Name of Project Student Name Independent Research Project Project Overview Milestone Description Date • Project scope • Project management approach (AGILE, waterfall, etc) • Major milestones • Major deliverables • Major risks • How could the project portfolio process be improved? Strategic Alignment Example below • Describe which tools / processes were used and why – Strategic management process – Project portfolio management • Financial criteria • Non-financial criteria • Project screening matrix – – – – – Major project proposal form Risk analysis form Project screening process Priority analysis form Project priority matrix • Did the needs / market analysis / business case identify all the project deliverables that the project eventually produced? • How could the project portfolio process be improved? Requirements Management Requirement Information I D Requireme nt Prior ity Cate gory Sour ce Relationship Traceability Rel ate Manif s to ests in Obj WBS ecti Delive Verific Validat ve rable ation ion • Requirements management approach • Requirements prioritization process • Product metrics – Cost – Quality – Performance • How accurate were the requirements? • How could the requirements management process have been improved? Scope Management • Insert WBS (Tree format) New Software Project 1.1 Design Phase 1.1.1 First Design Phase 1.2 Programming Phase 1.1.2 Second Design Phase 1.1.1.1 Design Task #1 1.1.2.1 Design Task #3 1.1.1.2 Design Task #2 1.1.2.2 Design Task #4 1.3 Testing Phase 1.2.1 Programming Task #1 1.3.1 Testing Task #1 1.2.2 Programming Task #2 1.3.2 Testing Task #2 1.3.3 Testing Task #3 • Scope management approach • Roles and responsibilities • Scope definition • Project scope statement • Scope verification • Scope control • How could the scope management process have been improved? Risk Management • Insert completed risk severity matrix Probability Very High High Probable Low Very Low Threats Very Low Low Moderate High Very High Discuss which tools used and why • Risk event graph (p 198) • Risk management process (p 199) • Risk breakdown structure (p 200) • Defined conditions for impact scales (p 203) • Risk assessment form (p 203) • Risk severity matrix (p 204) • Risk response matrix (p 209) • Change control process (p 216) • Sample change request (p 217) • PERT (p 227) • Quantitative risk analysis • Qualitative risk analysis • SWOT • Risk probability and impact assessment Schedule Insert your project schedule Duration Start 6 wks Mon 7/28/03 1st Half 2nd Half 1st Half 2nd Half 1st Half 2nd Half 1st Half 2nd Half Finish Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Fri 9/5/03 ID 1 Task Name A Build Candidate List 2 B Define Criteria for Selection 3 wks Mon 7/28/03 Fri 8/15/03 3 C Screen Candidates 50 wks Mon 9/8/03 Fri 8/20/04 4 D Interview Candidates 30 wks Mon 9/8/03 Fri 4/2/04 5 E Reference Checks 25 wks Mon 8/18/03 Fri 2/6/04 6 F Compile Information 35 wks Mon 8/23/04 Fri 4/22/05 7 G Distribtute Information 3 wks Mon 4/25/05 Fri 5/13/05 8 H Conduct Selection Process 3 wks Mon 5/16/05 Fri 6/3/05 9 10 – – – – activity sequences Durations resource requirements schedule constraints • What changes were made to the original baseline? 11 12 13 14 15 – How did this affect the project and what did you do to resolve? 16 17 18 19 20 21 22 23 24 • Discuss the approach / process of analyzing: 1 day Mon 7/28/03 Mon 7/28/03 Cost Management Month Planned Value Actual Cost Earned Value Dec-13 1271250 1271250 1017000 Jan-14 Feb-14 Mar-14 Apr-14 May-14 Jun-14 Jul-14 Aug-14 Sep-14 Oct-14 Nov-14 total budget Month Cum PV Cum AC Cum EV Dec-13 $1,271,250 $1,271,250 $1,017,000 Jan-14 Feb-14 Mar-14 Apr-14 May-14 Jun-14 Jul-14 Aug-14 Sep-14 Oct-14 Nov-14 1271250 Cost Performance Baseline Through Dec 2013 6000000 5000000 4000000 3000000 Cum PV 2000000 Cum AC 1000000 Cum EV 0 Discuss how project costs were measured • SV • CV • SPI • CPI • Cost variance response process • Reporting and variance response process • How could the estimating process have been improved? Estimating • Insert high level budget Major cost element: Major cost element Major cost element Risk reserve Total Project Cost $xxx,xxx.xx $xxx,xxx.xx $xxx,xxx.xx $xx,xxx.xx $xxx,xxx.xx Discuss which tools were used and why • Top Down – – – – – • Bottoms up – – – – – – – – – Management Reserve $x,xxx.xx • • • Consensus method (p 123) Ratio method (p 124) Apportion method (p 124) Function point method (p 125) Learning curves (p 126) Template (p 127) Parametric procedures (p 127) Detailed estimates (p 127) Expert judgement Analogous estimating Parametric estimating Bottom up estimating Three point estimates (PERT) Reserve analysis Phase estimating (p 128-129) How accurate were the estimates? How could the estimating process have been improved? Change Management • Insert change control process flow chart (example below) • Change management approach • Definitions of change • Change Control Board – Membership – Roles / responsibilities • Were changes frequent / major (provide examples)? • How could the change mangement process have been improved? Stakeholder Management • Insert power / interest grid 5 Discuss which tools were used and why – – – – – F B E • Power A C • D 1 Insert Engagement Grid Stakeholder Engagement – Discuss results – Discuss key stakeholder concerns – Discuss strategies for key stakeholders 5 Interest • Stakeholder Assessment – Discuss results – Discuss strategies for key stakeholders G 1 Stakeholder analysis Stakeholder register Project charter Power/Interest grid Stakeholder analysis matrix • • How effective were your strategies? Were stakeholder roles and responsibilities clearly delineated and defined? If not, how could they have been improved? Communications Management Communication Type Objective of Communication Kickoff Meeting Introduce the project team and the project. Review project objectives and management approach. Medium Face to Face Frequency Once Audience Project Sponsor Project Team Stakeholders Owner Project Manager Deliverable Agenda Meeting Minutes Discuss which tools used and why • Communications requirements analysis • Communications management plan – – – • • constraints Stakeholder communications requirements Communications methods and technologies used. How effective were your communications? How could the communications management process have been improved? Communications Management Priority Definition Decision Authority Timeframe for Resolution Priority 1 Priority 2 Priority 3 Priority 4 Communications Escalation Process • How often and what types of issues were escalated? • How could the escalation process have been improved? Procurement Management • Insert your project’s make or buy analysis matrix Discuss which tools used and why • Make or buy analysis • Expert judgment • Contract types Quality Plan • Insert graph of the quality tool used most often for quality metrics on this project (below is an example) Discuss which tools used and why • Cost benefit analysis • Cost of quality • Control charts • Benchmarking • Design of experiments • Statistical sampling • Flowcharting • Quality management plan • Quality metrics • Quality checklists • Quality audits • Cause and effect diagrams • Control charts • Histogram • Pareto chart • Run chart • Scatter diagram • Inspection • • Was the customer / sponsor satisfied with the deliverables? Was the transition / implementation strategy accurate and effective? If not, how could it have been improved? Human Resource Plan • Insert your project team organization chart Discuss which tools used and why • Functional organization (p 59) • Dedicated project team (p 61) • Matrix organization (p 66) • Key dimensions defining an organization’s culture (p 73) • Organizational culture diagnosis worksheet (p 75) • Organization charts and position descriptions • Networking • Human resource plan • Responsibility assignment matrix • Team building exercise • Ground rules • Co-location • Recognition and awards • Issue log • Conflict management Monitoring and Control • Insert your project’s earned value graph • How accurate were your original estimates of cost and schedule? • How could you have improved estimating? • Describe any early warning signs of problems that occurred • Were constraints and assumptions clear from the beginning, could the project charter / SOW have been improved? Lessons Learned • Are you proud of our finished deliverables (project work products)? If yes, what’s so good about them? If no, what’s wrong with them? • What was the single most frustrating part of your project? – How would you do things differently next time to avoid this frustration? • What was the most gratifying or professionally satisfying part of the project? • Which of your methods or processes worked particularly well? • Which of your methods or processes were difficult or frustrating to use? • If you could wave a magic wand and change anything about the project, what would you change? • Did your stakeholders, senior managers, customers, and sponsor(s) participate effectively? If not, how could you have improved their participation? Questions?