Green Village Electricity Project Nigeria: Operational Report An Initiative of GVE Projects Limited RC1071222 Ifeanyi B. Orajaka & Chuka P. Eze info@gve-group.com www.gve-group.com IEEE Smart Village Workshop, GHTC 2015, Seattle. 8th October 2015. The Business Summary 2 Executed Pilot Projects Pilot (I) Pilot (II) Capacity: 6kWp Capacity: 9kWp Cost: USD 75,000.00 Cost: USD60,000.00 Location: Egbeke – Etche, Rivers State, Nigeria Location: Egbeke – Etche, Rivers State, Nigeria Year of Completion: September 2013 Year of Completion: March, 2015 Impact(s): 480people, 20 jobs, 91.3MT of CO2, Impact(s):720people, 36 jobs, 136MT of CO2, 45% ($12) reduction in HH energy expenditure 45% ($12) reduction in HH energy expenditure Pilot (III) Pilot (IV) Capacity: 9kWp Capacity: 34kWp Cost: USD 60,000.00 Cost: USD 220,000.00 Location: Egbeke – Etche, Rivers State, Nigeria Location: Bisanti – Katcha, Niger State, Nigeria Year of Completion: March, 2015 Year of Completion: September, 2015 Impact(s):720people, 36 jobs, 136MT of CO2, Impact(s):1,600people, 90 jobs, 517MT of CO2, 45% ($12) reduction in HH energy expenditure 45% ($12) reduction in HH energy expenditure 3 Revenue Model GVE Base Infrastructure Modular Site of 34kWp Each Site Setup Cost (Equipment Only): $165,782.25 Service Offering per Site AIPU: Mini-grid $690.76 (240 Clients) Revenue Streams Ave. Monthly ARPU: $11.25 One-time Connection Fee: $20.00 P.A.Y.G Utility Fee: 0.45/kWh (off-peak) $0.75/kWh (peak) Legend: AIPU: Average Investment Per User ARPU: Average Revenue Per User 4 Project Heritage • US$1.4million raised and committed to six pilot projects till date • Rated by USAID and GIZ as the ideal model for advancing energy access in Nigeria • Listed among Sankalp Forum’s top-60 promising Sub Saharan Africa SMEs 2015 • Model is Scalable to Meet Specific Community Needs • Model has Directly Measurable Environ-Socio-Economic Impact Awards: •Finalist; West African Forum for Clean Energy Financing Business Plan Competition, Sept. 2015 •Finalist; City Mart/ City of Lagos Off-Grid Power Solution Challenge, June 2014. •Winner; GE Africa/ USADF, Power Africa Off-Grid Energy Access Challenge, Nov. 2013. •Winner; UNDP/ Bank of Industry –Nigeria, Access to Renewable Project Nigeria, Dec. 2012. •Winner; IEEE Presidents’ Change the World Project Challenge 2009. •The Project has been awarded 5 years pioneer status incentive 5 Pilot Projects in Photos 6 Pre-Implementation Scenario Night view of the community’s major pathway before the project Project Impacts • 460 Mini-grid Households (3,240 people) • 110 Street lighting points along the main street of the four beneficiary Communities. • Enhanced security at night • Extended business operating hours • 41 PBK Clients now has clean Electricity/ Cell Phone Charging. • Children gather around the street lighting points to study/ play at night. • 182 Jobs Created during and after implementation • $29,000 Created in Wealth in the four pilot communities during implementation. • Knowledge transfer to locals • 40% reduction in Energy related expenditure • Cumulative annual reduction of CO2 emission by 880.32 MTs Project Impacts Cont’d Night view of the community’s major pathway now. Management Team (All under 30) Ifeanyi Orajaka MD/CEO Chinedu Azodoh C.F.O. • B.Eng. Elect/Elect. Engineering, FUTO Nigeria • Certified Project Manager • Experience with ExxonMobil, Shell and NIIT • GIS Rural Electrification Planning Expert (7-Years) • Member Global Shapers • Management Trainings • Master of Finance, MIT Sloan, Boston • B. Eng Illinois Institute of Technology, • Experience with Barclays Capital, Goldman Sachs, MediaBridge Capital Advisers LLC. and BGL Capital Nigeria • President of NSBE, IIT Chuka Eze C.T.O. Wale Bakare • Executive Masters Project Management; CUPE, UK. • B.Eng. Elect/Elect. Engineering, FUTO Nigeria • Experience with Shell, Interswitch, Nigerian Breweries and Airtel Nigeria • GIS Rural Electrification Planning Expert (7-Years) • LL.B, & Chartered Arbitrator • Lagos Business School Alumnus • Trade Sales Manager; Nigerite Ltd. (Annual sales portfolio of $30.8m) • Channel Marketing Exec.; Vlisco Netherland BV (Annual sales portfolio of $6.15m) E.D. Marketing • Pioneer Company Secretary 11 Our Corporate Team Ifeanyi Orajaka Chuka Eze Chinedu Azodoh MD/CEO C.T.O. C.F.O. (MIT- Sloan) Ikechukwu Onyekwelu E.D. Corp. Strategy Wale Bakare E.D. Marketing Prof. Gloria Chukwudebe Kalada Apiafi Godwin Orajaka Michael DeSa Board Chairman Non-Exec. Director Non-Exec. Director Advisory: Finance 12 Challenges – Complex Equipment Import documentation & Cost – Delays between order, shipping, clearance & final delivery – Lengthy & expensive customs clearances – initial FOB prices – Seasonality of final transport from POE to deployment site. – Data Capturing and recording – Absence of replacement parts for critical equipment – Proper use of equipment by customer – Operator education & adherence to business model. - Financial Constraint (Fund raising) for scaling the model Lessons Learnt • Demand still very huge and increasing • Locals demand more energy for productive use and refrigeration (Tier 2 Energy Service level 200 – 800 Wh/d). • More Co-ordinated Procurement and Equipment Logistics process • Need to have handy replacement for critical equipment • More customers are inclined to the prepaid metering & mini grid • Need for a more robust field support mechanism • Need for adequate funding for implementation , administration and operational overheads Current & Future Plans • Ongoing analyses of pilot project outcomes and cash flow • Implementation of Phases 2 & 3 of BOI Funded Project • Continued Field Testing of Standardized procurement procedure • Continued Field Testing of Standardized shipping and delivery procedure • Continued R&D in Power station design & implementation process • Continued Optimization of cost and revenue collection • Standardizing field support mechanism through effective collaboration with CSI & manufacturers • Reinforcing corporate relationship with stakeholders • Developing ties with relevant manufacturers • Sourcing of capital investment for expansion (grants, angel investments, single digit debt financing) • Introduction of Community Shared Ownership (CSO) model • Extension of mini-grid power delivery to rural SMEs • Implementation of Expansion Phase I (16 New sites). Thank you!!! Please do not hesitate to contact us for further inquiries and/or requests. info@gve-group.com www.gve-group.com Twitter: @GreenVillageEle 16