Transforming Community Equipment Services London Update for JIP meeting 180909 The Transformation of Community Equipment Services (TCES) in London Aims to implement the retail solution for simple aids to daily living across London within 2 years and, additionally to: • Transform the market place for community equipment in London • Provide impetus to the achievement of the personalisation agenda within the London boroughs Site Status by 30/9 Comments Barking & Dagenham Project set up and launched 8th Sep Brent Developing governance structure Camden Project set up and go live planned for Oct Enfield Developing governance structure Harrow Project set up and launched 9th Sep Havering Project set up and launched 8th Sep Lambeth Project set up and launch being scheduled Southwark Project set up and launched 9th Sep 8 boroughs have previously committed resources and 6 are already well on the way to implementing the model 2 3 The proposed TCES London pre-programme planning covers the following activities Initiate Programme • Agree • Partnership Arrangements • Agree the • funding structure • Agree HR process and confirm T’s & • C’s, contracting arrangements• • Develop wider engagement • approach • Develop high level plans Set Up Governance Structure Establish • Programme Sponsor Role and Develop Charter • Establish Executive Steering Group & • Develop Charter • Establish Programme Board & Develop Charter Confirm Project • Resourcing Plan Launch Event for Programme Board, ESG and other interested Directors Recruit and Mobilise Team Confirm team • structure and resources Develop skill • sets, job descriptions etc Recruit team • Develop induction and training materials • Deliver induction and training • Prepare detailed plans Engagement • methodology and plan Stakeholder analysis and • management Comms plan Implementation • pathway and plans Virtual teaming implementation support • Market development • RAIDs • • KPIs • Contingency Engage London Sites Contact sites to set up engagement events Present to key Directors (LA/NHS) Understand preferred place in implementation waves Understand local sign off process to commit Draft wave plan Review Process and Launch • Finalise implementation waves • Allocate TCES London team to sites • Peer review plans and approach • Review with Sponsors • Approval and sign off by Programme Board and ESG • Hold Launch Event Underpinning this programme are tried & tested tools and materials prepared by the highly experienced CSED team Executive Steering Group (JIP) 4 (meets quarterly) Programme Sponsors DRD (Ian Winter) & Reports to TCES London Programme Board (meets bi-monthly initially) CA Efficiency Board Anyone else? Nominated DASS <<name>> <<name>> DRD Team Sarah Hollingworth JIP Chair (Marian Harrington) Capital Ambition Council Member <<name>> <<name> CSED Lynne Horn TCES Programme Manager Akosua Bame-Ashiagbor Project Managers/ Business Change Managers PM No 1 PM No 2 PM No 3 CSED PM No 4 PM No 5 PM No 6 <<name>> <<name>> <<name>> Lynne Horn <<name>> <<name>> <<name>> LA/NHS partnership LA/NHS partnership LA/NHS partnership LA/NHS partnership LA/NHS partnership <<name>> <<name>> <<name>> LA/NHS CSED partnership Lynne Horn <<name>> <<name>> <<name>> CSED National TCES Implementation Team 5 Suggested Programme Board and Executive Steering Group Launch event Event from 10am – 4pm (Date to be agreed) • Introductions and Expectations (15 mins) • Presentation of the Retail Model and Engagement Approach (2 hours) • Lunch (0.5hours) • Review TCES London business case and benefits realisation plan (1.5 hours) • Kick off Programme Boards and Executive Steering Group (1 hour) – Agree roles and responsibilities – Agree and sign off charters – Agree diary of meetings • Wrap up, next steps and close (15 mins) By the end of the session all participants will be clear on the deliverables and timelines for the TCES London Programme 6 Indicative high level TCES London programme plan for 2009/10 Jul TCES London Programme management Aug Sep Oct Nov Dec Jan Feb Mar Planning for TCES London Programme Programme Management Recruit and onboard TCES London Project Team National TCES Implementation Support National TCES Market Development Support Apr May Jun Team Start Implement Wave 1 sites Wave 2 onwards Mentoring and coaching new PMs and FSs Virtual Team Support Engagement events Complete current site SUR’s Thurrock Retail Ax Centre St Helens Retail Market research and planning of Wave 1 events Wave 2 onwards The target team start date is 16 November 2009 with the 1st wave of sites commencing their project initiation on 30 November 2009. 7 Approvals/decisions required today Approvals required • Do you agree to the overall programme approach to launch on 30 November? Actions required • Can we have 2 nominations for DASS to sit on the TCES London Programme Board? 8 TCES London Programme Supplementary Slides 9 There are 10 Steps to implementing the new model for Community Equipment PASS START UP READINESS TEST 1 Initiate SADLs project, set up SADLs governance structure & PM toolkit 2 Develop change management material & launch project with staff/stakeholders 3 Develop & initiate transition plans 4 Adopt national catalogue & tariff, develop marketplace 5 Tailor ‘to be’ assessment, prescription & retail processes Project Management Support 6 CADLs GO LIVE 10 SADLs GO LIVE 9 Develop & implement CADLs solution Transition SADLs to BAU 8 Understand how change will be captured & conduct change readiness assessments 7 Conduct user engagement activities Tailor finance & back office processes 10 High level TCES London Programme Plan M1 M2 M3 M4 M7 M8 M9 M10 M11 M12 Wave 3 Sites Engaged Local Governance in place Local Governance in place M14 M6 Wave 2 Sites Engaged Wave 1Sites Engaged M13 M5 Local Governance in place Local Approvals Local Approvals Local Approvals SURs SURs SURs Project Launch Project Launch Project Launch M15 M16 M17 M18 M19 M20 M21 M22 M23 M24 Wave 5 Sites Engaged Wave 4 Sites Engaged Local Governance in place Local Governance in place Local Approvals Local Approvals SURs SURs Project Launch Project Launch Total slippage built in to programme The target start date for the 1st wave of sites commencing their project is 30 November 2009. 11 High level Programme Plan per Borough M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 Sites Engaged Local Governance in place Local Approvals SURs Project Launch TCES London Support Local Retail Solution Developed 1st Prescription SADLs Ramp Up Local Project Closure Boroughs will receive 4 months on-site support then virtual teaming support from the TCES London Programme Manager and shared learning networks 12 TCES London Programme Governance Roles and Responsibilities TCES London Programme Sponsor 13 Deliverable: To champion the project and provide strategic support Aim: To remove barriers to the project’s success managing the project at strategic level ensuring sustained buy-in into the project with key stakeholders. This ensures the project manager is empowered and supported with the appropriate resources Time Plan/Key Milestones: Scope: •Input into strategic decisions and financial implications RACI A – London TCES Programme Manager Excludes: • Day-to-day project decisions • Process detail Policy Links: • NHS Next Stage Review • Putting People First • Our health, our care, our say: a new direction for community services Naturally works with which Stakeholders? • London TCES Programme and Executive Steering Boards • London DRD team • National TCES team • Individual London Boroughs Risks: • Lack of local borough executive engagement and commitment • Lack of locally provided resources, capability, timeliness • • Project launch Jan 10 • Project duration 2 years Deliverables: • Progress reporting to Project Board/Executive Steering Group Critical Success Factors: • Resources • Budget • Stakeholder Commitment Resources • DASS Leads on Efficiency for London (Marian Harrington & Mimi Konigsberg) Activities: •Physically represent and champion the project at major events •Attend Executive Steering Group meetings to update on progress •Chair Project Board meetings •Formally manage project scope •Approve plans, schedules and budgets •Ensure project benefits are realised TCES London Executive Steering Group 14 Deliverable: To ensure the TCES London programme meets the overall strategic direction of the LA/NHS partners Aim: To provide strategic direction and leadership to the London TCES Programme and oversee external communications and stakeholder management Time Plan/Key Milestones: Scope: • All 33 London boroughs and their NHS partners • Strategic decisions and financial implications Excludes: • Day to day project decisions • Process detail Policy Links: • NHS Next Stage Review • Putting People First • Our health, our care, our say: a new direction for community services RACI A – London TCES Programme Manager Naturally works with which Stakeholders? • London TCES Programme Boards • London DRD team • National TCES team •London ADASS team • Individual London Boroughs Risks: • Lack of local borough executive engagement and commitment • Lack of locally provided resources, capability, timeliness • Project launch Jan 10 • Project duration 2 years Deliverables: •? Critical Success Factors: • Resources • Budget • Regular attendance to update meeting • Material structured effectively to promote decision-making • Willingness to front events and act as champions and sponsors Resources • JIP Board or nominated Sub Group Activities: • Quarterly update session • Review of plan • Presentation of successes / major risks & issues • Resolution/actions on way forward • Strategic level decisionmaking • Lead the wider engagement through communications / disseminating project messages • Management with wider LA/NHS stakeholders TCES London Programme Board 15 Deliverable: To provide decision-making and leadership around the delivery of the TCES London programme Aim: To ensure available resources and capacity are available, that any obstacles or major risks to delivery are managed and that linkages with other initiatives/projects are managed. Time Plan/Key Milestones: Scope: • All 33 London boroughs and their NHS partners • Simple Aids to Daily Living RACI A – London TCES Programme Manager Excludes: • Complex Aids to Daily Living Policy Links: • NHS Next Stage Review • Putting People First • Our health, our care, our say: a new direction for community services Naturally works with which Stakeholders? • London TCES Programme and Executive Steering Boards • London DRD team • National TCES team • Individual London Boroughs Risks: • Lack of local borough executive engagement and commitment • Lack of locally provided resources, capability, timeliness • • Project launch Jan 10 • Project duration 2 years Deliverables: •? Critical Success Factors: Resources • DRD member • JIP member • CA member • Council member • National TCES member Activities: •Monthly update session •Review of plan •Presentation of successes / major risks & issues •Resolution/actions on way forward • Strategic level decisionmaking • Information cascade to appropriate teams TCES London Programme Manager 16 Deliverable: Structure, plans, systems and tools in place to manage programme within timeline Aim: To implement the retail solution for simple aids to daily living across London within 2 years whilst transforming the marketplace and provide impetus to achieve the wider personalisation agenda Time Plan/Key Milestones: Scope: • All 33 London boroughs and their NHS partners • Simple Aids to Daily Living RACI A – London TCES Programme Manager Excludes: • Complex Aids to Daily Living Policy Links: • NHS Next Stage Review • Putting People First • Our health, our care, our say: a new direction for community services Naturally works with which Stakeholders? • London TCES Programme and Executive Steering Boards • Sponsors • London DRD team • National TCES team • Individual London Boroughs Risks: • Lack of local borough executive engagement and commitment • Lack of locally provided resources, capability, timeliness • • Project launch Jan 10 • Project duration 2 years Deliverables: • Detailed project plan for implementation and roll out • Progress review methodology • Project Team recruited • Stakeholder engagement • Stakeholder communications • Risk matrix, Issues Log Critical Success Factors: • Resources • Budget • Stakeholder Commitment Resources • London TCES Programme Manager • London TCES Programme Team Activities: Control the project through •Regular project meetings •Managing the project plan and project controls (RAIDs, Comms plan etc) •Ensuring sponsors are in touch with key issues •Managing measurement process Support local Project Managers to •Design and implement their project plans to the defined quality standard •Review progress to plan •Escalate risks and issues locally •Sharing knowledge and coaching individuals •Providing QA through audits and checks TCES London Transformation Project Managers 17 Deliverable: Initiate local project and pass Start Up Readiness launching project within timeline Aim: Accountable for engaging executive sponsorship, initiating local project and establishing governance, start to develop the local business case and change management strategy, passing SUR to launch the local TCES SADLs project Time Plan/Key Milestones: Scope: • Input into key decisions impacting the project • Input into financial decisions impacting the project • Day-to-day project decisions Excludes: • Complex Aids to Daily Living • Strategic decisions Policy Links: • NHS Next Stage Review • Putting People First • Our health, our care, our say: a new direction for community services RACI R – London TCES Project Manager A - London TCES Programme Manager Naturally works with which Stakeholders? • Site Executive Steering and Project Boards • Site Sponsors • Site Business Change Manager and Working Group Leads • Site finance/service teams, prescribers, retailers, user forums • London TCES Programme Manager Risks: • Lack of local borough executive engagement and commitment • Lack of locally provided resources, capability, timeliness • • Months 1 -3 Establish governance and pass SUR in allocated sites • Month 4 – Handover to site BCM Deliverables: • PID • Next Steps list • Risk and Issues log • Risks that could knock the project off course (with mitigating actions) • All issues will have next steps • Report ‘local status’ back to London TCES through conference calling / measurement templates • Regular progress report to Sponsor Critical Success Factors: • Material structured effectively to promote decision-making • Willingness to front events and act as champions and sponsors • Ability to engage and work effectively with BCM Resources • London TCES Project Manager • Site Business Change Manager Activities: •Regular project meetings •Manage project plan •Manage team temperature •Ensure sponsor is in touch with key issues •Manage comms plan •Ensure project key messages have been communicated to the right staff groups •Ensure team environment is appropriate •Develop measurement process •Manage handover to BCM TCES London Financial Specialist Support 18 Deliverable: Support boroughs to complete their financial model as part of the local PID Aim: Accountable for engaging finance and service teams in sites, providing financial templates, support to source, analyse and interpret data to enable the completion and validation of the local financial model Time Plan/Key Milestones: Scope: • All 33 London boroughs and their NHS partners • Entire Community Equipment Service within each borough RACI R – London TCES Financial Specialists A – London TCES Programme Manager Deliverables: • Site Financial Models and Benefits Realisation Plan Excludes: • Local Financial reporting Policy Links: • NHS Next Stage Review • Putting People First • Our health, our care, our say: a new direction for community services Naturally works with which Stakeholders? • Site Executive Steering and Project Boards • Site Sponsors • Site finance and service teams • London TCES Project Managers • London TCES Programme Manager Risks: • Lack of local borough executive engagement and commitment • Lack of locally provided resources, capability, timeliness • Lack of good quality data • Months 1 - 4 – Deliver financial models and measurement tools for allocated sites Critical Success Factors: • Resources • Stakeholder Commitment • Good data Resources • London TCES Financial specialist • Site finance and service teams • Site Business Change Manager Activities: • Engage site finance and service teams • Distribute financial model and diagnostic tools • Coach site teams to source, collate and interpret the base data • Prepare Financial Model undertaking validation exercise with site teams • Analyse, clarify, identify and close gaps • Identify and confirm financial and non-financial benefits contributing to local business case • Facilitate sign off of local Financial Model • Develop business activity modelling tools and coach sites to apply through project lifecycle Local Site Business Change Manager 19 Deliverable: To embed the changes introduced by the retail model and realise the benefits Aim: Accountable for supporting the local site and responsible for managing working groups to plan and embed the change by championing and enabling new ways of working to transition into business as usual. This will involve co-ordination and monitoring of the change to realise the benefits in terms of measured improvements Scope: • Community Equipment Service within own Borough • Day-to-day decisions regarding change activities • Strategic change management decisions Excludes: • Generic strategic decisions and financial implications Policy Links: • NHS Next Stage Review • Putting People First • Our health, our care, our say: a new direction for community services Naturally works with which Stakeholders? • Site Executive Steering and Project Boards • Site Sponsors • Site finance and service teams • TCES Working Groups • London TCES Project Managers • London TCES Programme Manager Risks: • Lack of local borough executive engagement and commitment • Lack of locally provided resources, capability, timeliness • Lack of good quality data Time Plan/Key Milestones: • Months 1 - 4 – work with PM to initiate and launch project • Months 5 onwards – deliver project and realise benefits Resources • Site Business Change Manager • Site Working Groups RACI A – Business Change Manager Deliverables: • Change Management Strategy • Stakeholder Management Plan • Communications Strategy & Plan • Training Strategy & Plan • Measurement & Tracking tools to realise benefits • Local Retail Model Design • Full Business Case Critical Success Factors: • Ability to secure ‘buy-in’ from key stakeholders • Visible sponsorship • Evidence to suggest progress towards achieving cultural change • Clear benefits realisation plan Activities: • Responsible for developing & implementing change management activities • Responsible for developing & implementing stakeholder management activities • Responsible for implementing communications activities • Responsible for implementing training activities • Responsible for assessing the progress towards achieving and realising measured improvements • Responsible for establishing & implementing benefits tracking tools 20 TCES London Programme Team Recruitment 21 Detailed recruitment plan Key Activities SEPTEMBER 7 Receive approval from CA Efficiency Board 7 Develop Skills sets, job descriptions, T’s & C’s 10 Sign off resource plan and recruitment process/plan Advertise posts 14 21 OCTOBER 28 5 12 19 NOVEMBER 26 2 9 16 18 21 Develop Assessment Centre and materials Shortlist candidates 2 Send out interview pack 2 Conduct Assessment Centre 12 Notify candidates 13 Repeat Assessment Centre if required 19 Notice periods Develop Induction and training materials New Recruits Commence 16 DECEMBER 23 30 7 14 21 22 Detailed recruitment plan Key Activities New Recruits Commence NOVEMBER 2 9 16 DECEMBER 23 30 7 14 JANUARY 21 FEBRUARY 28 16 Induction and training Review PM and FS capabilities 20 27 Adjust training as required Develop individual Charters and PM toolkit 20 Allocate to sites and engage with local sponsors Commence work in Wave 1 site Implementation of Wave 1 site 30 See detailed plan The target start date is 16 November 2009 with the 1st wave of sites commencing their project initiation on 30 November 2009. Resources – Pros and Cons of contracting arrangements Secondments Interim • • Pros • • • • Cons • • • • Interims more likely to have the requisite mix of skills and experience needed for this strategic project Increased likelihood of the team’s ability to work at the pace required i.e. used to ‘hitting the ground’ running from one assignment to the other Speedier recruitment as no need for strict application of certain internal processes such as Hays Job Evaluation tools Speedier appointments i.e. avoid delays due to backfilling of staff etc Significant knowledge and skills transfer to in-house staff – benefit from the total experience of the consultant not just those relating to the current project Easier to replace if appointment turns out to be unsuitable i.e. the protracted process for terminating permanent appointments is avoided Benefit from flexibility in their approach to working locations i.e. willingness to move from one organisation to the other • • Salary costs are significantly higher May still have difficulty in finding people with the requisite skills and experience Significant knowledge and experience from rolling the model out across multiple organisations may not be successfully transferred in-house • • • • Salary costs are significantly cheaper Knowledge and skills from implementing the model are retained in house If appointed from within the relevant organisation will benefit from existing networks within the organisation and an understanding of its ‘politics’ Job evaluations for Project Managers within Local Authorities are pitched at rather junior levels therefore existing personnel lack the requisite knowledge, skills and experience Protracted recruitment process as all applicable internal protocols and processes need to be adhered to Protracted appointment process due to issues such as backfilling of positions etc 23 TCES London Programme Manager Job Profile Job Title TCES London Programme Manager Direction from 1. Project Board Direction to 1. 2. Transformation Project Managers Business Change Manager Role Purpose To plan, create and operate a virtual team networking structure, co-ordinating change management planning, design and implementation activities and documentation to deliver the TCES London programme, business case and financial model To manage the project within cost and time constraints Category Knowledge Essential PM Methodology PM Quality Standards MS Office Suite (Excel, Word, Project, PowerPoint) Desirable Understanding of Health Sector / Policies Skills Leadership Team Management Good Communication Stakeholder Management Influencing Reporting Structured Thinking Approach Negotiation Experience Demonstrate previous management of complex programmes Worked in a retail environment Worked in Health &/or Social Care Sector Personal Attributes Enthusiastic and driven Thorough Credible and respected Desire and ability to learn quickly Flexible Existing network of local contacts 24 Transformation Project Manager Job Profile Job Title Transformation Project Manager Direction from 1. 2. Project Board TCES London Programme Manager Direction to 1. 2. Business Change Manager Working Group Members Role Purpose To ensure that the Project as a whole produces the required deliverables to the defined standard of quality To manage the project within cost and time constraints Category Knowledge Essential PM Methodology PM Quality Standards MS Office Suite (Excel, Word, Project, PowerPoint) Desirable Understanding of Health Sector / Policies Skills Leadership Team Management Good Communication Stakeholder Management Influencing Reporting Structured Thinking Approach Negotiation Experience Worked in a project environment Worked in a retail environment Worked in Health &/or Social Care Sector Personal Attributes Enthusiastic and driven Thorough Credible and respected Desire and ability to learn quickly Flexible Existing network of local contacts 25 26 Financial Specialist Job Profile Job Title Financial Specialist Direction from 1. 2. Site Project Board and Site Business Change Manager TCES London Programme Manager and Site Project Managers Direction to 1. 2. Working Group Members Site finance and service teams Role Purpose To distribute financial modelling and diagnostic tools, evaluate information for inclusion in local site business cases and ensure inclusion in the TCES London business case and implementation plan Category Knowledge Essential • CCAB Accountant • Financial modelling and analyses • MS Office Suite (Excel, Word, Project, PowerPoint) Desirable Understanding of Health Sector / Policies Skills Financial competency Good Communication Stakeholder Management Influencing Reporting Structured Thinking Approach Negotiation Experience Worked in a project environment Worked in Health &/or Social Care Sector Personal Attributes Enthusiastic and driven Thorough Credible and respected Desire and ability to learn quickly Flexible Existing network of local contacts Local Site Business Change Manager Job Profile Job Title Business Change Manager Direction from 1. 2. Site Project Board TCES London Programme Manager and Site Project Manager (for first 4 months) Direction to 1. 2. Working Group Members Site finance and service teams Role Purpose To ensure that the Project as a whole produces the required deliverables to the defined standard of quality To embed the change within the organisation and transition to business as usual Category Knowledge Essential PM Methodology PM Quality Standards MS Office Suite (Excel, Word, Project, PowerPoint) Desirable Understanding of Health Sector / Policies Skills Leadership Change Management Good Communication (written and oral) Stakeholder Management Influencing Reporting Structured Thinking Approach Networking Negotiation Experience Worked in a project environment Worked in Health &/or Social Care Sector Clinical background Personal Attributes Enthusiastic and driven Thorough Credible and respected Desire and ability to learn quickly Flexible Existing network of local contacts 27