EEE161 __TRANSMISSION LINES AND FIELDS__ FALL 98

advertisement
EEE117L
NETWORK ANALYSIS LABORATORY
FALL 2014
Instructor
: Preetham B. Kumar
http://www.ecs.csus.edu/wcm/eee/faculty and staff/preetham kumar.html
Office hours: : Mon/Wed: 11 am - noon or by appointment.
Office
: ECS 5006
Telephone
: 278-7949
E-mail
: kumarp@ecs.csus.edu
Prescribed Text : 'Electric Circuits' by J.W. Nilsson & S.A. Riedel, 9th Edition, 2010
ISBN: 0-13-198925-1
Lab Material:
Lab location:
Lab schedule:
\\voyager\Lab\EEE\Tatro\EEE_117_Circuits_Lab
Riverside Hall 3017
Equipment Manuals
Various user guides for the test/measurement equipment in room 3017
Tektronix DPO 3014 Oscilloscope
Tektronix P6139A Oscilloscope Probe
Agilent 34401A Digital Multimeter
Agilent 33120A Function Generator
Agilent E3631A Power Supply
XYZs of the Oscilloscope from Trektronix
Multisim User Guide
Multisim is available in Riverside Hall rooms 3017 and 3013 and through the ECS Rhea
Remote Desktop server.
Multisim User Guide
Multisim Tutorial
How to connect to the ECS Rhea Remote Desktop
Course Grading
The pre-lab assignments, laboratory reports and attendance are the basis for the grade in
this lab. See the course syllabus (next page) for assignment due dates.
Lab
1
2
3
4
5
6
7
Circuit Simulation
Test Equipment Operation
Op Amp
Low Pass Filter #1
Rise/Fall Times
Times Ten Attenuator
Low Pass Filter #2
Total points
Pre-Lab
5
10
10
10
5
10
10
Report
5
5
10
10
10
Combined
5
10
15
15
15
20
20
60
40
100
Lab Schedule for Fall 2014
_________________________________________________________________________
WEEK
Lab. date
Lab
TOPICS
_________________________________________________________________________
1
09/02/14
Lab 1
Multisim/PSpice Introduction
2
09/09/14
Lab 1
Multisim/PSpice Introduction
Pre-Lab 1 assignment due
3
09/16/14
Lab 2
Test Equipment Operation – DC Meas.
Pre-Lab 2,Week-1 assignment due
4
09/23/14
Lab 2
Test Equipment Operation – AC Meas.
Pre-Lab 2,Week-2 assignment due
5
09/30/14
Lab 3
Operational Amplifiers
Pre-Lab 3,Week-1 assignment due
6
10/07/14
Lab 3
Operational Amplifiers
Pre-Lab 3,Week-2 assignment due
7
10/14/14
Lab 4
Low Pass Filter
Pre-Lab 4,Week-1 assignment due
Lab 3 report - due
8
10/21/14
Lab 4
Low Pass Filter
Pre-Lab 4,Week-2 assignment due
9
10/28/14
Lab 5
Rise/Fall Times for First Order Crkts.
Pre-Lab 5 assignment due
Lab 4 report - due
10
11/04/14
Lab 6
Times Ten Attentuator – Part I
Pre-Lab 6, Week-1 assignment due
Lab 5 report - due
11
11/11/14
Lab 6
Times Ten Attentuator – Part II
Pre-Lab 6, Week-2 assignment due
12
11/18/14
Lab 7
Low Pass filter
Pre-Lab 7, Week-1 assignment due
Lab 6 report - due
13
11/25/14
Lab 7
Low Pass filter
Pre-Lab 7,Week-2 assignment due
14
12/02/14
Make up labs
15
12/09/14
Lab 7 report - due
16
12/16/14
Finals Week – No lab