Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – AUGUST 2014 INDEX S. No DESCRIPTION 1 INDEX MAP 2 EXECUTIVE SUMMARY 3 PROJECT BACKGROUND 4 CONTRACT DATA 5 SALIENT FEATURES OF THE PROJECT SUBMISSION OF RELEVANT MANUAL & DOCUMENTS BY 6 CONCESSIONAIRE P.No . 2 3-5 6 7-8 9 10 7 STATUS OF PERMITS 11 8 TECHNICAL MAN POWER- INDEPENDENT ENGINEER 12 9 TECHNICAL MAN POWER- CONCESSIONAIRE 13 10 TECHNICAL MAN POWER- SUB CONTRACTOR 14-17 11 PRE CONSTRUCTION ACTIVITIES 18-19 12 DETAILS OF CORRESPONDENCE FROM IE 20-27 13 STATUS OF PLANT & MACHINERY 14 STATUS OF DRAWING (Structures/Highways) 15 CONSTRUCTION PROGRAMME BY THE CONCESSIONAIRE, 28 29-39 40 S-CURVE 16 PROJECT WORK PROGRESS 41-42 17 DETAILS STATUS OF STRUCTURE 43-52 BAR CHART 53-55 18 19 E EMERGENCY SERVICE 56 20 QUALITY ASSURANCE & QUALITY CONTROL 21 SAFETY AND ROAD MAINTENANCE 68 22 WEATHER REPORT 69 23 PHOTOGRAPHS 70 57-67 Page | 1 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – AUGUST 2014 Page | 2 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – AUGUST 2014 EXECUTIVE SUMMARY BACKGROUND: Ministry of Road Transport and Highways (MORT&H) has embarked on a staged up gradation programme of various National Highway. The widening is necessary to develop National Highway corridors where traffic intensity has increased significantly and there is requirement of augmentation of capacity for safe and efficient movement of traffic. MORT&H has authorized National Highway Authority of India (NHAI) to implement the development projects for six laning of Barwa Adda to Panagarh section of National Highway No.-2 in the state Jharkhand and West Bengal by way of Public-Private Partnership (PPP) mode. The project corridor on NH-2, a part of Golden Quadrilateral is passing through plains of Gangetic region of landlocked states of Bihar & Jharkhand and connects the National Capital with Kolkata traversing almost 1465 km, passing through the states of west Bengal, Bihar, Jharkhand, Uttar Pradesh, Haryana & Delhi. Apart from cutting across several other NFs it traverses through major towns of DurgapurAsansol, Dhanbad, Aurangabad, Varanasi, Allahabad, Kanpur, Agra, Faridabad, thereby catering to traffic with East West spectrum within the country. The project road of NH-2 starts from Barwa-Adda in Dhanbad district in the State of Jharkhand Km 398.240 and ends at Panagarh in Bardhaman district of West Bengal km 521.120. Total length of stretch is 122.88 km passes through Barwaadda, Ponrki, Bhitiya, Kaladih, Amarpur, Govindpur Bajar, Fakirdih,Phufwadih, Gopalganj, Nirsa, Belchahri in the district of Dhanbad in Jharkhand State and Salanpur, Niyamatpur, Asansol, Bogra Chatti, Palas danga, Raniganj More, Mangalpur, Andal More, Kada Road, Durgapur, Muchipara, Rajbandh Chati, Panagarh in the district of Bardhman in West Bengal. NHAI have awarded the task of Feasibility and Detailed engineering for improvement of this section of NH-2 to M/s ICT, India. NHAI has awarded the work of “Design, Build, Finance, Operate and Transfer of Km. 398.240 to Km. 521.120 including a bypass of length 8.120 Km. and service road of length 149.09 at selected locations to M/s Barwa Adda Expressway Ltd. (Mumbai). NHAI has awarded the Independent Consultancy for the project to M/s SA Infrastructure Consultants Pvt. Ltd. in association with Sugam Technocarts Pvt. Ltd. Page | 3 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – AUGUST 2014 The Project Road The concessionaire has divided the entire project road length into the following 3 Sections: Sections Chainage Chainage Total Sub-Contractor From To Length (Km) Section-I 398.240 441.565 43.325 M/s APCO Infratech Ltd. Section-II 441.565 471.150 29.585 M/s APCO Infratech Ltd. Section-III 471.150 521.120 49.970 M/s Oriental Structural Engineers Pvt. Ltd Project Milestones Mile Description stone 1 2 3 4 Scheduled Time Current Period Status Construction of Project 27th September 2014 Highway shall have ( 180th day from commenced. Appointed Date) (Expended not less than 10% of the total capital cost set forth in Financial Package) Five months completed Construction of all bridges shall have commenced. (Expended not less than 25% of the total capital cost set forth in Financial Package) 31st March 2015 (365th day from Appointed Date) - Construction of all Project Facilities shall have commenced. (Expended not less than 75% of the total capital cost set forth in Financial Package) 30th March 2016 (730th day from Appointed Date) - The scheduled Six Laning Date 26th September 2016 (910th day from Appointed Date) - Page | 4 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – AUGUST 2014 CONDITION PRECEDENT S. N. Compliance Responsible ROW Handing Over NHAI Authority 1 Execution date Current Status 28/03/2014 16/05/2014 27/05/2014 06/06/2014 10/06/2014 14/06/2014 01/07/2014 10/07/2014 21/08/2014 NHAI has handed over EROW of 534.80 Ha +12.286 Ha + 5.076 Ha +4.456 Ha+10.816Ha+ 4.138 ha = 571.572 Ha + 4.801 +1.612 Ha +1.962 Ha= - 579.947Ha 79.28 % Received. BDU Nov 01, 2013 Executed Substitution Agreement BDU Nov 01, 2013 Executed 5 Performance Security to Client BDU Oct 29, 2013 Submitted 6 Delivery of Financial Model to Client BDU Nov 01, 2013 Executed 7 Delivery of Warranties from All Consortium Member to client BDU Apr 23, 2013 Executed Apr 30, 2013 Executed 8 Delivery to the client a legal opinion from the legal counsel of the Concessionaire 19.02.2014 M/s S.A. Infrastructure Consultants Pvt. Ltd. in association with Sugam Technocrats Pvt. Ltd. Jharkhand13.04.2010 Available for both the States. 2 Permission of Environment Protection & Conservation of Site NHAI 3 Escrow Agreement 4 BDU Appointment of Independent Engineer 9 NHAI State Support Agreement 10 11 NHAI Approval from Railway Authorities in form of GAD for construction of ROB West Bengal – 13.04.2010 08.06.2012 NHAI 09.09.2011 GADs for both the ROB’s have been approved. Page | 5 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – AUGUST 2014 PROJECT DETAILS :The Project Road is 122.88 KM Long consisting of 1-Bypass of Length 8.120 Km for Congested Area at Panagarh including structures as under:- A. HIGHWAYS:- (a) Total Length of Existing Carriage Way = 121.990 Km. (b) Total No. of lane = 2*3 lane (c) Total length of Service Road = 149.09 Km. (d) Width of Service Road = 7m (c) Bypass Details:. Panagarh Bypass = 8.120km B. STRUCTURES:- (a) Major Bridges = 3 Nos. (b) Minor Bridges = 20 Nos. (11 New & 9 Widening) (c) Grade Separator = 12 Nos. (d) ROBs = 2 Nos. (e) VUPs and PUPs = 20/11 Nos. (f) Box Culverts /Hume Pipe/Slab Culverts = (g) Over Pass/ Under Pass 2/2 Nos = 202 Nos. Page | 6 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – AUGUST 2014 CONTRACT DATA CONCESSIONAIRE: Name of Project : Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Employer : National Highways Authority of India Concessionaire : Barwa Adda Expressway Limited, Plot No. C-22, G Block, Bandra Kurla Complex, Mumbai-400051 Project Developer : IL&FS Limited Construction Contractor : M/s Apco Infratech Pvt. Ltd. & Transportation Networks M/s Oriental Structural Engineers Pvt.Ltd. Date of Agreement : May 08, 2013 Development Period : From 08/05/2013 to 31/03/2014 Financial closure : 01/11/2013 Appointed Date : 01/04/2014 Project Cost/ Premium : Rs. 1665 Crore Premium of Rs. 42 Crore on appointed date and shall be increased by 5% as compared to the immediately preceding year. Construction Period : 910 days. Scheduled Date of Project Completion : 26/09/2016 Concession Period : 20 Years Including 30 months of Construction Period. Performance Security : Rs. 107.19 Crore Page | 7 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – AUGUST 2014 INDEPENDENT CONSULTANT/ENGINEER: Engineer (Consultants) : M/s SA Infrastructure Consultants Pvt. Ltd in Association with Sugam Technocrats Pvt.Ltd. Head Office Address : C/o S.A. Infra Structure Consultants Pvt. Ltd.101102, CS-1 Gyandkhand-II, Indrapuram, Ghaziadad – (UP) 201014. Ph.No.: 0120-2607756, Email-info@sainfra.com Office Address : Plot No.16/14, Bengal Ambuja, City Center, Durgapur, Dist:- Burdwan (W B), Pin-713216 Phone No.: 0343-2546115 Email-tl_panagarh@sainfra.com Date of Agreement : 19.01.2014 Commencement date : 19.02.2014 Contract Period : 36 months Scope of Consultancy : Independent Engineer Page | 8 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – AUGUST 2014 SALIENT FEATURES OF THE PROJECT :THE PROJECT ROAD The Project road comprises off from 398.240 to Km.521.120 Km of existing road of NH-2. The Salient Features of the project are as under:S.No. Description Quantity 1 Length of Project 122.88 KM 2 (a) By Pass – Total Length – 8.120 Km (b) Existing Carriageway Length – 121.990 Km. 3 Width of carriageway 2*12.25=24.50M 4 Service Road 149.09 Km. 5 Width of service road 7M 6 ROB’s 2 Nos at Km 443+710 & Km 520+373 7 Grade Separator 12 Nos. at km.398+811,407+538,408+326,456+312,464+185,475+670, 476+050,496+609,501+996,504+287,506+200,515+983 8 Major Bridges - (3 No’s) MJB 3 Nos. at Km.464+674,517+095,518+829 Minor Bridges – (20 No’s) MNB 11 Nos. at Km. 405+330,409+876,415+120,429+973,437+047,450+140,4 61+652,464+903,468+620,497+840,509+953, Widening 9 Nos. at Km. 445+596,462+895,463+091,463+710,471+006,485+002,4 92+871,495+735,507+503 9 VUP 20 Nos. at Km. 403+440,411+374,413+886,421+400,428+208,433+563,447+7 71,451+153,460+036,467+115,469,750,473+340,479+109,486 +427,489+702,491+451,494+430,509+559,518+221,519+349 PUP 11 Nos. at Km. 398+495,399+230,407+400,409+088,417+953,424+400,476+4 30,504+555,510+700,512+920,514+900 10 Vehicular Under Passes 11 Pedestrian Underpasses 12 Box /HP/Slab Culverts 13 BUS Lay Byes 14 Truck Lay Byes 15 Toll Plaza 2 Nos. at Km. 438+500,507+000. 16 Truck Parking Places 2 Nos. at Km. 398+250 to Km 398+750 & Km 441+800 to Km 442+300. 202 Nos. LHS 20 Nos. RHS 20 Nos. LHS 10 Nos. RHS 04 Nos. Page | 9 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – AUGUST 2014 Submission of Relevant Manual & Documents by Concessionaire:- SI. No Description Remarks 1 QAP Received 2 Work Methodology Received 3 Work Schedule Received 4 EMP Not received 5 Material Report of Borrow areas Received 6 Quarry location Received 7 Safety Manual Not received Page | 10 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – AUGUST 2014 Status of Permits:SI . Descriptions Applied Date Permits for extraction of boulder from quarry from Additional District Magistrate (ADM) Mines 15.06.2012 No 1 Permit for installation of crusher from village Panchayat and State/Central Pollution Control Board 2 25.11.2013 License for explosives from the office of Explosive controller 09.02.2013 NOC consent/Clearance required from village panchayat & State/Central Pollution Control Board/Dept. Vill Panchayat - 25.11.13 West Bengal Pollution Control Board - 20.12.13 5 Clearance required from village panchayat & State/Central Pollution Control Board Vill Panchayat - 25.11.13 West Bengal Pollution Control Board - 20.12.13 6 Permission required from village panchayat and ADM mines for Government & private land 7 Permission from Forest Department and other applicable agencies 3 4 Vill. Panchayat - 25.11.13 Dhanbad (Jh) - 08.11.11 Burdwan (WB) - 23.09.13, 25.09.13, 30.09.13,30.09.13, 03.10.13 Page | 11 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – AUGUST 2014 List of Technical Man Power of I.E.:Technical Manpower- Independent Engineer PROFESSIONAL STAFF Sl. 1 Name Mr. Vinod Prasad Jaiswal 2 Mr. A. N. Dhodapakar 3 Mr. Manoj Kumar Jaiswal 4 Mr. Saroj Kumar Singh 5 Mr. Yogendra Prasad 6 Nityanand Kumar 7 Mr. R.K.Rai 8 Mr. Kedar Paswan 9 Mr. Vijay Kumar Singh 10 Mr. Satyendu Sinha 11 Mr. R. S. Sharma 12 Mr. Upendra Kumar Singh 13 Mr. Rajeshwar Kumar Singh SUB PROFESSIONAL STAFF 1 Mr. Binash Ranjan Das 2 TBN 3 Mr. Nitai Satapathy 4 Mr. Santosh Sharma 5 Mr. Lalmani Pratap Singh 6 Mr. Amit Kumar Basu 7 Mr. Ajoy Banerjee 8 Mr. Sachin Kumar 9 Mr. Aniruddha Chatterjee 10 TBN 11 TBN 12 TBN 13 Mr. Hasan Faraz 14 Mr. Kumar Kaushal 15 Mr. Inderpal Singh 16 Mr. Rakesh Kumar Chakarborthy 17 Mr. Asim Kumar Mahapatra 18 Mr. Anup Mahadani 19 Mr. Tuna Behera 20 TBN 21 TBN 22 TBN 23 TBN 24 TBN 25 TBN 26 Mr. R.K.Singh 27 TBN Designation Team Leader cum Sr. Highway Engineer Sr. Bridge Design Engineer Resident cum Highway Engineer I Resident cum Highway Engineer II Highway Design Engineer I Highway Design Engineer I Bridge / Structural Engineer Sr. Pavement Specialist Sr. Quality cum Material Expert Traffic & Transportation Expert Road Safety Expert Financial Expert Legal Expert Survey Engineer I Survey Engineer II Survey Engineer III Survey Engineer IV Asst. Highway Engineer I Asst. Highway Engineer II Asst. Highway Engineer III Asst. Highway Engineer IV CADD Expert I CADD Expert II Environmental Engineer Asst. Bridge Engineer I Asst. Bridge Engineer II Asst. Bridge Engineer III Asst. Bridge Engineer IV Asst. Quality cum Material Engineer I Asst. Quality cum Material Engineer II Asst. Quality cum Material Engineer III Asst. Quality cum Material Engineer IV Date of Joining 06.03.2014 19.02.2014 20.03.2014 02.06.2014 19.02.2014 19.02.2014 19.05.2014 19.02.2014 20.5.2014 13.05.2014 22.05.2014 26.03.2014 28.03.2014 13.08.2014 03.03.2014 07.04.2014 08.04.2014 15.05.2014 09.08.2014 26.03.2014 13.08.2014 03.03.2014 07.04.2014 28.04.2014 Electrical Engineer I Electrical Engineer II HTMS / Toll Expert I HTMS / Toll Expert II Quantity Surveyor I Quantity Surveyor II Horticulture cum Landscaping Expert I Horticulture cum Landscaping Expert II Page | 12 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – AUGUST 2014 List of Tech. Man Power of Concessionaire:Sl. No. Name Designation Remarks Concessionaire – Durgapur (Km. 398.240 to Km. 521.120) 1. Mr. V.P.KATTI PROJECT DIRECTOR 2. Mr. Anil Kumar Mishra Sr. Planning Engineer 3. Mr. Vimlesh Kumar Sr. Quantity Surveyor 4. Mr. Piyush Jain Assistant Planning 5. Mr. Kaushal Mehta Finance and Accounts 6. Mr. Abdesh Jha Administration 7. Mr. I. Nagaraju Q.A./Q.C. Head 8. Mr. Bipad Bhaanjan Ghosh Sr. Surveyor/CAD 9. Mr. Vikram Dutta L.A. Officer 10. Mr. Amit Garg L.A. Officer 11. Mr. S.P.Singh Utility Shifting (Electrical) 12. Mr. U C Srivastav Sr. Manager – O & M Tolling 13. Mr. Praveen Jindal Manager - Tolling 14. Mr. Abhishek Anand Trainee (Highway) 15. Mr. Krishnendu Technician Concessionaire – I Dhanbad (Km. 398.240 to Km. 441.565) 16. Mr. Sanjiban Dutta Section In-Charge 17. Mr. Santosh Kumar Highway/Bridge Engineer 18. Mr. Naresh Chandra Sao Assistant Bridge Engineer 19. Mr. Umesh Sharma Assistant Material Engineer 20. Mr. Uttam Kumar Gayan Assistant Surveyor 21. Mr. Raj Kumar Ghosh Lab Technician Concessionaire – II Asansol (Km. 398.465 to Km. 471.150) 22. Mr. Malay Dutta Section In-Charge 23. Mr. Pramod Kumar Pandey Assistant Highway Engineer 24. Mr. Himanshu Bushan Panda Bridge Engineer 25. Mr. Suresh R Assistant Bridge Engineer 26. Mr. Pravin Kumar Sharma Assistant Material Engineer 27. Mr. Manoj Kumar Yadav Assistant Surveyor 28. Mr. Somnath Chatterjee Lab Technician Concessionaire – III Durgapur (Km. 471.150 to Km. 521.120) 29. 30. 31. 32. Mr. Zulfequar Ahmed Mr. Rajesh Kumar Mr. Aman Sachdeva Mr. Jyoti Prakash Bridge Engineer Assistant Highway Engineer Assistant Bridge Engineer Lab Technician Page | 13 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – AUGUST 2014 List of Tech. Man Power of the Sub-Contractor :(APCO Infratech Limited) – Section I Sl. No. Name Sr. Project Manager Designation 1. Mr. Satpal Singh Highway 2. Mr. Umesh Chand Singh 3. Mr. Sanjiv Kumar 4. Mr. Neeraj Pandey Structure 5. Mr. Amitabh Kumar 6. Mr. Jai Prakesh Tiwari 7. Mr. Abhishek Pratap Singh 8. Mr. Ajit Kumar Yadav 9. Mr. Raju Kumar Singh Planning & Billing 10. Mr. Krishan Murari Varma 11. Mr. Krishan Chand 12. Mr. Vanu Pratap Gupta 13. Mr. Jatin Sharma Quali1ty Control Engineers 14. Mr. Sarad Kumar Singh 15. Mr. Natwar Batra 16. Mr. Pravin Kumar Singh 17. Mr. Sashi Bhusan Kumar 18. Mr. Shayam Prakash Das 19. Mr. Pankaj Kumar Surveyor 20. Mr. Praveen K Srivastav 21. Mr. Sarya Pratap Kunwar 22. Mr. Uttam Kumar Verma 23. Mr. Ashish Kumar Mishra Mechanical Engineer 24. Mr. B. Anjaneyulu 25. Mr. Mahamad Rashid 26. Mr. Umesh Bisht 27. Mr. Rajat Singh 28. Mr. Brajesh Kumar Sharma Civil Supervisor 29. Mr. Bineshwar Singh 30. Mr. Pradip Kumar Singh 31. Mr. Dharmendra Singh 32. Mr. Ranjeet Singh 33. Mr. Shahrukh Khan 34. Mr. Babu Kumar Singh 35. Mr. Digvijay Singh Store 36. Mr. Pradip Kumar Mishra 37. Mr. Munna Kumar Singh Admin & Accounts 38. Mr. Partha Majumber 39. Mr. S.R. Srivastav Sr. General Manager Remarks AGM Highway Sr. Manager Jr. Engineer Sr. Engineer Sr. Project Engineer DET Engineer Sr. Foreman Sr. Engineer - Billing Document Controller GET Billing Engineer Asst. Engineer Jr. Engineer GET Lab Technician Lab Technician Lab Technician Sr. Supervisor Sr. Supervisor Sr. Supervisor Asst. Supervisor Manager Sr. Engineer-Plant Mechanical Engineer GET Data Entry Operator Supervisor Supervisor Civil Supervisor Supervisor Supervisor Supervisor – (Borrow Area) Civil Supervisor Sr. Store Officer Store Officer Dy. Manager Sr. Manager ( (P & A) Page | 14 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – AUGUST 2014 40. 41. 42. 43. IT Dept. 44. Mr. Rajneesh Kumar Mr. Raj Kumar Sharma Mr. Ram Mahajon Mr. Indra Bhusan Kumar Accountant Officer Supervisor (Admin) Manager Mr. Bipin Kumar Sharma IT Executive (APCO Infratech Limited) – Section II Sl. No. Name Project Manager 1. Mr. Manish Mishra Highway 2. Mr. R. P.Chowdhury 3. Mr. Mukesh Kumar Singh 4. Mr. Chandra Prakash Singh Structure 5. Mr. Jagadish Srivastava 6. Mr. Suresah Prasad Singh 7. Mr. Yogesh Chandra 8. Mr. Jitendra Kumar Singh 9. Mr. Rajindar Kumar 10. Mr. Amresh Singh 11. Mr. Satosh Kumar Srivastav Planning & Billing 12. Mr. Bijay Kumar Sahoo Quality Control Engineers 13. Mr. Suman Sanyal 14. Mr. Chandan Singh 15. Mr. Md. Shakil 16. Mr. Raj Kamal Tiwari Surveyor 17. Mr. Ashutosh Kumar Singh 18. Mr. Santosh Kumar Tripathi 19. Mr. Sunil Kumar Yadav 20 Mr. Atul Kumar 21. Mr. Sandip Mishra Mechanical & Mining Engineer 22. Mr. Kishan Mahon Kushwaha 23. Mr. Gautam Kumar Paul 24. Mr. P Bhaskar Reddy 25. Mr. Jitendra Kumar Store 26. Mr. P. P. Rajan 27. Mr. Sanu Lal Verma 28. Mr. Atul Kumar Debey 29. Mr. Shailendra Kumar Singh Admin & Accounts 30. Mr. Anil Kumar Singh 31. Mr. Sailendra Pattanayak 32. Mr. M. Srinivasa Rao 33. Mr. Arun Kumar Singh 34. Mr. Gagan Kumar Gandhi 35. Mr. Chinmay Nayak 36. Mr. Pravat Kumar Rout Safety 37. Mr. Manoj Kumar Giri Designation Remarks Project Manager Manager Engineer Supervisor Manager Manager Jr. Engineer Jr. Engineer Asst. Engineer Asst. Engineer Supervisor Engineer Manager Jr. Engineer Sr. Lab Technician Lab Technician Sr. Surveyor Sr. Surveyor Surveyor Asst. Surveyor Asst. Surveyor Manager Asst. Manager Engineer Manager - Mining Manager Sr. Store Keeper Officer Store Operator Manager – Admin Dy. Manager – Admin Dy. Manager – Accounts Executive Admin Accountant Officer Admin Accounts officer Safety Officer Page | 15 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – AUGUST 2014 (Oriental Structural Engineers Pvt. Ltd.) – Section III Sl. No. Name Designation Remarks Chief Project Manager 1. Mr. V. K. Chauhan Chief Project Manager Mr. N. K. Singh Mr. Praveen Srivastava Mr. Shio Kr. Singh Mr. Krishna Kumar Singh Mr. Arindam Das Mr. Arijit Mittal Mr. S. S. Negi Mr. Chandra Mani Kishore Mr. B. Shankar Rao Mr. Abhinav Singh Mr. Avimunyu Pal Mr. Suresh Kushwh Mr. Ummed Singh Mr. U.K.Jha Mr. Saurabh Kumar Mr. K.K. Jha Mr. Manor Gautam Mr. Vinod Kumar Sharma Mr. Sanjay Kumar Bharti Mr. Shivaji Suryanvanshi Mr. Jitendra Kumar Yadav Mr. Pravesh Kumar Yadav Sr. Project Manager Project Manager Sr. Project Manager Sr. Project Manager Project Engineer Sr. Manager Dy. Manager Sr. Engineer Sr. Engineer Sr. Engineer Dy. Manager Asst. Manager Asst. Manager Jr. Officer Sr. Supervisor Sr. Supervisor Supervisor Sr. Supervisor Sr. Supervisor Sr. Supervisor Supervisor Supervisor Mr. Rajeev Naryal Mr. Surendra Chhabra Mr. Ramavatar Sharma Mr. Ashok Kumar Singh Mr. S. N. Mondal Mr. Chandan Rikhi Mr. Pawan Kumar Mr. Manish Kumar Singh Mr. Shivram Mishra Mr. Shiv Prakash Mourya Mr. G. Haribabu Mr. Arjun Kumar Mr. Vijay Kr. Rai Mr. Ambrish Kr. Rai Mr. Rajeev Kumar Mr. Ugrasen Singh Mr. Durga Prasad Gautam Mr. Amit Kumar Singh Mr. Krishna Kumar Tripathi Mr. Baidhnath Upadhyay Sr. Project Manager Project Manager Dy. Project Manager Dy. Project Manager Dy. Project Manager Project Engineer Project Engineer Sr. Engineer Sr. Engineer Asst. Engineer Asst. Engineer Jr. Engineer Jr. Engineer Jr. Engineer Foreman Asst. Manager Officer Asst. Officer Supervisor Supervisor Highway 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. Structure 24. 25. 26. 27. 28. 29. 30. 31. 32. 33. 34. 35. 36. 37. 38. 39. 40. 41. 42. 43. Planning & Billing 44. 45. 46. 47. 48. 49. Mr. Sumanta Chakraborty Mr. Faishal Rizwan Siddqui Mr. Pawan Kumar Mr. Avijit Mahanto Mr. Brijesh Kumar Mishra Mr. Abhist Narayan Singh Jt. GM Sr. CAD Engineer Asst. Engineer (Design) Asst. Manager Officer GET Quality Control Engineers 50. 51. Mr. Anil Kumar Mr. Hari Singh Project Manager Dy. Manager Page | 16 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – AUGUST 2014 52. 53. 54. 55. 56. 57. 58. 59. Mr. Mukesh Kumar Singh Mr. Sanjay Kumar Paul Mr. Ravish Kumar Mr. Manik Kumar Jha Mr. Sunil Kumar Jha Mr. Jay Prakash Mr. Vinod Kumar Ray Mr. Rajendra Pratap Singh Asst. Engineer Asst. Engineer GET Sr. Lab Technician Lab Technician Lab Technician Lab Technician Lab Assistant Mr. Janmejay Rai Mr. Vijay Kumar Mr. Santosh Kumar Pradhan Mr. Hardev Singh Mr. Ravindra Tiwari Mr. Biswanath Mondal Mr. Ashok Kumar Singh Project Engineer Sr. Surveyor Surveyor Surveyor Surveyor Surveyor Asst. Surveyor Surveyor 60. 61. 62. 63. 64. 65. 66. Mechanical & Mining Engineer 67. 68. 69. 70. 71. 72. 73. 74. 75. 76. 77. 78. Mr. B.B. Singh Mr. J. S. Virdhi Mr. Man Mohan Sharma Mr. L. K. Sharma Mr. D. P. Singh Mr. Sailesh Kr. Dixit Mr. Hazari Lal Prasad Mr. Ram Raj Yadav Mr. Salil Das Gupta Mr. S N. Mishra Mr. Arun Kumar Singh Mr. Kaladharan Project Manager (P&M) Project Manager (Crusher) Jt. AGM AGM Sr. Engineer Asst. Engineer Foreman (elect.) Foreman (Plant) Dy. Manager Dy. Manager (Production) DEO Supervisor Mr. Jadav Akhtar Mr. Manoj Kumar Singh Officer Officer Mr. Shubrata Ghoshal Mr. R. Bhattachrarya Mr. B.D.Tiwari Mr. Veer Singh Mr. Sabir Khan Mr. Dependra Kulshresta Mr. Bipadtaran Singha Mr. Surendra Pratap Sharma Mr. Moti Upadhyay Mr. Jay Chand Jha Mr. Vishwajit Singh Mr. Chandan Singh Manager Asst. Manager Asst. Manager Asst. Manager Manager Officer Sr. Officer Officer Sr. Supervisor Supervisor Supervisor Supervisor Mr. Sandipan Dev Ray Mr. Shailesh Sharma Mr. Sachin Kumar Mr. Anubhav Pandey Mr. Ujjaval Kumar Mr. Rajesh Tiwari Mr. Ajit Kumar Jt. GM Manager Dy. Manager Dy. Manager Officer (Liaison) Asst. Officer Asst. Officer Mr. Dipak Kr. Dutta Mr. N. K. Srivastava Mr. Devendra Saptsishi Mr. Manas Kumar Mohanty Jt. AGM Manager Manager Asst. Manager Safety/HSE 79. 80. Store 81. 82. 83. 84. 85. 86. 87. 88. 89. 90. 91. 92. HR/Admin 93. 94. 95. 96. 97. 98. 99. Accounts 100. 101. 102. 103. Page | 17 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – AUGUST 2014 PRE CONSTRUCTION ACTIVITIES :SUB HEAD STATUS OF LAND ACQUISITIONS:Description Jharkhand West Bengal Total Remarks Length 43.16 km 79.72 km 122.880 km Total land required 259.00 Ha 472.56 Ha 731.56 Ha Handed over 185.00 Ha 394.947 Ha 579.947Ha 79.28% To be handed over 74.00 Ha 77.613 Ha 151.613 Ha 20.72% STATUS OF UTILITIES SHIFTING:S. N. Activity Unit Total Attended till this month Balance Nos. 26670 12685 13985 52.44% balance Nos. 7194 Nil 7194 Work in progress (JSEB , DPL &WBSEDCL) Remarks 1 Tree Cutting 2 Electric Poles 3 Electric Towers Nos. 12 Nil 12 4 Water Pipe lines RM 82379 Nil 82379 RM 52100 Nil 52100 5 Gas Pipe Lines (GEECL) 6 Petroleum Pipe line RM 837 Nil 837 Page | 18 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – AUGUST 2014 STATUS OF ENCUMBRANCES:SI. Descriptions Side N. Units Total Pucca Semi M 971 Nil 971 RHS M 944 Nil 944 Pucca LHS M 991 Nil 991 RHS M 1033 Nil 1033 LHS M 409 Nil 409 RHS M 381 Nil 381 LHS M 41 Nil 41 RHS M 43 Nil 43 Buildings 3. Kachha Buildings 4. Religious Structures Remarks month LHS Buildings 2. Balance till this (affected length) 1. Attended Page | 19 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – AUGUST 2014 DETAILS OF CORRESPONDENCE FROM IE’s OFFICEDURGAPUR (AUGUST, 2014) Correspondence with PD, NHAI PIU-Durgapur: 1. OUTGOING CORRESPONDENCE Sl. Ref. No. Date Subject 1 SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/233 01.08.2014 Repair & Maintenance of Entrusted Highways Stretches. 2 SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/236 01.08.2014 Verification & Certification of estimate for utility shifting received from Drinking water & sanitation Deptt. Jharkhand 3 SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/238 02.08.2014 Submission of Monthly Accident Report 4 SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/239 04.08.2014 Installation of CCTV Camera At Toll Plazas 5 SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/240 04.08.2014 Submission of weekly status report for tree filling 6 SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/241 04.08.2014 Submission of Invoice for the month of July 2014 7 SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/247 06.08.2014 Proposal for development of way side amenities along National Highways 8 SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/249 07.08.2014 Inspection report of Independent Engineer 9 SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/251 09.08.2014 Estimate for cutting and transportation of trees from Km. 398.240 (Barwa Adda) to Km. 441.400 (Barakar) for six laning of NH-2. 10 SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/252 11.08.2014 Submission of Weekly status reports for tree felling 11 SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/256 14.08.2014 Reference received from PMO 12 SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/260 14.08.2014 Compliance to the decision of executive committee held on 30.07.2014 13 SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/261 16.08.2014 Repair and maintenance of entrusted highway stretches 14 SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/263 19.08.2014 Submission of weekly status report for tree felling 15 SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/265 19.08.2014 Repair and maintenance of Entrusted highways 16 SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/266 19.08.2014 Fixing of 2 Nos. signed board 200 m away both side from Kalla More Page | 20 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – AUGUST 2014 17 SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/268 19.08.2014 MPR-6 for the month of July 2014 18 SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/270 21.08.2014 The Durgapur Projects Ltd. Proposal submitted vide letter no. DPL/ETD/CD/NHAI/579 dated 26.07.2014 19 SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/279 23.08.2014 Condition of road between Asansol to Panagarh 20 SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/280 25.08.2014 Submission of Weekly status reports for tree felling 21 SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/282 25.08.2014 Estimate for cutting and transportation of trees from Km. 398.240 (Barwa Adda) to Km. 441.400 (Barakar) for six laning of NH-2. 22 SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/291 26.08.2014 Vehicle Tracking System (VTS) with facility of Global Positioning System (GPS) to track Ambulance / Route Patrol vehicles. 23 SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/303 28.08.2014 Joining report 24 SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/304 29.08.2014 Verification of utility shifting estimate of DVC 30.08.2014 Construction of Road Under Bridge (RUB) for crossing NH-2 at Km. 430.200 in the state of Jharkhand to establish Railway Siding for Coal Transportation for 2 x 25MV Maithon Right Bank Thermal Power Station located at Maithon 25 SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/308 2. INCOMING CORRESPONDECE Sl. Ref. No. Date Subject 1 15018/1/2013/PIU(DUP)/1988 02.08.2014 Meeting agenda on 30.07.2014 at Dhanbad 2 15018/1/2012/PIU(DUP)/1992 02.08.2014 Installation of CCTV cameras at all Toll Plazas 3 15018/1/2013/PIU(DUP)/2021 07.08.2014 Design and drawings for ROB at Km. 520.385 4 15018/1/2013/PIU(DUP)/2038 08.08.2014 Complaint received regarding tolling operations at Beliyad Toll Plaza 5 15018/1/2012/PIU(DUP)2074 11.08.2014 Reference received from prime minister office 6 13021/1/2001/PIU(DUP)2075 11.08.2014 Verification of proposal of DPL. 7 15018/1/2012/PIU(DUP)2079 11.08.2014 8 15018/1/2013/PIU(DUP)/2081 11.08.2014 Estimate for cutting and transporting of tree from barwa adda (km.398.240)to barakar (km.441.400)for 6-laning of NH-2 Maintenance of NH-2 from Main Gate to Bhiringi More durgapur toward burdwan bounds lane/DVC more,kajora bridge near chitadanga which has became dangerous due to broken/path holes. 9 15018/1/2013/PIU(DUP)/2082 11.08.2014 Construction of ROB's by NHAI- clearance/approval by railway 10 11020/7/2000/PIU(DUP)TDS/2066 08.08.2014 Issue of TDS Certificate (Form No. 16A) for Qtr. 1 for the FY 2014-15 11 15017/1/2013/PIU(DUP)/2105 12.08.2014 Environment Clearance 12 15018/1/2013/PIU(DUP)/2098 12.08.2014 Tree felling from Barwa Adda to Barakar Page | 21 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – AUGUST 2014 13 15018/1/2013/PIU(DUP)/2100 12.08.2014 Fixing of 2 Nos. Signed Board 200mtr. Away both side from Kalla More 14 15016/1/2012/PIU(DUP)/2113 13.08.2014 Discrepancy in Land Acquisition proposal 15 15018/1/2012/PIU(DUP)/2114 12.08.2014 Compliance to the decision of Executive Committee held on 30.07.2014 16 15018/1/2012/PIU(DUP)/2115 13.08.2014 O & M of 4/6 laned corridors 17 15018/1/2013/PIU(DUP)/2119 13.08.2014 Providing protective culverts at IOCL pipeline crossings at malakhola (pipeline Ch.225.415) and Dhadka (pipeline Ch.236.327) & Rajbandh. 18 15018/1/2013/PIU(DUP)/2135 14.08.2014 19 15018/1/2013/PIU(DUP)/2170 21.08.2014 Repair and maintenance of entrusted highways stretches Discrepancy in Land Acquisition proposal 20 15018/1/2013/PIU(DUP)/2172 21.08.2014 21 15018/1/2012/PIU(DUP)/2187 22.08.2014 22 15018/1/2012/PIU(DUP)/2186 22.08.2014 23 15018/1/2013/PIU(DUP)/2211 26.08.2014 Reg. Manpower for the month of July & August 2014 Project specific websites 24 26.08.2014 Representation of the villagers of Shitla 25 15018//2012/PIU(DUP)/2222 15017/1/2012/PIU(DUP)/2238 27.08.2014 Verification of utility shifting estimate of DVC 26 15018/1/2013/PIU(DUP)/2240 27.08.2014 27 15018/1/2013/PIU(DUP)/2241 27.08.2014 Inspection of materials against estimate no. 51/DESA/2013-14 and W.O. no. 10/ESE/ESC/DHN/D.H./2014-15 Condition of road between Asansol to Panagarh 28 15017/1/2008/PIU(DUP)/1880 18.07.2014 29 15018/1/2013/PIU(DUP)/2248 28.08.2014 30 15017/1/2008/PIU(DUP)/2252 28.08.2014 31 15018/1/2013/PIU(DUP)/2255 28.08.2014 32 15018/1/2013/PIU(DUP)/2264 29.08.2014 Prayer for repairing of pot holes and patches on NH2 at DVC More, DMC More, near Bajaj show room in between Bhiringi more and old court more and kada road more under Durgapur P.S. 33 15018/1/2013/PIU(DUP)/2265 29.08.2014 Guideline of MoEF for diversion of forest land 34 15018/1/2013/PIU(DUP)/2266 29.08.2014 Redressal of grievances of Shri Subrata Roy, Asansol, West Bengal 35 15018/1/2013/PIU(DUP)/2267 29.08.2014 Construction of Box culvert at IOCL pipeline crossing under Asansol jurisdiction at Melakhola (Pipe line Ch. 225.415) and Dhadka (Pipeline Ch. 236.327) during extension of 4 lane to 6 lane of NH2 36 15018/1/2013/PIU(DUP)/2268 29.08.2014 Minutes of meeting of the monitoring committee to monitor the implementation of the provisions of the notification on Fly Ash Utilization Regarding condition of road between Asansol to Panagarh MPR-6 for the month of July 2014 Electrical Utility Shifting pertaining to JSEB/JUVNL./ Regarding Return of Measurement Book Verification of IPC-II for shifting of electrical utility of JUVNL. Minutes of meeting held 05 Aug 2014 at Hon,ble Minister of RT&H reg-Issues related to ROBs/RUBs constructed on NHs. Fixing of 2 Nos. Signed Board 200mtr. away both side from Kalla More Page | 22 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – AUGUST 2014 Correspondence with Concessionaire: 1. OUTGOING CORRESPONDENCE Sl. Ref. No. Date Subject 1 SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/234 01.08.2014 Estimate of Cutting and transportation of tress from km 398.240 (Barwa-adda) to Km 441.400 (Barakar) for six laning of NH-2. 2 SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/235 01.08.2014 Review of the GFC Drawings 3 SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/237 02.08.2014 Review of Grade Separator at Chainage 501+985 & 515+983 4 SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/242 05.08.2014 Borrow area test reports (B.A.-1) 5 SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/243 05.08.2014 Approval of Concrete Mix Design of M-15 (PCC), M20 (PCC), M-25(RCC), M-30 (RCC) & M-35 (Pile) 6 SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/244 05.08.2014 Approval of Concrete Mix Design of M-25 (RCC), M30 (RCC) of M/s India Cements Ltd for of OPC - 43 grade 7 SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/245 05.08.2014 Review of Pavement Design 8 SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/246 06.08.2014 Review of Pavement Design 9 SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/248 06.08.2014 Review of Box Culverts, PUPs & VUPs 10 SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/250 07.08.2014 Method statement of initial load test 11 SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/253 14.08.2014 O & M of 4/6 laned Corridors 14.08.2014 Review of design and drawing of widening of existing Minor Bridges at Km. 445+595, Km. 471+006 (C.A. Ch. 471+000), Km. 495+735 (C.A. Ch. 495+725), Km. 507+503(C.A. Ch. 507+510), Km. 485+002 (C.A. Ch. 484+990), Km. 492+871(C.A. Ch. 492+860), Km. 462+895, Km. 463+091(C.A. Ch. 462+090) & Km. 463+710 12 SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/254 13 SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/255 14.08.2014 Maintenance of NH-2 road from Main Gate to Bhiringi More Durgapur toward Burdwan bound lane/DVC More, Kajora Bridge near Chitadanga which has became dangerous due to Broken / Pot holes 14 SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/257 14.08.2014 Complaints received regarding tolling operations at Beliyad Toll Plaza 15 SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/258 14.08.2014 Construction of Public facility i.e. Medical Aid Post and Washroom at Beliyad Toll Plaza, Maithan 16 SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/259 14.08.2014 Trees from Km. 398.240 (Barwa Adda) to Km. 441.400 (Barakar) for six laning of NH-2 Page | 23 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – AUGUST 2014 17 SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/262 16.08.2014 Review of Plan and Profile drawings 18 SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/267 19.08.2014 Discrepancy in Land Acquisition proposal 19 SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/269 19.08.2014 Submission of progress report of the month JulyDiscrepancies in the status of drawings approval. 20 SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/271 21.08.2014 Route Patrol Vehicle, Ambulance & Crane Reg. 21 SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/272 21.08.2014 Review of Typical GADs of Pipe Culverts (Singal, Double and Multi cell) 22 SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/273 21.08.2014 Submission of drawing in Auto Cad format 23 SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/274 21.08.2014 Review of Plan and Profile drawings for Panagarh Bypass 24 SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/275 21.08.2014 Review of detailed drawing for concrete edge drain 25 SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/276 21.08.2014 Review of working drawing for various structures 26 SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/277 22.08.2014 Review of Design and drawing of Grade Separator at Km. 501+996 & Km. 515+983. 27 SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/278 23.08.2014 Review of Over Pass cross section Drawing. 28 SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/281 25.08.2014 Vehicle Tracking System (VTS) with facility of Global Positioning System (GPS) to track Ambulance / Route Patrol vehicles. 29 SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/283 25.08.2014 Use of steel reinforcement of 10mm dia in vertical walls @506+185 30 SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/284 25.08.2014 Bottom steel exposed and soffit of slab badly damaged of existing VUP at Ch. 500+120 31 SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/285 25.08.2014 Shifting of rising main along NH-2 under RCFA PtII W/S Scheme 32 SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/286 25.08.2014 Shoulder repairing works 33 SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/287 25.08.2014 Water Pipe line leakage at km 480+500(LHS) on road 34 SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/288 25.08.2014 Shifting of 1m dia DW&SD water pipe line on Jharkhand state from km 405+350 to km 456+700 35 SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/289 26.08.2014 Procurement of steel 36 SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/290 26.08.2014 Review of Minor Bridge (Retaining and Widening) at Km. 445+595, km 471+006, km 495+735, km 507+503, km 485+002, km 492+871, km 462+895, km 463+091, 463+710 37 SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/292 26.08.2014 In Liew of the major issues hampering taken off the project 38 SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/293 26.08.2014 Site Inspection on 30.08.2014 Page | 24 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – AUGUST 2014 39 SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/294 26.08.2014 Review of plan & profile drawing from km.507+000 to km 512+000 40 SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/295 26.08.2014 Safety arrangment at ongoing structures work from km 471.000 to km 521.000 41 SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/296 26.08.2014 Approval of Concrete Mix Design of M-20 (RCC), M35(RCC) & M-35 (R.E.Panel) 42 SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/297 26.08.2014 Third party test report of Maheshpur and Jangalpur Quarry proposed to be used for Bituminous and concrete works for the project stretch from Km 398+240 to Km 471+150-source approval 43 SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/298 26.08.2014 Borrow Area Test Report (B.A-2) 44 SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/299 26.08.2014 Third party test report of Ajay river, Damodar River and Barakar River for source approval- 45 SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/300 26.08.2014 46 SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/301 27.08.2014 Shifting of rising main along NH-2 under RCFA PtII W/S Scheme 47 SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/302 28.08.2014 Maintenance works 48 SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/305 29.08.2014 GSB Mix Design 49 SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/306 29.08.2014 Borrow Area Test Reports 50 SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/307 30.08.2014 Fixing of 2 Nos. signed board 200 m away both side from Kalla More 51 SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/309 30.08.2014 Redressal of grievances of Shri Subrata Roy, Asansol, West Bengal Third party test report of fly ash proposed to be used for concrete works for the project stretchsource approval 2. INCOMING CORRESPONDECE Sl. Ref. No. Date Subject 1 BAEL/PRJ/TEC/IEO/0219 02.08.2014 Submission of Monthly Fee statement schedule-M for the month of July-2014 2 BAEL/PRJ/TEC/IEO/0220 04.08.2014 Method Statement for Initial Vertical Load Test. 3 BAEL/PRJ/TEC/IEO/0221 04.08.2014 Submission of monthly accident report for the month of July 2014 4 BAEL/PRJ/TEC/IEO/0222 04.08.2014 Submission of weekly traffic census report 5 BAEL/PRJ/TEC/IEO/0223 05.08.2014 Submission of Borrow area test reports (B.A-2) 6 BAEL/PRJ/TEC/IEO/0224 06.08.2014 Submission of weekly accident report 7 BAEL/PRJ/TEC/IEO/0225 07.08.2014 Submission of Revised Plan and Profile Drawings from Km. 506.000 to 511.000 8 BAEL/PRJ/TEC/IEO/0226 07.08.2014 Submission of Pavement Design. 9 BAEL/PRJ/TEC/IEO/0227 07.08.2014 Independent Laboratory Testing Agency Approval. Page | 25 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – AUGUST 2014 10 BAEL/PRJ/TEC/IEO/0228 07.08.2014 11 BAEL/PRJ/TEC/IEO/0229 07.08.2014 12 BAEL/PRJ/TEC/IEO/0230 07.08.2014 Third party test reports of Fine Aggregate of Ajay River, Damodar River and Barakar River proposed to based for concrete production from Km. 398+240 to 471+150 - Source approval. 13 BAEL/PRJ/TEC/IEO/0231 08.08.2014 Review of Pavement design. 14 BAEL/PRJ/TEC/IEO/0232 09.08.2014 15 BAEL/PRJ/TEC/IEO/0233 11.08.2014 Submission of GADs structural drawings (Foundation) and Design and Analysis of Grade Separator at Km. 464+185, Km. 504+287 & Km. 506+200 for the project Submission of progress report for the month of July. 16 BAEL/PRJ/TEC/IEO/0234 12.08.2014 Submission of weekly traffic census report. 17 BAEL/PRJ/TEC/IEO/0235 12.08.2014 Submission of weekly accident report. 18 BAEL/PRJ/TEC/IEO/0236 13.08.2014 Compliance to your observations on Grade Separator at Km. 501+985 to Km. 515+983 submitted by us Mix design for package III from Km. 471.150 to Km. 521.120. Submission of Overpass GAD 19 BAEL/PRJ/TEC/IEO/0237 14.08.2014 Submission of Typical drawing for widening of Slab Culvert and Design and Analysis of Box culvert and VUP Submission of Drawings and Design and Analysis of ROB at Km. 443+710 20 BAEL/PRJ/TEC/IEO/0239 18.08.2014 21 BAEL/PRJ/TEC/IEO/0238 18.08.2014 Source approval modified bitumen 22 BAEL/PRJ/TEC/IEO/0240 19.08.2014 Design and drawing of widening of existing Minor Bridge at Km.. 445+595, Km. 471+006 (C.A. Ch. 471+000), Km. 495+735 (C.A. Ch. 495+725), Km. 507+503(C.A. Ch. 507+510), Km. 485+002 (C.A. Ch. 484+990), Km. 492+871(C.A. Ch. 492+860), Km. 462+895, Km. 463+091(C.A. Ch. 462+090) & Km. 463+710 compliance to the observations on the Minor Bridges. 23 BAEL/PRJ/TEC/IEO/0241 19.08.2014 24 BAEL/PRJ/TEC/IEO/0242 19.08.2014 Submission of working drawing structures Submission of weekly accident report 25 BAEL/PRJ/TEC/IEO/0243 19.08.2014 Submission of weekly traffic census report 26 BAEL/PRJ/TEC/IEO/0244 19.08.2014 Submission of GSB Mix Design 27 BAEL/PRJ/TEC/IEO/0245 19.08.2014 Review of GADs of New Minor Bridge drawing 28 BAEL/PRJ/TEC/IEO/0247 20.08.2014 Compliance to your observations on the TCS drawing submitted by us. 29 BAEL/PRJ/TEC/IEO/0248 22.08.2014 Submission of various structural drawings and design and analysis 30 BAEL/PRJ/TEC/IEO/0249 23.08.2014 Submission of Wet Mix Macadam Mix design 31 BAEL/PRJ/TEC/IEO/0250 23.08.2014 Compliance of plan and profile drawing from Km. 507+000 to 521+000 32 BAEL/PRJ/TEC/IEO/0251 23.08.2014 33 BAEL/PRJ/TEC/IEO/0252 23.08.2014 Submission of various structural drawings and design and analysis of foundation of abutment A1 & A2 (Geotech Capacity) of Minor Bridge at Km. 464+912 Source approval for modified Bitumen 34 BAEL/PRJ/TEC/IEO/0254 25.08.2014 Relocation of existing culvert at Km. 496+749 35 BAEL/PRJ/TEC/IEO/0255 25.08.2014 Source approval modified bitumen for for Bitumen Bitumen Emulsion for and various Emulsion and Page | 26 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – AUGUST 2014 36 BAEL/PRJ/TEC/IEO/0256 25.08.2014 Submission of Borrow area Test Report (B.A.-12) 37 BAEL/PRJ/TEC/IEO/0257 26.08.2014 Submission of revised GAD of VUP at Km. 489+702 and compliance to your observations on Box Structures submitted by us 38 BAEL/PRJ/TEC/IEO/0258 26.08.2014 Vehicle Tracking system (VTS) with facility of Global Positioning system (GPS) to track Ambulance / Route Patrol vehicles 39 BAEL/PRJ/TEC/IEO/0259 26.08.2014 Submission of weekly Accident report 40 BAEL/PRJ/TEC/IEO/0260 26.08.2014 Submission of weekly traffic census report 41 26.08.2014 Rate analysis for change of scope items 42 BAEL/PRJ/TEC/IEO/0261 BAEL/PRJ/TEC/IEO/0263 27.08.2014 43 BAEL/PRJ/TEC/IEO/0262 27.08.2014 Shifting of rising main NH-2 under RCFA Pt-II W/S Scheme DW&SD water pipe line of Jharkhand state from Km. 405+350 to Km. 456+700 44 BAEL/PRJ/TEC/IEO/0264 27.08.2014 Submission of working drawing for pipe culvert at Km. 439+709 45 BAEL/PRJ/TEC/IEO/0265 28.08.2014 Submission of GFC drawings 46 BAEL/PRJ/TEC/IEO/0266 28.08.2014 Discrepancy in land acquisition proposal from Km. 503+700 to 505+300 (LHS) 47 BAEL/PRJ/TEC/IEO/0267 29.08.2014 Submission of Borrow area test report (B.A. - 4) 48 BAEL/PRJ/TEC/IEO/0268 30.08.2014 Submission of design of approach slab and GFC drawings of Grade Separators at Km. 501+985 & Km. 515+983 Page | 27 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – AUGUST 2014 STATUS OF PLANTS AND MACHINERY:The details of major plants and equipment deployed are mentioned below; A. PLANTS SI.No. Description of Items Unit Total Remarks 1. Crusher Plant Nos. 3 Installation in progress (Each 300 TPH) 2. WMM Plant Nos. 3 3. Batching plant Nos. 3 4. Hot mix Plant Nos. 3 5. Weight Bridge Nos. 5 1.Commissioned – 1 No. (200 TPH) 2.Ready for Calibration – 1 no. (200 TPH), 3. Installation in Progress – 1 No. (300 TPH) 1. Commissioned – 1 No. (60 cum/hr) 2. Installation in progress – 1 No (30 cum/hr). 2. Installation in progress – 1 no. (60 cum/hr.) 1. Mobilization in progress- 1 No.(200TPH) 2. Installation in progress – 2 Nos. (1 No. 200 TPH & 1 No. 160 TPH) 1. Commissioned = 3 Nos. 2. Installation in Progress – 2 No. (Each 100 MT Capacity) B. MACHINERY 1. 2. 3. 4. 5. 6. 7. 8. 9. Dozer Excavator(1-1.2 cu.m bucket) Motar Grader (135-195HP) Vibr. Soil Compactor(8-10 t) Tendam Roller PTR Front Wheel Loader (3.0 cu.m) Tipper (10T/25T) Water tanker (10kl) Nos. Nos. Nos. Nos. Nos. No Nos. Nos. No 3 7 7 12 3 1 5 40 4 10. JCB loader Nos. 6 11. 12. Hydra Crane (14 MT) Air Compressor Nos. No. 6 2 13. 14. 15. 16. 17. Diesel Tanker DG (25-750KVA) Transit Mixture Broomer Trailor No. Nos. Nos. No. No. 2 24 10 1 1 C. SURVEY EQUIPMENTS 1. Total station Nos. 6 2. Auto level Nos. 16 Page | 28 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – AUGUST 2014 STATUS OF DESIGN AND DRAWING:Sl No. Chainage No. as per Drawing Name of Structure Description Status 398.240 to 521.120 Plan and Profile Km. 398.240 to 399.000(R1) Km. 399.000 to 405.000(R2) Km 405.000 to 407.000(R1) Km. 407.000 to 410.000(R0) Km 410.000 to 422.000(R1) Km422.000 to 434.000(Ro) Km 435.000 to 469.000(R2) Km 471.000 to 507.000(R2) Km507.000 to 513.000(R1) Km513.000 to 516.000(R1) Commented for km 507+000 to km 521.120. Under review Km 516.000 to 518.000(R2) Km 518.000 to 519.000(R1) Km 519.000 to 520.000(R4) Km 520.000 to 521.000(R3) Km 521.000 to 521.120(R2) 398.240 to 521.120 TCS 62 No TCS submitted 26 No. TCS Reviewed 398.240 to 521.120 Pavement Design Design submitted 1 464+674 MAJOR BRIDGE GAD Submitted Commented & Under review Under review 2 517+095 GAD & Design Submitted 3 518+829 GAD & Design Submitted 4 398+811 5 Commented & Under review Under review GAD & Design(only super structure) Submitted Under review 407+538 GAD Submitted Under review 6 408+326 GAD & Design(only super structure) Submitted Under review 7 456+312 GAD & Design(only super structure) Submitted Under review 8 464+185 GAD Submitted Under review 9 475+670 GAD & Design(only super structure) Submitted Under review 10 476+050 GAD Submitted Under review 11 496+609 GAD Submitted Under review 12 501+996 GAD & Design Submitted Under review Grade Separator Page | 29 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – AUGUST 2014 13 504+287 GAD & Design(only super structure) Submitted Under review 14 506+200 GAD & Design(only super structure) Submitted Under review 15 515+983 GAD & Design Submitted Under review 16 405+330 GAD Submitted Under review 17 409+876 GAD Submitted Under review 18 415+120 GAD Submitted Under review 19 429+973 GAD Submitted Under review 20 437+047 GAD Submitted Under review 21 450+140 GAD Submitted Under review 22 461+652 GAD Submitted Under review 23 464+903 GAD Submitted Under review 24 468+620 25 497+840 GAD Submitted Under review 26 509+953 GAD Submitted Under review 27 445+596 GAD & Reinforcement Details Reviewed 28 462+895 GAD & Reinforcement Details Reviewed 29 463+091 GAD & Reinforcement Details Reviewed 30 463+710 GAD & Reinforcement Details Reviewed 31 471+006 GAD & Reinforcement Details Reviewed 32 485+002 GAD & Reinforcement Details Reviewed 33 492+871 GAD & Reinforcement Details Under Reviewed 34 495+735 GAD & Reinforcement Details Reviewed 35 507+503 GAD & Reinforcement Details Reviewed 36 520+373 ROB Design Submitted GADs for both the ROBs have been approved 37 443+710 38 403+440 VEHICULAR UNDERPASS GAD & Reinforcement Details Reviewed 39 411+374 GAD & Reinforcement Details Reviewed MINOR BRIDGE (NEW) MINOR BRIDGE (WIDENING) Page | 30 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – AUGUST 2014 40 413+886 GAD & Reinforcement Details Reviewed 41 421+400 GAD & Reinforcement Details Reviewed 42 428+208 GAD & Reinforcement Details Reviewed 43 433+563 GAD & Reinforcement Details Reviewed 44 447+771 GAD submitted Under review 45 451+153 GAD submitted Under review 46 460+036 GAD & Reinforcement Details Reviewed 47 467+115 GAD & Reinforcement Details Reviewed 48 469+750 Not submitted 49 473+340 GAD & Reinforcement Details Reviewed 50 479+109 GAD submitted Under review 51 486+427 GAD & Reinforcement Details Reviewed 52 489+702 GAD submitted Under review 53 491+451 GAD & Reinforcement Details Reviewed 54 494+430 GAD & Reinforcement Details Reviewed 55 509+559 GAD & Reinforcement Details Reviewed 56 518+221 GAD & Reinforcement Details submitted Under review 57 519+349 GAD & Reinforcement Details submitted Under review 58 398+495 GAD & Reinforcement Details Reviewed 59 399+230 GAD & Reinforcement Details Reviewed 60 407+400 GAD & Reinforcement Details submitted Under review 61 409+088 GAD & Reinforcement Details Reviewed 62 417+953 GAD & Reinforcement Details Reviewed 63 424+400 GAD & Reinforcement Details Reviewed 64 476+430 GAD & Reinforcement Details Reviewed 65 504+555 GAD & Reinforcement Details Reviewed 66 510+700 GAD & Reinforcement Details Reviewed PEDESTRIAN UNDERPASS Page | 31 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – AUGUST 2014 67 512+920 GAD & Reinforcement Details Reviewed 68 514+900 GAD & Reinforcement Details Reviewed 69 398+519 GAD & Design submitted Under review 70 398+782 GAD & Design submitted Under review 71 403+335 GAD & Design submitted Under review 72 407+212 GAD submitted Under review 73 407+422 GAD & design submitted Under review 74 407+657 GAD submitted Under review 75 408+867 GAD & Design submitted Under review 76 409+060 GAD & Design submitted Under review 77 409+366 GAD & Design submitted Under review 78 411+332 GAD & Design submitted Under review 79 411+391 GAD & Design submitted Under review 80 413+926 GAD & Design submitted Under review 81 415+216 82 417+933 GAD & Design submitted Under review 83 421+327 84 421+497 GAD submitted Under review 85 424+467 GAD submitted Under review 86 427+882 GAD & Design submitted Under review 87 428+025 GAD & Design submitted Under review 88 443+615 GAD submitted Under review 89 443+931 GAD submitted Under review 90 444+047 GAD submitted Under review 91 448+029 GAD & design submitted Under review 92 450+883 GAD & Design submitted Under review 93 451+334 GAD & Design submitted Under review BOX CULVERT Page | 32 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – AUGUST 2014 94 456+131 GAD & Design submitted Under review 95 456+175 GAD & Design submitted Under review 96 456+355 GAD & Design submitted Under review 97 461+940 GAD & Design submitted Under review 98 467+300 GAD & Design submitted Under review 99 470+025 GAD submitted Under review 100 475+615 GAD submitted Under review 101 486+816 GAD submitted Under review 102 489+549 GAD & Design submitted Under review 103 489+860 GAD submitted Under review 104 494+593 GAD submitted Under review 105 496+719 GAD submitted Under review 106 496+749 GAD submitted Under review 107 502+182 GAD submitted Under review 108 502+372 GAD & Design submitted Under review 109 502+538 GAD & Design submitted Under review 110 505+934 GAD & Design submitted Under review 111 506+169 GAD & Design submitted Under review 112 509+255 GAD submitted Under review 113 512+635 GAD submitted Under review 114 512+997 GAD submitted Under review 115 515+180 GAD & Design submitted Reviewed 116 516+290 GAD submitted Under review 117 518+180 GAD & Design submitted Under review 118 519+690 GAD & Design submitted Reviewed 119 399+140 GAD Reviewed 120 400+070 GAD Reviewed 121 400+450 GAD Reviewed PIPE CULVERT Page | 33 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – AUGUST 2014 122 401+625 GAD Reviewed 123 404+115 GAD Reviewed 124 405+204 GAD Reviewed 125 405+777 GAD Reviewed 126 408+207 GAD Reviewed 127 409+125 GAD Reviewed 128 409+707 GAD Reviewed 129 410+140 GAD Reviewed 130 410+760 GAD Reviewed 131 414+040 GAD Reviewed 132 414+240 GAD Reviewed 133 414+750 GAD Reviewed 134 418+107 GAD Reviewed 135 418+748 GAD Reviewed 136 420+178 GAD Reviewed 137 425+330 GAD Reviewed 138 425+900 GAD Reviewed 139 426+935 GAD Reviewed 140 429+325 GAD Reviewed 141 429+449 GAD Reviewed 142 430+200 GAD Reviewed 143 431+110 GAD Reviewed 144 433+265 GAD Reviewed 145 433+600 GAD Reviewed 146 434+231 GAD Reviewed 147 435+200 GAD Reviewed 148 435+750 GAD Reviewed 149 435+915 GAD Reviewed Page | 34 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – AUGUST 2014 150 436+127 GAD Reviewed 151 436+655 GAD Reviewed 152 438+313 GAD Reviewed 153 438+605 GAD Reviewed 154 438+860 GAD Reviewed 155 438+966 GAD Reviewed 156 439+370 GAD Reviewed 157 439+710 GAD Reviewed 158 440+015 GAD Reviewed 159 440+095 GAD Reviewed 160 440+660 GAD Reviewed 161 440+850 GAD Reviewed 162 441+010 GAD Reviewed 163 444+420 GAD Reviewed 164 444+595 GAD Reviewed 165 444+897 GAD Reviewed GAD Reviewed 166 446+015 GAD Reviewed 167 447+048 GAD Reviewed 168 448+397 GAD Reviewed 169 449+080 GAD Reviewed 170 450+505 GAD Reviewed 171 450+690 GAD Reviewed 172 450+970 GAD Reviewed 173 451+070 GAD Reviewed 174 452+452 GAD Reviewed 175 452+350 GAD Reviewed 176 453+453 GAD Reviewed Page | 35 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – AUGUST 2014 177 453+940 GAD Reviewed 178 454+740 GAD Reviewed 179 456+460 GAD Reviewed 180 457+530 GAD Reviewed 181 459+750 GAD Reviewed 182 460+000 GAD Reviewed 183 460+120 GAD Reviewed 184 460+410 GAD Reviewed 185 460+495 GAD Reviewed 186 460+652 GAD Reviewed 187 460+775 GAD Reviewed 188 461+505 GAD Reviewed 189 462+175 GAD Reviewed 190 462+300 GAD Reviewed 191 462+360 GAD Reviewed 192 462+735 GAD Reviewed 193 463+015 GAD Reviewed 194 463+345 GAD Reviewed 195 463+530 GAD Reviewed 196 467+040 GAD Reviewed 197 473+415 GAD Reviewed 198 473+980 GAD Reviewed 199 476+446 GAD Reviewed 200 477+500 GAD Reviewed 201 478+570 GAD Reviewed 202 478+611 GAD Reviewed 203 478+990 GAD Reviewed 204 479+325 GAD Reviewed Page | 36 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – AUGUST 2014 205 485+790 GAD Reviewed 206 486+075 GAD Reviewed 207 511+920 GAD Reviewed 208 406+115 GAD & design submitted Under review 209 406+475 GAD & design submitted Under review 210 409+525 GAD & design submitted Under review 211 411+755 GAD & design submitted Under review 212 412+325 GAD & design submitted Under review 213 412.616 GAD & design submitted Under review 214 412+836 GAD & design submitted Under review 215 413+356 GAD & design submitted Under review 216 413+555 GAD & design submitted Under review 217 415+830 GAD & design submitted Under review 218 416+283 GAD & design submitted Under review 219 416+985 GAD & design submitted Under review 220 420+790 GAD & design submitted Under review 221 422+485 GAD & design submitted Under review 222 422+645 GAD & design submitted Under review 223 423+026 GAD & design submitted Under review 224 423+592 GAD & design submitted Under review 225 423+986 GAD & design submitted Under review 226 432+316 GAD & design submitted Under review 227 432+749 GAD & design submitted Under review 228 432+989 GAD & design submitted Under review 229 439+900 GAD & design submitted Under review 230 441+850 GAD & design submitted Under review 231 442+567 GAD & design submitted Under review 232 442+745 GAD & design submitted Under review SLAB CULVERT Page | 37 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – AUGUST 2014 233 444+675 GAD & design submitted Under review 234 446+410 GAD & design submitted Under review 235 446+655 GAD & design submitted Under review 236 449+421 GAD & design submitted Under review 237 449+821 GAD & design submitted Under review 238 452+685 GAD & design submitted Under review 239 453+580 GAD & design submitted Under review 240 455+705 GAD & design submitted Under review 241 457+130 GAD & design submitted Under review 242 457+260 GAD & design submitted Under review 243 465+060 GAD & design submitted Under review 244 465+087 GAD & design submitted Under review 245 465+525 GAD & design submitted Under review 246 465+765 GAD & design submitted Under review 247 468+375 GAD & design submitted Under review 248 469+220 GAD & design submitted Under review 249 472+225 GAD & design submitted Under review GAD & design submitted 250 474+862 GAD & design submitted Under review 251 481+930 GAD & design submitted Under review 252 484+030 GAD & design submitted Under review 253 487+904 GAD & design submitted Under review 254 488+660 GAD & design submitted Under review 255 489+128 GAD & design submitted Under review 256 491+970 GAD & design submitted Under review 257 493+834 GAD & design submitted Under review 258 495+445 GAD & design submitted Under review 259 497+040 GAD & design submitted Under review Page | 38 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – AUGUST 2014 260 497+367 GAD & design submitted Under review 261 499+890 GAD & design submitted Under review 262 500+278 GAD & design submitted Under review 263 501+260 GAD & design submitted Under review 264 501+562 GAD & design submitted Under review 265 502+863 GAD & design submitted Under review 266 503+456 GAD & design submitted Under review 267 505+226 GAD & design submitted Under review 268 505+700 GAD & design submitted Under review 269 506+723 GAD & design submitted Under review 270 507+738 GAD & design submitted Under review 271 512+383 GAD & design submitted Under review Page | 39 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – AUGUST 2014 PROJECT WORK PROGRESS :- Road Works Progress:Linear Progress (Road Works) Main Carriageway Activity Description Unit Total Length/Qty Completed % progress Main Carriageway Six lane C&G Km. Ha Km. cum Km. cum 122.88 306.53 122.88 1897473 122.88 1544213 5.645 18.55 10981.10 - GSB/ CT sub base GSB CT sub-base Km. cum cum 122.88 881086 291830 - WMM /CT Base WMM CT Base Km. cum cum 122.88 192599 120889 - AG Layer Km. cum Km. cum Km. cum 42.93 187020 122.88 250351 122.88 152516 - Embankment Sub-Grade DBM BC 4.60% 6.05% Work in progress 0.58% - Service Road Activity Description Unit Total Length/Qty Completed % progress C&G Km. Ha 149.09 141.97 4.70 3.29 3.15% 2.32% Embankment Km. cum 149.09 655085 4622.40 Work in progress 0.71% Sub-Grade Km. cum Km. cum Km. cum Km. cum Km. cum 149.09 644416 149.09 290445 149.09 73124 149.09 103876 149.09 40192 - CT Sub base CT Base AG Layer BC - Page | 40 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – AUGUST 2014 Structure Work Progress:Type of structures Total Completed In progress 1 Not yet started 1 ROB 2 Major bridge 3 3 Minor bridge 20 20 Grade Separator 12 2 10 Over pass 2 2 Under pass 2 2 Vehicular underpass 20 Pedestrian Underpass 11 Box culverts 47 5 42 Slab culverts 67 2 65 Pipe culverts 88 1 7 80 274 1 19 254 Total 2 18 11 Page | 41 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – AUGUST 2014 DETAIL STATUS OF STRUCTURE :Sl No. Chainage No. as per Drawing 1 464+674 2 517+095 3 518+829 NYS. 4 398+811 NYS. 5 407+538 NYS. 6 408+326 NYS. 7 456+312 NYS. 8 464+185 NYS. 9 475+670 10 476+050 11 496+609 NYS. 12 501+996 NYS. 13 504+287 NYS. 14 506+200 Work in progress 15 515+983 Work in progress 16 405+330 NYS. New 3 Lane Bridge on LHS 17 409+876 NYS. New 3 Lane Bridge on LHS 18 415+120 NYS. New 3 Lane Bridge on LHS 19 429+973 NYS. New 3 Lane Bridge on LHS NYS. New 3 Lane Bridge on LHS Name of Structure Status Remarks NYS. MAJOR BRIDGE Grade Separator MINOR BRIDGE (NEW) NYS. NYS. NYS. 20 437+047 21 450+140 NYS. New 3 Lane Bridge on LHS 22 461+652 NYS. New 3 Lane Bridge on LHS 23 464+903 NYS. New 3 Lane Bridge on RHS 24 468+620 NYS. New 3 Lane Bridge on LHS Page | 42 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – AUGUST 2014 25 497+840 NYS. New 3 Lane Bridge on LHS 26 509+953 NYS. New 3 Lane Bridge on LHS & Existing LHS Replaced by New 2 Lane Bridge 27 445+596 NYS. GAD & Reinforcement details approved 28 462+895 NYS. Widening on both Side 29 463+091 NYS. Widening on both Side 30 463+710 NYS. Widening on both Side 31 471+006 NYS. Widening on both Side 32 485+002 NYS. Widening on both Side NYS. Widening on both Side NYS. Widening on both Side NYS. Widening on both Side 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 MINOR BRIDGE (WIDENING) 492+871 495+735 507+503 520+373 ROB NYS. 443+710 NYS. 411+374 NYS. 413+886 NYS. 421+400 NYS. 428+208 NYS. 433+563 NYS. 447+771 460+036 467+115 469+750 473+340 479+109 486+427 489+702 GADs for both the ROBs have been approved NYS. 403+440 451+153 Work in progress (Test pile). VEHICULAR UNDERPASS NYS. NYS. NYS. NYS. NYS. NYS. NYS. NYS. Page | 43 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – AUGUST 2014 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 NYS. 491+451 NYS. 494+430 NYS. 509+559 Work in progress 518+221 Work in progress 519+349 NYS. 398+495 NYS. 399+230 NYS. 407+400 NYS. 409+088 NYS. 417+953 424+400 PEDESTRIAN UNDERPASS NYS. 476+430 NYS. 504+555 NYS. 510+700 NYS. 512+920 NYS. 514+900 398+519 398+782 403+335 407+212 407+422 407+657 408+867 409+060 409+366 411+332 411+391 413+926 NYS. BOX CULVERT NYS. Reconstruction NYS. Reconstruction NYS. Reconstruction NYS. Reconstruction NYS. Reconstruction NYS. Left side widening Reconstruction NYS. Reconstruction NYS. Reconstruction NYS. Reconstruction NYS. Reconstruction NYS. Reconstruction NYS. Retained with widening but change to Reconstruction & Right side Page | 44 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – AUGUST 2014 415+216 NYS. Existing Retained (RHS) New slab (LHS) NYS. Reconstruction NYS. Reconstruction NYS. Reconstruction NYS. Reconstruction NYS. Reconstruction NYS. Reconstruction NYS. Reconstruction NYS. Reconstruction NYS. Reconstruction NYS. Retained with widening but change to Reconstruction NYS. Reconstruction NYS. Reconstruction NYS. Retained with widening but change to Reconstruction NYS. Retained with widening but change to Reconstruction NYS. Retained with widening but change to Reconstruction NYS. Retained with widening but change to Reconstruction NYS. Reconstruction NYS. Reconstruction NYS. Reconstruction NYS. Reconstruction NYS. Reconstruction NYS. Reconstruction NYS. Reconstruction Work in progress Reconstruction NYS. Reconstruction NYS. Reconstruction NYS. Reconstruction 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 417+933 421+327 421+497 424+467 427+882 428+025 443+615 443+931 444+047 448+029 450+883 451+334 456+131 456+175 456+355 461+940 467+300 470+025 475+615 486+816 489+549 489+860 494+593 496+719 496+749 502+182 502+372 Page | 45 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – AUGUST 2014 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 502+538 505+934 506+173 509+255 512+635 512+997 515+180 516+290 518+180 519+690 399+140 400+070 400+450 401+625 404+115 405+204 405+777 408+207 409+125 409+707 410+140 410+760 414+040 414+240 414+750 418+107 418+748 420+178 PIPE CULVERT NYS. Reconstruction NYS. Left side widening Reconstruction & Right side Work in progress Left side widening Reconstruction & Right side NYS. Reconstruction NYS. Reconstruction Work in progress Reconstruction NYS. New NYS. New Work in Progress New Work in progress New NYS. Retained with widening NYS. Retained with widening In progress Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Existing Retained (RHS) New Pipe (LHS) NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening Page | 46 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – AUGUST 2014 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 425+330 425+900 426+935 429+325 429+449 430+200 431+110 433+265 433+600 434+231 435+200 435+750 435+915 436+127 436+655 438+313 438+605 438+860 438+966 439+370 439+710 440+015 440+095 440+660 440+850 441+010 444+420 444+595 444+897 NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening In progrss Retained with widening Page | 47 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – AUGUST 2014 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 446+015 447+048 448+397 449+080 450+505 450+690 450+970 451+070 452+452 452+350 453+453 453+940 454+740 456+460 457+530 459+750 460+000 460+120 460+410 460+495 460+652 460+775 461+505 462+175 462+300 462+360 462+735 In progress Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening In progress Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Existing Retained (RHS) New Pipe (LHS) NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening Page | 48 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – AUGUST 2014 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 463+015 463+345 463+530 467+040 473+415 473+980 476+446 477+500 478+570 478+611 478+990 479+325 485+790 486+075 511+920 406+115 406+475 409+525 411+755 412+325 412.616 412+836 413+356 413+555 415+830 416+283 416+985 420+790 SLAB CULVERT NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening Completed Retained with widening NYS. Retained with widening NYS. Retained with widening In progress Retained with widening Work in progress Retained with widening NYS. Retained with widening In progress Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening Page | 49 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – AUGUST 2014 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 422+485 422+645 423+026 423+592 423+986 432+316 432+749 432+989 439+900 441+850 442+567 442+745 444+675 446+410 446+655 449+421 449+821 452+685 453+580 455+705 457+130 457+260 465+060 465+087 465+525 465+765 468+375 469+220 472+225 NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening Page | 50 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – AUGUST 2014 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 474+862 481+930 484+030 487+904 488+660 489+128 491+970 493+834 495+445 497+040 497+367 499+890 500+278 501+260 501+562 502+863 503+456 505+226 505+700 506+723 507+738 512+383 438+500 Work in progress Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening Work in progress Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Toll Plaza 507+000 NYS. NYS- Not Yet Started Page | 51 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – AUGUST 2014 EMERGENCY SERVICES :SI. N. 1 Description Control Room Vehicle No Location Contact No - Durgapur 8170006300 2 Highway Petrol (Jharkhand) WB37C5168 Km.438.500 Toll Plaza 8229800282 3 Highway Ambulance(Jharkhand) JH10R2600 Km.438.500 Toll Plaza 8229800281 4 Highway Crane(Jharkhand) WB41E8714 Km.438.500 Toll Plaza 9525953313 5 Highway Pertol (West Bengal) A/F Km.499.270 DVC More 8170040455 6 Highway Petrol(Asansol) A/F Km 456.300 - 7 Highway Ambulance(West Bengal) JH10Z5503 Km.499.270 DVC More 8170040456 8 Highway Crane (West Bengal) WB41E9761 Km.467.450 Chanda More 9800104401 Page | 52 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – AUGUST 2014 Quality Assurance & Quality Control :- Site Laboratory in Dhanbad camp, Asansol Camp and Ranigarh Camp has been established and panagarh has partially established. Sl. No. Description of material & source STATUS I CEMENT a Ultratech OPC 53 Grde- Rawan Approved b The India Cement (OPC 43 Grade)-Vadapalli Approved II REINFORCEMENT Approved a. SAIL – Durgapur Approved b. Tata Tiscon – Bokaro Approved c. d. M/s RINL-Vizag M/s Tata Steel(Prestressing) Approved Approved e. M/s Usha Martin (Prestressing) Approved III HUME PIPES a. b. Hindustan Concrete pipe Industry – Ranchi Greenfield Industries – Makarampur Review Review c. Aggrawal Construction – Bolpur Review IV BORROW AREAS a Borrow Area-2 at km 519+300 LHS(Sec-III) Approved b Borrow Area-5 at Km 518+100 LHS(Sec-III) Approved c d e f V Borrow area-3 @Km.519+500LHS(Sec-III) Borrow area-10@km 516+000LHS(Sec-III) Borrow area 1 & 2 Sec-I Borrow area 1,3,4&5 sec-II Aggregates Approved Approved Approved Review a Sand Quarry-Ajay River Approved b c d e f g VI Sand Quarry Ajay River (Near Gaurandi) Sand Quarry Damodar River Sand Quarry Barakar River Stone Quarry-Maliara Stone Quarry Maheshpur Stone Quarry Jangalpur Water Approved Approved Approved Approved Approved Approved a 476+300 LHS-Casting yard Approved b 477+800 LHS- ECL water pipe line Approved Page | 53 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – AUGUST 2014 c 417+700RHS-APCO camp 1 Approved d 451+150 RHS- APCO camp-2 Approved Admixture &Curing Compound Approved a M/s Fosroc Approved b M/s. CICO Technologiest Ltd. Approved c M/s. Rheoplast Technology(P)-Faridabad Approved VII VIII Bearing a M/s.Sanfield India Ltd.-Bhopal Approved b M/s.Dynamic prestress(India)Ltd.-Nasik Approved IX Expansion Joints a M/s.Sanfield India Ltd. X Emulsiom a M/s.HINCOI-Haldia XI RE wall Agency’s a M/s.Suchi Geosyntheties Pvt.Ltd. Approved b M/s.techfab India Approved c M/s.STRATA Geosystems(India)Pvt.Ltd. Approved d M/s.Geosys India Infrastructures Pvt.Ltd Approved XII Approved Approved Independent Laboratory Agency’s a M/s.Suntech-,Ranchi Approved b M/s.Omega Consultant services,Kolkata Approved c M/s.Spectro Shyam labs Pvt.Ltd.(Calibration of equipment),Delhi M/s Vison Lab –Environment Test (Hydrabad) Approved d e f M/s Essjay Technomeasures Pvt. Ltd.-Howrah M/s Envirotech East(P) Ltd.- Environment Test (Hydrabad) Approved Approved Approved CALIBRATION STATUS OF LABORATORY EQUIPMENT AND PLANTS AS ON 31.08.2014 Page | 54 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – AUGUST 2014 S. NO Name of the Equipment/Instru ment Identification No. Frequency of calibration Actual date of calibration Due date of Calibration Details of Calibrating agency Remarks Young engg. & calibration services pvt.ltd. Young engg. & calibration services pvt.ltd. Section-I 1 Proving Ring 25 KN (CBR) SL No. : 25kN .52012 Yearly 07.05.2014 07.05.2015 2 Proving Ring 50 KN (MARSHALL) SL No. : 50kN . 11224 Yearly 07.05.2014 07.05.2015 07.09.2014 SAND POURING CYLINDER CALIBRATION 3 CYLINDER 100mm dia 01 2 Months 09.07.2014 4 CYLINDER 150mm dia 02 2 Months 09.07.2014 07.09.2014 5 CYLINDER 200mm dia 02 2 Months 09.07.2014 07.09.2014 02 2 Months 12.07.2014 10.09.2014 Compression Testing Machine (CTM) 1314617 12 Months 20.01.2014 19.01.2015 2 Proving Ring 25 KN (CBR) C-12276 26 Months 16.01.2014 15.03.2016 3 Proving Ring 50 KN (Marshall Test) C-12456 26 Months 28.04.2014 27.06.2016 4 Proving Ring 2 KN (Direct Shear Test) C-12457 26 Months 28.04.2014 27.06.2016 5 Stop Watch 12 Months 08.10.2013 08.10.2014 6 Hot Air Oven (00 to 4000C) BCL/BSW/1138 94 13-14/609 12 Months 20.01.2014 19.01.2015 Lab in 417+700 R/S Lab in 417+700 R/S Lab in 417+700 R/S CALIBRATION RAPID MOISTURE METER 6 MOISTURE METER Lab in 417+700 R/S Section-II 1 7 COMPANY NCCBM BALLABHGH ARH NCCBM BALLABHGH ARH NCCBM BALLABHGH ARH BCL/113894 TEST WELL INSTRUMENTS Water bath Range (00C to 1100C) 13-14/698 8 Vicat Apparatus 13-14/619 12 Months 20.01.2014 19.01.2015 9 Slimp Cone Range (100x200x300mm) 1 to 5 AIV Apparatus 13-14/636 To 638 12 Months 20.01.2014 19.01.2015 13-14/630 12 Months 10 TEST WELL INSTRUMENTS 12 Months 20.01.2014 19.01.2015 COMPANY TEST WELL INSTRUMENTS COMPANY TEST WELL INSTRUMENTS COMPANY TEST WELL INSTRUMENTS COMPANY 20.01.2014 19.01.2015 TEST WELL INSTRUMENTS COMPANY 11 FI & EI Apparatus 13-14/623 12 Months 20.01.2014 19.01.2015 12 Vibrating Machine 13-14/625 12 Months 20.01.2014 19.01.2015 TEST WELL INSTRUMENT S COMPANY TEST WELL Page | 55 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – AUGUST 2014 INSTRUMENT S COMPANY (Cement Motor) 13 Vibration Table 13-14/624 12 Months 20.01.2014 19.01.2015 14 Digital Thermo Meter 13-14/721 12 Months 20.01.2014 19.01.2015 15 Thermo Hygro Meter CTH-288 12 Months 28.04.2014 27.04.2015 TEST WELL INSTRUMEN TS COMPANY TEST WELL INSTRUMEN TS COMPANY Bagson Calibration Lab Pvt.Ltd. Soil 16 Measuring Jar 100 ML. 1314/725 TO 734 12 Months 20.01.2014 19.01.2015 TEST WELL INSTRUMEN TS COMPANY TEST WELL INSTRUMEN TS COMPANY TEST WELL INSTRUMEN TS COMPANY Bagson Calibration Lab Pvt.Ltd. TEST WELL INSTRUMEN TS COMPANY 17 Measuring Jar 500 ML. 1314/723 TO 724 12 Months 20.01.2014 19.01.2015 18 Measuring Jar 1314/723 to 725 12 Months 20.01.2014 19.01.2015 19 Proctor Moulds 14-15/796 to 798 12 Months 28.04.2014 27.04.2015 20 CBR Moulds 13-14/699 TO 720 12 Months 20.01.2014 19.01.2015 21 Plants Batching Plant (Schwing Stetter) 12-ETX2502 3 Months 17.06.2014 16.09.2014 Jointly Conducted BAGSON Calibration Lab Pvt.Ltd. BAGSON Calibration Lab Pvt.Ltd. BAGSON Calibration Lab Pvt.Ltd. BAGSON Calibration Lab Pvt.Ltd. BAGSON Calibration Lab Pvt.Ltd. ASPHALT 22 Bitumen Extraction Apparatus 14-15/790 12 Months 28.04.2014 27.04.2015 23 Penetrometer 14-15/787 12 Months 28.04.2014 27.04.2015 24 Softening Point 14-15/791 12 Months 28.04.2014 27.04.2015 25 Ductility 14-15/788 12 Months 28.04.2014 27.04.2015 26 Saybolt Furol Apparatus 14-15/892 12 Months 28.04.2014 27.04.2015 20.01.2014 19.01.2015 SAND POURING CYLINDER CALIBRATION 27 CYLINDER 100 MM 13-14/634 TO 635 12 Months TEST WELL INSTRUMEN Page | 56 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – AUGUST 2014 28 CYLINDER 200 MM 13-14/631 12 Months 20.01.2014 19.01.2015 TS COMPANY TEST WELL INSTRUMEN TS COMPANY CALIBRATION RAPID MOISTURE METER 29 MOISTURE METER 1314722 12 Months 20.01.2014 19.01.2015 TEST WELL INSTRUMEN TS COMPANY 30 MOISTURE METER 14-15/795 12 Months 28.04.2014 27.04.2015 31 Concrete Cude Mould (150X150X150 MM) 13-14/639 TO 683 12 Months 20.01.2014 19.01.2015 32 Cement Motor Cude Mould (70.6X70.6X70.6 MM) 13-14/684 TO 695 12 Months 20.01.2014 19.01.2015 TEST WELL INSTRUMEN TS COMPANY TEST WELL INSTRUMEN TS COMPANY TEST WELL INSTRUMEN TS COMPANY WEIGHTS & MEASURES 33 Weighing Scale Range (35 Kgs) 13-14/627 12 Months 20.01.2014 19.11.2014 34 Weighing Scale Range (35 Kgs) 13-14/628 12 Months 20.01.2014 19.11.2014 35 Weighing Scale Range (20 Kgs) 1314/626 12 Months 20.01.2014 19.01.2015 36 Weighing Scale Range (600 Grams) AX/2013/15353 12 Months 20.01.2014 19.01.2015 37 Vernier Callipers Range (0 to 150 MM) 14-15/804 12 Months 28.04.2014 27.04.2015 Eq, No./IS Sieve(450mm dia.)/1 12 Months 14.07.2014 13.07.2015 38 IS SIEVE IS Sieve 450 mm Dia Range 80.00M 39 75.00MM Eq, No./IS Sieve(450mm dia.)/2 12 Months 14.07.2014 13.07.2015 40 63.00MM Eq, No./IS Sieve(450mm dia.)/3 12 Months 14.07.2014 13.07.2015 41 53.00MM Eq, No./IS Sieve(450mm dia.)/4 12 Months 14.07.2014 13.07.2015 42 50.00MM Eq, No./IS Sieve(450mm dia.)/5 12 Months 14.07.2014 13.07.2015 43 45.00MM Eq, No./IS Sieve(450mm 12 Months 14.07.2014 13.07.2015 BAGSON Calibration Lab Pvt.Ltd. BAGSON Calibration Lab Pvt.Ltd. BAGSON Calibration Lab Pvt.Ltd. BAGSON Calibration Lab Pvt.Ltd. BAGSON Calibration Lab Pvt.Ltd. ApcoPackage-2 Lab ApcoPackage-2 Lab ApcoPackage-2 Lab ApcoPackage-2 Lab ApcoPackage-2 Lab ApcoPackage-2 Page | 57 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – AUGUST 2014 44 40.00MM 45 37.50MM 46 dia.)/6 Eq, No./IS Sieve(450mm dia.)/7 Lab ApcoPackage-2 Lab ApcoPackage-2 Lab ApcoPackage-2 Lab ApcoPackage-2 Lab ApcoPackage-2 Lab ApcoPackage-2 Lab ApcoPackage-2 Lab ApcoPackage-2 Lab ApcoPackage-2 Lab ApcoPackage-2 Lab ApcoPackage-2 Lab ApcoPackage-2 Lab ApcoPackage-2 Lab ApcoPackage-2 Lab ApcoPackage-2 Lab ApcoPackage-2 Lab ApcoPackage-2 Lab 12 Months 14.07.2014 13.07.2015 Eq, No./IS Sieve(450mm dia.)/8 12 Months 14.07.2014 13.07.2015 31.50MM Eq, No./IS Sieve(450mm dia.)/9 12 Months 14.07.2014 13.07.2015 47 26.50MM Eq, No./IS Sieve(450mm dia.)/10 12 Months 14.07.2014 13.07.2015 48 25.00MM Eq, No./IS Sieve(450mm dia.)/11 12 Months 14.07.2014 13.07.2015 49 22.40MM Eq, No./IS Sieve(450mm dia.)/12 12 Months 14.07.2014 13.07.2015 50 20.00MM Eq, No./IS Sieve(450mm dia.)/13 12 Months 14.07.2014 13.07.2015 51 19.00MM Eq, No./IS Sieve(450mm dia.)/14 12 Months 14.07.2014 13.07.2015 52 16.00MM Eq, No./IS Sieve(450mm dia.)/15 12 Months 14.07.2014 13.07.2015 53 14.00MM Eq, No./IS Sieve(450mm dia.)/16 12 Months 14.07.2014 13.07.2015 54 13.20MM Eq, No./IS Sieve(450mm dia.)/17 12 Months 14.07.2014 13.07.2015 55 12.50MM Eq, No./IS Sieve(450mm dia.)/18 12 Months 14.07.2014 13.07.2015 56 11.20MM Eq, No./IS Sieve(450mm dia.)/19 12 Months 14.07.2014 13.07.2015 57 10.00MM Eq, No./IS Sieve(450mm dia.)/20 12 Months 14.07.2014 13.07.2015 58 9.50MM Eq, No./IS Sieve(450mm dia.)/21 12 Months 14.07.2014 13.07.2015 59 6.30MM Eq, No./IS Sieve(450mm dia.)/22 12 Months 14.07.2014 13.07.2015 60 4.75MM Eq, No./IS Sieve(450mm dia.)/23 12 Months 14.07.2014 13.07.2015 071118, CAT 317E-DG 12 Months 10.06.2014 09.06.2015 AIMIL SO61042, AIM317E AN2 12 Months 10.06.2014 09.06.2015 AIMIL 1147/UAB998 12 Months 20.06.2014 19.06.2015 Spectro Lab Section-III 1 2 3 Compression Testing Machine (CTM) Compression Testing Machine (CTM) Proving Ring 50 Page | 58 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – AUGUST 2014 6 KM(CBR) Plunger Type Gauge (0-25 mm) Plunger Type Gauge (0-25 mm) Plants Batching Plant 7 Batching Plant 4 5 JO 6 12 Months 20.06.2014 19.06.2015 Spectro Lab JO8 A 12 Months 20.06.2014 19.06.2015 Spectro Lab Schwing Stater (CB-30) 3 Months 31.08.2014 30.11.2014 BHAI 3 Months 09.08.2014 08.11.2014 Details of QC Tests conducted during the month (01st August 2014 to 31st August 2014) Page | 59 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – AUGUST 2014 S. N. DESCRI PTION 1.0 Earth Work 1.1 OGL/EG L 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 1.10 Borrow area used for embank ment and sub grade Description of tests as per BIS/ Agreement provisions Grain size analysis MDD & OMC Atterberg limit FSI CBR Field density of original ground Grain size analysis MDD & OMC Sub Grade 1.16 Earthen Shoulder s 2.0 Concrete 2.1 Sand 2.2 2.3 Aggregat e 2.4 2.5 2.6 Cement Total Pass Fail Total Pass Fail Total 416 189 - 189 605 - 605 As required As required As required As required 1st test per 1000 m2 2nd test per 3000 m3 nd 2 test per 3000 m3 2nd test per 3000 m3 2nd test per 3000 m3 st 1 test per 3000 m3 As required 420 419 418 27 139 53 83 420 419 418 80 222 191 190 191 59 2 36 - 191 190 191 95 2 611 609 609 86 141 89 83 611 609 609 175 224 230 - 230 58 - 58 288 - 288 299 - 299 58 - 58 287 - 287 198 - 198 58 - 58 256 - 256 218 - 218 58 - 58 276 - 276 34 4 38 20 - 20 54 4 58 - - - - - - - - - 1st test per 250 m3 1st Test per 1000 m2 21 - 21 24 - 24 45 - 45 151 15 166 151 15 166 1st Test per 500 m2 2 - 2 - - - 2 - 2 1st Test per 500 m2 9 - 9 - - - 9 - 9 Sieve Analysis As required 59 - 59 35 - 35 94 - 94 Specific gravity and water absorption Sieve Analysis As required 3 - 3 2 - 2 5 - 5 As required 38 - 38 34 - 34 72 - 72 Flakiness & Elongation Index Los Angels Abrasion Value / AIV Specific gravity and water absorption Fineness As required 15 - 15 9 - 9 24 - 24 As required 15 - 15 9 - 9 24 - 24 Atterberg limit FSI Deleterious Content Test NMC 1.15 Fail Total no. of tests conducted up to this month - 1.12 Embank ment pass No. of tests conducted this month 416 CBR 1.14 No. of tests conducted up to previous month As required 1.11 1.13 Frequency of tests as per MoRTH/C.A. Field density of Compacted layers Field density of Compacted layers Field density of Compacted layers As required Consistency Initial & Final setting Soundness Test Specific Gravity Once per Every Lot - - - - - - - - - - - - 4 - 4 4 - 4 -- - - 4 - 4 4 - 4 - - - 4 4 4 - 4 - - - 4 - 4 4 - 4 - - - 1 - 1 1 - 1 Page | 60 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – AUGUST 2014 Compressive Strength 3 days Compressive Strength 7 days Compressive Strength 28 days 3.0 NP4 Spun Pipe 3.1 600 mm dia 3.2 900 mm dia - - - 4 - 4 4 - 4 - - - 4 - 4 4 - 4 - - - 4 - 4 4 - 4 Every lot Every Lot 1 - - 1 - - - - 1 - - 1 - 3.3 1000 mm dia Every Lot 3 - 3 2 - 2 5 - 5 3.4 1200 mm dia Every Lot - - - - - - - - - Two test per upto 100 tonnes and three test per above 100 tonnes 3 - 3 2 - 2 5 - 5 3 - 3 2 - 2 5 - 5 3 - 3 2 - 2 5 - 5 4.0 Independent Laboratory Testing 4.1 Steel Tensile Strength 4.2 4.3 0.2% proof stress Elongation 4.4 Bend Test 3 - 3 2 - 2 5 - 5 4.5 Re-Bend Test 3 - 3 2 - 2 5 - 5 4.6 Mass per meter run Water absorption Deleterious material (%) a. Light Weight Pieces b. Material finar than 75 micron Alkali aggregate reactivity a. Reduction in Alkalinity of 1.0 N NaOH b. Silica Dissolved Soundness (% by weight loss after 5 cycles) a.Sodium Sulphata b. Magnesium Sulphate Petrography 3 - 3 2 - 2 5 - 5 4 - 4 1 - 1 5 - 5 3 - 3 1 - 1 4 - 4 2 - 2 - - - 2 - 2 2 - 2 - - - 2 - 2 1 - 1 - - - 1 - 1 3 - 3 - - - 3 - 3 4 - 4 - - - 4 - 4 1 - 1 - - - 1 - 1 3 - 3 - - - 3 - 3 3 - 3 - - - 3 - 3 5 - 5 - - - 5 - 5 - - - 4 4 4 - 4 4 4 4 4 4 - 4 4 4 - - - 4 - - 4 - 4 - - 4 - - - 4 - 4 4 - 4 - - - 3 - 3 3 - 3 4.7 Stone Quarry 4.8 4.9 4.10 4.11 4.12 4.13 4.14 4.15 4.16 4.17 4.18 4.19 4.20 4.21 4.22 4.23 4.24 Cement Fineness Consistency Initial & Final Setting Soundness Test Chemical Properties Compressive strength 3 days Compressive Once every source Page | 61 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – AUGUST 2014 strength 7days Compressive strength 28 days 4.25 5.0 Mix Design 5.1 RCC M30 5.2 RCC M30 (Pump) 5.3 RCC M35 5.4 PCC M15 5.5 PCC M20 5.6 RCC M25 5.7 RCC M40 5.8 RCC M40 5.9 Compressive Strength 7 days Compressive Strength 7 days Compressive Strength 7 days Compressive Strength 7 days Compressive Strength 7 days Compressive Strength 7 days Compressive Strength 7 days Compressive Strength 28 days Compressive Strength 7 days RCC M35 (Pump) 6.0 Cast-in-situ Conceate Cubes 6.1 PCC Compressive M15 Strength 7 days 6.2 PCC Compressive M20 Strength 7 days Compressive 6.3 RCC M25 Strength 7 days - - - - - - - - - 2 - 2 1 - 1 3 - 3 As required 2 - 2 - - - 2 - 2 As required 7 2 9 - 4 4 7 6 13 As required - - - 4 - 4 4 - 4 As required - - - 1 - 1 1 - 1 As required - - - 1 - 1 1 - 1 As required - - - 4 4 8 4 4 8 As required - - - 5 4 9 5 4 9 As required - 2 2 1 - 1 1 2 3 13 - 13 10 - 10 23 - 23 15 - 15 12 - 12 31 - 31 4 - 4 3 - 3 7 - 7 As required As required 6.4 RCC M30 Compressive Strength 7 days - - - 14 - 14 14 - 14 6.5 RCC M35 Compressive Strength 7 days 4 - 4 - - - 4 - 4 6.6 PCC M15 Compressive Strength 28 days 4 - 4 27 - 27 31 - 31 6.7 PCC M20 - - - 8 - 8 8 - 8 - - - 3 - 3 3 - 3 - - 17 - 17 17 - 17 4 - 4 5 - 5 9 - 9 1 Test per 200m3 As required 2 - 2 - - - 2 - 2 2 - 2 - - - 2 - 2 1 Test per 200m3 1 Test per - - - 2 - 2 2 - 2 - - - 2 - 2 2 - 2 Compressive Strength 28 days 6.8 PCC Compressive M35 Strength 28 days 5.9 RCC Compressive M30 Strength 28 days 6.10 RCC Compressive M25 Strength 28 days 7.0 Granular Sub-Base 7.1 GSB Sieve Analysis MDD & OMC 7.2 8.0 Wet Mix Macadam Flakiness & 8.1 Elongation Index WMM AIV 8.2 Page | 62 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – AUGUST 2014 8.3 8.4 Specific gravity and water absorption Sieve Analysis 8.5 8.6 MDD & OMC Atterberg Limits 9.0 9.1 9.2 9.3 9.4 200m3 As required 1 Test per 100m3 As required 1 Test per 100m3 Cementation Sub-Base CTSB Sieve Analysis As required MDD & OMC As required Atterberg Limits As required 10% Fines Value As required - - - 4 - 4 4 - 4 - - - 18 - 18 18 - 18 - - - 2 2 - 2 2 2 2 - 2 2 - - - 14 14 14 - 14 - - - 5 5 5 - 5 - - - 2 2 2 - 2 - - - 2 2 2 - 2 Safety and Road Maintenance :Page | 63 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – AUGUST 2014 Safety:Advance marking sign regarding portion of any of the highways damaged or diversion or any other information which needs to be advised to the road users should be prepared in advance and kept ready to enable immediate necessary action in the matter to be able to ensure hassle free flow of traffic on existing highway. Unauthorized median opening should be immediate closed and median opening signage should be provided at authorized median opening locations. Concessionaire has requested to please make proper safety arrangement during cutting of trees, logging and transportation. Signage, Retro Reflective Tapes, Warning Sign should be provided at construction zone portions and also arrangement of traffic during construction and maintenance shall confirm to the requirements of IRC SP: 55, clause 112 of MORT&H Specification and provisions of concession agreement. Concessionaire is advised to submit the safety regulation as per Schedule L and safety Plan. Maintenance:The Maintenance of existing highway is being carried by concessionaire. In Panagarh town portion with overlaying of BC after milling work has been completed. Repairing of pot holes work also commenced, but which is very slow and nominal. Several correspondences have been made requesting to speed up the progress of repairing work. NOTICE has also been served to the Concessionaire vide IE’s letter no. SAICPLSugam/Barwa-Adda-Panagarh/IE/NH-2/2014/180 dated 10.07.2014 for immediate repairing failing which action will be taken as per the relevant clauses of MCA. Reminder Notice has been served on 10th day after issuing the notice vide IE’s Letter No. SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/205 dated 19.07.2014. Inspite of the notices being served, the Concessionaire fails to complete the work within the stipulated date. An estimate amounting to Rs.47, 43,800/- was prepared for the balance work and the same have been submitted to the NHAI office vide IE’s letter no: SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH2/2014/209 dated 21.07.2014 (copy enclosed) for taking further necessary action. The conditions of existing highway at some locations are critical. Specially at DVC More, Bhiringi location, Muchipara, DSP Maingate, Airforce to Darjiling more & Check post (barakar) locations should be taken up immediately. All cross drainage structure works must be inspected immediately and ensure that there is no debris/ or dismantled material/ any other obstruction to the water way and water flows freely. Cleaning of side drains along with service road/ main carriageway should be immediately cleaned and ensure that rain water should not be stagnant on main carriageway as well as service road. Maintenance of existing shoulder of project highway has to be taken up immediately. WEATHER REPORT :Page | 64 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – AUGUST 2014 01-August-14 Section -I Dhanbad Temperature Rain Fall 0C Max Min (mm) 34.0 27.0 NIL Section -II Asansol Temperature 0C Max Min 28.3 27.5 Rain Fall (mm) NIL Section – III Durgapur Temperature Rain 0C Fall Max Min (mm) 34.0 29.0 2.4 02- August -14 33.5 26.0 NIL 38.5 27.4 NIL 35.0 31.0 NIL 03- August -14 34.2 27.0 4.8 38.4 27.3 9.2 33.0 31.0 4.4 04- August -14 36.0 27.2 15.6 32.1 26.8 8.0 34.0 31.0 18.2 05- August -14 35.0 28.0 8.4 34.1 26.4 11.2 32.0 31.0 NIL 06- August -14 40.2 28.2 NIL 37.1 27.1 NIL 33.0 31.0 NIL 07- August -14 32.4 25.8 87.2 37.5 27.5 1.8 33.0 32.0 24.4 08- August -14 33.0 26.4 3.2 38.1 27.1 6.6 33.0 31.0 NIL 09- August -14 32.0 27.0 46.4 34.8 26.9 10.0 33.0 31.0 9.8 10- August -14 34.0 26.0 2.6 34.1 26.2 1.0 33.0 31.0 NIL 11- August -14 32.4 26.8 NIL 37.1 27.2 NIL 32.0 30.0 NIL 12- August -14 34.0 26.4 13.5 39.2 27.2 2.2 33.0 29.0 NIL 13- August -14 32.4 27.0 11.6 38.4 28.1 7.4 33.0 30.0 9.0 14- August -14 34.0 26.8 8.4 37.8 26.8 4.6 33.0 30.0 NIL 15- August -14 32.0 27.0 6.2 37.6 26.6 3.2 32.0 29.0 7.0 16- August -14 33.2 26.4 5.6 36.5 25.9 17.4 33.0 31.0 6.3 17- August -14 34.0 27.0 NIL 33.8 26.7 NIL 32.0 31.0 NIL 18- August -14 33.4 26.6 6.0 36.5 26.0 NIL 32.0 31.0 5.8 19- August -14 32.6 27.0 NIL 39.3 27.9 NIL 33.0 29.0 NIL 20- August -14 34.0 26.8 15.6 38.1 26.2 0.6 33.0 30.0 NIL 21- August -14 33.0 26.0 2.4 38.9 26.9 NIL 34.0 29.0 NIL 22- August -14 33.6 27.0 NIL 38.1 27.1 NIL 34.0 29.0 NIL 23- August -14 34.2 28.0 1.8 38.4 27.3 NIL 34.0 29.0 6.2 24- August -14 34.0 27.4 NIL 39.5 27.1 1.2 34.0 31.0 12.9 25- August -14 33.0 26.6 2.8 41.0 26.7 NIL 34.0 30.0 NIL 26- August -14 34.2 27.0 NIL 39.2 26.6 NIL 33.0 29.0 NIL 27- August -14 35.0 26.0 NIL 35.2 27.3 3.6 34.0 31.0 3.4 28- August -14 34.0 26.4 NIL 35.4 26.6 NIL 35.0 30.0 NIL 29- August -14 33.0 27.2 4.6 35.8 26.4 NIL 32.0 30.0 NIL 30- August -14 33.5 27.0 5.4 34.8 26.5 NIL 33.0 29.0 1.1 31- August -14 33.0 26.5 32.8 33.0 25.8 50.5 33.0 32.0 32.2 DATE Page | 65 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – AUGUST 2014 Site Photographs :- C& G work in progress at km 451+720 Box culvert at km 518+213 Page | 66