LSSIP 2011-2015

advertisement
Objective AOP04.2
The European Organisation for the Safety of Air Navigation
Objective AOP04.2
•
•
•
•
•
•
•
•
Comprehensive Explanation
Link to European ATM Master Plan
Most important SLoA(s)
Supporting Material
ESSIP Report 2014
Objective Coordinator’s Analysis, recommendations, tips & tricks
Conclusions
Links and contacts
November 2015
2
Comprehensive Explanation
Implement Advanced Surface Guidance and Control System (ASMGCS) Level 2
• This objective aims at implementing A-SMGCS Level 2 which
consists of an airport surface surveillance system (i.e. A-SMGCS
Level 1) complemented by an A-SMGCS control tool to detect
potential conflicts on runways and intrusions into restricted areas
and provide the controllers with appropriate alerts;
• The applicability area is presented in Table 8 of Part IV Annex B of
the ESSIP 2012 document;
• Initial operational capability - 01/2007, Full operational capability 12/2017
• PCP related
November 2015
3
Link to European ATM Master Plan
• [AO-0102]-Automated Alerting of Controller in Case of Runway
Incursion or Intrusion into Restricted Areas
• Enablers covered:
•
•
•
•
•
•
AERODROME-ATC-03
CTE-S02b
CTE-S03b
CTE-S04b
PRO-139
PRO-201a
November 2015
4
Most important SLoA(s)
• ASP01 - Install required A-SMGCS control function equipment;
• ASP02 - Train aerodrome control staff in the use of A-SMGCS
Level 2 in the provision of an aerodrome control service;
• ASP03 - Implement approved A-SMGCS Level 2 operational
procedures at airports equipped with A-SMGCS Level 2.
• APO01 – Install required A-SMGCS control function equipment
November 2015
5
Supporting Material
•
•
•
•
•
•
EUROCONTROL-Advanced Surface Movement, Guidance and Control Systems
(A-SMGCS) Implementation Manual, Edition 1.0, dated 15.04.2011.
Url:http://www.eurocontrol.int/articles/a-smgcs
EUROCONTROL-Functional Requirements for A-SMGCS Implementation Level
2, Edition 2.1, dated 01.06.2010. Url: http://www.eurocontrol.int/articles/a-smgcs
ETSI-EN 303 213-2, Ver. 1.1.1 - Advanced Surface Movement Guidance and
Control System (A-SMGCS); Part 2: Community Specification for A-SMGCS
Level 2 including external interfaces, dated October 2010, OJ 2010/C330/2;
ETSI-EN 303 213-3, Ver. 1.1.1 - Advanced Surface Movement Guidance and
Control System (A-SMGCS); Part 3: Community Specification for a deployed
cooperative sensor including its interfaces, dated October 2010, OJ
2010/C330/2;
ETSI-EN 303 213-4-1, Ver. 1.1.1 - Advanced Surface Movement Guidance and
Control System (A-SMGCS); Part 4: Community Specification for a deployed
non-cooperative sensor including its interfaces, Sub-part 1: Generic
requirements for non-cooperative sensor, dated October 2010, OJ 2010/C330/2;
ETSI- EN 303 213-4-2, Ver. 1.1.1 - Advanced Surface Movement Guidance and
Control System (A-SMGCS); Part 4: Community Specification for a deployed
non-cooperative sensor including its interfaces; Sub-part 2: Specific
requirements for a deployed Surface Movement Radar sensor, dated October
2010, OJ 2010/C330/2, Url :
http://webapp.etsi.org/WorkProgram/SimpleSearch/QueryForm.asp
November 2015
6
Supporting Material
•
•
•
•
ICAO-Doc 9830-Advanced Surface Movement Guidance and Control
Systems (A-SMGCS) Manual, First Edition, dated 01/07/2004. Url:
http://icao.int/publications/Pages/catalogue.aspx
EUROCAE-ED-116-Minimum Operational Performance Specification
for Surface Movement Radar Sensor Systems for use in A-SMGCS,
dated January 2004;
EUROCAE-ED-117-Minimum Operational Performance Specification
MOPS for Mode S Multilateration Systems for Use in Advanced
Surface Movement Guidance and Control Systems (A-SMGCS), dated
November 03;
EUROCAE-ED-87B-Minimum Aviation System Performance
Specification for Advanced Surface Movement Guidance and Control
Systems (A-SMGCS) - Levels 1 & 2 - Including Amendment N 1, dated
January 2009. Url: http://boutique.eurocae.net/catalog/index.php
November 2015
7
CP related AF1
CP related AF2
ESSIP Report 2014
ESSIP FOC: 12/2017
Planned Achievement: 12/2017 (80% completion)
On Time
CP related AF3
CP related AF4
(months): 0
40% complete
CP related AF5
CP related AF6
November 2015
8
Objective Coordinator’s Analysis,
recommendations, tips & tricks
• More elaborate explanation of chosen progress assessment is
required.
• This objective should not be declared completed if AOP04.1 is
not declared completed.
November 2015
9
Links and contacts
• Objective Coordinator:
•
Predrag Vranjkovic, +32 2 729 3257
predrag.vranjkovic@eurocontrol.int
Yi Xiong, +32 2 729 3528
yi.xiong@eurocontrol.int
• DNM Objective Expert:
•
November 2015
Paul Adamson, +32 2 729 5183
paul.adamson@eurocontrol.int
10
Download