Minutes of the 114th meeting of the Committee Constituted for Deciding
the Consent under Orange Category, held on 11.05.2009 in the
Conference Room of Chairman, DPCC.
The following persons attended the meeting:
1.
2.
3.
4.
5.
6.
7.
8.
Sh. J. K Dadoo, Chairman DPCC
Dr. A.K.Ambasht, Member Secretary, DPCC
Sh. S.K.Gupta, Head Chemical Engineering Deptt. ,IIT Delhi
Sh. B. Kumar, SEE, DPCC
Sh. M. Dwarakanth, SSO, Dept. of Env,. GNCTD.
EEs of CMC – I, II & III/PGRC.
AEEs and JEE of CMC – I, II & III.
AEE, PGRC.
In addition to above, Sh A.N. Singh Scientist, Deptt. of Environment and
Trainees of CMCs, PGRC & SIT also attended the meeting.
Following decisions were taken in the said meeting:Agenda Item No. 1 – Personal hearing of M/s Babaji Stampings & Jyothi
Electrocapacitors, Bawana Indl Area
The unit came for personal hearing today. Unit will file an affidavit
indicating that it has removed the D.G. Set. Call on 24.06.2009.
Agenda Item No.2- Special reference cases.
Decisions taken with respect to this agenda are tabulated and annexed
as Annexure – 1.
Agenda Item No.3- Shopping Mall cases
Decisions taken with respect to this agenda are tabulated and annexed
as Annexure – 2.
Agenda Item No.4- Construction Projects cases
Decisions taken with respect to this agenda are tabulated and annexed
as Annexure – 3.
Agenda Item No. 5- Remaining cases of 514 units in respect of waste
water discharge upto 1000 Lt/day out of about 6000
pending consent applications.
Decisions taken with respect to this agenda are tabulated and annexed
as Annexure – 4.
Table agenda item No. 1: M/s Renu Engg. Works, Plot No 188, PocketC, Sector-1, DSIDC, Bawana Indl. Area, Delhi
Issue Consent to Establish. Call on 24.06.2009
Table agenda item No. 2: M/s NBCC Centre Commercial Complex, Plot
No 2, Community Centre, Okhla Phase-I, New Delhi
Issue Consent to Establish. Call on 24.06.2009
Table agenda item No. 3: M/s Indo Europa Trading Co. Pvt. Ltd., 88,
Okhla Industrial Estate, New Delhi-20
Issue renewal of consent subject to the condition that it files application for
authorization under HWM Rules. Call on 24.06.2009
Table agenda item No. 4: M/s Security Systems, E-454, Phase-II, Okhla
Industrial Area, New Delhi-20
Ask the unit to confirm on affidavit that it is not drawing any ground water.
Call on 24.06.2009.
Table agenda item No. 5: M/s Pashupanjali Enterprises Pvt. Ltd, P. No.
340/17, Gali No 1, Friends Colony Indl. Area, Delhi
SIT-I to inspect and report. Call on 24.06.2009
Table agenda item No. 6: M/s Northern Railway State Entry Road, New
Delhi
Ask the unit to submit the full information in its consent application
and to submit environmental clearance expeditiously. Call on 24.06.2009.
Table agenda item No. 7: Hotel Queen Road Pvt. Ltd., 19, Ashoka Road,
Connaught Place, New Delhi-01
Ask the unit to explain why it has started operations without
submitting DJB permission for ground water extraction. Also ask the unit to
explain why it has started operations without full compliance of earlier CMC
decisions where it was asked to file an affidavit on five points. Let it be
clear to the unit that operating without Consent to Establish and Consent to
Operate it will be liable for causing damage to the environment.
Issue letter without waiting for minutes. Call on 03.06.2009.
Table agenda item No. 8: Jagdish Parsad Trilok Nath & Co.
(Indira Cold Storage), 42, Rama Road, Najafgarh Road Indl. Area,
Delhi
Issue consent to operate. Call on 24.06.2009.
Meeting ended with thanks to the Chair.
Sl.
No.
Name
Activity
Facts of The Case
Earlier Decision
Action Taken
Decision on 11.05.09
1
Adyar Anand
Bhawan,S-18,
Main Market
Green Park
Restaurant
Decision on 02.02.09:
Unit came for personal
hearing. Unit has filed an
affidavit stating that ETP of
2KLD capacity will be
installed within 3 months.
Time allowed upto
12.04.09. Call on 18.03.09
for interim report.
Decision on 20.03.09:
Issue reminder. Call on
29.04.09
Reply received from the unit
on 05.05.09 and requested
for some more time to
submit the adequacy report.
Time allowed. In the
meantime, unit be
asked to submit the
affidavit stating that
matter has been taken
up with the approved
consultant of DPCC
for adequacy report.
Call on
24.06.200924.06.2009
2
Complaint
against
Polybags used
in M/s Bangla
Pastry Shop,
125, Bangla
Sahib Marg,
Connaught
Place, Delhi.
Complaint
against
Polybags used
in M/s Kaleva,
109, Bangla
Sahib Marg.
Connaught
Place, Delhi.
Restaurants
The unit was inspected by DPCC official on 10.05.08 w.r.t. a public
complaint received from the residents of the area. As decided in CMC
on 13.05.08, a letter was issued to the unit on 05.06.08 for installation of
ETP, proper stack height with DG set and use of degradable plastic
bags. As decided in CMC on 18.06.2008, reminder issued on
03.07.2008. The unit submitted it's reply on 14.07.2008 regarding
correction of deficiencies and grant of three months time for installation
of ETP. As decided in CMC on 13.08.08, the file was put up
admistratively and as approved, a letter was issued to the unit on
09.09.08 regarding installation of ETP. As decided on 30.09.08, final
reminder issued on 17.10.08. The unit submitted it's reply on 21.10.08
and informed that work for installation of ETP has been awarded and
requested for grant of 2-3 months time for completion. Unit came for
personal hearing on 02.04.09 and Unit has filed an affidavit stating that
ETP of 2KLD capacity will be installed within 3 months. Time allowed
upto 12.04.09. Call on 18.03.09 for interim report.
An inspection was carried out by DPCC Engineer Trainees on 18.03.09
w.r.t. a public complaint. During the inspection, following were observed:
-Unit found operating and engage in cakes & pastry shop without seating
arrangements. Unit has provided oil and grease trap, found working. Unit
uses plastic carry bags, sample collected.
Decision on 20.03.09:
Issue reminder. Call on
29.04.09
Letter issued to the unit on
23.04.09. Reply received
from the unit on 28.04.09
and informed that they have
stopped use of plastic bags.
Ask the unit to submit
an afifdavit stating that
it will not use plastic
bags. Call on
24.06.2009
An inspection was carried out by DPCC Engineer Trainees on
18.03.09 w.r.t. a public complaint. During the inspection, following
were observed:
-Unit found operating and engage in mfg. of sweets & snakes
without seating arrengments.Unit has provided oil and grease
trap which was found working. Unit uses plastic and paper bags,
sample collected.
Decision on 20.03.09:
Issue reminder. Call on
29.04.09
Letter issued to the unit on
23.04.09. Reply received
from the unit on 05.05.09
and informed that they are
doing needful and nowdays
they are using Biodegradable bag only.
Ask the unit to submit
an afifdavit stating that
it will not use plastic
bags. Call on
24.06.2009
3
Restaurants
4
Complaint
against
Polybags used
in M/s Gupta
Sweets, 129,
Bangla Sahib
Marg,
Connaught
Place, Delhi.
Restaurants
An inspection was carried out by DPCC Engineer Trainees on
18.03.09 w.r.t. a public complaint. During the inspection, following
were observed: Unit found operating and engage in the activity of
Restaurant with 50 seating capacity. unit has provided oil and
grease trap which was found working. Unit uses plastic and paper
bags, sample collected.
Decision on 20.03.09:
Issue reminder. Call on
29.04.09
Letter issued to the unit on
23.04.09. Reply received
from the unit on 28.04.09
and informed that they will
not use plastic bags in
future.
Ask the unit to submit
an afifdavit stating that
it will not use plastic
bags. Call on
24.06.2009
5
Complaint
against
Polybags used
in M/s Rbk
(Reebok), CMS
Enterprises,
119-121, Bangla
Sahib Marg,
Connaught
Place, Delhi.
Complaint
against
Polybags used
in M/s Bata, opp.
Bangla foods,
Bangla Sahib
Marg,
Connaught
Place, Delhi.
Shop
An inspection was carried out by DPCC Engineer Trainees on
18.03.09 w.r.t. a public complaint. During the inspection, following
were observed: Unit engage in the the activity of Reebok
Showroom.
-Unit use plastic bags, sample collected.
Decision on 20.03.09:
Issue reminder. Call on
29.04.09
Letter issued to the unit on
23.04.09.
Issue final reminder.
Call on 24.06.2009
Shop
An inspection was carried out by DPCC Engineer Trainees on
18.03.09 w.r.t. a public complaint. During the inspection, following
were observed: Unit engage in Bata shoes/chappals showroom.
Unit uses Polybags, sample collected
Decision on 20.03.09:
Issue reminder. Call on
29.04.09
Letter issued to the unit on
23.04.09. Reply received
from the unit on 28.04.09
and submitted an affiadvit
stated that they have
stopped the use of plastic
bags.
No action in view of
the affidavit
submitted by the
unit.
6
7
M/s Rajiv
Automobile
(Bajaj
Showroom) A6, 100 ft. road,
Chhajupur,
Kabir Nagar,
Delhi.
Service
center-cumshowroom
inspection was carried out by DPCC officials on 06.05.09 w.r.t. a
public complaint received from Chhajupur RWA. During the
inspection it was observed that:
-Unit found operating and engages in Service station cum
showroom of Bajaj Scooters & Bikes.
-Unit is operating in Non-conforming area.
-Waste water generated and discharge into the sewer without any
treatment.
-Hazardous waste (waste oil) produced and stored in container.
-One DG set of 25 KVA installed at roof top of the building
without acoustic enclosure and adequate stack height.
8
Complaint
against Noise
pollution
caused by
Construction at
premises R-41,
Greater
Kailash Part I
from Shri
R.P.Joneja
through L.G.
office.
Construction
in R-41, GKI
A public complaint was received through LG Office regarding
noise pollution due to demolation/construction activity. The site
was inspected on 12.06.08 & 14.06.08 and as approved notice
u/s 31(A) of Air Act to M/s Shashi Kant Mittal & letter to Excise
Commissioner issued on 17.06.2008. As decided by CMC on
18.06.08, copy of notice sent to LG Office on 25.06.08. As per the
decision of CMC on 25.06.08 case is to be put up on 31.07.08.
But on 31.07.08, PGRC cases could not be taken. Decision on
06.08.08: The file of this unit submitted to the chairman
adminstratively and it was decided to take up this as a table
agenda, As the unit has not filed reply, notice for closure may be
issued immidiadly without
waiting
for minutes.
Notice u/s 31(a) of Air Act was issued on 08.08.08. As approved
in the file remider of notice was issued on 27.08.08.and delivered
at site through trainee engineer.The unit submitted its detailed
reply on 26.08.08. As decide in CMC on 28.08.08, a letter for
apportunity of hearing was issued to you Sh. Sashi kant mittal on
03.09.08 to appear befor CMC on 10.09.08.
Refer to
Commissioner of
Industries for
necessary action.
Call on 24.06.2009
Decision on 10.09.08:
Unit came for personal
hearing and it says that
the petitioner has also
filed a case in Hon'ble
High Court and no stay
has been granted. It has
also filed a copy of the
affidavit of the Supdt.
Engineer, MCD who
confirms the building
construction was as per
building bye laws. Let
the unit file the copy of
the High Court order and
the case will be dealt
with the admistratively.
the file was put up
administratively and as
approved a letter was
issued to Sh. Mittal on
21.11.08 for submission
of Hon'ble High Court
order. The order of
Hon'ble High Court was
submitted on 25.11.08
which was examined by
the Legal Consultant
Four members team
of PGRC Trainees
will inspect and
report. PGRC Team
will check whether
any noise/air/water
pollution is being
caused. Call on
24.06.2009.
9
Complaint
against M/s
Europian Jain
Industry, PP -42,
Gali no.-10,
Anand Parbat
Food Grade
ink for
Pharma
Printers and
trading of
paint thinner
aluminum foil.
Unit was inspected on 23.09.04, it was found that unit has applied for
consent in DPCC and the unit was outside the boundary of Anand Parbat
Indl Area. The consent was refused by CMC on 30.05.05 and PGRC
categorized the activity as F-27/33 and forwarded to DC for effective
closure. The said unit was sealed by SDM on 23.03.06. The unit
approached for revocation of consent , it was advised that unit can
approach COI for desealing the premises. The unit i.e. M/s Europian Jain
Industries complaining that why only his unit was closed. There are
many other units operating nearby the said unit.
Decision on 20.02.09: File
be put up administratively
by PGRC.
Decision on 25.03.09: Let
Sh. Mahapatra, our
advocate in the High Court
study the case and give his
considered view in this
case.
Written opinion has been
received from Sh.
Mahapatra, Advocate of
Delhi High Court. The
advocate has opined that
the concerned unit cannot
raise any question of
discrimination once it is held
that the premises in
question is in the nonconforming area and
running the industry falls
under F-27/33 catagory.
However, DPCC may
forward his application dated
16.03.09 for desealing and
seeking permission to do
some trading of industrial
goods, to the appropriate
authority to deal with the
matter.
If the unit wants desealing of its
premises, let it apply
to Commissioner of
Industries, which is an
appropriate authority
in view of Hon’ble
Supreme Court
orders. Call on
24.06.2009.
10
Sl.No
Complaint
against use of
plastic bags in
Shops and
other places in
Delhi.
Name of the unit
An inspection was carried out by Trainee Engineer on 08.05.09
w.r.t. a public complaint received from sh. K. K. Sharma. During
inspection, following were the observation:
1. M/s Bhola Store, 100, Baldev Park : Unit is engaged in general
store. Unit is using plastic bags (Sample Collected).
2. M/s Star Drycleaners, 118/2, Baldev Park: Unit is engaged in
drycleaning shop. Unit is using plastic bags (Sample Collected).
2. M/s Nav Durga Collection, Baldev Park: Unit is engaged in
garment shop. Unit is using plastic bags (Sample Collected).
2. M/s Shades Garments, 70, Baldev Park: Unit is engaged in
Garment Shop. Unit is using plastic bags (Sample Collected).
2. M/s Sachdeva General Store, 70, Baldev Park: Unit is engaged
in General Store. Unit is using plastic bags (Sample Collected).
2. M/s 6 Ten, 19, Baldev Park: Unit is engaged in General Store.
Unit is using plastic bags (Sample Collected).
2. M/s Simar Fashion & Handloom, 71/2, Baldev Park: Unit is
engaged in Trading of Garment and Handloom. Unit does not
allow to inspect.
Activity
Earlier Decision, if any
Issue notices for
stoppage of use of
plastic bags as per
notification dated
07.01.2009. Call on
24.06.2009
ATR/Remarks
Decision on 11.5.2009
1
Hotel Marina, G59, Connaught
Circus, New
Delhi
4 Star Hotel
05.11.2008
A letter may be sent to the unit asking for details of likely air /water/ noise polluton based on
the large scale of renovation being done. The unit may also be asked to install Solar Water
Heating System, Rain Water Harvesting System & CFL. Call on 10.12.2008
11.12.2008
Ask the unit to fully comply with the directions issued on 19.11.2008. Call on 14.01.2009
14.01.2009
Call for personal hearing on 02.02.2009 at 5.30 PM.
02.02.2009
The unit came for personal hearing today. The trade effluent is about 25 KLD as per Consent
to Establish application and estimated waste water discharge comes to more than 10 KLD.
The unit is advised to set up Biological ETP of 30 KLD capacity to cover treatment of entire
waste water generation.The unit is also advised to reuse the treated waste water in cooling
tower and toilet flushing. The remaining conditions already enunciated be also complied
with by the unit. Call on 18.03.2009 for interim report.
20.03.2009
Ask the unit to confirm full compliance on an affidavit. Call on 29.04.2009
Letter issued.
Reply received stating that signing
authority is out of station and requesting
time for 15 days for compliance.
Time allowed to submit
affidavit confirming full
compliance of earlier CMC
decision communicated.
Issue letter without waiting
for minutes. Call on
22.05.2009
2
Prominent Hotel,
Connaught Place,
New Delhi 110001
4 Star Hotel
05.11.2008
The following deficiencies were noted by SIT be communicated to the unit for correction:
(i) Mechanical mixing device with water arrangement need to be provided in the chemical
dosing tank (separate for lime, alum and poly electrolyte).
(ii) ETP log book should be maintained regularly.
(iii) Sludge should be managed as per HWM Rules.
(iv) Solar Water Heating system is required to be installed.
(v) Stack height of D.G. Set needs to be raised as per norms.
Call on 10.12.2008
11.12.2008
Ask the unit to file clear affidavit of all the deficiencies noted by SIT communicated to it.
Call on 14.01.2009.
14.01.2009
Call for personal hearing on 02.02.2009 at 5.45 PM.
02.02.2009
The unit came for personal hearing today. It has filed an affidavit covering the five points
raised but the perusal of the Consent to Establish application shows trade effluent discharge
of 27 KLD and domestic sewage of 08 KLD. The present ETP does not handle the domestic
sewage. The unit is therefore advised to set up biological STP covering both types of waste
water generation. The unit seeks two months time. Time of two months is allowed for setting
up the biological STP as well as Solar Water Heating system. Call on 18.03.2009 for interim
report.
20.03.2009
Issue Consent to Establish. Call on 29.04.2009
As per CMC decision CTE issued on
16.04.09.. Unit has applied for CTO on
05.11.08
SIT-I to inspect and
report. Call on 24.06.2009
3
S. No
Taj Palace Hotel,
2, Sardar Patel
Marg, Diplomatic
Enclave, New
Delhi-110021
Ref.
No
Name &
Address
Five Star Hotel
EC Status
24.11.2008
SIT report indicates that while the water consumption is 700 KLD, ETP takes care only 450
KLD. The unit must explain what happens to the rest through a water balance chart. The unit
may also indicate why solar water heating system capacity has not been utilized. Thirdly, the
unit may also indicate why the treated waste water is not being reused. Call on 10.12.2008.
11.12.2008
Call on 14.01.2009
14.01.2009
Call for personal hearing on 02.02.2009 at 6.00 PM.
02.02.2009
The unit came for personal hearing today. While it is treating 450 KLD of waste water
through a biological STP, the unit is advised to use the treated waste water for cooling
purposes which will save 200 KLD of fresh water. The unit is also advised to improve the
functioning of the STP to reduce the BOD level and try using treated waste water for toilet
flushing also. The unit is also advised to submit fresh adequacy report from one of the
empanelled agencies of DPCC. Call on 18.03.2009 for interim report.
20.03.2009
Issue reminder. Call on 29.04.2009
CTE
status
Bult Up
Area
Water / Waste
Water details
Total
Project
Cost
Date of
Commissioning
Letter issued on 28.01.09.
Unit has submitted Adequavy report of
STP
Earlier Decisions
Ask the unit to file full
compliance of earlier CMC
decision. Call on
24.06.2009.
ATR/REMARKS
Decision on 11.05.2009
1
SA17
R G Complex,
Plot no 2,
Motia Khan,
Paharganj,
Delhi
Not
submitted
Not
submitted
3990 sqm
10 KLD
Not reported
20.07.06
2
SA18
RG City
Centre, Plot
no 4, Motia
Khan,
Paharganj,
New Delhi
Not
submitted
Not
submitted
3990 sqm
MCD : 10 KLD
(in reply) / GW
: 20 KLD (as
per inspection
report) / WW 16 KLD without
STP (as per
inspection
report)
Not reported
29.05.2007
20.02.2009
SIT-I to inspect and report. Call on 04.03.2009
04.03.2009
Reply received from the applicant be shown to the
advocate along with the latest SIT report for further advice
in the matter without waiting for minutes in view of High
Court hearing on 06.03.2009.
20.03.2009
Ask the unit to apply for Consent to Establish, file CGWA
clearance, install rain water harvesting system. During
inspection it was observed that roof top rain water pipes
are not connected with the chamber / pit and so the unit
may be asked to correct the same. Call on 29.04.2009.
20.02.2009
SIT-I to inspect and report. Call on 04.03.2009
04.03.2009
Reply received from the applicant be shown to the
advocate along with the latest SIT report for further advice
in the matter without waiting for minutes in view of High
Court hearing on 06.03.2009.
20.03.2009
Ask the unit to apply for Consent to Establish, file CGWA
clearance, install rain water harvesting system. During
inspection it was observed that roof top rain water pipes
are not connected with the chamber / pit and so the unit
may be asked to correct the same. Call on 29.04.2009.
Letter issued.
Reply awaited.
Call on 22.05.2009
Letter issued.
Reply awaited.
Call on 22.05.2009
3
SA33
M/s
PiccaDelhi:
PVR Plaza, H
Block,
Connaught
Place, New
Delhi
Built up
area 900
Sq.m
CTE
issued.
Applied
for CTO
on 24-1007
4
SB-1
Paliwal
Developers
Ltd (DLF),
Galleria
shopping
Mall Plot No.
1 B, Mayur
Vihar, Delhi 92
Formal
order not
provided.
Only
website
reveals the
project is
clear on
06.06.2007.
08.02.2007
900 Sq.m
12324
6 KLD
(Municipal)/
ww 5 KLD ETP
2,69,51,320
RS.
139(MCD)+GW
wil be used as
supplmentry
source./42(WW)
56.06Cr. /
106.12 Cr.
August, 2006
25.02.2009
Issue Consent to Establish to M/s PVR Plaza.
Following units were found in the premises during the SIT
inspection:
(a) M/s Piccadily: ETP was not found operational. Unit
should make the ETP operational and submit adequacy
report for the same.
(b) M/s Nizam : Unit should apply for Consent to
Establish with proper details of installation of oil & grease
trap cum settling tank and air pollution control device.
(c) M/s Mirchi Kabab & Curies: Unit should apply for
Consent to Establish with proper details of installation of
oil & grease trap cum settling tank and air pollution
control device.
Call on 02.04.2009.
02.04.2009
Call on 22.04.2009
23.04.2009
Call on 08.05.2009 with SIT report.
Letter issued on
31.03.09.
Reply received. SIT
report to be discussed.
30.12.2008
SIT to inspect and report. Call on 14.01.2009
14.01.2009
In this case, MS to consult advocate and submit file
administratively within a week. Call on 18.02.2009
20.02.2009
Call on 25.03.2009
25.03.2009
Call on 02.04.2009
02.04.2009
Call on 09.04.2009
23.04.2009
Call on 08.05.2009
Advocate has been
consulted. Opinion
obtained. Warning
letter issued to the unit
as per the advice of the
advocate.
Writ filed by the unit
came up for hearing on
18.4.2009 and the same
has been adjourned to
27.7.09.No stay has
been granted as per the
information provided
by Legal Cell.
Delist the case as
the case is being
considered in
water polluting
cases.
SIT-I & SIT-II to
inspect and report
before 18.05.2009.
Inform advocate
accordingly. Call on
22.05.2009
5
SB20
Pragya
Products
Private Ltd,
Construcion
of
Commercial
Mall name
Shop in Park
at Plot no 2
Community
Centre Blk B ,
Shalimar
Bagh New
Delhi , Pragya
Products
Private Ltd
6
SB32
Jindal
Biochem (P)
Ltd.,
Karkardooma,
District
Centre, near
AGCR
Colony, Delhi
_
_
Original
application
dated
26/04/06
returned.
Now unit
submitted
CTE on
07.08.2008
Not
applied
Built up
area :
27265.42
sqm(as per
latest CTE
application)
MCD : 193
KLD / GW :
Not mentioned /
WW : 54 KLD
(as per latest
CTE
application)
However, as per
affidavit no
trade effluent
discharge.
76.11 Crores
(as per latest
CTE
application)
Operational
05.11.2008
Ask the unit to file adequacy report of STP and noise
monitoring report of D.G. Set. Call on 10.12.2008
11.12.2008
Call on 14.01.2009
14.01.2009
Ask the unit to file environmental clearance. Call on
04.03.2009
04.03.2009
Call on 09.04.2009 with full compliance.
09.04.2009
Call on 29.04.2009
Main file of the unit
was submitted to
Chairman, DPCC on
26.02.09 as desired by
him and the same is yet
to be received. Hence,
further action is being
taken on part file.
Letter issued on
31.03.09 asking the
unit to submit a copy
of EC.
Reply received along
with a copy of
Environmental
Clearance issued by
SEIAA.
Ask the unit to file
itemwise compliance of
Enviornmental
Clearance's conditions.
Call on 24.06.2009
23.12.2008
The unit came for personal hearing today. It seeks time of
60 days to comply with the CMC’s decision. Call on in the
last week of February, 2009 for compliance.
25.02.2009
Issue final reminder. Call on 02.04.2009
20.03.2009
Call on 02.04.2009
02.04.2009
Call on 22.04.2009
23.04.2009
Call on 08.05.2009
Reminder as per
CMC(O) decision
dated 25.02.2009, not
been issued, as the unit
approached Hon'ble
High Court.
Case was heard by the
Court on 18.4.09 and
the same was
adjourned to 5.5.09.
Now the case has been
adjourned to
18.5.2009.
SIT-I & SIT-II to
inspect and report
before 18.05.2009.
Photographs taken by
SIT during inspection be
given to the advocate for
showing to the court.
Legal Cell to brief the
advocate accordingly.
Call on 22.05.2009
7
SB53
Vardhman
Premimum
Mall, Deepali
Chowk, Outer
Ring Road,
Saraswati
Vihar, New
Delhi-34
16.03.2009
Send a letter to the unit to clarify the reason for varience in
the discharge of waste water as the unit has earlier
reported it as 15.51 KLD vide its letter dated 11.11.2008
and now it claims the waste water discharge as 1.86 KLD,
along with an affidavit stating the actual waste water
discharge. Issue letter without waiting for minutes. File be
submitted administratively also. Call on 25.03.2009.
25.03.2009
Call on 02.04.2009
02.04.2009
Call on 22.04.2009
23.04.2009
Call on 08.05.2009
Notice for Closure
issued to unit on 9.2.09
Unit has submitted
reply w.r.t. Notice for
Closure on 20.02.09.
Letter issued again on
19.3.09, as per decision
of CMC on 16.03.09 .
Reply received on
23.03.09 with an
affidavit stating that
presently waste water
discharge is 1.86 KLD
and by mistake waste
water discharge (15.51
KLD) was mentioned
vide earlier letter dated
11.11.08.
File has been submitted
administratively
also.The matter has
been discussed with the
concerned advocate by
the Chairman.
Case was heard by the
Court on 18.4.09 and
the same has been
adjourned to 5.5.09.
Now the case has been
adjourned to 18.5.2009
as per the information
provided by legal cell.
Call on 22.05.2009
8
9
SC13
SC14
DLF Retail
Developers
Ltd.
(Construction
of Shopping
Complex
named as DLF
South Court
at Plot No A1
& P2B, Saket
Place, Saket,
New Delhi )
DLF
Universal Ltd.
Construction
of
Commercial
Complex
name DLF
Court Yard at
Plot No. A4 &
P-1A, Saket
Place, New
Delhi-17
15/01/07
15-01-07
25/09/07
Applied
for consent
to
Establish
on 25-0907
53721 sqm
MCD-400 KLD
GW-NIL DIS197 KLD
245.35 crore
Jan, 2008
25.03.2009
The SIT inspection report and record reveals the following
deficiencies:
(i) Some of the D.G. Sets were found without adequate
stack height.
(ii) Unit is engaged in air polluting activity by use of D.G.
Sets, carrying out stone cutting, vehicular moment etc. and
water polluting activity by generation of trade effluent
waste water from washing, bathing of labourers, trade
effluent etc.
(iii) Wet garbage is being dumped in open.
(iv) Construction material is lying in open.
Ask the unit to correct the above deficiencies and submit
the compliance affidavit of environmental clearance
conditions. Call on 09.04.2009
23.04.2009
A written explanation of the EE of CMC-III may be
summoned for delaying this matter beyond any tolerable
limit. File be submitted with explanation within a week.
Call on 08.05.2009 with response of the unit.
20.03.2009
Advocate be consulted and appropriate action with draft
order be put up in CMC on 25.03.2009. Call on
25.03.2009.
25.03.2009
File be put up administratively without waiting for
minutes.
23.04.2009
A written explanation of the ALO-I as to why the order
has not been implemented. File may be sent to Sh. Vidhey
to immediately get the vacation of the stay and confirm to
DPCC in writing. Call on 08.05.2009
Letter issued to the unit
to comply with the
CMC decision dated
25.03.2009 regarding
correction of SIT
defeciencies and to
submit compliance
affidavit for
Environmental
clearance.
No reply received.
SIT-I & SIT-II to
inspect jointly and
report before
18.05.2009. Also DPCC
lab will take the samples
as per procedure along
with SIT inspection and
the sample may be sent to
CPCB and DPCC lab for
analysis. Call on
22.05.2009
SIT has inspected the
unit and as per the
decision of CMC dated
25.03.2009, file has
already been put up
administratively.
Worthy chariman has
asked to ALO to ake
the necessary action.
Ask the advcoate to
expedite the vacation of
the stay. Call on
22.05.2009
10
SC22
Beverly Park
Maintenance
Service Ltd at
Plot No. 3,
Vasant Kunj
Mall, Vasant
Kunj, Delhi
22/01/2007
28960 sq m
MCD-517 KLD
GW-nil DIS.125 KLD
358 crore
31/03/2007
02.04.2009
The following deficiencies were observed during the
inspection by SIT:(i) During inspection it was found that STP of 125 KLD
capacity has been installed whereas the waste water
generation from the building is 150 KLD as per CTE
application
(ii) Unit is required to maintain the proper logbook for
operation of STP indicating the flow meter reading also.
(iii) Unit is required to provide the composting facility for
the wet garbage
(iv) The Rain water harvesting pits requires regular
cleaning as the floating matter was observed in the pit
(v) Unit is required to file the compliance report w.r.t.
condition no. (xv), (xvi), (xvii) & (xviii) of the
construction phase and Sl. No (i) in respect of filing of
adequacy report of STP, (ii), (v), (vii) & (viii) during the
operational phase of environmental clearance’s conditions.
Ask the unit to correct the above deficiencies. Call on
12.05.2009.
23.04.2009
Call on 08.05.2009
Letter issued to the unit
to correct the
deficiencies of SIT.
No reply received.
In this case, the CMC
unanimously decided that
since the unit is operating
without being granted
consent to operate and
since the unit is running
with an under capacity
STP despite order of
MoEF for a 150 KLD
STP and since the unit
has not filed monitoring
report from DPCC
approved laboratory, the
unit may be informed that
it will be prosecuted
against within 10 days as
per the Hon’ble High
Court order dated
28.05.2008. The unit may
be informed about this
immediately and
prosecution may be
implemented exactly
after the delivery of the
notice which should be
by hand. Letter may be
shown administratively
and also to the advocate
in next two days before
issue. The prosecution
order be drafted by
advocate within this
week. Call on 22.05.2009
11
SC23
Regency Park
Management
Services
Private Ltd. at
Plot No. 4,
Vasant Kunj
Mall, Vasant
Kunj, Delhi
24/11/2006
25/9/2007
59731.663
sq m
MCD-287 KLD
GW-nil DIS-76
KLD
250 CRORE
15/7/2008
13.08.2008
The unit came for personal hearing today and explained
that since the matter is sub-judice, the mater should be
taken up in the Court. MS, DPCC has objected to this and
since there is no stay in the matter. MS, DPCC feels that in
the interest of comprehensive order, air, water & noise
monitoring report must be undertaken before any further
decision is taken. Let DPCC do the air, water & noise
monitoring in the next 15 days. Call on 03.09.2008.
28.08.2008
Call on 03.09.2008
03.09.2008
File is under submission to Higher Authorities.
30.12.2008
File to be submitted administratively immediately.
23.04.2009
As advised by the advocte, SIT-I to inspect and report.
Call on 08.05.2009
SIT report to be
discussed.
A show notice for closure
may be issued to the unit
in view of the following
deficiencies found in the
latest SIT inspection:
(i) Sludge transfer pumps
found removed. (ii) Flow
meter reading not
mentioned in the
logbook. (iii) Pipes
carrying floor washing
water/ any waste water
needs to be disconnected
from rain water
harvesting pits in order to
avoid ground water
contamination. (iv) No
supporting drawing for
installation of settling
tank / oil & grease trap of
rain water harwesting
system could be made
available during
inspection. (v) No
composting facility found
existing for wet garbage.
(vi) No information
regarding the report on
energy conservation
could be provided during
inspection.
Call on 22.05.2009
12
SC25
S. No
Manish
Buildwell Pvt.
Ltd., Plot No
2, LSC, Sec22 Dwarka ,
New Delhi
Built up
area :
8485.75
sqm
Name & Address
Ref.
No
24.06.2008
EC Status
8485.75
sqm
CTE
status
MCD- 73 KLD /
WW-57 KLD
(STP)
Bult Up
Area
Water /
Waste
Water
details
66,94,71,101
crores
Total
Project
Cost
2010
Date of
Commissioning
24.11.2008
There has been palpable error in handling this case by the
concerned CMC which is warned not to repeat this in
future. MS will personally work on this file and issue a
Show Cause Notice for closure based on the deficiencies
found by SIT. The notice for closure to be issued
immediately without waiting for minutes. Inform the
advocate accordingly. Call on 10.12.2008.
11.12.2008
SIT to inspect and report. Call on 23.12.2008
23.12.2008
SIT to inspect and thereafter take advice of advocate and
then file be submitted administratively.
09.04.2009
Since the unit has replied to the deficiencies noted by SIT,
a fresh inspection may be done by SIT-I. Call on
29.04.2009.
Earlier decisions
SIT report to be
discussed.
ATR/Remarks
Let the advocate be asked
to file application for
vacation of stay in view
of the fact that the water
requirement is 73 KLD
which is met through
borewell without DJB
clearance and estimated
waste water generation is
57 KLD without
installing STP/ETP/Oil &
Grease Trap which
indicates that entire waste
water will be going into
the drain and polluting
the river Yamuna. Call
on 22.05.2009
Decision on
11.05.2009
1
2
BES Buildcon Pvt.
Ltd., Swatantra
Bharat Mills
Complex, Plot No 15,
Najafgarh Road,
Delhi
EC
Accorded
on
05.08.2008
Applied on
24.06.2008
850401
sqm
MCD 2195 KLD
/ WW 3129 KLD
(STP)
DLF I.T. Park, 15,
Shivaji Marg, Delhi
EC
Accorded
on
19.01.09
Applied on
13.06.2008
430789.322
sqm
MCD1262 KLD
GW - Nil
WW 2471 KLD
(STP
Proposed)
1684.61
Crores
2010
A-15
A-22
916.63
crores
Dec-10
24.11.2008
CMC considered all the deficiencies noted on
the file. CMC also felt that decision taken in
Chief Secretary’s room earlier this month
about coverage of all raw material /
construction material used must be fully
complied. Copy of the building plan may also
be submitted. Issue letter accordingly. Call on
17.12.2008.
30.12.2008
Call on 28.01.2009
28.01.2009
Reply be examined carefully and file be put up
administratively within 01 week.
23.04.2009
Issue reminder to Conservator of Forests to file
reply by 30.04.2009 without waiting for
minutes. Call on 08.05.2009
Reminder issued to Conservator
of Forests.
Reply awaited.
Call on 24.06.2009
24.11.2008
CMC considered all the deficiencies noted on
the file. CMC also felt that decision taken in
Chief Secretary’s room earlier this month
about coverage of all raw material /
construction material used must be fully
complied. Copy of the building plan and copy
of environmental clearance may also be
submitted. Issue letter accordingly. Call on
17.12.2008.
30.12.2008
Call on 28.01.2009
28.01.2009
Reply be examined carefully and file be put up
administratively within 01 week.
23.04.2009
Issue reminder to Chief Conservator of Forests
to file reply by 30.04.2009 without waiting for
minutes. Call on 08.05.2009
Reminder issued to Conservator
of Forests.
Reply awaited.
Call on 24.06.2009
3
B-31
Construction of Hotel
at Community Center
Vivek Vihar Perfect
Learning Pvt.Ltd. A12, Swasthya Vihar,
Vikas Marg, Delhi92
Built up
area :
14822.71
sqm
Applied on
14.01.2009
Built up
area :
14822.71
sqm
MCD : 91
KLD /
WW : 43
KLD
Rs. 26.53
Crores
25.01.2009
12.03.2009
Call on 16.03.2009
16.03.2009
Ask the unit to file the approved architectural
drawing , permission from CGWA for ground
water drawl and to provide acoustic enclosure
with the D.G. Set. Call on 29.04.2009
Sl.
No
Ref.
No
ID.No
Name
Address
Industrial
Area
Activity
Consent
Application
Type
Status of
CTE
Status of
Consent
State of
Authorization
1
77
5040
BAS ENGINEERING P.
LTD
A-2, Udyog Nagar
Industrial area
Udyog
Nagar
Industrial
area
Servicing and washing of
cars.
Renewal
__
CTO valid upto
30.09.04. CTOR valid upto
17.01.08.
Applied for
CTO-R on
10.03.08
Applied for
Renewal of
Authorisation
on 10.03.08
Letter issued on 06.04.09.
Reply awaited.
Earlier Decisions
16.03.2009
Ask the unit to file
permission from
Central Ground Water
Authority for
extracting the ground
water. Call on
29.04.2009.
Ask the unit to file
DJB permission for
ground water
extration,architectural
drawing and to
provide acoustic
enclsoure with the
D.G. Set. Call on
24.06.2009
ATR / Remarks
Decision on
11.5.2009
Letter issued on
15.04.09
Reply received stating
that unit have
approached to CGWA
for permission of
ground water drawl
and collecting all
details, data and
documents which is
required for filling of
application.
Ask the unit to
approach DJB
for seeking the
ground water
extraction
permission in
view of new
orders. Call on
24.06.2009
2
78
1489
NIRMAL TRADING CO.
A-13, G.T. Karnal
Road Industrial Area
G.T.
Karnal
Road
Industrial
Area
Dyeing of silk yarn
Renewal
Applied for
CTE on
06.04.2009
vide I.D.
No. 29450.
Applied for
CTO (R) on
28.03.2005
vide I.D. No.
13239.
Applied for
CTO (R) on
15.07.2008
vide I.D. No.
26468.
CTO valid upto
27.11.06
Applied for
CTO-R on
29.12.06.
Applied for
renewal of
authorization
on 02.08.2006
vide I.D. No.
3061
16.03.2009
Ask the unit to apply
for Consent to
Establish. Call on
29.04.2009.
Letter issued on
17.04.09.
Applied for CTE on
06.04.2009 vide I.D.
No. 29450.
Issue Consent
to Establish.
Call on
24.06.2009
3
79
2823
CHARU MOTORS PVT
LTD
29, Najafgarh Road,
Moti Nagar DLF
Industrial Area
Moti Nagar
DLF
Industrial
Area
Automobile Workshop
(Servicing & Repairing)
Establish
CTE issued
valid upto
01.06.04
Applied for
Authorisation
on 26.08.04
16.03.2009
Ask the unit to file
permission from
Central Ground Water
Authority for
extracting the ground
water and submit fresh
adequacy report of
ETP from any of the
empanelled consultants
of DPCC. Call on
29.04.2009.
Letter issued on
15.04.09
Reply received stating
that unit have applied
for permission for
CGWA to zonal
officer, DJB. And
adequacy report was
submitted with the
application for Consent
to Operate.
SIT-I to
inspect and
report. Call
on 24.06.2009
4
80
4031
J.J. IMPEX (DELHI)
PVT.LTD
C-51, Ph-II, Okhla
Industrial Area
Okhla
Industrial
Area
Automobile Workshop cum
Service Station including
Denting & Painting
Establish
CTE issued
on
01.04.2003
CTO issued on
22.10.2003.
CTO ( R)
applied on
09.10.2006
Applied on
13.07.2004
16.03.2009
SIT-II to inspect and
report. Call on
29.04.2009.
SIT-II report to be
discussed.
Call on
24.06.2009
with SIT-II
report.
5
83
2423
MYSTIC
C-147 (A-147), PhaseII, Mayapuri Industrial
Area
Mayapuri
Industrial
Area
Washing of Garments.
Operate
CTE issued
on
21.11.2006
Applied for
CTO on
12.03.2008
Applied on
12.03.2008
16.03.2009
Ask the unit to file
permission from
Central Ground Water
Authority for
extracting the ground
water. Call on
29.04.2009.
Letter issued to file
permission from
Central Ground Water
Authority for
extracting the ground
water..
Reply received wherein
unit has mentioned that
they have registered
with CGWA.
Issue Consent
to Operate &
authorization
under HWM
Rules. Call on
6
84
4421
BAGGA LINK MOTORS
LTD
389/395, FIE,
Patparganj Industrial
Area
Patparganj
Industrial
Area
Service station cum
workshop of cars.
Renewal
Two times
consent
CTO (R)
obtained on
20.02.2004
vide consent
no. 9703 valid
upto
11.12.2006
Applied for
CTO (R) on
06.07.2007
vide I.D. No.
22220.
Applied for
renewal of
authorization
on 07.12.2006
vide I.D. No.
4148
16.03.2009
Ask the unit to file
permission from
Central Ground Water
Authority for
extracting the ground
water. Call on
29.04.2009.
7
85
5025
GALAXY
AUTOMOBILES
8, Tilak Nagar
Industrial Area
Tilak
Nagar
Industrial
Area
Automobile Service
station.
Renewal
__
CTO valid upto
08.01.07.
Applied for
CTO-R on
23.10.07
Applied for
Authorisation
on 04.02.05
16.03.2009
Ask the unit to apply
for Consent to
Establish, to file
permission from
Central Ground Water
Authority for
extracting the ground
water and submit fresh
adequacy report of
ETP from any of the
empanelled consultants
of DPCC. Call on
29.04.2009.
8
86
4032
SILVER OCEAN
EXPORTS PVT. LTD
Plot No. Y-29, PhaseII, Okhla Industrial
Area
Okhla
Industrial
Area
Mfg. of Readymade
garments with Washing.
Establish
Applied for
CTE on
03.04.2008
Applied on
03.04.2008
16.03.2009
Ask the unit to file
permission from
Central Ground Water
Authority for
extracting the ground
water and status of
installation of ETP
with adequacy report
from any of the
empanelled consultants
of DPCC.Call on
29.04.2009.
Letter issued on
17.04.09.
Reply received on
04.05.09 with the
request to clarify from
where clearence will be
obtained since DJB is
not granting the
permission to old
borewell & CGWA is
not granting the
permission to old
borewell in East
district .
Letter issued on
15.04.09.
Reply awaited.
Letter issued.
Reply awaited.
Send a letter to
the unit
referring the
new order and
ask the unit to
approach DJB
for clearance
for ground
water
extraction.
Call on
24.06.2009
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
9
10
87
88
2424
2425
KHANNA
AUTOMOBILES
C-124 A, Ph-II,
Mayapuri Industrial
Area
Mayapuri
Industrial
Area
Workshop of Motor cycles
with washing.
Renewal
SINGH FAB.
PROCESSORS
C-204/2, Ph-II,
Mayapuri Industrial
Area
Mayapuri
Industrial
Area
Job work of Washing &
dyeing of readymade
garments
Establish
CTO issued on
25.11.2004
CTO ( R)
applied on
03.03.2008
Applied for
CTE on
10.04.2007
Applied on
17.11.2008
16.03.2009
Ask the unit to apply
for Consent to
Establish, file
permission from
Central Ground Water
Authority for
extracting the ground
water and submit fresh
adequacy report of
ETP from any of the
empanelled consultants
of DPCC.Call on
29.04.2009.
16.03.2009
Ask the unit to file
permission from
Central Ground Water
Authority for
extracting the ground
water and status of
installation of ETP
with adequacy report
from any of the
empanelled consultants
of DPCC. Call on
29.04.2009.
Letter issued.
Reply awaited.
Letter issued.
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
11
89
345
SHIV INDUSTRIES
S-14,Badli Industrial
Estate phase-1
Badli
Industrial
Estate
Re Rolling Annealing &
Pickling of Stainless steel
sheets.
Renewal
CTE not
obtained.
Applied for
CTO (R) on
04.04.2005
vide I.D. No.
13369.
Applied for
CTO (R) on
16.05.2008
vide I.D. No.
25763.
Renewal of
authorization
granted on
28.11.2006
vide no. 1892.
16.03.2009
Ask the unit to apply
for Consent to
Establish, to file
permission from
Central Ground Water
Authority for
extracting the ground
water and submit fresh
adequacy report of
ETP from any of the
empanelled consultants
of DPCC. Also ask the
unit to submit an action
plan for stoppage of the
activity before
07.02.2010, which falls
under negative list as
per MPD-2021 and an
action plan for new
proposed activity in
conformity with MPD2021 on the vacant plot
due to closure of
present activity. Call
on 29.04.2009
Letter issued on
17.04.09
Reply received on
04.05.09 stating that
they are preparing for
apply CTE, are
collecting data &
documents for applying
for permision from
CGWA, they have
approached to DPCC
for fresh adequacy
report of ETP . Their
action plan is that they
will stop the activity of
pickling in the premise
before 07.02.2010
Ask the unit to
file definite
action plan for
stoppage of its
activivty
before
07.02.2010,
adequacy
report from an
empanelled
consultant of
DPCC and to
approach DJB
for seeking
permission for
ground water
extraction in
view of new
orders. Call on
24.06.2009
12
90
4547
JITENDRA TRADING
COMPANY
D-30 SMA Co-op.
Industrial Estate, G.T.
Karnal Road
S.M.A
Industrial
Area
Metal Finishing with
Electroplating & Buffing.
Renewal
13
91
4033
SHAMA
INTERNATIONAL
P.LTD.
F-53, Okhla Industrial
Area ,Phase-I
Okhla
Industrial
Area
Mfg. of Readymade
Garments with Washing.
Renewal
Applied for
CTE on
01.05.2009
vide I.D.
No. 29730
Applied for
CTO (R) on
29.09.2008
vide I.D. No.
27608.
Applied for
renewal of
authorization
on 14.07.2006
vide I.D. No.
2812
CTO issued on
13.04.2004.
CTO ( R)
applied on
12.03.2008
Applied on
12.03.2008
16.03.2009
Ask the unit to apply
for Consent to
Establish, file
permission from
Central Ground Water
Authority for
extracting the ground
water and submit fresh
adequacy report of
ETP from any of the
empanelled consultants
of DPCC. Also SIT-II
to inspect and report.
Call on 29.04.2009.
16.03.2009
Ask the unit to apply
for Consent to
Establish, file
permission from
Central Ground Water
Authority for
extracting the ground
water and submit fresh
adequacy report of
ETP from any of the
empanelled consultants
of DPCC.Call on
29.04.2009.
Letter issued on
15.04.09.
Reply received along
with copy of adequacy
report of ETP from
DCE on 05.05.09
stating that they have
applied for CTE on 01may -09, & as their
ground water
requirement is 700
l/day ( i.e. < 25 m3/
day) as per draft policy
guidelines of CGWA
therefore they are not
entitled to apply for
permission from
CGWA.
Applied for CTE on
01.05.2009 vide I.D.
No. 29730
Also SIT-II report to be
discussed.
Letter issued.
Reply awaited.
Ask the unit to
correct the
deficiencies
noted by SIT
and to
approach DJB
for seeking
permission for
ground water
extraction in
view of new
orders. Call on
24.06.2009
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
14
92
4607
JAYSONS (INDIA)
56, S.S.I Industrial
Area, G.T. Karnal
Road
S.S.I
Industrial
Area
Mfg. of Polyster zipper
including dyeing.
Establish
Applied for
CTE on
24.10.2008
vide I.D.
No. 27960.
15
93
4034
LINEN SCAPES (INDIA)
LTD.
A-208 , Phase-I,
Okhla Industrial Area
Okhla
Industrial
Area
Mfg. of Home furnishing
item etc.
Renewal
16
94
346
PAL TRADERS
S-23, Phase-I, Badli
Industrial Estate
Badli
Industrial
Estate
mfg of cement paint
powder and distemper
Renewal
CTE not
obtained.
17
95
4035
AAA VEHICLEADES
PVT. LTD
B-244, Phase-I, Okhla
Industrial Area
Okhla
Industrial
Area
Servicing and repairs of
Cars and Vehicles.
Establish
CTE
applied on
17.04.2008
Applied for
CTO (R) on
16.09.2005
vide I.D. No.
16436.
Applied for
CTO (R) on
24.10.2008
vide I.D. No.
27961.
Applied for
renewal of
authorization
on 24.08.2006
vide I.D. No.
3439 &
24.10.2008
vide I.D. No.
4772.
16.03.2009
Ask the unit to file
permission from
Central Ground Water
Authority for
extracting the ground
water. Call on
29.04.2009.
Letter issued on
17.04.09.
Reply received along
with the permission
from CGWA on
06.05.09 stating that
the water is being used
for domestic purposes
only & not for washing
/ dyeing purposes. .
SIT-I to
inspect and
report. Call
on 24.06.2009
CTO issued on
06.07.2002
16.03.2009
SIT-II to inspect and
report. Call on
29.04.2009.
SIT-II report to be
discussed.
Call on
24.06.2009
with SIT-II
report.
Applied for
CTO (R) on
30.06.2006
vide I.D. No.
18663.
16.03.2009
Ask the unit to apply
for Consent to
Establish and file
permission from
Central Ground Water
Authority for
extracting the ground
water. Call on
29.04.2009.
Letter issued.
Reply awaited.
16.03.2009
Issue reminder. Call on
29.04.2009
Reminder issued.
Reply awaited
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
Applied on
17.04.2008
24.06.2009
18
96
4036
19
97
3018
DETAILS
ROYAL AUTOMOBILE
D-30, PH-I, Okhla
Industrial Area
Okhla
Industrial
Area
Readymade garment with
washing.
Operate
CTE issued
on
03.05.2006
CTO applied on
21.11.2007
Applied on
21.11.2007
16.03.2009
Ask the unit to file
permission from
Central Ground Water
Authority for
extracting the ground
water. Call on
29.04.2009.
Letter issued.
Reply awaited.
35 SFS, DSIDC
Complex, Nangloi
DSIDC Industrial
Area
Nangloi
Industrial
Area
SERVICE. REPAIR, AND
MAINTENANCE OF
TWO WHEELERS.
Establish
Applied on
17.10.07
__
__
16.03.2009
Ask the unit to file
permission from
Central Ground Water
Authority for
extracting the ground
water, status of
installation of ETP
with adequacy report
from any of the
empanelled consultants
of DPCC and to apply
for authorization under
HWM Rules. Call on
29.04.2009.
Letter issued on
15.04.09.
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
20
98
5848
GYMKHANA SERVICE
STATION
RACE COURSE
ROAD
NC-ND
Gymkhana Service Station
(car wash unit)
Establish
21
100
6029
M/S Rama Motors (P) Ltd
Bawa Potteries
Compound, Aruna
Asaf Ali Road,Vasant
Kunj
N/A
Car service station
Renewal
22
101
5953
HINDUSTAN
PETROLEUM
COPERATION LTD.
Shakurbasti
Installation Rohtak
Road
N/A
Refilling and distribution
of Petroleum Products.
Operate
Applied on
11.09.08
__
CTO refused on
16.03.07, CTO
issued on
17.03.06 valid
upto 20.10.08.
Applied for
CTO-R on
17.10.08 and
CTE on
11.09.08
CTO issued on
05.01.2004.
CTO ( R)
applied on
19.03.2007
Applied for
Renewal of
Authorisation
on 07.03.08
16.03.2009
SIT-II to inspect and
report. Call on
29.04.2009.
SIT-II report to be
discussed.
Call on
24.06.2009
with SIT-II
report.
Applied on
03.11.2006
Renewal
16.03.2009
Ask the unit to apply
for Consent to
Establish and submit
fresh adequacy report
of ETP from any of the
empanelled consultants
of DPCC. Also SIT-II
to inspect and report
for ascertaining the
source of water supply.
Call on 29.04.2009.
Letter issued to apply
for Consent to
Establish and submit
fresh adequacy report
of ETP from any of the
empanelled consultants
of DPCC. .
Reply awaited. And
letter returned back.
Also SIT-II report to be
discussed.
Issue final
reminder for
full
compliance of
earlier CMC
decision. Also
inspection to
be expedited
by SIT-II.
Call on
24.06.2009
CTO valid upto
09.11.09
Authorisation
valid upto
31.01.09.
Applied for
renewal of
Authorization
on 13.03.09
16.03.2009
Call on 20.03.2009
20.03.2009
Ask the unit to apply
for Consent to
Establish and file
permission from
Central Ground Water
Authority for
extracting the ground
water. Call on
29.04.2009.
Letter issued on
17.04.09.
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
23
102
4038
ELECTROSPARK
A-126, Ph-II, Okhla
Industrial Area
Okhla
Industrial
Area
Powder Coating
Establish
CTE
applied on
18.12.2007
24
103
2426
SUHRIT SERVICES (P)
LTD
C-97, Phase II,
Mayapuri Industrial
Area ,
Mayapuri
Industrial
Area
Vehicle Service station
cum Workshop.
Operate
CTE issued
on
30.11.2006
25
104
529
Bharat Impex
Plot No-2, Pocket-o,
Sec-5, Bawana
Industrial Area
Bawana
Industrial
Area
C.P bathroom fittings with
plating
Establish
Applied for
CTE on
20.07.2007
vide I.D.
No. 22615
CTO applied on
22.11.2007
Allied on
22.11.2007
16.03.2009
Ask the unit to submit
fresh adequacy report
of ETP from any of the
empanelled consultants
of DPCC. Also SIT-II
to inspect and report.
Call on 29.04.2009.
Letter issued.
Reply awaited.
Also SIT-II report to be
discussed.
16.03.2009
Ask the unit to file
permission from
Central Ground Water
Authority for
extracting the ground
water. Call on
29.04.2009.
Letter issued.
Reply awaited.
16.03.2009
Ask the unit to file
permission from
Central Ground Water
Authority for
extracting the ground
water and status of
installation of ETP
with adequacy report
from any of the
empanelled consultants
of DPCC. Call on
29.04.2009.
Letter issued on
17.04.2009.
Reply received on
05.05.2009 and stating
that they are not
engaging any activity
which cause water
poluting. The unit is
dry so that there is no
need to install ETP.
Issue final
reminder for
full
compliance of
earlier CMC
decision. Also
inspection to
be expedited
by SIT-II.
Call on
24.06.2009
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
SIT-I to
inspect and
report. Call
on 24.06.2009
26
105
4039
COMRACK INFONET
PVT. LTD
C-176, 177, Phase-I,
Okhla Industrial Area
Okhla
Industrial
Area
Mfg. of Rack, cabinets for
Networking & Telecom
sheet metal components.
Establish
Applied for
CTE on
08.05.2008
Green Category
CTO issued on
29.12.2004
Apllied on
08.05.2008
27
106
2859
ALKARMA
57, Najafgarh Road
Industrial Area
Najafgarh
Road
Industrial
Area
Engineering work with
anodizing & phosphating
work.
Renewal
__
CTO issued on
12.03.01 valid
upto 20.03.04 .
CTO-R issued
on 27.08.04
valid upto
22.06.07.
Applied for
CTO-R
12.07.07
Applied for
Renewal of
Authorisation
on 12.06.06
Plot No 113 , PocketO , Sec-2 , Bawana
Industrial Area
Bawana
Industrial
Area
Galvanising Of Auto parts
Establish
28
107
530
DBDN INDUSTRIES
Applied for
CTE on
01.03.2007
vide I.D.
No. 20759
16.03.2009
Ask the unit to file
permission from
Central Ground Water
Authority for
extracting the ground
water, submit adequacy
report of ETP from any
of the empanelled
consultants of DPCC
and submit noise
monitoring report of
the D.G.Set from
approved laboratories
of DPCC. Call on
29.04.2009.
16.03.2009
Ask the unit to file
permission from
Central Ground Water
Authority for
extracting the ground
water, submit adequacy
report of ETP from any
of the empanelled
consultants of DPCC
and submit noise
monitoring report of
the D.G.Set from
approved laboratories
of DPCC. Call on
29.04.2009.
16.03.2009
Ask the unit to file
permission from
Central Ground Water
Authority for
extracting the ground
water and status of
installation of ETP /
ECS with adequacy
report from any of the
empanelled consultants
of DPCC. Call on
29.04.2009.
Letter issued.
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
Letter issued on
15.04.09
Reply received along
with CGWA
permission for ground
water drawl and stating
that unit has applied for
Adequacy report of
ETP and NMR of D.G
Set.
Ask the unit to
file full
compliance of
earlier CMC
decision. Call
on 24.06.2009
Letter issued on
16.03.09 .
Reply received on
05.05.09 stating that
they have dropped their
idea for establishing
hot dip galvanizing
facility at their works
in Bawana.
SIT-II to
inspect and
report. Call
on 24.06.2009
29
109
4548
JAQUAR & COMPANY
LTD.
C-21, SMA CoOperative Industrial
Estate G.T. Karnal
Road
S.M.A
Industrial
Area
Manufacturing of
Bathroom fitings
(Electroplating).
Renewal
Two times
consent
CTO(R)
obtained on
15.06.2004
vide consent
no. 10845 valid
upto
11.06.2007
Applied for
CTO (R) on
30.07.2007
vide I.D. No.
22894.
30
110
1928
Pin Dot Graphic Solutions
(P) Ltd
B-70,/75, DSIDC
Complex, Lawrence
Road Industrial Area
Lawrence
Road
Industrial
Area
Gravure Printing Cylindres
Establish
Applied for
CTE on
17.07.2007
vide I.D.
No. 22482.
31
111
4041
VARNALI
B-3/1- Okhla
Industrial Area
Okhla
Industrial
Area
washing and dry cleaning
of cloths and garments
accessors
Establish
CTE issued
on
06.01.2003
CTO issued on
30.04.2004
CTO ( R)
applied on
31.05.2007
32
112
4042
APRA AUTO INDIA
PVT. LTD.
F-85, Ph-I, Okhla
Industrial Area
Okhla
Industrial
Area
Repairing & Servicing of
Vehicles.
Operate
CTE issued
on
03.04.2006
Applied for
CTO on
10.07.2007
Applied for
renewal of
authorization
on 08.07.2008
vide I.D.No.
4618.
16.03.2009
Ask the unit to file
permission from
Central Ground Water
Authority for
extracting the ground
water and submit
adequacy report of
ETP from any of the
empanelled consultants
of DPCC. Call on
29.04.2009.
Letter issued on
17.04.09.
Reply received on
04.05.09 stating that
they have closed their
industrial activities
w.e.f. 31st March 2009
& now they are using
their premises as
godown, keeping only
2 storekeepers & 2
security guards to look
after the godown
activities.
SIT-II report to be
discussed.
Ask the unit to
file its reply on
an affidavit.
Call on
24.06.2009
Applied for
authorization
on 17.03.2008
vide I.D. No.
4523.
16.03.2009
SIT-II to inspect and
report. Call on
29.04.2009.
Applied on
31.05.2007
16.03.2009
Ask the unit to submit
fresh adequacy report
of ETP from any of the
empanelled consultants
of DPCC. Also SIT-II
to inspect and report.
Call on 29.04.2009.
Letter issued.
Reply awaited.
Also SIT-II report to be
discussed.
16.03.2009
Ask the unit to file
permission from
Central Ground Water
Authority for
extracting the ground
water. Call on
29.04.2009.
Letter issued to file
permission from
Central Ground Water
Authority for
extracting the ground
water..
Reply received stating
that they have already
shut down the bore
well and does not
require DJB
permission.
Issue final
reminder for
full
compliance of
earlier CMC
decision. Also
inspection to
be expedited
by SIT-II.
Call on
24.06.2009
Ask the unit to
file its reply on
an affidavit
and to
dismentle the
borewell. Call
on 24.06.2009
Issue SCN for
closure on the
basis of SIT
deficiencies.
Call on
24.06.2009
33
114
4044
LALLY AUTOMOBILES
PVT. LTD .
D-196,PH-1 Okhla
Industrial Area
Okhla
Industrial
Area
Workshop cum service
station of cars with
washing.
Operate
CTE issued
on
28.09.2006
Applied for
CTO on
20.02.2008
34
115
1490
M.G.F. AUTO MOBILES
LTD.
B-7, G.T. Karnal Road
Industrial Area
G.T.
Karnal
Road
Industrial
Area
Washing & Servicing of
Cars.
Renewal
CTE not
obtained.
Applied for
CTO (R) on
10.07.2007
vide I.D. No.
22262.
35
116
4045
RADNIK EXPORTS
A-192, PH-I, Okhla
Industrial Area
Okhla
Industrial
Area
Readymade garment with
washing.
Operate
CTE issued
on
05.04.2006
Applied for
CTO on
14.11.2007
16.03.2009
Ask the unit to file
permission from
Central Ground Water
Authority for
extracting the ground
water and submit
adequacy report of
ETP with details of
waste water connected
from the other units
from any of the
empanelled consultants
of DPCC. Call on
29.04.2009.
16.03.2009
Ask the unit to apply
for Consent to
Establish and file
permission from
Central Ground Water
Authority for
extracting the ground
water. Call on
29.04.2009.
Letter issued.
Reply awaited.
16.03.2009
Ask the unit to file
permission from
Central Ground Water
Authority for
extracting the ground
water. Call on
29.04.2009.
Letter issued.
Reply awaited.
Letter issued.
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
Issue final
reminder for
full
compliance of
earlier CMC
decision. Call
on 24.06.2009
36
117
2799
PANACEA BIOTEC
LTD.
B-1 Extn./ A-24-25,
Mathura Road Mohar
Co-operative
Industrial Area
Mohan Cooperative
Industrial
Area
Research & Development
of Medicines Lab.
Establish
Applied for
CTE on
03.06.2008
16.03.2009
Ask the unit to submit
status of installation of
ETP with adequacy
report from any of the
empanelled consultants
of DPCC. Also SIT-II
to inspect and report.
Call on 29.04.2009.
Letter issued.
Reply awaited.
Also SIT-II report to be
discussed.
37
118
4046
AT HOME INDIA PVT.
LTD.
F-29/4, Phase-II,
Okhla Industrial Area
Okhla
Industrial
Area
Cutting, Stitching,
Washing, Finishing &
Packing.
Establish
Green
Category
CTE issued
on
28.11.2002
orange
CategoryCTE
applied on
05.02.2008
16.03.2009
Ask the unit to submit
declariation for source
of water stating the
address on affidavit
and status of
installation of ETP
with adequacy report
from any of the
empanelled consultants
of DPCC. Call on
29.04.2009.
Letter issued.
Reply awaited.
38
119
1929
DARSHAN TRADING
CO
C-34, Lawrence Road
Indl Area
Lawrence
Road
Industrial
Area
Cold storage facility with
meat processing.
Renewal
Applied for
CTE on
05.03.2008
vide I.D.
No. 25103.
16.03.2009
SIT-II to inspect and
report. Call on
29.04.2009.
SIT-II report to be
discussed.
Obtained CTO
on 27.10.2004
vide consent
no. 12019 valid
upto
07.10.2007
Applied for
CTO (R) on
05.10.2007
vide I.D.No.
23790.
Applied for
authorization
on 03.01.2005
vide I.D. No.
2253,
05.10.2007
vide I.D.No.
4396 &
05.03.2008
vide I.D .No.
4503.
Issue final
reminder for
full
compliance of
earlier CMC
decision. Also
inspection to
be expedited
by SIT-II.
Call on
24.06.2009
Issue final
reminder for
full
compliance of
earlier CMC
decision. Call
on 24.06.2009
Re-inspection
by SIT-I and
report. Call
on 24.06.2009
39
120
5849
MOTORADES
Dr. K.S. Krishna Road
(Near N.P.L.)
NC-C
Petrol PUmp Service
Station
Renewal
__
40
121
4423
NAVEEN
AUTOMOBILES
37, Patparganj
Industrial Area
Patparganj
Industrial
Area
Service Station For Repair
and Servicing of Cars
Which Includes
Repairing/Manufacturing
of Spares. Washing,
Denting and Painting of
Cars Etc.
Establish
Applied for
CTE on
04.04.2007
vide I.D.
No. 20991.
CTO issued on
07.02.01valid
upto 14.01.04.
Applied for
CTO-R on
05.11.04 and
same was
refused on
16.10.05. CTO
-R issued on
14.09.06.
CTO-R valid
upto 25.09.08.
Applied for
CTO- R
10.09.08
16.03.2009
Ask the unit to file
permission from
Central Ground Water
Authority for
extracting the ground
water and apply for
authorization under
HWM Rules. Call on
29.04.2009.
Letter issued on
15.04.09
Reply received along
with CGWA
permission for ground
water drawl and
applied for
authorization under
HWM Rules.
Issue renewal
of consent and
authorization
under HWM
Rules. Call on
24.06.2009
16.03.2009
Ask the unit to file
permission from
Central Ground Water
Authority for
extracting the ground
water, status of
installation of ETP
with adequacy report
from any of the
empanelled consultants
of DPCC and submit
noise monitoring report
of the D.G.Set from
approved laboratories
of DPCC. Call on
29.04.2009.
Letter issued on
17.04.09.
Reply received along
with copy of
application submitted
to CGWA & affidavit
for non installation of
D.G set on 04.05.09,
stating that they have
completely installed
the E.T.P & application
for preparing adequacy
report has been
submitted to GGSIPU
& copy of this is
enclosed .
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
41
122
348
SHREE SHIV STEEL
S-55, Ph-I, Badli
Industrial Estate
Badli
Industrial
Estate
Pickling Annealing and re
rolling of S. S. patta/patti
Establish
Applied for
CTE on
21.04.2008
vide I.D.
No. 25532.
42
123
2860
SUGOI MOTORS (PVT)
LTD
27-A, Shivaji Marg,
Najafgarh Road
Industrial Area
Najafgarh
Road
Industrial
Area
Service, Repair and
maintenance of Car.
Establish
Applied on
11.04.08
Applied for
CTO on
01.09.06
Apply for
Authorization
on 13.03.09
16.03.2009
Ask the unit to file
permission from
Central Ground Water
Authority for
extracting the ground
water and status of
installation of
ETP/ECS with
adequacy report from
any of the empanelled
consultants of DPCC.
Also ask the unit to
submit an action plan
for stoppage of the
activity before
07.02.2010, which falls
under negative list as
per MPD-2021 and an
action plan for new
proposed activity in
conformity with MPD2021 on the vacant plot
due to closure of
present activity. Call
on 29.04.2009
Letter issued.
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
16.03.2009
Ask the unit to submit
clarification regarding
the existence of the
unit at its earlier
address i.e. 21A,
Shivaji Marg. Also
SIT-II to inspect and
report. Call on
29.04.2009.
Letter issued on
15.04.09
Reply received stating
that Sugoi Motors at
27-A, Shivaji Marg,
Najafgarh Road
Industrial Area is other
unit and it is extension
of Sugoi Motors (Pvt.)
Ltd. at 21-A, Shivaji
Marg, Najafgarh Road
Industrial Area.
Also SIT-II report to be
discussed.
Issue SCN for
closure on the
basis of SIT
deficiencies.
Also ask the
unit operating
at 21-A to
correct the
deficiencies
noted by SIT
and submit an
affidavit in this
regard. Call on
24.06.2009
43
44
45
124
125
126
4047
2803
2428
SAMARA
AUTOMOBILES PVT.
LTD.
13-14, DSIDC Shed,
Scheme-I, Okhla
Industrial Area, Ph-II
Okhla
Industrial
Area
Automobile Workshop
SEEMA OVERSEAS
B-11/46,Mohan Cooperative Industrial
Area Mathura Road
Mohan Cooperative
Industrial
Area
Mfg. of Builders Hardware
Items Including
Electroplating & Powder
Coating
Operate
A-96, Phase-II,
Mayapuri Industrial
Area
Mayapuri
Industrial
Area
Servicing and Repairing
Centre of Motor Cycles.
Renewal
SINGLA
AUTOMOBILES
Operate
CTE issued
on
16.08.2004
Applied for
CTO on
28.02.2005
CTE issued
on
07.05.2003
Applied for
CTO on
29.12.2004
CTO issued on
18.08.2005.
CTO ( R)
applied on
12.08.2008
16.03.2009
Ask the unit to file
fresh application for
consent to operate, to
install ETP and to file
permission from
Central Ground Water
Authority for
extracting the ground
water. Call on
29.04.2009.
16.03.2009
Ask the unit to file
fresh application for
consent to operate, file
fresh adequacy report
of ETP/ECS from
approved consultants
of DPCC and to file
permission from
Central Ground Water
Authority for
extracting the ground
water. Call on
29.04.2009.
16.03.2009
Ask the unit to apply
for Consent to
Establish, file fresh
adequacy report of
ETP from approved
consultants of DPCC
and to file permission
from Central Ground
Water Authority for
extracting the ground
water. Call on
29.04.2009.
Letter issued to file
fresh application for
consent to operate, to
install ETP and to file
permission from
Central Ground Water
Authority for
extracting the ground
water..
Reply awaited and
letter returned back.
Paste the letter
on the
premises. Call
on 24.06.2009
Letter issued.
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
Letter issued.
Reply awaited.
46
127
3285
TIMES
INTERNATIONAL
H-1258, DSIDC,
Narela Industrial Area
Narela
Industrial
Area
Thread dyeing.
Establish
Applied for
CTE on
19.04.2007
vide I.D.
No. 21084.
47
128
4424
AFFORDABLE
EXPORTS PVT. LTD.
189, FIE, Patparganj
Patparganj
Industrial
Area
manufacturing of
readymade garments with
dyeing & washing
Renewal
Two times
consent
48
129
4048
SHOR SHOT INDIA
PVT. LTD
D-1/1, Phase-II, Okhla
Industrial Area
Okhla
Industrial
Area
Mfg. of readymade
garment.
Establish
Green
CategoryCTE
refused
Orange
CategoryApplied for
CTE on
01.12.2008
16.03.2009
Ask the unit to file
affidavit about
installation of
ETP/ECS, acoustic
enclosure with D.G.
Set and requisite stack
height with boiler and
D.G. Set. Also ask the
unit to submit
permission from
CGWA. Call on
29.04.2009
CTO(R)
obtained on
02.09.2004
vide consent
no. 11456 valid
upto
31.08.2007
Applied for
CTO (R) on
30.08.2007
vide I.D. No.
23326.
Green
Categoryissued on
24.12.2002
CTO ( R)
applied on
12.12.2007
Applied for
renewal of
authorization
on 21.08.2006
vide I.D. No.
3399.
Letter issued.
Reply awaited.
16.03.2009
Ask the unit to file
fresh adequacy report
from empanelled
consultants of DPCC.
Also SIT-II to inspect
and report. Call on
29.04.2009.
Letter issued.
Reply awaited.
Also SIT-II report to be
discussed.
16.03.2009
Ask the unit to file
fresh adequacy report
from empanelled
consultants of DPCC
and to file permission
from CGWA. Call on
29.04.2009.
Letter issued.
Reply received stating
that they have already
applied for adequacy
report and also submit
an affidavit wherein
they have mentioned
that unit is not using
any ground water.
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
Issue final
reminder for
full
compliance of
earlier CMC
decision. Also
inspection be
expedited by
SIT-II. Call on
24.06.2009
Ask the unit to
file full
compliance of
earlier CMC
decision. Also
ask the unit to
clarify on
affidavit from
where it is
taking water
for domestic as
well as
industrial use
along with
documentary
proof. Call on
24.06.2009
49
130
4049
MICRO NIKEL PVT.
LTD
E-45/2, Phase-II,
Okhla Industrial Area
Okhla
Industrial
Area
Nickel Screens with
Electroplating (Chrome)
capacity 25 tp 30 Screens /
day.
Renewal
CTO applied on
01.04.2008
50
131
5955
ANIL FILLING
STATION
A-Block, Community
Centre, Paschim Vihar
NC-W
Service Station
Operate
__
Applied for
CTO on
19.07.04
51
132
2429
INDO EXPORT
CORPORATION
A2/1, Mayapuri
Industrial Area,
Phase-I
Mayapuri
Industrial
Area
Screen Printing with
Washing
Operate
Green
CategoryCTE issued
on
10.04.2008
CTO issued on
26.03.2004.
CTO ( R)
issued on
10.01.2006
Applied for
CTO ( R) on
08.04.2009
52
133
4780
RAGHUVANSHI
ENTERPRISES (P) LTD
Plot No. 485-A/1,
Dilshad Garden North
of G.T. Road
Industrial Area
Shahdara
Shahdara
Industrial
Area
(North of
GT Road)
Repair and Servicing of
Automobiles with washing.
Establish
Applied on
17.07.2007
__
16.03.2009
Ask the unit to file
fresh adequacy report
for ETP / ECS from
Shriam Institute of
Industrial Research or
from NPL. Call on
29.04.2009.
16.03.2009
Ask the unit to file
fresh consent to
operate application
along with adequacy
report from empanelled
consultants of DPCC
and to file permission
from CGWA. Call on
29.04.2009.
16.03.2009
Ask the unit to apply
Consent to Establish
under Orange category
and file fresh adequacy
report of ETP from
empanelled consultants
of DPCC. Call on
29.04.2009.
16.03.2009
Ask the unit to file an
affidavit confirming
installation of ETP.
Call on 29.04.2009.
Letter issued.
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision. Call
on 24.06.2009
Letter issued on
15.04.09
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
Issue final
reminder for
full
compliance of
earlier CMC
decision. Call
on 24.06.2009
Letter issued.
Reply awaited.
Letter issued.
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision. Call
on 24.06.2009
53
134
4425
GAYATRI PREM AUTO
PVT. LTD.
Plot No.-31, FIE
Patparganj Industrial
Area
Patparganj
Industrial
Area
Servicing and repair of
Motor Cycle/Scooter with
washing.
Establish
Applied for
CTE on
30.05.2008
vide I.D.
No. 25906.
54
135
2804
GKB RX LENS PVT.
LTD.
E-26, B-1, Extension,
Mohan Co-operative
Industrial Area
Mohan Cooperative
Industrial
Area
Mgf of Lens.
Establish
Applied for
CTE on
24.12.2008
Applied for
CTO on
02.02.2006
55
136
4781
R.K. AUTOMOBILES
ZB.45-46/487,
Dilshad Garden
(North of GT Road)
Industrial Area,
Shahdara
Shahdara
Industrial
Area
(North of
GT Road)
Service & Repair of Two
Wheelers with Washing.
Operate
CTE issued
on
27.12.2004
Applied for
CTO on
03.04.2008.
19-A, Main G.T.
Road, Dilshad Garden
Industrial Area,
Shahdara
Shahdara
Industrial
Area
(North of
GT Road)
Repair and Servicing of
automobiles with washing.
Establish
56
137
4782
RAGHUVANSHI
ENTERPRISES PVT.
LTD.
Applied for
CTE on
02.06.2008
Applied for
authorization
on 30.05.2008
vide I.D. No.
4584.
16.03.2009
Ask the unit to file a
fresh Consent to
Establish and affidavit
confirming installation
of ETP. Call on
29.04.2009.
Letter issued.
Reply awaited.
16.03.2009
Ask the unit to file
CGWA clearance and
submit affidavit for
installation of ETP.
Call on 29.04.2009.
Letter issued.
Reply awaited.
16.03.2009
In accordance with
adequacy report, let the
unit install flow
measuring device and
confirm. Call on
29.04.2009. Call on
29.04.2009.
16.03.2009
Ask the unit to file
permission from
Central Ground Water
Authority for
extracting the ground
water. Call on
29.04.2009.
Ask the unit to
file a fresh
Consent to
Operate and
affidavit
confirming
installation of
ETP. Call on
24.06.2009
Issue final
reminder for
full
compliance of
earlier CMC
decision. Call
on 24.06.2009
Letter issued.
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision. Call
on 24.06.2009
Letter issued.
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision. Call
on 24.06.2009
57
138
4050
ARKAY ENTERPRISES
D-89, Phase-I, Okhla
Industrial Area
Okhla
Industrial
Area
garments with washing
Renewal
CTO issued on
19.07.2002.
CTO ( R)
applied on
26.09.2005
58
139
5768
PICCA DELHI (A UNIT
OF ARA HOSPITALITY
PVT. LTD).
GROUND FLOOR,
PLAZA CINEMA
BUILDING H
BLOCK,
CONNAUGHT
CIRCUS
NC-ND
Restaurant 192 seats with
food and beverage and
liquor facility.
Operate
CTE issued
on 31.07.06
Applioed for
CTO on
24.10.07
59
140
3226
R.C. ENERGY
METERING PVT. LTD
B-65, GATE NO. 1,
Naraina Industrial
Area Phase - II
Naraina
Industrial
Area Phase
- II
Manufacturing of Energy
Meters, submersibelm
monoblock pumps, M. C.
B. s Starters & panels.
Establish
Applied on
10.07.08
CTO issued on
03.09.04 and
valid upto
20.07.07.
Applied for
CTO-R on
15.07.08
60
141
4051
UNICORN GARMENTS
PVT. LTD.
45-48, DSIDC SHED
SCHEME-III, PH-II,
Okhla Industrial Area
Okhla
Industrial
Area
Stitching of fabrication of
Ready made garments.
Establish
CTE issued
on
21.07.2006
16.03.2009
Ask the unit to apply
for Consent to
Establish, fresh consent
to operate application
and file fresh adequacy
report from empanelled
consultants of DPCC
along with permisson
from CGWA. Call on
29.04.2009.
Letter issued.
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision. Call
on 24.06.2009
__
16.03.2009
Ask SIT-II to inspect
and report. Call on
29.04.2009.
SIT-II report to be
discussed.
Also unit has submitted
a letter along with
adequacy report.
Issue SCN for
closure under
Water Act on
the basis of
SIT
deficiencies.
Call on
24.06.2009
Applied for
Renewal of
Authorisation
on 06.10.06
and 02.01.09
16.03.2009
Ask the unit to file
permission from
Central Ground Water
Authority for
extracting the ground
water. Call on
29.04.2009.
Letter issued on
15.04.09
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision. Call
on 24.06.2009
16.03.2009
Ask the unit to file
permission from
CGWA and an
affidavit regarding
installation of ETP.
Call on 29.04.2009.
Letter issued.
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision. Call
on 24.06.2009
61
142
1618
Unitech Industries
A-66, jhilmill
Industries Area
Jhilmil
Industrial
Area
Non Ferrous sheet metal
work Industrial fasteners
electrical sub assembly
Establish
CTE
applied on
26.11.2007
62
143
350
KWALITY THREADS
S-81,Badli Industrial
Estate
Badli
Industrial
Estate
Dyeing of Polyester Yarns.
Renewal
CTE not
obtained.
63
144
1209
BANSAL WIRE
INDUSTRIES LTD
458-466, Gali No 8,
shambhu Nath
compound, G T Road
Shahdara, Friends
Colony Industrial
Area
Friends
Colony
Industrial
Area
M S Wire Drawing with
Annealing pickling & Zinc
plating (Galvanizing)
Operate
16.03.2009
Ask the unit to file
permission from
CGWA, an affidavit
regarding installation
of ETP and submit
noise monitoring report
of D.G. Set from
approved lab of DPCC.
Call on 29.04.2009.
Applied for
CTO (R) on
13.05.2005
vide I.D. No.
14059.
Applied for
CTO (R) on
24.07.2008
vide I.D. No.
26719.
CTO issued on
11.07.2003
CTO ( R)
issued on
13.08.2004
CTO ( R)
refused on
21.06.2007
Applied for
authorization
on 25.04.2006
vide I.D. No.
2621.
16.03.2009
Ask the unit to install
flow meter with ETP,
apply for Consent to
Establish and file
permission from
CGWA clearance. Call
on 29.04.2009.
16.03.2009
SIT-II to inspect and
report. Call on
29.04.2009.
Letter issued to file
permission from
CGWA, an affidavit
regarding installation
of ETP and submit
noise monitoring report
of D.G. Set from
approved lab of
DPCC..
Reply awaited and
letter returned back.
Letter issued.
Reply awaited.
Paste the letter
on the
premises. Call
on 24.06.2009
SIT-II report to be
discussed.
Ask the unit to
file an
affidavit for
closure of its
activity and
not to start any
activity
without prior
permission
from DPCC.
Call on
24.06.2009
Issue final
reminder for
full
compliance of
earlier CMC
decision. Call
on 24.06.2009
64
145
4052
DIMPLE CREATIONS
PVT. LTD
C-64/5, PH-II Okhla
Industrial Area
Okhla
Industrial
Area
manf of readymade
garments with washing
Renewal
CTO applied on
14.01.2005
16.03.2009
Ask the unit to apply
for Consent to
Establish and file fresh
application for Consent
to Operate and fresh
adequacy report from
empanelled consultants
of DPCC. Call on
29.04.2009.
Letter issued to apply
for Consent to
Establish and file fresh
application for Consent
to Operate and fresh
adequacy report from
empanelled consultants
of DPCC..
Reply received wherein
unit has asked for some
time to submit the
compliance report.
Time allowed
till 24.06.2009
for full
compliance.
Call on
24.06.2009
65
146
4053
KALAKRITI PRINTS
PVT. LTD
F-29/5, Ph-II, Okhla
Industrial Area
Okhla
Industrial
Area
Printing of Cloth.
Renewal
CTO issued on
15.04.2004.
CTO ( R)
applied on
27.02.2008
16.03.2009
Ask the unit to increase
the capacity of settling
tank and add activated
carbon filter as
suggested in the
adequacy report. Call
on 29.04.2009.
Letter issued to
increase the capacity of
settling tank and add
activated carbon filter
as suggested in the
adequacy report. .
Reply received.
Reiterate CMC
decision taken
earlier. Call on
24.06.2009
66
148
5042
RAJPAL POLYTEX PVT.
LTD
L-4, Rohtak Road
Udyog Nagar
Industrial Area
Udyog
Nagar
Industrial
area
HOSIERY PRODUCT
(FABRIC & ZIPS) WITH
DYEING & WASHING.
Establish
Applied on
29.04.08
and
15.10.08
Applied for
Authorization
on 15.10.08
16.03.2009
Ask the unit to submit
affidavit for both,
installation of ETP and
acoustic enclosure with
D.G. Set. Call on
29.04.2009.
first time applied for
without washing ,
second time for with
washing.
Letter issued on
15.04.09
Affidavit submitted
stating that suitable
ETP and D.G Set with
inbuilt accauctic
enclosure has been
installed
67
149
6101
AUTO CARE CENTRE
NITI Marg,
Chanakyapuri
N/A
Filling Station cum Service
station of cars.
Operate
Issued on
03.02.06
valid upto
30.01.07.
Applied for
Authorization
on 06.11.06.
16.03.2009
Ask the unit to file
fresh authorization
under HWM Rules and
to file fresh adequacy
report from empanelled
consultants of DPCC.
Call on 29.04.2009.
Letter issued on
15.04.09
Reply awaited.
Consent
application
dated
29.04.2008 be
made
infructuous
and consent be
issued w.r.t.
application
dated
15.10.20008.
Call on
24.06.2009
Issue final
reminder for
full
compliance of
earlier CMC
decision. Call
on 24.06.2009
Applied for
CTO on
22.04.08.
68
150
352
EQUIPTECH PVT. LTD.
A-24, Phase-III, Badli
Industrial Estate
Badli
Industrial
Estate
Industrial Instrumentation
& Control (Including Steel
Fabrication &
Galvanization)
Renewal
69
152
5850
HEMKUNT SERVICE
STATION PVT. LTD
Link Road Near Lodhi
Hotel
N/A
Petrol Pump Cum Service
Station
Renewal
70
153
5851
SATYA SERVICE
STATION LTD
L-Block Hari Nagar
Jail Road
N/A
Oil filling Cum Service
Station.
Renewal
CTE not
obtained.
Applied for
CTO (R) on
24.07.2007
vide I.D. No.
22708.
Applied for
renewal of
authorization
on 17.10.2007
vide I.D. No.
3899.
CTO applied on
29.11.2007
__
CTO issued on
28.11.01 valid
upto 30.09.04.
CTO-R issued
on 15.09.05
valid upto
29.09.07.
Applied for
CTO-R on
18.01.08
Applied for
renewal on
18.1.08.
16.03.2009
Ask the unit to file
CGWA clearance,
affidavit for installation
of ETP / ECS and
acoustic enclosure &
adequate stack height
with D.G. Set. Call on
29.04.2009.
Letter issued.
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision. Call
on 24.06.2009
16.03.2009
Ask the unit to apply
for Consent to
Establish and to file
permission from
Central Ground Water
Authority for
extracting the ground
water. Call on
29.04.2009.
16.03.2009
Ask the unit to file
permission from
Central Ground Water
Authority for
extracting the ground
water. Call on
29.04.2009.
Letter issued.
Reply awaited.
Issue renewal
of consent.
Call on
24.06.2009
Letter issued on
15.04.09
Reply awaited.
Ask the unit to
file permission
from DJB for
ground water
extraction as
per new
orders. Call on
24.06.2009
71
154
5043
LANDMARK BANQUET
PVT. LTD.
B-I, Udyog Nagar
Industrial area
Udyog
Nagar
Industrial
area
CATERING SERVICE
FOR MARRIAGES &
OTHER PARTIES
Operate
72
155
2430
MAHARANI OF INDIA
C-154, Ph-II,
Mayapuri Industrial
Area
Mayapuri
Industrial
Area
manufacturing of ready
made garments (With
washing)
Renewal
__
Applied for
CTO on
30.08.04.
CTO issued on
29.09.2004.
CTO ( R)
applied on
18.12.2007
Applied for
HWM on
05.06.2007
16.03.2009
Ask the unit to apply
for Consent to
Establish, a fesh
application for Consent
to Operate and latest
adequacy report of
ETP and noise
monitoring report of
D.G. Set and
permission from
CGWA clearance. Also
ask the unit to install
CFL, rain water
harvesting system,
solar water harvesting
and plantation of tree.
Call on 29.04.2009.
Letter issued on
15.04.09
Replyreceived stating
that the unit has been
closed and no activity
is being carried out.
Ask the unit to
file its reply on
an affidavit.
Call on
24.06.2009
16.03.2009
Ask the unit to apply
for Consent to
Establish and to file
permission from
Central Ground Water
Authority for
extracting the ground
water, a fresh adequacy
report of ETP & noise
monitoring report of
D.G. Set from
approved consultants /
laboratories of DPCC.
Call on 29.04.2009.
Letter issued to apply
for Consent to
Establish and to file
permission from
Central Ground Water
Authority for
extracting the ground
water.
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
73
156
1492
REGAL PALACE
B-3, G.T. Karnal Road
Industrial Area
G.T.
Karnal
Road
Industrial
Area
Banquet Hall/Restaurant
Operate
CTE not
obtained.
Applied for
CTO on
14.12.2005
vide I.D.No.
17236.
74
157
353
V.K. INTERNATIONAL
B-9/2, Ph-I, Badli
Indl. Area
Badli
Industrial
Estate
Manufacturing of Stainless
Steel Patta/patti by
Annealing Pickling & Re
Rolling of Process.
Renewal
Two times
consent
75
158
6031
ALISHA ENTERPRISES
PVT. LTD.
12, Hauz Khas Village
N/A
RESTAURENT
Renewal
Obtained CTO
(R) on
25.04.2006
vide consent
no. 14257 valid
upto
26.03.2008
Applied for
CTO (R) on
21.11.2008
vide I.D. No.
28161.
CTO issued on
02.08.2002.
CTO ( R)
applied on
18.12.2006
Applied for
renewal of
authorization
on
118.07.2006
vide I.D. No.
2861.
16.03.2009
Ask the unit to apply
for Consent to
Establish and to file
permission from
Central Ground Water
Authority for
extracting the ground
water, a fresh adequacy
report of ETP &
affidavit for stack
height & acoustic
enclosure of D.G. Set.
Also ask the unit to
install solar water
heating system, rain
water harvesting
system, CFL & to
undertake plantation of
trees. Call on
29.04.2009.
16.03.2009
Ask the unit to file
affidavit for installation
of ETP and for stack
height & acoustic
enclosure of D.G. Set.
Call on 29.04.2009.
Letter issued.
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
Letter issued.
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision. Call
on 24.06.2009
16.03.2009
Ask the unit to apply
for Consent to
Establish, a fresh noise
monitoring report of
D.G. Set , a fresh
adequacy report from
empanelled consultants
/ laboratoires of DPCC
and affidavit about
source of water supply.
Call on 29.04.2009.
Letter issued.
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision. Call
on 24.06.2009
76
159
5884
HALDIRAM PRODUCT
(PVT) LTD
2032, 2033, KATRA
LACHHU SINGH
CHANDHI CHOWK
N/A
MFG. OF SWEETS &
SNACKS.
Establish
77
160
2431
J.P. DYE PRINTS
C-150, PH-II,
Mayapuri Industrial
Area
Mayapuri
Industrial
Area
Washing of Denim Cloths
Renewal
78
161
2805
VIVEK AUTOMOBILE
LTD
A-1, Mohan Cooperative Industrial
Area
Mohan Cooperative
Industrial
Area
Servicing, Repairing &
Washing of Vehicles (Car).
Establish
Applied for
CTE on
07.11.2007
vide I.D.
No. 24172.
Applied for
CTE on
29.07.2008
Applied for
CTO on
05.12.2007
vide I.D. No.
24417.
16.03.2009
Ask the unit to file
permission from
Central Ground Water
Authority for
extracting the ground
water and affidavit for
stack height & acoustic
enclosure of D.G. Set.
Call on 29.04.2009.
Letter issued.
Reply awaited.
CTO issued on
03.09.2004
CTO ( R)
applied on
21.09.2007
16.03.2009
Ask the unit to apply
for Consent to
Establish and to file
permission from
Central Ground Water
Authority for
extracting the ground
water, a fresh adequacy
report of ETP. Also ask
the unit to submit the
details about the boiler.
Call on 29.04.2009.
Letter issued to apply
for Consent to
Establish and to file
permission from
Central Ground Water
Authority for
extracting the ground
water, a fresh adequacy
report of ETP. Also ask
the unit to submit the
details about the
boiler..
Reply received stating
that they are applying
for CTE and for DJB
permission and not
using any boiler.
Letter issued.
Reply awaited.
16.03.2009
Ask the unit to file
permission from
Central Ground Water
Authority for
extracting the ground
water and submit
adequacy report of
ETP from any of the
empanelled consultants
of DPCC. Call on
29.04.2009.
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
Call on
24.06.2009
with full
compliance
Issue final
reminder to
submit an
affidavit for
installation of
ETP with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
79
164
2862
BISLERI
INTERNATIONAL PVT.
LTD.
60, Najafgarh Road
Industrial Area
Najafgarh
Road
Industrial
Area
Packaging of Drinking of
Mineral water
Operate
Applied for
CTO on
26.07.02.
Applied for
CTO on
02.03.07
16.03.2009
SIT-II to inspect and
report and also
comment on use of
plastic in the unit.
Call on 29.04.2009.
80
165
4057
BOUTIQUE
INTERNATIONAL
D-5/1, PH-II, Okhla
Industrial Area
Okhla
Industrial
Area
CUTTING ROW
CLOTHS, STITCHING
AND THEN
DISPATCHING THEM
Operate
Applied for
CTO on
21.06.2005
16.03.2009
Call on 20.03.2009
20.03.2009
Ask the unit to apply
for Consent to
Establish, noise
monitoring report of
D.G. Set from
approved laboratoires
of DPCC and affidavit
about source of water
supply. Call on
29.04.2009.
Letter issued.
Reply awaited.
Call for
personal
hearing on
03.06.2009 at
5.00 PM.
Adequacy report
submitted, Noise
monitoring report not
submitted, GW
mentioned nil.
Letter issued to apply
for Consent to
Establish, noise
monitoring report of
D.G. Set from
approved laboratoires
of DPCC and affidavit
about source of water
supply.
Reply received wherein
they have requested for
time for compliance.
Issue final
reminder for
full
compliance of
earlier CMC
decision. Call
on 24.06.2009
81
166
2863
JIWAN LAL & CO.
14-B, Najafgarh Road
Industrial Area
Najafgarh
Road
Industrial
Area
Light Engg. Work with
Forging
Operate
Applied for
CTO on
26.07.02
16.03.2009
Ask the unit to apply
for Consent to
Establish and file an
affidavit for installation
of ECS and stack
height / acoustic
enclosure with the
D.G. Set. Also ask the
unit to submit noise
monitoring report of
the D.G. Set from
approved laboratories
of DPCC. Call on
29.04.2009.
Letter issued on
15.04.09
Reply received without
affidavit stating that
they already have
required stacks
installed on diesel fired
furnace with burner
and they have applied
for fresh NMR in
DPCC. However unit is
silent on CTE
application.
Issue final
reminder for
Consent to
Establish and
full
compliance of
earlier CMC
decision. Call
on 24.06.2009
82
167
6032
KABILA
RESTAURANT(A Uniot
of Maxims Food)
DDA SHOPPING
CENTRE,
AUROBINDO
PLACE
N/A
Restaurant.
Operate
CTO issued on
29.03.2004
CTO ( R) on
21.08.2007
16.03.2009
Ask the unit to file
permission from
Central Ground Water
Authority for
extracting the ground
water, a fresh adequacy
report of ETP and raise
the stack height of the
D.G. Set and to submit
the noise monitoring
report of the D.G. Set
from approved
laboratories of
DPCC.Also ask the
unit to install solar
water heating system,
rain water harvesting
system, CFL & to
undertake planatation
of trees. Call on
29.04.2009.
Letter issued to file
permission from
Central Ground Water
Authority for
extracting the ground
water, a fresh adequacy
report of ETP and raise
the stack height of the
D.G. Set and to submit
the noise monitoring
report of the D.G. Set
from approved
laboratories of
DPCC.Also ask the
unit to install solar
water heating system,
rain water harvesting
system, CFL & to
undertake planatation
of trees..
Reply received wherein
they have submitted
the noise monitoring
report, permission from
DJB and also
mentioned that they are
manitaining a grease
trap plant.
Issue final
reminder for
full
compliance of
CMC decision,
failing which,
unit will be
called for
personal
hearing. Call
on 24.06.2009
83
168
5888
MC DONALDS FAMILY
RESTAURANT
UB-33-34, Jawahar
Nagar
N/A
Restaurant
Operate
84
169
5852
MCDONALD FAIMLY
RESTAURENT
S-27,Green Park
Market,S/O Sh Provat
Kr. Sen R/O CA 38/1
tagore Garden
N/A
Quick Service Restaurant
Operate
CTO applied on
09.11.2004
16.03.2009
Call on 20.03.2009
20.03.2009
Ask the unit to apply
for Consent to
Establish, affidavit
about source of water
supply, for installation
of oil & grease trap
cum settling tank & for
stack height / acoustic
enclosure with the
D.G. Set. Call on
29.04.2009.
Letter issued.
Reply awaited.
Call for
personal
hearing on
03.06.2009 at
5.15 PM.
16.03.2009
Ask the unit to file a
fresh adequacy report
of ETP, noise
monitoring reprot of
D.G. Set from
empanelled consultants
/ laboratories of DPCC
and affidavit for source
of water supply. Also
ask the unit to install
solar water heating
system, rain water
harvesting system,
CFL & to undertake
planatation of trees.
Call on 29.04.2009.
Letter issued.
Reply awaited.
Call for
personal
hearing on
03.06.2009 at
5.30 PM.
85
170
5853
MCDONALDS FAIMLY
RESTAURENT
M-70,Greater kailash1 Market
N/A
RESTAURANT
Operate
86
171
5771
MCDONALDS FAMILY
RESTAURANT
ISBT, DMRC
Railway Station,
Kashmere Gate, Near
ISBT
N/A
RESTAURENT
Operate
CTE not
obtained.
CTO applied on
24.03.2005
16.03.2009
Ask the unit to apply
for Consent to
Establish, file a fresh
adequacy report of
ETP, noise monitoring
reprot of D.G. Set from
empanelled consultants
/ laboratories of DPCC
and affidavit for source
of water supply. Also
ask the unit to install
solar water heating
system, rain water
harvesting system,
CFL & to undertake
planatation of trees.
Call on 29.04.2009.
Letter issued.
Reply awaited.
Call for
personal
hearing on
03.06.2009 at
5.45 PM.
Applied for
CTO on
09.11.2007
vide I.D. No.
12084
16.03.2009
Ask the unit to apply
for Consent to
Establish and to file
affidavit for installation
of oil & grease cum
settling tank. Also ask
the unit to install solar
water heating system,
rain water harvesting
system, CFL & to
undertake planatation
of trees. Call on
29.04.2009.
Letter issued.
Reply awaited.
Call for
personal
hearing on
03.06.2009 at
6.00 PM.
87
88
172
173
5922
6033
MCDONALDS FAMILY
RESTAURANT
Showroom No.17-24,
Grindlays Cinema,
Friends Colony
Industrial Area
N/A
MCDONALDS FAMILY
RESTAURANT
BG02, HUDCO
PLACE, ANSLA
PLAZA
N/A
Quick Service Restaurant
Quick service restaurant.
Operate
Establish
CTO applied on
09.11.2004
CTO issued on
15.04.2004
16.03.2009
Ask the unit to apply
for Consent to
Establish, file a fresh
adequacy report of
ETP, noise monitoring
reprot of D.G. Set from
empanelled consultants
/ laboratories of DPCC
and affidavit for source
of water supply. Also
ask the unit to install
solar water heating
system, rain water
harvesting system,
CFL & to undertake
planatation of trees.
Call on 29.04.2009.
16.03.2009
Ask the unit to file
permission from
Central Ground Water
Authority for
extracting the ground
water and submit an
affidavit for non
installation of D.G. Set
and to submit adequacy
report of ETP from
approved consultants
of DPCC.Also ask the
unit to install solar
water heating system,
rain water harvesting
system, CFL & to
undertake planatation
of trees. Call on
29.04.2009.
Letter issued.
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision. Call
on 24.06.2009
Letter issued.
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
89
90
174
177
6034
5889
MCDONALDS FAMILY
RESTAURANT
TDI-WEST SIDE
MALL, ALNKAR,
LAJPAT NAGAR
N/A
NIRULAS
2,3,4,25,2,27
LSD,DDA
Market,PocketB,Ashok Vihar-III
N/A
QUICK SERVICE
RESTAURANT
Operate
restaurant
Operate
CTO applied on
09.11.2004
CTE not
obtained.
CTO obtained
on 27.07.2006
vide consent
no. 16352 valid
upto
20.04.2007
16.03.2009
Ask the unit to apply
for Consent to
Establish, file a fresh
adequacy report of
ETP and affidavit for
source of water supply
and for non installation
of D.G. Set. Call on
29.04.2009.
16.03.2009
Ask the unit to apply
for Consent to
Establish and to file
affidavit for installation
of oil & grease cum
settling tank. Also ask
the unit to install solar
water heating system,
rain water harvesting
system, CFL & to
undertake planatation
of trees. Call on
29.04.2009.
Letter issued.
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision. Call
on 24.06.2009
Letter issued.
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision. Call
on 24.06.2009
91
178
5772
NIRULAS CORNER
HOUSE PVT. LTD.
N-6464B,CONNAUGHT
CIRCUS
N/A
RESTAURENT
Establish
92
179
4058
ORIENT CRAFT LTD
B-14, Phase-II Okhla
Industrial Area
Okhla
Industrial
Area
Manufacturing & Export of
Readymade Garment with
washing.
Operate
93
180
3286
PACKWELL &
COMPANY
Plot No.-2922, SectorJ, Narela Industrial
Park, Narela
Narela
Industrial
Area
manufacturing of Prindted
Circuit Board and
electronic components.
Establish
Applied on
16.05.07
__
CTO issued on
23.03.2005.
CTO ( R)
applied on
02.05.2008
Applied for
CTE on
10.12.2007
vide I.D.
No. 24439.
__
16.03.2009
Ask the unit to file
permission from
Central Ground Water
Authority for
extracting the ground
water, affidavit for
installation of ETP,
stack height / acosutic
eclosure with the D.G.
Set and submit noise
monitoring report of
D.G. Set from
approved laboratories
of DPCC.Also ask the
unit to install solar
water heating system,
rain water harvesting
system, CFL & to
undertake planatation
of trees. Call on
29.04.2009.
16.03.2009
Ask the unit to apply
for Consent to
Establish and to file
permission from
Central Ground Water
Authority for
extracting the ground
water. Call on
29.04.2009.
Letter issued on
15.04.09
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
Letter issued.
Reply awaited.
16.03.2009
Ask the unit to file
affidavit for installation
of ETP and for non
installation of D.G. Set.
Call on 29.04.2009.
Letter issued.
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
Issue final
reminder for
full
compliance of
earlier CMC
decision. Call
on 24.06.2009
94
181
4059
SIGNET
CORPORATION
A-83, Phase-II, Okhla
Industrial Area
Okhla
Industrial
Area
Readymade garments with
washing
Establish
Applied for
CTE on
05.02.2008
CTO applied on
08.05.2006
95
182
2
UPPER INDIA RUBBER
WORKS
D-2, GALI NO. - 04,
Anand Parbat
Industrial Area
Anand
Parbat
Industrial
Area
MOULDING OF
RUBBER AUTO PARTS
(WITHOUT TYRE &
TUBES) WATER STOPS
SEALS & PACKINGS.
Operate
__
Applied for
CTO on
21.08.02.
Applied for
CTO on
11.07.07
96
183
4060
CPL AUTOS (P) LTD.
S-47, Phase-II, Okhla
Industrial Area
Okhla
Industrial
Area
Washing and servicing of
vehicles.
Renewal
CTO issued on
27.09.2005.
CTO ( R)
applied on
26.09.2008.
__
16.03.2009
Ask the unit to file
permission from
Central Ground Water
Authority for
extracting the ground
water. Call on
29.04.2009.
Letter issued.
Reply awaited.
16.03.2009
Ask the unit to apply
for Consent to
Establish and to install
ECS for the emissions
generated from the
process. Call on
29.04.2009.
Letter issued on
15.04.09
Reply received
requesting for time
upto 15th may for
filling of CTE
application.
16.03.2009
Ask the unit to apply
for Consent to
Establish, file a fresh
adequacy report of
ETP, noise monitoring
reprot of D.G. Set from
empanelled consultants
/ laboratories of DPCC
and affidavit for source
of water supply. Call
on 29.04.2009.
Letter issued.
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
Time allowed
till 15.05.2009
for full
compliance.
Affidavit to be
filed. Call on
03.06.2009
Issue final
reminder for
full
compliance of
earlier CMC
decision. Call
on 24.06.2009
97
98
184
185
5958
1493
GULATI RESTAURANT
INVITATION
CERAMONIAL
6, Pandara Road
Market
N/A
B-52,G.T. Karnal
Road Industrial Area
G.T.
Karnal
Road
Industrial
Area
Restaurant.
BANQUET HALL/
RESTAURANT
Renewal
Operate
___
CTE not
obtained.
CTO valid upto
19.08.07.
Applied for
CTO-R on
14.12.07.
Applied for
CTO on
14.12.2005
vide I.D. No.
17237
Applied for
authorization
on 18.01.2008
vide I.D. No.
4467.
16.03.2009
Ask the unit to apply
for Consent to
Establish and
authorization under
HWM Rules , file a
fresh adequacy report
of ETP from
empanelled consultants
of DPCC. Also ask the
unit to file permission
from Central Ground
Water Authority for
extracting the ground
water. Call on
29.04.2009.
16.03.2009
Ask the unit to apply
for Consent to
Establish, file a fresh
adequacy report of
ETP from empanelled
consultants of DPCC,
file permission from
Central Ground Water
Authority for
extracting the ground
water and affidavit for
stack height / acoustic
enclosure with D.G.
Set. Also ask the unit
to install solar water
heating system, rain
water harvesting
system, CFL & to
undertake planatation
of trees. Call on
29.04.2009.
Letter issued on
15.04.09
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
Letter issued.
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
99
186
1787
BAGGA LINK SERVICE
LTD
9/55(A)Kirti Nagar
Industrial Area
Kirti Nagar
Industrial
Area
WORKSHOP CUM
SERVICE STATION OF
TWO WHEELERS.
Establish
Applied on
09.08.07
__
100
187
3
J.B. Motors PVT. LTD
1/1, Hall No.2,
Railway Line
Industrial Side, New
Rohtak Road, Anand
Parbhat Industrial
Area
Anand
Parbat
Industrial
Area
Workshop cum Serivicing
station of two wheelers
Establish
Applied on
19.11.07
_
A-2, DDA Shed,
Phase-1, Okhla
Industrial Area
Okhla
Industrial
Area
Workshop cum service
station of two wheelers.
Establish
101
188
4061
PASHUPATI MOTORS
Applied for
CTE on
27.09.2007
__
16.03.2009
Ask the unit to file
permission from
Central Ground Water
Authority for
extracting the ground
water and affidavit for
installation of ETP and
for stack height /
acoustic enclosure with
D.G. Set. Call on
29.04.2009.
16.03.2009
Call on 20.03.2009
20.03.2009
Inspection by Trainee,
PGRC to be expedited.
Call on 29.04.2009
16.03.2009
Ask the unit to file
permission from
Central Ground Water
Authority for
extracting the ground
water and fresh
adequacy report of
ETP and noise
monitoring report of
D.G. Set from
approved
consultants/laboratories
of DPCC. Call on
29.04.2009.
Letter issued on
15.04.09
Reply awaited.
Inspection report to be
discussed.
Letter issued.
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
Shift file from
PGRC to CMC
to issue SCN.
Call on
24.06.2009
Time allowed
till 24.06.2009
for full
compliance.
Call on
24.06.2009
102
189
3287
ARUN ELECTOPLATNG
B-2305, DSIDC
Narela Industrial Area
Narela
Industrial
Area
Electroplating & Powder
Coating
Renewal
CTO obtained
on 29.06.2004
vide consent
no. 10936 valid
upto
20.06.2007
Applied for
CTO (R) on
01.08.2007
vide I.D. No.
22972.
Applied for
renewal of
authorization
on 30.08.2006
vide I.D. No.
3490 &
01.12.2008
vide I.D. No.
4826.
16.03.2009
Ask the unit to apply
for Consent to
Establish, file
permission from
Central Ground Water
Authority for
extracting the ground
water and affidavit for
installation of ETP /
ECS. Also ask the unit
to a fresh file adequacy
report from empanelled
consultants of DPCC.
Call on 29.04.2009.
Letter issued.
Reply received on
05.05.2009 stating that
they have CTE on
26.11.2001.
CGWA permission is
not required for the
existing borewells.
Affidavit and adequacy
report of April, 2004
submitted.
Ask the unit to
file permission
from DJB for
ground water
extraction as
per new
orders and
fresh adequacy
report from
empanelled
consultant of
DPCC. Call on
24.06.2009
103
190
6102
GUPTA SERVICE
STATION
Moti Bagh South
N/A
Filling Station cum service
station (washing of cars).
Renewal
CTO issued on
02.08.2002
CTO ( R)
issued on
25.07.2005
CTO applied on
24.11.2008
Applied for
HWM on
17.11.2008
16.03.2009
Ask the unit to submit
an affidavit for source
of water supply and to
raise stack height of
D.G. Set as per norms.
Call on 29.04.2009.
Letter issued.
Reply awaited.
Issue Consent
to Establish.
Call on
24.06.2009
104
191
6103
R.K. SERVICE STATION
Yashwant Place,
Vinay Marg,
Chanakya Puri
N/A
Filling Station cum service
station (washing of cars).
Renewal
CTO issued on
18.06.03 valid
upto 20.06.05.
CTO-R issued
on 17.03.06
valid upto
20.06.08.
Applied for
CTO-R on
24.11.08
Applied for
Authorization
on 19.11.04,
23.11.04 and
02.06.08.
16.03.2009
Ask the unit to file
permission from
Central Ground Water
Authority for
extracting the ground
water and affidavit for
non installation of
D.G. Set.Call on
29.04.2009.
Letter issued on
15.04.09
Reply awaited.
Issue renewal
of consent and
authorization
under HWM
Rules. Call on
24.06.2009
CTE
obtained
on
26.11.2001
105
192
355
AUTO & GENERAL
CASTING (P) LTD.
M-12, Badli Industrial
Area
Badli
Industrial
Estate
Aluminium Die Casting &
Zinc Plating.
Renewal
106
193
5854
CAR CARE CENTRE
Lodhi Road Near Ispat
Bhawan
N/A
Petrol Pump cum service
station
Renewal
Two times
consent
CTO (R)
obtained on
07.07.2006
vide consent
no. 16097 valid
upto
21.08.2008.
Applied for
CTO (R) on
21.11.2008
vide I.D. No.
28159.
CTO issued on
30.12.2004
CTO ( r)
applied on
19.03.2008
Applied for
renewal of
authorization
on 18.08.2006
vide I.D. No.
3320.
16.03.2009
Ask the unit to file
permission from
Central Ground Water
Authority for
extracting the ground
water and affidavit for
installation of ETP /
ECS and stack height /
acoustic enclosure with
the D.G. Set.Call on
29.04.2009.
Letter issued.
Reply awaited.
16.03.2009
Ask the unit to file
permission from
Central Ground Water
Authority for
extracting the ground
water and fresh
adequacy report of
ETP and noise
monitoring report of
D.G. Set from
approved
consultants/laboratories
of DPCC. Call on
29.04.2009.
Letter issued.
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
Issue renewal
of consent.
Call on
24.06.2009
107
194
6037
OBERAI SERVICE
STATION
S-19, Green Park
Extension,Mehrauli
Road
N/A
Filling & Service Station
Operate
108
195
5773
AHLCON
BELA ROAD,
CHNDGI RAM
AKHARA, RING
ROAD
N/A
RMC PLANT
Operate
109
197
6038
Big Chill Cafe P.Ltd
HS-5, Kailash Colony
Market, NC-S
N/A
Restaurant (125 seats)
Establish
CTE
applied on
24.06.2004
CTO applied on
03.06.2005
16.03.2009
Ask the unit to apply a
fresh Consent to
Operate, permission
from Central Ground
Water Authority for
extracting the ground
water and fresh
adequacy report of
ETP from approved
consultantsof
DPCC.Call on
29.04.2009.
16.03.2009
SIT-II to inspect and
report. Call on
29.04.2009.
CTE
applied on
25.06.2007
16.03.2009
Ask the unit to file
affidavit for source of
water and installation
of ETP. Call on
29.04.2009.
Letter issued to file
permission from
Central Ground Water
Authority for
extracting the ground
water and fresh
adequacy report of
ETP and noise
monitoring report of
D.G. Set from
approved
consultants/laboratories
of DPCC..
Reply stating that they
have already taken
registration from
CGWA, already
submitted the fresh
adequacy report and
noise monitoring
report.
SIT-II report to be
discussed.
Paste the letter
on the
premises. Call
on 24.06.2009
Letter issued to file
affidavit for source of
water and installation
of ETP. .
Reply received aherein
unit has submitted the
adequacy report and
latest MCD bill.
Issue Consent
to Establish.
Call on
24.06.2009
Call for
personal
hearing on
03.06.2009 at
6.15 PM.
110
198
6039
DEVYANI
INTERNATIONAL LTD
S-32, Green Park
N/A
Restaurant servies.
Establish
CTE
applied on
14.07.2008
111
199
5774
DEVYANI
INTERNATIONAL PVT.
LTD.
58, JANPATH,
CONNAUGHT
PLACE
N/A
Restaurant services with
siting capacity under 100
seats.
Establish
CTE issued
on 29.06.07
valid upto
28.06.08
112
200
4614
KHARKIA ALLOYS
PVT. LTD
70, S.S.I Industrial
Area
S.S.I
Industrial
Area
M. S. Wire Drawing &
Galvanizing.
Renewal
CTE not
obtained.
Applied for
CTO on
08.10.04.
Refused on
05.05.05.
Applied for
CTO on
16.08.05.
Applied for
CTO on
27.09.07.
CTO obtained
on 14.06.2006
vide consent
no. 15320 valid
upto
14.09.2007.
Applied for
CTO (R) on
08.02.2008
vide I.D. No.
24900.
__
16.03.2009
Ask the unit to file
affidavit for source of
water and installation
of ETP and fresh
adequacy report of
ETP and noise
monitoring report of
D.G. Set from
approved
consultants/laboratories
of DPCC. Call on
29.04.2009.
Letter issued to file
affidavit for source of
water and installation
of ETP and fresh
adequacy report of
ETP and noise
monitoring report of
D.G. Set from
approved
consultants/laboratories
of DPCC..
Reply received stating
that they have already
applied for CTE. But
not submitted any reply
regarding our letter.
Call for
personal
hearing on
03.06.2009 at
6.30 PM.
16.03.2009
Ask the unit to install
flow measuring device
with ETP and apply for
authoriation under
HWM Rules. Call on
29.04.2009.
Letter issued on
15.04.09
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision. Call
on 24.06.2009
16.03.2009
Ask the unit to apply
for Consent to
Establish, affidavit for
installation of ETP /
ECS and stack height /
acoustic enclosure with
the D.G. Set. Call on
29.04.2009.
Letter issued.
The same is returned
back undelievered.
Trainee to
paste the letter
on the
premises. Call
on 24.06.2009
113
201
1932
PUNJAB BISCUIT
FACTORY
A-16, Lawrence Road
Industrial Area
Lawrence
Road
Industrial
Area
Sweet, Namkeen and
Confectionary items
Operate
CTE
obtained on
27.10.2004
vide
consent no.
12014 valid
upto
14.09.2005
114
202
1933
SEVEN SEAS
HOSPITALITY P. LTD.
B-28, Lawrence Road
Industrial Area
Lawrence
Road
Industrial
Area
BANQUET HALL WITH
RESTAURANT
FACILITIES.
Establish
Applied for
CTE on
09.10.2007
vide I.D.
No. 23824.
Applied for
CTO on
04.09.2006
vide I.D. No.
19210.
16.03.2009
Ask the unit to file
permission from
Central Ground Water
Authority for
extracting the ground
water and fresh
adequacy report of
ETP from approved
consultants of DPCC,
affidavit for installation
of ECS and oil &
grease trap cum
settling tank & stack
height / acoustic
enclosure with the
D.G. Set. Call on
29.04.2009.
Letter issued.
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
16.03.2009
Ask the unit to file
permission from
Central Ground Water
Authority for
extracting the ground
water and affidavit for
installation of ETP
,channelisation system
for kitchen emissions
& for stack height /
acoustic enclosure with
the D.G. Set. Also ask
the unit to installflow
measuring device, solar
water heating system,
rain water harvesting
system, CFL & to
undertake plantation of
trees. Call on
29.04.2009.
Letter issued.
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
115
203
4063
VAM HI-FASHION
GRAMENTS PVT LTD
B-58,PH-I,Okhla
Industrial Area
Okhla
Industrial
Area
Mfg of Readymade
Garments without washing.
Operate
Green
CategoryCTE issued
on
01.12.2006
Green
Categoryapplied on
02.04.2008
16.03.2009
SIT-II to inspect and
report. Call on
29.04.2009.
SIT-II report to be
discussed.
SIT-II to
inspect and
report. Call
on 24.06.2009
116
204
4064
NEW SAMRAT METAL
CO PVT. LTD
B-125, Ph-I, Okhla
Industrial Area
Okhla
Industrial
Area
Readymade garments.
Renewal
CTE issued
on
19.05.2004
CTO issued on
14.09.2004
CTO ( R)
applied on
01.01.2008
16.03.2009
Ask the unit to file
affidavit for source of
water and fresh
adequacy report of
ETP from empanelled
consultants of DPCC.
Call on 29.04.2009.
Letter issued.
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision. Call
on 24.06.2009
117
205
6104
P K DELICIES PVT.
LTD.
GROUND FLOOR
HALL,YASHWANT
PLACE,SATYA
MARG
CHANKYAPURI
N/A
sweet shop cum Eating
House.
Operate
Issued on
17.10.06
valid upto
16.10.07.
Applied for
CTO on
07.01.08
16.03.2009
Ask the unit to install
flow meter device. Call
on 29.04.2009.
Letter issued on
15.04.09
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision. Call
on 24.06.2009
118
206
4065
RASAH EXIM LTD.
E-49/10, Ph-II, Okhla
Industrial Area
Okhla
Industrial
Area
Service Station cum show
room of two wheelers.
Renewal
CTE issued
on
21.02.2006
16.03.2009
Ask the unit to file
permission from
Central Ground Water
Authority for
extracting the ground
water. Call on
29.04.2009.
Letter issued.
Ask the unit to
file affidavit
stating that no
ground water
is tapped and
submit
documentary
proof for
taking
municipal
water. Call on
24.06.2009.
119
207
356
NARENDERA
INDUSTRIES
S-59, Phase-I, Badli
Industrial Estate
Badli
Industrial
Estate
Re Rolling of S.S. Sheet 2.
T/Day
Establish
Applied for
CTE on
20.09.2007
vide I.D.
No. 23568.
Applied for
CTO (R) on
03.07.2007
vide I.D. No.
22133.
Applied for
renewal of
authorization
on 18.07.2006
vide I.D. No.
2860
16.03.2009
Ask the unit to file
permission from
Central Ground Water
Authority for
extracting the ground
water and status of
installation of
ETP/ECS and non
installation of D.G. Set.
Also ask the unit to
submit an action plan
for stoppage of the
activity before
07.02.2010, which falls
under negative list as
per MPD-2021 and an
action plan for new
proposed activity in
conformity with MPD2021 on the vacant plot
due to closure of
present activity. Call
on 29.04.2009
Letter issued on
21.04.09.
Reply received on they
have applied for
permission from
CGWA as soon as they
get they will submit the
same, they have
stopped pickling
activity , removed
ETP/ECS from the
premises & there is no
D.G. set in the
industry.
Ask the unit to
file an
affidavit
stating that
they have
stopped
pickling
activity,
removed
ETP/ECS from
the premises
and there is no
D.G. Set in the
unit. Also ask
the unit to file
permission
from DJB for
ground water
extraction as
per new
orders.Call on
24.06.2009
120
208
4
AUTOWISE SERVICE
STATION
PP-38A, Gali No. 10,
Anand Parbat
Industrial Area
Anand
Parbat
Industrial
Area
Repairing & servicing of
cars
Renewal
__
CTO issued on
07.05.03 valid
upto 01.08.05.
__
16.03.2009
Ask the unit to apply
for consent to establish,
file permission from
Central Ground Water
Authority for
extracting the ground
water, a fresh adequacy
report of ETP and
affidavit for non
installation of D.G. Set.
Letter issued.
Case is being dealt
with PGRC. Cases
Unit has submitted its
reply stating that the
water used for washing
is being taken from
water tankers and
applied for Adequacy
report of ETP to
DCE.Also submitted
an affidavit stating that
there is no generator
set in the service
station premises.
Call on
24.06.2009
121
209
5775
HOLY SHRINE HOTELS
PVT LTD
38-U/A,Jawahar
Nagar,Bunglow Road
N/A
Restaurent Business
(Seating Capacity under
100 seats)
Renewal
CTO issued on
15.04.2004
16.03.2009
Call on 20.03.2009
20.03.2009
Ask the unit to apply
for Consent to
Establish, file
permission from
Central Ground Water
Authority for
extracting the ground
water and submit
affidavit for installation
of ETP/ECS. Call on
29.04.2009.
122
210
4660
R.J. INDUSTRIES
Kh.No. 22/9/3, Gali
No.-8 Samaipur
Industrial Area
Samaipur
Industrial
Area
Mfg. of Hinges with Acid
Dipping.
Renewal
Two times
consent
CTO (R)
obtained on
07.07.2006
vide consent
no. 16140 valid
upto
08.07.2008.
Applied for
CTO (R) on
19.08.2008
vide I.D. No.
27003.
Applied for
renewal of
authorization
on 07.08.2006
vide I.D. No.
3206.
16.03.2009
Ask the unit to file
permission from
Central Ground Water
Authority for
extracting the ground
water, and affidavit for
installation of ETP and
acoustic enclosure /
stack height of D.G.
Set. Call on
29.04.2009.
Letter issued on
20.03.09.
Reply received on
30.04.09 stating that
they have approached
to the CGWA for the
procedure, which will
take some time for
completion then only
they will grant them
the permission. They
are using the ground
water only for the toilet
& washing utensils in
the restaurant from the
long time & not for any
other industrial
purposes. As ETP is
concerned for 75 seats
they have installed
Grease/ oil trap.
Letter issued.
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Also
ask the unit to
file noise
monitoring
report from
approved
laboratory of
DPCC. Call on
24.06.2009
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
123
211
4066
BHARAT SMALTING
CO.
SHED NO. 202,
DSIDC COMPLEX,
PH -I, Okhla
Industrial Area
Okhla
Industrial
Area
zips sliders including
plating.
Renewal
CTO issued on
13.07.2004
CTO ( R)
applied on
27.08.2007
124
212
1934
SIPLA FRUIT PRODUCT
B-64 A, Lawrence
Road Industrial Area
Lawrence
Road
Industrial
Area
Manufacturing of Achar &
Muraba.
Renewal
CTE not
obtained.
125
213
4427
T. R. Sawhney Motors P.
Ltd
508, FIE, Patparganj
Industrial Area
Patparganj
Industrial
Area
Servicing of Automobiles
Establish
Applied for
CTE on
04.06.2008
vide I.D.
No. 25976
Applied for
CTO (R) on
11.08.2008
vide I.D. No.
26923.
Authorization
refused on
08.02.2007
Applied for
authorization
on 04.06.2008
vide I.D. No.
4592.
16.03.2009
Ask the unit to apply
for Consent to
Establilsh, file
permission from
Central Ground Water
Authority for
extracting the ground
water, fresh adequacy
report of ETP from
empanelled consultants
of DPCC and affidavit
for installation of ECS.
Call on 29.04.2009.
Letter issued.
Reply awaited.
16.03.2009
Ask the unit to apply
for Consent to
Establilsh, file
permission from
Central Ground Water
Authority for
extracting the ground
water, fresh adequacy
report of ETP from
empanelled consultants
of DPCC and affidavit
for stack height /
acoustic enclosure with
the D.G. Set. Call on
29.04.2009.
16.03.2009
Ask the unit to file
permission from
Central Ground Water
Authority for
extracting the ground
water, affidavit for
installation of
ETP/ECS and for stack
height / acoustic
enclosure with the
D.G. Set. Call on
29.04.2009.
Letter issued.
Reply awaited.
Letter issued.
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
126
214
357
AGGARWAL TRADERS
S-22, Ph-I, Badli
Industrial Estate
Badli
Industrial
Estate
Mfg. of plastic moulded
items
Operate
CTE not
obtained.
CTO obtained
on 08.06.2004
vide consnet
no. 10691 valid
upto
21.07.2005
127
215
5044
API ASSOCIATES PVT.
LTD
D-15, Udyog Nagar
Industrial area
Udyog
Nagar
Industrial
area
Manufacturing of
Footwear.
Renewal
__
CTO issued on
13.02.03 valid
upto 25.07.05.
CTO-R valid
upto 25.07.08.
Applied for
CTO-R on
16.07.08
128
216
1935
BLUE BIRD
ENTERPRISES PVT
LTD.
189/91, Lawrence
Road Industrial Area
Lawrence
Road
Industrial
Area
Mfg. of bread.
Establish
Applied for
CTE on
11.03.2008
vide I.D.
No. 25149.
Applied for
CTO on
27.09.2005
vide I.D. No.
16577.
129
217
5855
DELHI TRANSPORT
CORPORATION
Hari Nagar Depot-2
N/A
Repair & Maintenance.
Establish
Issued on
25.07.08
valid upto
24.07.09
CTO valid upto
25.12.05.
CTO Refused
on 26.09.06.
CTO-R valid
upto
13.05.2010.
__
Valid upto
24.07.2010
16.03.2009
SIT-II to inspect and
report. Call on
29.04.2009.
SIT-II report to be
discussed.
16.03.2009
SIT-II to inspect and
report. Call on
29.04.2009.
SIT-II report to be
discussed.
16.03.2009
Ask the unit to file
permission from
Central Ground Water
Authority for
extracting the ground
water, affidavit for
installation of ECS and
for stack height /
acoustic enclosure with
the D.G. Set. Call on
29.04.2009.
Letter issued.
Reply awaited.
16.03.2009
SIT-II to inspect and
report. Call on
29.04.2009.
SIT-II report to be
discussed. Howeevr
unit has submitted a
letter requesting for
grant of consent.
Consent
refused for
M/s Aggarwal
Traders. Ask
the new unit
namely M/s
Vrinda
Industries to
apply for
Consent to
Establish. Call
on 24.06.2009
Call on
24.06.2009
with SIT-II
report.
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
Call on
24.06.2009
with SIT-II
report.
130
218
6041
DEVYANI
INTERNATIONAL PVT
LTD (PIZZA HUT)
12, Community
Center, Saket
N/A
Fast Food Service
Operate
131
219
2432
ESS AAR MOTORS
B-73, PH-1, Mayapuri
Industrial Area
Mayapuri
Industrial
Area
SHOWROOM CUM
SERVICE STATION OF
TWO WHEELERS
Establish
CTO applied on
08.10.2004
CTE
applied on
09.08.2007
16.03.2009
Call on 20.03.2009
20.03.2009
Ask the unit to apply
for Consent to
Establish, fresh consent
to operate, submit
affidavit for source of
water supply, adequacy
report of ETP from any
of the empanelled
consultants of DPCC
and submit noise
monitoring report of
the D.G.Set from
approved laboratories
of DPCC. Call on
29.04.2009.
Letter issued.
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision. Call
on 24.06.2009
16.03.2009
Ask the unit to apply
for consent to operate,
file permission from
Central Ground Water
Authority for
extracting the ground
water, adequacy report
of ETP and noise
monitoring report of
D.G.Set from
empanelled consultants
/ laboratories of DPCC.
Call on 29.04.2009.
Letter issued.
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
132
220
1620
HIMGIRI
AUTOMOBILES PVT.
LTD
A-19, Jhilmil
Industrial Area
Jhilmil
Industrial
Area
Repairing and Servicing of
Bikes
Establish
CTE
applied on
15.02.2007
16.03.2009
Ask the unit to apply
for consent to operate,
file permission from
Central Ground Water
Authority for
extracting the ground
water, adequacy report
of ETP and noise
monitoring report of
D.G.Set from
empanelled consultants
/ laboratories of DPCC.
Call on 29.04.2009.
Letter issued.
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
133
221
2433
KARAN MOTORS PVT.
LTD.
B-67, Mayapuri
Industrial Area PhaseI
Mayapuri
Industrial
Area
ENGAGED
MANUFACTURING OF
SMALL QUANTITY OF
AUTO PARTS
(CASTING, INDUCTION,
FURNACE, CAPACITY
500 KG.)
Renewal
CTO issued on
25.06.2004
CTO ( R)
applied on
05.10.2007
16.03.2009
SIT-II to inspect and
report. Call on
29.04.2009.
SIT-II report to be
discussed.
The following
deficiencies
observed
during the
inspection by
SIT :(i) ECS
installed over
melting
furnace.
However,
suction
arrangement
needs to be
improved so
that entire
emissions are
channelized
towards the
hood provided.
(ii) Water
circulation
pump with the
wet scrubber is
under repair.
(iii) Hazardous
waste (casting
sand) needs to
be managed as
per HWM
Rules. (iv)
Dust collector
connected to
sand mould
reclamation
machine is
under repair.
(v) Two D.G.
Sets of 600
KVA & 800
KVA kept in
separate rooms
with acoustic
door and stack
height needs to
be raised as
per norms.
Noise
monitoring
report needs to
be obtained.
(vi) One
borwell exists
at site for
which
permission
from DJB is
required as per
new orders.
Ask the unit to
correct the
above
deficiencies
and submit an
affidavit in this
regard. Call on
24.06.2009.
134
222
5856
MGS HOSPITALITY
PLOOF RESTAURANT
13- Main
Market,Lodhi Colony
N/A
EATING HOUSERESTAURANT WITH 72
SEATING CAPACITY
Operate
CTO applied on
17.07.2006
135
223
6042
MOTI MAHAL DELUXII
M-30, GREATER
KAILASH PART-I,
N/A
eating establishment
Renewal
CTO issued on
29.03.2004
CTO ( r)
applied on
31.05.2007
16.03.2009
Ask the unit to apply
for consent to establish,
file permission from
Central Ground Water
Authority for
extracting the ground
water, a fresh adequacy
report of ETP and
noise monitoring report
of D.G.Set from
empanelled consultants
/ laboratories of DPCC.
Also ask the unit to
install flow meter with
ETP. Call on
29.04.2009.
16.03.2009
Ask the unit to file
permission from
Central Ground Water
Authority for
extracting the ground
water, effluent analysis
report of ETP and
noise monitoring report
of D.G.Set from
empanelled consultants
/ laboratories of DPCC.
Call on 29.04.2009.
Letter issued to apply
for consent to establish,
file permission from
Central Ground Water
Authority for
extracting the ground
water, a fresh adequacy
report of ETP and
noise monitoring report
of D.G.Set from
empanelled consultants
/ laboratories of DPCC.
Also ask the unit to
install flow meter with
ETP. .
Reply received.
Call for
personal
hearing on
03.06.2009 at
6.45 PM.
Letter issued to file
permission from
Central Ground Water
Authority for
extracting the ground
water, effluent analysis
report of ETP and
noise monitoring report
of D.G.Set from
empanelled consultants
/ laboratories of
DPCC..
Reply received stating
that they have already
applied for CGWA
permission and as they
are 76 seatter
restaurant they have
also installed oil and
grease trap. Also, they
have submitted the
noise monitoring
report.
Call for
personal
hearing on
03.06.2009 at
7.00 PM.
136
224
4068
ORIENT CRAFT LTD
C-54/1, Phase-II,
Okhla Industrial Area
Okhla
Industrial
Area
Manufactur & Export of
Readymade Garment
without Washing.
Renewal
Green
CategoryCTE issued
on
26.10.2004
CTO issued on
25.10.2005
CTO ( R)
applied on
22.10.2008
16.03.2009
SIT-II to inspect and
report. Call on
29.04.2009.
SIT-II report to be
discussed.
Call on
24.06.2009
with SIT-II
report.
137
225
4069
ORIENT CRAFT LTD.
F-23/3, Phase-II,
Okhla Industrial Area
Okhla
Industrial
Area
manufacture & Export of
Readymade Garment
without washing.
Renewal
Green
CategoryCTE issued
on
12.12.2003
CTO issued on
09.12.2004
CTO ( R)
applied on
04.12.2007
16.03.2009
SIT-II to inspect and
report. Call on
29.04.2009.
SIT-II report to be
discussed.
Call on
24.06.2009
with SIT-II
report.
138
226
6106
P.K. DELICACIES PVT.
LTD.
MEZZ.FLOOR,HALL
YASHWANT
PLAZA,SATYA
MARG,
N/A
Fine denning Restaurant
Operate
Issued on
17.10.06
valid upto
16.10.07.
Applied for
CTO on
07.11.08
16.03.2009
Ask the unit to file
permission from
Central Ground Water
Authority for
extracting the ground
water and affidavit for
non installation of
D.G. Set. Call on
29.04.2009.
Letter issued on
15.04.09
Reply received
alongwith an affidavit
stating that unit have
not installed any
Borewell and D.G. Set
Call for
personal
hearing on
03.06.2009 at
7.15 PM.
139
227
4070
R.M.X. JOSS
C-49, Okhla Industrial
Area, Phase-II
Okhla
Industrial
Area
Mfg. of Garments with
washing.
Renewal
CTO issued on
26.07.2002.
CTO (R) issued
on 30.01.2006
140
228
2434
RICHA & CO.
B-34, Phase-I,
Mayapuri Industrial
Area
Mayapuri
Industrial
Area
Mfg. of Readymade
Garments.
Renewal
CTO issued on
26.07.2002
CTO ( R)
issued on
22.07.2005
CTO ( R)
applied on
29.09.2008
141
229
2807
YAMAHA MOTORS
INDIA SALES PVT.
LTD.
B-1/F-8, Mohan Cooperative Industrial
Estate, Mathura Road
Mohan Cooperative
Industrial
Area
Service Station cum
Workshop of Two
Wheelers.
Operate
CTE issued
on
09.12.2005
CTO applied on
09.09.2008
16.03.2009
Ask the unit to apply
for consent to establish,
file permission from
Central Ground Water
Authority for
extracting the ground
water, a fresh adequacy
report of ETP and
noise monitoring report
of D.G.Set from
empanelled consultants
/ laboratories of DPCC.
Also ask the unit to
install flow meter with
ETP. Call on
29.04.2009.
16.03.2009
Ask the unit to file
permission from
Central Ground Water
Authority for
extracting the ground
water and noise
monitoring report of
D.G.Set from
empanelled
laboratories of DPCC.
Call on 29.04.2009.
Letter issued.
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
Letter issued.
Reply awaited.
16.03.2009
Ask the unit to submit
affidavit for source of
water supply. Call on
29.04.2009.
23.04.2009
Change the name of the
unit in the CTE
application and transfer
it to next CMC on
08.05.2009
Letter issued.
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
Issue final
reminder for
full
compliance of
earlier CMC
decision. Call
on 24.06.2009
142
230
1621
AMAN MOTORS
A-5/6, Jhilmil
Industrial Area
Jhilmil
Industrial
Area
Workshop Cum Services
Station Of Two Wheelers
Establish
CTE
applied on
16.01.2007
143
231
4428
ARYA MOTORS
361, FIE,
PATPARGANJ
INDUSTRIAL AREA
Patparganj
Industrial
Area
WORKSHOP CUM
SERVICE STATION OF
TWO WHEELERS.
Establish
Applied for
CTE on
03.10.2007
vide I.D.
No. 23741.
144
232
4072
BAGGA LINK SERVICE
LTD
B-90/19, Phase-I,
Okhla Industrial Area
Okhla
Industrial
Area
Workshop cum service
station of two wheelers.
Establish
CTE
applied on
15.06.2007
16.03.2009
Ask the unit to apply
for consent to establish,
file permission from
Central Ground Water
Authority for
extracting the ground
water and adequacy
report of ETP from
empanelled consultants
of DPCC. Call on
29.04.2009.
16.03.2009
Ask the unit to apply
for consent to establish,
file permission from
Central Ground Water
Authority for
extracting the ground
water and affidavit for
installation of ETP.
Call on 29.04.2009.
Letter issued.
Reply awaited.
Time allowed
till 24.06.2009
for full
compliance.
Call on
24.06.2009
Letter issued.
The same is reutrned
back undelievered.
Paste the letter
on the
premises. Call
on 24.06.2009
16.03.2009
Ask the unit to apply
for consent to operate,
file permission from
Central Ground Water
Authority for
extracting the ground
water and adequacy
report of ETP from
empanelled consultants
of DPCC. Call on
29.04.2009.
Letter issued.
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
145
233
5923
DEEPAK
AUTOMOBILES
G.T. Road, Shahdara
N/A
Filling Station cum Service
station of vehicles.
Establish
CTE
applied on
08.05.2008
16.03.2009
Ask the unit to apply
for consent to operate,
file permission from
Central Ground Water
Authority for
extracting the ground
water and adequacy
report of ETP from
empanelled consultants
of DPCC. Call on
29.04.2009.
Letter issued.
Reply awaited.
146
234
4073
FIRST HONDA (DIV. OF
CAPITAL TRUST
LIMITED)
A-264, Ph-I, Okhla
Industrial Area
Okhla
Industrial
Area
Workshop Cum Service
Station of Two Wheelers.
Establish
CTE
applied on
06.12.2006
16.03.2009
Ask the unit to apply
for consent to operate,
file permission from
Central Ground Water
Authority for
extracting the ground
water and adequacy
report of ETP from
empanelled consultants
of DPCC. Call on
29.04.2009.
147
235
1494
GAUTAM MOTORS
B-83,G.T. Karnal
Road Industrial Area
G.T.
Karnal
Road
Industrial
Area
workshop cum service
stationof three wheelers
Establish
Applied for
CTE on
23.05.2007
vide I.D.
No. 21478.
16.03.2009
Ask the unit to apply
for consent to operate,
file permission from
Central Ground Water
Authority for
extracting the ground
water and affidavit for
installation of ETP.
Call on 29.04.2009.
Letter issued o apply
for consent to operate,
file permission from
Central Ground Water
Authority for
extracting the ground
water and adequacy
report of ETP from
empanelled consultants
of DPCC. .
Reply awaited.
Also, letter returned
back.
Letter issued.
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
Paste the letter
on the
premises. Call
on 24.06.2009
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
148
237
5045
GUPTA AUTOMOBILES
& CO
F-26, DSIDC,
UDYOG NAGAR
NAGAR
INDUSTRIAL AREA
Udyog
Nagar
Industrial
area
WORK SHOP CUM
SERVICE STATION OF
VEHICLE.
Establish
Applied on
24.11.08
__
__
16.03.2009
Ask the unit to apply
for consent to operate,
file permission from
Central Ground Water
Authority for
extracting the ground
water and affidavit for
installation of ETP.
Call on 29.04.2009.
Letter issued on
15.04.09
Reply awaited.
149
238
2864
KHANNA AGENCIES
PVT. LTD
71/7, Rama Road,
Najafgarh Road
Industrial Area
Najafgarh
Road
Industrial
Area
Workshop Cum Showroom
With Washing of Two
Wheelers
Establish
Applied on
05.03.07
_
Applied on
19.11.07
16.03.2009
Ask the unit to apply
for consent to operate
and affidavit for
installation of ETP and
non installation of D.G.
Set.Call on 29.04.2009.
Letter issued on
15.04.09.
Letter returned back
Undelievered
150
239
5026
LAMBA ENTERPRISES
PVT. LTD
6-A, TILAK NAGAR
INDUSTRIAL AREA
Tilak
Nagar
Industrial
Area
SERVICE STATION
CUM SERVICE
STATION OF VEHICLES
Establish
Applied on
08.08.08
__
Aplied on
08.08.08
16.03.2009
Ask the unit to apply
for consent to operate,
file permission from
Central Ground Water
Authority for
extracting the ground
water and affidavit for
installation of ETP and
non installation of D.G.
Set. Call on
29.04.2009.
Letter issued on
15.04.09
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
Paste the letter
on the
premises. Call
on 24.06.2009
Time allowed
for full
compliance.
Call on
24.06.2009
151
240
4615
MALWA MOTORS PVT.
LTD
W-10, Ph-II, Okhla
Industrial Area
Okhla
Industrial
Area
Workshop Cum Service
Station of Two Wheelers.
Establish
Applied for
CTE on
22.03.2007
vide I.D.
No. 20900.
152
241
4074
MEHANDRU
AUTOMOBILE
Shed NO.29, DSIDC
Ph-II, Okhla Industrial
Area
Okhla
Industrial
Area
Servicing of Two
Wheelers(Bikes/Scooter)
Establish
153
242
1622
MITTAL ENTERPRISES
(A UNIT OF BHARAT
METAL CO.)
35, Jhilmil Industrial
Area
Jhilmil
Industrial
Area
WORKSHOP CUM
SERVICE STATION OF
TWO WHEELERS
Establish
Applied for
authorization
on 29.02.2008
vide I.D. No.
4499.
16.03.2009
Ask the unit to apply
for consent to operate,
file permission from
Central Ground Water
Authority for
extracting the ground
water and adequacy
report of ETP from
empanelled consultants
of DPCC. Call on
29.04.2009.
Letter issued to apply
for consent to operate,
file permission from
Central Ground Water
Authority for
extracting the ground
water and adequacy
report of ETP from
empanelled consultants
of DPCC.
Reply received and
requested for the
submission of the
same.
CTE
applied on
22.03.2007
16.03.2009
Ask the unit to apply
for consent to operate,
file permission from
Central Ground Water
Authority for
extracting the ground
water and adequacy
report of ETP from
empanelled consultants
of DPCC. Call on
29.04.2009.
Letter issued.
Reply awaited.
CTE
applied on
05.09.2007
16.03.2009
Ask the unit to apply
for consent to operate,
file permission from
Central Ground Water
Authority for
extracting the ground
water and adequacy
report of ETP from
empanelled consultants
of DPCC. Call on
29.04.2009.
Letter issued.
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
Time allowed
for full
compliance.
Call on
24.06.2009
154
243
5963
NEM CHAND TARA
CHAND
10/7, Mile Stone, G.
T. Karnal Road,
Alipur
N/A
Filling Station Cum
Service Station Of Two
wheelers.
Establish
Applied for
CTE on
22.04.2008
vide I.D.
No. 25546.
155
245
1936
STRIPLEX INDUSTRIES
PVT LTD
B-9, Lawrence Road
Industrial Area
Lawrence
Road
Industrial
Area
CATERING.
Establish
Applied for
CTE on
14.05.2008
vide I.D.
No. 25736.
156
246
2865
SWADESHI AUTO PVT.
LTD.
41, Rama Road
Najafgarh Road
Industrial Area
Najafgarh
Road
Industrial
Area
Service Station of two
wheelers.
Operate
CTE issued
on 15.05.06
valid upto
14.05.07
Applied for
authorization
on 22.04.2008
vide I.D. No.
4552.
Applied for
CTO on
03.03.08
Aplied on
22.11.07
16.03.2009
Ask the unit to apply
for consent to operate,
file permission from
Central Ground Water
Authority for
extracting the ground
water and affidavit for
installation of ETP.
Call on 29.04.2009.
Letter issued.
Reply awaited.
16.03.2009
Ask the unit to apply
for consent to operate
under Orange category
and affidavit for
installation of ETP and
for stack height
/acoustic enclosure
with the D.G.Set. Call
on 29.04.2009.
Letter issued.
Reply awaited.
16.03.2009
Ask the unit to file
permission from
Central Ground Water
Authority for
extracting the ground
water and noise
monitoring report of
D.G.Set from
empanelled
laboratories of DPCC.
Call on 29.04.2009.
Letter issued on
15.04.09
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
Issue final
reminder for
full
compliance of
earlier CMC
decision. Call
on 24.06.2009
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
157
247
1623
CHARU MOTORS PVT.
LTD
B-31 Jhilmil Industrial
Area
Jhilmil
Industrial
Area
Servicing & repairing of
cars.
Operate
CTE issued
on
27.02.2007
158
248
4075
EURO MOTORS PVT.
LTD
F-85, Phase-I,Okhla
Industrial Area
Okhla
Industrial
Area
Automobile workhop cum
service station.
Establish
CTE
applied on
08.06.2007
159
249
4518
GOPI PVT. LTD.
18, Rajasthan Udyog
Nagar Industrial Area
, GTK Road
Rajasthan
Udyog
Nagar
Industrial
Area
party hall cum restaurant
Renewal
Applied for
CTE on
10.10.2005
vide I.D.
No. 16685
160
250
5964
KANISHKA FOODS
FRANCHISEE SAGAR
RATNA
C-8/386, Sector-8,
Rohini
N/A
RESTAURANT
Operate
CTE not
obtained.
CTO applied on
13.05.2008
CTO obtained
on 14.08.2003
vide consent
no. 7217 valid
upto
01.08.2005
Applied for
CTO on
09.08.2004
vide I.D. No.
11294.
Authorization
refused on
28.11.2006
16.03.2009
Ask the unit to file
permission from
Central Ground Water
Authority for
extracting the ground
water and adequacy
report of ETP from
empanelled consultants
of DPCC and affidavit
for non installation of
D.G. Set. Call on
29.04.2009.
Letter issued.
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
16.03.2009
Ask the unit to apply
for consent to operate,
file permission from
Central Ground Water
Authority for
extracting the ground
water, adequacy report
of ETP and noise
monitoring report of
D.G.Set from
empanelled consultants
/ laboratories of DPCC.
Also ask the unit to
submit affidavit for
source of water supply.
Call on 29.04.2009.
Letter issued.
Reply awaited.
16.03.2009
SIT-II to inspect and
report. Call on
29.04.2009.
SIT-II report to be
discussed.
Call on
24.06.2009
with SIT-II
report.
16.03.2009
SIT-II to inspect and
report. Call on
29.04.2009.
SIT-II report to be
discussed.
Refuse consent
of old address.
Ask the unit to
apply for
Consent to
Establish for
new addrress.
Call on
24.06.2009
161
251
5776
NAVAYUGA READY
MIX CONCRETE
PLANT
BELA ROAD,
CHNDGI RAM
AKHARA, RING
ROAD
N/A
RMC PLANT
Operate
CTE not
obtained.
Applied for
CTO on
31.08.2006
vide I.D. No.
19187.
162
252
5046
PRECISION
ELECTRONICS
INSTRUMENTS CO
H-45, Udyog Nagar
Industrial area
Udyog
Nagar
Industrial
area
Manufacturng of Electronic
Weighing machine & fare
meters.
Renewal
__
CTO issued on
24.10.05 valid
upto 21.02.08.
Applied for
CTO-R on
10.03.08
163
253
2825
DOCTOR BELI RAM &
SONS (MFG)
42, KIrti nagar, Moti
Nagar DLF Industrial
Area
Moti Nagar
DLF
Industrial
Area
Mfg. of Personal Weighing
Scale
Operate
__
CTO issued on
11.08.03 valid
upto 08.07.05.
CTO-R issued
on 12.05.06
valid upto
08.07.08.
Applied for
CTO-R on
09.01.09
16.03.2009
SIT-II to inspect and
report. Call on
29.04.2009.
SIT-II report to be
discussed.
N/A
16.03.2009
Ask the unit to apply
for consent to establish,
file permission from
Central Ground Water
Authority for
extracting the ground
water and noise
monitoring report of
D.G.Set from approved
laboratories of DPCC.
Call on 29.04.2009.
Letter issued on
15.04.09
Reply received stating
that unit is in process
for compliance.
Aplied for
renewal on
28.09.06
16.03.2009
Ask the unit to submit
an affidavit for source
of water supply and for
installation of ETP.
Call on 29.04.2009.
Letter issued on
15.04.09
Reply received without
affidavit stating that
unit is not using water
in manufacturing
process and carrying
out powder coating
without
Phosphating.and
doesnot need to install
ETP.
Refuse
consent. Ask
the new unit
namely M/s
Tecno
Concrete to
appy for
consent to
establish. Call
on 24.06.2009
Time allowed
for full
compliance.
Call on
24.06.2009
Call for
personal
hearing on
12.06.2009 at
5.00 PM.
164
254
4076
VASAN ABHA
190, DSIDC shed, PhI, Okhla Industrial
Area
Okhla
Industrial
Area
Dyeing and washing of
readymade/clothe garments
Operate
CTO issued on
08.06.2004
CTO ( R)
applied on
07.08.2006
Applied for
HWM on
24.11.2008
16.03.2009
Ask the unit to apply
for consent to establish,
file permission from
Central Ground Water
Authority for
extracting the ground
water and noise
monitoring report of
D.G.Set from
empanelledlaboratories
of DPCC. Call on
29.04.2009.
Letter issued.
Reply awaited.
165
255
2436
GAUTAM AUTO
B-49, PhaseI,Mayapuri Industrial
Area
Mayapuri
Industrial
Area
REPAIRING &
SERVICING OF
AUTOMOBILES VIZ
MOTORCYCLES
Renewal
CTO issued on
02.11.2004
Applied for
HWM on
17.11.2008
16.03.2009
Ask the unit to apply
for consent to operate,
file permission from
Central Ground Water
Authority for
extracting the ground
water, adequacy report
of ETP and noise
monitoring report of
D.G.Set from
empanelled consultants
/ laboratories of DPCC.
Also ask the unit to
submit affidavit for
source of water supply.
Call on 29.04.2009.
Letter issued.
Reply awaited.
166
256
4077
HIMALAYA
INDUSTRIES
C-20, Phase I, Okhla
Industrial Area
Okhla
Industrial
Area
Mfg Of Ice
Renewal
CTO issued on
28.05.2003
CTO ( R)
applied on
08.09.2006
16.03.2009
Ask the unit to apply
for consent to establish,
file permission from
Central Ground Water
Authority for
extracting the ground
water and noise
monitoring report of
D.G.Set from
empanelled
laboratories of DPCC.
Call on 29.04.2009.
Letter issued.
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
Paste the letter
on the
premises. Call
on 24.06.2009
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
167
257
3288
BHARAT ENTERPRISES
I-2173, DSIDC,
Narela Industrial Area
Narela
Industrial
Area
hand pump parts (zinc
plating and (Light
Engineering works)
Operate
168
258
4078
CLASSIC FASHION /
M/s Boutique Global
D-80, Phase-I, Okhla
Industrial Area
Okhla
Industrial
Area
Cutting the Raw Cloth as
per Design and then
Stitching is done
Operate
CTE not
obtained.
Applied for
CTO on
02.02.2006
vide I.D. No.
17654.
CTO applied on
21.06.2005
Applied for
authorization
on 20.02.2006
vide I.D. No.
2602.
16.03.2009
Ask the unit to apply
for consent to establish
and affidavit for source
of water supply. Call
on 29.04.2009.
Letter issued.
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision. Call
on 24.06.2009
16.03.2009
Issue final reminder to
Boutique Global. Call
on 29.04.2009.
Letter issued.
Reply awaited.
Consent
application of
M/s Classic
Fashion has
already been
refused as it
has been
closed .M/s
Boutique
Global is
existing at the
premises
which has
applied for
CTE on
4.12.07.Classic
fashion be
delisted. Ask
the unit M/s
Boutique
Global to
submit
affidavit
regarding
installation of
ETP & source
of water,
adequacy
report of ETP
from
empanelled
consultant of
DPCC and
noise
monitoring
report of D.G
Set from
approved
laboratory of
DPCC. Call on
24.06.2009
169
259
6151
CREST INN (A UNIT OF
MPA HOSPITALITY
PVT. LTD)
4/27, WEA, Saraswati
Marg, Karol Bagh
N/A
Guest house
Establish
Applied on
11.06.08
__
___
16.03.2009
SIT-II to inspect and
report. Call on
29.04.2009.
SIT-II report to be
discussed.
Call for
personal
hearing on
12.06.2009 at
5.15 PM.
170
260
4661
DAKSH
INTERNATIONAL
KH. NO-22/6/2, GALI
NO-9, Samaipur
Industrial Area
Samaipur
Industrial
Area
MANUFACTURING OF
AUTO PARTS
(SLUMINUM DIE
CASTING).
Renewal
CTE not
obtained.
Authorization
obtained on
28.11.2006
vide I.D. No.
1904
16.03.2009
Ask the unit to apply
for consent to establish
and affidavit for
installation of ECS.
Call on 29.04.2009.
Letter issued.
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision. Call
on 24.06.2009
171
261
5965
DEVYANI
INTERNATIONAL PVT.
LTD. (PIZZA HUT)
G-5, Aggarwal
Millennium Tower,
Subhash Place
N/A
Fast Food Service
Operate
CTE not
obtained.
CTO obtained
on 05.11.2004
vide consent
no. 12165 valid
upto
30.08.2007
Applied for
CTO (R) on
30.08.2007
vide I.D.No.
23350.
Applied for
CTO on
08.10.2004
vide I.D. No.
11865.
16.03.2009
Ask the unit to apply
for consent to establish,
fresh adequacy report
of ETP from
empanelled consultants
of DPCC and affidavit
for non installation of
D.G. Set. Call on
29.04.2009.
Letter issued.
The same is returned
back undelievered.
Paste the letter
on the
premises. Call
on 24.06.2009
172
262
2866
DIC INDIA LIMITED
7, DLF Shivaji Marg.
Najafgarh Road
Industrial Area
Najafgarh
Road
Industrial
Area
Non-flexo graphic ink mfg.
Operate
173
263
2867
FAHRENHEIT
AUTOMOBILES PVT.
LTD
68/3, NAJAFGARH
ROAD INDUSTRIAL
AREA
Najafgarh
Road
Industrial
Area
AUTOMOBILE / CAR
SERVICE
Establish
174
264
1937
GANGA ROLLER
FLOUR MILLS P. LTD
B-37, Lawrence Road
Industrial Area
Lawrence
Road
Industrial
Area
manufacturing of Atta and
Suji and maida & Dalia and
Cattelfeed.
Operate
Applied for
CTO on
25.09.06 in
new name.
Applied for
Authorization
on 20.06.08 in
the name of
old unit.
16.03.2009
Ask the unit to apply
for consent to establish,
noise monitoring report
of D.G. Set from
approved laboratories
of DPCC and affidavit
for source of water
supply. Call on
29.04.2009.
Letter issued on
15.04.09
Reply received stating
that they have already
submitted Noise
Monitoring Report
alongwith CTO-R
application submitted
in Sept. 2006 and unit
may be informed in
case fresh NMR is
required.
Issue final
reminder for
full
compliance of
earlier CMC
decision. Call
on 24.06.2009
CTE issued
on 28.01.09
valid upto
27.01.2010
__
Applied on
03.12.08
16.03.2009
Ask the unit to apply
for consent to operate
and file permission
from Central Ground
Water Authority for
extracting the ground
water. Call on
29.04.2009.
Letter issued on
15.04.09.
Reply awaited.
Two times
consent
CTO (R)
obtained on
15.10.2004
vide consent
no. 11834 valid
upto
29.09.2007
Applied for
CTO (R) on
27.11.2007
vide I.D. No.
24323
16.03.2009
Ask the unit to fresh
adequacy report of
ECS from empanelled
consultants of DPCC
and affidavit for source
of water. Call on
29.04.2009.
Letter issued on
17.04.09.
Reply received on
18.04.09 along with
copy of adequacy
report of ECS &
certificate of
registration of wells
from CGWA .
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
Issue renewal
of consent.
Call on
24.06.2009
175
265
3289
KHARE & ASSOCIATES
B-2560, DSIDC
Narela Industrial Area
Narela
Industrial
Area
Engineering Works
Operate
CTE
obained on
on
30.11.2004
vide
consent no.
12218 valid
upto
25.10.2005
Applied for
CTO on
30.05.2005
vide I.D. No.
14222.
176
266
3227
MEHTA OFFSET PVT
LTD
A-16 East Naraina
Industrial Area Phase
- II
Naraina
Industrial
Area Phase
- II
Photo type setting,
processing plate making,
printing.
Establish
Applied on
11.02.08
Applied for
CTO on
05.11.04
177
267
4393
PRECISION PIPES &
PROFILES CO LTD.
70, Phase-III, Okhla
Industrial Estate
Okhla
Industrial
Estate
Mfg. of Trims & Moulded
Components for
Automobiles.
Renewal
CTO issued on
23.02.2005
CTO ( R)
applied on
22.02.2008
Applied for
renewal of
authorization
21.07.08.
16.03.2009
Ask the unit to apply
for consent to operate,
file permission from
Central Ground Water
Authority for
extracting the ground
water and affidavit for
non installation of D.G.
Set and installation of
ETP/ECS. Call on
29.04.2009.
Letter issued.
Reply awaited.
16.03.2009
Ask the unit to apply
for consent to operate
afresh, a fresh
adequacy report of
ETP from empanelled
consultants of DPCC
and affidavit for source
of water supply. Call
on 29.04.2009.
Letter issued on
15.04.09.
Reply awaited.
16.03.2009
Ask the unit to apply
for consent to establish,
file permission from
Central Ground Water
Authority for
extracting the ground
water and noise
monitoring report of
D.G.Set from
empanelled
laboratories of DPCC.
Call on 29.04.2009.
Letter issued.
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
Issue final
reminder for
full
compliance of
earlier CMC
decision. Call
on 24.06.2009
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
178
268
4394
PRECISION PIPES &
PROFILES CO. LTD.
161, Okhla Industrial
Estate, Phase-III
Okhla
Industrial
Estate
Weather strips and
Moulded items for
Automobiles
Renewal
CTO applied on
23.02.2005
179
269
4429
PRJ ENTERPRISES
82, FIE Patparganj
Industrial Area
Patparganj
Industrial
Area
Show Room Workshop of
car (washing)
Establish
CTE
obtained on
17.06.2003
vide
consent no.
5820 valid
upto
01.06.2004
180
270
4080
RICHA GLOBAL
C-68/1, Ph-II, Okhla
Industrial Area
Okhla
Industrial
Area
Readymade Garment &
madeups without washing
Operate
CTE issued
on
20.03.2006
CTO applied on
28.11.2006
16.03.2009
Ask the unit to apply
for consent to establish,
file permission from
Central Ground Water
Authority for
extracting the ground
water and noise
monitoring report of
D.G.Set from
empanelled
laboratories of DPCC.
Call on 29.04.2009.
Letter issued.
Reply awaited.
16.03.2009
Ask the unit to apply
for consent to operate,
authorization under
HWM Rules, file
permission from
Central Ground Water
Authority for
extracting the ground
water and affidavit for
stack height / acoustic
enclosure with the
D.G. Set. Call on
29.04.2009.
Letter issued.
Reply awaited.
16.03.2009
SIT-II to inspect and
report. Call on
29.04.2009.
SIT-II report to be
discussed.
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
Call on
24.06.2009
with SIT-II
report.
181
273
1788
NEETA KATHURIA
31-A, DLF Najafgarh
Road Industrial Area
Kirti Nagar
Industrial
Area
cycle rim and buffing &
polishing and
electroplating.
Renewal
CTE issued
on 23.03.04
valid upto
05.02.05
CTO issued on
15.06.06 valid
upto 14.02.07.
Applied for
CTO-R on
07.12.07
Applied for
renewal of
autorisation on
28.06.06
16.03.2009
Ask the unit to file
permission from
Central Ground Water
Authority for
extracting the ground
water , adequacy report
from approved
laboratories of DPCC
and affidavit for non
installation of D.G. Set
and installation of
ECS. Call on
29.04.2009.
Letter issued on
15.04.09.
Reply awaited.
182
274
6152
AUTO CARE
Disst.Centre,Shivagi
Place,Najafgarh
Road,Rajouri Garden
N/A
Filling pump cum service
station(etc)
Establish
Applied on
28.02.07
__
__
16.03.2009
Ask the unit to apply
for Consent to Operate,
file permission from
Central Ground Water
Authority for
extracting the ground
water and affidavit for
installation of ETP.
Call on 29.04.2009.
Letter issued on
15.04.09.
Reply awaited.
183
275
4082
LALLY AUTOMOBILES
PVT LTD.
15-16,DSIDC
SHED,PHASEII,Okhla Industrial
Area
Okhla
Industrial
Area
Servicing of vechiles
Establish
CTE
applied on
12.04.2007
16.03.2009
Ask the unit to apply
for Consent to Operate,
file permission from
Central Ground Water
Authority for
extracting the ground
water and adequacy
report of ETP and
noise monitoring report
of D.G. Set from
empanelled consultants
/ approved laboratories
of DPCC. Call on
29.04.2009.
Letter issued.
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
Ask the unit to
apply
authorizaton
under HWM
Rules and full
compliance of
earlier CMC
decision. Call
on 24.06.2009
184
276
359
PARKASH INDUSTRIES
121, Phase-II, Badli
Industrial Easte
Badli
Industrial
Estate
Chrome Plated Bathroom
Fittings.
Establish
Applied for
CTE on
07.05.2008
vide I.D.
No. 25673
CTO (R)
refused on
23.05.2006
vide refusal no.
1141.
185
277
5857
RUBY TUESDAY (A
UNIT OF ROUND THE
CLOCK STORES LTD.)
M-48, Connaught
Place
N/A
Restaurant with 96 covers.
Establish
CTE issued
on 29.06.07
Applied for
CTO on
13.08.07
186
278
2437
S.K. TRADERS
A-50, Phase-I,
Mayapuri Industrial
Area
Mayapuri
Industrial
Area
REPAIR WORKSHOP &
SERVICING OF
AUTOMOBILES (TWO
WHEELERS).
Establish
CTE
applied on
17.10.2007
Applied for
authorization
on 07.05.2008
vide I.D. no.
4567.
16.03.2009
Ask the unit to submit
an affidavit for
installation of ETP and
stack height / acoustic
enclosure of D.G. Set.
Call on 29.04.2009.
Letter issued.
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision. Call
on 24.06.2009
16.03.2009
SIT-II to inspect and
report.Call on
29.04.2009.
SIT-II report to be
discussed.
16.03.2009
Ask the unit to apply
for Consent to Operate,
file permission from
Central Ground Water
Authority for
extracting the ground
water and adequacy
report of ETP from
empanelled consultants
of DPCC. Call on
29.04.2009.
Letter issued.
Reply awaited.
Consent to M/s
Ruby Tuesday
refused. Ask
the new unit
namely M/s
Sancho's
Restaurant to
appy for
Consent to
Establish
under Orange
category. Call
on 24.06.2009
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
187
279
6043
SAGAR VENTURES
22, Mother House,
Community Centre,
Yusuf Sarai
N/A
RESTRAINTS (48
SHEETS).
Renewal
CTO issued on
15.04.2004
CTO ( R)
applied on
19.09.2007
188
280
6107
YASHWANT PLACE
SERVICE STATION
Africa Avenue, Opp.
Chanakya Cinema
N/A
Filling Station cum service
station.
Renewal
__
189
281
4083
IGLOO INDIA PVT. LTD
51, DSIDC Shed,
Okhla Industrial Area,
Phase-1
Okhla
Industrial
Area
mfg. of split
Airconditionery and sheet
metal parts with powder
coating.
Establish
CTE
applied on
03.01.2008
CTO issued on
09.05.02 valid
upto 30.04.05.
CTO-R valid
upto 19.09.08.
CTO-R applied
on 24.11.08
Athorization
valid upto
16.08.08
Applied on
03.01.2008
16.03.2009
Ask the unit to apply
for Consent to
Establish, file
permission from
Central Ground Water
Authority for
extracting the ground
water and to install
flow meter device and
channelization system
for the kitchen
emissions. Call on
29.04.2009.
Letter issued.
Reply awaited.
16.03.2009
Ask the unit to apply
for authorization under
HWM Rules, noise
monitoring report of
D.G. Set from
approved laboratories
of DPCC and affidavit
for source of water
supply. Call on
29.04.2009.
16.03.2009
Ask the unit to file
permission from
Central Ground Water
Authority for
extracting the ground
water and adequacy
report from empanelled
consultants of DPCC
and noise monitoring
report of D.G. Set from
approved laboratories
of DPCC. Call on
29.04.2009.
Letter issued.
Reply awaited.
Letter issued to file
permission from
Central Ground Water
Authority for
extracting the ground
water and adequacy
report from empanelled
consultants of DPCC
and noise monitoring
report of D.G. Set from
approved laboratories
of DPCC..
Reply received stating
that there is no bore
well, no D.G. set and
for adequacy report
they are approaching
the consultant.
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
Issue final
reminder for
full
compliance of
earlier CMC
decision. Call
on 24.06.2009
Call for
personal
hearing on
12.06.2009 at
5.30 PM.
190
283
4555
STANDARD METAL
INDUSTRIES
E-8, S.M.A Industrial
Area, G.T. Karnal
Road
S.M.A
Industrial
Area
Mfg. of Door Fitting
Including Plating &
Buffing.
Renewal
191
284
531
AKHILESH CHANDRA
185, SEC-4, PKT-B,
DSIDC COMPLEX
Bawana Industrial
Area
Bawana
Industrial
Area
ELECTROPLATING
WITH JOB WORKS
Establish
192
285
4084
BOUTIQUE
INTERNATIONAL PVT.
LTD
D-14/1, Phase-II,
Okhla Industrial Area
Okhla
Industrial
Area
Mfg. of Readymade
Garments.
Establish
Two times
consent
Obtained CTO
(R) on
07.07.2006
vide consent
no. 16136 valid
upto
23.06.2008
Applied for
CTO (R) on
19.08.2008
vide I.D. No.
27004.
Applied for
renewal of
authorization
on 07.08.2006
vide I.D. no.
3189.
Applied for
CTE on
10.05.2007
vide I.D.No.
21289.
CTO applied on
21.06.2005
Applied on
11.08.2006
16.03.2009
Ask the unit to file
permission from
Central Ground Water
Authority for
extracting the ground
water and affidavit for
installation of
ETP/ECS and stack
height / acosutic
enclosure with the
D.G. Set. Call on
29.04.2009.
Letter issued.
Reply awaited.
16.03.2009
Ask the unit to file
permission from
Central Ground Water
Authority for
extracting the ground
water and affidavit for
installation of
ETP/ECS . Call on
29.04.2009.
Letter issued.
Reply awaited.
16.03.2009
Ask the unit to apply
for a fresh Consent to
operate, noise
monitoring report of
D.G. Set from
approved laboratories
of DPCC and affidvit
for source of water
supply. Call on
29.04.2009.
Letter issued to apply
for a fresh Consent to
operate, noise
monitoring report of
D.G. Set from
approved laboratories
of DPCC and affidvit
for source of water
supply.
Reply received stating
that they have applied
for noise monitoring
and water test report
and as they will get the
report they will apply
for CTO.
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
Issue final
reminder for
full
compliance of
earlier CMC
decision. Call
on 24.06.2009
193
194
286
287
4085
360
PUBLIC PRINTING
(DELHI) SERVICE
C-80, Phase-1, Okhla
Industrial Area
Okhla
Industrial
Area
printing
S.B. STEEL
S-58, PHASE-I, Badli
Industrial Estate
Badli
Industrial
Estate
pickling and Annealing &
reroling of S. S. Sheets.
Renewal
Establish
CTO issued on
20.06.2005
CTO ( R)
applied on
18.06.2008
Applied for
CTE on
20.09.2007
vide I.D.No.
23570.
Applied on
21.10.2004
Applied for
renewal of
authorization
on 20.07.2006
vide I.D. no.
2884.
16.03.2009
Ask the unit to apply
for Consent to
establish, noise
monitoring report of
D.G. Set from
approved laboratories
of DPCC , fresh
adequacy report of
ETP from empanelled
consultants of DPCC
and affidvit for source
of water supply.
16.03.2009
Ask the unit to file
permission from
Central Ground Water
Authority for
extracting the ground
water, submit fresh
adequacy report of
ECS from any of the
empanelled consultants
of DPCC and affidavit
for stack height /
acoustic enclosure with
the D.G. Set. Also ask
the unit to submit an
action plan for
stoppage of the activity
before 07.02.2010,
which falls under
negative list as per
MPD-2021 and an
action plan for new
proposed activity in
conformity with MPD2021 on the vacant plot
due to closure of
present activity. Call
on 29.04.2009
Letter issued.
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision. Call
on 24.06.2009
Letter issued on
21.04.09.
Reply received along
with affidavit for stack
height/ acoustic
enclsure with D.G. set
on 05.05.09 stating that
they have applied for
permission from
CGWA as soon as they
get the permission they
will submit the same,
they have submitted
the bank draft of Rs.
16000/- in favour of
Registrar GGSIPU for
adequacy/ ECS as soon
as they get the report
they will submit the
same, for stoppage of
the activity they said
that they will plan their
bussiness activity
depending upon the
prevailing
circumstances &
guidelines of the Govt.
of Delhi.
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
195
288
5858
SHANKAR
AUTOMOBILES
Bhai Veer Singh
Marg, Near Gole
Market
N/A
Filling station cum service
station.
Renewal
__
CTO issued on
07.03.01 valid
upto 18.02.04.
CTO-R valid
upto 27.04.07.
CTO-R applied
on 17.11.087.
Athorization
valid upto
27.03.08
196
289
362
SWIFT CHEMICAL
CORPORATION
S-56, Phase-I Badli
Industrial Estate
Badli
Industrial
Estate
Annealing & Pickling of S.
S. Sheets.
Establish
Applied for
CTE on
20.09.2007
vide I.D.No.
23585.
Applied for
CTO (R) on
03.07.2007
vide I.D. No.
22134.
Applied for
renewal of
authorization
on 18.07.2006
vide I.D. No.
2859.
16.03.2009
Ask the unit to apply
for renewal of
authorization under
HWM Rules, file
permission from
Central Ground Water
Authority for
extracting the ground
water, submit noise
monitoring report of
D.G. Set from
approved laboratories
of DPCC. Call on
29.04.2009.
16.03.2009
Ask the unit to file
permission from
Central Ground Water
Authority for
extracting the ground
water, submit fresh
adequacy report of
ECS from any of the
empanelled consultants
of DPCC and affidavit
for stack height /
acoustic enclosure with
the D.G. Set. Also ask
the unit to submit an
action plan for
stoppage of the activity
before 07.02.2010,
which falls under
negative list as per
MPD-2021 and an
action plan for new
proposed activity in
conformity with MPD2021 on the vacant plot
due to closure of
present activity. Call
on 29.04.2009
Letter issued on
15.04.09
Reply received
requesting 45 days
time compliance.
Time allowed
till 24.06.2009
for full
compliance.
Call on
24.06.2009
Letter issued.
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
197
290
3290
A.J. EXPORTS (P) LTD
G-1024, DSIDC,
NARELA
INDUSTRIAL AREA
Narela
Industrial
Area
Mfg. of Wire Drawing with
pickling.
Establish
Applied for
CTE on
07.03.2008
vide I.D.
No. 25105
CTO refused on
30.06.2006
vide refusal no.
1195.
Applied for
authorization
on 07.03.2008
vide I.D. No.
4505.
16.03.2009
Ask the unit to apply
for a fresh consent to
operate and file
permission from
Central Ground Water
Authority for
extracting the ground
water. Call on
29.04.2009.
Letter issued.
Reply awaited.
198
291
2166
BAJAJ MOTORS
T-5/242, PH-I,
Mangolpuri Industrial
Area
Mangolpuri
Industrial
Area
Servicing of Vehicles
Renewal
CTE not
obtained.
Applied for
CTO (R) on
22.06.2007
vide I.D.No.
21945.
Authorization
granted on
28.11.2006
vide I.D. No.
1916.
16.03.2009
Ask the unit to apply
for consent to establish
and affidavit for source
of water supply. Call
on 29.04.2009.
Letter issued.
Reply awaited.
199
293
4086
JANEX
X-2, Ph-II,Okhla
Industrial Area
Okhla
Industrial
Area
mfg. & Export of
Handicraft and jewelries
item with plating.
Operate
CTE issued
on
17.10.2006
CTO applied on
26.09.2007
Applied on
26.09.2007
16.03.2009
Ask the unit to file
permission from
Central Ground Water
Authority for
extracting the ground
water and noise
monitoring report of
D.G.Set from
empanelled
laboratories of DPCC.
Call on 29.04.2009.
Letter issued to file
permission from
Central Ground Water
Authority for
extracting the ground
water and noise
monitoring report of
D.G.Set from
empanelled
laboratories of DPCC.
Reply received and
requested for time to
submit the compliance.
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
Issue final
reminder for
full
compliance of
earlier CMC
decision. Call
on 24.06.2009
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
200
295
6108
BIKANER SWEET SHOP
1/2695, DB Gupta
Road, Karol Bagh
N/A
Preparation and sale of
Indian and fast fods in the
restaurant with seating
capacity for 80(eighty)
Person
Operate
__
Applied for
CTO on
28.11.05.
201
296
1789
PETER(S) INDIA P. LTD
5/26, Kirti Nagar
Industrial Area
Kirti Nagar
Industrial
Area
Offset Printing.
Renewal
__
CTO issued on
26.11.08 valid
upto 24.06.04.
CTO-R valid
upto 24.06.07.
Applied for
CTO-R on
22.06.07.
Applied for
renewal on
08.08.06
351 F.I.E. Patparganj
Industrial Area
Patparganj
Industrial
Area
Silver plating on handicraft
Brassware items.
Obtained CTO
(R) on
23.11.2005
vide consent
no. 13399 valid
upto
04.07.2007
Applied for
CTO (R) on
18.01.2008
vide I.D. No.
24787.
Applied for
renewal of
authorization
on 18.08.2006
vide I.D. No.
3344.
202
297
4430
WHORRA
ENTERPRISES
Renewal
CTE not
obtained.
16.03.2009
Ask the unit to apply
for consent to establish,
a fresh consent to
operate , file
permission from
Central Ground Water
Authority for
extracting the ground
water and affidavit for
non installation of D.G.
Set. Also ask the unit
to install flow
measuring device and
channelization system
for the kitchen
emissions. Call on
29.04.2009.
16.03.2009
Ask the unit to file
permission from
Central Ground Water
Authority for
extracting the ground
water and fresh
adequacy report of
ETP from approved
consultants of DPCC.
Call on 29.04.2009.
20.03.2009
Ask the unit to file
permission from
Central Ground Water
Authority for
extracting the ground
water and submit
affidavit for stack
height / acoustic
enclosure with the
D.G. Set. Call on
29.04.2009.
Letter issued on
15.04..09
Reply received seeking
time till end of may for
compliance.
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
Letter issued on
15.04.09
Reply received
alongwith CGWA
permission and stating
unit has applied for
Adequacy report of
ETP.
Issue final
reminder for
full
compliance of
earlier CMC
decision. Call
on 24.06.2009
Letter issued on
20.03.09.
Reply received on
30.04.09 stating that
they are registered with
the CGWA under
registration no.
DLOFCT/21683 Type
borewell and they
submit a affidavit for
removal of D.G. Set.
Issue renewal
of consent.
Call on
24.06.2009
203
298
4087
YAATRI
B-159, Phase-I, Okhla
Industrial Area
Okhla
Industrial
Area
Readymade Garments
(with washing).
Establish
CTE
applied on
11.06.2008
204
299
5813
DASHMESH
AUTOMOBILES(UNITII)
Plot no-7,Local
shopping
center,Gazipur
N/A
Automobile repairing &
servicing including
washing and painting.
Establish
CTE
refused on
27.06.2007
vide refusal
no. 1622.
205
300
4088
M.R. UTILITY
PRODUCTS PVT. LTD.
E-46/6, Ph-II, Okhla
Industrial Area
Okhla
Industrial
Area
Electroplating
Establish
CTE issued
on
12.08.2004
CTE
applied on
21.11.2007
Applied on
11.06.2008
CTO issued on
08.09.2004
CTO ( R)
applied on
13.07.2006
Applied on
16.05.2005
20.03.2009
Ask the unit to submit
affidavit for source of
water supply, adequacy
report of ETP from any
of the empanelled
consultants of DPCC
and noise monitoring
report of the D.G.Set
from approved
laboratories of DPCC.
Call on 29.04.2009.
Letter issuedto submit
affidavit for source of
water supply, adequacy
report of ETP from any
of the empanelled
consultants of DPCC
and noise monitoring
report of the D.G.Set
from approved
laboratories of DPCC..
Reply received stating
that they have applied
for noise monitoring
report. Also, unit has
submitted an affidavit
stating that they are not
using any ground water
and submitted
adequacy report.
Ask the unit to
file accurate
adequacy
report from
empanelled
consultant of
DPCC and
noise
monitoring
report of D.G.
Set from
approved
laboratory of
DPCC. Call on
24.06.2009
20.03.2009
Trainee, CMC-II to
inspect and report. Call
on 29.04.2009
Inspection carried out
and found that the unit
has closed its
operations and the
premises is lying
vacant.
No action.
20.03.2009
Ask the unit to submit
affidavit for source of
water supply, adequacy
report of ETP from any
of the empanelled
consultants of DPCC
and noise monitoring
report of the D.G.Set
from approved
laboratories of DPCC.
Call on 29.04.2009.
Letter issued.
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision. Call
on 24.06.2009
206
301
5
COSMO PLATER PVT.
LTD.
3/31, Anand Parbat
Industrial Area
Anand
Parbat
Industrial
Area
Electroplating & Anodizing
(Job work)
Renewal
207
302
2438
JASMINE GRAPHICS
A-42, 3rd Floor, Gate
No.4, Ph-II, Mayapuri
Industrial Area
Mayapuri
Industrial
Area
Dyeing of suit salwar &
Dupattas.
Renewal
208
304
532
KHANDELWAL
INDUSTRIES
Plot No. -151, PocketE, Sector-4, DSIDC
Industrial Complex
Bawana Industrial
Area
Bawana
Industrial
Area
Mfg of assembling of
electrical home appliances
with buffing & plating
Establish
___
Applied for
CTE on
10.05.2007
vide I.D.No.
21290.
CTO valid upto
02.07.05. CTOR
applied01.07.05
again applied
for CTO-R on
21.08.08.
Applied for
renewal of
Authorization
on 14.07.06
20.03.2009
Ask the unit to apply
for Consent to
Establish and affidavit
about source of water
supply. Call on
29.04.2009.
Letter issued on
17.04.09
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision. Call
on 24.06.2009
CTO issued on
02.08.2004
CTO ( R)
applied on
20.02.2008
Applied on
27.11.2006
Renewal
20.03.2009
Ask the unit to apply
for Consent to
Establish, file
permission from
Central Ground Water
Authority for
extracting the ground
water and adequacy
report of ETP from any
of the empanelled
consultants of DPCC.
Call on 29.04.2009.
Letter issued.
Reply awaited.
20.03.2009
Ask the unit to apply
for authorization under
HWM Rules, file
permission from
Central Ground Water
Authority for
extracting the ground
water and submit
affidavit for installation
of ETP/ECS. Call on
29.04.2009.
Letter issued.
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
209
305
5890
MOTOR CENTRE
Mall Road. Opp.
Alpana Cinema,
Model Town
N/A
Servicing of Automobiles.
Establish
CTE
obtained on
26.03.2008
vide
consent no.
18472 valid
upto
25.03.2009
210
306
3291
NU-LITE INDUSTRIES
(INDIA)
Plot no.-F-1898,
DSIDC industrial
Complex narela
Narela
Industrial
Area
Mfg. of hardware goods
with electroplating.
Establish
Applied for
CTE on
11.03.2008
vide I.D.
No. 25146
CTO obtained
on 30.07.2003
vide consent
no. 6921 valid
upto
15.04.2006.
Authorization
granted on
02.06.2008
vide no. 2024.
20.03.2009
Ask the unit to submit
affidavit for source of
water supply, adequacy
report of ETP from any
of the empanelled
consultants of DPCC
and noise monitoring
report of the D.G.Set
from approved
laboratories of DPCC.
Call on 29.04.2009.
Letter issued on
17.04.09.
Reply received along
with copy of
permission from
CGWA , Adequacy
report of ETP plant
issued by GGSIPU &
noise monitoring report
of the D.G. set issued
by DPCC lab on
04.05.09
Issue renewal
of consent and
authorization
under HWM
Rules. Call on
24.06.2009
20.03.2009
Ask the unit to apply
for authorization under
HWM Rules, file
permission from
Central Ground Water
Authority for
extracting the ground
water and submit
affidavit for installation
of ETP. Call on
29.04.2009.
Letter issued.
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
211
212
307
308
4090
1210
POWDER COATERS
SHIVA MOTORS
B-197, Phase-I, Okhla
Industrial Area
Okhla
Industrial
Area
Powder COATING.
PLOT NO. 1/536-A,
FRIENDS COLONY
INDUSTRIAL AREA
JHILMIL TAHIRPUR
G. T. ROAD
SHAHDRA
Friends
Colony
Industrial
Area
Auto moriles service &
repair workshop (Motor
cycle etc)
Establish
Establish
CTE
applied on
22.02.2008
CTE
applied on
13.12.2007
CTO applied on
24.08.2004
Applied on
05.10.2006
Renewal
20.03.2009
Ask the unit to apply
for consent to operate,
submit affidavit for
source of water supply,
adequacy report of
ETP from any of the
empanelled consultants
of DPCC and noise
monitoring report of
the D.G.Set from
approved laboratories
of DPCC. Also ask the
unit to provide acoustic
enclossure with the
D.G. Set. Call on
29.04.2009.
20.03.2009
Ask the unit to apply
for Consent to Operate,
submit permission
from Central Ground
Water Authority for
extracting the ground
water, adequacy report
of ETP from any of the
empanelled consultants
of DPCC and noise
monitoring report of
the D.G.Set from
approved laboratories
of DPCC. Call on
29.04.2009.
Letter issued to apply
for consent to operate,
submit affidavit for
source of water supply,
adequacy report of
ETP from any of the
empanelled consultants
of DPCC and noise
monitoring report of
the D.G.Set from
approved laboratories
of DPCC. Also ask the
unit to provide acoustic
enclossure with the
D.G. Set.
Reply received stating
that they have applied
for noise monitoring
report and adequacy
report and request for
some time to submit
the compliance report.
Ask the unit to
file proper
signed
affidavit and
full
compliance of
earlier CMC
decision. Call
on 24.06.2009
Letter issued.
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
213
309
533
VISHWASH AUTO
MOBILES INDIA
Plot No.-84, PocketG, Sector-1, DSIDC
Industrial Complex,
Bawana Industrial
Area
Bawana
Industrial
Area
Mfg. of Auto Parts With
Electroplating.
Establish
Applied for
CTE on
21.07.2008
vide I.D.
No. 26613.
Applied for
authorization
on 21.07.2008
vide I.D. No.
4643.
214
310
6045
AUTOCENTRE
D-Block Defence
Colony
N/A
Petrol Pump cum Service
Station.
Renewal
CTO applied on
05.03.2008
215
312
2439
D.K. TRADERS
C-198, PH-II,
Mayapuri Industrial
Area
Mayapuri
Industrial
Area
Manufacturing of Refined
paraffin wax, compound
wax and candles.
Renewal
CTO issued on
23.07.2002
CTO ( R)
applied on
24.08.2005
20.03.2009
Ask the unit to file
permission from
Central Ground Water
Authority for
extracting the ground
water and submit
affidavit for installation
of ETP. Call on
29.04.2009.
Letter issued.
Reply awaited.
20.03.2009
Ask the unit to submit
affidavit about source
of water supply. Call
on 29.04.2009.
Letter issued.
Reply awaited.
20.03.2009
Ask the unit to apply
for Consent to
Establish, fresh
renewal of consent,
submit permission
from Central Ground
Water Authority for
extracting the ground
water and noise
monitoring report of
the D.G.Set from
approved laboratories
of DPCC. Call on
29.04.2009.
Letter issued to apply
for Consent to
Establish, fresh
renewal of consent,
submit permission
from Central Ground
Water Authority for
extracting the ground
water and noise
monitoring report of
the D.G.Set from
approved laboratories
of DPCC. .
Reply received stating
that they have applied
for noise monitoring
report of D.G Set and
have applied for
Consent.
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
Issue final
reminder for
full
compliance of
earlier CMC
decision. Call
on 24.06.2009
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
216
217
218
313
314
315
6109
5047
2440
DELHI TRANSPORT
CORPORATION
Ghuman Hera Depot
GPS SENSORS &
INDICATORS (P) LTD.
K-14, Udyog Nagar
Industrial area
METAL FORGINGS
B-1, B-17, Mayapuri
Industrial Area , Ph-I
N/A
Repair & Maintenance of
Buses.
Establish
Udyog
Nagar
Industrial
area
Mfg. of electronic
Indicators and load Cells
Operate
Mayapuri
Industrial
Area
Manufacturing of
automobile parts and
engineering goods.
Operate
20.03.2009
Ask the unit to apply
for authorization under
HWM Rules and file
permission from
Central Ground Water
Authority for
extracting the ground
water. Call on
29.04.2009.
CTE issued
on 07.07.06
valid upto
06.07.07
Applied for
CTO on
31.01.08
CTO applied on
12.04.2007
Applied on
31.01.08
20.03.2009
Ask the unit to file
permission from
Central Ground Water
Authority for
extracting the ground
water. Call on
29.04.2009.
20.03.2009
Ask the unit to apply
for consent to establish,
submit affidavit for
source of water supply
and noise monitoring
report of the D.G.Set
from an approved
laboratory of DPCC.
Call on 29.04.2009.
Letter issued.
Reply awaited.
Letter issued on
17.04.09
Reply awaited.
Letter issued to apply
for consent to establish,
submit affidavit for
source of water supply
and noise monitoring
report of the D.G.Set
from an approved
laboratory of DPCC..
Reply received stating
that they have applied
for renewal and unit
has submit an affidavit
for source of water
supply and applied for
getting noise
monitoring report.
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
Issue final
reminder for
full
compliance of
earlier CMC
decision. Call
on 24.06.2009
Issue final
reminder for
full
compliance of
earlier CMC
decision. Call
on 24.06.2009
219
316
5892
PRAG DISTILED
WATER ICE FACTORY
AND PRAG COLD
STORAGE
3754-XII, Old Subzi
Mandi
N/A
Ice manufacturing and
Cold Storage.
Renewal
Two times
consent
220
319
2441
SANYA MOTORS
C-101, Mayapuri
Industrial Area,
Phase-II
Mayapuri
Industrial
Area
Showroom Cum Service
Station
Renewal
CTE issued
on
07.03.2003
221
320
1941
Am Automobiles (A Unit
of Blue Bird Enterprises
PVT. LTD)
Plot No. 189-91
Lawrence Road
Industrial Area
Lawrence
Road
Industrial
Area
Automobiles servic Center
with washing Denting and
painting & Repairing
Establish
CTE
obtained on
13.08.2008
vide
consent no.
18725 valid
upto
12.08.2009
CTO (R)
obtained on
15.11.2006
vide consent
no. 17627 valid
upto
15.07.2008.
Applied for
CTO (R) on
07.07.2008
vide I.D. No.
26343.
CTO issued on
18.01.2005
CTO ( R)
applied on
17.11.2008
20.03.2009
Ask the unit to submit
an affidavit regarding
correct information
about the source of
water supply and its
consumption. Call on
29.04.2009
Letter issued.
Reply received on
30.04.2009 along with
affidavit.
Call for
personal
hearing on
12.06.2009 at
5.45 PM.
Applied on
17.11.2007
Renewal
20.03.2009
Ask the unit to file
permission from
Central Ground Water
Authority for
extracting the ground
water, adequacy report
of ETP from any of the
empanelled consultants
of DPCC and affidavit
for non installation of
D.G.Set. Call on
29.04.2009.
Letter issued.
Reply awaited.
Time allowed
for full
compliance.
Call on
24.06.2009
Applied for
authorization
on 07.04.2008
vide I.D. No.
4542.
20.03.2009
Ask the unit to apply
for consent to operate.
Call on 29.04.2009
Letter issued.
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision. Call
on 24.06.2009
222
321
534
BAJRANG
ELECTROPLATORS
Plot No.220, Pkt-I,
Sec-5, DSIDC
Complex, Bawana
Industrial Area
Bawana
Industrial
Area
Electriplating
Establish
CTE
obtained on
27.03.2006
vide
consent no.
13891 valid
upto
26.03.2007
223
322
1496
Choprasons
Plot No B-73, GTK
Road Industrial Area
G.T.
Karnal
Road
Industrial
Area
Car service centre
Establish
Applied for
CTE on
10.07.2007
vide I.D.
No. 22277.
224
323
535
HIMSHEEL
INTERNATIONAL
Plot No.31, Pkt-N,
Sec-3, DSIDC,
Bawana Industrial
Area
Bawana
Industrial
Area
Automobiles showroom
cum service centre
(Repairing, painting,
denting, servicing)
Establish
Applied for
CTE on
16.01.2007
vide I.D No.
20468
20.03.2009
Ask the unit to apply
for authorization under
HWM Rules, file
permission from
Central Ground Water
Authority for
extracting the ground
water and submit
affidavit for installation
of ETP. Call on
29.04.2009.
20.03.2009
Ask the unit to apply
for authorization under
HWM Rules, file
permission from
Central Ground Water
Authority for
extracting the ground
water and affidavit for
installation of ETP and
for non installation of
D.G.Set. Call on
29.04.2009.
Letter issued on
17.04.09.
Reply received on
05.05.09 stating that
they are not engaging
in any activity at
present and when they
will start their unit they
will install ETP plant.
Issue SCN for
closure. Call
on 24.06.2009
Letter issued.
Reply awaited.
20.03.2009
Ask the unit to apply
for authorization under
HWM Rules, file
permission from
Central Ground Water
Authority for
extracting the ground
water and affidavit for
installation of ETP and
for non installation of
D.G.Set. Also ask the
unit to provide
information about
painting booth and
suction arrangement.
Call on 29.04.2009.
Letter issued on
19.04.09.
Reply received on
01.05.09 stating that
they need 2 months
time so that they can
collect all relevant
documents from
different concerned
department.
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
Time allowed
for full
compliance.
Call on
24.06.2009
225
324
4556
M.G. AUTOSALES
E-18,S.M.A. Idustiral
area
S.M.A
Industrial
Area
Automobiles Service
Centre with washing
denting and painting
Establish
Applied for
CTE on
17.12.2007
vide I.D.
No. 24509.
226
325
1624
RAJINDRA MOTORS
A-17, DSIDC, Jhilmil
Industrial Area,
Shahdara
Jhilmil
Industrial
Area
Servicing & Washing of
Two Wheelers.
Establish
CTE
applied on
27.03.2008
20.03.2009
Ask the unit to apply
for authorization under
HWM Rules, file
permission from
Central Ground Water
Authority for
extracting the ground
water and affidavit for
installation of ETP and
for non installation of
D.G.Set. Also ask the
unit to provide
information about
painting booth and
suction arrangement.
Call on 29.04.2009.
20.03.2009
Ask the unit to file
permission from
Central Ground Water
Authority for
extracting the ground
water and adequacy
report of ETP from any
of the empanelled
consultants of DPCC.
Call on 29.04.2009.
Letter issued on
17.04.09.
Reply received along
with affidavit on
04.05.09 stating that
they are not extracting
ground water , only
purchase water is used,
ETP has been
provided, they will
apply consent to
operate application as
soon as they get the
adequacy report . At
present there is no D.G.
set & if installed in
future then acoustic
enclosures shall be
provided wtih adequate
stack height, there is no
paint booth at present.
Ask the unit to
file affidavit
stating that
ground water
is not being
extracted. Call
on 24.06.2009
Letter issued.
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
227
326
536
SHARP GRAVURE CO.
Plot No 10, Sect-J,
Pocket-I, Bawana
Industrial Area
Bawana
Industrial
Area
Engg. Works &
Electroplating
Establish
Applied for
CTE on
29.12.2006
vide I.D.
No. 20324.
228
328
6153
VAIBHAV FILLING
STATION
A. Block, Community
Centre, Vikaspuri
N/A
Petrol Pump Cum Service
station.
Renewal
__
229
329
1497
GAY SERVICE
STATION
G.T. Karnal Road
Industrial Area, Opp.
Hans Cinema,
Azadpur
G.T.
Karnal
Road
Industrial
Area
Mechanical repair and
servicing of vehicles (car
washing).
Establish
Applied for
CTE on
15.04.2008
vide I.D.
No. 25493.
CTO issued on
24.08.04 valid
upto 24.07.05.
Applied for
CTO-R on
18.07.05.
Again applied
for CTO-R on
07.08.08
20.03.2009
Ask the unit to apply
for authorization under
HWM Rules, file
permission from
Central Ground Water
Authority for
extracting the ground
water and affidavit for
installation of ETP and
for non installation of
D.G.Set. Call on
29.04.2009.
Letter issued.
The same is returned
back undelievered.
Paste the letter
on the
premises. Call
on 24.06.2009
Applied for
Authorization
on 28.09.06
20.03.2009
Ask the unit to apply
for Consent to
Establish and file
permission from
Central Ground Water
Authority for
extracting the ground
water. Also ask the unit
to install flow
measuring device. Call
on 29.04.2009.
Letter issued on
17.04.09
Reply awaited.
Applied for
authorization
on 15.04.2008
vide I.D.No.
4547.
20.03.2009
Ask the unit to file
permission from
Central Ground Water
Authority for
extracting the ground
water, affidavit for
installation of ETP and
for stack height &
acoustic enclosure of
D.G. Set. Call on
29.04.2009.
Letter issued.
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
230
331
5859
MOTI MAHAL DELUX
(A UNIT OF I.N.SHROFF
ENTERPRISES)
20/48M MALCHA
MARG ,
DIPLOMATIC
ENCLAVE ,
CHANAKYA PURI
N/A
Restaurant
Renewal
231
332
1625
PLAST TECH (INDIA)
B-40, Jhilmil
Industrial Area GT
Road Shahdara
N/A
Electroplating
Renewal
__
CTO issued on
22.04.04, valid
upto 28.03.07.
Applied for
CTO-R on
26.03.07
CTO obtained
on 29.06.2004.
Applied for
renewal on
15.10.2007
__
20.03.2009
Ask the unit to apply
for consent to establish,
submit affidavit for
source of water supply,
information about
seating capacity of the
restaurant and
adequacy report from
any of the empanelled
consultants of DPCC.
Call on 29.04.2009.
Letter issued on
17.04.09
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision. Call
on 24.06.2009
20.03.2009
Ask the unit to apply
for consent to establish,
submit affidavit for
source of water supply
and adequacy report of
ETP from any of the
empanelled consultants
of DPCC. Call on
29.04.2009.
Letter issued to apply
for consent to establish,
submit affidavit for
source of water supply
and adequacy report of
ETP from any of the
empanelled consultants
of DPCC..
Reply received that
they have applied for
CTE, thay are not any
ground water and will
submit the adequacy
report in due course of
time.
Issue final
reminder for
full
compliance of
earlier CMC
decision. Call
on 24.06.2009
232
333
4431
SHAH NAMKEEN
283, FIE Patparganj
Industrial Area
Patparganj
Industrial
Area
Mfg. of Namkeens.
Renewal
233
334
2870
SINGH SONS
ELECTROPLATING
WORKS
70 Rama Road,
Shivaji Marg
Najafgarh
Road
Industrial
Area
Electroplating.
Renewal
234
335
5860
VOLGA RESTAURANT
19-B, Connaught
Place
N/A
Restaurant
Renewal
Applied for
CTE on
0.05.2009
vide I.D.
No. 29800
CTO obtained
on 26.10.2004
vide consent
no. 11998 valid
upto
03.10.2007.
Applied for
CTO (R) on
11.12.2007
vide I.D. No.
24455.
CTO issued on
30.12.03 valid
upto 24.07.05.
CTO-R valid
upto 24.07.08.
Applied for
CTO-R on
23.07.08
__
CTO issued on
01.05.06, valid
upto 20.04.07.
Applied for
renewal on
19.03.07.
20.03.2009
Ask the unit to apply
for Consent to
Establish, file
permission from
Central Ground Water
Authority for
extracting the ground
water and affidavit for
installation of oil &
grease trap and hood
and suction
arrangement. Call on
29.04.2009.
Applied for
renewal on
18.08.08
20.03.2009
Ask the unit to file
permission from
Central Ground Water
Authority for
extracting the ground
water. Call on
29.04.2009.
20.03.2009
Ask the unit to apply
for Consent to
Establish and file
permission from
Central Ground Water
Authority for
extracting the ground
water. Call on
29.04.2009.
Letter issued on
13.04.09.
Reply received along
with copy of
permission from
CGWA on 06.05.09
stating that they are
applying for consent to
establish & they use
corporation water in
process , they have
provided the oil &
Grease trap for the
generation of Effluent
and Hood & suction
arrangement for air
freshness.
Letter issued on
17.04.09
Reply areceived stating
that the existing
industry doesnot come
under the perview of
obtaining Ground
Water Clearaance from
CGWA.
(Letter from CGWA
enclosed).
Letter issued on
17.04.09
Reply areceived stating
that the existing
industry doesnot come
under the perview of
obtaining Ground
Water Clearaance from
CGWA.
(Letter from CGWA
enclosed).
SIT-I to
inspect and
report. Call
on 24.06.2009
Ask the unit to
file permission
from DJB for
ground water
extraction as
per new
orders. Call on
24.06.2009
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
235
336
4395
NEW WOOL MOORES
SPORTS
E-123, Phase-III,
Okhla Industrial
Estate
Okhla
Industrial
Estate
236
337
4092
ORIENTAL
AUTOMOBILE
Y-34, Phase-II, Okhla
Industrial Area
Okhla
Industrial
Area
237
338
5967
AJANTA ESPRESSO
BAR
8-UB, Bunglow Road
N/A
Washing of Cotton Quits
Bed Spreads Cushion
Covers.
EATING HOUSE
Renewal
CTO obtained
on 06.07.2002.
CTR obtained
on 06.07.2005.
Applied for
renewal on
04.07.2008.
20.03.2009
Ask the unit to file
permission from
Central Ground Water
Authority for
extracting the ground
water. Call on
29.04.2009.
Letter issued to file
permission from
Central Ground Water
Authority for
extracting the ground
water..
Reply received and
unit has requested for
time to submit the
same.
Time allowed
till 24.06.2009
for full
compliance.
Call on
24.06.2009
Operate
20.03.2009
Ask the unit to apply
for consent to operate,
authorization under
HWM Rules, submit
affidavit for source of
water supply and
adequacy report of
ETP from any of the
empanelled consultants
of DPCC. Call on
29.04.2009.
Letter issued.
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision. Call
on 24.06.2009
Operate
20.03.2009
Ask the unit to apply
for consent to establish,
consent to operate, file
permission from
Central Ground Water
Authority for
extracting the ground
water and affidavit for
installation of oil &
grease trap and hood
and suction
arrangement. Call on
29.04.2009.
Letter issued.
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
238
339
2871
APEX SHOES CO. PVT.
LTD.
70 Rama Road, (16B), Najafgarh Road
Industrial Area
Najafgarh
Road
Industrial
Area
Manufacturing Of PVC
Compound.
Operate
239
340
3092
ASIATIC ELECTRONIC
INDUSTRIES
A-58, Naraina
Industrial Area Phase
-I
Naraina
Industrial
Area Phase
-I
mfg
Renewal
240
342
2167
FLORA ELECTRICAL
INDUSTRIES (REGD.)
A-104, Mangolpuri
Industrial Area PhaseII
Mangolpuri
Industrial
Area
Electrical goods like main
switches & main switch
boxes with phosphating &
electroplating
Establish
CTE issued
on 31.09.04
valid upto
16.08.05,
again CTE
issued valid
upto
04.11.07
Applied for
CTE on
12.02.2008
vide I.D.
No. 24922.
applied for
CTO on
26.02.07.
20.03.2009
Ask the unit to submit
an affidavit about
source of water supply.
Call on 29.04.2009.
Letter issued on
17.04.09.
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision. Call
on 24.06.2009
CTR obtained
on 05.05.2006.
Appled for
renewal
on27.12.2006
20.03.2009
Ask the unit to submit
permission from
Central Ground Water
Authority for
extracting the ground
water and noise
monitoring report of
the D.G.Set from
approved laboratories
of DPCC. Call on
29.04.2009.
Letter issued to submit
permission from
Central Ground Water
Authority for
extracting the ground
water and noise
monitoring report of
the D.G.Set from
approved laboratories
of DPCC. .
Reply received stating
that they are not using
any ground water and
submitted the noise
monitoring report.
Ask the unit to
install flow
measuring
device with
STP and to file
permission
from DJB for
ground water
extraction as
per new
orders. Call on
24.06.2009
20.03.2009
Ask the unit to submit
permission from
Central Ground Water
Authority for
extracting the ground
water, affidavit for
stack height & acoustic
enclosure of D.G. Set
and adequacy report of
ETP from any of the
empanelled consultants
of DPCC. Call on
29.04.2009.
Letter issued.
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
CTO (R)
obtained on
22.11.2005
vide consent
no. 13377 valid
upto
05.04.2008
Applied for
renewal of
authorization
on 01.09.2006
vide I.D. No.
3520.
241
242
343
345
3093
537
MAYUR PRINT HOUSE
SHRI GURUNANAK
PLASTIC INDUSTRIES.
A-29/1, Naraina
Industrial Area Phase
-I
Naraina
Industrial
Area Phase
-I
Offset Printing inecuding
washing of plates
Operate
Plot No-4,PocketN,Sec-5,DSIDC Indl
Complex,Bawana
Industrial Area
Bawana
Industrial
Area
Mfg of PVC/plastic goods
with injection moulding
machine,rubber
goods,electrical goods &
engg works
Establish
CTO obtained
on 12.10.2004.
Applied for
renewal on
11.07.2006.
Applied for
CTE on
06.02.2007
vide I.D.
No. 20588
20.03.2009
Ask the unit to apply
for consent to establish,
submit permission
from Central Ground
Water Authority for
extracting the ground
water and adequacy
report of ETP from any
of the empanelled
consultants of DPCC.
Call on 29.04.2009.
20.03.2009
Ask the unit to submit
permission from
Central Ground Water
Authority for
extracting the ground
water, manufacturing
process with flow chart
and information about
hood and suction
device for rubber
goods. Call on
29.04.2009.
Letter issued.
Reply awaited.
Letter issued.
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
243
346
1626
VEEKAY GENERAL
INDUSTRIES
B-46 , Jhilmil
Industrial Area
Jhilmil
Industrial
Area
Mfg of copper catenary
wire and grooved copper
conductor.
Renewal
CTO obtained
on 13.12.2002.
Applied for
renewal on
12.12.2005.
Again applied
for renewal on
05.01.2009.
20.03.2009
SIT-II to inspect and
report. Call on
29.04.2009
SIT-II report to be
discussed.
The following
deficiencies
observed
during the
inspection by
SIT :(i) Stack
height of D.G.
Set of 200
KVA needs to
be raised.
(ii) Oil spillage
observed
within site. Oil
storage area
needs to be
maintained
properly to
avoid oil
spillage. Spent
oil / used oil /
fresh oil to be
stored and
managed as
per HWM
Rules.
(iii) One
borwell exists
at site for
which
permission
from DJB is
required as per
new orders.
Ask the unit to
correct the
above
deficiencies
and submit an
affidavit in this
regard. Call on
24.06.2009.
244
347
4093
VIBHA PRESS PVT.
LTD
C-66/3, Ph-II, Okhla
Industrial Area
Okhla Indl.
Area
Offset Printing inecuding
washing of plates & ink
rollers
Operate
245
348
365
VINEET & COMPANY
B-1, PH-I, Badli
Industrial Estate
Badli
Industrial
Estate
Copper/Copper
Alloy/Brass ingots (Casting
only).
Renewal
246
349
4396
LUXOR PEN COMPANY
229, Phase-III, Okhla
Industrial Estate
Okhla Indl.
Estate
Industrial.
Renewal
247
350
538
S.G. BEVERAGES
PLOT NO. 1,
SECTOR-5,
POCKET-G, DSIDC
INDUSTRIAL AREA
Bawana Industrial
Area
Bawana
Industrial
Area
Packing of drinking water
carbonated water and mfg.
of pet plastic bottles.
Operate
CTO obtained
on 12.08.2004.
Applied for
renewal on
05.12.2007.
Two times
consent
CTE
obtained on
17.08.2006
vide
consent no.
16429 valid
upto
16.08.2007
CTO (R)
obtained on
14.06.2006
vide consent
no. 15160 valid
upto
10.05.2008.
Applied for
CTO (R) on
17.06.2008
vide I.D. No.
26089.
CTO obtained
on 08.11.2002.
CTR obtained
on 07.11.2005.
Applied for
renewal
25.11.2008.
Applied for
CTO on
23.11.2007
vide I.D. No.
24303.
Applied for
authorization
on 01.08.2006
vide I.D. No.
3039.
Letter issued.
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision. Call
on 24.06.2009
SIT-II report to be
discussed.
Consent
refused. Call
on 24.06.2009
20.03.2009
SIT-II to inspect and
report. Call on
29.04.2009
SIT-II report to be
discussed.
Call on
24.06.2009
with SIT-II
report.
20.03.2009
SIT-II to inspect and
report. Call on
29.04.2009
SIT-II report to be
discussed.
Call on
24.06.2009
with SIT-II
report.
20.03.2009
Ask the unit to apply
for consent to establish,
submit affidavit for
source of water supply
and adequacy report of
ETP from any of the
empanelled consultants
of DPCC. Call on
29.04.2009.
20.03.2009
SIT-II to inspect and
report. Call on
29.04.2009
248
351
3094
TARUN ELECTRONICS
C-171, Naraina
Industrial Area Phase
-I
Naraina
Industrial
Area Phase
-I
Mfg. of electronics
components with
electroplating.
Renewal
CTR obtained
on 27.04.2005.
Applied for
renewal on
21.05.2008.
20.03.2009
Ask the unit to file
permission from
Central Ground Water
Authority for
extracting the ground
water. Call on
29.04.2009.
Letter issued to file
permission from
Central Ground Water
Authority for
extracting the ground
water..
Reply received wherein
unit has mentioned that
they have registered
with CGWA.
Issue renewal
of consent.
Call on
24.06.2009
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
249
352
3292
GURU NANAK CYCLE
INDUSTRIES
I-2066, Narela
Industrial Area
Narela
Industrial
Area
Mfg Of Spokes (with
electroplating)
Operate
Applied for
CTO on
30.01.2006
vide I.D. No.
17609.
20.03.2009
Ask the unit to apply
for authorization under
HWM Rules and file
permission from
Central Ground Water
Authority for
extracting the ground
water. Call on
29.04.2009.
Letter issued.
Reply awaited.
250
353
2442
METAL COADING
A-34, PhaseII,Mayapuri Industrial
Area
Mayapuri
Industrial
Area
Electroplating Job Work
Operate
CTR obtained
on 17.07.2003.
Applied for
renewal on
11.07.2006.
20.03.2009
Ask the unit to apply
for consent to establish,
authorization under
HWM Rules, submit
permission from
Central Ground Water
Authority for
extracting the ground
water and fresh
adequacy report of
ETP from any of the
empanelled consultants
of DPCC. Call on
29.04.2009.
Letter issued.
Reply awaited.
251
354
2443
KRISHNA
ELECTROPLATING
WORKS
C-81, Mayapuri Indl.
Area, Phase-II
Mayapuri
Industrial
Area
Job Work of Electroplating
Renewal
252
355
1498
B.K. Motors & Tractors
A-81, G.T.Karnal
Road, Opp. Hans
Chnema, Industrial
Area
G.T.
Karnal
Road
Industrial
Area
Servicing of Two
Wheelers.
Establish
253
356
3095
DELTA ELECTRONICS
PVT LTD
B-99/2, Naraina
Industrial Area Phase
-I
Naraina
Industrial
Area Phase
-I
Mfg of Electronic
Components, Electronic
sub assembly and PC
Board Assembly.
Operate
GORAMAL HARI RAM
LTD.
39, Rama Road,
Najafgarh Road
Industrial Area
Najafgarh
Road
Industrial
Area
Manufacturing of Soap,
Detergent Cake, Powder,
Scouring Powder & Bar
without trade effluent
discharge.
Renewal
254
357
2872
CTR obtained
on 17.07.2003.
Applied for
renewal on
11.07.2006.
Applied for
CTE on
25.04.2008
vide I.D.
No. 25582.
Applied for
CTO on
28.01.2005
vide I.D. No.
12522.
Applied for
CTO on
28.04.2008
vide I.D. No.
25597.
Applied CTO
on 12.12..2006.
___
CTO issued on
01.10.01 valid
upto 31.08.04,
CTO-R valid
upto 29.08.07.
Applied for
CTO-R on
21.08.07
Applied for
authorization
on 05.09.2006
vide I.D. No.
3536.
20.03.2009
Ask the unit to apply
for consent to establish,
authorization under
HWM Rules, submit
permission from
Central Ground Water
Authority for
extracting the ground
water and adequacy
report of ETP from any
of the empanelled
consultants of DPCC.
Call on 29.04.2009.
Letter issued.
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
20.03.2009
Ask the unit to submit
affidavit about source
of water supply. Call
on 29.04.2009.
Letter issued.
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision. Call
on 24.06.2009
20.03.2009
Trainee, CMC-III to
inspect and report. Call
on 29.04.2009
Letter issued.
Reply awaited.
Inspection be
expedited by
Trainee, CMCIII. Call on
24.06.2009
20.03.2009
SIT-II to inspect and
report. Call on
29.04.2009
SIT-II report to be
discussed.
Call on
24.06.2009
with SIT-II
report.
255
358
6112
HINDUSTAN
PETROLEUM
CORPORATION LTD.
Bijwasan Installation,
Bijwasan
N/A
Storage & Distribution of
Petroleum Product
Renewal
CTR obtained
on 22.06.2004.
Applied for
renewal on
15.06.2007.
256
359
539
KIRPAL
CONFECTIONERY
WORKS
Plot no 173, Pocket-E,
Sec-2, DSIDC
Bawana Industrial
Area
Bawana
Industrial
Area
Mfg Of Confectionery
Products
Establish
Applied for
CTE on
26.04.2007
vide I.D.
No. 21136.
257
360
2444
MOHAN ENTERPRISES
C-141, Ph-II,
Mayapuri Industrial
Area
Mayapuri
Industrial
Area
Electroplating.
Renewal
CTE
obtained on
09.12.2003
258
361
2445
NAULAKHA
CHEMICAL
INDUSTRIES
A-10 Mayapuri
Industrial Area PhaseII
Mayapuri
Industrial
Area
Mfg. of washing soap
Operate
20.03.2009
Ask the unit to file
permission from
Central Ground Water
Authority for
extracting the ground
water. Call on
29.04.2009.
20.03.2009
Ask the unit to apply
for consent to operate,
authorization under
HWM Rules and
affidavit for installation
of ETP and hood and
suction arrangement.
Call on 29.04.2009.
Letter issued.
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision. Call
on 24.06.2009
Letter issued.
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision. Call
on 24.06.2009
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
CTO obtained
on 06.12.2004.
Applied for
renewal on
28.11.2007.
20.03.2009
Ask the unit to apply
for renewal of
authorization under
HWM Rules, submit
permission from
Central Ground Water
Authority for
extracting the ground
water and adequacy
report of ETP from any
of the empanelled
consultants of DPCC.
Call on 29.04.2009.
Letter issued.
Reply awaited.
CTO applied on
05.07.2006
20.03.2009
Ask the unit to apply
for Consent to
Establish and file
permission from
Central Ground Water
Authority for
extracting the ground
water. Call on
29.04.2009.
Letter issued.
Reply awaited.
from DJB in
view of new
orders. Call on
24.06.2009
259
362
5048
NIKHIL UDYOG
D-15, Udyog Nagar
Industrial area
Udyog
Nagar
Industrial
area
Manufacturing of
Footwear.
Renewal
__
260
363
5049
NIKHIL UDYOG UNIT II
D-14 , Udyog Nagar
Industrial area ,Main
Rohtak Road
Udyog
Nagar
Industrial
area
Mfg Of Footwear
Renewal
__
CTO issued on
14.02.03 valid
upto 24.07.05,
CTO-R issued
on 11.05.06
valid upto
24.07.08.
Applied for
CTO-R on
16.07.08
CTO issued on
01.03.04 valid
upto 05.02.07,
Applied for
CTO-R on
29.01.07
__
20.03.2009
Ask the unit to submit
affidavit for source of
water supply and for
installation of hood and
suction arrangement
for mixing process.
Call on 29.04.2009.
Letter issued on
17.04.09.
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision. Call
on 24.06.2009
20.03.2009
Ask the unit to file
permission from
Central Ground Water
Authority for
extracting the ground
water and affidavit for
installation of hood and
suction arrangement
for mixing process.
Call on 29.04.2009.
Letter issued on
17.04.09.
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
261
364
1627
OM PRAKASH
B-34, G T Road,
Shahdara, Jhilmil
Industrial Area
Jhilmil
Industrial
Area
M S Wire Drawing with
Pickling
Operate
Applied for
CTO on
13.08.2003
20.03.2009
Ask the unit to apply
for Consent to
Establish and renewal
of consent, file
permission from
Central Ground Water
Authority for
extracting the ground
water and submit
affidavit for installation
of ETP/ECS. Call on
29.04.2009.
Letter issued.
Reply awaited.
262
365
1628
CHINTAMANI FOOD
AND SNACKS PVT.
LTD.
A-10, Jhilmil
Industrial Area
Jhilmil
Industrial
Area
FOOD AND SNACKS
SWEETS AND
RESTAURANT (48
SEATS)
Operate
Applied for
CTO on
7.08.2006
20.03.2009
Ask the unit to submit
adequacy report of
ETP from any of the
empanelled consultants
of DPCC, affidavit for
source of water supply
and for installation of
hood and suction
arrangement. Call on
29.04.2009.
Letter issued to submit
adequacy report of
ETP from any of the
empanelled consultants
of DPCC, affidavit for
source of water supply
and for installation of
hood and suction
arrangement. .
Reply received and
unit requested for time
of two months to
submit the compliance
report
263
366
4432
DELITE MOULDING
WORKS
Plot No C-16, DSIDC
Industrial Complex,
Patparganj Industrial
Area
Patparganj
Industrial
Area
Mfg Of Ice Cream, Milk
products & Confectionery
Products
Establish
20.03.2009
Ask the unit to apply
for consent to operate,
authorization under
HWM Rules, file
permission from
Central Ground Water
Authority for
extracting the ground
water and affidavit for
installation of ETP and
hood and suction
arrangement. Call on
29.04.2009.
Letter issued.
Reply awaited.
Applied for
CTE on
05.02.2007
vide I.D.
No. 20572.
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
Time allowed
till 24.06.2009
for full
compliance.
Call on
24.06.2009
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
264
367
4867
EVERBRIGHT
ELECTROPLATERS
308/5, Shahzada Bagh
Industrial Area
Shahzada
Bagh
Industrial
Area
Nickel & Chrome
Electroplating.
Establish
265
368
2446
EVEREST
TRANSMISSION
B-44 , Mayapuri
Industrial Area PhaseI
Mayapuri
Industrial
Area
MFG OF AIR/VACUUM
BLOWER & SPARESDRY PROCESS
Operate
Applied for
CTE on
13.07.2007
vide I.D.
No. 22414.
CTO obtained
on 03.11.2004
vide consent
no. 12072 valid
upto
30.09.2007.
Applied for
CTR under
Green category
on 13.10.2005.
Applied for
CTO on
21.12.2006.
Applied for
renewal of
authorization
on 20.07.2006
vide I.D. no.
2881.
20.03.2009
Ask the unit to submit
affidavit for source of
water supply and fresh
adequacy report of
ETP from any of the
empanelled consultants
of DPCC. Call on
29.04.2009.
Letter issued.
Reply received on
04.05.2009 and stating
that they have
submitted fee for AR
of ETP to GGSI and
also informed that
water supply is through
borewell but not in the
form of affidavit.
Ask the unit to
file permission
from DJB for
ground water
extraction as
per new orders
and file its
reply on an
affidavit. Call
on 24.06.2009
20.03.2009
Ask the unit to apply
for Consent to
Establish under Orange
category, file
permission from
Central Ground Water
Authority for
extracting the ground
water and noise
monitoring report of
the D.G.Set from
approved laboratories
of DPCC. Call on
29.04.2009.
Letter issued to apply
for Consent to
Establish under Orange
category, file
permission from
Central Ground Water
Authority for
extracting the ground
water and noise
monitoring report of
the D.G.Set from
approved laboratories
of DPCC..
Reply received wherein
unit has mentioned that
they have already
applied for CTO under
orange category and
also unit has submitted
the noise monitoring
report and an
application form to file
CGWA permission.
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
266
369
4094
GOOD LUCK COATERS
A-267, Phase-I, Okhla
Industrial Area
Okhla Indl.
Area
Powder Coating.
Establish
Applied for
CTE on
28.03.2008.
20.03.2009
Ask the unit to apply
for consent to operate,
file affidavit for
installation of ETP,
permission from
Central Ground Water
Authority for
extracting the ground
water, adequacy report
of ETP from any of the
empanelled consultants
of DPCC and noise
monitoring report of
the D.G.Set from
approved laboratories
of DPCC. Call on
29.04.2009.
Letter issued to apply
for consent to operate,
file affidavit for
installation of ETP,
permission from
Central Ground Water
Authority for
extracting the ground
water, adequacy report
of ETP from any of the
empanelled consultants
of DPCC and noise
monitoring report of
the D.G.Set from
approved laboratories
of DPCC..
Reply received stating
that unit has applied for
adequacy report and as
soon as they will get
the report they will
applied for CTO. Also,
unit has submitted
noise monitoring
report, affidavit for
installation of ETP,
affidavit of using
water.
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
267
370
3096
Knitcraft Apparels
International P. Ltd.
A-81, Phase-I,
Naraina Industrial
Area
Naraina
Industrial
Area Phase
-I
MFG. OF READYMADE
GARMENTS WITHOUT
WASHING & DYEING.
Establish
Obtained
CTE on
03.08.2007.
Applied for
CTE on
02.11.2007
20.03.2009
Trainee, CMC-III to
inspect and report. Call
on 29.04.2009
Letter issued.
Reply awaited.
Inspection be
expedited by
Trainee, CMCIII. Call on
24.06.2009
268
373
4096
SERVEL INDIA PVT.
LTD
D-6/1, Phase-II, Okhla
Industrial Area
Okhla Indl.
Area
Manufacturing of Wires
and Cables.
Establish
Applied for
CTE on
14.05.2008..
20.03.2009
Trainee, CMC-III to
inspect and report. Call
on 29.04.2009
Letter issued.
Reply awaited.
Inspection be
expedited by
Trainee, CMCIII. Call on
24.06.2009
269
374
4097
SEVERAL INDIA PVT
LTD
D-6/1, Ph-II, Okhla
Industrial Area
Okhla Indl.
Area
MFG OF
TELECOMMUNICATION
CABLE
Renewal
270
375
2810
SHREYANS MOTERS
PVT. LTD.
A-31, Mohan Cooperative Industrial
Area ,Mathura Road
Mohan Cooperative
Industrial
Area
CAR SERVIC STATION
INCLUDING WASHING.
Operate
271
376
6154
GYANS RESTAURANTS
28/10, Central Market,
Opp. Neelkanth
Mandir, East Patel
Nagar
N/A
Restaurant
Operate
G-1094-1087, DSIDC
Narela Industrial Area
Narela
Industrial
Area
272
377
3293
KANSIL
INDUSTRIES/RUKMANI
WIRES (P) LTD.
Mfg of Bright Steel Bars
including Pickling.
Renewal
Applied for
CTR on
03.11.2006.
20.03.2009
Trainee, CMC-III to
inspect and report. Call
on 29.04.2009
Letter issued.
Reply awaited.
Obtained
CTE on
10.08.2006.
Applied for
CTO on
21.02.2008.
20.03.2009
SIT-II to inspect and
report. Call on
29.04.2009
SIT-II report to be
discussed.
__
Applied for
CTO on
24.08.06
CTE not
obtained.
CTO obtained
on 02.09.2004
vide consent
no. 11463 valid
upto
31.07.2005
Applied for
CTO(R) on
27.11.2006
vide I.D. No.
19942.
Authorization
granted on
28.11.2006
vide no. 1910.
20.03.2009
Ask the unit to apply
for consent to establish,
submit affidavit for
source of water supply
& for installation of
ETP and adequacy
report of ETP from any
of the empanelled
consultants of DPCC.
Also ask the unit to file
valid health licence
from MCD & eating
house licence from
Delhi Police. Call on
29.04.2009.
20.03.2009
Ask the unit to apply
for consent to establish,
submit permission
from Central Ground
Water Authority for
extracting the ground
water and fresh
adequacy report of
ETP from any of the
empanelled consultants
of DPCC. Call on
29.04.2009.
Inspection be
expedited by
Trainee, CMCIII. Call on
24.06.2009
Call on
24.06.2009
with SIT-II
report.
Letter issued on
17.04.09.
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision. Call
on 24.06.2009
Letter issued.
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
273
378
4098
SILVER OCEAN
EXPORTS PVT. LTD
Plot No. E-45/9&10,
Phase-II, Okhla
Industrial Area
Okhla Indl.
Area
Mfg. of Readymade
garments W/o Washing.
Establish
274
379
4099
AJ INTERNATIONAL
PVT. LTD.
D-160/2, Okhla
Industrial Area
Okhla Indl.
Area
manf. of readymade
Garments with washing
Operate
Applied for
CTE on
03.04.2008.
20.03.2009
Trainee, CMC-III to
inspect and report. Call
on 29.04.2009
Applied for
CTO on
06.09.2005.
20.03.2009
Ask the unit to apply
for consent to establish,
submit affidavit for
source of water supply
and noise monitoring
report of the D.G.Set
from approved
laboratories of DPCC.
Call on 29.04.2009.
Letter issued.
Reply awaited.
Inspection be
expedited by
Trainee, CMCIII. Call on
24.06.2009
Letter issued to apply
for consent to establish,
submit affidavit for
source of water supply
and noise monitoring
report of the D.G.Set
from approved
laboratories of DPCC..
Reply received wherein
unit has requested for
some time.
Time allowed
till 24.06.2009
for full
compliance.
Call on
24.06.2009
275
380
4100
COSMO METAL
FINISHING CO.
T-31, Okhla Industrial
Area, Phase-II
Okhla Indl.
Area
Electroplating and
Phosphating.
Renewal
Obtained CTR
on 08.06.2004.
Applied for
CTR on
30.07.2007.
20.03.2009
Ask the unit to submit
affidavit for source of
water supply and fresh
adequacy report of
ETP from any of the
empanelled consultants
of DPCC. Call on
29.04.2009.
Letter issued.
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision. Call
on 24.06.2009
276
381
2447
D.D. MOTORS (A DIV.
OF D.D. INDUSTRIES
LTD)
B-8, Phase-I Mayapuri
Industrial Area
Mayapuri
Industrial
Area
Servicing & Repairing of
Automobiles Vehicles.
Renewal
Obtained CTR
on 16.06.2004.
Applied for
CTR on
31.07.2007.
20.03.2009
Ask the unit to submit
affidavit for source of
water supply, fresh
adequacy report of
ETP from any of the
empanelled consultants
of DPCC and noise
monitoring report of
the D.G.Set from
approved laboratories
of DPCC. Call on
29.04.2009.
Letter issued.
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision. Call
on 24.06.2009
277
383
6113
HUNDRED PERCENT
FILLING & SERVICE
STATION
LSC, SEC-9, OPP.
NHAI, DWARIKA
N/A
Filling cum Service
Station.
Renewal
278
384
1500
INDICARE MOTORS
PVT LTD
A-32,G.T. Karnal
Road Industrial Area
G.T.
Karnal
Road
Industrial
Area
Automobile service stations
Operate
NITISH INDUSTRIES
G-1012, DSIDC
Narela Industrial Area
Narela
Industrial
Area
Mfg. of Fastners
(Electroplating)
279
386
3294
Renewal
Obtained CTO
on 15.07.2004.
Applied for
CTR on
11.07.2007.
20.03.2009
Ask the unit to apply
for consent to
establilsh,
authorization under
HWM Rules, submit
affidavit for source of
water supply and fresh
adequacy report of
ETP from any of the
empanelled consultants
of DPCC. Call on
29.04.2009.
CTE
obtained on
09.06.2003
vide
consent no.
5428 valid
upto
23.04.2004
Applied for
CTO (R) on
11.09.2007
vide I.D. No.
23454
Applied for
authorization
on 11.09.2007
vide I.D. No.
4373.
Two times
consent
CTO (R)
obtained on
07.07.2006
vide consent
no. 16127 valid
upto
25.07.2008.
Applied for
CTO (R) on
24.10.2008
vide I.D. No.
27937.
Applied for
renewal of
authorization
on 12.01.2007
vide I.D. No.
4201.
20.03.2009
Ask the unit to file
permission from
Central Ground Water
Authority for
extracting the ground
water and fresh
adequacy report of
ETP from any of the
empanelled consultants
of DPCC. Also ask the
unit to submit an
affidavit for installation
of hood and suction
arrangement over the
paint booth. Call on
29.04.2009.
20.03.2009
Ask the unit to file
permission from
Central Ground Water
Authority for
extracting the ground
water. Call on
29.04.2009.
Letter issued.
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision. Call
on 24.06.2009
Letter issued.
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
Letter issued.
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision. Call
on 24.06.2009
280
387
4104
KRITI
B-279, Okhla
Industrial Area PhaseI
Okhla Indl.
Area
Printing including plate
making.
Renewal
Obtained CTO
on 17.08.2004.
281
388
4433
RANA METAL WORKS
plot no. 251,FIE.
Patparganj Industrial
Area
Patparganj
Industrial
Area
mfg sheet metal boxes with
electroplating
Establish
CTE
obtained on
26.03.2003
vide
consent no.
3604 valid
upto
09.03.2004
282
389
540
REENKY RUBBER
UDYOG
P. No. 13, Sector-I,
Pocket-O, DSIDC,
Bawana Industrial
Area
Bawana
Industrial
Area
MFG OF RUBBER
GASKET & RUBBER
PARTS (WITHOUT
TYRE & TUBES)
Establish
Applied for
CTE on
26.02.2007
vide I.D.No.
20721.
Applied for
CTO(R) on
21.01.2007
vide I.D. No.
20511.
Applied for
renewal of
authorization
on 18.08.2006
vide I.D. No.
3380.
20.03.2009
Ask the unit to apply
for consent to establish,
renewal of consent,
authorization under
HWM Rules, submit
adequacy report of
ETP from any of the
empanelled consultants
of DPCC and noise
monitoring report of
the D.G.Set from
approved laboratories
of DPCC. Call on
29.04.2009.
Letter issued.
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision. Call
on 24.06.2009
20.03.2009
Ask the unit to submit
affidavit for source of
water supply and fresh
adequacy report of
ETP from any of the
empanelled consultants
of DPCC. Call on
29.04.2009.
Letter issued.
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision. Call
on 24.06.2009
20.03.2009
Ask the unit to apply
for consent to operate,
submit an affidavit for
installation of hood and
suction arrangement
and permission from
Central Ground Water
Authority for
extracting the ground
water. Call on
29.04.2009.
Letter issued.
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
283
390
6155
SANJHA CHULLAH
RESTAURANT P. LTD
361, Kohat Enclave,
Pitampura
N/A
Restaurant cum banquet
hall.
Establish
Applied for
CTE on
13.10.2008
vide I.D.
No. 27789.
20.03.2009
Ask the unit to apply
for consent to operate,
authorization under
HWM Rules and
submit affidavit for
source of water supply,
for installation of ETP
and hood and suction
arrangement. Call on
29.04.2009.
Letter issued.
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision. Call
on 24.06.2009
284
391
4434
U. K. B. ELECTRONICS
Plot No 7, FIE,
Patparganj Industrial
Area
Patparganj
Industrial
Area
Mfg Of PVC Wire & Cable
& Plastic Goods With
Injection Moulding
Machine
Establish
CTE
obtained on
26.12.2006
vide
consent no.
17803 valid
upto
25.12.2007
Applied for
CTE on
02.03.2007
vide I.D.No.
20766.
20.03.2009
Ask the unit to submit
an affidavit for
installation of hood and
suction arrangement
and permission from
Central Ground Water
Authority for
extracting the ground
water. Call on
29.04.2009.
Letter issued.
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
285
392
2811
UTILITY FORMS PVT.
LTD.
A-23/B-1, mohan Cooperative Industrial
Estate
Mohan Cooperative
Industrial
Area
Offset Printig & Computer
Stationery.
Operate
20.03.2009
Ask the unit to apply
for Consent to
Establish and file
permission from
Central Ground Water
Authority for
extracting the ground
water. Call on
29.04.2009.
Letter issued.
Reply awaited.
Time allowed
for full
compliance.
Call on
24.06.2009
Obtained CTO
on 07.04.2003
Applied for
CTO on
06.07.2007.
286
393
2873
VALENTINE
BANQUBLEX
4-A, Najafgarh Road
Industrial Area
Najafgarh
Road
Industrial
Area
Catering service(Banquet
hall)
Renewal
287
394
2449
ALLIED PUBLISHERS
PRIVATE LIMITED
A-104, Mayapuri
Industrial Area,
Phase-II
Mayapuri
Industrial
Area
OFFSET PRINTING
9TEXT BOOKS,
BROCHERS, LABELS,
CATALOGUES ETC)
WITH PLATE MAKING
Operate
__
CTO issued on
13.11.03 valid
upto 25.07.05.
Applied for
CTO-R on
25.07.05.
20.03.2009
Ask the unit to apply
for consent to establish,
renewal of consent,
authorization under
HWM Rules and
submit affidavit for
source of water supply,
for installation of hood
and suction
arrangement and noise
monitoring report of
the D.G.Set from
approved laboratories
of DPCC. Also ask the
unit to install CFL, rain
water harvesting
system, solar water
harvesting and
plantation of tree. Call
on 29.04.2009.
Letter issued on
17.04.09.
Reply awaited.
Time allowed
for full
compliance.
Call on
24.06.2009
Consent
refused under
Green category
on 08.09.2005.
Applied for
CTO on
24.01.2007.
20.03.2009
Ask the unit to apply
for Consent to
Establish and file
permission from
Central Ground Water
Authority for
extracting the ground
water. Call on
29.04.2009.
Letter issued to apply
for Consent to
Establish and file
permission from
Central Ground Water
Authority for
extracting the ground
water..
Reply received stating
that at present there is
not industrial activity,
they are just having the
trading of computers
peripherals only and
whenever they will
start their industrial
activity they take the
permission form
DPCC.
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
288
289
290
395
396
397
541
3295
3019
METALLIC PRODUCTS
MULTIPLEXUS (INDIA)
Shiv Ganga Automobiles
Plot No. J-61, DSIDC
Bawana Industrial
Area
Bawana
Industrial
Area
Manufacturing & Job Work
of Hot Dip Galvanized of
Small MS Components.
Establish
C-440, Narela
Industrial Area
Narela
Industrial
Area
Printing of Paper &
CARDS.
Renewal
G-5, Dsidc Industrial
Complex, Rohtak
Road Nangloi Dsidc
Industrial Area
Nangloi
Industrial
Area
repair workshop &
servicing of automobiles
Establish
Applied for
CTE on
02.08.2007
vide I.D.No.
22994.
CTE not
obtained.
Applied for
CTE on
06.11.07
20.03.2009
Ask the unit to apply
for consent to operate,
authorization under
HWM Rules and file
permission from
Central Ground Water
Authority for
extracting the ground
water. Call on
29.04.2009.
CTO obtained
under Green
category on
04.07.2003
vide consent
no. 6404 valid
upto
31.03.2008
Applied for
CTO under
Orange
category on
27.05.2008
vide I.D. No.
25849.
__
Applied for
renewal of
authorization
on 14.08.2006
vide I.D. No.
3308.
20.03.2009
Ask the unit to apply
for Consent to
Establish and affidavit
about source of water
supply. Call on
29.04.2009.
20.03.2009
Ask the unit to apply
for consent to operate,
authorization under
HWM Rules, file
permission from
Central Ground Water
Authority for
extracting the ground
water, affidavit for
installation of ETP and
for non installation of
D.G.Set. Also ask the
unit to file adequacy
report of ETP from any
of the empanelled
consultants of DPCC.
Call on 29.04.2009.
Letter issued.
The same is returned
back undelievered.
Paste the letter
on the
premises. Call
on 24.06.2009
Letter issued .
Reply received on
03.06.08 stating that
they have wrongly not
submitted the water
cess return along with
the pay order, thus they
are enclosing duly
filled return of water
cess.
Issue final
reminder for
full
compliance of
earlier CMC
decision. Call
on 24.06.2009
Letter issued on
17.04.09.
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
291
398
5027
VARDHMAN TRADERS
15, TILAK NAGAR
INDUSTRIAL AREA
Tilak
Nagar
Industrial
Area
REPAIR WORKSHOP &
SERVICING OF
AUTOMOBILES (TWO
WHEELERS).
Establish
292
399
5050
AAR AAY PRODUCTS
PVT. LTD.
G-1, Udyog Nagar
Industrial area
Udyog
Nagar
Industrial
area
Mfg of PVC Soles
Renewal
293
400
1942
BAWA MASALA CO
PVT. LTD.
G-20-21, Lawrence
Road Industrial Area
Lawrence
Road
Industrial
Area
MFG. & PACKING OF
SPICES.
Renewal
Applied fro
CTE on
07.11.08
CTE not
obtained.
CTO issued on
07.12.2000
valid upto
30.11.03.
CTO-R issued
on 21.10.03
valid upto
30.11.06.
Applied for
CTO-R on
05.01.2007
Applied for
CTO (R) on
28.09.2007
vide I.D. No.
23710.
20.03.2009
Ask the unit to apply
for consent to operate,
authorization under
HWM Rules, file
permission from
Central Ground Water
Authority for
extracting the ground
water, affidavit for
installation of ETP and
for non installation of
D.G.Set. Also ask the
unit to file adequacy
report of ETP from any
of the empanelled
consultants of DPCC.
Call on 29.04.2009.
Letter issued on
17.04.09.
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision with
direction to
seek
permission for
ground water
extraction
from DJB in
view of new
orders. Call on
24.06.2009
20.03.2009
Ask the unit to submit
affidavit for source of
water supply and hood
and suction
arrangement. Call on
29.04.2009.
Letter issued on
17.04.09.
Reply received
alonwith an affidavit
stating that unit has
installed proper hood
& suction arrangement
and source of water
supply is MCD
Issue renewal
of consent.
Call on
24.06.2009
20.03.2009
Ask the unit to apply
for Consent to
Establish and affidavit
about source of water
supply. Call on
29.04.2009.
Letter issued.
Reply received on
01.05.2009
Issue final
reminder for
full
compliance of
earlier CMC
decision
including
consent to
establish
application.
Call on
24.06.2009
294
401
6
BHAGWANTI
INDUSTRIES
PP-25, ST.NO. 10,
Anand Parbat
Industrial Area
Anand
Parbat
Industrial
Area
MFG OF ACID SLURRY
& LIQUID DETERGENT
Operate
295
402
6156
CHANAKYA PURI
SERVICE STATION
OUTER RING
ROAD, MEERA
BAGH, PASCHIM
VIHAR
N/A
CAR REPAIR &
SERVICE STATION.
Establish
CHANDRA
ELECTRICAL
INDUSTRIES
7/18, Kirti Nagar
Industrial Area
Kirti Nagar
Industrial
Area
COPPER WIRE
DRAWING & enamelling
Renewal
296
403
1791
Applied for
CTO on
20.05.02.
20.03.2009
Ask the unit to apply
for Consent to
Establish and fresh
consent to operate.
Call on 29.04.2009.
Applied on
19.10.07
__
20.03.2009
Ask the unit to apply
for consent to operate,
authorization under
HWM Rules, submit
affidavit about source
of water supply, for
installation of ETP and
for non installation of
D.G.Set. Call on
29.04.2009.
CTO issued on
16.10.01 valid
upto 30.09.04.
again CTO
issued on
09.05.05 valid
upto 30.05.06.
Applied for
CTO-R on
03.08.06
Applied for
renewal of
athorization
on 03.10.06
20.03.2009
Ask the unit to file
permission from
Central Ground Water
Authority for
extracting the ground
water, adequacy report
of ETP from any of the
empanelled consultants
of DPCC and noise
monitoring report of
the D.G.Set from
approved laboratories
of DPCC. Call on
29.04.2009.
Letter issued on
17.04.09.
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision. Call
on 24.06.2009
Letter issued on
17.04.09.
Reply awaited.
Issue final
reminder for
full
compliance of
earlier CMC
decision. Call
on 24.06.2009
Letter issued on
17.04.09.
Reply received stating
that unti is involved in
copper wire drawing
& enamelling which is
a dry process and there
is no usage of water.
Therefore unit doesnot
require adequacy report
of ETP and permission
from CGWA.
Also unit has submitted
NMR dated 14.06.06.