
within Fareham's
settlement area.
Completions are a result
of redevelopment and
extensions and change of
use to existing
developments. However,
only Site 2 was delivered
within Fareham Town
Centre.
243 dwellings delivered
within Western Wards
settlement area.
Total
Development will be permitted within the Western Wards and
Whiteley settlement boundaries where it protects their setting and
the natural, historic, biodiversity and cultural resources and
contributes to one or more of the following:
Contribute
towards 1,480
dwellings in the
Western Wards
between 2010
and 2026.
11+ years
(2012-2026)
Local
Indicator
Achievement
6-10 years
(2016-2021)
CS9 Development in the Western Wards & Whiteley
Indicator
0-5 years
(2011-2016)
Indicator
Type
Policy
2010-2011
Fareham LDF
Housing
Delivery
243
-
-
-
243
Housing
Supply
-
939
231
103
1273
Total
243
939
231
103
1516
Capacity exists to deliver
a further 1,273 dwellings.
This high quantum of
housing is consistent with
the Core Strategy vision
to direct development
toward the Western
Wards and Whiteley.
Nil B1 floorspace completed in the
Western Wards.
For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa
a37
Annual Monitoring Report
Contribute
towards and
23,000 sq m of B1
floorspace in the
Whiteley between
2010 and 2026.
Local
Indicator
Contribute
towards 180
dwellings at
Whiteley between
2010 and 2026.
223
126
Total
-
349
223
126
B2 floorspace
completions at one site:
1. R K MARINE LIMITED,
BRIDGE ROAD,
SWANWICK
Gains in employment
floorspace exceed losses
resulting in a net gain of
B2 employment
floorspace of 126 sq m
Nil B1 floorspace completed in
Whiteley
Total
Local
Indicator
Net
Floorspace
349
Housing
Delivery
Housing
Supply
CS11 Development in Stubbington & Hill Head, Portchester
and Titchfield
Employment
Floorspace
Lost
B2
Total
Local
Indicator
Site 1
6-10 years
(2016-2021)
11+ years
(2012-2026)
Contribute
towards and
29,000 sq m of
B2/B8 floorspace
in the Western
Wards between
2010 and 2026.
Comments
Employment
Floorspace
Gains
Local
Indicator
Achievement
0-5 years
(2011-2016)


pedestrian environment;
supports the provision of additional access to and/or
enhanced biodiversity at Chilling/Brownwich and in the
Hamble Valley where possible contributing to the
conservation or enhancement of the interest features of
nearby sites of national or international importance;
expansion of the district centre;
a swimming pool in the Western Wards.
Indicator
Use Class
Indicator
Type
Policy

December 2011
2010-2011
Fareham LDF
22
-
-
-
22
-
170
0
0
170
22
170
0
0
192
Contribute
towards 60
dwellings in
For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa
22 dwellings delivered
within Whiteley settlement
area.
Capacity exists to deliver
a further 170 dwellings.
This quantum of housing
is consistent with the Core
Strategy vision to direct
development toward the
Western Wards and
Whiteley.
8 dwellings delivered
within Portchester
settlement area.
a38
Annual Monitoring Report
December 2011





Portchester
between 2010
and 2026.
protects the setting of the settlement;
protects their natural, historic, biodiversity and cultural
resources;
contributes to the provision of green infrastructure;
maintains and strengthens the character, vitality and
viability of district and local centres;
contributes to the following levels of development.
Settlement
Area
Portchester
Residential
Development
Around 60
dwellings
Stubbington &
Hill Head
Titchfield
Around 60
dwellings
Around 30
dwellings
Employment
Development
1,800 sq m B1
300 sq m
B2/B8
650 sq m
The provision of new community, built sports and cultural facilities
will be supported in Stubbington & Hill Head and Portchester
through the expansion of existing facilities.
Achievement
Housing
Delivery
Housing
Supply
Total
Local
Indicator
Local
Indicator
Contribute
towards 1,800 sq
m B1 employment
floorspace
between 2010
and 2026 in
Portchester.
Contribute
towards 300 sq m
B2/B8
employment
floorspace
between 2010
and 2026 in
Portchester.
Comments
Total
Small scale development will be permitted within the settlement
boundaries of Portchester, Stubbington & Hill Head and Titchfield
where it:
Indicator
0-5 years
(2011-2016)
6-10 years
(2016-2021)
11+ years
(2012-2026)
Indicator
Type
Policy
2010-2011
Fareham LDF
8
-
-
-
8
-
16
16
28
50
8
16
16
28
58
Capacity exists to deliver
a further 50 dwellings.
This low quantum of
housing is consistent with
the Core Strategy vision
to direct development
toward the Western
Wards to and minimise
the level of development
in lower order settlement
area of Portchester.
Nil B1 floorspace completed in
Portchester.
Nil B2/B8 floorspace completed in
Portchester.
For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa
a39
December 2011
Housing
Delivery
Housing
Supply
Total
Local
Indicator
Contribute
towards 30
dwellings in
Titchfield between
2010 and 2026.
Housing
Delivery
Housing
Supply
Total
For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa
2
-
-
-
2
-
36
20
0
56
2
36
20
0
58
Total
Contribute
towards 60
dwellings in
Stubbington & Hill
Head between
2010 and 2026.
Comments
Total
Achievement
0-5 years
(2011-2016)
6-10 years
(2016-2021)
11+ years
(2012-2026)
Local
Indicator
Indicator
0-5 years
(2011-2016)
6-10 years
(2016-2021)
11+ years
(2012-2026)
Indicator
Type
2010-2011
Policy
Annual Monitoring Report
2010-2011
Fareham LDF
0
-
-
-
0
-
13
16
0
29
0
13
16
0
29
2 dwellings delivered
within Stubbington & Hill
settlement area.
Capacity exists to deliver
a further 56 dwellings.
This low quantum of
housing is consistent with
the Core Strategy vision
to direct development
toward the Western
Wards to and minimise
the level of development
in lower order settlement
area of Stubbington & Hill
Head.
Nil dwellings delivered
within Stubbington & Hill
settlement area.
Capacity exists to deliver
29 dwellings.
This low quantum of
housing is consistent with
the Core Strategy vision
to direct development
toward the Western
Wards to and minimise
the level of development
in lower order settlement
area of Titchfield.
a40
Fareham LDF
Annual Monitoring Report
December 2011
Indicator
Type
Policy
Local
Indicator
Indicator
Contribute
towards 650 sq m
of employment at
Titchfield between
2010 and 2026.
Achievement
Comments
Nil employment floorspace
completed in Titchfield.
SITE SPECIFC POLCIES
CS10 Coldeast Hospital Strategic Site
The comprehensive development of the former Coldeast Hospital
Site will be achieved through the implementation of the existing
residential planning permissions for 250 dwellings and through the
preparation and adoption of a Supplementary Planning Document.
Development will be permitted where it delivers, or facilitates the
delivery of high quality development:
Within the urban area
 the development of a second phase of the community
hospital on approximately 1.0 ha of land immediately
north of the existing community hospital, or for other
health, community, or residential institution uses (use
Classes C2, D1 or D2) in the event it is declared surplus
to foreseeable NHS requirements;
 the development of approximately 0.75 ha of land
immediately west of the community hospital for up to 30
dwellings including affordable housing, with appropriate
links to surrounding development and open space
Development outside the urban area

the repair, and long term restoration and re-use of the
Mansion House, including the repair of the walled garden,
Brook Lane Gate Lodge, with the repair and
reinstatement of associated Lodge gates, gate piers and
Within Urban Area
Local
Indicator
Local
Indicator
To deliver the 2nd
phase of the
community
hospital (or other
uses as
described).
Deliver up 30
dwellings
including
affordable
housing in
between 2010-26.
See comment
See comment
Development at this site
(in addition to that already
underway) has not yet
started however the
Supplementary Planning
Document has been
adopted.
Outside Urban Area
Local
Indicator
Local
Indicator
Local
To secure a long
term use for the
Mansion House.
Provision of sport
pitches, cemetery
extension,
allotments,
swimming pool
and improved
built community
facilities.
Provision of
See comment
See comment
Development at this site
(in addition to that already
underway) has not yet
started however the
Supplementary Planning
Document has been
adopted.
See comment
For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa
a41
Fareham LDF
Annual Monitoring Report
Policy
wing walls, as part of the complex of locally listed
buildings on the site. The Mansion House and approximately 3.5
ha of grounds (an historic park and garden) would be suitable for
use as a hotel with associated conference and leisure facilities or
for employment or care use provided that the permitted use
safeguards the integrity of the house and gardens, including the
walled garden, whilst enabling some public access. Extensions to
the Mansion house and/or satellite buildings in its grounds will be
strictly limited in scale to that demonstrated to be necessary to
secure the

restoration and re-use of the Mansion. The Brook Lane
Gate Lodge is suitable for residential re-use;
 improvements to pedestrian, cycle and public transport
access to and through the site, together with appropriate
traffic calming and safe routes to schools and links to the
footpath network in the local area;
 the provision of sports pitches and informal public open
space, including retention of the existing woodland, and
conservation and enhancement of biodiversity and habitat
interests on the site, linking with Holly Hill Woodland Park
and the wider countryside;
 the provision of a new cemetery;
 the provision of new allotments;
 the provision of a sports pavilion with an integral
community meeting room;
 the provision of a public swimming pool facility; and
 between 150 and 170 dwellings including affordable
housing, of a mix of sizes, together with a sheltered
housing scheme comprising private and affordable
dwellings of up to 60 units of accommodation and
associated communal facilities, will be permitted on
approximately 6.0ha gross of the site to facilitate the
delivery of the above listed social, environmental and
repair/restoration benefits.
December 2011
Indicator
Type
Indicator
Local
Indicator
Indicator
between 150 and
170 dwellings
including
affordable
housing between
2010-26.
Provision of a
sheltered housing
scheme
comprising private
and affordable
dwellings of up to
60 units.
Achievement
Comments
See comment
Planning Permission will not be granted for residential
For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa
a42
Fareham LDF
Annual Monitoring Report
Policy
December 2011
Indicator
Type
Indicator
Achievement
Comments
development outside the urban area in isolation of the
repair/restoration of all of the locally listed buildings, and the
provision of appropriate financial contributions towards delivery of
the identified social and environmental benefits, together with the
securing of the publicly accessible open space through the
transfer of the land to the Council or an appropriate management
company.
The dwellings and sheltered housing accommodation, together
with related open space would be built in the south-east of the
site, to the north and south of the former Mansion House drive.
The precise number of dwellings will be subject to detailed site
analyses and design and the need to ensure that the integrity of
the locally listed buildings, trees and the parkland setting is
appropriately protected whilst ensuring the living environment of
future occupiers is safeguarded. This development, together with
the Mansion House will be accessed via Coldeast Way and Brook
Lane. The sports pavilion and pitches, cemetery, allotments and
site for the future provision of a public swimming pool facility will
be provided in the Southern and Western parts of the site,
accessed from Barnes Lane.
For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa
a43
Fareham LDF
Annual Monitoring Report
Policy
CS12 Daedalus Strategic Site
December 2011
Indicator
Type
Local
Indicator
The Daedalus Airfield is allocated for strategic employment
development. Development will be permitted where:
• it is demonstrated that it does not adversely affect the existing or
future potential general aviation operation of the airfield;
• it does not unacceptably diminish the integrity and function of the
strategic gap between Stubbington/ Lee-on-the-Solent and
Fareham/ Gosport;
• it does not adversely affect the integrity of the landscape
character of the countryside;
• it can demonstrate that there will be no adverse impacts on
European designated sites;
• primary access is from Broom Way (Hangars East) and Gosport
Road (Hangars West);
• it does not have an adverse impact on air quality;
• prior consideration is given to the potential extraction of mineral
deposits;
• it incorporates the site's heritage where feasible;
• both archaeological and contamination assessments and
evaluations are carried out prior to the commencement of
development;
• it delivers, or facilitates the delivery of high quality development
including:
Local
Indicator
Local
Indicator
Indicator
To provide
between 10,00033,000 sq m of
industrial and
warehousing
employment
development.
Contribute
towards provision
for recreation and
open space
accessible to new
and existing
residents.
Provision of
landscaping and
green
infrastructure
including
allotments
together with
linkages to the
existing footpath
network and the
Alver Valley.
Achievement
See comment
Comments
Development at this site
has not yet stated
however an outline
planning application was
submitted in June 2011.
See comment
See comment
a. employment development that retains and strengthens the
marine and aviation employment clusters, particularly
those that require direct access to an operational airfield;
b. between 10,000 sq m and 33,000 sq m of net additional
general, or light industrial or warehousing (associated with
aerospace or marine) employment floorspace with only
ancillary office accommodation, to contribute towards the
overall provision set out in Policy CS1;
c. the creation of local employment opportunities that take
For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa
a44
Fareham LDF
Annual Monitoring Report
Indicator
Type
Policy
d.
e.
f.
g.
h.
i.
December 2011
Indicator
Achievement
Comments
advantage of and develop local skills, including during
construction;
open space accessible to residents particularly those of
Stubbington and Hill Head;
landscaping and green infrastructure including allotments
together with linkages to the existing footpath network and
the Alver Valley;
environmental and biodiversity protection and
enhancement;
minimising increases in traffic levels and congestion,
through sustainable transport arrangements;
a reorganisation and consolidation of existing and new
floorspace, including the phased removal of some existing
built structures to create an efficient arrangement of
buildings and associated activities sympathetic to the
landscape and strategic gap, whilst having regard to the
specific space and operational requirements of aviation
related employment uses;
appropriate utility service provision (water, waste water,
energy and communications).
Replacement and new buildings will be energy efficient and be
designed to reflect existing building heights and mass and take
advantage of site topographical and built features that help to
reduce adverse impacts upon residential amenity, landscape
character and the integrity of the strategic gap.
Development must take account of the odour contour on the north
of the site from the Peel Common waste treatment works.
CS13 North of Fareham Strategic Development Area
Local
Indicator
Permission will be granted for the development of a Strategic
Development Area to the north of Fareham following the adoption
Local
Indicator
Provide 6,5007,500 dwellings at
the SDA
Provide up to
90,750 sq m of
See comment
See comment
For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa
Development at this site
has not yet stated
however the Area Action
Plan is in preparation.
a45
Fareham LDF
Annual Monitoring Report
December 2011
Indicator
Type
Policy
of an Area Action Plan and the preparation of a comprehensive
masterplan for the development. The development will include
provision for between 6,500- 7,500 dwellings, unless it is found
that this level of housing cannot be delivered without adversely
affecting the integrity of protected European conservation sites. If
any potential adverse effects cannot be avoided or adequately
mitigated, the level and scale of development would need to be
reduced accordingly to ensure that there are no adverse effects
on the integrity of any European sites. The development will also
provide supporting environmental, social and physical
infrastructure, retail and employment floorspace to both support
the development and to contribute towards meeting the
development objectives of the South Hampshire Sub-Region. The
new community will aim to be as self-contained as possible, whilst
complementing and supporting the established town centre of
Fareham and adjoining settlements.
Local
Indicator
Local
Indicator
Indicator
employment
floorspace
Provision of road
access to the M27
Provision of a Bus
Rapid Transit link
to Fareham town
centre
Achievement
Comments
See comment
See comment
The high level development principles are:

the new development will create an inclusive and
cohesive community, built upon the principles of
sustainability;

the development will be an exemplar of sustainable
design, and resource efficiency, and will minimise water
consumption and carbon emissions arising from
operational energy use in new and existing buildings and
infrastructure within the SDA;

the development will provide up to 90,750 sq m of
employment floorspace, in a range of employment
opportunities which contribute to sub-regional economic
development objectives and contribute towards creating a
high level of self containment and accessibility to reduce
the need for commuting;
For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa
a46
Fareham LDF
Annual Monitoring Report
December 2011
Indicator
Type
Policy

the layout will create a connected network of Strategic
Green Infrastructure, open spaces and recreational
facilities that respects and enhances the landscape
qualities of the area and meets the needs of the new
community; and avoids or mitigates the potential
ecological impacts of the development, and provides a net
gain in biodiversity in the area. The basis for developing a
Green Infrastructure Strategy will be to conserve and
enhance the existing landscape, historic and ecological
features on the site and adjacent areas, whilst linking new
and established green spaces within the built environment
and connecting the urban area to its wider rural
hinterland;

the provision of Green Infrastructure to meet the
recreational needs of additional residents, to contribute to
the access networks to the natural environment and BAP
targets to achieve a net gain for biodiversity, to make a
positive contribution towards implementing the
Partnership for Urban South Hampshire Sub-Regional
Green Infrastructure Strategy, and to ensure that any
potential adverse effects on nationally and internationally
protected sites identified through the SA/ HRA work are
avoided. Where adequate mitigation or avoidance
measures cannot be achieved on site through the
provision of Green Infrastructure a financial contribution
will be sought to provide off-site mitigation measures such
as managing access to nationally or internationally
important sites or the provision of off-site Green
Infrastructure;

green buffers will be incorporated into the layout to
prevent coalescence with Knowle, Wickham, Funtley and
Fareham;

the AAP and masterplan will be developed in accordance
Indicator
Achievement
For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa
Comments
a47
Fareham LDF
Annual Monitoring Report
December 2011
Indicator
Type
Policy
Indicator
Achievement
Comments
with the Emerging Transport Strategy, which is based on
the following key principles;
o The SDA will have high levels of self containment;
o The SDA will address a significant proportion of trips
through the development of robust reduce and
manage policies;
o Bus Rapid Transit (BRT) will form a key component
of the access strategy;
o Access will initially be via the A32 and junction 10 of
the M27;
o At a later stage a link road may be required from the
A32 to junction 11 of the M27;
o A phasing plan will be agreed, setting out how the
rate of development will be linked to the funding and
provision of the necessary transport infrastructure.

the longer term transport interventions will need to be
carefully designed to minimise the impacts on the
strategic road network and fully mitigate any
environmental or traffic impacts. It will also need to help
facilitate an effective Bus Rapid Transit system;

a balanced package of measures will be introduced to
encourage smarter transport choices to meet the needs of
the new development, and maximise the opportunities for
sustainable travel; including the provision of a network of
footpaths, cycleways and bridleways to enhance
permeability within the site and to access the adjoining
area; connection to the Bus Rapid Transit system; and
effective measures to mitigate the transport impacts of the
proposed development on the strategic and local road
network;

the development will provide supporting social and
physical infrastructure; including a range of convenience
and comparison shopping, local employment, health,
For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa
a48
Fareham LDF
Annual Monitoring Report
December 2011
Indicator
Type
Policy
Indicator
Achievement
Comments
community and leisure facilities centred around a new
district centre, together with provision for pre-school,
primary and secondary education. Up to three local
centres will be provided to act as neighbourhood hubs for
the provision of social infrastructure and local employment
opportunities;

the layout will provide for a range of housing types, sizes
and tenures to meet the needs of the new community and
aim to provide between 30-40% affordable housing;

a Sustainable Drainage System will be fully integrated into
the network of open spaces, to mitigate potential flood
risk, allowing the SDA to adapt to climate change whilst
providing biodiversity benefits and enhanced recreational
opportunities. The development must also provide
sewerage infrastructure.
The detailed framework setting the nature, form and boundary of
the new community will be set out in an Area Action Plan. Other
locations in the Borough will not be developed in lieu of
development at the Strategic Development Area regardless of the
eventual capacity or the phasing of the development.
An infrastructure phasing plan will be prepared and agreed by the
Council, setting out how the rate of development will be linked to
the funding and provision of the necessary social and physical
infrastructure to ensure that the respective phases of the
development do not come forward until the necessary
infrastructure has been secured.
The masterplan will be produced in partnership with the
development interests and will provide an indicative layout
showing the disposition and quantity of future land-uses, and give
a three dimensional indication of the urban design parameters
which will be incorporated into any future planning application;
For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa
a49
Fareham LDF
Annual Monitoring Report
December 2011
Indicator
Type
Policy
Indicator
Achievement
Comments
An improved monitoring
system must be
developed in order to test
the effectiveness of this
policy in terms of
achieving the Code for
Sustainable Homes.
An improved monitoring
system must be
developed in order to test
the effectiveness of this
policy in terms of
achieving BREEM
standards.
together with a phasing and implementation strategy.
The masterplan will be accompanied by or incorporate a
sustainability strategy which clearly demonstrates how the
principles of sustainable development will be incorporated into the
proposals and implemented to achieve the aim of an exemplar of
a sustainable community.
A management plan will be produced as part of the
masterplanning process to demonstrate how infrastructure and
community assets will be maintained and managed.
All the above documents will need to be clear on the expected
outcomes, and be sufficiently flexible to respond to changing
opportunities and circumstances. They will also need to
demonstrate how the National Air Quality Standards will be met.
DEVELOPMENT GUIDELINES
Local
Indicator
The Borough Council will promote and secure sustainable
development by directing development to locations with
sustainable transport options, access to local services, where
there is a minimum negative impact on the environment or
opportunities for environmental enhancement. Development must
not prejudice the development of a larger site.
Number of
dwellings not
meeting the
relevant Code for
Sustainable
Homes standards.
Data for this indicator is unavailable
CS15 Sustainable Development and Climate Change
Local
Indicator
Amount of multi
residential and
non-residential
floorspace
completed that
does not meet the
relevant BREEAM
standards.
Number of
planning consents
granted for non-
Data for this indicator is unavailable
This will be achieved by:

Ensuring that the scale and density of the proposal makes
an efficient use of land. With a minimum of 60dph within
areas with high multi-modal transport accessibility and
good access to a range of social, environmental and
economic infrastructure, taking account of the character of
Local
Indicator
None
For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa
Policy has been effective
a50
Fareham LDF
Annual Monitoring Report
Indicator
Type
Policy

December 2011
the location.
Seeking to achieve the following timescale and levels for
the Code for Sustainable Homes and the equivalent for
non residential development unless it can be
demonstrated to be unviable:
All residential development achieves at
least the following level of Code for
Sustainable Homes standard
Until the end of 2011
4
From 2012
5
From 2016
6
All multi-residential and non-residential
development with a floorspace of over
500m2 must achieve the following BREAM
standards.
BREEAM '
Until the end of 2011
very good'
BREEAM
From 2012
'excellent'
BREEAM
From 2016
'excellent'
Core
Output
Indicator
E1
Local
Indicator
Indicator
compatible
development (as
defined in PPS25)
outside of Flood
Zone 1.
Number of
planning
permissions
granted contrary
to EA advice on
flooding and
water quality
grounds
Number of
developments
incorporating
Sustainable
Urban Drainage
Systems.
Achievement
Comments
None
Policy has been effective
Data for this indicator is unavailable
There is currently no
monitoring system in
place to effectively
measure this indicator.
Ensuring that there is sufficient capacity available, or will be made
available, in existing infrastructure to meet the needs of the new
development including adequate land and funding for waste
management.
Avoiding unacceptable levels of flood risk and proactively
managing surface water through the promotion of sustainable
drainage techniques.
For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa
a51
Fareham LDF
Annual Monitoring Report
December 2011
Indicator
Type
Policy
CS16 Natural Resources and Renewable Energy
Local
Indicator
New development will be expected to safeguard the use of natural
resources by:





Demonstrating the latest best practice for energy
efficiency, passive solar design and water conservation in
the construction and use of the buildings;
Taking measures to reduce carbon emissions, pollution
and waste during the construction and operation of new
developments through orientation, layout, design and
material selection;
Reducing, reusing and recycling waste on-site;
Preventing the loss of the best and most versatile
agricultural land (Grades 1, 2 or 3a of the Natural England
Agricultural Land Classifications System);
Protecting mineral resources from permanent
development, without first allowing for extraction, which
would lead to the sterilisation of the deposit.
Development (1 dwelling or more and 500m2 or more of nonresidential floorspace) will be encouraged to contribute to the
Fareham target of 12MW of renewable energy by 2020. Major
developments (250 dwellings or more or 5,000 sq m or more of
non-residential floorspace) should aim to maximise on-site
renewable energy production and resource efficiency. In such
cases, the extent of contribution should be demonstrated, taking
account of viability. The generation of energy from renewable or
low carbon sources will be permitted unless there are judged to be
unacceptable social, environmental or economic impacts.
CS17 High Quality Design
All development, buildings and spaces will be of a high quality of
design and be safe and easily accessed by all members of the
community. Proposals will need to demonstrate adherence to the
Indicator
Amount of
development on
the best and most
versatile and most
agricultural land
(Grades 1, 2 or 3a
agricultural land).
Achievement
1 site granted planning permission
(outline and then full consent) on 2
applications granted on grade 2
agricultural land.
Core
Output
Indicator
(E3)
Contribution
toward 12 MW of
renewable energy
generated by
2012.
No data for this indicator available.
Core
Output
Indicator
H6
Number of new
development
achieving the
Building for Life
(BFL) standard of
10 sites assessed year. 5 were
rated as "average", 4 as "good" and
one as "very good" (Coach &
Horses scheme in Titchfield).
For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa
Comments
Although the site is
designated as agricultural
the site was in fact
determined to be
brownfield (formerly
occupied b y a number
redundant residential
buildings used as
Children's Residences)
The policy has therefore
been effective as none
best and most versatile
agricultural land has been
lost.
There is no currently no
mechanism in place to
monitor this indicator.
Building for life standards
are not a policy
requirement. However,
the Assessment provides
a useful indicator of high
a52
Fareham LDF
Annual Monitoring Report
December 2011
Indicator
Type
Policy
principles of urban design and sustainability to help create quality
places. In particular development will be designed to:









respond positively to and be respectful of the key
characteristics of the area, including heritage assets,
landscape, scale, form, spaciousness and use of external
materials,
provide continuity of built form, a sense of enclosure with
active frontages to the street and safety of the public
realm,
ensure permeable movement patterns and connections to
local services, community facilities, jobs and shops,
create a sense of identity and distinctiveness and one that
is legible,
enable and/or encourage a mix of uses and diversity in an
area,
ensure that the public realm has pedestrian priority77, is
safe, secure, functional and accessible, and is
constructed of quality materials and well maintained,
enable buildings to provide flexible accommodation, which
can be adapted to suit all members of a community
throughout their lifetime,
provide green infrastructure, including landscaping, open
spaces, greenways and trees within the public realm, and
provide appropriate parking for intended uses taking
account of the accessibility and context of a development
and tackling climate change.
In addition new housing will be required to:

Indicator
Achievement
'good' or above.
Local
Indicator
Amount of
development
permitted
following design
principles
No data is available for this
indicator
Local
Indicator
Number of
dwellings not
meeting the
relevant Code for
Sustainable
Homes standards.
Amount of multi
residential and
non-residential
floorspace
completed that
does not meet the
relevant BREEAM
standards.
Number of
dwellings meeting
the Lifetime
Homes from
2013.
See Policy CS15
Local
Indicator
Local
Indicator
Comments
quality design and will be
retained to measure this
policy.
All relevant planning
applications should have
regard to design
principals from the outset.
See Policy CS15
Data for this indicator is unavailable
There is no currently no
mechanism in place to
monitor this indicator.
secure adequate internal and external space, dwelling
mix, privacy, and sunlight and daylight to meet the
requirements of future occupiers.
Demonstration of adherence to the principles must be set out
For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa
a53
Fareham LDF
Annual Monitoring Report
Policy
December 2011
Indicator
Type
Indicator
Achievement
Comments
within design and access statements, and/or where relevant,
design codes, briefs, frameworks or masterplans and to include a
contextual analysis. Where relevant, a report by a licensed
assessor which sets out compliance with the BREEAM and/or
Code for Sustainable Homes level operating at the time of any
application for planning permission.
New housing should seek to achieve the Lifetime Home standard
from 2013. Prior to 2013, the Council will encourage developers to
meet the lifetime home standard having regard to the viability of
the proposal
DG4: Site Characteristics
Development will be permitted, provided that it: (A) retains any
important historic features on the site; (B) does not detract from
the natural landform of the site; (C) retains areas or features of
landscape or nature conservation value; (D) respects views into
and out of the site; and (E) takes proper account of any
contamination of the land
DG7: Signs and Advertisements
Signs and advertisements will be permitted, provided that they:
(A) do not adversely affect the character, quality and appearance
of the building or the surrounding area; (B) do not combine with
existing advertisements to create an unacceptable cumulative
impact; (C) do not create a hazard to public safety; and (D) in the
case of a listed building or a building in a conservation area, it
complies with Policies HE2 and HE7 respectively.
DG8: Commercial Frontages
Local
Indicator
Maintaining
important site
characteristics
and features.
This policy has been taken into
account during pre-application
discussions and in the
determination of applications.
This policy will be
replaced in principle as
part of the Site Allocations
& Development
Management DPD.
Local
Indicator
Ensure signs and
advertisements in
accordance with
policy.
This policy has been taken into
account during pre-application
discussions and in the
determination of applications.
This policy is covered by
PPS1 and PPS5 and
detail will be incorporated
into the Site Allocations &
Development
Management DPD, and
Fareham Town Centre
AAP.
Local
Indicator
Effect of policy on
appearance of
This policy has been taken into
account during pre-application
This policy is covered by
PPS1 and PPS5 and
For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa
a54
Fareham LDF
Annual Monitoring Report
December 2011
Indicator
Type
Policy
Development involving the creation of a new frontage, including
the erection of blinds, canopies and shutters or the alteration of
existing frontages, will be permitted provided that: (A) it takes
account of the architectural characteristics of the individual
building and its surrounding area; (B) it does not adversely affect
the character and appearance of the building or the surrounding
area; and (C) in the case of a listed building, it complies with
Policy HE2 or in the case of a building in a conservation area, it
complies with Policy HE6 and/or Policy HE8.
DG11: Seafield Park
Proposals for the future use or development of Seafield Park will
be permitted provided that: (A) the largely open nature of the site
is maintained; (B) the future use and management of the open
area is resolved before any planning permission is granted; and
(C) any buildings necessary to secure (A) and (B) are restricted to
the part of the site within the urban area.
Indicator
Achievement
Comments
commercial
frontages.
discussions and in the
determination of applications.
detail will be incorporated
into the Site Allocations &
Development
Management DPD and
the Fareham Town Centre
AAP.
Local
Indicator
Enabling
development to
support the
provision of the
open space.
Residential development for 51
units was granted in 2001 and is
now complete.
Policy nearly implemented
24 dwellings under
construction. Completion
of development expected
2011/12.
Local
Indicator
Development of
open space
where majority of
site remains
natural and any
buildings
necessary are
restricted within
the urban area.
Open nature of site maintained
though location on largely
previously developed area and
within urban area boundary.
Remainder left open and is
managed as public open space with
an equipped children’s playground.
COUNTRYSIDE, COAST AND NATURE CONSERVATION
CS4 Green Infrastructure, Biodiversity and Geological
Conservation
Habitats important to the biodiversity of the Borough, including
Sites of Special Scientific Interest, Sites of Importance for Nature
Conservation, areas of woodland, the coast and trees will be
protected in accordance with the following hierarchy of nature
conservation designations:
Local
Indicator
Local
Indicator
Projects
completed in line
with PUSH GI
Infrastructure
Strategy.
95% of SSSIs in
favourable or
recovering
condition by 2026.
Nil
91.6% of SSSIs in favourable or
recovering condition by 2026.
Fareham is still 3.4% short of this
target, although good progress has
For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa
Condition of SSSIs:
75.3% Favourable
condition; 16.3%
unfavourable
a55
Fareham LDF
Annual Monitoring Report
Policy
(i) International - Special Protection Areas (SPA), Special Areas of
Conservation (SAC) and RAMSAR;
(ii) National - Sites of Special Scientific Interest (SSSI) and
National Nature Reserves (NNRs);
(iii) Local - Sites of Importance for Nature Conservation (SINC),
Local Nature Reserves (LNR), other Ancient Woodland (AW) not
identified in (ii) above;
(iv) Sites of Nature Conservation Value (SNCVs).
Where possible, particularly within the identified Biodiversity
Opportunity Areas, sites will be enhanced to contribute to the
objectives and targets set out in UK, Regional, County and Local
Biodiversity Action Plans. Green Infrastructure networks, which
buffer and link established sites, whilst also enabling species to
disperse and adapt to climate change will be maintained and
enhanced.
Networks of accessible multi-functional Green Infrastructure will
be planned around existing green spaces in urban, urban fringe
and rural areas and will be appropriate to the extent and
distribution of the existing and proposed population.
Development Proposals will be permitted where Green
Infrastructure provision in accordance with the Green
Infrastructure Strategy has been integrated within the
development where this is appropriate. Development proposals
will provide for appropriate access to greenspace for informal
recreation to avoid adverse impacts from recreation and other
impacts on European and Ramsar sites and on nationally and
locally important sites.
December 2011
Indicator
Type
Indicator
Achievement
Comments
already been made.
Local
Indicator
Core
Output
Indicator
E2
Amount, quality
and function of
green
infrastructure
delivered.
Change in areas
of Biodiversity
Importance
(SPAs, SACs,
Ramsar, National
Nature Reserves,
SINCSs, LNRs,
Ancient Woodland
and SNCVs)
recovering; 6.8%
unfavourable
no change and; 1.6%
unfavourable
declining.
There is currently no
monitoring system in
place that will enable this
indicator to be measured
Data unavailable
Loss
(ha)
0
0
Gain
(ha)
0
0
Net
(ha)
0
0
Ramsar
0
0
0
NNR
SINC
LNR
AW
0
5
0
0
0
0
51.4
0
0
-5
51.4
0
SNCV
n/a
n/a
n/a
SPA
SAC
2 new LNRs in Fareham;
Holly Hill Woodland Park
(28.02 ha) and Warsash
Common (23.38 ha).
Small loss of SINC at
Seafield Park - loss of 6A
species8.
Greater detail regarding
environmental
designations is provided
by Hampshire Biodiversity
Information Centre Annual
Monitoring Report.
The survey of SINCs
includes SNVC.
No data is available for
8 '6A Species' are notable species including: Red Data Book species, Nationally Scarce species, species covered under Schedules 1,5 and 8 of the Wildlife & Countryside Act 1981, Annex 1 of
the EC Bird Directive 79/409 and Annex II & IV of the EC Directive 92/43/EEC 'The Habitats Directive', and those covered by the Bern, Bonn and Ramsar Conventions. Notable species will also
include species which are considered 'County Rare' or 'County Scarce' (County Rare = those species recorded in 1% or less tetrads in Hampshire or either of the two vice-counties (11 & 12)
separately. County Scarce = 4% or less tetrads).
For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa
a56
Fareham LDF
Annual Monitoring Report
Policy
December 2011
Indicator
Type
Indicator
Achievement
Comments
AW.
Green Infrastructure will be created and safeguarded through:
 Investing in appropriate management, enhancement and
restoration, and the creation of new resources including
parks, woodland and trees, and wildlife habitats;
 Not permitting development that compromises its integrity
and therefore that of the overall green infrastructure
framework
In order to prevent adverse effects upon sensitive European sites
in and around the Borough, the Council will work with other local
authorities (including the Partnership for Urban South Hampshire)
to develop and implement a strategic approach to protecting
European sites from recreational pressure and development. This
will include a suite of mitigation measures, with adequate
provision of alternative recreational space for access
management measures within and around the European sites and
mitigation for impacts on air quality due to road traffic, supported
by developer contributions where appropriate. Development likely
to have an individual or cumulative adverse impact will not be
permitted unless the necessary mitigation measures have been
secured.
Local
Indicator
Amount of
additional BAP
habitat delivered,
including buffering
and linkages of
established sites;
Nil additional BAP habitats
delivered.
Local
Indicator
Contribution to
Biodiversity
Opportunity Areas
and County and
local BAPs.
No data available.
Local
Indicator
Condition of
SSSIs
No development affecting SSSIs
Local
Indicator
Number of
planning consents
granted which
impact upon sites
of geological
importance.
No development impacting upon
site of geological importance.
Number of
planning consents
20 sites granted permission outside
of the defined urban areas.
The Council will, through its Annual Monitoring Report, Local Air
Quality Management and ongoing visitor surveys and related
activities, scrutinise the effectiveness of the joint strategic
approach to avoidance and mitigation of effects on European
sites. It will adjust the rate, scale and/or distribution of housing or
employment development across the Borough to respond to the
findings of new evidence where appropriate, including the Solent
Disturbance and Mitigation Project in order to preserve the
integrity of European sites.
This policy has been taken into
account during pre-application
discussions and in the
determination of applications.
A reliable data source to
report on this indicator is
required.
This policy has been taken into
account during pre-application
discussions and in the
determination of applications.
Sites of geological importance will be protected and enhanced.
CS14 Development on Land outside Settlements
Local
Indicator
For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa
Policy C1 has been
replaced by the Core
a57
Fareham LDF
Annual Monitoring Report
Policy
December 2011
Indicator
Type
Built development on land outside the defined settlements will be
strictly controlled to protect the countryside and coastline from
development which would adversely affect its landscape
character, appearance and function. Acceptable forms of
development will include that essential for agriculture, forestry,
horticulture and required infrastructure. The conversion of existing
buildings will be favoured. Replacement buildings must reduce the
impact of development and be grouped with other existing
buildings, where possible. In coastal locations, development
should not have an adverse impact on the special character of the
coast when viewed from the land or water.
CS22 Development in Strategic Gaps
Land within a Strategic Gap will be treated as countryside.
Development proposals will not be permitted either individually or
cumulatively where it significantly affects the integrity of the gap
and the physical and visual separation of settlements.
Indicator
granted contrary
to policy permitted
outside of defined
urban areas.
Achievement
This policy has been taken into
account during pre-application
discussions and in the
determination of applications.
Comments
Strategy policy CS14. As
the Core Strategy was not
adopted at the point of
determination of these
applications, the grant of
permission must be
considered in the context
of the Local Plan policies
being applied at the time.
Although the 20 sites
were granted permission
despite their countryside
location these
permissions were in line
with other policy
exceptions (notably Local
Plan policies: C1, C2, C3,
H11, H12, H13 and H14).
Local
Indicator
Number of
planning consents
granted on land in
strategic gaps.
3 planning consents granted on
land in strategic gaps.
This policy has been taken into
account during pre-application
discussions and in the
determination of applications.
Strategic Gaps have been identified between
Fareham/Stubbington and Western Wards/Whiteley (the Meon
gap); and Stubbington/Lee on the Solent and Fareham/Gosport.
Their boundaries will be reviewed in accordance with the following
criteria:
For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa
No sites have been
granted planning consent
contrary to policy.
Policy C11 has been
replaced by the Core
Strategy policy CS22. As
the Core Strategy was not
adopted at the point of
determination of these
applications, the grant of
permission must be
considered in the context
of the Local Plan policies
being applied at the time.
Although the 3 sites were
a58
Fareham LDF
Annual Monitoring Report
Policy
December 2011
Indicator
Type
Indicator
Achievement
a) The open nature/sense of separation between settlements
cannot be retained by other policy designations;
Comments
granted permission, these
developments were
acceptable due to other
policy considerations
(notably Local Plan
policies: C1, C2, C3, C11,
H11, H12, H13 and H14).
b) The land to be included within the gap performs an important
role in defining the settlement character of the area and
separating settlements at risk of coalescence;
c) In defining the extent of a gap, no more land than is necessary
to prevent the coalescence of settlements should be included
having regard to maintaining their physical and visual separation.
C7: New Moorings
New moorings will be permitted provided that: (A) they are not
located in the Mooring Restriction Areas: (i) Fareham Lake, other
than at Upper Quay under Policy R8; (ii) south of Warsash Sailing
Club Jetty; (iii) between Warsash Ferry and Hamble Village; (iv)
south of Crableck; (v) south of Swanwick Public Hard; and (vi) the
Upper Hamble and Curbridge Creek (B) the River Hamble
Harbour Authority’s limit on the total number of moorings is not
exceeded; and (C) there is no adverse impact on nature
conservation and other environmental interests.
Local
Indicator
C8: Existing Moorings within Mooring Restriction Areas
The replacement or relocation of existing moorings within the
Mooring Restriction Areas will not be permitted unless: (A) there
are no alternative locations outside the Moorings Restriction
Areas: (B) it will result in improvements to navigation and the
appearance of the River Hamble or Fareham Lake; and (C) there
is no adverse impact on nature conservation and other
environmental interests.
Local
Indicator
C12: Local Gaps
Local
Number of new
moorings
permitted in
accordance with
and not in
accordance with
the policy.
No new moorings have been
permitted.
This policy has been taken into
account during pre-application
discussions and in the
determination of applications.
Number of
replacement
moorings
permitted in
accordance with
and not in
accordance with
the policy.
No replacement or relocation of
existing moorings have been
permitted.
Number of
4 planning consents granted on
This policy has been taken into
account during pre-application
discussions and in the
determination of applications.
For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa
This policy has been
taken into account during
pre-application
discussions and in the
determination of
applications.
This policy will be
reviewed in the Site
Allocations and
Development
Management DPD.
This policy has been
taken into account during
pre-application
discussions and in the
determination of
applications.
This policy will be
reviewed in the Site
Allocations and
Development
Management DPD.
Although the 4 sites were
a59
Fareham LDF
Annual Monitoring Report
Indicator
Type
Policy
Development that would physically and/or visually diminish
undeveloped land in the following gaps will not be permitted:
Lower Swanwick - Sarisbury; (B) Sarisbury - Locks Heath;
Warsash - Locks Heath; (D) Segensworth - Locks Heath;
Wallington - Portchester; and (F) Fareham - Portchester.
December 2011
the
(A)
(C)
(E)
Indicator
Indicator
planning consents
granted in Local
Gaps.
Achievement
land in local gaps.
This policy has been taken into
account during pre-application
discussions and in the
determination of applications.
Comments
granted permission, these
developments were
acceptable due to other
policy considerations
(notably Local Plan
policies: C1, C2, C3, C12,
H11, H12, H13 and H14).
This policy will be
reviewed in the Site
Allocations and
Development
Management DPD.
C15: Local Nature Reserve Allocations
The following areas are proposed as Local Nature Reserves and
they will be safeguarded from development in order that they can
be implemented during the plan period: (A) Hook-with-Warsash
(extension to existing); (B) South west of Gull Coppice, Whiteley;
(C) North west of Gull Coppice, Whiteley; (D) Quaveys Copse,
Whiteley; and (E) Bushy Land, Whiteley.
Local
Indicator
Safeguarding
from development
of proposed
nature reserves to
be implemented
during the plan
period on the
following sites:
No development
A) Hook-withWarsash
No development
B) South west of
Gull Coppice
No development
C) North west of
Gull Coppice,
Whiteley;
D) Quaveys
Copse,
Whiteley;
No development
No development
For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa
a60
Fareham LDF
Annual Monitoring Report
Policy
C17: Sites of Nature Conservation Value
Development which would adversely affect non-designated sites
or features of nature conservation value will be not permitted
unless, where possible, provision is made to offset the adverse
impact. Where appropriate, a legal agreement will be sought to
secure the replacement of habitats or features lost to
development.
December 2011
Indicator
Type
Core
Output
Indicator
E2
Local
Indicator
Local
Indicator
C18: Protected Species
Development which would adversely affect species, or their
habitats, protected by the Habitats Regulations 1994, the Wildlife
and Countryside Act 1981 or other legislation will not be permitted
unless measures can be undertaken which prevent harm to the
species or damage to the habitats.
Where appropriate,
permission will be conditioned or a legal agreement sought to
secure the protection of the species or their habitats.
Local
Indicator
Indicator
E) Bushy Land,
Whiteley.
Change in areas
and populations
of biodiversity
importance.
Change in priority
habitats and
species (by type).
Change in areas
designated for
their intrinsic
environmental
value including
sites of
international,
national, regional
or sub-regional
significance
Amount of
development
permitted which
proposes harm to
species or
damage to
habitats, where
mitigation is
inadequate.
Achievement
This Core Output Indicator is
reported under policy CS4.
See Policy CS4
See Policy CS4
No data available.
For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa
Comments
Policy C17 is
predominantly covered
under CS4. However,
unlike CS4, this policy
acknowledges the
importance of protecting
non-designated sites.
This policy will be
reviewed in the Site
Allocations &
Development
Management DPD.
This policy has been
taken into account during
pre-application
discussions and in the
determination of
applications.
This policy will be
reviewed in the Site
Allocations &
Development
Management DPD.
Additional guidance is
contained in the Fareham
Biodiversity Action Plan.
a61
Fareham LDF
Annual Monitoring Report
Policy
December 2011
Indicator
Type
Indicator
Achievement
Comments
HISTORIC ENVIRONMENT
HE5: Change of Use in Fareham High Street Conservation
Area
Changes of use to offices (Classes A2 and B1) or non-residential
institutions (Class D1) will be permitted within Fareham High
Street Conservation Area, provided that: (A) there would be no
prejudice to the mixed-use character of the conservation area or
the retail character of the shopping area; (B) there would be no
loss of a residential unit unless it is essential to protect the fabric
of a building or the environment; and (C) provision can be made
for off-street car parking on the site or in the vicinity without the
loss of gardens and without the creation of vehicular access onto
Civic Way.
HE6: Conservation Areas - Shopfronts
New shopfronts in conservation areas will be permitted, provided
that: (A) it does not result in the removal or alteration of features
of architectural or historic value; and (B) the new design relates
closely to the overall character of the building in terms of scale,
style and materials, together with the use of traditional elements.
Local
Indicator
HE7: Conservation Areas - Signs and Advertisements
New signs and advertisements in conservation areas which
accord with Policy DG7 will be permitted provided that: (A) the
size, design and materials are related to the building on which the
sign is to be displayed; and (B) if freestanding, they are positioned
so that the setting of the building or character of the area is not
harmed; and (C) fascias, letters and signage are not internally
illuminated.
HE8: Conservation Areas - Blinds, Canopies and Shutters
Blinds, canopies and security shutters in conservation areas will
be permitted, provided that: (A) they are designed as an integral
part of a shopfront; and (B) the size, colour, materials and design
are appropriate to the character of the building. External security
shutters will not be permitted.
Local
Indicator
Local
Indicator
Local
Indicator
Amount of
development
permitted in
accordance with
and not in
accordance with
the policy.
No applications were granted
permission contrary to policy.
Number of
planning consents
granted not in
accordance with
the policy
No applications were granted
contrary to policy.
Number of
planning consents
granted not in
accordance with
the policy
Number of
planning consents
granted not in
accordance with
the policy.
This policy has been taken into
account during pre-application
discussions and in the
determination of applications.
This policy has been taken into
account during pre-application
discussions and in the
determination of applications.
No applications were granted
contrary to policy.
This policy has been taken into
account during pre-application
discussions and in the
determination of applications.
No applications were granted
contrary to policy.
This policy has been taken into
account during pre-application
discussions and in the
For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa
This policy will be
reviewed as part of the
Fareham Town Centre
AAP.
Additional guidance is
available in the Fareham
High Street Conservation
Area Character
Assessment. This
document was adopted
on 9 October 2006.
This policy will be
reviewed in the Site
Allocations &
Development
Management DPD and is
covered by PPS5
This policy will be
reviewed in the Site
Allocations &
Development
Management DPD and is
covered by PPS5
This policy will be
reviewed in the Site
Allocations &
Development
Management DPD and is
covered by PPS5.
a62
Fareham LDF
Annual Monitoring Report
December 2011
Indicator
Type
Policy
HE9: Buildings of Local Architectural or Historic Interest
Proposals for Buildings of Local Architectural or Historic Interest
(that is, buildings not on the Statutory List but contained within the
Local List), involving alterations, additions or other development,
including changes of use, will be permitted, provided that such
development does not adversely affect their character or setting.
Local
Indicator
HE10: Historic Parks and Gardens
Development in accordance with the other policies in the Plan will
be permitted provided that it does not harm historic parks and
gardens, whether of regional or local importance, or their settings.
Local
Indicator
Indicator
Number of
planning consents
granted not in
accordance with
the policy
Number of
planning consents
granted not in
accordance with
the policy
Achievement
determination of applications.
No applications were granted
contrary to policy.
This policy has been taken into
account during pre-application
discussions and in the
determination of applications.
No applications were granted
contrary to policy.
This policy has been taken into
account during pre-application
discussions and in the
determination of applications.
Comments
This policy will be
reviewed in the Site
Allocations &
Development
Management DPD. and is
covered by PPS5
This policy will be
reviewed in the Site
Allocations &
Development
Management DPD and is
covered by PPS5
HOUSING
CS2 Housing Provision
3,729 dwellings will be provided within the Borough to meet the
South Hampshire sub-regional strategy housing target between
2006 and 2026, excluding the SDA. Priority will be given to the
reuse of previously developed land within the existing urban
areas.
Housing will be provided through;






completions between April 2006 and March 2010 (1,637
units);
sites that already have planning permission (1,434 units);
dwellings on previously developed land;
sites allocated in earlier local plans;
the Strategic Development Allocation at the former
Coldeast Hospital;
the Strategic Development Location at Fareham Town
Core
Output
Indicator
H2
Core
Output
Indicator
H2
Core
Output
Indicator
H2c
Core
Output
Indicator
H3
Achieve 3,729
dwellings in the
Borough outside
the SDA across
the plan period.
Plan period
housing targets
These indicators are discussed
under policy CS6
See Section 4 of this AMR
for further details.
Net additional
dwellings
New and
converted
dwellings on
previously
For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa
a63
Annual Monitoring Report
Indicator
Type
The supply of sites will be kept up-to-date through a regular
review of the Strategic Housing Land Availability Assessment
which will identify sites. Those that are allocated will be done so
through the Site Allocations and Development Management
Development Plan Document. The Annual Monitoring Report will
inform the pace of housing delivery and update the housing
trajectory.
Development will achieve a mix of different housing sizes, types
and tenures informed by the Housing Market Assessment and the
Council's Housing Strategy.
CS18 Provision of Affordable Housing
The Council will require the provision of affordable housing on all
schemes that can deliver a net gain of 5 or more dwellings.



On sites that can accommodate between 5 and 9
dwellings developers will be expected to provide 30%
affordable units OR the equivalent financial contribution
towards off-site provision.
On sites that can accommodate between 10 and 14
dwellings developers will be expected to provide 30%
affordable units.
On sites that can accommodate 15 or more dwellings
developers will be expected to provide 40% affordable
units.
Achievement
Comments
developed land
Core
Output
Indicator
H2d
Managed delivery
target
Core
Output
Indicator
H5
Gross affordable
housing
completions
Total
Affordable
Homes
Provided
Centre; and
new allocations and redesignations to be identified
through the Site Allocations and Development
Management DPD
Indicator
Intermediate
Homes
Provided
Policy

December 2011
Social Rented
Homes
Provided
Fareham LDF
2010/
2011
133
84
217
2009/
2010
14
29
43
Development proposals will be required to provide a mixture of
dwelling types, sizes and tenures reflecting the identified housing
needs of the local population.
Where development viability is an issue, developers will be
For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa
Fareham targets
affordable housing
provision of 100
affordable dwellings per
annum. This target has
been exceeded by some
margin. Delivery rate has
significant improved since
last year where only 43
units were delivered.
A significant percentage
of the completions 108
social and 28intermediate
dwellings were delivered
at Hunts Pond Road.
Smaller yet still significant
contributions were from
sites at Osborne Road
South and Broadlaw
a64
Fareham LDF
Annual Monitoring Report
December 2011
Indicator
Type
Policy
Indicator
Achievement
Comments
expected to produce a financial assessment in which it is clearly
demonstrated the maximum number of affordable dwellings which
can be achieved on the site.
Walk. The remainder from
a number of small sites
across the Borough.
Should a site fall below the above identified thresholds but is
demonstrably part of a potentially larger developable site, the
Council will seek to achieve affordable housing on a pro rata
basis.
The level of affordable housing provision will also be subject to
other planning objectives to be met from the development of the
site.
CS19 Gypsies, Travellers and Travelling Showpeople
Population
Gypsy and Traveller and Travelling Showpeople pitches will be
permitted or allocated in accordance with current government
policy to meet the needs identified in the Gypsies and Travellers
and Travelling Showpeople Accommodation Assessments
updated as necessary Any specific sites identified within the
Borough will be allocated in the Site Allocations and Development
Management Development Plan Document.
Core
Output
Indicator
H4
Number of pitches
provided for
Gypsies,
Travellers and
Travelling
Showpeople
Assessment and
any subsequent
revisions.
Permanent
Transit
Total
0
0
0
In identifying sites through the Site Allocations and Development
Management Development Plan Document for Gypsies and
Travellers and Travelling Showpeople, previously developed land
within or on the edge of urban areas will be considered before
sites in rural locations. The site must be suitable for this type of
accommodation in that it meets the criteria below and there is a
realistic likelihood it will come forward during the plan period,
taking into account site constraints such as flood risk, access to
the highway network and infrastructure.
No permanent
permissions were granted
for any permanent
pitches, transit sites nor
travelling
showperson's units.
Temporary planning
permission was granted
on 6th April 2010 for two
gypsy caravans in
Newgate Lane which will
expire on 31 December
2016.
Planning permission will be granted where the following criteria
can be met:

The site is accessible to shops, schools and health
For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa
a65
Fareham LDF
Annual Monitoring Report
December 2011
Indicator
Type
Policy
Indicator
Achievement
Comments
East of Botley Road: Construction
complete on southern portion, 7
units. Part of allocation to north
granted planning consent for 15
units.
Completion estimated for
2011/12
North of Whiteley:
227 dwellings completed.
Construction on remainder of the
site for 113 units has commenced.
Completion estimated for
2019/20
facilities by public transport, on foot or by cycle.
H1: Housing Allocations
The following sites together with existing allocations and sites with
planning permission shown on the Proposals Map and listed in
Appendix 5 are allocated for residential development. They will
be safeguarded from any other form of permanent development in
order that they are available for implementation during the plan
period:
Number of Dwellings (indicative)
New
Allocations
Allocated
(1997)
Built or
Permitted
(1997-99)
East of
Botley Road
25
0
25
North of
Whiteley
260
0
260
Peters Road
210
0
210
240
0
240
160
0
160
15
17
0
63
0
Hunts Pond
Road
Segensworth
Road - North
East of
Whiteley
Lane
Segensworth
Road - South
Without
Permission
(1999)
Local
Indicator
& part of
Core
Output
Indicator
H2
Number of
Dwellings
completed at
each Local Plan
housing
allocation.
Peters Road:
Outline planning permission for 307
dwellings granted 2008, has lapsed
21/11/11. Four new applications for
an alternative hybrid scheme
comprising of 288 dwellings
submitted in 2011
Hunts Pond Road:
Permission granted for phase 1,
248 dwellings; phase 2, 73
dwellings; and permission granted
for 4 dwellings to the north. Part of
allocation to south and east do not
have from planning permission.
Development Brief SPD
adopted November 2007.
Completion estimated for
2017/18.
Development Brief SPD
adopted January 2007.
170 units completed to
date.
Segensworth Road - North:
217 dwellings completed
Site complete
East of Whiteley Lane
17 dwellings completed
Site complete
Segensworth Road - South
Site complete
For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa
a66
Fareham LDF
Annual Monitoring Report
December 2011
Indicator
Type
Policy
Catisfield
Lane
0
30
Former WT
Station
0
75
Former
Wicor School
35
Chalk Pit, Hill
Road
Total
910
Indicator
Achievement
Comments
63 dwellings completed
Catisfield Lane
No planning permission
Development Brief SPD
adopted February 2004
0
Former WT Station
75 dwellings completed
Site complete
20
0
Former Wicor School
35 dwellings completed
Site complete
263
840
Chalk Pit, Hill Road
24 dwellings completed
Site complete
Nil planning applications granted
which have proposed the loss of
residential accommodation.
The policy has generally achieved
the aim of retaining residential
accommodation with losses only
being permitted where the use
complies with the policy.
Conversions of offices and
floorspace above shops have been
permitted, particularly in Fareham
town centre.
The policy will be
reviewed in the Site
Allocations &
Development
Management DPD.
H4: Retention of Housing
Change of use or development which results in the loss of
residential accommodation will be permitted, provided that: (A) the
new use is for the establishment of a small business, a medical or
dental practice or another community facility to serve the wider
residential area; and (B) a unit of accommodation is retained.
Local
Indicator
& part of
Core
Output
Indicator
H2
Number of
planning
application
granted proposing
the loss of
residential
accommodation.
H5: Conversions to Flats
The conversion and/or extension of offices, existing dwellings and
of vacant floorspace above shops to smaller self-contained units
of accommodation will be permitted, provided that: (A) the
proposal, or the cumulative impact of the proposal with other
similar proposals would not adversely affect the character of the
area, particularly in conservation areas, or have unacceptable
environmental, amenity or traffic implications; (B) intrusive
features, for example, rear fire escapes or external access
stairways are sympathetically designed and, where there may be
problems of overlooking, housed in a covered structure; (C) the
property to be converted is not a small family dwelling but is large
enough to enable the provision of new dwellings with adequate
Local
Indicator
&
Part of
Core
Output
Indicator
H2.
Number of
planning consents
granted for the
conversion and/or
extension of
offices, existing
dwellings and of
vacant floorspace
above shops to
smaller selfcontained units
The policy will be
reviewed in the Site
Allocations &
Development
Management DPD.
1 planning consent granted:
P/10/0475/FP - CHANGE OF USE
FROM SEVEN OFFICE SUITES &
ALTERATION TO ROOF TO
FORM THREE ONE BEDROOM
STUDIO FLATS & ONE , ONE
BEDROOM MAISONETTE
For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa
a67
Fareham LDF
Annual Monitoring Report
Policy
space standards; (D) with the exception of the town centre and
other commercial locations, appropriate outdoor amenity space is
provided; and (E) where appropriate, the proposal meets the
criteria in Policies DG3, HE2, and HE4.
H6: Houses in Multiple Occupation
The sub-division of existing dwellings within the urban area for the
purposes of multiple occupation will be permitted, provided that:
(A) the property to be converted is not a small family dwelling; (B)
a satisfactory living environment for the occupants is provided; (C)
the proposal, or the cumulative impact of the proposal with other
similar proposals would not adversely affect the character of the
area, particularly in conservation areas, or have unacceptable
environmental, amenity or traffic implications; and (D) where
appropriate, the proposal meets the criteria in Policies DG3, HE2,
and HE4.
H8: Community-Based Supported Housing Units
Community-based supported housing units will be permitted within
existing residential areas within the urban area, provided that: (A)
they contain adequate safeguards to protect the residential
amenity of the occupiers of neighbouring properties; (B) the
cumulative impact of the proposal with other similar proposals
would not adversely affect the character of the area or have
unacceptable environmental, amenity or traffic implication; and (C)
appropriate outdoor amenity space is provided except where the
property adjoins an existing public open space.
H9: Annexes for Dependent Relatives
The provision of self-contained annexes to accommodate
dependent relatives will be permitted, provided that: (A) it is not
possible to satisfactorily cater for dependent relatives within the
existing dwelling;(B) the annexe is capable of incorporation into,
or use as, an ancillary part of the existing dwelling when there is
no longer a need for the annexe; and (C) adequate gardens and
car parking spaces are provided. Where the annexe is detached
December 2011
Indicator
Type
Indicator
Achievement
Local
Indicator
&
Part of
Core
Output
Indicator
H2.
Number of
planning
permission
granted proposing
the change of use
from existing
dwellings to HMO
and not in
accordance with
the policy.
There has been limited demand for
houses in multiple occupations in
the Borough. During the 2010/11
monitoring year no planning
permissions were granted for HMO.
The policy will be
reviewed in the Site
Allocations &
Development
Management DPD.
Local
Indicator
Number of
community-based
supported
housing units
permitted in
accordance with
and not in
accordance with
the policy.
There have been no communitybased supported housing units
permitted during the 2010/11
monitoring year
Permissions have been
granted for community
based supported housing
units in accordance with
the policy.
Number of selfcontained
annexes to
accommodate
dependent
relatives will be
permitted in
accordance with
Permissions have been granted for
self-contained annexes in
accordance with the policy.
Completion of 6 annexes in
2010/11.
Local
Indicator
Comments
The policy will be
replaced in the Site
Allocations &
Development
Management DPD.
For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa
It will be difficult to
accurately monitor the
application of policy in
term of criteria A) and B)
post development.
The policy will be
reviewed in the Site
a68
Fareham LDF
Annual Monitoring Report
December 2011
Indicator
Type
Policy
from the original dwelling, a legal agreement will be sought to
prevent the use of the annexe as a separate dwelling.
H13: Extensions to Dwellings and Ancillary Buildings in the
Countryside
A residential extension or the erection of an ancillary building be
permitted in the countryside, provided that:(A) in the case of an
extension, it is of an appropriate size and design and does not
adversely affect the character of the area or the wider landscape;
or (B) in the case of the erection of an ancillary building, it is of
appropriate design and located within or close to an existing group
of buildings so that it does not adversely affect the landscape; and
(C) in the case of an extension to an agricultural worker’s
dwelling, it does not result in a dwelling larger than the unit can
sustain in the long term.
H14: Frontage Infill in the Countryside
Residential development for one or two new dwellings on infill
sites within the countryside will be permitted, provided that: (A) it
occupies a gap between existing dwellings in an otherwise
continuously built-up frontage and would not harm the character of
the area; (B) the new dwellings and plots are similar in size and
character to adjoining properties; (C) it does not result in the
extension of a frontage or the consolidation of an isolated group of
dwellings; and (D) it does not involve the siting of dwellings at the
rear of existing dwellings.
Indicator
Achievement
and not in
accordance with
the policy.
Comments
Allocations &
Development
Management DPD.
Local
Indicator
Number of
planning
permissions
granted for
extension or the
erection of
ancillary buildings
permitted in the
countryside,
contrary to policy.
No new dwellings other than those
permitted by policy H13 have been
permitted.
The policy will be
reviewed in the Site
Allocations &
Development
Management DPD.
Local
Indicator
Number of
planning
permissions
granted for one or
two new dwellings
on infill sites
within the
countryside,
contrary to policy.
No new dwellings other than those
permitted by policy H14 have been
permitted.
The policy will be
reviewed in the Site
Allocations &
Development
Management DPD.
FACILITIES, SERVICES, INFRASTRUCTURE AND CONTRIBUTIONS
CS20: Infrastructure and Developer Contributions
Development will be required to provide or contribute towards the
provision of infrastructure through planning conditions, legal
agreement or directly through the service provider. Contributions
or provision may also be required to mitigate the impact of
Local
Indicator
Number of
developments
permitted not
making
infrastructure
No data is available for the
indicator.
For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa
Monitoring system will
need to be devised in
order to test the
effectiveness of this
policy.
a69
Fareham LDF
Annual Monitoring Report
Policy
development upon infrastructure. Detailed guidance on provision
or contributions is or will be set out in Supplementary Planning
Document(s) including any standard charges introduced through
the Community Infrastructure Levy.
FS1: Community Facility Allocations
The following sites are allocated for community purposes and they
will be safeguarded from development in order that they are
available for implementation during the plan period: (A) a new
community centre, south of Gull Coppice, Whiteley; (B) an
extension to the Fareham Youth Centre, Park Lane, Fareham;
and (C) community uses, Hunts Pond Road, Titchfield Common,
as part of a larger scheme to include education uses and open
space;
December 2011
Indicator
Type
Indicator
Comments
obligations that
are required to do
so.
Local
Indicator
Allocated sites to
be safeguarded
from permanent
development:
(A) a new
community
centre, south of
Gull Coppice,
Whiteley;
(B) an extension
to the Fareham
Youth Centre,
Park Lane,
Fareham;
FS2: Education Allocations
The following sites are allocated for education purposes and they
will be safeguarded from permanent development in order that
they are available for implementation during the plan period: (A) a
new primary school, Heath Road/Centre Way, Locks Heath (2.8
hectares); and (B) educational uses, Hunts Pond Road, Titchfield
Achievement
Local
Indicator
Whiteley Community Centre now
constructed.
Part A) of this policy can
be deleted.
Fareham Youth Centre has not
been extended.
This site will be reviewed
through the Site
Allocations DPD.
No community uses provided at
Hunts Pond Road
This site will be reviewed
through the Site
Allocations DPD.
(C) community
uses, Hunts Pond
Road, Titchfield
Common, as part
of a larger
scheme to include
education uses
and open space;
Sites allocated for
educational
purposes to be
safeguarded:
For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa
This policy will be
reviewed as part of the
Site Allocations and
Development
Management DPD.
a70
Fareham LDF
Annual Monitoring Report
Policy
December 2011
Indicator
Type
Common, as part of a larger scheme to include community uses
and open space (7.5 hectares).
FS4: Health Facility Allocations, Coldeast Hospital
Land is allocated at Coldeast Hospital for the following health
facilities and they will be safeguarded from development in order
that they are available for implementation during the plan period:
(A) a community hospital; and (B) learning disability homes.
Local
Indicator
Indicator
Achievement
Comments
(A) A new primary
school, Heath
Road/Centre
Way, Locks
Heath (2.8
hectares); and
A. A new primary school has not
been developed.
This site has been
declared surplus to
requirements by the
education authority. A
planning application for
residential development
was withdrawn 2007.
(B) Educational
uses, Hunts
Pond Road,
Titchfield
Common, as
part of a larger
scheme to
include
community
uses and
open space
(7.5 hectares).
Safeguard land
for the following
uses:
B. No educational uses have been
developed.
The site is owned by
HCC. The future of this
site remains uncertain.
(A) A community
hospital;
A.
This has been implemented in
part. See Policy CS10 above
Land remains allocated
for a 2nd phase through
the Coldeast strategic site
allocation in the Core
Strategy so the
designation on the
Proposals Map remains in
part.
(B) Learning
disability homes
B.
No new consents have been
granted for this type of
development during the
Part B) of this policy has
been part implemented.
The health authority has
For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa
a71
Fareham LDF
Annual Monitoring Report
Policy
December 2011
Indicator
Type
Indicator
Achievement
2010/11 year (see comment
for further details)
Comments
provide two dwellings for
learning disability homes
and a further two
dwellings are proposed as
part of the next phase of
development at Coldeast.
This policy could
potentially be deleted
following consultation with
the Health Authority.
RECREATION, LEISURE AND TOURSIM
CS21 Protection and Provision of Open Space
The Borough Council will safeguard and enhance existing open
spaces and establish networks of Green Infrastructure to add
value to their wildlife and recreational functions Development
which would result in the loss of or reduce the recreational value
of open space, including public and private playing fields,
allotments and informal open space will not be permitted, unless it
is of poor quality, under-used, or has low potential for open space
and a better quality replacement site is provided which is
equivalent in terms of accessibility and size.
Local
Indicator
Local
Indicator
Proposals for new residential development will be permitted
provided that, where existing provision is insufficient to provide for
the additional population, public open space is provided as
follows:



Parks and Amenity Open Space 1.5 ha / 1,000 population
Outdoor Sport – 1.2 ha / 1,000 population
Children’s Play Equipment – 14 pieces of equipment per
1,000 1-12 year olds
Youth Facilities – 1 youth facility/MUGA per settlement area
Local
Indicator
Number of
planning consent
granted where the
proposals will
result in a net loss
of open space
and is not in line
with the policy
provisions.
Achieve
greenspace
standards of
4.7ha per 1,000
population (1.5ha
parks and
amenity; 2ha
accessible natural
greenspace; and
1.2 ha of outdoor
sport)
Amount of
additional public
open space
No data available
There is currently no
robust mechanism for
monitoring the quantum of
additional open space
being provided.
No data available
There is currently no
robust mechanism for
monitoring the quantum of
additional greenspace
being provided.
No data available
There is currently no
robust mechanism for
monitoring the quantum of
For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa
a72
Fareham LDF
Annual Monitoring Report
Policy
In addition to these types of open spaces, where existing
provision is insufficient to provide for the additional population, the
Borough Council will seek the provision of accessible greenspace
which meets the standards set out in the South East Green
Infrastructure Framework including Accessible Natural Green
Space standards.
R2: Cams Alders Sports Ground
Proposals which improve the range and quality of outdoor and
indoor sports provision at Cams Alders Sports Ground will be
permitted, provided that: (A) they include redevelopment of the
stadium to provide a football pitch and other sporting and ancillary
facilities; (B) the existing rugby and cricket pitches are relocated
within the site; (C) access is provided from Palmerston Business
Park and the existing access from Highfield Avenue is closed
except for emergency purposes; (D) if necessary, additional
parking is provided on-site to an appropriate standard; (E) the
nature conservation interest of the site is respected and the
existing trees and hedgerows are retained together with an area
of public open space; and (F) further landscape screening is
provided along boundaries with residential areas.
December 2011
Indicator
Type
Local
Indicator
Local
Indicator
Indicator
achieved by
development
ANGSt standards
achieved, by
reference to scale
and accessibility
of green space
Development at
Cams Alders
Sports Ground
that is in
accordance with
the policy.
Achievement
No data available
Portchester Football Club have
made and continuing to make
improvements to the club facilities
in line with criterion A) of this policy.
Planning permission,
P/09/0966/FP, granted in 2010
(amended 23-07-2010,
P/10/0453/FP) for:
SITING OF PRE-FABRICATED
BUILDING FOR USE AS CLUB
HOUSE AND A 100 PERSON
PRE-FORMED STAND
Application submitted in 2011,
P/11/0781/FP, proposing:
DEMOLITION OF EXISTING
SPORTS PAVILION AND
ERECTION OF NEW SPORTS
PAVILION
Comments
additional open space
being provided.
There is no robust
mechanism for monitoring
the scale and accessibility
of greenspace.
Future provision of
outdoor and indoor sports
facilities at sites within the
Borough will be usefully
informed by recent
government guidance
(see comment) and a
number of subsequent
relevant LDF evidence
studies that have been
completed; Playing Pitch
Study; Greenspace Study
and; Indoor Sport Study
All three studies make
informed
recommendations of what
facilities are needed in the
location based upon the
most recent evidence and
informed by extensive
community consultation.
This policy will be
reviewed as part of the
Site Allocations and
For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa
a73
Fareham LDF
Annual Monitoring Report
Policy
R4: Public Open Space Allocations
The following sites are allocated for new public open space and
they will be safeguarded from development in order that they can
be implemented during the plan period: (A) Informal open space
at the Former Orchard Land, north west of Yew Tree Drive,
Whiteley (2.8 hectares); (B) Informal open space at Quaveys
Copse, Whiteley (4.4 hectares); (C) Sports pitches and informal
open space at Hunts Pond Road, Titchfield Common as part of a
larger scheme to include Community and Education Uses (5.5
hectares); (E) Sports pitches and informal open space at Seafield
Park (10 hectares); (F) Extension to Stroud Green Allotments (0.9
hectares).
December 2011
Indicator
Type
Local
Indicator
Indicator
Achievement
The following new
public open space
allocations
safeguarded from
development:
All allocated sites have been
successfully safeguarded from
development.
(A) Informal open
space at the
Former
Orchard Land,
north west of
Yew Tree
Drive,
Whiteley
Safeguarded, not implemented
(C) Informal open
space at
Quaveys
Copse,
Whiteley
(D) Sports pitches
and informal
open space at
Hunts Pond
Road,
Titchfield
Common
Safeguarded, not implemented
Safeguarded, not implemented
Development at Seafield Park (Site
E) was completed and brought into
use in January 2008.
Comments
Development
Management DPD.
LDF evidence studies
have been completed:
(i)
The Greenspace
Study
(ii)
The Playing
Pitch Study
Together these two
studies assessed the
Borough’s open spaces
for quantity, quality and
accessibility. They will
inform site by site
recommendations to be
made through the LDF
process.
An update to the Playing
Pitch Strategy and the
Greenspace Strategy will
be undertaken as part of
the Site Allocations and
development
Management DPD where
this policy will be
reviewed.
Safeguarded, not implemented
(E) Sports pitches
and informal
open space at
Seafield Park
For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa
a74
Fareham LDF
Annual Monitoring Report
Policy
December 2011
Indicator
Type
Local
Indicator
R7: New Footpaths
Development will be permitted provided that the proposal
incorporates the provision of any relevant sections of the following
footpaths: (A) the final section of the Portchester Coastal Footpath
from the southern end of Wicor Mill Lane; and (B) south-east of
Fleet End Road, Warsash.
Local
Indicator
Indicator
(F) Extension to
Stroud Green
Allotments
Improvement of
the range and
quality of outdoor
and indoor sports
provision.
Development of
new footpaths
incorporating
provision in
Portchester and
Warsash
Achievement
Comments
An application was submitted for
the improvements to the facilities at
Portchester Football Club.
See policy R2
Neither footpath has been
completed.
In both cases, their
development is
dependent to a large
degree on enabling
development and the
implementation of
schemes on adjacent
land.
Completion of the
Portchester coastal
footpath is largely
dependent on
development of the
category B employment
land to the north. In the
case of Fleet End Road,
Warsash, the housing
allocation to the north is
not wholly built out, so the
footpath remains possible.
This policy will be
reviewed as part of the
Site Allocations and
Development
Management DPD.
For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa
a75
Fareham LDF
Annual Monitoring Report
December 2011
Indicator
Type
Policy
R8: Upper Quay, Fareham
In the event of the seaborne aggregate depot at Upper Quay,
Fareham closing or relocating, development of the site for
appropriate leisure uses will be permitted, provided that: (A) any
additional moorings or waterside uses are limited to the area
currently used by waterside vessels; (B) there is no adverse
impact on the Town Quay Conservation Area or buildings of
special architectural or historical interest; (C) there is no adverse
impact on nature conservation interests; and (D) it would not have
unacceptable environmental, amenity or traffic implications.
Local
Indicator
Indicator
Development of
the site for
appropriate
leisure uses
Achievement
The seaborne aggregate depot
remains operational, so the detail of
this policy is not relevant.
Comments
This policy remains
relevant.
This policy will be
reviewed as part of the
Fareham Town Centre
AAP.
The facility is included in
the Hampshire Minerals &
Waste Plan (Draft)
November 2011 Policy 16
Safeguarding Minerals
Infrastructure.
EMPLOYMENT
CS1 Employment Provision
Additional employment development will be permitted to meet a
minimum floorspace target of 41,000 sq m (excluding the SDA)
and to contribute to GVA growth. This will be met through:






Completed floorspace between April 2006 and March
2010;
Safeguarding existing employment areas;
Implementing existing commitments;
Requiring the inclusion of 10,000 sq m of new B1
development as part of mixed use schemes within
Fareham town centre;
Daedalus Airfield Strategic Development Allocation to
accommodate a minimum of 10,000 sq m and up to
33,000 sq m of net additional23 general, or light industrial
or warehousing employment floorspace (Policy CS12);
Taking a flexible approach to the redevelopment of
existing employment sites for different uses which
Core
Output
Indicators
BD2,
BD4i and
BD4ii
Contribute toward
41,000 sq m of
employment
floorspace by
2026 (excluding
the SDA)
See policy CS6.
Core
Output
Indicators
BD2,
BD4i and
BD4ii
Amount of
floorspace lost in
existing
employment area.
See policy CS6.
Core
Output
Indicators
BD2,
BD4i and
Amount of
employment
floorspace lost by
type
See policy CS6.
For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa
a76
Fareham LDF
Annual Monitoring Report
Indicator
Type
Policy

contribute to economic development.
Employment sites and areas will be reviewed through the
Site Allocations and Development Management
Development Plan Document, informed by the
Employment Land Review
To support economic and GVA growth, development will be
permitted where it:




December 2011
Supports the continuing use of an existing employment
site for uses which contribute to economic development;
Allows for diversification and modernisation;
Supports the enhancement of identified local clusters;
Supports advances in ICT, and the development of
communications technology infrastructure.
Development will be permitted where it provides a necessary
ancillary service to support the primary business function of the
employment area.
Indicator
Achievement
Comments
BD4ii
Core
Output
Indicators
BD2,
BD4i and
BD4ii
Core
Output
Indicators
BD2,
BD4i and
BD4ii
Core
Output
Indicators
BD3
Total amount of
additional
employment
floorspace - by
type
See policy CS6.
Total amount of
additional
floorspace on
PDL.
100% of additional employment
floorspace was delivered on PDL.
Employment land
available - by type
ID.
21 part
39
74
78
78
79
95
103
123
124
154
165
172
198
199
211
Address
43 High
Street,
Fareham
Lucketts
Travel,
Broadcut
24
Newgate
Lane
Unit 2100,
Talbot
Road
Kites Croft
30 Brunel
Way
Funtley
Court
RK Marine
Little Park
Farm
Solent
Business
Park,
Phase 2
Maytree
Road
The
Walled
Garden,
Cams Hall
Daedalus
Civic &
Cultural
Quarter
Market
Quay Car
Park
Fareham
Station
Yard
For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa
B1
B2/B8
Total
274
274
197
197
205
205
828
828
3,523
3,523
500
500
461
461
126
126
18,305
18,305
23,526
23,526
620
620
1,843
1,843
8,000
As the table demonstrates
Fareham has a significant
surplus in identified
employment floorspace in
all use relevant classes.
25,006
33,006
2,500
2,500
1,000
1,000
6,000
6,000
a77
Fareham LDF
Annual Monitoring Report
Policy
December 2011
Indicator
Type
Indicator
Achievement
1167
1261
1274
1276
1280
1286
E1: Existing Employment Areas in the Urban Area
Category 'A' Areas. Within Category 'A' employment areas, listed
in Appendix 7 and shown on the Proposals Map, the expansion of
existing premises within their curtilages or the redevelopment of
existing premises for development within Use Classes B1
(Business), B2 (General Industrial) or Class B8 (Storage or
Distribution) will be permitted, provided that: (A) the development
includes, where appropriate, a range of sizes and types of
premises; (B) where appropriate, sites or accommodation suitable
for starter and small businesses constitute at least 10% of the net
developable area; (C) only uses within Classes B1 and B8 are
located near boundaries with residential areas; and (D) it would
not adversely affect the character of the area or have
unacceptable amenity or traffic implications. Changes of use or
redevelopment of Category ‘A’ employment areas which would
result in their loss from employment uses will not be permitted.
Core
Output
Indicators
B1, B2
and B3.
Amount of
development
permitted in
accordance with
and not in
accordance with
the policy.
Coldeast
Mansion
The Yard,
Cranleigh
Road
15
Segenswo
rth Road
Midas
Marine,
Coal Park
Lane
Great
Brook,
Brook
Lane
West
Street
West
3,879
Comments
3,879
291
727
291
727
402
402
2,191
2,191
1,700
1,700
TOTAL
50,727
51,377
102,104
Future
Requireme
nts
14,054
14,587
28,641
Surplus
36,673
36,790
73,463
All category A areas remain largely
in use for B1-B8 uses as intended.
Two of the E1B sites (Old Turnpike
– The Retreat and South of
Warsash Road) have been
developed solely for residential.
Category 'B' Areas. Within Category 'B' employment areas, listed
in Appendix 7 and shown on the Proposals Map, the
intensification of existing uses will not be permitted if it would
result in the over-intensive use of the site. Where appropriate, any
permission may be conditioned or a legal agreement sought to
For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa
The Fareham Borough
Employment Land Review
considers the extent to
which existing
employment sites should
be protected and for what
uses.
This policy including the
issue of uses that do not
fall within use classes B1B8, but often seek to
locate within employment
areas, e.g. crèches,
childcare facilities, vehicle
hire operators and health
& fitness centres is being
considered in the Site
Allocations and
Development
Management DPD in the
light of revised PPS4.
a78
Fareham LDF
Annual Monitoring Report
Policy
prevent the future intensification of development on the site.
Within Category ‘B’ employment areas, the expansion of existing
premises within their curtilages or the redevelopment of existing
premises will be permitted for either Class B1 (Business) uses or
for mixed-use development, including Class B1 (Business) uses,
provided that the development would not adversely affect
residential amenity, the character of the area or have
unacceptable environmental or traffic implications.
E2: Employment Allocations
Development for employment uses (Classes B1, B2 and B8) will
be permitted on the following sites: (A) Kites Croft; (B)
Segensworth South; (C) Area 1, Segensworth West; (D) Area 4a,
Segensworth West; (E) Little Park Farm Road, Park
Gate. Provided that: (i) the development includes, where
appropriate, a range of sizes and types of premises; (ii) that sites
or accommodation suitable for starter and small businesses
constitute at least 10% of the net developable area; (iii) only uses
within Classes B1 and B8 are located near boundaries with
residential areas; and (iv) it would not adversely affect the
character of the area or have unacceptable environmental,
amenity or traffic implications. Change of use or redevelopment
of the above sites, which would result in the loss of these areas
for employment uses, will not be permitted.
E3: Solent Business Park - Phase 2
Development of 11 hectares for business uses (Class B1) as part
of Phase 2 of the Solent Business Park will be permitted, provided
that: (A) at least 40% of the development area is parkland; (B) the
development is of a high standard of design; (C) it would not
adversely affect the character of the area or have unacceptable
environmental, amenity or traffic implications; and (D) the
applicants enter into a legal agreement to secure the long term
management of the parkland.
December 2011
Indicator
Type
Local
Indicator
&
Core
Output
Indicators
BD1, BD2
and BD3
Local
Indicator
Indicator
Achievement
Comments
Delivery of
allocated sites for
employment uses
(Classes B1, B2
and B8) in
accordance with
and not in
accordance with
the policy.
Development has taken place on
most of the Borough’s employment
allocations. The only notable
exception is Little Park Farm, which
suffers from serious accessibility
problems.
Little Park Farm is subject
to ongoing investigation
and discussion between
the Borough Council,
Hampshire County
Council and the site
owners.
Amount of
development
permitted in
accordance with
and not in
accordance with
the policy
No additional development for
business uses (Class B1) as part of
Phase 2 of the Solent Business
Park.
This policy will be
reviewed as part of the
Site Allocations and
Development
Management DPD.
This policy will be
reviewed as part of the
Site Allocations and
Development
Management DPD.
Permission has been granted for
business uses, subject the
satisfaction of a number of
conditions The permission has not
been implemented.
The site is being marketed although
For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa
a79
Fareham LDF
Annual Monitoring Report
Policy
E4: Fareham Railway Station Yard
In the event of the railhead aggregate depot closing or relocating
and no suitable alternative rail freight uses coming forward,
comprehensive development of the area to the east of Fareham
Railway Station for Class B1 (Business) uses or for mixed-use
development, including Class B1 ( Business) uses, will be
permitted, provided that: (A) the development is part of a
comprehensive scheme for the whole site, including the provision
of additional station car parking; (B) the scheme includes
improved access to the station roundabout; (C) the scheme
includes the landscaping of the eastern boundary with adjoining
residential areas; (D) the proposal does not prejudice the
implementation of the South Hampshire Rapid Transit Scheme;
and (E) it would not adversely affect the character of the area or
have unacceptable amenity or traffic implications.
E5: Open Storage Uses
The following sites will be safeguarded for open storage uses: (A)
land at Segensworth (approx. 1.2 hectares); and (B) land at
Clapgate, Wallington (approx. 0.5 hectare). Provided that: (i) no
buildings are located on the site other than ancillary offices or
workshops; (ii) the stacking heights of materials and the heights of
buildings do not adversely affect the character of the area; and (iii)
at Segensworth, screening is provided in the form of mounding
and planting belts.
December 2011
Indicator
Type
Local
Indicator
Local
Indicator
Indicator
Amount of
development
permitted in
accordance with
and not in
accordance with
the policy.
Sites to be
safeguarded for
open storage
uses
Achievement
the developer has also promoted
the site for potential residential
development.
No progress in 2010/11.
Aggregates depot still operating so
policy has not come into effect.
Development of the area to the east
of Fareham railway Station for
Class B1 uses or for mixed-use
development including Class B1
No development contrary to policy
in 2010/11.
The east side of Segensworth has
been developed as the ‘Start
Centre’, a B1 office block. The
western site of Segensworth is a
recycling centre.
Comments
The facility is included in
the Hampshire Minerals &
Waste Plan (Draft)
November 2011 Policy 16
Safeguarding Minerals
Infrastructure.
This policy will be
reviewed as part of the
Fareham Town Centre
AAP.
This policy will be
reviewed in the Site
Allocations and
Development
Management DPD.
Clapgate remains largely in open
storage use.
E11: Boatyards
Marine-related development will be permitted at the following
boatyards: (A) Eastlands Boatyard, Coal Park Lane, Swanwick;
(B) RK Marine, north of Bridge Road, Swanwick; (C) Swanwick
Local
Indicator
Amount of
development
permitted in
accordance with
Planning permission was granted
for the redevelopment of the
boatyard at Swanwick Marina
including residential development,
For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa
This policy will be
reviewed in Site
Allocations and
Development
a80
Fareham LDF
Annual Monitoring Report
December 2011
Indicator
Type
Policy
Marina, South Of Bridge Road, Swanwick; (D) Universal Shipyard,
Crableck Lane, Sarisbury Green; (E) Stone Pier Yard, Shore
Road, Warsash; (F) Wicor Marine, Cranleigh Road, Portchester;
and (G) Lower Quay, Fareham. Provided that: (i) it relates to boat
building, repair, maintenance, fitting out and other ancillary uses;
(ii) it does not extend beyond the defined cartilage of the boatyard
onto undeveloped land; (iii) it would not adversely affect the
character of the area or have unacceptable environmental,
amenity or traffic implications; and (iv) waterside sites are
safeguarded for boatyard uses.
Indicator
and not in
accordance with
the policy.
Achievement
allowed as an enabling element, a
material start has been made at this
site to prevent the lapse of the
permission.
Comments
Management DPD.
.
SHOPPING AND TOWN CENTRE STRATEGY
CS3 Vitality and Viability of Centres
Development proposals within the Borough's identified centres will
be encouraged to promote competition and consumer choice,
whilst maintaining and strengthening the individual character,
vitality and viability of the centre. Development will be permitted
provided it maintains the current hierarchy of the retail centres:



Core
Output
Indicators
BD4,
BD1, BD2
This policy is
measured under
CS6
See policy CS6
Part of
Core
Output
Indicator
BD4
Contribution
toward 20,000 sq
m of retail
floorspace in
Fareham town
centre.
Significant progress made toward
the delivery of the new supermarket
on the Foundry site.
Town Centre - Fareham
District Centres - Locks Heath, Portchester, North of
Fareham Strategic Development Area
Local Centres - Stubbington, Broadlaw Walk (Fareham),
Highlands Road (Fareham), Gull Coppice (Whiteley),
Titchfield, Warsash and Park Gate
Whilst each centre will be developed to promote its unique
identity, the overall retail hierarchy should be adhered to.
CS8 Fareham Town Centre Strategic Site
The sub regional role of Fareham town centre will be
strengthened through major proposals for retail, office, leisure and
culture facilities which will be directed to this location.
Development will be permitted where it is in accordance with the
Fareham Town Centre Area Action Plan and makes provision for:
For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa
a81
Fareham LDF
Annual Monitoring Report
Indicator
Type
Policy












December 2011
a new supermarket on the Foundry site, of 3,900 sq m net
sales floorspace;
additional comparison shopping floorspace;
around 350 dwellings;
approximately 10,000 sq m B1 office floorspace;
the replacement of healthcare facilities;
the replacement of community centre facilities;
other supporting town centre uses;
the creation of mixed use buildings and spaces within
specific development sites;
improved transport links through the development of a
public transport hub and priority measures for
pedestrians, cyclists and public transport;
a high quality public realm including green infrastructure
and measures to support biodiversity, where practicable;
parking facilities in accordance with adopted standards
and ensuring the efficient use of space, particularly
underground and multi-level arrangements;
the protection and enhancement of conservation areas
and historic buildings.
The Fareham Town Centre Area Action Plan will identify site
specific proposals, which will take into account areas at risk to
flooding. The Action Plan will define the town centre
S7: Non-Retail Uses in District and Local Centres and
Parades
In the District and Local Centres and Parades, with the exception
of Middle Road, Park Gate, changes of use of the ground floor
from Class A1 retail to non-retail will be permitted, provided that:
(A) the use would not extend or consolidate existing non-retail
uses so that they would dominate the character of the area and
shoppers would be discouraged from using the centre or parade;
(B) the non-retail use provides a service appropriate to a shopping
centre, such as financial and professional services, a launderette,
café or restaurant; and (C) a shop window display will be
Part of
Core
Output
Indicator
BD1
Part of
Core
Output
Indicator
Local
Indicator
Indicator
Achievement
Contribution
toward 10,000 sq
m of employment
floorspace in
Fareham town
centre
Contribution
toward 350
dwellings in
Fareham town
centre
Nil retail floorspace " in Fareham
town centre
Amount of
development
permitted in
accordance with
and not in
accordance with
the policy.
This policy generally continues to
serve its intended purpose,
although the growing extent of A5
class hot take away uses in one or
two parades is a trend that needs to
be carefully monitored.
Comments
29 dwellings completed in the Town
Centre area.
For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa
This policy will be
reviewed in Site
Allocations and
Development
Management DPD. With
guidance from PPS4.
Issues regarding non
Class A1 and active
frontages also as with
policy S3 need
a82
Fareham LDF
Annual Monitoring Report
Policy
maintained. In Middle Road, Park Gate the change of use of any
shop to a non-retail use at ground floor level will not be permitted
S8: Retention of Local Shops
Outside centres and parades, the change of use of local shops
from retail to non-retail use will not be permitted unless: (A) there
is an alternative local shop which can conveniently serve the area;
or (B) the unit is vacant and there have been reasonable attempts
to let it for retail use.
S9: New Local Shops
The provision of local shops within the urban area and in areas of
new development to meet the day-to-day shopping needs of the
immediate locality will be permitted provided that such
development is of a scale and character appropriate to its
surroundings and local function. A site of 0.5 hectares (1.25
acres) is safeguarded for a new local shopping centre adjoining
the Whiteley Primary School south-west of Gull Coppice,
Whiteley.
S12: Hot Food Shops
Proposals for shops for the sale of hot food (Class A3) will be
permitted provided that either by themselves or cumulatively they
would not: (A) damage the vitality and viability of the centre or
area contrary to Policies S3 and S7; (B) adversely affect the
character of the area, particularly within conservation areas; and
(C) have unacceptable environmental, amenity or traffic
implications, particularly in residential areas. Where proposals
involve the cooking of food, the applicants will be required to
provide details of odour neutraliser equipment, such details to
include the design, location, size and position of the outlet,
materials to be used for trunking and pipework and the method of
installation.
December 2011
Indicator
Type
Indicator
Achievement
Comments
consideration.
Local
Indicator
Amount of
development
permitted in
accordance with
and not in
accordance with
the policy.
This policy continues to serve its
intended purpose.
This policy will be
reviewed in Site
Allocations and
Development
Management DPD. With
guidance from PPS4.
Local
Indicator
Amount of
development
permitted in
accordance with
and not in
accordance with
the policy.
This policy continues to serve its
intended purpose. The new local
shopping centre has been
developed in Whiteley.
This policy will be
reviewed in Site
Allocations and
Development
Management DPD.
Local
Indicator
Amount of
development
permitted in
accordance with
and not in
accordance with
the policy.
This policy continues to serve its
intended purpose.
This policy will be
reviewed in Site
Allocations and
Development
Management DPD in the
light of government
guidance on healthy
living.
TRANSPORT
For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa
a83
Fareham LDF
Annual Monitoring Report
Policy
CS5 Transport Strategy and Infrastructure
The Council will, where necessary, work with the Local Highways
Authority, Highways Agency and transport operators to promote,
permit, develop and/or safeguard a high quality and sustainable
integrated transport system for the Borough. This will include the
following measures:
1.
Land will be identified and safeguarded in Local Development
Documents where necessary for the following:
 Bus Rapid Transit - Gosport to Fareham to SDA to
Portsmouth and towards Southampton Premium Bus
Network Corridors;
 Access to the Strategic Development Area north of
Fareham, including land at Junction 10 and 11 of the M27
motorway and from Junction 11 to the A32(subject to the
outcome of the sub regional transport modelling);
 Fareham railway station public transport interchange;
 Key junctions and links on the strategic and local road
network;
 Pedestrian and cycle corridors and access points
including access to the natural environment through
Countryside Access Plans and Rights of Way
Improvement Plans, to improve people’s health and
wellbeing;
 Wharves and depots associated with the extraction and
delivery of aggregates and minerals by non road based
transport;
 Works identified at Newgate Lane, Fareham;
 Potential for a rail station for the SDA.
December 2011
Indicator
Type
Indicator
Achievement
Comments
Local
Indicator
Implementation of
phase 1 of the
Bus Rapid Transit
system
Significant progress has been
made toward the completion of
phase 1 of the Bus Rapid Transit
system.
Local
Indicator
Identify road
access route
linking the SDA
and M27
No progress made
This will be considered in
detail through the SDA
AAP.
Local
Indicator
Progress made
toward the
development of
Fareham railway
station public
transport
interchange.
Progress toward
works identified at
Newgate Lane,
Fareham.
No progress made
This will be considered in
detail through the
Fareham Town Centre
AAP.
A section of Newgate Lane has
been altered to facilitate the BRT
route. No additional improvements
have been made.
This will be considered in
detail through the Site
Allocations and
Development
Management DPD.
Local
Indicator
1. Development will not be permitted where this is prejudicial
to the implementation of these schemes and associated
land.
2. Development proposals which generate significant
For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa
a84
Fareham LDF
Annual Monitoring Report
December 2011
Indicator
Type
Policy
Indicator
Achievement
Comments
Local
Indicator
Safeguard from
development line
proposed for
South Hampshire
Rapid Transit
System (SHRT).
SHRT is no longer being
implemented. A replacement
strategy which seeks to safeguard
land for Bus Rapid Transport (BRT)
is being progressed. BRT Phase 1
is under construction.
Local
Indicator
Safeguard land
for the following
proposals which
will improve and
maintain the
effectiveness of
This policy will be
reviewed in principle as
part of the Site Allocations
and Development
Management DPD. It will
be implemented in line
with the policy context
provided in the Fareham
Town Centre AAP, DPD
and Site Allocations and
Development
Management DPD and
the SDA AAP
Outstanding elements to
be reviewed in the Site
Allocations and
Development
Management DPD.
demand for travel and/or are of a high density, will be
located in accessible* areas that are or will be well served
by good quality public transport, walking and cycling
facilities.
3. The Council will permit development which:
 contributes towards and/or provides necessary and
appropriate transport infrastructure including reduce and
manage measures** and traffic management measures in
a timely way;
 does not adversely affect the safety and operation of the
strategic and local road network, public transport
operations or pedestrian and cycle routes;
 is designed and implemented to prioritise and encourage
safe and reliable journey's by walking, cycling and public
transport.
T3: South Hampshire Rapid Transit
The line of the proposed South Hampshire Rapid Transit system
will be safeguarded from development which would prejudice its
use for this purpose.
T7: Improvements to the Strategic Road Network
Land is safeguarded for the following proposals which will improve
and maintain the effectiveness of the Strategic Road Network: (A)
B3385 Newgate Lane, Fort Fareham - Peel Common; (B) Gosport
- Fareham Link Road; and (C) A27/A32 Quay Street Roundabout,
Fareham. Development will not be permitted where it would be
For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa
a85
Fareham LDF
Annual Monitoring Report
Policy
December 2011
Indicator
Type
likely to prejudice future proposals at the following junctions: (i)
Segensworth Roundabout; and (ii) A27 west to east flyover, Quay
Street, Fareham.
T8: Improvements to the Distributor Road Network
Land will be safeguarded for the following improvements to serve
development: (A) The remaining stages of the Western Local
Distributor Road, Warsash; (B) The remaining sections of the Park
Gate Short Bypass; (C) The remaining sections of the Local
Distributor Roads linking the Whiteley Area Distributor Road to
Botley Road; and (D) A new access road to the Knowle Hospital
Site.
Indicator
Achievement
Comments
the Strategic
Road Network:
Local
Indicator
A) Progress
scheme at
Newgate
Lane
Not implemented
B) Progress
Gosport
Fareham Link
road
Not implemented
C) Progress
scheme at
Quay Street
roundabout
Improvements to
the distributor
road network at:
Alterations to Quay Street
roundabout are being implemented
as part of the Tesco development
on the Foundry Site.
A. Western local
distributor
road
Complete
Minor section linking
Dibles Road with
Lockswood Road subject
to land purchase
B. Park Gate
Park Gate bypass abandoned.
The Executive confirmed
the abandonment of the
western and eastern
sections of the bypass in
May and October 2007
respectively following
decisions by the Highway
Authority, Hampshire
Outstanding elements to
be reviewed in the Site
Allocations and
Development
Management DPD.
For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa
a86
Fareham LDF
Annual Monitoring Report
Policy
December 2011
Indicator
Type
Indicator
Achievement
Comments
County Council.
T9: Access to Whiteley
(A) Road connections from Whiteley to Botley Road for general
traffic will not be permitted until Whiteley Way is complete
between Junction 9 on the M27 and the A3051 north of Curbridge;
(B) Bus only access from Botley Road to Yew Tree Drive and/or
Rookery Avenue will be permitted provided that it can be
demonstrated to be safe and that satisfactory arrangements can
be made to exclude other vehicular traffic.
Local
Indicator
C. Botley road
link from
Whiteley Way
No progress made.
D. A new access
road to the
Knowle
Hospital
Progress toward
the delivery of the
following
infrastructure:
Completed
A. Whiteley Way
Completion is subject to potential
development of 3,000 houses to the
north of Whiteley within Winchester
District
B. Bus link
Completed
Implementation stalled by
land acquisition difficulties
and related costs. Recent
Housing permission at
Shetland Rise has
allowed for a financial
contribution and part of
the remaining land
towards completion.
Outstanding elements to
be reviewed in the Site
Allocations and
Development
Management DPD.
For further information on this Document please contact planningpolicy@fareham.gov.uk aaaaaaaaaaaaaaaaa
See T8(C) above
The proposal for 3,000
dwellings North of
Whiteley is contained in
the Winchester Core
Strategy which has
reached preferred options
stage, but is subject to
submission and public
examination.
a87
Fareham LDF
Annual Monitoring Report
December 2011
APPENDIX 2
List of Local Plan Policies Replaced by the Core Strategy
Local Plan Policy
C1
C2
C3
Development in the
Countryside
Conversion of Existing
Buildings in the Countryside
New Buildings in the
Countryside
C4
Farm-Based Diversification
C5
Coastal Zone
River Hamble and Fareham
Lake
Areas of Special Landscape
Character
Protection of the Setting of
Settlements
Strategic Gaps
Statutory National and Local
Nature Conservation
Designations
Sites of Importance for Nature
Conservation
C6
C9
C10
C11
C14
C16
Replacement Policy
CS14
Development Outside Settlements
CS14
Development Outside Settlements
CS14
Development Outside Settlements
CS14
Development Outside Settlements
Sustainable Development in Rural
Areas
Development Outside Settlements
CS14
Development Outside Settlements
CS6
CS14
CS6
CS14
CS22
The Development Strategy
Development Outside Settlements
The Development Strategy
Development Outside Settlements
Development in Strategic Gaps
CS4
Green Infrastructure, Biodiversity and
Geological Conservation
CS14
PPS7
CS4
DG1
Environmental Impact
CS15
CS16
DG2
Prejudice to Other
Development
CS15
CS17
DG3
Impact on the Surrounding
Area
CS15
DG5
Design
CS15
CS17
DG6
Landscape Design
CS17
DG9
Infrastructure Requirements
CS20
DG10
Coldeast Hospital
CS10
DG12
Daedalus Airfield
CS12
E6
E7
Employment Development in
the Urban Area
Business Development in
Fareham Town Centre
Green Infrastructure, Biodiversity and
Geological Conservation
Sustainable Development and Climate
Change
Renewable Energy
Sustainable Development and Climate
Change
High Quality Design
Sustainable Development and Climate
Change
Sustainable Development and Climate
Change
High Quality Design
High Quality Design
Infrastructure and Development
Contributions
Coldeast Hospital (Strategic
Development Allocation)
Daedalus Airfield (Strategic
Development Allocation)
CS6
The Development Strategy
CS8
Fareham Town Centre (Strategic
Development Location)
For further information on this Document please contact planningpolicy@fareham.gov.uk
a
88
Fareham LDF
Annual Monitoring Report
Local Plan Policy
December 2011
Replacement Policy
CS1
Employment Provision
Development Outside Settlements
E10
Employment in the
Countryside
CS14
FS1 (D)
Community Facility Allocations
CS10
FS6
Renewable Energy
CS16
H2
CS2
Residential Development in the
CS6
Urban Area
CS15
H3
Areas of Special Residential
Character
CS15
H7
Elderly Persons' Housing, Rest
Homes and Nursing Homes
CS2
CS15
Affordable Housing
Residential Development in the
Countryside
Conversion of Existing
Buildings in the Countryside to
Residential Use
Sites for Gypsies and
Travelling Showpeople
Archaeology
Listed Buildings
Conservations Areas Setting
Conservations Areas - New
Development
Protection of Existing Open
Space
CS18
Coldeast Hospital Strategic
Development Allocation
Renewable Energy
Housing Provision
The Development Strategy
Sustainable Development and Climate
Change
Sustainable Development and Climate
Change
Housing Provision
Sustainable Development and Climate
Change
Provision of Affordable Housing
CS14
Development Outside Settlements
CS14
Development Outside Settlements
Public Open Space Allocations
H10
H11
H12
H15
HE1
HE2
HE3
HE4
R3
R4
(D)
R5
R6
S2
S3
S5
S6
Open Space in New
Residential Development
Recreation, Leisure and
Tourism in the Countryside
Shopping in the Retail Core,
Fareham Town Centre
Non Retail Uses in the Retail
Core, Fareham Town Centre
Quay Street, Fareham
Shopping Development in
District and Local Centres
CS6
CS6
CS6
Gypsies, Travellers & Travelling
Showpeople Population
The Development Strategy
The Development Strategy
The Development Strategy
CS6
The Development Strategy
CS21
Protection and Provision of Open Space
CS10
Coldeast Hospital (Strategic
Development Allocation)
CS21
Protection and Provision of Open Space
CS14
Development Outside Settlements
CS19
CS8
CS8
CS8
CS3
CS9
CS11
S10
Out-of-Centre Shopping
CS3
Fareham Town Centre (Strategic
Development Location)
Fareham Town Centre (Strategic
Development Location)
Fareham Town Centre (Strategic
Development Location)
The Vitality and Viability of Centres
Development in the Western Wards and
Whiteley
Development In Portchester,
Stubbington and Whiteley
The Vitality and Viability of Centres
For further information on this Document please contact planningpolicy@fareham.gov.uk
a
89
Fareham LDF
Annual Monitoring Report
Local Plan Policy
S11
S13
December 2011
Replacement Policy
Retail Warehouses
Garden Centres
CS3
CS14
The Vitality and Viability of Centres
Development Outside Settlements
Transport Strategy and Infrastructure
The Development Strategy
Sustainable Development and Climate
Change
High Quality Design
Sustainable Development and Climate
Change
High Quality Design
T1
Location of New Development
CS5
CS6
CS15
CS17
T2
Public Transport
CS15
CS17
T4
Walking, Cycling and Mobility
Impairment
CS5
Transport Strategy and Infrastructure
T5
Transport Development
CS15
CS17
Sustainable Development and Climate
Change
High Quality Design
T6
New or Improved Highway
Access
CS5
Transport Strategy and Infrastructure
For further information on this Document please contact planningpolicy@fareham.gov.uk
a
90
Fareham LDF
Annual Monitoring Report
December 2011
APPENDIX 3
List of Local Plan Policies not saved in 2007 by Government direction
C13
Statutory International Nature Conservation Designations
FS3
Educational Establishments and Institutions in the Countryside
FS5
Garden of Rest, Portchester
R1
Recreation, Leisure and Tourism in the Urban Area
E8
Business Development in District and Local Centres
S1
Fareham Town Centre Strategy
S4
Market Quay, Fareham
T10
Rear Service Roads, Fareham Town Centre
T11
Public Car Park Allocation, Market Quay, Fareham
For further information on this Document please contact planningpolicy@fareham.gov.uk
a
91
Fareham LDF
Annual Monitoring Report
December 2011
APPENDIX 4
Schedule of sites comprising the five year housing land supply
SHLAA
Ref
Site Name
0016
0030
0041
0058
0193
1014
1015
1028
1056
1058
1066
1069
1071
1072
Whiteley Area 11 (part)
148 Botley Road
Peters Road
East of Raley Road
Foundry Site (Housing Element)
Land North of Whiteley
Swinton Hall
14-22 Dibles Road
The Hampshire Rose
Former Community Facilities
34-36 Portchester Road
239 - 241 Hunts Pond Road
St Christopher's Hospital
Land at Hunts Pond Road
Shetland Rise
Whiteley Area 11 (part)
Locks Heath
Area 4 Housing Allocation
Quay Street
Whiteley Lane
Warsash Road
1074
Bell Davies Road
Land between 335-357 Gosport
Road
East of Northway, Southway and
Westway
70 Trinity Street
40-42 Westley Grove
6 -8 Ranvilles Lane
Coldeast Hospital
Air Training Corps (ATC) Site
Newpark Garage
Swanwick Marina, Bridge Road
35 - 37 Shore Road
Former Keileen Nursery
Broadlaw Walk
Stubbington
1076
1077
1089
1095
1096
1121
1124
1144
1203
1209
1211
1212
2011/12
Net Gain
2012/13
Net Gain
2013/14
Net Gain
2014/15
Net Gain
2015/16
Net Gain
27
0
0
0
0
10
0
3
0
0
0
25
0
102
0
15
0
10
0
30
0
4
0
0
3
17
0
63
15
0
30
0
0
33
5
0
5
0
7
0
25
0
0
0
60
0
20
30
0
0
0
0
0
0
15
0
0
0
100
0
35
10
0
0
0
0
0
0
0
17
24
0
0
0
0
Fareham
0
0
0
0
7
Western Wards
Fareham
Fareham
Fareham
Western Wards
Western Wards
Western Wards
Western Wards
Western Wards
Western Wards
Fareham
0
0
0
0
20
0
0
0
0
3
0
0
23
13
0
30
20
14
0
0
0
14
14
0
0
0
30
14
0
20
8
0
0
0
0
0
0
40
0
0
29
0
0
0
0
0
0
0
40
0
0
0
0
0
0
Site Address
96 Highlands Road
Wynton Way
Fareham
Course Park Farm
Wickham Road
Fareham
Fareham
Bridge Road
Farm Road
Station Road
Lower Swanwick
Brook Avenue
Settlement Area
Whiteley
Whiteley
Western Wards
Western Wards
Fareham
Whiteley
Western Wards
Western Wards
Fareham
Fareham
Portchester
Western Wards
Fareham
Western Wards
Stubbington & Hill
Head
For further information on this Document please contact planningpolicy@fareham.gov.uk
a
92
Fareham LDF
SHLAA
Ref
Annual Monitoring Report
Site Name
1232
1249
Polygraphic House
East of Lower Duncan Road
1257
Coldeast Strategic Allocation
1258
1259
1288
1294
Coldeast Strategic Allocation
Hope Lodge
324-326 Brook Lane
45-47 West Street
1295
1297
Blackbrook Road
Coach and Horses Public House
1299
45 Vicarage Lane
1300
1301
9-11 Burnt House Lane
207 West Street
Land adjacent to Swanwick Lodge,
Glen Rd
69 Botley Road
161 - 155 White Hart Lane
Admiral Cunningham Public House
Collingwood House
Land at Monterey Drive
1303
1305
1308
1315
1316
1319
December 2011
2011/12
Net Gain
2012/13
Net Gain
2013/14
Net Gain
2014/15
Net Gain
2015/16
Net Gain
Titchfield
Western Wards
0
0
0
0
5
9
0
9
0
0
Western Wards
0
0
50
35
0
Western Wards
Fareham
Western Wards
Fareham
0
0
8
0
0
0
4
9
0
0
0
0
35
0
0
0
50
7
0
0
Fareham
Titchfield
Stubbington & Hill
Head
Stubbington & Hill
Head
Fareham
2
8
4
0
0
0
0
0
0
0
0
0
0
4
0
8
0
0
8
0
0
0
0
0
0
3
0
0
0
0
0
243
3
0
0
7
5
10
306
0
5
6
0
0
0
281
0
0
0
0
0
0
277
0
0
0
0
0
0
266
Site Address
8-10 Southampton Hill
16 Botley Road
South West of Coldeast
Way
North East of Coldeast
Way
Fareham Park Road
Sarisbury Green
Blackbrook Industrial
Estate
South Street
Stubbington
Settlement Area
Swanwick
Western Wards
Western Wards
Portchester
Longfield Avenue
Fareham
Gibralter Close
Fareham
Warsash
Western Wards
ANNUAL AGGREGATE TOTAL =
For further information on this Document please contact planningpolicy@fareham.gov.uk
a
93
Fareham LDF
Annual Monitoring Report
December 2011
APPENDIX 5
List of Sources

Census 2001
http://www.ons.gov.uk/ons/guide-method/census/census-2001/index.html

Fareham Borough Council's Corporate Strategy (2011)
http://www.fareham.gov.uk/pdf/cxoffice/corporatevision2011_17.pdf

Fareham Borough Core Strategy (August 2011)
http://www.fareham.gov.uk/pdf/cxoffice/corporatevision2011_17.pdf

Fareham Borough Local Plan Review (2000)
http://www.fareham.gov.uk/pdf/planning/corestrategy/localplan.pdf

Retail Health Checks
http://www.fareham.gov.uk/pdf/planning/corestrategy/rtailhthaut10.pdf

Strategic Housing Land Availability Assessment (November 2011)
http://www.fareham.gov.uk/pdf/planning/corestrategy/shlaavol2.pdf

Local Development Scheme (May 2011)
http://www.fareham.gov.uk/pdf/planning/ldf/ldsmay2011.pdf

Hampshire County Council 2010 Small Area Population Forecast
http://www3.hants.gov.uk/factsandfigures/population-statistics/popestimates/small-area-pop-stats.htm

PUSH Economic Development Strategy (October 2010)
http://www.push.gov.uk/pos-101109-r02-bto-amm-appendix_b.pdf

Fareham Borough Employment Land Review (2010)
http://www.fareham.gov.uk/council/departments/planning/ldf/landreview.aspx

Hampshire County Council Housing Monitoring 2010/11
http://www3.hants.gov.uk/planning/factsandfigures

Hampshire County Council Employment / Retail Monitoring returns 2010/11
http://www3.hants.gov.uk/planning/factsandfigures

Annual Monitoring Report (December 2010)
http://www.fareham.gov.uk/pdf/planning/amr2010.pdf

Land Registry
http://www.landreg.gov.uk/house-prices

PUSH South Hampshire Sub-Regional Strategy - Final Advice to SEERA
2005
http://www.push.gov.uk/partnership/background/content-advice-to-seera.htm
For further information on this Document please contact planningpolicy@fareham.gov.uk
a
94
Download