CPCCBC 4012A Read and interpret plans and specifications 18740 Certificate IV Building & Construction (Building) Glenn P. Costin Introduction Purpose • To develop the necessary skill and knowledge to read and interpret construction plans and associated specifications and schedules. Architectural drafting is a language like any other: One must be fluent to understand its various nuances and peculiarities. Likewise, as a language it changes over time, so one must remain engaged. Glenn P. Costin Standards and Codes Building Code of Australia (BCA) Calls for various Australian Standards: AS 1100.101 – 1992 (and amendments) Technical Drawing – General Principles AS 1100.301 – 1985 (and supplements) Architectural Drawing HB 47 – 1993 Dimensioning and Tolerances Glenn P. Costin 1. Types of Drawings Sketches Critical part of the initial design phase Glenn P. Costin Initial Sketches Glenn P. Costin Sketch Plans or ‘Roughs’ Good design evolves from the doing, yet is reflective of being “We shape our buildings; thereafter they shape us”. Winston Churchill Glenn P. Costin Pictorial Drawings • Orthographic Vs Pictorial What we ‘see’ What we draw ‘orthographically’ Glenn P. Costin Pictorial Types 30o Isometric Shows 3 dimensions. All dimensions full length. Glenn P. Costin Pictorial Types 45o Oblique Shows 3 dimensions. Receding dimensions reduced (1/2 size). Glenn P. Costin Pictorial Types Plan Drawing Plane Vanishing Point (VP) Vanishing Point (VP) Horizon Line Ground Line Perspective Spectator Position (SP) Two Point Perspective Perspective Orthographic Glenn P. Costin Pictorial Types Wright Frank Lloyd : Falling Water Mill Presentation Drawings Construction Drawings Tann ery L The ‘Plans’ ox 7 600 70 97 0 Appr ' 203 ° 53 5 31 Ap 105° 32' pro 24 080 x 1 03 00 Exi Gar sting age Sel &S f hed 5 Exi Co sting nta ine Self dU nit 19 530 93 Site Plan (Existing) 0 Scale 1:500 13 1° 16 ' 114 ° 14 ' Proposed Water Tanks 41 340 27 160 186° 20' 186° 20' Notes: 1. Block dimensions based upon Certificate of Title. 2. Contours indicative only. 3. No established trees need to be removed for this project. 4. Shadow lines not provided due to lack of relevance (extreme distances between project and neighbouring dwellings). 5. Storm water and drainage to existing outflows (where not directed by proposed storage tanks as shown). 0 31 57 430 276° 20' Site Plan (Proposed Dwelling Shown) Scale 1:300 Project: Contact Information: Glenn P. Costin Ph: 02 60582840 Proposed Alterations to 1 Hidden Lane DWG 1 - 14 Scale 1:300 or As Shown All Dimensions in mm 22000 8110 180 180 3400 300 11390 100 3800 3850 180 600 180 2500 110 2400 110 2000 110 1500 180 4800 1300 600 600 600 180 Ensuite Study Kitchen C Dining Living 110 110 3725 Laundry Strutting Beam Over Strutting Beam Over 180 B 1220 Master Bedroom B 9120 Tie Beam Over Hall Hall Entry C Verandah 180 1475 Verandah Deck 2180 600 180 WC 600 100 9490 5230 D 1000 110 2130 180 1550 110 1600 140 340 Deck D 9490 2895 Bath Deck 5225 3800 3880 2980 Bed 2 180 Bed 3 Verandah 3895 300 180 600 A 300 1200 Orthographic Drawn to Scale Offer multiple views and details Provide evidence of compliance Submitted to relevant authorities Show location of construction Used for quoting and tendering Allow off site manufacturing Legal documents (in disputes) Are the ‘construction manual’ 300 • • • • • • • • • • ane 2100 1920 A 8275 600 180 2325 180 1780 1510 180 3800 100 6485 1475 600 8755 110 23080 2500 Proposed Floor Plan Scale 1:100 Project: Contact Information: Proposed Alterations to 1 Hidden Lane Glenn P. Costin Ph: 0260582840 Scale 1:100 or As Shown All Dimensions in mm DWG 3 - 14 Glenn P. Costin Aspects of construction Plans Site and Location Plans • Small Scale (1:1000) • Location Plans show where the building site is Glenn P. Costin Aspects of construction Plans Tann ery L a 203 x 76 00 ° 53 5 31 Ap Appro ' ne 70 97 0 105° 32' pro 80 x 1 03 00 24 0 5 19 5 30 93 0 Ex Ga isting rag e & Self She d Ex Co isting nta ine Self dU nit 13 1° 1 6' 114 ° 14 ' 186° 20' 41 340 Notes: 1. Block dimensions based upon Certificate of Title. 2. Contours indicative only. 3. No established trees need to be removed for this project. 4. Shadow lines not provided due to lack of relevance (extreme distances between project and neighbouring dwellings). 5. Storm water and drainage to existing outflows (where not directed by proposed storage tanks as shown). 186° 20' Proposed Water Tanks 27 160 Site Plans • Make clear the location of the structure on the site • Show the lay of the land • Show Boundary lines • Building Orientation • Show Existing Structures, easements and the like. • Scale 1:200 - 1:500 0 31 57 430 276° 20' Aspects of construction Plans 22000 8110 180 180 3400 300 11390 100 3800 3850 180 600 180 2500 110 2400 110 2000 110 1500 180 4800 1300 600 600 600 180 Bath Deck Ensuite 5225 Study Kitchen C Dining 110 3725 Living Strutting Beam Over 180 B Strutting Beam Over Laundry C 180 1475 Verandah Verandah Deck 2100 1920 A 8275 600 180 2325 180 1780 1510 180 3800 100 6485 1475 600 8755 110 23080 2500 Glenn P. Costin 2180 600 180 WC 600 100 110 B 1220 Hall Hall 9120 D Entry Tie Beam Over D 1000 110 2130 300 1200 9490 5230 180 1550 110 1600 140 340 Deck Master Bedroom 9490 2895 2980 3800 3880 Bed 2 180 Bed 3 Verandah 3895 300 180 600 A 300 Floor Plan • Arial view • Details horizontal dimensions • Location of rooms • Position of fixtures • Roof outline • Thickness of walls • Scale 1:100 Aspects of construction Plans Elevations • Side views of structure • Heights or ‘elevations’ • Not a lot of measured detail • Only height measurements offered • Scale 1:100 Original Roof and Wall Lines U.S. Ceiling Main FFL Upper Levels G.L. G.L. FFL Lower Levels South Elevation 25° (Approx Existing) U.S. Ceiling Main 5° Approx 4000 U.S. Ceiling Master Bedroom FFL Upper Levels 850 G.L. G.L. FFL Lower Levels G.L. G.L. G.L. East Elevation Glenn P. Costin Aspects of construction Plans Custom Orb ColorBond Cladding on 64mm Metal Top Hats. 2/170 x 35 F17 HWD Ridge Beam (Laminated) R3.5 Polyester or Pure Wool Batts to Ceiling Including Lounge Cathedral (No Fibre Glass to be Used) Cathedral Ceiling to Lounge 13mm Plasterboard on Metal Battens To Match Existing (Approx 25°) 120 x 45 F17 HWD Rafters to Lounge Trusses at 900 c/c to Manufaturer's specifications 100 x 75 F17 HWD Post Supporting Ridge Beam 2/240 x 35 F17 HWD Strutting Beam (Laminated) R2.0 Polyester or Pure Wool Batts to all External Walls (No Fibre Glass to be Used) Rendered 75mm Hebel Power Panel Fixed to 90mm MGP12 Stud Walls using 25mm Top Hats as per Manufactures Specifications. FFL Upper Levels 850 19mm Spotted Gum/Merbu or 'Modwood' Decking to Duragal Subfloor FFL Lower Levels Carter Holt Harvey 19mm Yellow Tougne 'R' Floor. 19mm T&G Blackbutt Solid Timber Flooring Over on Duragal Subfloor System To Match Existing (Approx 3150) Fire Rated Ducting and In-Line Fan Unit (Hot Air to Bed/Study/Bath Rooms) Raking Eave Terminated at Chimney 3000 Sections • Cut vertically through building • Location of cut a perspective shown on floor plan • Show inside of building • Show detail hidden from elevations • Often heavily annotated • Scale 1:100 or larger FFL Lower Levels R1.5 Polyester or Pure Wool Batts to all Internal Walls (No Fibre Glass to be Used) 19 mm Yellow Tougne 'R' Floor as Wall Backing to Subfloor Area of Lounge Wall. Fan-Less Ducting (Cold Air from Bed/Study/Bath Rooms to Slow Combustion Heater Area) Section A-A Glenn P. Costin Aspects of construction Plans Bracing Requirements Design Wind Classification Region A Terrain Category TC2 Topographic Classification T2 Sheilding PS Wind Classification N3 Bracing Plan • Recent addition • Show type and location of bracing • Accompanied by bracing schedule Structure Roof: Composite Design Pitch 25° - New: Lounge - Rafters at 900 c/c with Cathedral Ceiling Lining Under, Sheet Clad on Metal Battens over. All Other Areas - Trusses at 900 c/c, Sheet Clad on Metal Battens. - Existing: Traditionally Pitched Rafters at 900 c/c. Walls: Composite Design - New: 90mm Timber Stud Clad with Hebal 70mm 'Power Panel' on Metal Battens - Existing: 180mm Solid Masony B1i Deck 2 x B1s Verandah Verandah 4 Strutting Beam Over Kitchen Combination Beam Over WC B2v 3 Laundry Dining B1a Living B1b B1g 1 Master Bedroom B1f B1e 2 x B1t Lintel Over B1hHall 4 x B2r Ensuite Tie Beam Over 2x B2u Hall Entry 2 x B2q Bath B2n Study B1k Floor: Composite Design - New: Duragal Subfloor System (Gal Stumps, Bearers & Joists) with 19mm Yellow Tongue 'R' Floor Sheet Topped with 19mm Black Butt End Matched T&G HWD Flooring. - Existing: Traditional Concrete Stumps with HWD Bearers & Joists Topped with19mm Black Butt T&G HWD Flooring 32m² + 8m² (Upper Lounge Wall consideration) Force = 1.4 Restraint required = 56.0 kN Restraint provided = 58.4 kN (Nominal bracing and that offered by existing structure not considered) Direction 2 54m² + 8.2m² ( Upper Lounge Wall consideration) Force = 1.3 Restraint required = 80.9 kN Restraint provided = 81.6 kN (Nominal bracing not considered) Direction 3 18m² Force = 1.2 Restraint required = 21.6 kN Restraint provided = 19.2 kN (Bracing Provided By Existing Structure Considered - New Structure Imposes No Additional Area to Existing and is Within 5.1m). Direction 4 12m² Force = 1.1 Restraint required = 13.2 kN Restraint provided = 14.4 kN (Nominal bracing not considered) Strutting Beam Over Deck B2p Bed 2 4 x B2m Bed 3 Verandah 4 x B2o B2l B1j Areas Direction 1 B1c Direction 4 B1d Deck 2 Brace Type Restraint Offered Length Location B 9.6 kN/m 1800 u B 4.8 kN/m 900 v TOTAL = 14.4 kN/m Glenn P. Costin Aspects of construction Plans Overlays • Simplified Floor Plan • Required for extensions and renovations • Identify new work from old Existing Play Room, Laundry, Bathroom and WC Removed Including Concrete Slab. Ground Line Lowered to Improve Ventilation to Both New Works and Existing Retained Structure. Internal Wall Removed: Replace with 2/190 x 45 Compound Beam (Strutting/Hanging) Over Verandah Bed 3 Existing Study Removed including Removal of Original Verandah Roof and Pillars to this Area Bed 2 Bath Deck Ensuite Study Deck Master Bedroom Hall Hall Entry Laundry Living Kitchen Dining WC Verandah Verandah Deck Existing Double Hung Window Relocated to East of Chimney. Replaced With External Door. External Wall and Hip of Roof Removed: Trussed Roof Over Existing Verandah Roof Removed. Note: Pillars to be Retained Glenn P. Costin Aspects of construction Plans Rendered 75mm Hebel Power Panel Fixed to 90mm MGP12 Stud Walls using 25mm Top Hats as per Manufactures Specifications. 90mm MGP12 Pine Framing to AS1684 R2.0 Poly or Pure Wool Insulation (No Fibre Glass to be used) 10mm Gyprock Sheeting. Rendered Hebel or Styrofoam Moulding Screwed and Glued to Hebel Power Panel. 19mm T&G Blackbutt Solid Timber Flooring or Ceramic Tiles (i.e. Wet Areas). 10mm AbleFlex Expansion Joint. Carter Holt Harvey 19mm Yellow Tougne 'R' Floor. 100 x 50 x 1.6 Duragal Joists at 450c/c All Ends to be Plastic Capped Continuous Alcor or equivalent Flashing Behind Sarking and Under AbleFlex Expansion Joint. 100 x 50 x 2.0 Duragal Bearers Located as per Footing Plan. All Ends to be Plastic Capped. 'Rock Faced' 100 series (90mm) Concrete Blocks Contiouous Beneath Hebel Power Panel. Min 150mm* Min 75mm Details • Enlargements of key areas • Offer clearer picture of how something is to go together • Show work that may differ from standard building practice • Often heavily annotated Continuous Galvanised Ant Cap with DampProof Flashing Under. 'Rock Faced' 200 series (190mm) Concrete Blocks Contiouous with Strip Footing. 100 series (90mm) Concrete Block Piers Tied to Strip Footing at Each Bearer End Support Location or at Max 1800c/c for Bearers Running Parallel to Wall. Min 6000mm2/m Ventilation Provided at Evenly Spaced Intervals Through Dwarf Wall. (Climate Zone 3). 600 X 400 Continuous Concrete Strip Footing to Perimeter of New Works. Min 20MPa Concrete * Beyond 2.0m from External Wall or Top of Slope, Minimum is 400mm. 12mm Ø Threaded Rod Tied to 12mm Ø Starter Bars to Each Bearer End Postion or at Max 1800 c/c for Bearers Running Parallel to Wall 4-L12TM to Top and Bottom of Strip Footing Glenn P. Costin Aspects of construction Plans Schedules • May be stand alone or be accompanied by other drawings • Door & Window • Materials & Finishes • Bracing Door & Window Schedule Dimensions stated as Nominal only. Glazing Design Wind Speed: 41m/s All doors treated with weather seals all round D9 GD7 D4 W1 D6 D7 D8 D5 W12 Over Head Gable D3 W2 D1 W3 W4 Repositioned Existing Item Glass Specification W1 S 1000 x 1600 Timber Awning W2 S 1000 x 600 Timber fixed vented & obscure (Toilet Window) W3 S 1000 x 2400 Timber double hung W4 S 1500 x 1000 Timber Double Hung (Repositioned Existing Window) W5, 6 & 11 S 1500 x 1000 Timber double hung W7 DG 2100 x 900 Timber Awning W8 S 2400 x 500 Timber Hopper W9 GB 2100 x 700 Glass Block W10 GB 1500 x 2000 Glass Block W12 TDG 1800 x 3100 Timber Gable Hopper D1 & 2 S 2040 x 820 Glazed Timber External D3 NA 2040 x 820 Flush Panel Cavity Slider D4 - D9 NA 2040 x 820 Colonial Timber Internal GD1 S 2150 x 2000 Glazed Timber External GD2 DG 2150 x 3100 Glazed Timber Bifold External GD3 DG 2040 x 1800 Glazed Timber External Door & Awning Window GD4 DG 2040 x 1800 Glazed Timber External GD5 S 2040 x 2400 Glazed Timber French Doors with Awning Sidelights GD6 S 2150 x 2500 Glazed Timber French Doors with Awning Sidelights GD7 S 2040 x 2400 Solid Timber Entrance Door with Awning Sidelights Glass Codes S DG TDG Single 5mm Double Glazed min 3-6-3 Toughened Double Glazed Glenn P. Costin Aspects of construction Plans Service Details • Plumbing • Heating • Air conditioning • Electrical • Vary in scale and complexity depending upon requirements Glenn P. Costin Aspects of construction Plans Amendment Drawings • Document revisions • May affect one or all drawings • Identified by revision block or number • Triangle points to revision Glenn P. Costin 2. Symbols and Abbreviations Symbols: An agreed array of objects, characters or figures Three main types of symbols used • Drawing (material renderings, doors etc.) • Fixture (sink, basin, stove, dishwasher) • Services (electrical, heating, cooling) Glenn P. Costin Symbols and Abbreviations Be aware that some symbols are nation specific. E.g.: Australia • door hinged on the right hand side. • window hinged at top (Awning sash) United Kingdom (Australia till late 1960s) • door hinged on the left hand side • window hinged at bottom (hopper sash). Glenn P. Costin Symbols and Abbreviations Common Line Types Continuous Dashed Centre Glenn P. Costin Symbols and Abbreviations 22000 Line Types 3850 180 180 2500 11390 110 2400 110 2000 110 1500 4800 1300 600 600 600 180 B C 5225 3725 Living Strutting Beam Over Dining Strutting Beam Over 180 B 1220 110 110 Master Bedroom 9120 Hall Hall Tie Beam Over Deck 180 Ensuite Study C Glenn P. Costin 80 Bath Deck 2895 Bed 2 3895 180 A Symbols and Abbreviations Abbreviations and Terms • WRC Western Red Cedar • KDHWD Kiln Dried Hard Wood • GAL Galvanised • GL Ground Line • USCL Underside Ceiling Line • FFL Finished Floor Line Glenn P. Costin 3. Key Features on Site Plan • • • • • • Location & Orientation Datum Access & Egress Contours Slopes Geographical & Topographical Glenn P. Costin Location & Orientation 5 31 Ap p 70 97 0 105° 32' 10 300 24 080 rox Appro x 203 ° 53 ' 7 600 Tann ery L ane 5 19 530 0 Ex Ga isting rag e & Self She d Ex Co isting nta ine Self dU nit 93 13 1° 16 ' 114 ° 14 ' 186° 20' 41 340 27 160 Notes: 1. Block dimensions based upon Certificate of Title. 2. Contours indicative only. 3. No established trees need to be removed for this project. 4. Shadow lines not provided due to lack of relevance (extreme distances between project and neighbouring dwellings). 5. Storm water and drainage to existing outflows (where not directed by proposed storage tanks as shown). 186° 20' Proposed Water Tanks 0 31 57 430 276° 20' Glenn P. Costin Important Terms Permanent Bench Mark Temporary Bench Mark Datum In this case Sea Level (PM or PBM) Often located in pavements (TBM) Usually positioned by a licensed surveyor Station Benchmarks: Permanent (PM) orallTemporary (TBM) marks Datum: The point to other heights are Station: The location ofwhich the levelling instrument (may ofreferenced known above the original datum (sometimes (may be sea level or ain height nominated beheight more than one ‘Station’ a survey). used as the datum with a nominated height). arbitrarily). Glenn P. Costin Important Terms Rise: The increase in height between a location (Datum, peg, or mark) and the one previous to it. Peg C records a Fall when sighted after Peg B Peg B records a rise when sighted after Peg A B C A Fall: The decrease in height between a location (Datum, peg, or mark) and the one previous to it Glenn P. Costin Important Terms Reduced Level (R.L.): The height of a location (datum, peg, or mark) relative to the nominated reference point (sea level, bench mark of given height, or the like). Foresight 1.000 Backsight 1.200 Sea Level or ‘Datum’ R.L. 0.000 Ground rises 0.200m Peg B R.L. 75.450 Peg A R.L. 75.250 This means the ground at Peg A is 75.250m above sea level From Previous survey. The word ‘reduced’ is used in this case to mean ‘taken from’. Every R.L. is ‘taken from’ (reduced), and so has a relationship to, something else. Glenn P. Costin Contour Lines 180 170 160 150 Glenn P. Costin Glenn P. Costin Easements • Land that someone other than the ‘owner’ has legal right to access • May limit or inhibit building • Will always be on title documents • Must be shown on site plan • Examples include sewer lines and other underground services, water courses, public rights of passage and the like. Glenn P. Costin 4. Key Features on Drawings Task: Using the plan set provided complete the table in the notes. Glenn P. Costin 5. Specifications • Form part of contract documents • Have legal standing Specify: Materials Works to be undertaken Quality of work Obligations (Builder, Owner, Contractors) Standards and Codes to be adhered to Statutory requirements Glenn P. Costin Specifications • Standard Specifications available (MBA, HIA, Natspec) • Builders/Architects/Designers may write their own • Not all domestic construction will have a specifications ‘book’ • May include Provisional Sum (PS) and Prime Cost (PC) Items Glenn P. Costin Provisional Sum Items Some work cannot be accurately quoted due to unknowns within the scope of that work E.g.: Rock Excavation, Landscaping, Retaining walls – May be higher or lower than the PS amount – To provide a quote for the full job an estimate amount is entered that ‘provides’ for the work. – Once work is completed the actual cost is documented and the client billed accordingly – This amount in original quote. – Builders should clearly identify PS items for themselves and to their clients Glenn P. Costin Prime Cost Items • Applies to items and or materials which might not be chosen by the client until work has progressed. • Actual cost of items accounted in final statements to client. Prime Cost (PC) items might include: – – – – Tiles Sinks Taps Lights etc. Glenn P. Costin Variations to Standard Specifications Clients can call for variations to the standard specification Variations can be to: • quality expected • Listed PC items • Materials and finishes Variations must be recorded (Addendum to Specifications or noted as variation to plans) Glenn P. Costin Essential elements of Specifications Specifications broken into sections such as: • • • • • • Introductory Section Statutory Requirements Owners Obligations Plans, Permits, Fees Site Works Footings And many other sections covering specific trades such as Carpentry, Joinery, Roofing, Bricklaying and the like. Glenn P. Costin Essential elements of Specifications • Many elements of construction are held within the Specifications only • Builders need to identify and interpret these elements for quoting and construction purposes • Builder needs to ensure client is aware of these elements. • Builder needs to ensure supervision on and off site covers these elements Glenn P. Costin 6. Non-Structural Aspects of Specifications Aspects that cover elements of structure that do not carry load or resist force (uplift, wind forces, earth pressures etc.) E.g.: Plumbing and electrical, fittings, appliances etc. • Client generally has input into selection of some nonstructural items, or elements of items (brick colour, face etc.) • Builder may be called upon for advice • Builder should be aware of limitations to choice described by the Specifications (e.g. wind load capacity of glazing) Glenn P. Costin