Graham ISD Pioneer Elementary Improvement Plan School Year: 2013 - 2014 ________________________ Date of School Board Approval Pioneer Elementary Campus Improvement Plan 2013- 2014 1 Legal References Each school district shall have a district improvement plan that is developed, evaluated, and revised annually, in accordance with district policy, by the superintendent with the assistance of the districtlevel committee. (Section 11.251 of the Texas Education Code) Each school year, the principal of each school campus, with the assistance of the campus-level committee, shall develop, review, and revise the campus improvement plan for the purpose of improving student performance for all student populations, including students in special education programs under Subchapter A, Chapter 29, with respect to the student achievement indicators adopted under Section 39.051 and any other appropriate performance measures for special needs populations. (Section 11.253 of the Texas Education Code) Mission Statement Graham ISD will focus on the future by empowering students to think creatively and critically while learning in engaging, innovative, and inspiring environments. Pioneer Elementary Campus Improvement Plan 2013- 2014 2 Planning and Decision Making Committee Name Position Signature Parent, Business, Community, Teacher, etc Lisa Budarf Gary Borwning Pioneer Principal GISD Curriculum Coordinator Eric Arrell Community Membership Jennifer Conway Business Membership Fabiola Concha Pioneer Teacher Whitney Barefoot Linda Bryant Pioneer Teacher Non-Teaching Staff Membership Deanna Armstrong Parent Membership Michelle Atwood Parent Membership Karen Hartgraves Parent Membership Mary Heartfield Parent Membership Pioneer Elementary Campus Improvement Plan 2013- 2014 3 Comprehensive Needs Assessment A Comprehensive Needs Assessment was conducted with the Committee on 9/23/13 Participants in Attendance Data Sources Examined Lisa Budarf AEIS Discipline Referral Data Parent, Community, Teacher, and /or Student Surveys Student Attendance Data TPRI Data Campus Emergency Plans Jennifer Conway Fabiola Concha Whitney Barefoot PDAS Linda Bryant Deanna Armstrong Karen Hartgraves Mary Heartfield Pioneer Elementary Campus Improvement Plan 2013- 2014 4 Comprehensive Needs Assessment: Summary of Findings Identified Areas of Strength and Concern Areas of Strength Data Source Class Schedule and Special Programs Schedule Master Schedule School Structure Leadership Focus Groups School Safety and Emergency Planning Campus Emergency Plan / Drills Classroom Technology Campus Evaluation Areas of Concern Data Source Discipline referrals and time out of class Discipline Referrals Lack of student interventions and data tracking related to TPRI results TPRI Data Percentage of “unexcused” and “excused absences Attendance Data Lower Test scores in social studies and science in upper grades State Accountability (AEIS) Lack of resources / opportunity for economically disadvantaged Staff, parent, community, and student surveys; administration evaluations Staff, parent, community, and student surveys; administration evaluations Lack of full-time counseling / support program Support and training for classroom and campus technologies Staff Development In this plan, the term “student groups” refers to students who are H, W, AA, ED, Migrant, LEP, G/T, and Special Education Pioneer Elementary Campus Improvement Plan 2013- 2014 5 Summary of Findings - Narrative Pioneer Elementary Campus Improvement Plan 2013- 2014 6 State Compensatory Education This District has written policies and procedures to identify the following: Students who are at risk of dropping out of school under state criteria Students who are at risk of dropping out of school under local criteria How students are entered into the SCE program How students are exited from the SCE program The cost of the regular education program in relation to budget allocations per student and/or instructional staff per student ratio Total SCE funds allotted to Pioneer Elementary are $36,436 Total FTEs funded through SCE at Pioneer Elementary are FTE 2.0 The process we use to identify students at risk is: Student data is reviewed BOY and MOY by interventionist and counselor The process we use to exit students from the SCE program who no longer qualify is: Student data is reviewed EOY by interventionist and counselor. At Pioneer Elementary State Compensatory Funds are used to support Title I initiatives. Pioneer Elementary Campus Improvement Plan 2013- 2014 7 State Compensatory Education Program Program Evaluation/Needs Assessment Grades __________ TAKS Math % Met Standard 2011 2012 2013 Reading/ELA % Met Standard 2011 2012 2013 Writing % Met Standard 2011 2012 2013 Science % Met Standard 2011 2012 2013 Social Studies % Met Standard 2011 2012 2013 Students At-Risk Students Not At-Risk Drop Out Data 2011 Completion Data 2012 2011 2012 Students At-Risk Students Not AtRisk Pioneer Elementary Campus Improvement Plan 2013- 2014 8 State Compensatory Education State of Texas Student Eligibility Criteria: A student under 21 years of age and who: 1. Is in prekindergarten – grade 3 and did not perform satisfactorily on a readiness test/assessment given during the current school year. 2. Is in grades 7-12 and did not maintain a 70 average in two or more subjects in the foundation curriculum during a semester in the preceding or current school year OR is not maintaining a 70 average in two or more foundation subjects in the current semester. 3. Was not advanced from one grade to the next for one or more school years (students in pre-k and k that are retained at parent request are not considered at-risk). 4. Did not perform satisfactorily on a state assessment instrument, and has not in the previous or current school year performed on that instrument or another appropriate instrument at a level equal to at least 110 percent of the level of satisfactory performance on that instrument 5. Is pregnant or is a parent 6. Has been placed in an AEP during the preceding or current school year 7. Has been expelled during the preceding or current school year 8. Is currently on parole, probation, deferred prosecution, or other conditional release 9. Was previously reported through PEIMS to have dropped out of school 10. Is a student of limited English proficiency 11. Is in the custody or care of DPRS or has, during the current school year, been referred to DPRS 12. Is homeless 13. Resided in the preceding school year or resides in the current school year in a residential placement facility in the district, including a detention facility, substance abuse treatment facility, emergency shelter, psychiatric hospital, halfway house, or foster group home. Pioneer Elementary Campus Improvement Plan 2013- 2014 9 Federal, State and Local Funding Sources Federal funding sources that will be integrated and coordinated with State and Local funds to meet the needs of all students; Program/Funding Source Federal Programs Title 1, Part A Title II, Part A (TPTR) Title III, Part A (LEP) Title VI, Part B Rural/Low Income IDEA Funds State Programs/Funding Source Career/Technology Education State Compensatory Education Dyslexia Gifted/Talented Special Education Bilingual/ESL Program Student Success Initiative Local Programs/Funding Source Grants Pioneer Elementary Campus Improvement Plan 2013- 2014 10 Goal 1: Attract and retrain a highly qualified faculty. Objective 1: Pioneer Elementary will actively monitor, involve, and recruit a highly qualified staff. Summative Evaluation: 90% of staff will return the next school year. % Classes taught by Highly Qualified Teachers 100% Data 2011 - 2012 Activity/Strategy *Title 1 Schoolwide Component (#1-10) Extend appreciation and recognition to staff through: Special Emails Celebrations Thank You Notes Teacher Appreciation Events 4, 5 Encourage and promote staff expertise through experiences such as: Mentoring Faculty Presentations Participation in Training & Conferences Collaborative Planning & Sharing Actively recruit and maintain a Highly Qualified staff by: Attend Job Fairs Advertise vacancies through multiple mediums Professional development opportunities will be provided for staff to maintain highly qualified 3, 4, 5, 8 Person(s) Responsible Principal % Highly Qualified Teachers Timeline Aug. 2013 – Aug. 2014 100% Resources Local Funds PTO % Highly Qualified Paraprofessionals 100% Evidence of Implementation Increased staff participation Evidence of Impact % of teachers returning to campus Opportunity for appreciation Counselor Principal Aug. 2013 – June 2014 Campus Focus Groups Title 1 Local Funds New Teachers 3, 4, 5, Principal Principal Curriculum Director Shared goals and outcomes for all staff Campus focus group participation March 2014 – Aug. 2014 Human Resources 3,4,5,10 Staff presentations through multiple mediums (inperson, digital, collaborative) Title 1 Hiring of highly qualified applicants Teacher and Paraprofessional certifications Title 1 Current certifications 100% highly qualified staff Local Funds On-going trainings available to all staff Increased student achievement on TPRI and Local Funds Aug. 2013 – Aug. 2014 Pioneer Elementary Campus Improvement Plan 2013- 2014 11 status required by NCLB. Programs based on identified needs available to both professionals and paraprofessionals. Using a variety of instructional resources to meet the needs of students Balanced literacy in early childhood settings T.O.P.s training Provide opportunities to build capacity of teachers, principals, and other staff to integrate technology effectively into challenging curriculum and related instructional strategies that are aligned with the TEKS. Identify teachers and paraprofessionals who do not meet NCLB HQ requirements and provide specific professional development IDEA (Pre-K) Campus Focus Groups Unit Assessments SCE Teachers Paraprofessionals 3, 4, 5, 10 Principal Aug. 2013 – June 2014 Campus Focus Groups 3,4 Principal, BOY Human Resources Dept. MOY Title I Local Funds SCE Evaluation of the level of technology integration in lessons (H.E.A.T) Increased rigor in lessons Lesson Plans 360* Walkthroughs Review of HR records 100% core academic classes taught by HQ teachers, 100% paraprofessional with instructional duties will meet NCLB requirements EOY Pioneer Elementary Campus Improvement Plan 2013- 2014 PDAS Evaluations 12 Goal 2: All students of Pioneer Elementary will be educated in learning environments that are safe, drug free, and conducive to learning. Objective 1: A well developed nurturing, child-centered environment in every classroom, a highly organized and structured atmosphere for learning will be provided in every room. Summative Evaluation: 100% of students participate in campus safety drills. Both incidents noted and discipline referrals to the office are documented and handled appropriately with emotional and social improvement. Data All Students Discipline/Incidents 2012 - 2013 Safety Drills 2013 - 2014 Activity/Strategy Title 1 School wide Component (#1-10) Person(s) Responsible Timeline Resources In an effort to promote “safe schools” Pioneer will conduct learning opportunities on topics such as: Bullying Conflict Resolution Drug, Tobacco, & Alcohol Prevention Tattling Self Discipline Anger Management Stranger Danger Campus nurse provides nursing services to students: Immunization Updates Notices Vision, hearing, spinal screenings Asthma monitoring / care Administering medications 1, 2, 9, 10 Principal Aug 2013 – May 2014 Counselor Evidence of Implementation Title I Improved behavior Local Funds Student awareness of unsafe environments Teacher 1 Principal District Lead Nurse Aug. 2013 – June 2014 Local Funds Nursing records updated Evidence of Impact Decreased office referrals Progress in social / emotional development as noted in promotion / retention records Increased attendance rates Documentation of screenings Campus Nurse Pioneer Elementary Campus Improvement Plan 2013- 2014 13 Review and revise Campus Emergency Operations Plan, communicate changes, and conduct practice drills to prepare for crisis situations. 1. 10 Principal Aug. 2013 – June 2014 n/a Participation in drills Campus Emergency Plan Staff Faculty Meeting Agendas Drill Reports Provide ongoing communication to parents about safety issues, policies, and procedures required to ensure safety at school on a daily basis via: Grading Period Newsletter (English & Spanish) Parent Orientation Parent Meetings Automated Phone Calls Updated Website Weekly communication by teacher Parent / teacher conferences Quarterly parent / guardian learning opportunities Provide support and or resources for teachers and parents so that the needs of students with behavior or transitional needs are met by means of: Consistent discipline strategies Staff development Intervention plans Appropriate support and communication Staff and nurse collaboration with community to plan and present lessons to health classes related to: Dental Hygiene Hand Washing Red Ribbon Week 1. 10 Principal Aug. 2013 – June 2014 Counselor Title I Increased turnout at school events Local Funds Positive rapport with parents Staff Parent Survey Increased parent participation Open communication between school and home 1, 10 1. 10 Principal Aug. 2013 – June 2014 Title 1 Counselor Grant Staff Local Funds Principal Nurse Aug. – 2013 – June 2014 Title I Increased parent and teacher involvement Discipline reports / decrease in referrals Community resources utilized Progress noted in social and emotional development Increased Community Involvement in School Lesson Plans Local Funds PE Teacher Pioneer Elementary Campus Improvement Plan 2013- 2014 14 Provide support for teachers and parents so that the needs of students are met, within guidelines for safety which include: Hallways Cafeteria Electronically Monitoring Visitors Wearing Employee Badges Secure entrance / exits Monitor security cameras. 1. 10 Principal Staff Aug. 2013 – June 2014 Title I Safe and orderly campus Campus Surveys Local Funds Observation and routine verification of procedures Reports provided by SRO. School Resource Officer Pioneer Elementary Campus Improvement Plan 2013- 2014 15 Goal 3: Effective and rigorous instructional practices that motivate and actively engage students and develop necessary intervention plans when any student does not perform to standard. Objective 1: By May 90% of students will be performing at or above grade level with successful progress on MOY and EOY TPRI. Summative Evaluation: 95% promotion rate to first grade. Data 2008-2009 Dropout Report All Students Activity/Strategy TPRI / Tejas Lee, administered in K, results will be utilized to identify instructional targets to remediate and reinforce H W AA ED Migrant Title 1 Schoolwide Component (#1-10) Person(s) Responsible Timeline Resources 4, 8, 9 Principal BOY, MOY, EOY Counselor Title 1 Local Funds Intervention Team 8, 9 Principal Counselor Spec.Ed. Evidence of Implementation Ongoing tracking of students receiving intervention. GT Male Female Evidence of Impact Decrease of students on Tier 3 or Tier 2 of intervention Intervention specialist support to classroom biweekly Teacher All kindergarten classroom teachers will progress monitor with running records to plan tired instruction during RTI period for reading and math. LEP October – May at two week intervals Title 1 Aug. 2013 – June 2013 RTI forms completed and ongoing current data to support intervention strategies Decrease in students needing intervention Title 1 Lesson Plan Audits TPRI Results Local Funds Walkthroughs Promotion rates IDEA Campus focus group meetings PDAS Evaluations Local Funds Intervention Team Teacher Promote a comprehensive balanced literacy program campus wide. 2, 3, 7, 8, 9 Principal Teachers Pioneer Elementary Campus Improvement Plan 2013- 2014 16 In accordance with Special Education regulations we will serve students with disabilities in many instructional arrangements ensuring that students are served in the Least Restrictive Environment (LRE). Promote technology integration into all discipline areas as mandated by the TEKS. 1, 2, 4, 7, 8, 9, 10 Principal Aug. 2013 – May - 2014 Title I SPED students participating in full inclusion setting when appropriate Annual ARDS Title I Walkthroughs PDAS Evaluations Technology Dept. Local Funds Campus focus groups STARR Reports Teachers Local Grants Lesson plans Diagnostician Local Funds Special Education SCE Budget 100% of students with IEP will be meeting their goals Teacher 1, 2, 8, 9, 10 Principal Aug. 2013 – May 2014 SCE Budget Promote and provide activities for students to support classroom-learning projects and/or provide cultural arts experiences, technology integration, and a healthy lifestyle to enhance learning. Special Event Days Parent Learning Days Open House Field Trips Daily Enrichment Rotations 1, 2, 6, 10 Principal Campus Focus Groups Aug. 2013 – May 2014 Title I Local Funds Ongoing evaluation of programs through teacher / parent feedback Survey Response Support and turnout for events SCE Budget Teachers Pioneer Elementary Campus Improvement Plan 2013- 2014 17 Goal 4: Parents and Community will be partners in the education of students at Pioneer Elementary. Objective 1: By May 2014, at least 99% of all students’ parents and/or family members will participate in at least one school sponsored academic activity for/with their child(ren). Summative Evaluation: School records indicate that at least 99% of students’ parents/family members participated in at least one partnership education opportunity. Activity/Strategy Provide parent training and learning opportunities on campus as well as communication opportunities off campus. Automated Phone Calls Campus Newsletter Campus Calendar Parent Orientation Campus Learning Opportunities o Quarterly Parent Trainings o Programs o Open House Campus focus groups will work with the principal and counselor to develop, coordinate, and implement a plan to provide support and resources to early learners and their families including: Behavior Support Community Services Classroom Assistance Parent Support Parent Training Community Involvement Title 1 Schoolwide Component (#1-10) Person(s) Responsible 2, 3, 4, 5 Principal Resources Timeline Aug. 2013 – June 2014 Counselor Title I Evidence of Implementation Participation in school events Local Funds Evidence of Impact Sign-In Sheets Evaluations and surveys IDEA 6, 7, 9, 10 Principal Aug. 2013 – June 2014 Title I Counselor Local Funds Focus Groups Grants Increased support for families and students Decrease in office referrals Early intervention Documented resources provided to students / families Multi-tiered support available in the school Pioneer Elementary Campus Improvement Plan 2013- 2014 18 Monitor and evaluate campus volunteer and partnership programs Volunteer readers Parent volunteers Parent’s As Teachers 6, 7, 10 Principal PAT Coordinator Aug. 2013 – June 2014 Title I Participation in events Sign-In Sheets Local Funds Moral on campus and among community Survey Grants Pioneer Elementary Campus Improvement Plan 2013- 2014 19 Goal 5: All students will be promoted to first grade with the support needed to be successful in school and complete subsequent grade levels. Objective: By May 2014, a retention rate of less than 5% in kindergarten. Summative Evaluation: A decrease in the percent of students at-risk of dropping out of school. Data 2009-2010 All Students H W AA ED Migrant Title 1 Schoolwide Component (#1-10) Person(s) Responsible Timeline Resources Collaborate with feeder grades to ensure success of current and future students to Provide joint staff development District wide intervention teams End of year transitional information provided to future campus Transitional plans for pre-k students Prekindergarten will participate in “transitional” day at the end of the year with their parent to learn about the upcoming year. 1, 2, 3, 4, 7, 10 Principal Aug. 2013 – June 2014 Title I Pre-K and Kindergarten teachers will coordinate transitional strategies. Parent notifications Transition Visits Pre-K and Kindergarten Round- 6, 7, 10 Activity/Strategy Teachers Local Funds LEP Spec.Ed. Evidence of Implementation GT Male Female Evidence of Impact Well balanced classrooms with current data to support placement RTI Data Transition to kindergarten is successful with few questions from staff or parents Parent Survey Teacher feedback and coordination from feeder schools provides enrollment data for next year Round-up participation Campus Observation IDEA SCE Budget 6, 7, 10 Principal May 2014 Local Budget Counselor Staff Survey Pre-K Staff Principal Aug. 2013 – June 2014 Title 1 Feeder Facilities Local Funds Staff IDEA Evaluation & Surveys SCE Budget Pioneer Elementary Campus Improvement Plan 2013- 2014 20 Ups Parent Orientations Monitor enrollment patterns, specifically class size, to determine the most fiscally sound pupil teacher ratio and staffing assignments. 1, 8, 10 Continue to revise the master schedule to utilize all available time and personnel for instruction including: Appropriate budget spending for supplies to support schedule Campus wide strategic planning Duty Assignments Efficient use of work hours for PLT, planning, and staff development. 1, 8, 9, 10 Principal Aug. 2013 – Aug, 2014 Counselor Title I Local Funds IDEA Principal Class sizes are equitable and balanced Aug. 2013 – Aug. 2014 Title I Counselor Local Budget Focus Groups Idea PEIMS Data Survey Teaching assignments based on current needs Communication regarding campus structure and organization PDAS PDAS Master Schedule Survey Participation in campus initiatives Increased rigor in the classroom Pioneer Elementary Campus Improvement Plan 2013- 2014 21