05/15/15 DESIGN NO. _____ SECTION 15560 FLEXIBLE WATER-TUBE BOILERS (HOT WATER) PART 1 - GENERAL 1.01 DESCRIPTION OF WORK A. 3 1.02 1.03 Provide low-pressure (hot water) flexible water-tube boilers/burners units suitable for burning No. 2 fuel oil or natural gas, as specified herein, as shown on the Drawings, and as needed for a complete and proper installation. The burner specified on Section 15593 shall be part of the package boiler-burner units. Product specific requirements are contained herein; Section 15501, General Provisions for Heating, Ventilating and Air Conditioning Work, shall be referred to for general requirements. RELATED SECTIONS A. Division 1 Sections (General Requirements) B. Division 3 Sections C. Division 5 Sections D. Division 15 Sections E. Division 16 Sections SUPPLEMENTAL SUBMITTALS A. Product Data 1. B. 3 NYCSCA Submit manufacturer's technical data. refractory floor and wall Shop Drawings 1. Submit wiring diagrams for power and control wiring required for final connections to boiler/burner units and controls. Clearly differentiate between portions of wiring that are factory-installed and portions to be field-installed. 2. Submit details of the boiler fabrication and combustion chamber 3. Gas Piping or Fuel Oil Piping Diagrams FLEXIBLE WATER-TUBE BOILERS (HOT WATER) 15560 - 1 05/15/15 C. D. 11 5 DESIGN NO. _____ Test Report 1. Submit a factory inspection report prior to shipping along with all the tests performed at the factory. 2. Submit a field inspection report prior to placing the boiler in operation along with all the tests performed at the site. Certificates 1. DEP Permit: Provide for boilers with equaling or exceeding 2,800,000 BTUH. 2. DEP Certification of Compliance: Verification of meeting DEP Assembled Equipment Acceptance Requirements per DEP Rules Effective Feb. 17, 2014: (on DEP’s list of accepted equipment; or UL, CSA Group or ETL Listed with Contractor’s Professional Engineer’s Certification of Compliance; or Unlisted Custom equipment with Contractor’s Professional Engineer’s Certification of Compliance). 3. Burner UL Listing: Submit UL 726 listing for oil burning boilers, UL 795 (or ANSI Z21.13) listing for gas burning boilers, UL 726 and UL 795 (or ANSI Z21.13) listings for boilers with dual fuel burners. Per DEP requirements effective Feb. 17, 2014, it is permissible that a new burner be listed by UL, CSA Group, ETL, or any other national recognized testing laboratory that uses UL testing conditions and have their Listing Mark label. 4. Department of Buildings (DOB) ‘H-2’ Certification: Furnish and deliver in duplicate (prior to field start up), one copy to the Authority (CID) and one copy to the Boiler and Licensing Division of the Department of Buildings of the City of New York, a certificate of test and inspection for each boiler issued by the boiler insurance company or State Labor Department which made the inspection. These certificates shall furnish all data required by the New York State and ASME Codes. 5. DOB Certification of Compliance (Refer to Article 3.03). 6. DEP Certificate of Operation, Registration if applicable: a. NYCSCA or fuel input Certificate of Boilers with fuel input equaling or exceeding 2,800,000 BTUH: At the completion of the burning system installation Work, obtain a "Certificate of Operation" from the Department of Environmental FLEXIBLE WATER-TUBE BOILERS (HOT WATER) 15560 - 2 05/15/15 DESIGN NO. _____ Protection (Air Resources) and deliver this Certificate of Operation to the Authority before the request for final payment is made. Certificate shall name the Department of Education as the owner. b. 7. E. Projects with boilers with fuel input less than 2,800,000 BTUH but greater than or equal to 350,000 BTUH: Must be registered with the DEP. Deliver this Certificate of Registration to the Authority before the request for final payment is made. Registrations shall name the Department of Education as the owner. Contractor’s start-up and demonstration affidavit. Contract Closeout Submittals 1. Submit factory certified prototype testing reports indicating that all boiler/burner combinations have the following minimum combustion efficiencies as defined below in Table A: TABLE A Type Size Category Input Minimum Efficiency Test Procedure** Boilers Gas Fired >2,500,000 BTUH DOE 10 CFR Part 431 85%Ec per ASHRAE 90.12010 and 2014 NYCECC Boilers Oil Fired >2,500,000 BTUH DOE 10 CFR Part 431 85%Ec per ASHRAE 90.12010 and 2014 NYCECC ** Test procedures are based on 2014 New York City Energy Conservation Code and ASHRAE 90.1-2010 as modified by Appendix A of the 2014 NYCECC. 3 NYCSCA 2. Submit operating instruction manuals, complete with schematic wiring and piping diagrams for the boiler/burner units, all combustion and operating controls and maintenance data. 3. Framed Piping and Wiring Diagram: Provide “As Built” wiring diagram and piping layout of the oil or gas for the boiler/burner system. The diagram and layout shall FLEXIBLE WATER-TUBE BOILERS (HOT WATER) 15560 - 3 05/15/15 DESIGN NO. _____ be framed and mounted where directed in the Boiler Room. Frame shall be of aluminum satin finish, with one side of frame removable and with a plywood backing. Provide safety glass in the front. All parts of the installation shall be indicated exactly as installed and shall be properly identified. Valve identification numbers shall agree with valve tags of Section 15502: HVAC Identification and all piping shall be clearly shown and labeled. 4. 1.04 F. Maintenance Materials G. Provide a set boiler/burner. of manufacturer’s guarantees for each SUPPLEMENTAL QUALITY ASSURANCE A. Codes and Standards 1. NYCSCA Maintenance Data: Submit Maintenance Manual for boilers/burners, controls, and accessories; including "trouble-shooting" maintenance and preventative maintenance schedule and procedures. Minimum Combustion Efficiency: Minimum Combustion efficiency shall be as indicated in Table A of Supplemental Submittals for the prototype when tested according to the referenced test procedures to determine efficiency for commercial space heating boilers. The provisions related to prototype testing conducted after the boiler submittals for the project (with interim conditional approval of the submittals) shall only be allowed until May 1, 2012. a. At the time boiler shop drawings are submitted, Contractor shall also furnish a report certifying that a prototype boiler of the same construction type, fuel type and using the same burner as specified for this project has been tested in the factory in accordance with the requirements of Table A. This report shall include all test data that confirms that the requirements of Table A have been met. This prototype testing shall be valid for all boilers similarly configured in the range of approximately 75 – 300 horsepower. Prototype testing need not have been conducted by independent third party. b. In the event that factory prototype testing has not been completed prior to submittal of boiler shop drawings this boiler submittal may be granted FLEXIBLE WATER-TUBE BOILERS (HOT WATER) 15560 - 4 05/15/15 DESIGN NO. _____ "conditional" approval after verifying that all other aspects of the submittal comply with the basis of design, subject to subsequent Factory or Field prototype testing. NYCSCA 1) Factory Prototype Testing for Conditionally Approved Boilers (where the prototype is identical to the project specific boiler(s) and functions as the prototype for testing): Contractor/manufacturer shall proceed to fabricate the boilers at the factory at its own risk. Before the boiler(s) is shipped to the site, the prototype boiler shall be tested in accordance with the testing methodology as defined in Table A. Contractor/manufacturer shall submit a report certifying the boiler(s) meets or exceeds the applicable boiler efficiencies. This report shall include all data associated with the testing that confirms meeting the requirements of Table A. If the boiler factory prototype testing does not indicate a minimum combustion efficiency as required in Table A, the boiler(s) shall not be shipped to the site, final approval will not be granted, and the Contractor/manufacturer shall not be entitled to any compensation. Contractor/manufacturer shall provide a different boiler(s)/burner combination that complies with the specification. 2) Field Prototype Testing for Conditionally Approved Boilers (where project specific boiler(s) will be the prototype for testing): Contractor/manufacturer shall proceed to fabricate the boiler(s) at the factory at its own risk and ship to the site for subsequent field manufacturer prototype testing in accordance with the testing methodology as defined in Table A. Testing shall be conducted within seven (7) working days after boiler startup. Contractor/manufacturer shall submit a report certifying the boiler(s) meets or exceeds the applicable boiler efficiencies. This report shall include all data associated with the testing that confirms meeting the requirements of Table A. If the test does not indicate a minimum combustion efficiency as required in Table A, final approval shall not be granted and the Contractor/manufacturer shall remove the FLEXIBLE WATER-TUBE BOILERS (HOT WATER) 15560 - 5 05/15/15 DESIGN NO. _____ installed boiler(s) and/or burner and replace with a different boiler(s)/burner combination that complies with the specification including the testing requirements contained in Table A, at no additional expense to the Authority. All associated costs shall be borne by the Contractor/manufacturer including, but not limited to, all removal costs, temporary heat expenses, the costs of the replacement boilers and/or burners and any related General Contracting expenses such as rigging costs, costs to open/close the building envelope, etc. 2. NYCSCA DEP Bureau of Air Resources Effective Feb. 17, 2014: Assembly Requirements a. List of accepted equipment: If the application for the work permit is to install equipment that appears on DEP’s list of accepted equipment, no additional certification is required. b. UL/CSA/ETL listed equipment: If the application for the work permit is to install equipment that is listed by UL, CSA Group, or ETL, a certification of compliance from a professional engineer must be submitted on a form prescribed by the DEP. c. Unlisted and custom equipment: If the application for the work permit is to install custom equipment, or equipment that is not on the DEP’s list of accepted equipment and is not UL, CSA Group, or ETL-listed, a certification of compliance from a professional engineer must be submitted on a form prescribed by DEP. 3. Low pressure boiler construction: in accordance with American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, Section IV and the requirements of the City of New York, the State of New York and any other public authorities having jurisdiction. 4. Boilers shall be approved by the NYC Department of Environmental Protection (Air Resources), and shall be listed and labeled in accordance with UL 726 for oil or UL 795 (or ANSI Z21.13) for gas per Section MC 1004.1 of the 2014 NYC Mechanical Code, Section FGC 631.1 of the 2014 NYC Fuel Gas Code and 2014 NYCECC. The UL listing FLEXIBLE WATER-TUBE BOILERS (HOT WATER) 15560 - 6 05/15/15 DESIGN NO. _____ shall be indicated on the Shop Drawings, and labeled on equipment. 1.05 6. New York State Industrial Code Rule 4 (12NYCRR4) 7. Before submitting any equipment shop drawings for approval, the HVAC Contractor, Automatic Temperature Controls Contractor and the Equipment Vendor and Manufacturer shall coordinate the controls required for the system. 8. All appliances regulated by the New York City Construction Codes shall be listed and labeled (reference Sections MC 301.4 and MC 301.6). Testing of material shall be in accordance with Section §28-113 of the NYC Administrative Code (reference Section MC 301.5). Whenever the NYC Construction Codes or the Rules of the Department of Buildings requires that material be listed or labeled and material proposed to be used is not so listed or labeled, the use of such material shall be subject to prior approval by the Commissioner (Office of Technical Certification and Research OTCR) and such material shall be used only to the extent set forth in such approval. Materials that were previously approved by the Board of Standards and Appeal (BSA) or by the Department (MEA) before the effective date of the NYC Construction Codes may continue to be used, but only to the extent set forth in such approval, and only if such approval is not specifically amended or repealed by the Commissioner. For factory built boilers (not field assembled) rig boilers/burners in compliance with manufacturer's rigging and moving instructions for unloading boilers/burners, and moving them to final location. SEQUENCE AND SCHEDULING A. NYCSCA NYCECC Compliance: Boilers shall meet the minimum efficiency requirements of the New York City Energy Conservation Code. SUPPLEMENTAL DELIVERY, STORAGE, AND HANDLING REQUIREMENTS A. 1.06 5. Coordinate the size and location of the concrete pad on which boiler/burner units are to be mounted. For factory built boilers (not field assembled) coordinate the boiler/burner unit’s intake opening through the building. Close the opening after the boiler/burner units are in place. Coordinate the placing of the grounding electrode with the FLEXIBLE WATER-TUBE BOILERS (HOT WATER) 15560 - 7 05/15/15 DESIGN NO. _____ Division 16 Electrical Contractor, concrete. Reference Section 16450. 1.07 before pouring the MAINTENANCE MATERIALS A. 1.08 Furnish with each boiler, all necessary tools for opening manholes, handholes and front and rear covers. WARRANTY A. Warranty period for downcomers, drums, tubes and headers shall be 20 years for thermal shock. The guarantee period start date shall be the date of Substantial Completion. PART 2 - PRODUCTS 2.01 MANUFACTURERS A. Subject to compliance with requirements, manufacturers offering packaged flexible water-tube boilers which may be incorporated in the work include, but are not limited to, the following (pending approval with burner utilized and meeting the efficiency requirements of Table A): Bryan Steam Corporation. Cleaver-Brooks; Div Aqua-Chem, Inc. Unilux Boiler Corp. B. 2.02 Boiler Models: Bryan Steam Cleaver Brooks Unilux Boiler Corp. DR, CLM, HECL, AB, RV, RW Series FLX “Z” PACKAGED WATER-TUBE BOILERS A. 3 NYCSCA Boilers/Burners shall be fabricated, assembled and tested packaged flexible water-tube design. Field work shall be done by factory authorized technicians. All field work shall be tested and inspected by a boiler insurance company or by NYS Department of Labor personnel. Boilers/burners shall be complete with integral forced draft No. 2 fuel oil or natural gas burner mounted on a hinged backing plate for access to furnace; burner controls, boiler trims, operating and safety controls, control panel, oil pumps and motors, piping and wiring connections and all other items and accessories. Assemble and wire boiler/burner units so that only water, fuel, drains, blowdown, electrical, and vent connections are required. Capacities and electrical characteristics shall be as shown on the Drawings. FLEXIBLE WATER-TUBE BOILERS (HOT WATER) 15560 - 8 05/15/15 DESIGN NO. _____ B. The boiler shall be of a two-drum flexible watertube design with a tangent tube waterwall furnace mounted on a heavy steel frame. Top, bottom and sides of the furnace shall be water-cooled. Provide with lifting lugs on top of boiler and accessible drain and blowdown tappings, both high and low, for surface and mud removal. C. Boiler tubes shall be no less than 1½” diameter, .095" wall thickness SA178A, electric resistance, welded carbon steel and shall be easy to remove and replace without expanding, rolling or welding the tube attachment to the drums. Limit tube configuration to a maximum of three. D. The boiler shall have sufficiently sized provide natural internal circulation. E. The boiler shall be provided with an adequate number of inspection openings to facilitate internal boiler inspection and cleaning. Provide observation ports for the inspection of flame conditions. F. The tangent wall tubes shall be covered with manufacturer's recommended thickness of insulation under a gas-tight, 11gauge inner casing and a 22-gauge steel outer casing. The boiler base frame and other components shall be factorypainted before shipment, using a hard enamel finish. G. Grounding of Boilers: Coordinate with the Division Electrical Contractor for the grounding and bonding equipment (Reference Section 16450). H. Boiler Number Plate: provide a number plate for each boiler, as required by New York City Ordinances. Numbers shall be of solid brass, not less than 2" in height. Each number shall be permanently mounted on the steel front wall. I. Every boiler shall have a shutoff valve in the supply and return piping. For multiple boiler installations, each boiler shall have individual shutoff valves in the supply and return piping. (Refer to Section MC 1005.). J. A remote control shall be provided to stop the flow of oil and/or gas and combustion air to any burner or fuel burning internal combustion equipment. Such control shall be located outside all means of egress to the room in which the burner or equipment is located and as close to such entrances as practicable, except that when an outside location is impracticable, such control may be located immediately inside the room in which the burner or equipment is located, provided such location is accessible at all times. All such NYCSCA downcomers to 16 of FLEXIBLE WATER-TUBE BOILERS (HOT WATER) 15560 - 9 05/15/15 DESIGN NO. _____ controls shall be labeled: “REMOTE CONTROL FOR BURNER”. (Refer to Section MC 1006.8). 2.03 BOILER TRIM 2.04 A. Low Water Cut-Off with manual reset: A probe-type, low water cut-off control shall be mounted in the upper drum. It is to be wired to the burner control circuit to prevent burner operation if the boiler water falls below a safe level. B. Dial type combination pressure and temperature gage, or a separate pressure gage and thermometer. Gages shall be of the dial type, a minimum of 4” in diameter, and if separate gages are installed, both gages shall be located where they may be easily observed and read, without the observer changing position or location. C. Water relief valves of type and size to comply with ASME Code requirements. (Refer to Section 15570: Boiler Accessories) D. Operating Control: Adjustable electric temperature controller (aquastat), set to maintain a pre-determined temperature in the boiler, with a range of from 1200 F to 2200 F. E. High Limit Controls: Adjustable electric temperature controllers (aquastats), set to shut down the burner when the temperature in the boiler reaches the predetermined setting. Limit controllers shall be of the manual reset type, with a range of from 1200 F to 2200 F. F. Dip Tube: Provide as an integral part of boiler water outlet nozzle. SOURCE QUALITY CONTROL A. 2.05 Boiler shall be designed and constructed as per ASME code, section IV and shall bear the ASME stamp for maximum working pressure of 160 PSIG and 250°F temperature. SHOP QUALITY CONTROL A. The boilers/burners shall be inspected during construction in the shop of the manufacturer by an inspector of an approved 9 boiler insurance company, or of the NY State Labor Department. After completion of construction, each boiler shall be successfully tested at the shop. The boiler shall be stamped legibly with all identifying marks and symbols, the manufacturer's name, the allowable working pressure in pounds per square inch, the year of manufacture, and all other markings required by the latest editions of the New York State NYCSCA FLEXIBLE WATER-TUBE BOILERS (HOT WATER) 15560 - 10 05/15/15 DESIGN NO. _____ and the ASME Boiler Codes. Insulating covering shall be left off the above stampings. 2.06 4 BOILER CONTROL POINTS A. Boiler manufacturer shall provide integration of monitoring and alarm functions by providing controls as indicated in 15985. Boiler manufacturer shall provide gateway to convert from their protocol to the LonWorks protocol (LonTalk). PART 3 - EXECUTION 3.01 SUPPLEMENTAL INSTALLATION A. NYCSCA General 1. Comply with NYC Department of Buildings regulations concerning the installation of the boilers/burners and file with that department all required information before starting the boilers/burners installation. 2. Boilers/burners shall be set level on the concrete base provided in Section 03300: Cast-in-Place Concrete in the boiler room. 3. Boilers/burners shall not be installed until the boiler room floor finish (whether waterproof type or not) has been completed. The grounding electrode shall be installed by the Division 16 Contractor prior to the pouring of the concrete base for the boilers/burners. Each boiler/burner unit shall be electrically grounded as specified and recommended by the manufacturer and regulatory agencies. 4. Boilers/burners shall be not less than the rating shown on the Drawings, and the height shall fit the space available, leaving ample allowance for replacing tubes, vent connections, piping, and all other items and accessories along with manufacturer's recommended clearances around and over boilers/burners. 8 5. Provide platform and/or ladders in order to grant access to water relief valves in accordance with Section MC 1004.3.1. Per Section MC 1004.3, clearances shall be maintained around boilers, heaters and tanks and related equipment and appliances so as to permit inspection, servicing, repair, replacement and visibility of all gauges. When boilers are installed or replaced, clearance shall be provided to allow access for inspection, maintenance and repair. Passageways around all sides of boilers shall have an unobstructed width as FLEXIBLE WATER-TUBE BOILERS (HOT WATER) 15560 - 11 05/15/15 DESIGN NO. _____ required by the manufacturer and in no case less than 18”, unless otherwise approved by the DOB Commissioner. B. 3 C. 3 D. NYCSCA 6. Approved piping and wiring diagrams and installation instruction shall be obtained from the manufacturer and followed in the installation of the boilers/burners. 7. Install boilers/burners in accordance with State Code, New York City Code and Local Utility Company Requirements. 8 Contractor shall provide liquid tight flexible metal conduit (Sealtite) for final conduit connections to all the motors. Gas Piping: refer to Section 15416: Gas Piping System. Connect gas piping to boiler/burner, full size of boiler/burner gas train inlet as a minimum or as shown on Drawings. Provide union with sufficient clearance for burner removal and service. 1. Install gas piping as per approved Shop Drawings and as shown on the Drawings Details. Submit to approvals prior to fabrication and installation. Provide required boiler clearances 2. Gas vent piping of the gas trains shall be as specified under plumbing work. Oil Piping: refer to Section 15593: Fuel Burning Equipment and Section 15510: HVAC Piping. Connect oil piping to boiler/burner, full size of inlet to burner as a minimum. Provide shutoff valve and union with sufficient clearance for burner removal and service. 1. Install fuel oil piping as per approved Shop Drawings and as shown on the Drawings Details. Submit for approvals prior to fabrication and installation. 2. Provide 100 mesh strainer baskets on strainers serving the burners oil pumps and strainers serving the transfer oil pumps. Hot Water Piping: Refer to Section 15510: HVAC Piping. Connect supply and return boiler tappings as indicated, with shutoff valve and union or flange at each connection, all as shown on the Drawings. The boiler shall be designed to rapidly mix return water with the boiler water. FLEXIBLE WATER-TUBE BOILERS (HOT WATER) 15560 - 12 05/15/15 DESIGN NO. _____ E. Breeching: refer to Section 15575: Breeching, Chimneys, and Stacks. Connect breeching to boiler/burner outlet full size of outlet with all accessories. 3.02 PAINTING A. 3.03 FIELD QUALITY CONTROL A. 3.04 Hydrostatic Test/Safety Valve Operation Inspection 1. Arrange for hydrostatic tests and the witnessing of operation of all safety valves at rated pressure of the boilers by the Department of Buildings. Notify the Authority and the Custodian or building manager (DoE) by letter, at least 48 hours in advance of the time at which such tests are to be made. 2. Each boiler shall be connected completely, including water connections, trimming, surface and drain lines, and all other items and accessories, with valves inserted in connections to mains, and ends left open until after tests have been applied to provide that the valves are tight under the specified pressure. 3. Obtain a Certificate of Compliance (Form 276) from the Department of Buildings and deliver to the Authority immediately after the boiler tests have been completed. B. Calibrate the parallel positioning linkage-less burners. C. Refer to Section 15992: Cleaning and Testing, for testing procedures and requirements. DEMONSTRATION A. NYCSCA Painting: Boiler/burner units shall be primed painted at the shop with one coat of heat resistant primer. The shop coat shall provide a complete protective covering. All damaged spots shall be touched up before insulation is applied (Refer to Section 09900: Painting). Preliminary Requirements: provide the services of the field service representative of the boiler-burner unit manufacturer for the following: 1. Inspect each boiler/burner unit installations prior to start-up. 2. Supervise initial firing of boilers/burners. FLEXIBLE WATER-TUBE BOILERS (HOT WATER) 15560 - 13 05/15/15 DESIGN NO. _____ 3. B. Instruction of Maintenance Personnel: The manufacturers' representative shall instruct all New York City Department of Education custodial (or building manager) maintenance personnel and DOE Maintenance Representative in the operation and maintenance of the boilers/burners and all items and accessories. Provide a minimum of 40 hours for instruction purposes, exclusive of all pre-start-up, start-up and service call time. C. Start-up: The Contractor shall perform necessary Interdisciplinary Tests and Functional Performance Tests (FPT) according to the manufacturer’s procedures. Start-Up operational and safety checks, checking of alarms and performance checks shall be witnessed by the Authority’s Construction Inspection Division (CID). D. E. NYCSCA Instruct Authority Designated Personnel. 1. A water treatment system shall be operational before any attempt is made to start the boiler/burner units. 2. Replace damaged equipment. 3. Perform services in accordance with manufacturer's written start-up instructions. Field start up reports to be provided by the authorized start up representative upon completion. Refer to Section 15593: Fuel Burning Equipment. or malfunctioning controls and Maintenance and Operation Training 1. Contractor shall prepare a detailed, coordinated stepby-step maintenance and operations manuals covering all boilers/burners equipment, tube removal and replacement demonstration and all other items and accessories as per Section G01730 and Section 15501. 2. As a part of the maintenance and operating instructions, review data in operating and maintenance manual, including tube removal and replacement demonstration, preventative maintenance schedule and procedures, and procedures for obtaining repair parts and technical assistance. Demonstrate all phases of operation including start-up and shut-down. Schedule training with the Authority. Provide at least 4 days notice to the Authority and the Custodian (or building manager) and DOE Maintenance Representative. Training shall be for a minimum of 40 hours. FLEXIBLE WATER-TUBE BOILERS (HOT WATER) 15560 - 14 05/15/15 3.05 3.06 BOILER CLEANING AND WATER TREATMENT A. The Contractor shall retain the services of a reputable water treatment service company. This company shall test boiler water and provide a written report with recommendation for chemical treatment as soon as the system is filled with water. This same company shall provide water treatment service and inspection. Every two (2) weeks during temporary heating and for one (1) year after Substantial Completion of the school. Refer to Section 15517: Water Treatment for Hydronic Systems. B. Prior to start-up the Contractor shall flush and clean the boiler to remove all rust and deposits. Cleaning agents to be used shall be as recommended and approved by the Chemical Treatment Firm and by the Boiler Manufacturer. ACCEPTANCE TEST A. 3.07 DESIGN NO. _____ Boilers/Burners shall not be placed in operation until completion of construction, inspection and testing and only after a Certificate of Compliance has been issued by the commissioner. All final inspections and tests for boilers/burners shall be subject to the provision for Special Inspections, except that such inspections and tests shall be made by a qualified boiler inspector in the employ of the department or a duly authorized insurance company as provided in section 204 of the labor law. Equipment having a Btu input of not more than three hundred and fifty thousand Btu per hour shall be exempt from this requirement. INTERDISCIPLINARY TESTS AND FUNCTIONAL PERFORMANCE TESTS A. Interdisciplinary Pre-Start-Up and Start-Up Tests: The Contractor shall conduct interdisciplinary pre-start up and start up tests as per the manufacturer’s start up procedures. Contractor shall submit signed start up affidavit signed by the factory authorized service representative indicating that all of the manufacturer’s pre-start up and start up procedures have been successfully completed. B. 5 NYCSCA Functional Performance Tests: Contractor shall also submit signed functional performance testing affidavit signed by the factory authorized service representative indicating that all of the manufacturer’s functional performance tests have been successfully completed. Refer to the functional performance tests as defined in Section 15970 since a BMS/DDC system is to be FLEXIBLE WATER-TUBE BOILERS (HOT WATER) 15560 - 15 05/15/15 DESIGN NO. _____ provided and the equipment is to be integrated into the BMS/DDC system. 3.08 COMMISSIONING OF FLEXIBLE WATER TUBE BOILERS (HOT WATER) A. HVAC Contractor shall comply with the Commissioning Requirements of Contract Specification Section S01660 for Flexible Water Tube Boilers (Hot Water). B. All testing for hot water piping, dual temperature piping, oil fuel piping, gas piping, hydrostatic testing of boilers, and smoke test of boiler chimney shall be completed prior to commencement of the commissioning process. 7 3 END OF SECTION BB:JV:RE 05/15/15 Notes to Specifier (Delete from Specifications) 1. Section 15503 is to be utilized if the project involves construction of a New Building or Addition to building in Seismic Design Category C or D. Section 15503 is also to be utilized if project involves retrofit work in Existing Buildings in Seismic Design Category C or D constructed after LL17/1995 went into effect. Use Section 15504, Vibration Isolation, (without seismic restraints) for retrofit work on Existing Buildings constructed prior to the effective date of LL17/1995 and for any buildings in Seismic Design Category B. 2. Not used. 3. Edit as required for the type of fuel selected (No. 2 oil or natural gas). 4. For boilers installed in schools with LonWorks BMS/DDC Temperature Control System. Flexible water-tube boilers should only be used on CIP projects as New Construction and Major Modification projects will utilize gas fired condensing boilers. CIP projects will not be provided with a BMS/DDC network. The integration of a flexible water-tube boiler into a BMS/DDC network would be for a special case only. Edit as required. 5. Edit as required if no BMS/DDC network is to be provided. 6. Not used. 7. This paragraph is intended for projects that must comply with the NYC Green Schools Rating System (generally all capacity projects) and the following CIP projects: NYCSCA FLEXIBLE WATER-TUBE BOILERS (HOT WATER) 15560 - 16 05/15/15 a. b. 8. DESIGN NO. _____ HVAC upgrades (boiler replacements/ DDC-only systems/ AC upgrades, etc) Temperature Control systems BMS/DDC Systems Per Section MC 1004.3.1: Steam-heating boilers and hot water heating boilers that exceed one of the following limits: 5,000,000 BTUH input, 5,000 pounds of steam per hour, or a 1,000 square foot heating surface and all boilers with manholes on top of the boiler, shall have a minimum clearance of 3 feet from the top of the boiler to the ceiling. Package boilers, steam heating boilers and hot water heating boilers without manholes on top of the shell and not exceeding one of the limits described herein, shall have a minimum clearance of 2 feet from the ceiling. Where the required clearances cannot be provided due to physical limitations, file a reconsideration request (form BC-1) during the filing process demonstrating the physical limitations. Show platform/ladder details on the Drawings in accordance with Article 4-6.6 of the New York State Industrial Code Rules for low pressure boilers. Article 4-6.4 of the NYS Industrial Code Rules for low pressure boilers installed in a space or room not previously used to house a boiler (after March 31, 1965), requires access platforms over boilers where the distance from the floor to the top of the boiler or boiler setting exceeds eight (8) feet and the clearance of the working surface of such platform to the lowest point of any overhead structure shall be not less than seven feet. Edit specification references to ladders/platforms if not required. 9. Edit as required if work is to be done in the field. 10. Note deleted. 11. Note deleted. NYCSCA FLEXIBLE WATER-TUBE BOILERS (HOT WATER) 15560 - 17 05/15/15 DESIGN NO. _____ LIST OF SUBMITTALS SUBMITTAL DATE SUBMITTED DATE APPROVED Product Data: ______________ _____________ ______________ _____________ 1. 2. 3. 4. Manufacturers Product Data Installation Instructions Capacities Refractory Technical Data Shop Drawings: 3 1. Wiring Diagrams 2. Details of the Boiler Construction and Combustion Chamber 3. Gas Piping Diagrams 4. Fuel Oil Piping Diagrams Test Reports ______________ _____________ ______________ _____________ 1. Factory Test and Inspection 2. Field Test and Inspection Certificate: 1. 2. 3. 4. 5. 6. DEP Permit DEP Certification of Compliance Burner listing DOB ‘H-2’ certification DOB Certification of Compliance DEP Certificate of Operation (or Registration as applicable) 7. Start-up and demonstration affidavit Contract Closeout Submittals: ______________ _____________ 1. Certified Prototype Testing Reports (combustion efficiencies) 2. Operating Instruction Manuals 3. Framed Piping and Wiring Diagrams 4. Maintenance manual Maintenance Materials: ______________ _____________ Manufacturer’s Guarantees: ______________ _____________ * * * NYCSCA FLEXIBLE WATER-TUBE BOILERS (HOT WATER) 15560 - 18