UNIVERSITY OF LEEDS Facilities Directorate Health and Safety Committee Minutes of the meeting held on 14th March 2013 Present: Steve Gilley (Chair in place of Dennis Hopper), Granville Cheetham, Nick Creighton, Lee Dewhurst, Mike Howroyd, Neil Lowley, Josie Ormston, Ian Robertson, Stewart Ross and Harry Sumner Apologies: Dennis Hopper, Stuart Eyles, Andy Lindley and Neil Maughan In Attendance: Alistair Cunliffe Minutes of the previous meeting 12/40 RECEIVED: the minutes of the meeting held on 15th November 2012 (AGENDUM1) Matters arising from the minutes and actions 12/41 GC was informed by FDHR that for any members of staff off sick for more than 7 days, then a procedure was already in place. SG queried whether staff who were off sick for an extended period could be allowed back to work to resume duties within their capabilities. JO confirmed that the issue had to be managed on a case by case basis with managers encouraged to alert the FD management who could advise on the correct course of action. Processes were available as per Occupational Health therefore managers needed to be made aware that they could ask for help. 12/42 GC confirmed that a consolidated report on HASMAP Audits had not been completed. The various levels of HASMAP would be difficult to audit via a desktop exercise. SG noted that the scorecard distributed did provide useful information however it would be useful for the information to be taken to the next level, i.e. security, cleaning. LD confirmed that vertical audits could be used as a summary and this could be looked at with each area below the Heads of Service to be included. 12/43 LD noted a few minor items within the minutes which would need to be amended. 12/28 would be changed as the HSE paper was due to go to University H&S Committee in February not this meeting, although LD had subsequently tabled the paper today anyway. 12/44 Accident statistics report RECEIVED: the FD accident statistics Report (FDHS/12/08) 12/45 41 incidents were reported during this quarter which was an increase on the 40 reported in the previous quarter. 10 of these were ‘near miss’ incidents. 6 of the ‘near miss’ incidents related to sharps in the Dental school. Significantly 4 reported verbal abuse incidents to staff working at Weetwood Sports Grounds had been reported. 12/46 17 incidents resulted in superficial or no injury to the person involved. There had been 4 vehicle related incidents. These included a brake failure after servicing which could have been very serious. In response to this issue a Service Level Agreement had been drawn up with new standards now set. Also a member of agency staff reversed a vehicle into waste bins whilst not holding a valid licence. SR noted that this highlighted the need for all agency staff to be inducted. 12/47 There had been a dramatic fall in days lost due to incident absence. Only 4 days had been lost over the recent quarter as a result of 2 incidents. This was compared to 66 days absence in the previous quarter. There were no RIDDOR reportable incidents for this quarter following 3 reported in the last quarter 12/48 The greatest number of incidents reported in the period was from Cleaning Services who reported 20 incidents, which was 48% of the FD total. The ‘sharps’ reported in the Dental school had been reported to the relevant Dental committee’s, however this process needed to be cyclical as new students start. 12/49 In regards the trend of verbal abuse towards staff at Weetwood, training had been arranged with the outcomes to be closely monitored. The abuse appeared to mainly be from drunken students with the bar staff being abused. SR confirmed that he would look at the current policy with Rob Wadsworth on users abusing staff and review any possible action that could be undertaken. Door staff were not currently employed however for major events this could be investigated. 12/50 12/51 Fire wardens inspections report RECEIVED: a report on fire inspections (FDHS/12/09) LEODIS had now been removed from the Residences inspections with Bodington Hall to be removed. No major issue were identified within the report. 12/52 Safety co-ordinators inspections report RECEIVED: the Safety Coordinators Inspections Report (FDHS/12/10) 12/53 The Safety Inspections Report was reviewed with no issues identified. 12/54 Enforcing bodies interactions HSE appeared to be randomly identifying staff within the organisation to speak with. It was believed that appropriate systems were in place to respond to any queries. 12/56 12/57 Update from trade union representatives NL queried at what stage Wellbeing and Health were invited to comment on new build or major refurbishment projects, for example in regards staff facilities/loading bays for the new Library. It was confirmed that the Fire Safety team were brought in at Stage B normally with H&S managers involved to support the SMT. SG confirmed that all major schemes were discussed at Facilities Liaison Groups which reminded Faculty’s of the need to involve Unions with projects and to discuss any problems. SG confirmed that the Library project was discussed with the Library Team with liaison via Michael Emley and Stella Butler who would take on board any staff concerns. LD noted that often the involvement was dependant upon how proactive the SMT’s and H&S Managers were on each project. The Design Team on project were also required to work within the national H&S guidelines and standards. Contractor Management Report RECEIVED: a report on contractor management (FDHS/12/11) 12/58 Of the 720 interactions during the reporting period, over 97% were undertaken by a Technical Officer who was tasked to manage the works and best placed to observe any poor work practices. This rate had been improved from 90% for the previous reporting period. A session with Eversheds had been arranged for Technical Officers in regards Managing Contractors. 12/59 A lack of operatives attending an induction continued to be a particular problem; however this was a significant decrease in the numbers previously reported after a concerted effort to encourage operatives to attend the FD induction. 12/60 An improvement notice had been issued to MTR roofing contractors on the 25th January 2013 following a report of an operative working on a roof outside of the protection of edge protection. 12/61 The electronic permit to work system was being piloted with feedback awaited before the system was rolled out across campus. This system was based on the University protocol and aided communication and prevented contractors clashing in areas on site. 12/62 12/63 Feedback from FD Health and Safety Management Groups SR noted that there had been further regular appraisals of the inspection results with issues around gas/equipment checks now resolved. SR was now also engaging with the Services previously covered by MA-B to make them aware of the ability to engage in H&S issues. GC noted that scenario setting and a pro active culture which would test whether the appropriate systems were in place was progressing which fitted alongside the emergency response processes. Health and Safety Services Update 12/64 RECEIVED: Health and Safety Fees for Intervention Scheme (FDHS/12/12) 12/65 LD noted that the new Fees for Intervention Scheme was one of the biggest changes to the system in a generation. The style of intervention would now be reactive enforcement with employees that contravene the H&S law being forced to pay the HSE’s enforcement costs at a rate of £124 per hour until the breach had been rectified. The new system had been developed due to the removal of funding from central government. 12/66 Many of the inspectors had noted that they were unhappy with the new system and that they preferred the partnership arrangement which would be lost. GC noted that they would now lack the ability to advise clients. 12/67 It was hoped that the University impact would be minimal however it was only right that testing systems for a response were reviewed. It also needed to be understood where the costs would fall for any breach, i.e. Academically, Research, FD or split between departments. Confirmation was also sought as to what would happen for example, if an inspector only discovered an issue in the last 5mins of a 5hr visit and what costs would be owed. LD noted that the University’s H&S Policy had been taken to Council not the H&S Committee. The Management of Water Hygiene (Legionella) paper had been taken to the Health and Safety Committee in February with an update due in April. 12/68 12/69 12/70 12/71 The Car Park enforcement paper had now been developed onto a second draft. The paper was designed to regulate parking behaviour on campus. Any Other Business RECEIVED: USHA Fire Statistics 2011/2012 (FDHS/12/13) HS noted that the USHA would be included as part of the Estates Management Statistics as from next year. The paper reviewed the national statistics gathered from the 2011/12 period and compared them against the University of Leeds. The stats needed to be treated carefully as there were lots of variances to be considered. In regards Academic Buildings the UoL rate for Near miss / 100 detectors appeared to be high however it was believed that this was due to the greater proportion of detectors and the fact that UoL reported all alarms that Security attend. 12/72 HS believed that the stats indicated that the University was monitoring well in comparison to some other sites. The University was also below the mean in regards major fires/injuries. HS also noted that the University also probably had more detectors than legally required as a life saving aspect. Minute 12/49 ACTION SR would review current policy with Rob Wadsworth in regards staff being verbally abused at Weetwood. OWNER SR