The Transportation Demand Forecasting Model of Taichung Rapid Transit System (TCModel 2011) Teresa Chang, Planner Sept. 5, 2012 Presentation Outline Background of the Study Area What Do We Want to Know? Why Do We Update? How Do We Update? Introduction of TCModel 2011 Taipei . Taichung . Kaohsiung . Shanghai . Hong Kong . Macau 2 Background— Study Area Taichung Taichung(29) Changhua(19) Changhua Nantou Nantou(2) •Study Area – Taichung Urban Countys: Taichung, Changhua, Nantou Towns: 50 Area: 3,062.3 KM2 Population: 3.95million people Taipei . Taichung . Kaohsiung . Shanghai . Hong Kong . Macau 3 $ Background -Railway Master Plan $ Operations $ Taiwan Rail(gray) Taiwan High Speed Rail $ $ $ (yellow) $ Taichung $ Construction $ TR-Red Line (the project completion year is 2015) MRT-Green Line (the project completion year is 2017) Planning $ $ $ $ $$ & $ $ $ MRT-Blue Line MRT-Orange Line Nantou Changhua $ Taipei . Taichung . Kaohsiung . Shanghai$ . Hong Kong . Macau 4 Background -Orange Line Taichung Airport OA4 $ OA3 $ OA2 Taichung MRT — Orange Line $ $OA1 O1 O2 $ $ O3 $ O4/G7 $ O5 $ $O6 From OA4 To O17 Length,km (elevated) 14.7 Length,km (underground) 14.8 O7 $ O8 $ O10 $ $ O9/B9 $O11 $O12 O13 Changhua $ $O14 O15 $ Total Length,km Stations (elevated, Stations (underground, 8 ) 13 Total number of stations 21 $O16 MRT System $O17 Depot Depot ) 29.5 Transfer Stations ( MCT 1 , ) 2 Nantou Taipei . Taichung . Kaohsiung . Shanghai . Hong Kong . Macau 5 What Do We Want to Know? 1 • Percent of Private Trips to Total 2 • Orange Line Boarding (passengers/day) and Revenue 3 • Traffic Impact of the Surrounding Area 4 • Travel Time Savings (reduced travel time and new trips) 5 • Vehicle Operating Cost Savings (fuel and non-fuel 6 • Accident Cost Savings (safety benefits) 7 • Emission Reductions (CO, NOx PM10) 8 • Evaluating the Effectiveness of Policies operating cost reductions) Taipei . Taichung . Kaohsiung . Shanghai . Hong Kong . Macau 6 Why Do We Update? Development of TC Model •Tranplan+ Transport •Base Year: 1988 •Future Year: 2020 •TAZs: 138(132+6)zones •Household Travel Survey: 1990 (Samples: 12,000) •Tranplan+ Transport •Base Year: 1994 •Future Year: 2021 •TAZs: 257 (253+4)zones •Household Travel Survey: 1995 •TransCAD •Base Year: 2001 •Future Year: 2031 •TAZs : 257(253+4)zones •Household Travel Survey: No •TransCAD •Base Year: 2007 •Future Year: 2031 •TAZs: 257(253+4)zones •Household Travel Survey: No (Samples: 1,700) The Household Travel Survey has been not conducted since 1995. TransCAD using dialog boxes to input which can’t take down all steps. Final model only has OD matries and the highway network. Taipei . Taichung . Kaohsiung . Shanghai . Hong Kong . Macau 7 How Do We Update ? Major updates Select a new modeling platform (CUBE) Update screen line survey and cordon line survey Update travel behavior survey Check and adjust trip generation rates Reconstruct the highway network and transit network Update and forecast the demographic data Check and update the Traffic Analysis Zones Better data and good tools can effectively improve model accuracy ! Taipei . Taichung . Kaohsiung . Shanghai . Hong Kong . Macau 8 How Do We Update ? – Model Methodology Outline Model Structure: Sequential 4-step model Module Approaches • Production: Cross-classification • Attraction: Multiple Regression •Gravity Model •Impedance Function: Gamma Function •Travel Behavior Survey: Stated Preference •Multinomial Logit Model(MNL) •HW: Multi-Modal Equilibrium Assignment Model •PT: Best-Path Taipei . Taichung . Kaohsiung . Shanghai . Hong Kong . Macau 9 Introduction of TCModel 2011 –Model Structure 4-step Travel Demand Modeling Procedure Taipei . Taichung . Kaohsiung . Shanghai . Hong Kong . Macau 10 Introduction of TCModel 2011 –Model Characteristics •Internal: 320 zones •External: 7 zones •Reserve: 16 zones •Total number of zones: 343 zones •Total number of links: 42,681 links •Transit Lines: 335 lines •Car •Motor •Bus •Taiwan Rail •MRT •Weekday •24hrs • Peak hour Taipei . Taichung . Kaohsiung . Shanghai . Hong Kong . Macau 11 Introduction of TCModel 2011 –Scenario Management Interface This provides a convenient interface for defining scenarios, editing and running the scenarios. Planning Year: 2021(Y110), 2031(Y120) , 2041(Y130) Scenarios: Land Use Policies: Without TOD , With TOD Traffic Policies: Bus headway, Oil prices, Parking fare Taipei . Taichung . Kaohsiung . Shanghai . Hong Kong . Macau 12 Introduction of TCModel 2011 –Applications of Model Outputs Boarding Passengers Passengers Per Hour in Peak Direction(PPHPD or p/h/d) Passenger Kilometers Traveled (PKMT) Passenger Hours Traveled (PHT) Vehicle Kilometers Traveled (VKMT) Vehicle Hours Traveled (VHT) Average Speeds Volume to Capacity (V/C) Ratios Station Design Train Operation Plan Economic Benefit-Cost Analysis Financial Viability Analysis Policy Analysis Traffic Impact Analysis Sreen Line Analysis Taipei . Taichung . Kaohsiung . Shanghai . Hong Kong . Macau 13 The end Thank you! E-mail : teresa@thi.com.tw Taipei . Taichung . Kaohsiung . Shanghai . Hong Kong . Macau