CCNA3 Skills Test 2014FL due by 8pm, Wednesday, October 15th , 2014 (last harmonized cisco final exam day) As lead network engineer for your local corporate site, you have been assigned the CIDR address of 198.7.6.128/25 from the home office CCIE administrator. Your location has two Ethernet LANs connected with a private metropolitan Ethernet (“GigaMAN” type) circuit. Use the gray Ethernet crossover cable between two Cisco 1841 routers’ FastEthernet 0/0 interfaces to simulate the MAN circuit. Using VLSM, assign a /30 address space to the MAN link, a /28 address space to the first LAN, and a /26 address space to the second LAN. Assign ports 1-12 of the first 2960 switch to the first LAN using VLAN 111 and ports 13-24 of the second switch to the second LAN using VLAN 222. Use any static or classless dynamic routing protocol. Project deliverables include a subnet chart for each VLSM subnet showing network address, range of usable host addresses, and broadcast address; a labeled logical schematic showing all router and switch connections with all networks indicated with CIDR notation (i.e., 198.7.6.xx/yy), and the square-style chart showing total used and available subnets from the entire /25 space. Connect two workstations in the lab topology and test end-to-end connectivity with ping. Grading rubric: Subnet charts Schematic Address utilization square chart VLAN creation and port assignments Properly configured routing protocol End-to-end connectivity with PING 15% 10% 10% 15% 25% 25% ==== 100% (10% extra credit – add IPv6 addressing and dual-stack routing. Use the 2001:DB8:ACAD prefix.) Work singly or in groups; groups may produce a single set of deliverables.