OVERVIEW ON THE MYPD3 PUBLIC CONSULTATION PROCESS PRESENTATION TO THE SELECT COMMITTEE ON ECONOMIC DEVELOPMENT : 04 DECEMBER 2012 Contents 1. 2. 3. 4. Overview of Eskom’s application Our planned approach to the application Information sharing session The consultation process and determination 2 Eskom’s application • NERSA confirms that we have received an application from Eskom • Five year application which proposes increases of 16 % per annum over the period • Application also includes a request for restructuring of tariffs – To simplify residential tariffs but also protect the poor – To recalculate tariff charges based on an updated cost to serve study – To unbundle tariff components to show cross subsidisation and transparency – To Revise Eskom’s time of use tariff to reduce the peak highdemand (winter) energy price 3 Our planned approach • NERSA is required by the Electricity Regulation Act to allow an efficient supplier to recover its costs to supply plus a fair rate of return • To achieve this NERSA uses a MYPD methodology based on a rate of return mechanism • The summary the mechanism – Allowable revenues = costs to supply + ROA 4 MYPD Process/Procedure • There are 6 pillars used in the MYPD determination process: Pillar 1 : Planning o Review of previous decisions and current regulatory rules o Analysis of current/prevailing economic, political, social and legal environment o Draft Process plan that includes timelines etc Pillar 2: Organising o The MYPD application is broken down into key elements/teams for the ease of management of the work. 5 MYPD Process/Procedure (Contd) Pillar 3: Analysing o Actual analysis of the data received from Eskom Pillar 4: Consultation o In MYPD , a broad spectrum of stakeholders are consulted for their views and comments. Written comments are solicited and Public Hearings are held in all provinces of South Africa 6 MYPD Process/Procedure (Contd) Pillar 5: Determination o This is mainly the consolidation of all evidence that has been gathered (spreadsheets, comments etc). After consolidation of the evidence, the Regulator will consider the regulatory objectives to be achieved including the public interest Pillar 6: Communication o After the decision by the Energy Regulator, communicated to Eskom and the Minister of Energy. o NERSA then holds a media conference it is 7 MYPD Process/Procedure (Contd) Public Consultation Processes Requests for written comments Discussions (Information Sharing) with stakeholders and the public on Eskom’s application Radio Talk Shows (SABC & Community Radio Stations) SABC TV Public Hearings in all provinces 8 Radio Talk Shows conducted RADIO STATION DATE Thobela FM 31 October 2012 Lotus FM 07 November 2012 RSG 07 November 2012 SA FM 08 November 2012 Lesedi FM 12 November 2012 Umhlobo Wenene FM 14 November 2012 Ukhozi FM 16 November 2012 18 Community Radio Stations 19 November 2012 Good Hope FM 19 November 2012 Ligwalagwala FM 20 November 2012 9 Public Hearings (15 – 31 January 2013) PROVINCE CITY/TOWN DATE Western Cape Cape Town 15-01-2013 Eastern Cape Port Elizabeth 16-01-2013 Kwa-Zulu Natal Durban 17-01-2013 Free State Bloemfontein 21-01-2013 Northern Cape Kimberly 22-01-2013 North West Potchefstroom 23-01-2013 Mpumalanga Nelspruit 25-01-2013 Limpopo Polokwane 29-01-2013 Gauteng Roodepoort 30 & 31-01-2013 10 Timelines for processing Eskom’s MYPD3 Application ACTIVITY DATE Receipt of Eskom’s Application 18 October 2012 Publication of Application on NERSA Website (Request for written comments) 22 October 2012 Closing date for stakeholder comments on Eskom’s MYPD3 application 20 November 2012 Public Hearings in all provinces 15 – 31 January 2013 Energy Regulator’s Decision on Eskom’s MYPD3 application 28 February 2013 11 Conclusion • NERSA is committed to a transparent consultative process in its decision making process • Discussions with the general public and stakeholders will provide a platform to interrogate the application • NERSA will also ensure engagement with the following high level stakeholders and decision makers – PPC on Energy, Economic Development, Local Government, Public Enterprises and NCOP; – Department of Energy; – Mayors of identified towns/cities; and – Traditional Leaders in relevant towns/cities 12 Thank You Tel: 012 401 4600 Fax: 012 401 4700 Website: www.nersa.org.za Physical Address: Kulawula House 526 Madiba Street Arcadia,0083 Pretoria 13