Status of the FAIR Project

advertisement
Status of the FAIR Project
Boris Sharkov
FAIR Scientific Director (des.)
NuPECC Madrid 31.06.2010
Austria China Finland
France Germany Greece India
Italy
Poland Romania Russia Slovakia Slovenia Spain
Sweden
UK
Saudi Arabia
Research Communities at FAIR
SIS 100/300
Nuclear Matter Physics with
35-45 GeV/u HI beams, x1000
CBM
HADES
HESR
Rare Isotope
Production
Target
Hadron Physics
with antiprotons
of 0 - 15 GeV
Plasma Physics: x600
higher target energy
density 600kJ/g
Special Features:
• 50ns Bunched beams
• Electron cooling of secondary beams
• SC magnets fast ramping
• Parallel operation
B. Sharkov
Super
FRS
FLAIR
CRRESR
Antiproton
Production
Target
Nuclear Structure & Astrophysics
with rare isotope beams, x10 000
and excellent cooling
NESR
100 m
High EM Field (HI)
_
Fundamental Studies (HI & p)
Applications (HI)
2
Development of Project Staging
2003
Recommendation by WissenschaftsRat – FAIR Realisation in three stages
2005
Entire Facility
Baseline Technical Report
Phase A
2007
Module 0
SIS100
2009
Module 1
expt areas
CBM/HADES
and APPA
Module 2
Super-FRS
fixed target
area
NuSTAR
Module 3
pbar facility,
incl. CR for
PANDA,
options for
NuSTAR
Modularized Start Version
B. Sharkov
Phase B
SIS300
Module 4
LEB for
NuSTAR,
NESR for
NuSTAR and
APPA,
FLAIR for
APPA
Module 5
RESR
nominal
intensity for
PANDA &
parallel
operation
with
NuSTAR and
APPA
SIS18
Proton
Beamline
Module 6
SIS300
HESR Cooler
ER
3
Rationale for new Modularized Start Version (WP)
in 2009
a
detailed cost estimate for CC presented
by architects
a new cost estimate in 2009 for the
accelerator complex
Detailed list of site related construction
costs was worked out
firm commitments of FAIR Member States
Germany and State of Hesse
announced to cover "site-dependent"
construction costs outside FAIR
project budget + 110 M€ !
B. Sharkov
4
Basic Criteria :
Outstanding research opportunities should be offered
to all four scientific pillars of FAIR by the Modularized
Start Version
B. Sharkov
5
Modularized Start Version
Module 4:
low energy RIB and
low energy antiprotons
Module 5:
RESR storage ring
P+ beamline
ABM building
B. Sharkov
Module 0:
SIS100 and connection
to existing GSI accel.
Module 1:
Experimental areas
Module 2:
Super-FRS
Module 3:
High-energy antiprotons
(p-linac, pbar-target, CR,
HESR)
12
Science with the Modularized Start Version
CBM/HADES
APPA
PANDA
NuSTAR
B. Sharkov
13
Cost Estimate Modules 0-3 (Price Basis 2005)
Total accelerator and personnel Modules 0 - 3
502
Total civil construction Modules 0 - 3
400
Experiment funding
78
FAIR GmbH personnel and running costs
47
Grand Total Modules 0 - 3
1027
all values in M€
B. Sharkov
14
Firm Commitments
FAIR Countries
Total declared Contribution (k€)
Austria
5.000
China
12.000
Finland
5.000
France
27.000
Germany
705.000
Great Britain
8.000
Greece
4.000
India
36.000
Italy
42.000
Poland
23.740
Romania
11.870
Russia
178.050
Slovenia
12.000
Slovakia
6.000
Spain
19.000
Sweden
10.000
Total
1.104.660
Firm Commitments
1.038.660
Primeminister Putin
signed. Officially
publicized last week.
not firm for the first batch
Kingdom of Saudi-Arabia signed the Declaration to contribute at least 1 %
B. Sharkov
15
Dear Colleagues,
We are happy to inform you that the Decree of the Russian
Government on Russian participation in FAIR project was
issued and published. Its number is 245-p of February 27, 2010.
By this decision Russian Government approved the project of
FAIR Convention with Russian contribution to FAIR construction in
the amount of 178,05 MEuro (prices of January 2005) and authorized
the State Corporation “Rosatom” to be Russian Shareholder of FAIR Company.
Sincerely,
O.Patarakin, P.Bogdanov.
Finance Summary
Cost of Modularized Start Version = 1027 M€
Firm funding commitments of FAIR Partners = 1039 M€
Modularized Start Version secures a swift start within the
current funding commitments
B. Sharkov
17
Evaluation Board 16 October 2009
1. The Modularized Start Version is the right way to proceed.
2. The project is more focussed and is in even better shape.
3. We should now start as soon as possible!
The Green Paper outlines the path to achieve this goal
B. Sharkov
18
FAIR accelerator Work Packages
B. Sharkov
19
International Partner 1
WP 1
form
International Partner 2
WP 2
FAIR GmbH
Consortium
(represented by
Consortium Leader)
International Partner 3
WP 3
•
•
•
International Partner n
WP n
Preparatory Phase R&D by GSI & Partner Institutes
SIS300 magnets
NESR Electron Cooling
IHEP Protvino
SIS100 rapidly cycling sc magnets
CEA / CNRS
Variable Frequency
Cavities
BINP Novosibirsk
B. Sharkov
21
SIS18upgrade Program
Scrapers and NEG coating for
pressure stabilization
Injection system for low
charged state heavy ions
Charge separator for higher
intensity and high quality beams
h=2 acceleration cavity for faster ramping
Power grid connection
The SIS18upgrade program: Booster operation with low charge state heavy ions
Acceleration of Intermediate Charge State Heavy Ions
 Significant progress with Ta24+ and U27+ ions due to the upgrade program in comparison with 2001
 Maximum beam energy about 200 MeV/u
Roadmap
 Start of construction activities 2010/11 +1 year
 Schedule is driven by civil construction
 Aim for earliest commissioning of accelerators and respective experiments
Module Construction
time (months)
0
1
2
3
B. Sharkov
72
28
60
60
Ready for
installation
2015 / 16 +1 year
2015 / 16 +1 year
2016
2016 +1 year
24
Road Map FAIR Site & Buildings
2009
1
2010
2 3
4
5
2011
2012
6 7
8
2013
2014
2015
1 Handing in of preplanning documents to hbm
2 Clarification of user requirements Modularized Start Version (MSV)
3 Start revised preplanning for MSV
4 Expected approval of revised planning for MSV
5 Preparation of documents for building permit
6 Expected approval for (partial) building permit
7 Start site preparation (clearing trees)
8 Award contracts on civil construction work lot 1 … 4
9 Completion of civil construction work lot 1 … 4
10 Start installation of accelerators and detectors
2016
9
10
2017
Building the FAIR GmbH
Management Board
Chairperson of the Management Board: B. Sharkov
Managing Directors (=Geschäftsführer in the sense ot the GmbH)
Boris Sharkov, Simone Richter
Administration
Department
S Richter
Site & Buildings
Departmement
NN
Technical Department
D. Krämer
Research Department
Z. Majka
(NN)
Law Office
Buildings
GSI Acc Liason
APPA
Human Ressources
Technical Infrastructure
Technical follow-up
CBM
Project Office
Projectadminsitration
In-Kind Coordination
NuSTAR
Public Relations
PANDA
Internal Audit
Finances,
Controlling, and
Accounting
Procurement/Contracts
Safety etc.
Recruitment of key personnel:
 Research Director
 In-Kind Coordinator
 Head of Sites and Buildings
 Legal and accounting staff
 Staff for the coordination of accelerators and experiments
General Support
B. Sharkov
(Currently only contracts for 2010 possible (via GSI))
27
Roadmap to foundation the FAIR company
2010
01
1
1
2
3
4
5
6
7
8
2011
02
2
03
3
04
05
06
07
4 5
08
09
6 7
8
10
11
12
KW1: Fertigstellung der Rechtsdokumente
KW8: Dokumente von Auswärtiges Amt an andere Außenministerien versandt
KW13: Alle Übersetzungen zurück beim Auswärtigen Amt
KW19: Alle offenen Fragen der Übersetzungen bilateral gelöst
KW22: Alle Rechtsdokumente in den fünf Vertragssprachen verfügbar
KW32: Formale Zustimmung aller Partnerländer
KW33: Übersetzerkonferenz – Translation conference
KW37: Formelle Unterzeichnung der Konvention
KW38: Gründung der FAIR GmbH
B. Sharkov
28
Conclusions
 Based on recent cost estimates and firm commitments of
FAIR Member States the Modularized Start Version is
elaborated
 Modules 0-3 ensure a physics programme that is unique,
competitive with great discovery potential
 All FAIR science communities can perform excellent
physics from early on
 The facility can be smoothly upgraded towards the full
version of FAIR (modules 4,5,6)
 Setup of the international FAIR company proceeds in
parallel
FAIR is gathering MOMENTUM !
B. Sharkov
29
Board of FAIR Collaborations founded
•
APPA, CBM, NuSTAR, PANDA: two representatives each
•
discuss common issues (e.g. research and funding)
•
initiate joint activities
Contact your funding agencies!
Raise more money for your experiment !
B. Sharkov
32