Council Plan 2014/15 Performance Report A report of Council’s performance against the 2014/15 actions from the City of Whittlesea Council Plan 20132017 ‘Shaping Our Future’ Table of Contents Executive Summary .................................................................................... 3 Background ................................................................................................ 3 Status ......................................................................................................... 3 Results ....................................................................................................... 4 Future Direction 1: Inclusive & Engaged Community........................... 5 Future Direction 2: Accessibility in, out and around our City ............... 9 Future Direction 3: Growing our Economy ........................................ 14 Future Direction 4: Places and Spaces to connect people ................. 16 Future Direction 5: Health and Wellbeing ......................................... 19 Future Direction 6: Living Sustainably ............................................... 24 Future Direction 7: Good Corporate Governance .............................. 26 2 Executive Summary The purpose of this 2014/15 Council Plan Performance Report is to inform Council and the community of our progress on delivering the City of Whittlesea Council Plan 20132017 ‘Shaping Our Future’. This report represents the second annual update on Council’s progress in delivering projects and strategies committed to in the Council Plan. As per the requirements of the Local Government Performance and Reporting Framework (LGPRF), the new LGPRF measures will be included in the City of Whittlesea’s Annual Report for the 2014/15 financial year, rather than in this report. Background The 2013-2017 Council Plan ‘Shaping Our Future’ was developed in 2013 and incorporates the Municipal Public Health and Wellbeing Plan. Under the Local Government Act and the Public Health and Wellbeing Act, both Plans are required to be reported against. Council has made a commitment to the community, in line with the statutory annual review requirements, that an annual Performance Report and annual review of both Plans will be undertaken concurrently. The annual Performance Report will provide a status of the indicators against each Council Goal, together with a commentary about work completed. The annual review must assess the Council Plan against the Charter of Human Rights and Responsibilities Act 2006. Results of the annual Performance Report and review shall inform the annual budget and corporate planning direction. Status This Council Plan Performance Report has been prepared at the end of quarter 4 for the 2014/15 financial year, in preparation for the Annual Report. In the second year of the Council Plan, significant progress has been made towards achieving actions that will contribute to the long term vision held by the community for the City of Whittlesea in the year 2030. 3 The following graph highlights this progress: 26 52 Achieved Work Ongoing Not Achieved 34 Of the 112 actions listed in the 2014/15 Council Plan: 52 (46%) actions have been achieved in the 2013/14 financial year. 34 (31%) actions are still listed as Work Ongoing, most of these had significant work undertaken on them during the past financial year and in some cases will continue until complete, or will continue into the new financial year. 26 (23%) actions were not achieved and some explanations around the issues contributing to these are given under each Future Direction. Results The current status of the actions from the second year of the Council Plan is identified in the following way: Status Result Explanation Green Achieved This action was achieved during the 2014/15 financial year Yellow Work Ongoing Progress has been made on this action but work will continue into following year(s) Red Not Achieved This action was not able to be completed during the 2014/15 financial year 4 Future Direction 1: Inclusive & Engaged Community Summary: Council has spent the 2014/15 year working hard to develop clear strategies, policies and tools to best support our community in coming together. In particular, our advocacy for funding from State and Federal governments for community infrastructure, the Community Gardens Policy and Guidelines and the review and ongoing support of the Community Leaders Network have already been achieved. The Arts Development Strategy, Disability Action Plan priorities and Multicultural Engagement Tool has reached completion and the Community Building Strategy is well into development and will continue to be shaped in 2015/16. There are 16 actions for the 2014/15 year within the Inclusive and Engaged Community Future Direction: 10 actions have already been achieved Four actions are currently ongoing or are in various stages of completion Two action were not achieved Municipal Public Health and Wellbeing Plan goal Goal No. 1.01 Council Goal Council will work to build a stronger sense of community within neighbourhoods and across the municipality, and create new opportunities for social networks and civic engagement. 2014/15 Action Develop a community building strategy Develop a comprehensive suite of community health and wellbeing indicators and determinants to inform planning and monitoring Status Comments Work Ongoing Consultant engaged to develop Community Building Framework, work well underway and background paper, framework and recommendations drafted. To be finalised in 2015/16 Work Ongoing Current at 50% complete and with work well underway, this will continue into the 2015/16 year. 5 Goal No. 1.01 Council Goal Council will work to build a stronger sense of community within neighbourhoods and across the municipality, and create new opportunities for social networks and civic engagement. 2014/15 Action Support establishment and sustainability of community driven community gardens and increase local social connection opportunities (through implementation of Community Garden Policy and Guidelines) Status Comments Achieved Discussions have occurred with Whittlesea Community Garden over this period resulting in a funding submission to Council to support the project worker into the 2015/16 year. Support and review the Community Leadership Network Achieved Meetings have been held with the Community Leadership Network to provide support and assistance. Implementation of an arts development strategy Work Ongoing Draft Arts Development Strategy listed for Forum in September 2015. 1.02 Council will co-Ordinate Arts and Cultural programs to bring people together 1.03 Council will take a strategic approach to the future needs of art across the municipality Conduct an arts and cultural needs study Not Achieved 1.04 Co-Ordinate and review the range of festivals provided to bring people together Scope the development of a training program in festival delivery Work Ongoing 1.05 Council will support local volunteer groups to act as advocates to other government agencies with a stronger voice Develop a strategy to build the capacity of local volunteer groups through an identified number of training sessions Achieved This project was reprioritised for the 2014/15 year and may be reconsidered in future years. Scoping of training needs is underway as part of the development of the Event Approval Project which is scheduled to be completed at the end of 2016. Consultation has been undertaken with key departments. 2 training sessions held to build advocacy capacity of local volunteer groups 6 Goal No. Council Goal 2014/15 Action Status Comments 1.06 Align planning, policy and practices to the circumstances and aspirations of the community, as expressed by the Community Implement year 2 priority actions of the Disability Action Plan Achieved Disability Action Plan on track for completion of most actions in this period. 1.07 Facilitate an effective community engagement process by providing information to the community about all relevant factor for consideration Develop Multicultural Engagement Tool Achieved Multicultural Engagement tool has been developed. Achieved Planning applications are assessed against the provisions of the State Planning Framework and the Whittlesea Planning Scheme. This ensures that the cultural heritage of the City is taken into account when applications are assessed and is one means by which the cultural heritage of our community can be said to have been shared, especially through the identification and preservation of significant sites and features. Achieved Numerous meetings conducted with Vic Roads. Not Achieved Project not due to commence this year. May be considered in future years. 1.10 Provide opportunities for the sharing of cultural heritage 1.11 Council actively advocate for services and infrastructure in our growth areas 1.13 Provide programs to engage diverse community and address race based discrimination Implement heritage overlay on locally significant heritage places. Advocate to State and Federal Governments for funding to improve community infrastructure for connectedness within the community Explore feasibility of a university led study to analyse effectiveness of Work Ready program for newly arrived migrant workers at Council 7 Goal No. Council Goal 2014/15 Action Status Comments Develop four year Strategy for LEAD Achieved Council's 4 year anti-racism Strategy based on the LEAD program findings was presented to ELT and a Council Forum it is scheduled for the 4 August 2015 Council meeting 1.14 Council will partner with Aboriginal communities to achieve the best possible opportunities and outcomes From Reconciliation Action Plan, implement the adoption of Aboriginal Community Engagement Protocols Achieved Protocols have been developed with the WRG and wider community. 1.15 Develop welcoming, inclusive and healthy sporting environment program based on the VicHealth Everyone Wins & Healthy Sporting Environment approach Develop Strategy for clubs engagement and seek partner/ sponsors. Achieved Inclusive Clubs background paper finalised. 8 Future Direction 2: Accessibility in, out and around our City Summary: Accessibility continues to be one of the most pressing issues for our community and Council has helped to create some significant improvements in this area in 2014/15. The obvious success of the Access Denied campaign, bringing a promise of the rail extension to Mernda and the building of the O’Hern’s Road interchange, has been just one of a number of successful projects. Initiatives such as the shared path along Darebin Creek and Edgar’s Road, upgrades to McKimmies Road, the Middle Years Strategy to assist children to be engaged and supported, and the community consultation around desired uses for the new community facility at University Hill are further examples of Council’s work in this area. There are 27 actions for the 2014/15 year within the Accessibility in, out and around our City Future Direction: Nine actions have already been achieved Ten actions are currently ongoing or at various stages of completion Eight actions have not been achieved Municipal Public Health and Wellbeing Plan goal Goal No. Council Goals 2014/15 Actions 2.01 Work with partners/stakeholders to ensure hospital based medical services are provided to our community Advocate for funding for existing and new hospitals to service the existing and future northern region of Melbourne and the outlying rural areas 2.02 Work with partners/stakeholders to ensure health, dental and community services are provided to our community Advocate for local respite services targeting 24-65 year olds 2.03 Provide for expanded library services Incorporate strategic land use planning for future libraries into growth area plans Status Comments Work Ongoing The Hospital Advocacy is new and still working with Northern Health on what the level of support is required. Further work will continue into the new financial year. Achieved Respite advocacy factsheets reviewed, continued support for RAW (Respite Alliance Whittlesea). Work Ongoing Library Strategy not funded in the 2014/15 year. This has been superseded by the development of a Library Plan for Mernda and Epping North in the 2015/16 year. 9 Goal No. 2.05 2.07 Council Goals Council will deliver capital works construction of new spaces Facilitate access to community and supported playgroups to enable social connections, child development activities and social support 2014/15 Actions Status Develop a Municipal Library Strategy to inform future planning Not Achieved Feasibility study for University Hill completed Achieved Promotion of new Community Activity Centres to young parents as possible locations for new playgrounds Achieved 2.08 Deliver high quality services and supports for children, young people and families Implementation of social capital and service system plans Work Ongoing 2.09 Provide Council services in a timely and effective manner Review service levels of Council provided services Work Ongoing 2.10 Work with other levels of Government, developers and stakeholders to explore options for low cost housing are available to our community Identify housing gaps and housing affordability through Social and Affordable Housing Strategy 2.11 Provide opportunities for young people in the municipality to be engaged and supported Implementation of middle years strategy Comments Library Strategy not funded in the 2014/15 year. This has been superseded by the development of a Library Plan for Mernda and Epping North in the 2015/16 year. New Works program to be undertaken in 2015/16 and 2016/17 Community engagement activities promoted at Hazel Glen, Jindi and Galada. For example, promoting Community Playgroups to New Parent Groups Growing Pains report developed towards this plan. This is part of a broader scope of work called People Spaces and Places (PSaP). In 2015/16, PSaP work will be reviewed and prioritised. Work on defining services has commenced, as has participation in the Family Day Care Service Review. Recommendations on FDC review have been presented to Council and will inform the next steps. Not Achieved Feasibility study is required to give us the tools to have further discussions with stakeholders, including State Government. Work Ongoing In April a combined consultation/workshop with primary and secondary schools involved in 2013 and 2014 MDI Surveys and with wider community stakeholders/service agencies was held. Whittlesea has been 10 Goal No. Council Goals 2014/15 Actions Status Comments registered to participate in the 2015 MDI Survey as the lead agent for Victoria. To date we have had interest from 8 schools (all government schools). We are exploring the possibility of the MDI reporting to include a distinction between growth corridor areas and established areas. Work was undertaken on a potential community transport initiative, but the development of a framework was not progressed. This action will be progressed in the 2015/16 year. This project has been rescoped to form part of Road Asset Management Plan, which will better align it with related projects. Bicycle Plan and Road Safety Strategies have been revised as part of the Integrated Transport Strategy. A Green Travel Plan has also been developed. More work to progress into the 2015/16 year. 2.12 Develop a community transport framework to ensure a service is provided to residents Develop council's community transport policy in the context of the agreed municipal community transport framework Work Ongoing 2.13 Develop a construction strategy to support future Council road upgrades Consider development of future road construction strategies Not Achieved 2.14 Ensure our road network integrates with other transport elements Develop an implementation plan for the Integrated Transport Strategy Work Ongoing 2.15 Council will advocate to the State Government for improvements to major roads within the municipality Advocate for transport improvements as per Top 10 Advocacy Priorities Achieved Priorities were delivered to the Federal Government for consideration in the 2015/16 budget. 2.15 Advocate to the State Government for improvements to major roads within the municipality Advocate for duplication of high use roads such as High Street and Plenty Road Achieved At least two meetings had occurred with Vic Roads. 11 Goal No. Council Goals 2014/15 Actions Status Comments 2.16 Maintain Council's road network with capital funding for rehabilitation of roads, footpaths and roadside infrastructure Construction of shared path along Darebin Creek and in Edgars Road Not Achieved This project was reprioritised for the 2014/15 year and may be reconsidered in future years 2.16 Maintain Council's road network with capital funding for rehabilitation of roads, footpaths and roadside infrastructure Not Achieved This project was reprioritised for the 2014/15 year and may be reconsidered in future years. Not Achieved This project was reprioritised for the 2014/15 year and may be reconsidered in future years. Work Ongoing This project acquired the required funding later than anticipated and has now been reallocated as a priority for the 2015/16 year. Not Achieved This project was reprioritised for the 2014/15 year and may be reconsidered in future years. Implement actions from Walking Strategy Work Ongoing The Walking Strategy has been reviewed and future work will be undertaken to integrate actions into the Integrated Transport Strategy. Improvement to bicycle network Achieved The Bicycle Plan, as per the Integrated Transport Strategy, has been revised. Achieved Cycling actions from Integrated Transport Strategy have been implemented. 2.17 2.17 2.17 2.18 2.19 Deliver capital works design and construction programs for extra carriageways, extension, duplications on identified Council Roads Deliver capital works design and construction programs for extra carriageways, extension, duplications on identified Council Roads Deliver capital works design and construction programs for extra carriageways, extension, duplications on identified Council Roads Council will work towards better connectivity of safe walking paths Council will work towards delivering safer cycling options to the community with State Government and other stakeholders Beautification works in Scott Street Design of Bush Boulevard Construction of McKimmies Road Construction of Downs Road Implement cycling actions Bicycle plans 12 Goal No. 2.20 2.21 2.22 Council Goals 2014/15 Actions Status Improve connectivity of walking and cycling paths to public transport consistent with integrated Transport Strategy Achieved Advocate for more public transport and expansion in growth areas Achieved Work with partners and stakeholders to address access and promote use of the NBN Participate in the implementation of Regional Digital Economy Strategy Not Achieved Ensure a whole of Council strategy guides our online community engagement Expand the number of online consultation opportunities through online consultation portal 'Community Voice' Work Ongoing Advocate to the State Government for improved public transport servicing this municipality Comments Bicycle Tracks are identified for inclusion in the 2015 Advocacy priorities. Although complete, this action will continue through the remainder of the 2015 year. Numerous meetings have been held with the State Government on the topic of public transport in growth areas. This project was dependent on external funding sources. No external funding opportunities available in the 2014/15 year to enable participation in the program. There have not been any major consultations that warrant a Community Voice project site since early 2015. 13 Future Direction 3: Growing our Economy Summary: There has been solid contributions to this Future Direction, finalising actions such as the Aboriginal Employment Strategy (including the employment of four Aboriginal staff), the Procurement Strategy and strengthening relationships with communitybased non-profit education and training providers, agencies and networks. Work is still underway on the Recruitment Strategy which is the precursor to informing the Work Experience and Student Placement Strategy, which requires further inputs over the 2015/16 year to finalise. Council has finalised the Economic Development Directions Paper and draft Economic Development Strategy documents have been prepared. This work will roll over into the 2015/16 year which will see the development of the Economic Development Strategy for the municipality. There are 9 actions for the 2014/15 year within the Growing our Economy Future Direction: Five have been achieved Two are currently being worked on, or are at various stages of completion Two has not been achieved Municipal Public Health and Wellbeing Plan goal Goal No. 3.01 Council Goals Facilitate the delivery of more local jobs for all with a focus on groups who experience social and health inequalities, together with an organisational commitment to employing locally 2014/15 Actions Status Deliver Aboriginal Employment Strategy Achieved Review Council's Recruitment Strategy. Work Ongoing Develop a work experience and student placement strategy across Council and NonGovernment Organisations to maximise employment pathways for local students. Not Achieved Comments Four staff have been employed through this program. Part of the overall review of the Employment Strategy due June 2016. Part of the overall review of employment strategy (due June 2016) however we are currently on-boarding students in the absence of a completed strategy. This work is ongoing into the 2015/16 year. 14 Goal No. Council Goals 2014/15 Actions 3.02 Council will facilitate the development of industry to support local employment Finalise Economic Development Directions Paper and utilise this to develop an Economic Development Strategy Brief Achieved 3.03 Council will build internal capacity and provide local positive social outcomes with social procurement partners, Develop a Procurement Strategy incorporating social procurement Achieved 3.06 Ensure Council has adequately zoned industrial land Scope a revitalisation of land use project Achieved 3.09 Investigate options for using rural land for agricultural production Continue delivery of Rural incentive programs Not Achieved Work with partners to facilitate more learning opportunities Strengthen relationships with community-based non-profit education and training providers, agencies and networks Achieved 3.10 3.11 Provide tools and support for families to be strong Develop a family strengthening plan Status Work Ongoing Comments Directions paper is now complete. This now forms part of the Economic Development Strategy, which will appear as a Council Plan action for the 2015/16 year. The Procurement Strategy was launched in March 2015, which outlines processes to support Social Procurement and social benefit deliverables in the tendering process. This has been achieved with Thomastown Industrial Review. The Draft Strategy is now complete and will be reported to Council Q1 15/16. This project will be reviewed in the 2015/16 year as part of the Green Wedge Management Plan 5 year review. Significant work has been undertaken in 2014/15 to strengthen relationships with education and training providers. Progress towards this plan has occurred through the Epping North Family Strengthening, Streamlining and Right@Home projects. This is scheduled for completion in the 2015/16 year. 15 Future Direction 4: Places and Spaces to connect people Summary: Open space within the City of Whittlesea was one of the most positive topics raised during consultation with the community in 2012 and 2013. Residents love the green parks, passive open space and the sporting facilities within the municipality. The Open Space Strategy is in the final stages of being approved, and has been a very extensive piece of work. This Strategy will inform long term open space planning, so it is important this document is accurate and relevant before being presented to Council for adoption. Significant community consultation has occurred to support this Strategy. Significant work has been undertaken on many of the actions in this Future Direction which will help achieve better places and spaces into the future. There are nine actions listed as Work Ongoing, all of which have completed a significant amount of work to date. This work includes refinements to the draft Halls and Meeting Room Strategy, working through year one actions from the Major Leisure & Aquatic Facility Strategy and a scheduled review of the Shade Policy. Of the four actions not achieved, there are two actions where tasks will be informed by the Open Space Strategy which has not yet been endorsed by Council and is under review. There are 11 actions for the 2014/15 year within the Places and Spaces to connect people Future Direction: Three actions have been achieved Four actions are currently being worked on, or at varying stages of completion Four actions are not achieved Goal No. 4.01 Council Goal Continue to provide a range of open spaces for use by the community 2014/15 Action Status Develop a Management Plan for Darebin Creek District Park Not Achieved Develop action plan to implement the Open Space Strategy Not Achieved Comments This project was reprioritised for the 2014/15 year and may be reconsidered in future years. This action plan is dependent on adoption of the Open Space Strategy which is still in progress with the Executive 16 Goal No. Council Goal 2014/15 Action Status Comments Leadership Team and Council. 4.02 Develop improved governance models for community facilities Implement new governance model at Whittlesea Community Activity Centre Achieved Refine community facilities governance model for Aurora Community Activity Centre and Renaissance Rise Family and Children's Centre operations Work Ongoing 4.02 Develop improved governance models for community facilities Conduct a feasibility study for the long term plan for PRACC Not Achieved 4.03 Ensure wide range of community meeting spaces are available Implement Halls and Meeting Spaces Strategy Work Ongoing 4.04 Strengthen and implement Council planning tools to build better connections Ensure Urban Design plays a lead role in the Precinct Structure Planning process Achieved 4.05 Council will develop and implement a strategic plan for future leisure centres and aquatic facilities that meet local requirements Implement Major Leisure & Aquatic Facility Strategy Achieved New governance model developed and will be applied (with required contextual refinement) to each new community facility as they come online. Governance models still under development for Jindi and Galada (formally Renaissance Rise and Aurora) and will be documented by the end of 2015. This project was reprioritised for the 2014/15 year and may be reconsidered in future years. Draft Study and Implementation Plan prepared awaiting Senior Management consideration. This project has been included in the Department's 2015/16 Business Plan to ensure it is completed. Urban Design is included as part of all major projects and Precinct Structure Plans. Year One action is to undertake the Mill Park Leisure Centre Redevelopment Feasibility Study. This has been completed. 17 Goal No. Council Goal 2014/15 Action Status 4.06 Continue to provide a high quality network of local parks and recreational facilities across the urban and rural areas which are managed for community and environmental benefits. Using Open Space Strategy criteria, assess requirements for suitable future park sites Not Achieved 4.07 Implement Recreation Strategy Development of Minor Sports Strategy Work Ongoing 4.08 Assist with access for everyone to play spaces that are suitable for all ages and abilities Undertake review of existing shade policy Work Ongoing Comments This project is dependent on adoption of the Open Space Strategy. Some work has progressed for the Minor Sports Strategy in the 2014/15 year. This project has been included in the Department's 2015/16 Business Plan to continue this work. Project proposal endorsed by the Executive Leadership Team in April 2015 and review underway. Further work is forecast for the 2015/16 year. 18 Future Direction 5: Health and Wellbeing Summary: Incorporating the Municipal Public Health and Wellbeing Plan into the Council Plan enabled Council to recognise the benefits of integrated planning across all seven Future Directions which support a social determinants approach to community health and wellbeing. Of the 26 actions identified under the Health and Wellbeing Future Direction, Council has adopted the Family Violence Strategy, strengthened partnerships to address identified cause of and contributing factors to family violence in the local context and developed & delivered community recovery training. Highlights include substantial work in the area of gender equity and prevention of family violence, development of a Responsible Gambling Strategy, progress on the application of the Heart Foundation’s "Healthy by Design” guidelines in council plans and policies, and our analysis show that over 60,000 members of the local community have been reached by the Healthy Together Program. A Community Safety Committee has been established with active representation from key stakeholders, including Victoria Police and Council, with agreed terms of reference and further work will progress into the 2015/16 year. There are 26 actions for the 2014/15 year within the Health and Wellbeing Future Direction: 16 actions have been achieved Seven are currently being worked on, or at varying stages of completion Three have not been achieved Municipal Public Health and Wellbeing Plan goal Goal No. Council Goal 2014/15 Actions 5.02 Council will support action to prevent family violence and sexual assault by addressing the underlying causes of gender- based violence and promoting equal and Embed gender equity and primary prevention strategies into departmental business plans Status Comments Work Ongoing Actions listed within the Gender Equity Strategy will be incorporated within relevant Business Plans by the end of 2015. 19 Goal No. Council Goal 2014/15 Actions Status Comments respectful relationships in the community Implement gender analysis training for relevant key staff 5.02 5.04 5.05 Council will support action to prevent family violence and sexual assault by addressing the underlying causes of gender- based violence and promoting equal and respectful relationships in the community Council leads regional collaboration to develop regional capacity to respond to all emergency events Council will incorporate community resilience into our emergency management planning to Achieved Explore internal and external funding options Achieved Adopt Family Violence Action Plan Achieved Identify actions and partnerships to address identified cause of and contributing factors to family violence in the local context Achieved Post impact assessment tool developed and adopted Achieved Regional recovery model developed and adopted Work Ongoing Community recovery training developed and delivered Work Ongoing Gender Equity training sessions held, including with the Councillors. Council support Whittlesea Community Connections in a successful application to "our Watch" for $150k for primary prevention in CALD communities. Family Violence Strategy endorsed in December 2014, and launched in March 2015. Considerable work has been undertaken to build partnerships and identify opportunities for interventions. Impact tools have been developed and adopted. Training modules will be delivered during the 2015/16 year. The NWMR Collaboration group will continue to meet until the end of the 2015 calendar year. There has been 70% of project complete to date. Training developed, pending framework review from Emergency Management Victoria (EMV). 20 Goal No. Council Goal 2014/15 Actions Status build community capacity Emergency exercise developed and delivered in partnership with Whittlesea Community resilience Committee. Achieved Exercises Noisy Miner, Oliver Whistler, Pilotbird and Quaker Parrot held. Achieved Memorandum of understanding (MoU) has been signed with Adventist Disaster Recovery Association (ADRA). Volunteer partnerships developed Comments Council will integrate Crime Prevention Through Environmental Design (CPTED) principles into policy, Strategies, design guidelines and capital works to enhance community safety and address crime prevention. CPTED principles integrated into Urban design framework Achieved CPTED principles are addressed as part of our broader urban design considerations. Urban Design matters are discussed as part of the development of all our current Precinct Structure Plans as a key focus. 5.07 Council will work with State Government on a staged plan for the delivery of education facilities in Whittlesea’s growth areas Manage joint City of Whittlesea and Department of Education and Early Childhood Development, Education and Infrastructure Forums Achieved All scheduled joint forums were held in in the 2014/15 year. 5.09 Council will consider health and wellbeing outcomes and health inequities perspective in planning HiAP tool developed and piloted Not Achieved 5.10 Council will plan for growth by supporting the creation of liveable socially connected communities Growth Areas Social Planning Tool (GASPT) process adopted and used at the City of Whittlesea Achieved 5.06 This project has been delayed pending findings of the UNSW equity audit of Healthy Together Victoria which will inform the approach moving forward. GASPT process adopted, and Ashley Park Community Activity Centre has been developed utilising GASPT. 21 Goal No. Council Goal 5.11 Council will support the creation of healthy active liveable connected communities via parks and open space planning, transport planning and urban planning 5.12 5.13 5.14 Council will support and encourage health promoting settings to reduce risk factors for preventable chronic disease via the Health Together Whittlesea federally funded program Council will develop healthy sporting environment programs based on the VicHealth Healthy Sporting Environment approach. Council will increase access and availability of healthy, affordable food including fresh fruit and vegetables in areas of identified need. 2014/15 Actions Status Comments Work Ongoing Scoping completed and background report done. Work to continue into the 2015/16 year. Progress achievement programs Achieved Council provided with quarterly memo updates, over 60,000 residents now reached by the Healthy Together Achievement Program. Implement health champions program Achieved Over 70 health champions have been recruited into the Program. ‘Healthy by Design' projects developed. Deliver social marketing campaign Achieved Develop strategy for club engagement Not Achieved Explore partner and funding options/sponsors Not Achieved Implement a project which increases access to fresh fruit and vegetables in areas of identified need. Explore opportunities to collaborate with the Achieved Linked to the State Government’s Live Lighter campaign, which is now finalised. Strategy is not developed, however the Sports Coordination Team have further developed internal and external partners to continue to ensure Club Engagement/Development opportunities throughout the 2014/15 year align with Council's and the community’s objectives. This project was dependent on external funding. External funding is not available from Vic Health at this time. Established a partnership with Asylum Seeker Resource Centre (ASRC) to introduce the Food Justice Truck project in Thomastown. A successful partnership was developed with 22 Goal No. Council Goal 2014/15 Actions Status wholesale fruit and vegetable market to address food insecurity through redistribution of fruit and vegetables Coordinate Food Coalition 5.15 5.16 5.17 Council will develop policy to support and encourage health promoting community settings to reduce risk factors for preventable chronic disease. Work in partnership with community and service providers to reduce and minimise the negative social, economic and health impacts of gambling Older residents have access to a range of supports which improve their wellbeing and capacity to age positively Develop an Alcohol management policy and amendments to the Planning Scheme to support implementation of the Policy Implement the Responsible Gambling Strategy action plans in partnership with Key stakeholders. Continue to work with other councils across Victoria to advocate for responsible gambling through the Victorian local government Associations' Local Government Working Group on Gambling Adopt the Positive Ageing Strategy (Secure resources and develop strategy) Achieved Comments “Foodbank” which resulted in state government funding to establish a regional distribution Hub in Epping to provide for Emergency Relief agencies. Internal Food working group set up and background report done on Local Food Systems. Work Ongoing Project proposal endorsed by the Executive Leadership Team in May 2015, policy to be developed by December 2015. Work Ongoing Strategy was adopted by Council in December 2014 and many of the year one actions will require funding allocations over the coming years to support implementation. Achieved Multiple meetings held with other councils across Victoria as part of the Enough Pokies Campaign. Work Ongoing A Positive Ageing Policy Project Officer was appointed in July 2015, development of the strategy to follow in the 2015/16 year. 23 Future Direction 6: Living Sustainably Summary: In 2013, Council adopted the Environmental Sustainability Strategy, which has driven much of the success within this Future Direction. The target of 75% completion of Environmental Sustainability Strategy (ESS) priorities has been exceeded this year, and Council now has arrangements in place with a local company in Thomastown (SRS), as part of the Waste Strategy, who recycle e-waste and employ people with disabilities. Funding was not available to complete the Biodiversity Action Plan so this was not achieved this year, nor will extending recycling services to commercial premises be achieved for 2014/15. There are 8 actions for the 2014/15 year within the Living Sustainably Future Direction: Six have been achieved Two have not been achieved Goal No. 6.01 6.02 Council Goal Continue to develop and deliver community education and conservation programs Continue to work on strategies and plans that are shaping the City of Whittlesea to be environmentally sustainable 2014/15 Actions Status Deliver programs to assist the community transition to a low emissions future Achieved Implement Waste Strategy - working with local business that employs disabled workers to break down waste components for recycling Achieved Extending recycling service to commercial premises (14/15) Not Achieved ‘SOW’ Workshop topics included worm farms and composting; saving energy and water; growing vegetables; safe garden pest control techniques; cooking seasonally without waste; and sustainability training for early years’ services. This strategy includes ewaste and the employment of local disabled workers - Council has a contract with SRS who employ local people with disabilities to recycle e-waste. This action relates to extending recycling services to commercial premises which requires further scoping and budget considerations in coming years. 24 Goal No. 6.03 6.04 Council Goal Implement the Green Wedge Management Plan Implement actions detailed within Council's Environmental Sustainability Strategy (ESS) 2014/15 Actions Status Review the River Red Gum Protection Policy Achieved Implement short term priorities in ESS Achieved Continue the development and implementation of Emission Reduction Plans Achieved Develop and implement a Biodiversity Action Plan Not Achieved Implement Native Vegetation Strategic Offset Plan Achieved Review undertaken no further action required at this stage. Will be potentially reviewed again in context of PSP processes/outcomes in 15/16 by sustainability Planning. 77% of Actions completed, exceeding the target of 75%. Emission Reduction Plans complete and being implemented. This project was reprioritised for the 2014/15 year and may be reconsidered in future years. Plan endorsed by Council early 2015. Implementation has commenced. 25 Future Direction 7: Good Corporate Governance Summary: This Future Direction was formally added to the current Council Plan in 2013 to ensure that the Community was aware of Council’s responsibilities to govern municipal undertakings appropriately. Implementation of the Centralised Customer Service Centre is a significant highlight for the 2014/15 financial year. After only four months in operation, the Customer Service Centre answered its 50,000th call and is currently taking an amazing 673 calls per day. A further achievement in 2014/15 was the development of a 6 Green Star rated Civic Precinct Master Plan. There are a number of actions that will roll over into the next financial year, including implementing the full Asset Management System, Service Level Agreement Reporting which have both been identified as projects that will cross multiple financial years. There are also a number of items that did not reach completion at the end of this financial year. There have been several reviews to better align the work we are doing which has resulted in some actions becoming superseded or re-prioritised to ensure that we are focused on the right outcomes. There are 15 actions for the 2014/15 year within the Good Corporate Governance Future Direction: Three have been achieved Seven are currently being worked on and should progress well Five have not been achieved Goal No. 7.01 7.02 Council Goal Develop and implement a Customer Service improvement program Develop and implement plan for population growth 2014/15 Action Implement centralised Customer Service Centre Undertake research to determine what the capacity of Council is to provide services to a culturally and linguistically diverse community Develop a 6 star Green Star rated Civic Precinct Master plan Status Comments Achieved New centralised customer service centre in operation. Work Ongoing New Customer Service Strategy on target to be developed by September 2015. Achieved Civic Precinct Master Plan developed. 26 Goal No. Council Goal 2014/15 Action Status Scenario planning project Not Achieved Review Whittlesea Planning Scheme and update Municipal Strategic Statement (MSS) and Local Planning Policies Work Ongoing 7.03 Develop and implement a financial sustainability program Develop growth model for LTFP Not Achieved 7.03 Develop and implement a financial sustainability program Develop Asset Management Policy Work Ongoing Continue to develop a partnership approach for working with agencies to ensure service delivery meets community need Lead in inter Government agreements with Federal and State Governments to ensure that government services which are transferred to Council have full impact assessment undertaken 7.04 7.05 Council services embrace new technology Implementation of Asset Management System Comments This project was reprioritised for the 2014/15 year and may be reconsidered in future years. Recently consulted the Executive Leadership Team on MSS content amendment. It is now ready to present to Council for consideration. This project has undergone a review and has been superseded by Long Term Financial Plan modelling assumptions project. The Asset Management Policy has been finalised and approved by the Executive Leadership Team and will be presented to Council by the end of 2015. Not Achieved Further work is required to properly scope the requirements of this action. This will be addressed in more detail in the coming years. Work Ongoing Implementation of the Asset Management System will continue through to 2017. Phase one is well underway, with the Artworks and Drainage assets recorded and uploaded into the syste,. Open Space assets will be uploaded by the end of 2015. 27 Goal No. 7.06 7.07 Council Goal Council builds and maintains a competent workforce and leadership capability in order to deliver efficient and effective services to the community Council will integrate planning for services to ensure alignment to community need 2014/15 Action Status Comments Develop IT Strategy Work Ongoing IT Strategy presented to Information and Communication Services Committee, for approval by the end of 2015. Review Information Management Strategy Achieved Information Management Strategy review complete. Conduct workforce and service plan reviews to ensure service delivery is keeping pace with changing demands Work Ongoing Training session attended, a draft workforce plan was developed and is currently under internal review. Implementation of draft Service Level Agreements with regular reporting Work Ongoing Service Planning & Review project has paused at this stage but will continue into the 2015/16 year. Not Achieved This project is dependent on the Service Level Planning project (above) and therefore has not progressed at this stage. Progress will be made in the coming years. Not Achieved The Green Purchasing / EcoBuy Policy has been superseded by the Procurement Policy which has significant content regarding green purchasing. Implement best value approach to service delivery Review Council’s Green Purchasing Policy/EcoBuy 28