Minutes of the 114th meeting of the Committee Constituted for Deciding the Consent under Orange Category, held on 11.05.2009 in the Conference Room of Chairman, DPCC. The following persons attended the meeting: 1. 2. 3. 4. 5. 6. 7. 8. Sh. J. K Dadoo, Chairman DPCC Dr. A.K.Ambasht, Member Secretary, DPCC Sh. S.K.Gupta, Head Chemical Engineering Deptt. ,IIT Delhi Sh. B. Kumar, SEE, DPCC Sh. M. Dwarakanth, SSO, Dept. of Env,. GNCTD. EEs of CMC – I, II & III/PGRC. AEEs and JEE of CMC – I, II & III. AEE, PGRC. In addition to above, Sh A.N. Singh Scientist, Deptt. of Environment and Trainees of CMCs, PGRC & SIT also attended the meeting. Following decisions were taken in the said meeting:Agenda Item No. 1 – Personal hearing of M/s Babaji Stampings & Jyothi Electrocapacitors, Bawana Indl Area The unit came for personal hearing today. Unit will file an affidavit indicating that it has removed the D.G. Set. Call on 24.06.2009. Agenda Item No.2- Special reference cases. Decisions taken with respect to this agenda are tabulated and annexed as Annexure – 1. Agenda Item No.3- Shopping Mall cases Decisions taken with respect to this agenda are tabulated and annexed as Annexure – 2. Agenda Item No.4- Construction Projects cases Decisions taken with respect to this agenda are tabulated and annexed as Annexure – 3. Agenda Item No. 5- Remaining cases of 514 units in respect of waste water discharge upto 1000 Lt/day out of about 6000 pending consent applications. Decisions taken with respect to this agenda are tabulated and annexed as Annexure – 4. Table agenda item No. 1: M/s Renu Engg. Works, Plot No 188, PocketC, Sector-1, DSIDC, Bawana Indl. Area, Delhi Issue Consent to Establish. Call on 24.06.2009 Table agenda item No. 2: M/s NBCC Centre Commercial Complex, Plot No 2, Community Centre, Okhla Phase-I, New Delhi Issue Consent to Establish. Call on 24.06.2009 Table agenda item No. 3: M/s Indo Europa Trading Co. Pvt. Ltd., 88, Okhla Industrial Estate, New Delhi-20 Issue renewal of consent subject to the condition that it files application for authorization under HWM Rules. Call on 24.06.2009 Table agenda item No. 4: M/s Security Systems, E-454, Phase-II, Okhla Industrial Area, New Delhi-20 Ask the unit to confirm on affidavit that it is not drawing any ground water. Call on 24.06.2009. Table agenda item No. 5: M/s Pashupanjali Enterprises Pvt. Ltd, P. No. 340/17, Gali No 1, Friends Colony Indl. Area, Delhi SIT-I to inspect and report. Call on 24.06.2009 Table agenda item No. 6: M/s Northern Railway State Entry Road, New Delhi Ask the unit to submit the full information in its consent application and to submit environmental clearance expeditiously. Call on 24.06.2009. Table agenda item No. 7: Hotel Queen Road Pvt. Ltd., 19, Ashoka Road, Connaught Place, New Delhi-01 Ask the unit to explain why it has started operations without submitting DJB permission for ground water extraction. Also ask the unit to explain why it has started operations without full compliance of earlier CMC decisions where it was asked to file an affidavit on five points. Let it be clear to the unit that operating without Consent to Establish and Consent to Operate it will be liable for causing damage to the environment. Issue letter without waiting for minutes. Call on 03.06.2009. Table agenda item No. 8: Jagdish Parsad Trilok Nath & Co. (Indira Cold Storage), 42, Rama Road, Najafgarh Road Indl. Area, Delhi Issue consent to operate. Call on 24.06.2009. Meeting ended with thanks to the Chair. Sl. No. Name Activity Facts of The Case Earlier Decision Action Taken Decision on 11.05.09 1 Adyar Anand Bhawan,S-18, Main Market Green Park Restaurant Decision on 02.02.09: Unit came for personal hearing. Unit has filed an affidavit stating that ETP of 2KLD capacity will be installed within 3 months. Time allowed upto 12.04.09. Call on 18.03.09 for interim report. Decision on 20.03.09: Issue reminder. Call on 29.04.09 Reply received from the unit on 05.05.09 and requested for some more time to submit the adequacy report. Time allowed. In the meantime, unit be asked to submit the affidavit stating that matter has been taken up with the approved consultant of DPCC for adequacy report. Call on 24.06.200924.06.2009 2 Complaint against Polybags used in M/s Bangla Pastry Shop, 125, Bangla Sahib Marg, Connaught Place, Delhi. Complaint against Polybags used in M/s Kaleva, 109, Bangla Sahib Marg. Connaught Place, Delhi. Restaurants The unit was inspected by DPCC official on 10.05.08 w.r.t. a public complaint received from the residents of the area. As decided in CMC on 13.05.08, a letter was issued to the unit on 05.06.08 for installation of ETP, proper stack height with DG set and use of degradable plastic bags. As decided in CMC on 18.06.2008, reminder issued on 03.07.2008. The unit submitted it's reply on 14.07.2008 regarding correction of deficiencies and grant of three months time for installation of ETP. As decided in CMC on 13.08.08, the file was put up admistratively and as approved, a letter was issued to the unit on 09.09.08 regarding installation of ETP. As decided on 30.09.08, final reminder issued on 17.10.08. The unit submitted it's reply on 21.10.08 and informed that work for installation of ETP has been awarded and requested for grant of 2-3 months time for completion. Unit came for personal hearing on 02.04.09 and Unit has filed an affidavit stating that ETP of 2KLD capacity will be installed within 3 months. Time allowed upto 12.04.09. Call on 18.03.09 for interim report. An inspection was carried out by DPCC Engineer Trainees on 18.03.09 w.r.t. a public complaint. During the inspection, following were observed: -Unit found operating and engage in cakes & pastry shop without seating arrangements. Unit has provided oil and grease trap, found working. Unit uses plastic carry bags, sample collected. Decision on 20.03.09: Issue reminder. Call on 29.04.09 Letter issued to the unit on 23.04.09. Reply received from the unit on 28.04.09 and informed that they have stopped use of plastic bags. Ask the unit to submit an afifdavit stating that it will not use plastic bags. Call on 24.06.2009 An inspection was carried out by DPCC Engineer Trainees on 18.03.09 w.r.t. a public complaint. During the inspection, following were observed: -Unit found operating and engage in mfg. of sweets & snakes without seating arrengments.Unit has provided oil and grease trap which was found working. Unit uses plastic and paper bags, sample collected. Decision on 20.03.09: Issue reminder. Call on 29.04.09 Letter issued to the unit on 23.04.09. Reply received from the unit on 05.05.09 and informed that they are doing needful and nowdays they are using Biodegradable bag only. Ask the unit to submit an afifdavit stating that it will not use plastic bags. Call on 24.06.2009 3 Restaurants 4 Complaint against Polybags used in M/s Gupta Sweets, 129, Bangla Sahib Marg, Connaught Place, Delhi. Restaurants An inspection was carried out by DPCC Engineer Trainees on 18.03.09 w.r.t. a public complaint. During the inspection, following were observed: Unit found operating and engage in the activity of Restaurant with 50 seating capacity. unit has provided oil and grease trap which was found working. Unit uses plastic and paper bags, sample collected. Decision on 20.03.09: Issue reminder. Call on 29.04.09 Letter issued to the unit on 23.04.09. Reply received from the unit on 28.04.09 and informed that they will not use plastic bags in future. Ask the unit to submit an afifdavit stating that it will not use plastic bags. Call on 24.06.2009 5 Complaint against Polybags used in M/s Rbk (Reebok), CMS Enterprises, 119-121, Bangla Sahib Marg, Connaught Place, Delhi. Complaint against Polybags used in M/s Bata, opp. Bangla foods, Bangla Sahib Marg, Connaught Place, Delhi. Shop An inspection was carried out by DPCC Engineer Trainees on 18.03.09 w.r.t. a public complaint. During the inspection, following were observed: Unit engage in the the activity of Reebok Showroom. -Unit use plastic bags, sample collected. Decision on 20.03.09: Issue reminder. Call on 29.04.09 Letter issued to the unit on 23.04.09. Issue final reminder. Call on 24.06.2009 Shop An inspection was carried out by DPCC Engineer Trainees on 18.03.09 w.r.t. a public complaint. During the inspection, following were observed: Unit engage in Bata shoes/chappals showroom. Unit uses Polybags, sample collected Decision on 20.03.09: Issue reminder. Call on 29.04.09 Letter issued to the unit on 23.04.09. Reply received from the unit on 28.04.09 and submitted an affiadvit stated that they have stopped the use of plastic bags. No action in view of the affidavit submitted by the unit. 6 7 M/s Rajiv Automobile (Bajaj Showroom) A6, 100 ft. road, Chhajupur, Kabir Nagar, Delhi. Service center-cumshowroom inspection was carried out by DPCC officials on 06.05.09 w.r.t. a public complaint received from Chhajupur RWA. During the inspection it was observed that: -Unit found operating and engages in Service station cum showroom of Bajaj Scooters & Bikes. -Unit is operating in Non-conforming area. -Waste water generated and discharge into the sewer without any treatment. -Hazardous waste (waste oil) produced and stored in container. -One DG set of 25 KVA installed at roof top of the building without acoustic enclosure and adequate stack height. 8 Complaint against Noise pollution caused by Construction at premises R-41, Greater Kailash Part I from Shri R.P.Joneja through L.G. office. Construction in R-41, GKI A public complaint was received through LG Office regarding noise pollution due to demolation/construction activity. The site was inspected on 12.06.08 & 14.06.08 and as approved notice u/s 31(A) of Air Act to M/s Shashi Kant Mittal & letter to Excise Commissioner issued on 17.06.2008. As decided by CMC on 18.06.08, copy of notice sent to LG Office on 25.06.08. As per the decision of CMC on 25.06.08 case is to be put up on 31.07.08. But on 31.07.08, PGRC cases could not be taken. Decision on 06.08.08: The file of this unit submitted to the chairman adminstratively and it was decided to take up this as a table agenda, As the unit has not filed reply, notice for closure may be issued immidiadly without waiting for minutes. Notice u/s 31(a) of Air Act was issued on 08.08.08. As approved in the file remider of notice was issued on 27.08.08.and delivered at site through trainee engineer.The unit submitted its detailed reply on 26.08.08. As decide in CMC on 28.08.08, a letter for apportunity of hearing was issued to you Sh. Sashi kant mittal on 03.09.08 to appear befor CMC on 10.09.08. Refer to Commissioner of Industries for necessary action. Call on 24.06.2009 Decision on 10.09.08: Unit came for personal hearing and it says that the petitioner has also filed a case in Hon'ble High Court and no stay has been granted. It has also filed a copy of the affidavit of the Supdt. Engineer, MCD who confirms the building construction was as per building bye laws. Let the unit file the copy of the High Court order and the case will be dealt with the admistratively. the file was put up administratively and as approved a letter was issued to Sh. Mittal on 21.11.08 for submission of Hon'ble High Court order. The order of Hon'ble High Court was submitted on 25.11.08 which was examined by the Legal Consultant Four members team of PGRC Trainees will inspect and report. PGRC Team will check whether any noise/air/water pollution is being caused. Call on 24.06.2009. 9 Complaint against M/s Europian Jain Industry, PP -42, Gali no.-10, Anand Parbat Food Grade ink for Pharma Printers and trading of paint thinner aluminum foil. Unit was inspected on 23.09.04, it was found that unit has applied for consent in DPCC and the unit was outside the boundary of Anand Parbat Indl Area. The consent was refused by CMC on 30.05.05 and PGRC categorized the activity as F-27/33 and forwarded to DC for effective closure. The said unit was sealed by SDM on 23.03.06. The unit approached for revocation of consent , it was advised that unit can approach COI for desealing the premises. The unit i.e. M/s Europian Jain Industries complaining that why only his unit was closed. There are many other units operating nearby the said unit. Decision on 20.02.09: File be put up administratively by PGRC. Decision on 25.03.09: Let Sh. Mahapatra, our advocate in the High Court study the case and give his considered view in this case. Written opinion has been received from Sh. Mahapatra, Advocate of Delhi High Court. The advocate has opined that the concerned unit cannot raise any question of discrimination once it is held that the premises in question is in the nonconforming area and running the industry falls under F-27/33 catagory. However, DPCC may forward his application dated 16.03.09 for desealing and seeking permission to do some trading of industrial goods, to the appropriate authority to deal with the matter. If the unit wants desealing of its premises, let it apply to Commissioner of Industries, which is an appropriate authority in view of Hon’ble Supreme Court orders. Call on 24.06.2009. 10 Sl.No Complaint against use of plastic bags in Shops and other places in Delhi. Name of the unit An inspection was carried out by Trainee Engineer on 08.05.09 w.r.t. a public complaint received from sh. K. K. Sharma. During inspection, following were the observation: 1. M/s Bhola Store, 100, Baldev Park : Unit is engaged in general store. Unit is using plastic bags (Sample Collected). 2. M/s Star Drycleaners, 118/2, Baldev Park: Unit is engaged in drycleaning shop. Unit is using plastic bags (Sample Collected). 2. M/s Nav Durga Collection, Baldev Park: Unit is engaged in garment shop. Unit is using plastic bags (Sample Collected). 2. M/s Shades Garments, 70, Baldev Park: Unit is engaged in Garment Shop. Unit is using plastic bags (Sample Collected). 2. M/s Sachdeva General Store, 70, Baldev Park: Unit is engaged in General Store. Unit is using plastic bags (Sample Collected). 2. M/s 6 Ten, 19, Baldev Park: Unit is engaged in General Store. Unit is using plastic bags (Sample Collected). 2. M/s Simar Fashion & Handloom, 71/2, Baldev Park: Unit is engaged in Trading of Garment and Handloom. Unit does not allow to inspect. Activity Earlier Decision, if any Issue notices for stoppage of use of plastic bags as per notification dated 07.01.2009. Call on 24.06.2009 ATR/Remarks Decision on 11.5.2009 1 Hotel Marina, G59, Connaught Circus, New Delhi 4 Star Hotel 05.11.2008 A letter may be sent to the unit asking for details of likely air /water/ noise polluton based on the large scale of renovation being done. The unit may also be asked to install Solar Water Heating System, Rain Water Harvesting System & CFL. Call on 10.12.2008 11.12.2008 Ask the unit to fully comply with the directions issued on 19.11.2008. Call on 14.01.2009 14.01.2009 Call for personal hearing on 02.02.2009 at 5.30 PM. 02.02.2009 The unit came for personal hearing today. The trade effluent is about 25 KLD as per Consent to Establish application and estimated waste water discharge comes to more than 10 KLD. The unit is advised to set up Biological ETP of 30 KLD capacity to cover treatment of entire waste water generation.The unit is also advised to reuse the treated waste water in cooling tower and toilet flushing. The remaining conditions already enunciated be also complied with by the unit. Call on 18.03.2009 for interim report. 20.03.2009 Ask the unit to confirm full compliance on an affidavit. Call on 29.04.2009 Letter issued. Reply received stating that signing authority is out of station and requesting time for 15 days for compliance. Time allowed to submit affidavit confirming full compliance of earlier CMC decision communicated. Issue letter without waiting for minutes. Call on 22.05.2009 2 Prominent Hotel, Connaught Place, New Delhi 110001 4 Star Hotel 05.11.2008 The following deficiencies were noted by SIT be communicated to the unit for correction: (i) Mechanical mixing device with water arrangement need to be provided in the chemical dosing tank (separate for lime, alum and poly electrolyte). (ii) ETP log book should be maintained regularly. (iii) Sludge should be managed as per HWM Rules. (iv) Solar Water Heating system is required to be installed. (v) Stack height of D.G. Set needs to be raised as per norms. Call on 10.12.2008 11.12.2008 Ask the unit to file clear affidavit of all the deficiencies noted by SIT communicated to it. Call on 14.01.2009. 14.01.2009 Call for personal hearing on 02.02.2009 at 5.45 PM. 02.02.2009 The unit came for personal hearing today. It has filed an affidavit covering the five points raised but the perusal of the Consent to Establish application shows trade effluent discharge of 27 KLD and domestic sewage of 08 KLD. The present ETP does not handle the domestic sewage. The unit is therefore advised to set up biological STP covering both types of waste water generation. The unit seeks two months time. Time of two months is allowed for setting up the biological STP as well as Solar Water Heating system. Call on 18.03.2009 for interim report. 20.03.2009 Issue Consent to Establish. Call on 29.04.2009 As per CMC decision CTE issued on 16.04.09.. Unit has applied for CTO on 05.11.08 SIT-I to inspect and report. Call on 24.06.2009 3 S. No Taj Palace Hotel, 2, Sardar Patel Marg, Diplomatic Enclave, New Delhi-110021 Ref. No Name & Address Five Star Hotel EC Status 24.11.2008 SIT report indicates that while the water consumption is 700 KLD, ETP takes care only 450 KLD. The unit must explain what happens to the rest through a water balance chart. The unit may also indicate why solar water heating system capacity has not been utilized. Thirdly, the unit may also indicate why the treated waste water is not being reused. Call on 10.12.2008. 11.12.2008 Call on 14.01.2009 14.01.2009 Call for personal hearing on 02.02.2009 at 6.00 PM. 02.02.2009 The unit came for personal hearing today. While it is treating 450 KLD of waste water through a biological STP, the unit is advised to use the treated waste water for cooling purposes which will save 200 KLD of fresh water. The unit is also advised to improve the functioning of the STP to reduce the BOD level and try using treated waste water for toilet flushing also. The unit is also advised to submit fresh adequacy report from one of the empanelled agencies of DPCC. Call on 18.03.2009 for interim report. 20.03.2009 Issue reminder. Call on 29.04.2009 CTE status Bult Up Area Water / Waste Water details Total Project Cost Date of Commissioning Letter issued on 28.01.09. Unit has submitted Adequavy report of STP Earlier Decisions Ask the unit to file full compliance of earlier CMC decision. Call on 24.06.2009. ATR/REMARKS Decision on 11.05.2009 1 SA17 R G Complex, Plot no 2, Motia Khan, Paharganj, Delhi Not submitted Not submitted 3990 sqm 10 KLD Not reported 20.07.06 2 SA18 RG City Centre, Plot no 4, Motia Khan, Paharganj, New Delhi Not submitted Not submitted 3990 sqm MCD : 10 KLD (in reply) / GW : 20 KLD (as per inspection report) / WW 16 KLD without STP (as per inspection report) Not reported 29.05.2007 20.02.2009 SIT-I to inspect and report. Call on 04.03.2009 04.03.2009 Reply received from the applicant be shown to the advocate along with the latest SIT report for further advice in the matter without waiting for minutes in view of High Court hearing on 06.03.2009. 20.03.2009 Ask the unit to apply for Consent to Establish, file CGWA clearance, install rain water harvesting system. During inspection it was observed that roof top rain water pipes are not connected with the chamber / pit and so the unit may be asked to correct the same. Call on 29.04.2009. 20.02.2009 SIT-I to inspect and report. Call on 04.03.2009 04.03.2009 Reply received from the applicant be shown to the advocate along with the latest SIT report for further advice in the matter without waiting for minutes in view of High Court hearing on 06.03.2009. 20.03.2009 Ask the unit to apply for Consent to Establish, file CGWA clearance, install rain water harvesting system. During inspection it was observed that roof top rain water pipes are not connected with the chamber / pit and so the unit may be asked to correct the same. Call on 29.04.2009. Letter issued. Reply awaited. Call on 22.05.2009 Letter issued. Reply awaited. Call on 22.05.2009 3 SA33 M/s PiccaDelhi: PVR Plaza, H Block, Connaught Place, New Delhi Built up area 900 Sq.m CTE issued. Applied for CTO on 24-1007 4 SB-1 Paliwal Developers Ltd (DLF), Galleria shopping Mall Plot No. 1 B, Mayur Vihar, Delhi 92 Formal order not provided. Only website reveals the project is clear on 06.06.2007. 08.02.2007 900 Sq.m 12324 6 KLD (Municipal)/ ww 5 KLD ETP 2,69,51,320 RS. 139(MCD)+GW wil be used as supplmentry source./42(WW) 56.06Cr. / 106.12 Cr. August, 2006 25.02.2009 Issue Consent to Establish to M/s PVR Plaza. Following units were found in the premises during the SIT inspection: (a) M/s Piccadily: ETP was not found operational. Unit should make the ETP operational and submit adequacy report for the same. (b) M/s Nizam : Unit should apply for Consent to Establish with proper details of installation of oil & grease trap cum settling tank and air pollution control device. (c) M/s Mirchi Kabab & Curies: Unit should apply for Consent to Establish with proper details of installation of oil & grease trap cum settling tank and air pollution control device. Call on 02.04.2009. 02.04.2009 Call on 22.04.2009 23.04.2009 Call on 08.05.2009 with SIT report. Letter issued on 31.03.09. Reply received. SIT report to be discussed. 30.12.2008 SIT to inspect and report. Call on 14.01.2009 14.01.2009 In this case, MS to consult advocate and submit file administratively within a week. Call on 18.02.2009 20.02.2009 Call on 25.03.2009 25.03.2009 Call on 02.04.2009 02.04.2009 Call on 09.04.2009 23.04.2009 Call on 08.05.2009 Advocate has been consulted. Opinion obtained. Warning letter issued to the unit as per the advice of the advocate. Writ filed by the unit came up for hearing on 18.4.2009 and the same has been adjourned to 27.7.09.No stay has been granted as per the information provided by Legal Cell. Delist the case as the case is being considered in water polluting cases. SIT-I & SIT-II to inspect and report before 18.05.2009. Inform advocate accordingly. Call on 22.05.2009 5 SB20 Pragya Products Private Ltd, Construcion of Commercial Mall name Shop in Park at Plot no 2 Community Centre Blk B , Shalimar Bagh New Delhi , Pragya Products Private Ltd 6 SB32 Jindal Biochem (P) Ltd., Karkardooma, District Centre, near AGCR Colony, Delhi _ _ Original application dated 26/04/06 returned. Now unit submitted CTE on 07.08.2008 Not applied Built up area : 27265.42 sqm(as per latest CTE application) MCD : 193 KLD / GW : Not mentioned / WW : 54 KLD (as per latest CTE application) However, as per affidavit no trade effluent discharge. 76.11 Crores (as per latest CTE application) Operational 05.11.2008 Ask the unit to file adequacy report of STP and noise monitoring report of D.G. Set. Call on 10.12.2008 11.12.2008 Call on 14.01.2009 14.01.2009 Ask the unit to file environmental clearance. Call on 04.03.2009 04.03.2009 Call on 09.04.2009 with full compliance. 09.04.2009 Call on 29.04.2009 Main file of the unit was submitted to Chairman, DPCC on 26.02.09 as desired by him and the same is yet to be received. Hence, further action is being taken on part file. Letter issued on 31.03.09 asking the unit to submit a copy of EC. Reply received along with a copy of Environmental Clearance issued by SEIAA. Ask the unit to file itemwise compliance of Enviornmental Clearance's conditions. Call on 24.06.2009 23.12.2008 The unit came for personal hearing today. It seeks time of 60 days to comply with the CMC’s decision. Call on in the last week of February, 2009 for compliance. 25.02.2009 Issue final reminder. Call on 02.04.2009 20.03.2009 Call on 02.04.2009 02.04.2009 Call on 22.04.2009 23.04.2009 Call on 08.05.2009 Reminder as per CMC(O) decision dated 25.02.2009, not been issued, as the unit approached Hon'ble High Court. Case was heard by the Court on 18.4.09 and the same was adjourned to 5.5.09. Now the case has been adjourned to 18.5.2009. SIT-I & SIT-II to inspect and report before 18.05.2009. Photographs taken by SIT during inspection be given to the advocate for showing to the court. Legal Cell to brief the advocate accordingly. Call on 22.05.2009 7 SB53 Vardhman Premimum Mall, Deepali Chowk, Outer Ring Road, Saraswati Vihar, New Delhi-34 16.03.2009 Send a letter to the unit to clarify the reason for varience in the discharge of waste water as the unit has earlier reported it as 15.51 KLD vide its letter dated 11.11.2008 and now it claims the waste water discharge as 1.86 KLD, along with an affidavit stating the actual waste water discharge. Issue letter without waiting for minutes. File be submitted administratively also. Call on 25.03.2009. 25.03.2009 Call on 02.04.2009 02.04.2009 Call on 22.04.2009 23.04.2009 Call on 08.05.2009 Notice for Closure issued to unit on 9.2.09 Unit has submitted reply w.r.t. Notice for Closure on 20.02.09. Letter issued again on 19.3.09, as per decision of CMC on 16.03.09 . Reply received on 23.03.09 with an affidavit stating that presently waste water discharge is 1.86 KLD and by mistake waste water discharge (15.51 KLD) was mentioned vide earlier letter dated 11.11.08. File has been submitted administratively also.The matter has been discussed with the concerned advocate by the Chairman. Case was heard by the Court on 18.4.09 and the same has been adjourned to 5.5.09. Now the case has been adjourned to 18.5.2009 as per the information provided by legal cell. Call on 22.05.2009 8 9 SC13 SC14 DLF Retail Developers Ltd. (Construction of Shopping Complex named as DLF South Court at Plot No A1 & P2B, Saket Place, Saket, New Delhi ) DLF Universal Ltd. Construction of Commercial Complex name DLF Court Yard at Plot No. A4 & P-1A, Saket Place, New Delhi-17 15/01/07 15-01-07 25/09/07 Applied for consent to Establish on 25-0907 53721 sqm MCD-400 KLD GW-NIL DIS197 KLD 245.35 crore Jan, 2008 25.03.2009 The SIT inspection report and record reveals the following deficiencies: (i) Some of the D.G. Sets were found without adequate stack height. (ii) Unit is engaged in air polluting activity by use of D.G. Sets, carrying out stone cutting, vehicular moment etc. and water polluting activity by generation of trade effluent waste water from washing, bathing of labourers, trade effluent etc. (iii) Wet garbage is being dumped in open. (iv) Construction material is lying in open. Ask the unit to correct the above deficiencies and submit the compliance affidavit of environmental clearance conditions. Call on 09.04.2009 23.04.2009 A written explanation of the EE of CMC-III may be summoned for delaying this matter beyond any tolerable limit. File be submitted with explanation within a week. Call on 08.05.2009 with response of the unit. 20.03.2009 Advocate be consulted and appropriate action with draft order be put up in CMC on 25.03.2009. Call on 25.03.2009. 25.03.2009 File be put up administratively without waiting for minutes. 23.04.2009 A written explanation of the ALO-I as to why the order has not been implemented. File may be sent to Sh. Vidhey to immediately get the vacation of the stay and confirm to DPCC in writing. Call on 08.05.2009 Letter issued to the unit to comply with the CMC decision dated 25.03.2009 regarding correction of SIT defeciencies and to submit compliance affidavit for Environmental clearance. No reply received. SIT-I & SIT-II to inspect jointly and report before 18.05.2009. Also DPCC lab will take the samples as per procedure along with SIT inspection and the sample may be sent to CPCB and DPCC lab for analysis. Call on 22.05.2009 SIT has inspected the unit and as per the decision of CMC dated 25.03.2009, file has already been put up administratively. Worthy chariman has asked to ALO to ake the necessary action. Ask the advcoate to expedite the vacation of the stay. Call on 22.05.2009 10 SC22 Beverly Park Maintenance Service Ltd at Plot No. 3, Vasant Kunj Mall, Vasant Kunj, Delhi 22/01/2007 28960 sq m MCD-517 KLD GW-nil DIS.125 KLD 358 crore 31/03/2007 02.04.2009 The following deficiencies were observed during the inspection by SIT:(i) During inspection it was found that STP of 125 KLD capacity has been installed whereas the waste water generation from the building is 150 KLD as per CTE application (ii) Unit is required to maintain the proper logbook for operation of STP indicating the flow meter reading also. (iii) Unit is required to provide the composting facility for the wet garbage (iv) The Rain water harvesting pits requires regular cleaning as the floating matter was observed in the pit (v) Unit is required to file the compliance report w.r.t. condition no. (xv), (xvi), (xvii) & (xviii) of the construction phase and Sl. No (i) in respect of filing of adequacy report of STP, (ii), (v), (vii) & (viii) during the operational phase of environmental clearance’s conditions. Ask the unit to correct the above deficiencies. Call on 12.05.2009. 23.04.2009 Call on 08.05.2009 Letter issued to the unit to correct the deficiencies of SIT. No reply received. In this case, the CMC unanimously decided that since the unit is operating without being granted consent to operate and since the unit is running with an under capacity STP despite order of MoEF for a 150 KLD STP and since the unit has not filed monitoring report from DPCC approved laboratory, the unit may be informed that it will be prosecuted against within 10 days as per the Hon’ble High Court order dated 28.05.2008. The unit may be informed about this immediately and prosecution may be implemented exactly after the delivery of the notice which should be by hand. Letter may be shown administratively and also to the advocate in next two days before issue. The prosecution order be drafted by advocate within this week. Call on 22.05.2009 11 SC23 Regency Park Management Services Private Ltd. at Plot No. 4, Vasant Kunj Mall, Vasant Kunj, Delhi 24/11/2006 25/9/2007 59731.663 sq m MCD-287 KLD GW-nil DIS-76 KLD 250 CRORE 15/7/2008 13.08.2008 The unit came for personal hearing today and explained that since the matter is sub-judice, the mater should be taken up in the Court. MS, DPCC has objected to this and since there is no stay in the matter. MS, DPCC feels that in the interest of comprehensive order, air, water & noise monitoring report must be undertaken before any further decision is taken. Let DPCC do the air, water & noise monitoring in the next 15 days. Call on 03.09.2008. 28.08.2008 Call on 03.09.2008 03.09.2008 File is under submission to Higher Authorities. 30.12.2008 File to be submitted administratively immediately. 23.04.2009 As advised by the advocte, SIT-I to inspect and report. Call on 08.05.2009 SIT report to be discussed. A show notice for closure may be issued to the unit in view of the following deficiencies found in the latest SIT inspection: (i) Sludge transfer pumps found removed. (ii) Flow meter reading not mentioned in the logbook. (iii) Pipes carrying floor washing water/ any waste water needs to be disconnected from rain water harvesting pits in order to avoid ground water contamination. (iv) No supporting drawing for installation of settling tank / oil & grease trap of rain water harwesting system could be made available during inspection. (v) No composting facility found existing for wet garbage. (vi) No information regarding the report on energy conservation could be provided during inspection. Call on 22.05.2009 12 SC25 S. No Manish Buildwell Pvt. Ltd., Plot No 2, LSC, Sec22 Dwarka , New Delhi Built up area : 8485.75 sqm Name & Address Ref. No 24.06.2008 EC Status 8485.75 sqm CTE status MCD- 73 KLD / WW-57 KLD (STP) Bult Up Area Water / Waste Water details 66,94,71,101 crores Total Project Cost 2010 Date of Commissioning 24.11.2008 There has been palpable error in handling this case by the concerned CMC which is warned not to repeat this in future. MS will personally work on this file and issue a Show Cause Notice for closure based on the deficiencies found by SIT. The notice for closure to be issued immediately without waiting for minutes. Inform the advocate accordingly. Call on 10.12.2008. 11.12.2008 SIT to inspect and report. Call on 23.12.2008 23.12.2008 SIT to inspect and thereafter take advice of advocate and then file be submitted administratively. 09.04.2009 Since the unit has replied to the deficiencies noted by SIT, a fresh inspection may be done by SIT-I. Call on 29.04.2009. Earlier decisions SIT report to be discussed. ATR/Remarks Let the advocate be asked to file application for vacation of stay in view of the fact that the water requirement is 73 KLD which is met through borewell without DJB clearance and estimated waste water generation is 57 KLD without installing STP/ETP/Oil & Grease Trap which indicates that entire waste water will be going into the drain and polluting the river Yamuna. Call on 22.05.2009 Decision on 11.05.2009 1 2 BES Buildcon Pvt. Ltd., Swatantra Bharat Mills Complex, Plot No 15, Najafgarh Road, Delhi EC Accorded on 05.08.2008 Applied on 24.06.2008 850401 sqm MCD 2195 KLD / WW 3129 KLD (STP) DLF I.T. Park, 15, Shivaji Marg, Delhi EC Accorded on 19.01.09 Applied on 13.06.2008 430789.322 sqm MCD1262 KLD GW - Nil WW 2471 KLD (STP Proposed) 1684.61 Crores 2010 A-15 A-22 916.63 crores Dec-10 24.11.2008 CMC considered all the deficiencies noted on the file. CMC also felt that decision taken in Chief Secretary’s room earlier this month about coverage of all raw material / construction material used must be fully complied. Copy of the building plan may also be submitted. Issue letter accordingly. Call on 17.12.2008. 30.12.2008 Call on 28.01.2009 28.01.2009 Reply be examined carefully and file be put up administratively within 01 week. 23.04.2009 Issue reminder to Conservator of Forests to file reply by 30.04.2009 without waiting for minutes. Call on 08.05.2009 Reminder issued to Conservator of Forests. Reply awaited. Call on 24.06.2009 24.11.2008 CMC considered all the deficiencies noted on the file. CMC also felt that decision taken in Chief Secretary’s room earlier this month about coverage of all raw material / construction material used must be fully complied. Copy of the building plan and copy of environmental clearance may also be submitted. Issue letter accordingly. Call on 17.12.2008. 30.12.2008 Call on 28.01.2009 28.01.2009 Reply be examined carefully and file be put up administratively within 01 week. 23.04.2009 Issue reminder to Chief Conservator of Forests to file reply by 30.04.2009 without waiting for minutes. Call on 08.05.2009 Reminder issued to Conservator of Forests. Reply awaited. Call on 24.06.2009 3 B-31 Construction of Hotel at Community Center Vivek Vihar Perfect Learning Pvt.Ltd. A12, Swasthya Vihar, Vikas Marg, Delhi92 Built up area : 14822.71 sqm Applied on 14.01.2009 Built up area : 14822.71 sqm MCD : 91 KLD / WW : 43 KLD Rs. 26.53 Crores 25.01.2009 12.03.2009 Call on 16.03.2009 16.03.2009 Ask the unit to file the approved architectural drawing , permission from CGWA for ground water drawl and to provide acoustic enclosure with the D.G. Set. Call on 29.04.2009 Sl. No Ref. No ID.No Name Address Industrial Area Activity Consent Application Type Status of CTE Status of Consent State of Authorization 1 77 5040 BAS ENGINEERING P. LTD A-2, Udyog Nagar Industrial area Udyog Nagar Industrial area Servicing and washing of cars. Renewal __ CTO valid upto 30.09.04. CTOR valid upto 17.01.08. Applied for CTO-R on 10.03.08 Applied for Renewal of Authorisation on 10.03.08 Letter issued on 06.04.09. Reply awaited. Earlier Decisions 16.03.2009 Ask the unit to file permission from Central Ground Water Authority for extracting the ground water. Call on 29.04.2009. Ask the unit to file DJB permission for ground water extration,architectural drawing and to provide acoustic enclsoure with the D.G. Set. Call on 24.06.2009 ATR / Remarks Decision on 11.5.2009 Letter issued on 15.04.09 Reply received stating that unit have approached to CGWA for permission of ground water drawl and collecting all details, data and documents which is required for filling of application. Ask the unit to approach DJB for seeking the ground water extraction permission in view of new orders. Call on 24.06.2009 2 78 1489 NIRMAL TRADING CO. A-13, G.T. Karnal Road Industrial Area G.T. Karnal Road Industrial Area Dyeing of silk yarn Renewal Applied for CTE on 06.04.2009 vide I.D. No. 29450. Applied for CTO (R) on 28.03.2005 vide I.D. No. 13239. Applied for CTO (R) on 15.07.2008 vide I.D. No. 26468. CTO valid upto 27.11.06 Applied for CTO-R on 29.12.06. Applied for renewal of authorization on 02.08.2006 vide I.D. No. 3061 16.03.2009 Ask the unit to apply for Consent to Establish. Call on 29.04.2009. Letter issued on 17.04.09. Applied for CTE on 06.04.2009 vide I.D. No. 29450. Issue Consent to Establish. Call on 24.06.2009 3 79 2823 CHARU MOTORS PVT LTD 29, Najafgarh Road, Moti Nagar DLF Industrial Area Moti Nagar DLF Industrial Area Automobile Workshop (Servicing & Repairing) Establish CTE issued valid upto 01.06.04 Applied for Authorisation on 26.08.04 16.03.2009 Ask the unit to file permission from Central Ground Water Authority for extracting the ground water and submit fresh adequacy report of ETP from any of the empanelled consultants of DPCC. Call on 29.04.2009. Letter issued on 15.04.09 Reply received stating that unit have applied for permission for CGWA to zonal officer, DJB. And adequacy report was submitted with the application for Consent to Operate. SIT-I to inspect and report. Call on 24.06.2009 4 80 4031 J.J. IMPEX (DELHI) PVT.LTD C-51, Ph-II, Okhla Industrial Area Okhla Industrial Area Automobile Workshop cum Service Station including Denting & Painting Establish CTE issued on 01.04.2003 CTO issued on 22.10.2003. CTO ( R) applied on 09.10.2006 Applied on 13.07.2004 16.03.2009 SIT-II to inspect and report. Call on 29.04.2009. SIT-II report to be discussed. Call on 24.06.2009 with SIT-II report. 5 83 2423 MYSTIC C-147 (A-147), PhaseII, Mayapuri Industrial Area Mayapuri Industrial Area Washing of Garments. Operate CTE issued on 21.11.2006 Applied for CTO on 12.03.2008 Applied on 12.03.2008 16.03.2009 Ask the unit to file permission from Central Ground Water Authority for extracting the ground water. Call on 29.04.2009. Letter issued to file permission from Central Ground Water Authority for extracting the ground water.. Reply received wherein unit has mentioned that they have registered with CGWA. Issue Consent to Operate & authorization under HWM Rules. Call on 6 84 4421 BAGGA LINK MOTORS LTD 389/395, FIE, Patparganj Industrial Area Patparganj Industrial Area Service station cum workshop of cars. Renewal Two times consent CTO (R) obtained on 20.02.2004 vide consent no. 9703 valid upto 11.12.2006 Applied for CTO (R) on 06.07.2007 vide I.D. No. 22220. Applied for renewal of authorization on 07.12.2006 vide I.D. No. 4148 16.03.2009 Ask the unit to file permission from Central Ground Water Authority for extracting the ground water. Call on 29.04.2009. 7 85 5025 GALAXY AUTOMOBILES 8, Tilak Nagar Industrial Area Tilak Nagar Industrial Area Automobile Service station. Renewal __ CTO valid upto 08.01.07. Applied for CTO-R on 23.10.07 Applied for Authorisation on 04.02.05 16.03.2009 Ask the unit to apply for Consent to Establish, to file permission from Central Ground Water Authority for extracting the ground water and submit fresh adequacy report of ETP from any of the empanelled consultants of DPCC. Call on 29.04.2009. 8 86 4032 SILVER OCEAN EXPORTS PVT. LTD Plot No. Y-29, PhaseII, Okhla Industrial Area Okhla Industrial Area Mfg. of Readymade garments with Washing. Establish Applied for CTE on 03.04.2008 Applied on 03.04.2008 16.03.2009 Ask the unit to file permission from Central Ground Water Authority for extracting the ground water and status of installation of ETP with adequacy report from any of the empanelled consultants of DPCC.Call on 29.04.2009. Letter issued on 17.04.09. Reply received on 04.05.09 with the request to clarify from where clearence will be obtained since DJB is not granting the permission to old borewell & CGWA is not granting the permission to old borewell in East district . Letter issued on 15.04.09. Reply awaited. Letter issued. Reply awaited. Send a letter to the unit referring the new order and ask the unit to approach DJB for clearance for ground water extraction. Call on 24.06.2009 Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 9 10 87 88 2424 2425 KHANNA AUTOMOBILES C-124 A, Ph-II, Mayapuri Industrial Area Mayapuri Industrial Area Workshop of Motor cycles with washing. Renewal SINGH FAB. PROCESSORS C-204/2, Ph-II, Mayapuri Industrial Area Mayapuri Industrial Area Job work of Washing & dyeing of readymade garments Establish CTO issued on 25.11.2004 CTO ( R) applied on 03.03.2008 Applied for CTE on 10.04.2007 Applied on 17.11.2008 16.03.2009 Ask the unit to apply for Consent to Establish, file permission from Central Ground Water Authority for extracting the ground water and submit fresh adequacy report of ETP from any of the empanelled consultants of DPCC.Call on 29.04.2009. 16.03.2009 Ask the unit to file permission from Central Ground Water Authority for extracting the ground water and status of installation of ETP with adequacy report from any of the empanelled consultants of DPCC. Call on 29.04.2009. Letter issued. Reply awaited. Letter issued. Reply awaited. Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 11 89 345 SHIV INDUSTRIES S-14,Badli Industrial Estate phase-1 Badli Industrial Estate Re Rolling Annealing & Pickling of Stainless steel sheets. Renewal CTE not obtained. Applied for CTO (R) on 04.04.2005 vide I.D. No. 13369. Applied for CTO (R) on 16.05.2008 vide I.D. No. 25763. Renewal of authorization granted on 28.11.2006 vide no. 1892. 16.03.2009 Ask the unit to apply for Consent to Establish, to file permission from Central Ground Water Authority for extracting the ground water and submit fresh adequacy report of ETP from any of the empanelled consultants of DPCC. Also ask the unit to submit an action plan for stoppage of the activity before 07.02.2010, which falls under negative list as per MPD-2021 and an action plan for new proposed activity in conformity with MPD2021 on the vacant plot due to closure of present activity. Call on 29.04.2009 Letter issued on 17.04.09 Reply received on 04.05.09 stating that they are preparing for apply CTE, are collecting data & documents for applying for permision from CGWA, they have approached to DPCC for fresh adequacy report of ETP . Their action plan is that they will stop the activity of pickling in the premise before 07.02.2010 Ask the unit to file definite action plan for stoppage of its activivty before 07.02.2010, adequacy report from an empanelled consultant of DPCC and to approach DJB for seeking permission for ground water extraction in view of new orders. Call on 24.06.2009 12 90 4547 JITENDRA TRADING COMPANY D-30 SMA Co-op. Industrial Estate, G.T. Karnal Road S.M.A Industrial Area Metal Finishing with Electroplating & Buffing. Renewal 13 91 4033 SHAMA INTERNATIONAL P.LTD. F-53, Okhla Industrial Area ,Phase-I Okhla Industrial Area Mfg. of Readymade Garments with Washing. Renewal Applied for CTE on 01.05.2009 vide I.D. No. 29730 Applied for CTO (R) on 29.09.2008 vide I.D. No. 27608. Applied for renewal of authorization on 14.07.2006 vide I.D. No. 2812 CTO issued on 13.04.2004. CTO ( R) applied on 12.03.2008 Applied on 12.03.2008 16.03.2009 Ask the unit to apply for Consent to Establish, file permission from Central Ground Water Authority for extracting the ground water and submit fresh adequacy report of ETP from any of the empanelled consultants of DPCC. Also SIT-II to inspect and report. Call on 29.04.2009. 16.03.2009 Ask the unit to apply for Consent to Establish, file permission from Central Ground Water Authority for extracting the ground water and submit fresh adequacy report of ETP from any of the empanelled consultants of DPCC.Call on 29.04.2009. Letter issued on 15.04.09. Reply received along with copy of adequacy report of ETP from DCE on 05.05.09 stating that they have applied for CTE on 01may -09, & as their ground water requirement is 700 l/day ( i.e. < 25 m3/ day) as per draft policy guidelines of CGWA therefore they are not entitled to apply for permission from CGWA. Applied for CTE on 01.05.2009 vide I.D. No. 29730 Also SIT-II report to be discussed. Letter issued. Reply awaited. Ask the unit to correct the deficiencies noted by SIT and to approach DJB for seeking permission for ground water extraction in view of new orders. Call on 24.06.2009 Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 14 92 4607 JAYSONS (INDIA) 56, S.S.I Industrial Area, G.T. Karnal Road S.S.I Industrial Area Mfg. of Polyster zipper including dyeing. Establish Applied for CTE on 24.10.2008 vide I.D. No. 27960. 15 93 4034 LINEN SCAPES (INDIA) LTD. A-208 , Phase-I, Okhla Industrial Area Okhla Industrial Area Mfg. of Home furnishing item etc. Renewal 16 94 346 PAL TRADERS S-23, Phase-I, Badli Industrial Estate Badli Industrial Estate mfg of cement paint powder and distemper Renewal CTE not obtained. 17 95 4035 AAA VEHICLEADES PVT. LTD B-244, Phase-I, Okhla Industrial Area Okhla Industrial Area Servicing and repairs of Cars and Vehicles. Establish CTE applied on 17.04.2008 Applied for CTO (R) on 16.09.2005 vide I.D. No. 16436. Applied for CTO (R) on 24.10.2008 vide I.D. No. 27961. Applied for renewal of authorization on 24.08.2006 vide I.D. No. 3439 & 24.10.2008 vide I.D. No. 4772. 16.03.2009 Ask the unit to file permission from Central Ground Water Authority for extracting the ground water. Call on 29.04.2009. Letter issued on 17.04.09. Reply received along with the permission from CGWA on 06.05.09 stating that the water is being used for domestic purposes only & not for washing / dyeing purposes. . SIT-I to inspect and report. Call on 24.06.2009 CTO issued on 06.07.2002 16.03.2009 SIT-II to inspect and report. Call on 29.04.2009. SIT-II report to be discussed. Call on 24.06.2009 with SIT-II report. Applied for CTO (R) on 30.06.2006 vide I.D. No. 18663. 16.03.2009 Ask the unit to apply for Consent to Establish and file permission from Central Ground Water Authority for extracting the ground water. Call on 29.04.2009. Letter issued. Reply awaited. 16.03.2009 Issue reminder. Call on 29.04.2009 Reminder issued. Reply awaited Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on Applied on 17.04.2008 24.06.2009 18 96 4036 19 97 3018 DETAILS ROYAL AUTOMOBILE D-30, PH-I, Okhla Industrial Area Okhla Industrial Area Readymade garment with washing. Operate CTE issued on 03.05.2006 CTO applied on 21.11.2007 Applied on 21.11.2007 16.03.2009 Ask the unit to file permission from Central Ground Water Authority for extracting the ground water. Call on 29.04.2009. Letter issued. Reply awaited. 35 SFS, DSIDC Complex, Nangloi DSIDC Industrial Area Nangloi Industrial Area SERVICE. REPAIR, AND MAINTENANCE OF TWO WHEELERS. Establish Applied on 17.10.07 __ __ 16.03.2009 Ask the unit to file permission from Central Ground Water Authority for extracting the ground water, status of installation of ETP with adequacy report from any of the empanelled consultants of DPCC and to apply for authorization under HWM Rules. Call on 29.04.2009. Letter issued on 15.04.09. Reply awaited. Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 20 98 5848 GYMKHANA SERVICE STATION RACE COURSE ROAD NC-ND Gymkhana Service Station (car wash unit) Establish 21 100 6029 M/S Rama Motors (P) Ltd Bawa Potteries Compound, Aruna Asaf Ali Road,Vasant Kunj N/A Car service station Renewal 22 101 5953 HINDUSTAN PETROLEUM COPERATION LTD. Shakurbasti Installation Rohtak Road N/A Refilling and distribution of Petroleum Products. Operate Applied on 11.09.08 __ CTO refused on 16.03.07, CTO issued on 17.03.06 valid upto 20.10.08. Applied for CTO-R on 17.10.08 and CTE on 11.09.08 CTO issued on 05.01.2004. CTO ( R) applied on 19.03.2007 Applied for Renewal of Authorisation on 07.03.08 16.03.2009 SIT-II to inspect and report. Call on 29.04.2009. SIT-II report to be discussed. Call on 24.06.2009 with SIT-II report. Applied on 03.11.2006 Renewal 16.03.2009 Ask the unit to apply for Consent to Establish and submit fresh adequacy report of ETP from any of the empanelled consultants of DPCC. Also SIT-II to inspect and report for ascertaining the source of water supply. Call on 29.04.2009. Letter issued to apply for Consent to Establish and submit fresh adequacy report of ETP from any of the empanelled consultants of DPCC. . Reply awaited. And letter returned back. Also SIT-II report to be discussed. Issue final reminder for full compliance of earlier CMC decision. Also inspection to be expedited by SIT-II. Call on 24.06.2009 CTO valid upto 09.11.09 Authorisation valid upto 31.01.09. Applied for renewal of Authorization on 13.03.09 16.03.2009 Call on 20.03.2009 20.03.2009 Ask the unit to apply for Consent to Establish and file permission from Central Ground Water Authority for extracting the ground water. Call on 29.04.2009. Letter issued on 17.04.09. Reply awaited. Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 23 102 4038 ELECTROSPARK A-126, Ph-II, Okhla Industrial Area Okhla Industrial Area Powder Coating Establish CTE applied on 18.12.2007 24 103 2426 SUHRIT SERVICES (P) LTD C-97, Phase II, Mayapuri Industrial Area , Mayapuri Industrial Area Vehicle Service station cum Workshop. Operate CTE issued on 30.11.2006 25 104 529 Bharat Impex Plot No-2, Pocket-o, Sec-5, Bawana Industrial Area Bawana Industrial Area C.P bathroom fittings with plating Establish Applied for CTE on 20.07.2007 vide I.D. No. 22615 CTO applied on 22.11.2007 Allied on 22.11.2007 16.03.2009 Ask the unit to submit fresh adequacy report of ETP from any of the empanelled consultants of DPCC. Also SIT-II to inspect and report. Call on 29.04.2009. Letter issued. Reply awaited. Also SIT-II report to be discussed. 16.03.2009 Ask the unit to file permission from Central Ground Water Authority for extracting the ground water. Call on 29.04.2009. Letter issued. Reply awaited. 16.03.2009 Ask the unit to file permission from Central Ground Water Authority for extracting the ground water and status of installation of ETP with adequacy report from any of the empanelled consultants of DPCC. Call on 29.04.2009. Letter issued on 17.04.2009. Reply received on 05.05.2009 and stating that they are not engaging any activity which cause water poluting. The unit is dry so that there is no need to install ETP. Issue final reminder for full compliance of earlier CMC decision. Also inspection to be expedited by SIT-II. Call on 24.06.2009 Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 SIT-I to inspect and report. Call on 24.06.2009 26 105 4039 COMRACK INFONET PVT. LTD C-176, 177, Phase-I, Okhla Industrial Area Okhla Industrial Area Mfg. of Rack, cabinets for Networking & Telecom sheet metal components. Establish Applied for CTE on 08.05.2008 Green Category CTO issued on 29.12.2004 Apllied on 08.05.2008 27 106 2859 ALKARMA 57, Najafgarh Road Industrial Area Najafgarh Road Industrial Area Engineering work with anodizing & phosphating work. Renewal __ CTO issued on 12.03.01 valid upto 20.03.04 . CTO-R issued on 27.08.04 valid upto 22.06.07. Applied for CTO-R 12.07.07 Applied for Renewal of Authorisation on 12.06.06 Plot No 113 , PocketO , Sec-2 , Bawana Industrial Area Bawana Industrial Area Galvanising Of Auto parts Establish 28 107 530 DBDN INDUSTRIES Applied for CTE on 01.03.2007 vide I.D. No. 20759 16.03.2009 Ask the unit to file permission from Central Ground Water Authority for extracting the ground water, submit adequacy report of ETP from any of the empanelled consultants of DPCC and submit noise monitoring report of the D.G.Set from approved laboratories of DPCC. Call on 29.04.2009. 16.03.2009 Ask the unit to file permission from Central Ground Water Authority for extracting the ground water, submit adequacy report of ETP from any of the empanelled consultants of DPCC and submit noise monitoring report of the D.G.Set from approved laboratories of DPCC. Call on 29.04.2009. 16.03.2009 Ask the unit to file permission from Central Ground Water Authority for extracting the ground water and status of installation of ETP / ECS with adequacy report from any of the empanelled consultants of DPCC. Call on 29.04.2009. Letter issued. Reply awaited. Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 Letter issued on 15.04.09 Reply received along with CGWA permission for ground water drawl and stating that unit has applied for Adequacy report of ETP and NMR of D.G Set. Ask the unit to file full compliance of earlier CMC decision. Call on 24.06.2009 Letter issued on 16.03.09 . Reply received on 05.05.09 stating that they have dropped their idea for establishing hot dip galvanizing facility at their works in Bawana. SIT-II to inspect and report. Call on 24.06.2009 29 109 4548 JAQUAR & COMPANY LTD. C-21, SMA CoOperative Industrial Estate G.T. Karnal Road S.M.A Industrial Area Manufacturing of Bathroom fitings (Electroplating). Renewal Two times consent CTO(R) obtained on 15.06.2004 vide consent no. 10845 valid upto 11.06.2007 Applied for CTO (R) on 30.07.2007 vide I.D. No. 22894. 30 110 1928 Pin Dot Graphic Solutions (P) Ltd B-70,/75, DSIDC Complex, Lawrence Road Industrial Area Lawrence Road Industrial Area Gravure Printing Cylindres Establish Applied for CTE on 17.07.2007 vide I.D. No. 22482. 31 111 4041 VARNALI B-3/1- Okhla Industrial Area Okhla Industrial Area washing and dry cleaning of cloths and garments accessors Establish CTE issued on 06.01.2003 CTO issued on 30.04.2004 CTO ( R) applied on 31.05.2007 32 112 4042 APRA AUTO INDIA PVT. LTD. F-85, Ph-I, Okhla Industrial Area Okhla Industrial Area Repairing & Servicing of Vehicles. Operate CTE issued on 03.04.2006 Applied for CTO on 10.07.2007 Applied for renewal of authorization on 08.07.2008 vide I.D.No. 4618. 16.03.2009 Ask the unit to file permission from Central Ground Water Authority for extracting the ground water and submit adequacy report of ETP from any of the empanelled consultants of DPCC. Call on 29.04.2009. Letter issued on 17.04.09. Reply received on 04.05.09 stating that they have closed their industrial activities w.e.f. 31st March 2009 & now they are using their premises as godown, keeping only 2 storekeepers & 2 security guards to look after the godown activities. SIT-II report to be discussed. Ask the unit to file its reply on an affidavit. Call on 24.06.2009 Applied for authorization on 17.03.2008 vide I.D. No. 4523. 16.03.2009 SIT-II to inspect and report. Call on 29.04.2009. Applied on 31.05.2007 16.03.2009 Ask the unit to submit fresh adequacy report of ETP from any of the empanelled consultants of DPCC. Also SIT-II to inspect and report. Call on 29.04.2009. Letter issued. Reply awaited. Also SIT-II report to be discussed. 16.03.2009 Ask the unit to file permission from Central Ground Water Authority for extracting the ground water. Call on 29.04.2009. Letter issued to file permission from Central Ground Water Authority for extracting the ground water.. Reply received stating that they have already shut down the bore well and does not require DJB permission. Issue final reminder for full compliance of earlier CMC decision. Also inspection to be expedited by SIT-II. Call on 24.06.2009 Ask the unit to file its reply on an affidavit and to dismentle the borewell. Call on 24.06.2009 Issue SCN for closure on the basis of SIT deficiencies. Call on 24.06.2009 33 114 4044 LALLY AUTOMOBILES PVT. LTD . D-196,PH-1 Okhla Industrial Area Okhla Industrial Area Workshop cum service station of cars with washing. Operate CTE issued on 28.09.2006 Applied for CTO on 20.02.2008 34 115 1490 M.G.F. AUTO MOBILES LTD. B-7, G.T. Karnal Road Industrial Area G.T. Karnal Road Industrial Area Washing & Servicing of Cars. Renewal CTE not obtained. Applied for CTO (R) on 10.07.2007 vide I.D. No. 22262. 35 116 4045 RADNIK EXPORTS A-192, PH-I, Okhla Industrial Area Okhla Industrial Area Readymade garment with washing. Operate CTE issued on 05.04.2006 Applied for CTO on 14.11.2007 16.03.2009 Ask the unit to file permission from Central Ground Water Authority for extracting the ground water and submit adequacy report of ETP with details of waste water connected from the other units from any of the empanelled consultants of DPCC. Call on 29.04.2009. 16.03.2009 Ask the unit to apply for Consent to Establish and file permission from Central Ground Water Authority for extracting the ground water. Call on 29.04.2009. Letter issued. Reply awaited. 16.03.2009 Ask the unit to file permission from Central Ground Water Authority for extracting the ground water. Call on 29.04.2009. Letter issued. Reply awaited. Letter issued. Reply awaited. Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 Issue final reminder for full compliance of earlier CMC decision. Call on 24.06.2009 36 117 2799 PANACEA BIOTEC LTD. B-1 Extn./ A-24-25, Mathura Road Mohar Co-operative Industrial Area Mohan Cooperative Industrial Area Research & Development of Medicines Lab. Establish Applied for CTE on 03.06.2008 16.03.2009 Ask the unit to submit status of installation of ETP with adequacy report from any of the empanelled consultants of DPCC. Also SIT-II to inspect and report. Call on 29.04.2009. Letter issued. Reply awaited. Also SIT-II report to be discussed. 37 118 4046 AT HOME INDIA PVT. LTD. F-29/4, Phase-II, Okhla Industrial Area Okhla Industrial Area Cutting, Stitching, Washing, Finishing & Packing. Establish Green Category CTE issued on 28.11.2002 orange CategoryCTE applied on 05.02.2008 16.03.2009 Ask the unit to submit declariation for source of water stating the address on affidavit and status of installation of ETP with adequacy report from any of the empanelled consultants of DPCC. Call on 29.04.2009. Letter issued. Reply awaited. 38 119 1929 DARSHAN TRADING CO C-34, Lawrence Road Indl Area Lawrence Road Industrial Area Cold storage facility with meat processing. Renewal Applied for CTE on 05.03.2008 vide I.D. No. 25103. 16.03.2009 SIT-II to inspect and report. Call on 29.04.2009. SIT-II report to be discussed. Obtained CTO on 27.10.2004 vide consent no. 12019 valid upto 07.10.2007 Applied for CTO (R) on 05.10.2007 vide I.D.No. 23790. Applied for authorization on 03.01.2005 vide I.D. No. 2253, 05.10.2007 vide I.D.No. 4396 & 05.03.2008 vide I.D .No. 4503. Issue final reminder for full compliance of earlier CMC decision. Also inspection to be expedited by SIT-II. Call on 24.06.2009 Issue final reminder for full compliance of earlier CMC decision. Call on 24.06.2009 Re-inspection by SIT-I and report. Call on 24.06.2009 39 120 5849 MOTORADES Dr. K.S. Krishna Road (Near N.P.L.) NC-C Petrol PUmp Service Station Renewal __ 40 121 4423 NAVEEN AUTOMOBILES 37, Patparganj Industrial Area Patparganj Industrial Area Service Station For Repair and Servicing of Cars Which Includes Repairing/Manufacturing of Spares. Washing, Denting and Painting of Cars Etc. Establish Applied for CTE on 04.04.2007 vide I.D. No. 20991. CTO issued on 07.02.01valid upto 14.01.04. Applied for CTO-R on 05.11.04 and same was refused on 16.10.05. CTO -R issued on 14.09.06. CTO-R valid upto 25.09.08. Applied for CTO- R 10.09.08 16.03.2009 Ask the unit to file permission from Central Ground Water Authority for extracting the ground water and apply for authorization under HWM Rules. Call on 29.04.2009. Letter issued on 15.04.09 Reply received along with CGWA permission for ground water drawl and applied for authorization under HWM Rules. Issue renewal of consent and authorization under HWM Rules. Call on 24.06.2009 16.03.2009 Ask the unit to file permission from Central Ground Water Authority for extracting the ground water, status of installation of ETP with adequacy report from any of the empanelled consultants of DPCC and submit noise monitoring report of the D.G.Set from approved laboratories of DPCC. Call on 29.04.2009. Letter issued on 17.04.09. Reply received along with copy of application submitted to CGWA & affidavit for non installation of D.G set on 04.05.09, stating that they have completely installed the E.T.P & application for preparing adequacy report has been submitted to GGSIPU & copy of this is enclosed . Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 41 122 348 SHREE SHIV STEEL S-55, Ph-I, Badli Industrial Estate Badli Industrial Estate Pickling Annealing and re rolling of S. S. patta/patti Establish Applied for CTE on 21.04.2008 vide I.D. No. 25532. 42 123 2860 SUGOI MOTORS (PVT) LTD 27-A, Shivaji Marg, Najafgarh Road Industrial Area Najafgarh Road Industrial Area Service, Repair and maintenance of Car. Establish Applied on 11.04.08 Applied for CTO on 01.09.06 Apply for Authorization on 13.03.09 16.03.2009 Ask the unit to file permission from Central Ground Water Authority for extracting the ground water and status of installation of ETP/ECS with adequacy report from any of the empanelled consultants of DPCC. Also ask the unit to submit an action plan for stoppage of the activity before 07.02.2010, which falls under negative list as per MPD-2021 and an action plan for new proposed activity in conformity with MPD2021 on the vacant plot due to closure of present activity. Call on 29.04.2009 Letter issued. Reply awaited. Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 16.03.2009 Ask the unit to submit clarification regarding the existence of the unit at its earlier address i.e. 21A, Shivaji Marg. Also SIT-II to inspect and report. Call on 29.04.2009. Letter issued on 15.04.09 Reply received stating that Sugoi Motors at 27-A, Shivaji Marg, Najafgarh Road Industrial Area is other unit and it is extension of Sugoi Motors (Pvt.) Ltd. at 21-A, Shivaji Marg, Najafgarh Road Industrial Area. Also SIT-II report to be discussed. Issue SCN for closure on the basis of SIT deficiencies. Also ask the unit operating at 21-A to correct the deficiencies noted by SIT and submit an affidavit in this regard. Call on 24.06.2009 43 44 45 124 125 126 4047 2803 2428 SAMARA AUTOMOBILES PVT. LTD. 13-14, DSIDC Shed, Scheme-I, Okhla Industrial Area, Ph-II Okhla Industrial Area Automobile Workshop SEEMA OVERSEAS B-11/46,Mohan Cooperative Industrial Area Mathura Road Mohan Cooperative Industrial Area Mfg. of Builders Hardware Items Including Electroplating & Powder Coating Operate A-96, Phase-II, Mayapuri Industrial Area Mayapuri Industrial Area Servicing and Repairing Centre of Motor Cycles. Renewal SINGLA AUTOMOBILES Operate CTE issued on 16.08.2004 Applied for CTO on 28.02.2005 CTE issued on 07.05.2003 Applied for CTO on 29.12.2004 CTO issued on 18.08.2005. CTO ( R) applied on 12.08.2008 16.03.2009 Ask the unit to file fresh application for consent to operate, to install ETP and to file permission from Central Ground Water Authority for extracting the ground water. Call on 29.04.2009. 16.03.2009 Ask the unit to file fresh application for consent to operate, file fresh adequacy report of ETP/ECS from approved consultants of DPCC and to file permission from Central Ground Water Authority for extracting the ground water. Call on 29.04.2009. 16.03.2009 Ask the unit to apply for Consent to Establish, file fresh adequacy report of ETP from approved consultants of DPCC and to file permission from Central Ground Water Authority for extracting the ground water. Call on 29.04.2009. Letter issued to file fresh application for consent to operate, to install ETP and to file permission from Central Ground Water Authority for extracting the ground water.. Reply awaited and letter returned back. Paste the letter on the premises. Call on 24.06.2009 Letter issued. Reply awaited. Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 Letter issued. Reply awaited. 46 127 3285 TIMES INTERNATIONAL H-1258, DSIDC, Narela Industrial Area Narela Industrial Area Thread dyeing. Establish Applied for CTE on 19.04.2007 vide I.D. No. 21084. 47 128 4424 AFFORDABLE EXPORTS PVT. LTD. 189, FIE, Patparganj Patparganj Industrial Area manufacturing of readymade garments with dyeing & washing Renewal Two times consent 48 129 4048 SHOR SHOT INDIA PVT. LTD D-1/1, Phase-II, Okhla Industrial Area Okhla Industrial Area Mfg. of readymade garment. Establish Green CategoryCTE refused Orange CategoryApplied for CTE on 01.12.2008 16.03.2009 Ask the unit to file affidavit about installation of ETP/ECS, acoustic enclosure with D.G. Set and requisite stack height with boiler and D.G. Set. Also ask the unit to submit permission from CGWA. Call on 29.04.2009 CTO(R) obtained on 02.09.2004 vide consent no. 11456 valid upto 31.08.2007 Applied for CTO (R) on 30.08.2007 vide I.D. No. 23326. Green Categoryissued on 24.12.2002 CTO ( R) applied on 12.12.2007 Applied for renewal of authorization on 21.08.2006 vide I.D. No. 3399. Letter issued. Reply awaited. 16.03.2009 Ask the unit to file fresh adequacy report from empanelled consultants of DPCC. Also SIT-II to inspect and report. Call on 29.04.2009. Letter issued. Reply awaited. Also SIT-II report to be discussed. 16.03.2009 Ask the unit to file fresh adequacy report from empanelled consultants of DPCC and to file permission from CGWA. Call on 29.04.2009. Letter issued. Reply received stating that they have already applied for adequacy report and also submit an affidavit wherein they have mentioned that unit is not using any ground water. Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 Issue final reminder for full compliance of earlier CMC decision. Also inspection be expedited by SIT-II. Call on 24.06.2009 Ask the unit to file full compliance of earlier CMC decision. Also ask the unit to clarify on affidavit from where it is taking water for domestic as well as industrial use along with documentary proof. Call on 24.06.2009 49 130 4049 MICRO NIKEL PVT. LTD E-45/2, Phase-II, Okhla Industrial Area Okhla Industrial Area Nickel Screens with Electroplating (Chrome) capacity 25 tp 30 Screens / day. Renewal CTO applied on 01.04.2008 50 131 5955 ANIL FILLING STATION A-Block, Community Centre, Paschim Vihar NC-W Service Station Operate __ Applied for CTO on 19.07.04 51 132 2429 INDO EXPORT CORPORATION A2/1, Mayapuri Industrial Area, Phase-I Mayapuri Industrial Area Screen Printing with Washing Operate Green CategoryCTE issued on 10.04.2008 CTO issued on 26.03.2004. CTO ( R) issued on 10.01.2006 Applied for CTO ( R) on 08.04.2009 52 133 4780 RAGHUVANSHI ENTERPRISES (P) LTD Plot No. 485-A/1, Dilshad Garden North of G.T. Road Industrial Area Shahdara Shahdara Industrial Area (North of GT Road) Repair and Servicing of Automobiles with washing. Establish Applied on 17.07.2007 __ 16.03.2009 Ask the unit to file fresh adequacy report for ETP / ECS from Shriam Institute of Industrial Research or from NPL. Call on 29.04.2009. 16.03.2009 Ask the unit to file fresh consent to operate application along with adequacy report from empanelled consultants of DPCC and to file permission from CGWA. Call on 29.04.2009. 16.03.2009 Ask the unit to apply Consent to Establish under Orange category and file fresh adequacy report of ETP from empanelled consultants of DPCC. Call on 29.04.2009. 16.03.2009 Ask the unit to file an affidavit confirming installation of ETP. Call on 29.04.2009. Letter issued. Reply awaited. Issue final reminder for full compliance of earlier CMC decision. Call on 24.06.2009 Letter issued on 15.04.09 Reply awaited. Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 Issue final reminder for full compliance of earlier CMC decision. Call on 24.06.2009 Letter issued. Reply awaited. Letter issued. Reply awaited. Issue final reminder for full compliance of earlier CMC decision. Call on 24.06.2009 53 134 4425 GAYATRI PREM AUTO PVT. LTD. Plot No.-31, FIE Patparganj Industrial Area Patparganj Industrial Area Servicing and repair of Motor Cycle/Scooter with washing. Establish Applied for CTE on 30.05.2008 vide I.D. No. 25906. 54 135 2804 GKB RX LENS PVT. LTD. E-26, B-1, Extension, Mohan Co-operative Industrial Area Mohan Cooperative Industrial Area Mgf of Lens. Establish Applied for CTE on 24.12.2008 Applied for CTO on 02.02.2006 55 136 4781 R.K. AUTOMOBILES ZB.45-46/487, Dilshad Garden (North of GT Road) Industrial Area, Shahdara Shahdara Industrial Area (North of GT Road) Service & Repair of Two Wheelers with Washing. Operate CTE issued on 27.12.2004 Applied for CTO on 03.04.2008. 19-A, Main G.T. Road, Dilshad Garden Industrial Area, Shahdara Shahdara Industrial Area (North of GT Road) Repair and Servicing of automobiles with washing. Establish 56 137 4782 RAGHUVANSHI ENTERPRISES PVT. LTD. Applied for CTE on 02.06.2008 Applied for authorization on 30.05.2008 vide I.D. No. 4584. 16.03.2009 Ask the unit to file a fresh Consent to Establish and affidavit confirming installation of ETP. Call on 29.04.2009. Letter issued. Reply awaited. 16.03.2009 Ask the unit to file CGWA clearance and submit affidavit for installation of ETP. Call on 29.04.2009. Letter issued. Reply awaited. 16.03.2009 In accordance with adequacy report, let the unit install flow measuring device and confirm. Call on 29.04.2009. Call on 29.04.2009. 16.03.2009 Ask the unit to file permission from Central Ground Water Authority for extracting the ground water. Call on 29.04.2009. Ask the unit to file a fresh Consent to Operate and affidavit confirming installation of ETP. Call on 24.06.2009 Issue final reminder for full compliance of earlier CMC decision. Call on 24.06.2009 Letter issued. Reply awaited. Issue final reminder for full compliance of earlier CMC decision. Call on 24.06.2009 Letter issued. Reply awaited. Issue final reminder for full compliance of earlier CMC decision. Call on 24.06.2009 57 138 4050 ARKAY ENTERPRISES D-89, Phase-I, Okhla Industrial Area Okhla Industrial Area garments with washing Renewal CTO issued on 19.07.2002. CTO ( R) applied on 26.09.2005 58 139 5768 PICCA DELHI (A UNIT OF ARA HOSPITALITY PVT. LTD). GROUND FLOOR, PLAZA CINEMA BUILDING H BLOCK, CONNAUGHT CIRCUS NC-ND Restaurant 192 seats with food and beverage and liquor facility. Operate CTE issued on 31.07.06 Applioed for CTO on 24.10.07 59 140 3226 R.C. ENERGY METERING PVT. LTD B-65, GATE NO. 1, Naraina Industrial Area Phase - II Naraina Industrial Area Phase - II Manufacturing of Energy Meters, submersibelm monoblock pumps, M. C. B. s Starters & panels. Establish Applied on 10.07.08 CTO issued on 03.09.04 and valid upto 20.07.07. Applied for CTO-R on 15.07.08 60 141 4051 UNICORN GARMENTS PVT. LTD. 45-48, DSIDC SHED SCHEME-III, PH-II, Okhla Industrial Area Okhla Industrial Area Stitching of fabrication of Ready made garments. Establish CTE issued on 21.07.2006 16.03.2009 Ask the unit to apply for Consent to Establish, fresh consent to operate application and file fresh adequacy report from empanelled consultants of DPCC along with permisson from CGWA. Call on 29.04.2009. Letter issued. Reply awaited. Issue final reminder for full compliance of earlier CMC decision. Call on 24.06.2009 __ 16.03.2009 Ask SIT-II to inspect and report. Call on 29.04.2009. SIT-II report to be discussed. Also unit has submitted a letter along with adequacy report. Issue SCN for closure under Water Act on the basis of SIT deficiencies. Call on 24.06.2009 Applied for Renewal of Authorisation on 06.10.06 and 02.01.09 16.03.2009 Ask the unit to file permission from Central Ground Water Authority for extracting the ground water. Call on 29.04.2009. Letter issued on 15.04.09 Reply awaited. Issue final reminder for full compliance of earlier CMC decision. Call on 24.06.2009 16.03.2009 Ask the unit to file permission from CGWA and an affidavit regarding installation of ETP. Call on 29.04.2009. Letter issued. Reply awaited. Issue final reminder for full compliance of earlier CMC decision. Call on 24.06.2009 61 142 1618 Unitech Industries A-66, jhilmill Industries Area Jhilmil Industrial Area Non Ferrous sheet metal work Industrial fasteners electrical sub assembly Establish CTE applied on 26.11.2007 62 143 350 KWALITY THREADS S-81,Badli Industrial Estate Badli Industrial Estate Dyeing of Polyester Yarns. Renewal CTE not obtained. 63 144 1209 BANSAL WIRE INDUSTRIES LTD 458-466, Gali No 8, shambhu Nath compound, G T Road Shahdara, Friends Colony Industrial Area Friends Colony Industrial Area M S Wire Drawing with Annealing pickling & Zinc plating (Galvanizing) Operate 16.03.2009 Ask the unit to file permission from CGWA, an affidavit regarding installation of ETP and submit noise monitoring report of D.G. Set from approved lab of DPCC. Call on 29.04.2009. Applied for CTO (R) on 13.05.2005 vide I.D. No. 14059. Applied for CTO (R) on 24.07.2008 vide I.D. No. 26719. CTO issued on 11.07.2003 CTO ( R) issued on 13.08.2004 CTO ( R) refused on 21.06.2007 Applied for authorization on 25.04.2006 vide I.D. No. 2621. 16.03.2009 Ask the unit to install flow meter with ETP, apply for Consent to Establish and file permission from CGWA clearance. Call on 29.04.2009. 16.03.2009 SIT-II to inspect and report. Call on 29.04.2009. Letter issued to file permission from CGWA, an affidavit regarding installation of ETP and submit noise monitoring report of D.G. Set from approved lab of DPCC.. Reply awaited and letter returned back. Letter issued. Reply awaited. Paste the letter on the premises. Call on 24.06.2009 SIT-II report to be discussed. Ask the unit to file an affidavit for closure of its activity and not to start any activity without prior permission from DPCC. Call on 24.06.2009 Issue final reminder for full compliance of earlier CMC decision. Call on 24.06.2009 64 145 4052 DIMPLE CREATIONS PVT. LTD C-64/5, PH-II Okhla Industrial Area Okhla Industrial Area manf of readymade garments with washing Renewal CTO applied on 14.01.2005 16.03.2009 Ask the unit to apply for Consent to Establish and file fresh application for Consent to Operate and fresh adequacy report from empanelled consultants of DPCC. Call on 29.04.2009. Letter issued to apply for Consent to Establish and file fresh application for Consent to Operate and fresh adequacy report from empanelled consultants of DPCC.. Reply received wherein unit has asked for some time to submit the compliance report. Time allowed till 24.06.2009 for full compliance. Call on 24.06.2009 65 146 4053 KALAKRITI PRINTS PVT. LTD F-29/5, Ph-II, Okhla Industrial Area Okhla Industrial Area Printing of Cloth. Renewal CTO issued on 15.04.2004. CTO ( R) applied on 27.02.2008 16.03.2009 Ask the unit to increase the capacity of settling tank and add activated carbon filter as suggested in the adequacy report. Call on 29.04.2009. Letter issued to increase the capacity of settling tank and add activated carbon filter as suggested in the adequacy report. . Reply received. Reiterate CMC decision taken earlier. Call on 24.06.2009 66 148 5042 RAJPAL POLYTEX PVT. LTD L-4, Rohtak Road Udyog Nagar Industrial Area Udyog Nagar Industrial area HOSIERY PRODUCT (FABRIC & ZIPS) WITH DYEING & WASHING. Establish Applied on 29.04.08 and 15.10.08 Applied for Authorization on 15.10.08 16.03.2009 Ask the unit to submit affidavit for both, installation of ETP and acoustic enclosure with D.G. Set. Call on 29.04.2009. first time applied for without washing , second time for with washing. Letter issued on 15.04.09 Affidavit submitted stating that suitable ETP and D.G Set with inbuilt accauctic enclosure has been installed 67 149 6101 AUTO CARE CENTRE NITI Marg, Chanakyapuri N/A Filling Station cum Service station of cars. Operate Issued on 03.02.06 valid upto 30.01.07. Applied for Authorization on 06.11.06. 16.03.2009 Ask the unit to file fresh authorization under HWM Rules and to file fresh adequacy report from empanelled consultants of DPCC. Call on 29.04.2009. Letter issued on 15.04.09 Reply awaited. Consent application dated 29.04.2008 be made infructuous and consent be issued w.r.t. application dated 15.10.20008. Call on 24.06.2009 Issue final reminder for full compliance of earlier CMC decision. Call on 24.06.2009 Applied for CTO on 22.04.08. 68 150 352 EQUIPTECH PVT. LTD. A-24, Phase-III, Badli Industrial Estate Badli Industrial Estate Industrial Instrumentation & Control (Including Steel Fabrication & Galvanization) Renewal 69 152 5850 HEMKUNT SERVICE STATION PVT. LTD Link Road Near Lodhi Hotel N/A Petrol Pump Cum Service Station Renewal 70 153 5851 SATYA SERVICE STATION LTD L-Block Hari Nagar Jail Road N/A Oil filling Cum Service Station. Renewal CTE not obtained. Applied for CTO (R) on 24.07.2007 vide I.D. No. 22708. Applied for renewal of authorization on 17.10.2007 vide I.D. No. 3899. CTO applied on 29.11.2007 __ CTO issued on 28.11.01 valid upto 30.09.04. CTO-R issued on 15.09.05 valid upto 29.09.07. Applied for CTO-R on 18.01.08 Applied for renewal on 18.1.08. 16.03.2009 Ask the unit to file CGWA clearance, affidavit for installation of ETP / ECS and acoustic enclosure & adequate stack height with D.G. Set. Call on 29.04.2009. Letter issued. Reply awaited. Issue final reminder for full compliance of earlier CMC decision. Call on 24.06.2009 16.03.2009 Ask the unit to apply for Consent to Establish and to file permission from Central Ground Water Authority for extracting the ground water. Call on 29.04.2009. 16.03.2009 Ask the unit to file permission from Central Ground Water Authority for extracting the ground water. Call on 29.04.2009. Letter issued. Reply awaited. Issue renewal of consent. Call on 24.06.2009 Letter issued on 15.04.09 Reply awaited. Ask the unit to file permission from DJB for ground water extraction as per new orders. Call on 24.06.2009 71 154 5043 LANDMARK BANQUET PVT. LTD. B-I, Udyog Nagar Industrial area Udyog Nagar Industrial area CATERING SERVICE FOR MARRIAGES & OTHER PARTIES Operate 72 155 2430 MAHARANI OF INDIA C-154, Ph-II, Mayapuri Industrial Area Mayapuri Industrial Area manufacturing of ready made garments (With washing) Renewal __ Applied for CTO on 30.08.04. CTO issued on 29.09.2004. CTO ( R) applied on 18.12.2007 Applied for HWM on 05.06.2007 16.03.2009 Ask the unit to apply for Consent to Establish, a fesh application for Consent to Operate and latest adequacy report of ETP and noise monitoring report of D.G. Set and permission from CGWA clearance. Also ask the unit to install CFL, rain water harvesting system, solar water harvesting and plantation of tree. Call on 29.04.2009. Letter issued on 15.04.09 Replyreceived stating that the unit has been closed and no activity is being carried out. Ask the unit to file its reply on an affidavit. Call on 24.06.2009 16.03.2009 Ask the unit to apply for Consent to Establish and to file permission from Central Ground Water Authority for extracting the ground water, a fresh adequacy report of ETP & noise monitoring report of D.G. Set from approved consultants / laboratories of DPCC. Call on 29.04.2009. Letter issued to apply for Consent to Establish and to file permission from Central Ground Water Authority for extracting the ground water. Reply awaited. Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 73 156 1492 REGAL PALACE B-3, G.T. Karnal Road Industrial Area G.T. Karnal Road Industrial Area Banquet Hall/Restaurant Operate CTE not obtained. Applied for CTO on 14.12.2005 vide I.D.No. 17236. 74 157 353 V.K. INTERNATIONAL B-9/2, Ph-I, Badli Indl. Area Badli Industrial Estate Manufacturing of Stainless Steel Patta/patti by Annealing Pickling & Re Rolling of Process. Renewal Two times consent 75 158 6031 ALISHA ENTERPRISES PVT. LTD. 12, Hauz Khas Village N/A RESTAURENT Renewal Obtained CTO (R) on 25.04.2006 vide consent no. 14257 valid upto 26.03.2008 Applied for CTO (R) on 21.11.2008 vide I.D. No. 28161. CTO issued on 02.08.2002. CTO ( R) applied on 18.12.2006 Applied for renewal of authorization on 118.07.2006 vide I.D. No. 2861. 16.03.2009 Ask the unit to apply for Consent to Establish and to file permission from Central Ground Water Authority for extracting the ground water, a fresh adequacy report of ETP & affidavit for stack height & acoustic enclosure of D.G. Set. Also ask the unit to install solar water heating system, rain water harvesting system, CFL & to undertake plantation of trees. Call on 29.04.2009. 16.03.2009 Ask the unit to file affidavit for installation of ETP and for stack height & acoustic enclosure of D.G. Set. Call on 29.04.2009. Letter issued. Reply awaited. Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 Letter issued. Reply awaited. Issue final reminder for full compliance of earlier CMC decision. Call on 24.06.2009 16.03.2009 Ask the unit to apply for Consent to Establish, a fresh noise monitoring report of D.G. Set , a fresh adequacy report from empanelled consultants / laboratoires of DPCC and affidavit about source of water supply. Call on 29.04.2009. Letter issued. Reply awaited. Issue final reminder for full compliance of earlier CMC decision. Call on 24.06.2009 76 159 5884 HALDIRAM PRODUCT (PVT) LTD 2032, 2033, KATRA LACHHU SINGH CHANDHI CHOWK N/A MFG. OF SWEETS & SNACKS. Establish 77 160 2431 J.P. DYE PRINTS C-150, PH-II, Mayapuri Industrial Area Mayapuri Industrial Area Washing of Denim Cloths Renewal 78 161 2805 VIVEK AUTOMOBILE LTD A-1, Mohan Cooperative Industrial Area Mohan Cooperative Industrial Area Servicing, Repairing & Washing of Vehicles (Car). Establish Applied for CTE on 07.11.2007 vide I.D. No. 24172. Applied for CTE on 29.07.2008 Applied for CTO on 05.12.2007 vide I.D. No. 24417. 16.03.2009 Ask the unit to file permission from Central Ground Water Authority for extracting the ground water and affidavit for stack height & acoustic enclosure of D.G. Set. Call on 29.04.2009. Letter issued. Reply awaited. CTO issued on 03.09.2004 CTO ( R) applied on 21.09.2007 16.03.2009 Ask the unit to apply for Consent to Establish and to file permission from Central Ground Water Authority for extracting the ground water, a fresh adequacy report of ETP. Also ask the unit to submit the details about the boiler. Call on 29.04.2009. Letter issued to apply for Consent to Establish and to file permission from Central Ground Water Authority for extracting the ground water, a fresh adequacy report of ETP. Also ask the unit to submit the details about the boiler.. Reply received stating that they are applying for CTE and for DJB permission and not using any boiler. Letter issued. Reply awaited. 16.03.2009 Ask the unit to file permission from Central Ground Water Authority for extracting the ground water and submit adequacy report of ETP from any of the empanelled consultants of DPCC. Call on 29.04.2009. Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 Call on 24.06.2009 with full compliance Issue final reminder to submit an affidavit for installation of ETP with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 79 164 2862 BISLERI INTERNATIONAL PVT. LTD. 60, Najafgarh Road Industrial Area Najafgarh Road Industrial Area Packaging of Drinking of Mineral water Operate Applied for CTO on 26.07.02. Applied for CTO on 02.03.07 16.03.2009 SIT-II to inspect and report and also comment on use of plastic in the unit. Call on 29.04.2009. 80 165 4057 BOUTIQUE INTERNATIONAL D-5/1, PH-II, Okhla Industrial Area Okhla Industrial Area CUTTING ROW CLOTHS, STITCHING AND THEN DISPATCHING THEM Operate Applied for CTO on 21.06.2005 16.03.2009 Call on 20.03.2009 20.03.2009 Ask the unit to apply for Consent to Establish, noise monitoring report of D.G. Set from approved laboratoires of DPCC and affidavit about source of water supply. Call on 29.04.2009. Letter issued. Reply awaited. Call for personal hearing on 03.06.2009 at 5.00 PM. Adequacy report submitted, Noise monitoring report not submitted, GW mentioned nil. Letter issued to apply for Consent to Establish, noise monitoring report of D.G. Set from approved laboratoires of DPCC and affidavit about source of water supply. Reply received wherein they have requested for time for compliance. Issue final reminder for full compliance of earlier CMC decision. Call on 24.06.2009 81 166 2863 JIWAN LAL & CO. 14-B, Najafgarh Road Industrial Area Najafgarh Road Industrial Area Light Engg. Work with Forging Operate Applied for CTO on 26.07.02 16.03.2009 Ask the unit to apply for Consent to Establish and file an affidavit for installation of ECS and stack height / acoustic enclosure with the D.G. Set. Also ask the unit to submit noise monitoring report of the D.G. Set from approved laboratories of DPCC. Call on 29.04.2009. Letter issued on 15.04.09 Reply received without affidavit stating that they already have required stacks installed on diesel fired furnace with burner and they have applied for fresh NMR in DPCC. However unit is silent on CTE application. Issue final reminder for Consent to Establish and full compliance of earlier CMC decision. Call on 24.06.2009 82 167 6032 KABILA RESTAURANT(A Uniot of Maxims Food) DDA SHOPPING CENTRE, AUROBINDO PLACE N/A Restaurant. Operate CTO issued on 29.03.2004 CTO ( R) on 21.08.2007 16.03.2009 Ask the unit to file permission from Central Ground Water Authority for extracting the ground water, a fresh adequacy report of ETP and raise the stack height of the D.G. Set and to submit the noise monitoring report of the D.G. Set from approved laboratories of DPCC.Also ask the unit to install solar water heating system, rain water harvesting system, CFL & to undertake planatation of trees. Call on 29.04.2009. Letter issued to file permission from Central Ground Water Authority for extracting the ground water, a fresh adequacy report of ETP and raise the stack height of the D.G. Set and to submit the noise monitoring report of the D.G. Set from approved laboratories of DPCC.Also ask the unit to install solar water heating system, rain water harvesting system, CFL & to undertake planatation of trees.. Reply received wherein they have submitted the noise monitoring report, permission from DJB and also mentioned that they are manitaining a grease trap plant. Issue final reminder for full compliance of CMC decision, failing which, unit will be called for personal hearing. Call on 24.06.2009 83 168 5888 MC DONALDS FAMILY RESTAURANT UB-33-34, Jawahar Nagar N/A Restaurant Operate 84 169 5852 MCDONALD FAIMLY RESTAURENT S-27,Green Park Market,S/O Sh Provat Kr. Sen R/O CA 38/1 tagore Garden N/A Quick Service Restaurant Operate CTO applied on 09.11.2004 16.03.2009 Call on 20.03.2009 20.03.2009 Ask the unit to apply for Consent to Establish, affidavit about source of water supply, for installation of oil & grease trap cum settling tank & for stack height / acoustic enclosure with the D.G. Set. Call on 29.04.2009. Letter issued. Reply awaited. Call for personal hearing on 03.06.2009 at 5.15 PM. 16.03.2009 Ask the unit to file a fresh adequacy report of ETP, noise monitoring reprot of D.G. Set from empanelled consultants / laboratories of DPCC and affidavit for source of water supply. Also ask the unit to install solar water heating system, rain water harvesting system, CFL & to undertake planatation of trees. Call on 29.04.2009. Letter issued. Reply awaited. Call for personal hearing on 03.06.2009 at 5.30 PM. 85 170 5853 MCDONALDS FAIMLY RESTAURENT M-70,Greater kailash1 Market N/A RESTAURANT Operate 86 171 5771 MCDONALDS FAMILY RESTAURANT ISBT, DMRC Railway Station, Kashmere Gate, Near ISBT N/A RESTAURENT Operate CTE not obtained. CTO applied on 24.03.2005 16.03.2009 Ask the unit to apply for Consent to Establish, file a fresh adequacy report of ETP, noise monitoring reprot of D.G. Set from empanelled consultants / laboratories of DPCC and affidavit for source of water supply. Also ask the unit to install solar water heating system, rain water harvesting system, CFL & to undertake planatation of trees. Call on 29.04.2009. Letter issued. Reply awaited. Call for personal hearing on 03.06.2009 at 5.45 PM. Applied for CTO on 09.11.2007 vide I.D. No. 12084 16.03.2009 Ask the unit to apply for Consent to Establish and to file affidavit for installation of oil & grease cum settling tank. Also ask the unit to install solar water heating system, rain water harvesting system, CFL & to undertake planatation of trees. Call on 29.04.2009. Letter issued. Reply awaited. Call for personal hearing on 03.06.2009 at 6.00 PM. 87 88 172 173 5922 6033 MCDONALDS FAMILY RESTAURANT Showroom No.17-24, Grindlays Cinema, Friends Colony Industrial Area N/A MCDONALDS FAMILY RESTAURANT BG02, HUDCO PLACE, ANSLA PLAZA N/A Quick Service Restaurant Quick service restaurant. Operate Establish CTO applied on 09.11.2004 CTO issued on 15.04.2004 16.03.2009 Ask the unit to apply for Consent to Establish, file a fresh adequacy report of ETP, noise monitoring reprot of D.G. Set from empanelled consultants / laboratories of DPCC and affidavit for source of water supply. Also ask the unit to install solar water heating system, rain water harvesting system, CFL & to undertake planatation of trees. Call on 29.04.2009. 16.03.2009 Ask the unit to file permission from Central Ground Water Authority for extracting the ground water and submit an affidavit for non installation of D.G. Set and to submit adequacy report of ETP from approved consultants of DPCC.Also ask the unit to install solar water heating system, rain water harvesting system, CFL & to undertake planatation of trees. Call on 29.04.2009. Letter issued. Reply awaited. Issue final reminder for full compliance of earlier CMC decision. Call on 24.06.2009 Letter issued. Reply awaited. Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 89 90 174 177 6034 5889 MCDONALDS FAMILY RESTAURANT TDI-WEST SIDE MALL, ALNKAR, LAJPAT NAGAR N/A NIRULAS 2,3,4,25,2,27 LSD,DDA Market,PocketB,Ashok Vihar-III N/A QUICK SERVICE RESTAURANT Operate restaurant Operate CTO applied on 09.11.2004 CTE not obtained. CTO obtained on 27.07.2006 vide consent no. 16352 valid upto 20.04.2007 16.03.2009 Ask the unit to apply for Consent to Establish, file a fresh adequacy report of ETP and affidavit for source of water supply and for non installation of D.G. Set. Call on 29.04.2009. 16.03.2009 Ask the unit to apply for Consent to Establish and to file affidavit for installation of oil & grease cum settling tank. Also ask the unit to install solar water heating system, rain water harvesting system, CFL & to undertake planatation of trees. Call on 29.04.2009. Letter issued. Reply awaited. Issue final reminder for full compliance of earlier CMC decision. Call on 24.06.2009 Letter issued. Reply awaited. Issue final reminder for full compliance of earlier CMC decision. Call on 24.06.2009 91 178 5772 NIRULAS CORNER HOUSE PVT. LTD. N-6464B,CONNAUGHT CIRCUS N/A RESTAURENT Establish 92 179 4058 ORIENT CRAFT LTD B-14, Phase-II Okhla Industrial Area Okhla Industrial Area Manufacturing & Export of Readymade Garment with washing. Operate 93 180 3286 PACKWELL & COMPANY Plot No.-2922, SectorJ, Narela Industrial Park, Narela Narela Industrial Area manufacturing of Prindted Circuit Board and electronic components. Establish Applied on 16.05.07 __ CTO issued on 23.03.2005. CTO ( R) applied on 02.05.2008 Applied for CTE on 10.12.2007 vide I.D. No. 24439. __ 16.03.2009 Ask the unit to file permission from Central Ground Water Authority for extracting the ground water, affidavit for installation of ETP, stack height / acosutic eclosure with the D.G. Set and submit noise monitoring report of D.G. Set from approved laboratories of DPCC.Also ask the unit to install solar water heating system, rain water harvesting system, CFL & to undertake planatation of trees. Call on 29.04.2009. 16.03.2009 Ask the unit to apply for Consent to Establish and to file permission from Central Ground Water Authority for extracting the ground water. Call on 29.04.2009. Letter issued on 15.04.09 Reply awaited. Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 Letter issued. Reply awaited. 16.03.2009 Ask the unit to file affidavit for installation of ETP and for non installation of D.G. Set. Call on 29.04.2009. Letter issued. Reply awaited. Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 Issue final reminder for full compliance of earlier CMC decision. Call on 24.06.2009 94 181 4059 SIGNET CORPORATION A-83, Phase-II, Okhla Industrial Area Okhla Industrial Area Readymade garments with washing Establish Applied for CTE on 05.02.2008 CTO applied on 08.05.2006 95 182 2 UPPER INDIA RUBBER WORKS D-2, GALI NO. - 04, Anand Parbat Industrial Area Anand Parbat Industrial Area MOULDING OF RUBBER AUTO PARTS (WITHOUT TYRE & TUBES) WATER STOPS SEALS & PACKINGS. Operate __ Applied for CTO on 21.08.02. Applied for CTO on 11.07.07 96 183 4060 CPL AUTOS (P) LTD. S-47, Phase-II, Okhla Industrial Area Okhla Industrial Area Washing and servicing of vehicles. Renewal CTO issued on 27.09.2005. CTO ( R) applied on 26.09.2008. __ 16.03.2009 Ask the unit to file permission from Central Ground Water Authority for extracting the ground water. Call on 29.04.2009. Letter issued. Reply awaited. 16.03.2009 Ask the unit to apply for Consent to Establish and to install ECS for the emissions generated from the process. Call on 29.04.2009. Letter issued on 15.04.09 Reply received requesting for time upto 15th may for filling of CTE application. 16.03.2009 Ask the unit to apply for Consent to Establish, file a fresh adequacy report of ETP, noise monitoring reprot of D.G. Set from empanelled consultants / laboratories of DPCC and affidavit for source of water supply. Call on 29.04.2009. Letter issued. Reply awaited. Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 Time allowed till 15.05.2009 for full compliance. Affidavit to be filed. Call on 03.06.2009 Issue final reminder for full compliance of earlier CMC decision. Call on 24.06.2009 97 98 184 185 5958 1493 GULATI RESTAURANT INVITATION CERAMONIAL 6, Pandara Road Market N/A B-52,G.T. Karnal Road Industrial Area G.T. Karnal Road Industrial Area Restaurant. BANQUET HALL/ RESTAURANT Renewal Operate ___ CTE not obtained. CTO valid upto 19.08.07. Applied for CTO-R on 14.12.07. Applied for CTO on 14.12.2005 vide I.D. No. 17237 Applied for authorization on 18.01.2008 vide I.D. No. 4467. 16.03.2009 Ask the unit to apply for Consent to Establish and authorization under HWM Rules , file a fresh adequacy report of ETP from empanelled consultants of DPCC. Also ask the unit to file permission from Central Ground Water Authority for extracting the ground water. Call on 29.04.2009. 16.03.2009 Ask the unit to apply for Consent to Establish, file a fresh adequacy report of ETP from empanelled consultants of DPCC, file permission from Central Ground Water Authority for extracting the ground water and affidavit for stack height / acoustic enclosure with D.G. Set. Also ask the unit to install solar water heating system, rain water harvesting system, CFL & to undertake planatation of trees. Call on 29.04.2009. Letter issued on 15.04.09 Reply awaited. Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 Letter issued. Reply awaited. Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 99 186 1787 BAGGA LINK SERVICE LTD 9/55(A)Kirti Nagar Industrial Area Kirti Nagar Industrial Area WORKSHOP CUM SERVICE STATION OF TWO WHEELERS. Establish Applied on 09.08.07 __ 100 187 3 J.B. Motors PVT. LTD 1/1, Hall No.2, Railway Line Industrial Side, New Rohtak Road, Anand Parbhat Industrial Area Anand Parbat Industrial Area Workshop cum Serivicing station of two wheelers Establish Applied on 19.11.07 _ A-2, DDA Shed, Phase-1, Okhla Industrial Area Okhla Industrial Area Workshop cum service station of two wheelers. Establish 101 188 4061 PASHUPATI MOTORS Applied for CTE on 27.09.2007 __ 16.03.2009 Ask the unit to file permission from Central Ground Water Authority for extracting the ground water and affidavit for installation of ETP and for stack height / acoustic enclosure with D.G. Set. Call on 29.04.2009. 16.03.2009 Call on 20.03.2009 20.03.2009 Inspection by Trainee, PGRC to be expedited. Call on 29.04.2009 16.03.2009 Ask the unit to file permission from Central Ground Water Authority for extracting the ground water and fresh adequacy report of ETP and noise monitoring report of D.G. Set from approved consultants/laboratories of DPCC. Call on 29.04.2009. Letter issued on 15.04.09 Reply awaited. Inspection report to be discussed. Letter issued. Reply awaited. Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 Shift file from PGRC to CMC to issue SCN. Call on 24.06.2009 Time allowed till 24.06.2009 for full compliance. Call on 24.06.2009 102 189 3287 ARUN ELECTOPLATNG B-2305, DSIDC Narela Industrial Area Narela Industrial Area Electroplating & Powder Coating Renewal CTO obtained on 29.06.2004 vide consent no. 10936 valid upto 20.06.2007 Applied for CTO (R) on 01.08.2007 vide I.D. No. 22972. Applied for renewal of authorization on 30.08.2006 vide I.D. No. 3490 & 01.12.2008 vide I.D. No. 4826. 16.03.2009 Ask the unit to apply for Consent to Establish, file permission from Central Ground Water Authority for extracting the ground water and affidavit for installation of ETP / ECS. Also ask the unit to a fresh file adequacy report from empanelled consultants of DPCC. Call on 29.04.2009. Letter issued. Reply received on 05.05.2009 stating that they have CTE on 26.11.2001. CGWA permission is not required for the existing borewells. Affidavit and adequacy report of April, 2004 submitted. Ask the unit to file permission from DJB for ground water extraction as per new orders and fresh adequacy report from empanelled consultant of DPCC. Call on 24.06.2009 103 190 6102 GUPTA SERVICE STATION Moti Bagh South N/A Filling Station cum service station (washing of cars). Renewal CTO issued on 02.08.2002 CTO ( R) issued on 25.07.2005 CTO applied on 24.11.2008 Applied for HWM on 17.11.2008 16.03.2009 Ask the unit to submit an affidavit for source of water supply and to raise stack height of D.G. Set as per norms. Call on 29.04.2009. Letter issued. Reply awaited. Issue Consent to Establish. Call on 24.06.2009 104 191 6103 R.K. SERVICE STATION Yashwant Place, Vinay Marg, Chanakya Puri N/A Filling Station cum service station (washing of cars). Renewal CTO issued on 18.06.03 valid upto 20.06.05. CTO-R issued on 17.03.06 valid upto 20.06.08. Applied for CTO-R on 24.11.08 Applied for Authorization on 19.11.04, 23.11.04 and 02.06.08. 16.03.2009 Ask the unit to file permission from Central Ground Water Authority for extracting the ground water and affidavit for non installation of D.G. Set.Call on 29.04.2009. Letter issued on 15.04.09 Reply awaited. Issue renewal of consent and authorization under HWM Rules. Call on 24.06.2009 CTE obtained on 26.11.2001 105 192 355 AUTO & GENERAL CASTING (P) LTD. M-12, Badli Industrial Area Badli Industrial Estate Aluminium Die Casting & Zinc Plating. Renewal 106 193 5854 CAR CARE CENTRE Lodhi Road Near Ispat Bhawan N/A Petrol Pump cum service station Renewal Two times consent CTO (R) obtained on 07.07.2006 vide consent no. 16097 valid upto 21.08.2008. Applied for CTO (R) on 21.11.2008 vide I.D. No. 28159. CTO issued on 30.12.2004 CTO ( r) applied on 19.03.2008 Applied for renewal of authorization on 18.08.2006 vide I.D. No. 3320. 16.03.2009 Ask the unit to file permission from Central Ground Water Authority for extracting the ground water and affidavit for installation of ETP / ECS and stack height / acoustic enclosure with the D.G. Set.Call on 29.04.2009. Letter issued. Reply awaited. 16.03.2009 Ask the unit to file permission from Central Ground Water Authority for extracting the ground water and fresh adequacy report of ETP and noise monitoring report of D.G. Set from approved consultants/laboratories of DPCC. Call on 29.04.2009. Letter issued. Reply awaited. Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 Issue renewal of consent. Call on 24.06.2009 107 194 6037 OBERAI SERVICE STATION S-19, Green Park Extension,Mehrauli Road N/A Filling & Service Station Operate 108 195 5773 AHLCON BELA ROAD, CHNDGI RAM AKHARA, RING ROAD N/A RMC PLANT Operate 109 197 6038 Big Chill Cafe P.Ltd HS-5, Kailash Colony Market, NC-S N/A Restaurant (125 seats) Establish CTE applied on 24.06.2004 CTO applied on 03.06.2005 16.03.2009 Ask the unit to apply a fresh Consent to Operate, permission from Central Ground Water Authority for extracting the ground water and fresh adequacy report of ETP from approved consultantsof DPCC.Call on 29.04.2009. 16.03.2009 SIT-II to inspect and report. Call on 29.04.2009. CTE applied on 25.06.2007 16.03.2009 Ask the unit to file affidavit for source of water and installation of ETP. Call on 29.04.2009. Letter issued to file permission from Central Ground Water Authority for extracting the ground water and fresh adequacy report of ETP and noise monitoring report of D.G. Set from approved consultants/laboratories of DPCC.. Reply stating that they have already taken registration from CGWA, already submitted the fresh adequacy report and noise monitoring report. SIT-II report to be discussed. Paste the letter on the premises. Call on 24.06.2009 Letter issued to file affidavit for source of water and installation of ETP. . Reply received aherein unit has submitted the adequacy report and latest MCD bill. Issue Consent to Establish. Call on 24.06.2009 Call for personal hearing on 03.06.2009 at 6.15 PM. 110 198 6039 DEVYANI INTERNATIONAL LTD S-32, Green Park N/A Restaurant servies. Establish CTE applied on 14.07.2008 111 199 5774 DEVYANI INTERNATIONAL PVT. LTD. 58, JANPATH, CONNAUGHT PLACE N/A Restaurant services with siting capacity under 100 seats. Establish CTE issued on 29.06.07 valid upto 28.06.08 112 200 4614 KHARKIA ALLOYS PVT. LTD 70, S.S.I Industrial Area S.S.I Industrial Area M. S. Wire Drawing & Galvanizing. Renewal CTE not obtained. Applied for CTO on 08.10.04. Refused on 05.05.05. Applied for CTO on 16.08.05. Applied for CTO on 27.09.07. CTO obtained on 14.06.2006 vide consent no. 15320 valid upto 14.09.2007. Applied for CTO (R) on 08.02.2008 vide I.D. No. 24900. __ 16.03.2009 Ask the unit to file affidavit for source of water and installation of ETP and fresh adequacy report of ETP and noise monitoring report of D.G. Set from approved consultants/laboratories of DPCC. Call on 29.04.2009. Letter issued to file affidavit for source of water and installation of ETP and fresh adequacy report of ETP and noise monitoring report of D.G. Set from approved consultants/laboratories of DPCC.. Reply received stating that they have already applied for CTE. But not submitted any reply regarding our letter. Call for personal hearing on 03.06.2009 at 6.30 PM. 16.03.2009 Ask the unit to install flow measuring device with ETP and apply for authoriation under HWM Rules. Call on 29.04.2009. Letter issued on 15.04.09 Reply awaited. Issue final reminder for full compliance of earlier CMC decision. Call on 24.06.2009 16.03.2009 Ask the unit to apply for Consent to Establish, affidavit for installation of ETP / ECS and stack height / acoustic enclosure with the D.G. Set. Call on 29.04.2009. Letter issued. The same is returned back undelievered. Trainee to paste the letter on the premises. Call on 24.06.2009 113 201 1932 PUNJAB BISCUIT FACTORY A-16, Lawrence Road Industrial Area Lawrence Road Industrial Area Sweet, Namkeen and Confectionary items Operate CTE obtained on 27.10.2004 vide consent no. 12014 valid upto 14.09.2005 114 202 1933 SEVEN SEAS HOSPITALITY P. LTD. B-28, Lawrence Road Industrial Area Lawrence Road Industrial Area BANQUET HALL WITH RESTAURANT FACILITIES. Establish Applied for CTE on 09.10.2007 vide I.D. No. 23824. Applied for CTO on 04.09.2006 vide I.D. No. 19210. 16.03.2009 Ask the unit to file permission from Central Ground Water Authority for extracting the ground water and fresh adequacy report of ETP from approved consultants of DPCC, affidavit for installation of ECS and oil & grease trap cum settling tank & stack height / acoustic enclosure with the D.G. Set. Call on 29.04.2009. Letter issued. Reply awaited. Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 16.03.2009 Ask the unit to file permission from Central Ground Water Authority for extracting the ground water and affidavit for installation of ETP ,channelisation system for kitchen emissions & for stack height / acoustic enclosure with the D.G. Set. Also ask the unit to installflow measuring device, solar water heating system, rain water harvesting system, CFL & to undertake plantation of trees. Call on 29.04.2009. Letter issued. Reply awaited. Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 115 203 4063 VAM HI-FASHION GRAMENTS PVT LTD B-58,PH-I,Okhla Industrial Area Okhla Industrial Area Mfg of Readymade Garments without washing. Operate Green CategoryCTE issued on 01.12.2006 Green Categoryapplied on 02.04.2008 16.03.2009 SIT-II to inspect and report. Call on 29.04.2009. SIT-II report to be discussed. SIT-II to inspect and report. Call on 24.06.2009 116 204 4064 NEW SAMRAT METAL CO PVT. LTD B-125, Ph-I, Okhla Industrial Area Okhla Industrial Area Readymade garments. Renewal CTE issued on 19.05.2004 CTO issued on 14.09.2004 CTO ( R) applied on 01.01.2008 16.03.2009 Ask the unit to file affidavit for source of water and fresh adequacy report of ETP from empanelled consultants of DPCC. Call on 29.04.2009. Letter issued. Reply awaited. Issue final reminder for full compliance of earlier CMC decision. Call on 24.06.2009 117 205 6104 P K DELICIES PVT. LTD. GROUND FLOOR HALL,YASHWANT PLACE,SATYA MARG CHANKYAPURI N/A sweet shop cum Eating House. Operate Issued on 17.10.06 valid upto 16.10.07. Applied for CTO on 07.01.08 16.03.2009 Ask the unit to install flow meter device. Call on 29.04.2009. Letter issued on 15.04.09 Reply awaited. Issue final reminder for full compliance of earlier CMC decision. Call on 24.06.2009 118 206 4065 RASAH EXIM LTD. E-49/10, Ph-II, Okhla Industrial Area Okhla Industrial Area Service Station cum show room of two wheelers. Renewal CTE issued on 21.02.2006 16.03.2009 Ask the unit to file permission from Central Ground Water Authority for extracting the ground water. Call on 29.04.2009. Letter issued. Ask the unit to file affidavit stating that no ground water is tapped and submit documentary proof for taking municipal water. Call on 24.06.2009. 119 207 356 NARENDERA INDUSTRIES S-59, Phase-I, Badli Industrial Estate Badli Industrial Estate Re Rolling of S.S. Sheet 2. T/Day Establish Applied for CTE on 20.09.2007 vide I.D. No. 23568. Applied for CTO (R) on 03.07.2007 vide I.D. No. 22133. Applied for renewal of authorization on 18.07.2006 vide I.D. No. 2860 16.03.2009 Ask the unit to file permission from Central Ground Water Authority for extracting the ground water and status of installation of ETP/ECS and non installation of D.G. Set. Also ask the unit to submit an action plan for stoppage of the activity before 07.02.2010, which falls under negative list as per MPD-2021 and an action plan for new proposed activity in conformity with MPD2021 on the vacant plot due to closure of present activity. Call on 29.04.2009 Letter issued on 21.04.09. Reply received on they have applied for permission from CGWA as soon as they get they will submit the same, they have stopped pickling activity , removed ETP/ECS from the premises & there is no D.G. set in the industry. Ask the unit to file an affidavit stating that they have stopped pickling activity, removed ETP/ECS from the premises and there is no D.G. Set in the unit. Also ask the unit to file permission from DJB for ground water extraction as per new orders.Call on 24.06.2009 120 208 4 AUTOWISE SERVICE STATION PP-38A, Gali No. 10, Anand Parbat Industrial Area Anand Parbat Industrial Area Repairing & servicing of cars Renewal __ CTO issued on 07.05.03 valid upto 01.08.05. __ 16.03.2009 Ask the unit to apply for consent to establish, file permission from Central Ground Water Authority for extracting the ground water, a fresh adequacy report of ETP and affidavit for non installation of D.G. Set. Letter issued. Case is being dealt with PGRC. Cases Unit has submitted its reply stating that the water used for washing is being taken from water tankers and applied for Adequacy report of ETP to DCE.Also submitted an affidavit stating that there is no generator set in the service station premises. Call on 24.06.2009 121 209 5775 HOLY SHRINE HOTELS PVT LTD 38-U/A,Jawahar Nagar,Bunglow Road N/A Restaurent Business (Seating Capacity under 100 seats) Renewal CTO issued on 15.04.2004 16.03.2009 Call on 20.03.2009 20.03.2009 Ask the unit to apply for Consent to Establish, file permission from Central Ground Water Authority for extracting the ground water and submit affidavit for installation of ETP/ECS. Call on 29.04.2009. 122 210 4660 R.J. INDUSTRIES Kh.No. 22/9/3, Gali No.-8 Samaipur Industrial Area Samaipur Industrial Area Mfg. of Hinges with Acid Dipping. Renewal Two times consent CTO (R) obtained on 07.07.2006 vide consent no. 16140 valid upto 08.07.2008. Applied for CTO (R) on 19.08.2008 vide I.D. No. 27003. Applied for renewal of authorization on 07.08.2006 vide I.D. No. 3206. 16.03.2009 Ask the unit to file permission from Central Ground Water Authority for extracting the ground water, and affidavit for installation of ETP and acoustic enclosure / stack height of D.G. Set. Call on 29.04.2009. Letter issued on 20.03.09. Reply received on 30.04.09 stating that they have approached to the CGWA for the procedure, which will take some time for completion then only they will grant them the permission. They are using the ground water only for the toilet & washing utensils in the restaurant from the long time & not for any other industrial purposes. As ETP is concerned for 75 seats they have installed Grease/ oil trap. Letter issued. Reply awaited. Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Also ask the unit to file noise monitoring report from approved laboratory of DPCC. Call on 24.06.2009 Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 123 211 4066 BHARAT SMALTING CO. SHED NO. 202, DSIDC COMPLEX, PH -I, Okhla Industrial Area Okhla Industrial Area zips sliders including plating. Renewal CTO issued on 13.07.2004 CTO ( R) applied on 27.08.2007 124 212 1934 SIPLA FRUIT PRODUCT B-64 A, Lawrence Road Industrial Area Lawrence Road Industrial Area Manufacturing of Achar & Muraba. Renewal CTE not obtained. 125 213 4427 T. R. Sawhney Motors P. Ltd 508, FIE, Patparganj Industrial Area Patparganj Industrial Area Servicing of Automobiles Establish Applied for CTE on 04.06.2008 vide I.D. No. 25976 Applied for CTO (R) on 11.08.2008 vide I.D. No. 26923. Authorization refused on 08.02.2007 Applied for authorization on 04.06.2008 vide I.D. No. 4592. 16.03.2009 Ask the unit to apply for Consent to Establilsh, file permission from Central Ground Water Authority for extracting the ground water, fresh adequacy report of ETP from empanelled consultants of DPCC and affidavit for installation of ECS. Call on 29.04.2009. Letter issued. Reply awaited. 16.03.2009 Ask the unit to apply for Consent to Establilsh, file permission from Central Ground Water Authority for extracting the ground water, fresh adequacy report of ETP from empanelled consultants of DPCC and affidavit for stack height / acoustic enclosure with the D.G. Set. Call on 29.04.2009. 16.03.2009 Ask the unit to file permission from Central Ground Water Authority for extracting the ground water, affidavit for installation of ETP/ECS and for stack height / acoustic enclosure with the D.G. Set. Call on 29.04.2009. Letter issued. Reply awaited. Letter issued. Reply awaited. Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 126 214 357 AGGARWAL TRADERS S-22, Ph-I, Badli Industrial Estate Badli Industrial Estate Mfg. of plastic moulded items Operate CTE not obtained. CTO obtained on 08.06.2004 vide consnet no. 10691 valid upto 21.07.2005 127 215 5044 API ASSOCIATES PVT. LTD D-15, Udyog Nagar Industrial area Udyog Nagar Industrial area Manufacturing of Footwear. Renewal __ CTO issued on 13.02.03 valid upto 25.07.05. CTO-R valid upto 25.07.08. Applied for CTO-R on 16.07.08 128 216 1935 BLUE BIRD ENTERPRISES PVT LTD. 189/91, Lawrence Road Industrial Area Lawrence Road Industrial Area Mfg. of bread. Establish Applied for CTE on 11.03.2008 vide I.D. No. 25149. Applied for CTO on 27.09.2005 vide I.D. No. 16577. 129 217 5855 DELHI TRANSPORT CORPORATION Hari Nagar Depot-2 N/A Repair & Maintenance. Establish Issued on 25.07.08 valid upto 24.07.09 CTO valid upto 25.12.05. CTO Refused on 26.09.06. CTO-R valid upto 13.05.2010. __ Valid upto 24.07.2010 16.03.2009 SIT-II to inspect and report. Call on 29.04.2009. SIT-II report to be discussed. 16.03.2009 SIT-II to inspect and report. Call on 29.04.2009. SIT-II report to be discussed. 16.03.2009 Ask the unit to file permission from Central Ground Water Authority for extracting the ground water, affidavit for installation of ECS and for stack height / acoustic enclosure with the D.G. Set. Call on 29.04.2009. Letter issued. Reply awaited. 16.03.2009 SIT-II to inspect and report. Call on 29.04.2009. SIT-II report to be discussed. Howeevr unit has submitted a letter requesting for grant of consent. Consent refused for M/s Aggarwal Traders. Ask the new unit namely M/s Vrinda Industries to apply for Consent to Establish. Call on 24.06.2009 Call on 24.06.2009 with SIT-II report. Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 Call on 24.06.2009 with SIT-II report. 130 218 6041 DEVYANI INTERNATIONAL PVT LTD (PIZZA HUT) 12, Community Center, Saket N/A Fast Food Service Operate 131 219 2432 ESS AAR MOTORS B-73, PH-1, Mayapuri Industrial Area Mayapuri Industrial Area SHOWROOM CUM SERVICE STATION OF TWO WHEELERS Establish CTO applied on 08.10.2004 CTE applied on 09.08.2007 16.03.2009 Call on 20.03.2009 20.03.2009 Ask the unit to apply for Consent to Establish, fresh consent to operate, submit affidavit for source of water supply, adequacy report of ETP from any of the empanelled consultants of DPCC and submit noise monitoring report of the D.G.Set from approved laboratories of DPCC. Call on 29.04.2009. Letter issued. Reply awaited. Issue final reminder for full compliance of earlier CMC decision. Call on 24.06.2009 16.03.2009 Ask the unit to apply for consent to operate, file permission from Central Ground Water Authority for extracting the ground water, adequacy report of ETP and noise monitoring report of D.G.Set from empanelled consultants / laboratories of DPCC. Call on 29.04.2009. Letter issued. Reply awaited. Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 132 220 1620 HIMGIRI AUTOMOBILES PVT. LTD A-19, Jhilmil Industrial Area Jhilmil Industrial Area Repairing and Servicing of Bikes Establish CTE applied on 15.02.2007 16.03.2009 Ask the unit to apply for consent to operate, file permission from Central Ground Water Authority for extracting the ground water, adequacy report of ETP and noise monitoring report of D.G.Set from empanelled consultants / laboratories of DPCC. Call on 29.04.2009. Letter issued. Reply awaited. Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 133 221 2433 KARAN MOTORS PVT. LTD. B-67, Mayapuri Industrial Area PhaseI Mayapuri Industrial Area ENGAGED MANUFACTURING OF SMALL QUANTITY OF AUTO PARTS (CASTING, INDUCTION, FURNACE, CAPACITY 500 KG.) Renewal CTO issued on 25.06.2004 CTO ( R) applied on 05.10.2007 16.03.2009 SIT-II to inspect and report. Call on 29.04.2009. SIT-II report to be discussed. The following deficiencies observed during the inspection by SIT :(i) ECS installed over melting furnace. However, suction arrangement needs to be improved so that entire emissions are channelized towards the hood provided. (ii) Water circulation pump with the wet scrubber is under repair. (iii) Hazardous waste (casting sand) needs to be managed as per HWM Rules. (iv) Dust collector connected to sand mould reclamation machine is under repair. (v) Two D.G. Sets of 600 KVA & 800 KVA kept in separate rooms with acoustic door and stack height needs to be raised as per norms. Noise monitoring report needs to be obtained. (vi) One borwell exists at site for which permission from DJB is required as per new orders. Ask the unit to correct the above deficiencies and submit an affidavit in this regard. Call on 24.06.2009. 134 222 5856 MGS HOSPITALITY PLOOF RESTAURANT 13- Main Market,Lodhi Colony N/A EATING HOUSERESTAURANT WITH 72 SEATING CAPACITY Operate CTO applied on 17.07.2006 135 223 6042 MOTI MAHAL DELUXII M-30, GREATER KAILASH PART-I, N/A eating establishment Renewal CTO issued on 29.03.2004 CTO ( r) applied on 31.05.2007 16.03.2009 Ask the unit to apply for consent to establish, file permission from Central Ground Water Authority for extracting the ground water, a fresh adequacy report of ETP and noise monitoring report of D.G.Set from empanelled consultants / laboratories of DPCC. Also ask the unit to install flow meter with ETP. Call on 29.04.2009. 16.03.2009 Ask the unit to file permission from Central Ground Water Authority for extracting the ground water, effluent analysis report of ETP and noise monitoring report of D.G.Set from empanelled consultants / laboratories of DPCC. Call on 29.04.2009. Letter issued to apply for consent to establish, file permission from Central Ground Water Authority for extracting the ground water, a fresh adequacy report of ETP and noise monitoring report of D.G.Set from empanelled consultants / laboratories of DPCC. Also ask the unit to install flow meter with ETP. . Reply received. Call for personal hearing on 03.06.2009 at 6.45 PM. Letter issued to file permission from Central Ground Water Authority for extracting the ground water, effluent analysis report of ETP and noise monitoring report of D.G.Set from empanelled consultants / laboratories of DPCC.. Reply received stating that they have already applied for CGWA permission and as they are 76 seatter restaurant they have also installed oil and grease trap. Also, they have submitted the noise monitoring report. Call for personal hearing on 03.06.2009 at 7.00 PM. 136 224 4068 ORIENT CRAFT LTD C-54/1, Phase-II, Okhla Industrial Area Okhla Industrial Area Manufactur & Export of Readymade Garment without Washing. Renewal Green CategoryCTE issued on 26.10.2004 CTO issued on 25.10.2005 CTO ( R) applied on 22.10.2008 16.03.2009 SIT-II to inspect and report. Call on 29.04.2009. SIT-II report to be discussed. Call on 24.06.2009 with SIT-II report. 137 225 4069 ORIENT CRAFT LTD. F-23/3, Phase-II, Okhla Industrial Area Okhla Industrial Area manufacture & Export of Readymade Garment without washing. Renewal Green CategoryCTE issued on 12.12.2003 CTO issued on 09.12.2004 CTO ( R) applied on 04.12.2007 16.03.2009 SIT-II to inspect and report. Call on 29.04.2009. SIT-II report to be discussed. Call on 24.06.2009 with SIT-II report. 138 226 6106 P.K. DELICACIES PVT. LTD. MEZZ.FLOOR,HALL YASHWANT PLAZA,SATYA MARG, N/A Fine denning Restaurant Operate Issued on 17.10.06 valid upto 16.10.07. Applied for CTO on 07.11.08 16.03.2009 Ask the unit to file permission from Central Ground Water Authority for extracting the ground water and affidavit for non installation of D.G. Set. Call on 29.04.2009. Letter issued on 15.04.09 Reply received alongwith an affidavit stating that unit have not installed any Borewell and D.G. Set Call for personal hearing on 03.06.2009 at 7.15 PM. 139 227 4070 R.M.X. JOSS C-49, Okhla Industrial Area, Phase-II Okhla Industrial Area Mfg. of Garments with washing. Renewal CTO issued on 26.07.2002. CTO (R) issued on 30.01.2006 140 228 2434 RICHA & CO. B-34, Phase-I, Mayapuri Industrial Area Mayapuri Industrial Area Mfg. of Readymade Garments. Renewal CTO issued on 26.07.2002 CTO ( R) issued on 22.07.2005 CTO ( R) applied on 29.09.2008 141 229 2807 YAMAHA MOTORS INDIA SALES PVT. LTD. B-1/F-8, Mohan Cooperative Industrial Estate, Mathura Road Mohan Cooperative Industrial Area Service Station cum Workshop of Two Wheelers. Operate CTE issued on 09.12.2005 CTO applied on 09.09.2008 16.03.2009 Ask the unit to apply for consent to establish, file permission from Central Ground Water Authority for extracting the ground water, a fresh adequacy report of ETP and noise monitoring report of D.G.Set from empanelled consultants / laboratories of DPCC. Also ask the unit to install flow meter with ETP. Call on 29.04.2009. 16.03.2009 Ask the unit to file permission from Central Ground Water Authority for extracting the ground water and noise monitoring report of D.G.Set from empanelled laboratories of DPCC. Call on 29.04.2009. Letter issued. Reply awaited. Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 Letter issued. Reply awaited. 16.03.2009 Ask the unit to submit affidavit for source of water supply. Call on 29.04.2009. 23.04.2009 Change the name of the unit in the CTE application and transfer it to next CMC on 08.05.2009 Letter issued. Reply awaited. Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 Issue final reminder for full compliance of earlier CMC decision. Call on 24.06.2009 142 230 1621 AMAN MOTORS A-5/6, Jhilmil Industrial Area Jhilmil Industrial Area Workshop Cum Services Station Of Two Wheelers Establish CTE applied on 16.01.2007 143 231 4428 ARYA MOTORS 361, FIE, PATPARGANJ INDUSTRIAL AREA Patparganj Industrial Area WORKSHOP CUM SERVICE STATION OF TWO WHEELERS. Establish Applied for CTE on 03.10.2007 vide I.D. No. 23741. 144 232 4072 BAGGA LINK SERVICE LTD B-90/19, Phase-I, Okhla Industrial Area Okhla Industrial Area Workshop cum service station of two wheelers. Establish CTE applied on 15.06.2007 16.03.2009 Ask the unit to apply for consent to establish, file permission from Central Ground Water Authority for extracting the ground water and adequacy report of ETP from empanelled consultants of DPCC. Call on 29.04.2009. 16.03.2009 Ask the unit to apply for consent to establish, file permission from Central Ground Water Authority for extracting the ground water and affidavit for installation of ETP. Call on 29.04.2009. Letter issued. Reply awaited. Time allowed till 24.06.2009 for full compliance. Call on 24.06.2009 Letter issued. The same is reutrned back undelievered. Paste the letter on the premises. Call on 24.06.2009 16.03.2009 Ask the unit to apply for consent to operate, file permission from Central Ground Water Authority for extracting the ground water and adequacy report of ETP from empanelled consultants of DPCC. Call on 29.04.2009. Letter issued. Reply awaited. Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 145 233 5923 DEEPAK AUTOMOBILES G.T. Road, Shahdara N/A Filling Station cum Service station of vehicles. Establish CTE applied on 08.05.2008 16.03.2009 Ask the unit to apply for consent to operate, file permission from Central Ground Water Authority for extracting the ground water and adequacy report of ETP from empanelled consultants of DPCC. Call on 29.04.2009. Letter issued. Reply awaited. 146 234 4073 FIRST HONDA (DIV. OF CAPITAL TRUST LIMITED) A-264, Ph-I, Okhla Industrial Area Okhla Industrial Area Workshop Cum Service Station of Two Wheelers. Establish CTE applied on 06.12.2006 16.03.2009 Ask the unit to apply for consent to operate, file permission from Central Ground Water Authority for extracting the ground water and adequacy report of ETP from empanelled consultants of DPCC. Call on 29.04.2009. 147 235 1494 GAUTAM MOTORS B-83,G.T. Karnal Road Industrial Area G.T. Karnal Road Industrial Area workshop cum service stationof three wheelers Establish Applied for CTE on 23.05.2007 vide I.D. No. 21478. 16.03.2009 Ask the unit to apply for consent to operate, file permission from Central Ground Water Authority for extracting the ground water and affidavit for installation of ETP. Call on 29.04.2009. Letter issued o apply for consent to operate, file permission from Central Ground Water Authority for extracting the ground water and adequacy report of ETP from empanelled consultants of DPCC. . Reply awaited. Also, letter returned back. Letter issued. Reply awaited. Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 Paste the letter on the premises. Call on 24.06.2009 Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 148 237 5045 GUPTA AUTOMOBILES & CO F-26, DSIDC, UDYOG NAGAR NAGAR INDUSTRIAL AREA Udyog Nagar Industrial area WORK SHOP CUM SERVICE STATION OF VEHICLE. Establish Applied on 24.11.08 __ __ 16.03.2009 Ask the unit to apply for consent to operate, file permission from Central Ground Water Authority for extracting the ground water and affidavit for installation of ETP. Call on 29.04.2009. Letter issued on 15.04.09 Reply awaited. 149 238 2864 KHANNA AGENCIES PVT. LTD 71/7, Rama Road, Najafgarh Road Industrial Area Najafgarh Road Industrial Area Workshop Cum Showroom With Washing of Two Wheelers Establish Applied on 05.03.07 _ Applied on 19.11.07 16.03.2009 Ask the unit to apply for consent to operate and affidavit for installation of ETP and non installation of D.G. Set.Call on 29.04.2009. Letter issued on 15.04.09. Letter returned back Undelievered 150 239 5026 LAMBA ENTERPRISES PVT. LTD 6-A, TILAK NAGAR INDUSTRIAL AREA Tilak Nagar Industrial Area SERVICE STATION CUM SERVICE STATION OF VEHICLES Establish Applied on 08.08.08 __ Aplied on 08.08.08 16.03.2009 Ask the unit to apply for consent to operate, file permission from Central Ground Water Authority for extracting the ground water and affidavit for installation of ETP and non installation of D.G. Set. Call on 29.04.2009. Letter issued on 15.04.09 Reply awaited. Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 Paste the letter on the premises. Call on 24.06.2009 Time allowed for full compliance. Call on 24.06.2009 151 240 4615 MALWA MOTORS PVT. LTD W-10, Ph-II, Okhla Industrial Area Okhla Industrial Area Workshop Cum Service Station of Two Wheelers. Establish Applied for CTE on 22.03.2007 vide I.D. No. 20900. 152 241 4074 MEHANDRU AUTOMOBILE Shed NO.29, DSIDC Ph-II, Okhla Industrial Area Okhla Industrial Area Servicing of Two Wheelers(Bikes/Scooter) Establish 153 242 1622 MITTAL ENTERPRISES (A UNIT OF BHARAT METAL CO.) 35, Jhilmil Industrial Area Jhilmil Industrial Area WORKSHOP CUM SERVICE STATION OF TWO WHEELERS Establish Applied for authorization on 29.02.2008 vide I.D. No. 4499. 16.03.2009 Ask the unit to apply for consent to operate, file permission from Central Ground Water Authority for extracting the ground water and adequacy report of ETP from empanelled consultants of DPCC. Call on 29.04.2009. Letter issued to apply for consent to operate, file permission from Central Ground Water Authority for extracting the ground water and adequacy report of ETP from empanelled consultants of DPCC. Reply received and requested for the submission of the same. CTE applied on 22.03.2007 16.03.2009 Ask the unit to apply for consent to operate, file permission from Central Ground Water Authority for extracting the ground water and adequacy report of ETP from empanelled consultants of DPCC. Call on 29.04.2009. Letter issued. Reply awaited. CTE applied on 05.09.2007 16.03.2009 Ask the unit to apply for consent to operate, file permission from Central Ground Water Authority for extracting the ground water and adequacy report of ETP from empanelled consultants of DPCC. Call on 29.04.2009. Letter issued. Reply awaited. Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 Time allowed for full compliance. Call on 24.06.2009 154 243 5963 NEM CHAND TARA CHAND 10/7, Mile Stone, G. T. Karnal Road, Alipur N/A Filling Station Cum Service Station Of Two wheelers. Establish Applied for CTE on 22.04.2008 vide I.D. No. 25546. 155 245 1936 STRIPLEX INDUSTRIES PVT LTD B-9, Lawrence Road Industrial Area Lawrence Road Industrial Area CATERING. Establish Applied for CTE on 14.05.2008 vide I.D. No. 25736. 156 246 2865 SWADESHI AUTO PVT. LTD. 41, Rama Road Najafgarh Road Industrial Area Najafgarh Road Industrial Area Service Station of two wheelers. Operate CTE issued on 15.05.06 valid upto 14.05.07 Applied for authorization on 22.04.2008 vide I.D. No. 4552. Applied for CTO on 03.03.08 Aplied on 22.11.07 16.03.2009 Ask the unit to apply for consent to operate, file permission from Central Ground Water Authority for extracting the ground water and affidavit for installation of ETP. Call on 29.04.2009. Letter issued. Reply awaited. 16.03.2009 Ask the unit to apply for consent to operate under Orange category and affidavit for installation of ETP and for stack height /acoustic enclosure with the D.G.Set. Call on 29.04.2009. Letter issued. Reply awaited. 16.03.2009 Ask the unit to file permission from Central Ground Water Authority for extracting the ground water and noise monitoring report of D.G.Set from empanelled laboratories of DPCC. Call on 29.04.2009. Letter issued on 15.04.09 Reply awaited. Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 Issue final reminder for full compliance of earlier CMC decision. Call on 24.06.2009 Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 157 247 1623 CHARU MOTORS PVT. LTD B-31 Jhilmil Industrial Area Jhilmil Industrial Area Servicing & repairing of cars. Operate CTE issued on 27.02.2007 158 248 4075 EURO MOTORS PVT. LTD F-85, Phase-I,Okhla Industrial Area Okhla Industrial Area Automobile workhop cum service station. Establish CTE applied on 08.06.2007 159 249 4518 GOPI PVT. LTD. 18, Rajasthan Udyog Nagar Industrial Area , GTK Road Rajasthan Udyog Nagar Industrial Area party hall cum restaurant Renewal Applied for CTE on 10.10.2005 vide I.D. No. 16685 160 250 5964 KANISHKA FOODS FRANCHISEE SAGAR RATNA C-8/386, Sector-8, Rohini N/A RESTAURANT Operate CTE not obtained. CTO applied on 13.05.2008 CTO obtained on 14.08.2003 vide consent no. 7217 valid upto 01.08.2005 Applied for CTO on 09.08.2004 vide I.D. No. 11294. Authorization refused on 28.11.2006 16.03.2009 Ask the unit to file permission from Central Ground Water Authority for extracting the ground water and adequacy report of ETP from empanelled consultants of DPCC and affidavit for non installation of D.G. Set. Call on 29.04.2009. Letter issued. Reply awaited. Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 16.03.2009 Ask the unit to apply for consent to operate, file permission from Central Ground Water Authority for extracting the ground water, adequacy report of ETP and noise monitoring report of D.G.Set from empanelled consultants / laboratories of DPCC. Also ask the unit to submit affidavit for source of water supply. Call on 29.04.2009. Letter issued. Reply awaited. 16.03.2009 SIT-II to inspect and report. Call on 29.04.2009. SIT-II report to be discussed. Call on 24.06.2009 with SIT-II report. 16.03.2009 SIT-II to inspect and report. Call on 29.04.2009. SIT-II report to be discussed. Refuse consent of old address. Ask the unit to apply for Consent to Establish for new addrress. Call on 24.06.2009 161 251 5776 NAVAYUGA READY MIX CONCRETE PLANT BELA ROAD, CHNDGI RAM AKHARA, RING ROAD N/A RMC PLANT Operate CTE not obtained. Applied for CTO on 31.08.2006 vide I.D. No. 19187. 162 252 5046 PRECISION ELECTRONICS INSTRUMENTS CO H-45, Udyog Nagar Industrial area Udyog Nagar Industrial area Manufacturng of Electronic Weighing machine & fare meters. Renewal __ CTO issued on 24.10.05 valid upto 21.02.08. Applied for CTO-R on 10.03.08 163 253 2825 DOCTOR BELI RAM & SONS (MFG) 42, KIrti nagar, Moti Nagar DLF Industrial Area Moti Nagar DLF Industrial Area Mfg. of Personal Weighing Scale Operate __ CTO issued on 11.08.03 valid upto 08.07.05. CTO-R issued on 12.05.06 valid upto 08.07.08. Applied for CTO-R on 09.01.09 16.03.2009 SIT-II to inspect and report. Call on 29.04.2009. SIT-II report to be discussed. N/A 16.03.2009 Ask the unit to apply for consent to establish, file permission from Central Ground Water Authority for extracting the ground water and noise monitoring report of D.G.Set from approved laboratories of DPCC. Call on 29.04.2009. Letter issued on 15.04.09 Reply received stating that unit is in process for compliance. Aplied for renewal on 28.09.06 16.03.2009 Ask the unit to submit an affidavit for source of water supply and for installation of ETP. Call on 29.04.2009. Letter issued on 15.04.09 Reply received without affidavit stating that unit is not using water in manufacturing process and carrying out powder coating without Phosphating.and doesnot need to install ETP. Refuse consent. Ask the new unit namely M/s Tecno Concrete to appy for consent to establish. Call on 24.06.2009 Time allowed for full compliance. Call on 24.06.2009 Call for personal hearing on 12.06.2009 at 5.00 PM. 164 254 4076 VASAN ABHA 190, DSIDC shed, PhI, Okhla Industrial Area Okhla Industrial Area Dyeing and washing of readymade/clothe garments Operate CTO issued on 08.06.2004 CTO ( R) applied on 07.08.2006 Applied for HWM on 24.11.2008 16.03.2009 Ask the unit to apply for consent to establish, file permission from Central Ground Water Authority for extracting the ground water and noise monitoring report of D.G.Set from empanelledlaboratories of DPCC. Call on 29.04.2009. Letter issued. Reply awaited. 165 255 2436 GAUTAM AUTO B-49, PhaseI,Mayapuri Industrial Area Mayapuri Industrial Area REPAIRING & SERVICING OF AUTOMOBILES VIZ MOTORCYCLES Renewal CTO issued on 02.11.2004 Applied for HWM on 17.11.2008 16.03.2009 Ask the unit to apply for consent to operate, file permission from Central Ground Water Authority for extracting the ground water, adequacy report of ETP and noise monitoring report of D.G.Set from empanelled consultants / laboratories of DPCC. Also ask the unit to submit affidavit for source of water supply. Call on 29.04.2009. Letter issued. Reply awaited. 166 256 4077 HIMALAYA INDUSTRIES C-20, Phase I, Okhla Industrial Area Okhla Industrial Area Mfg Of Ice Renewal CTO issued on 28.05.2003 CTO ( R) applied on 08.09.2006 16.03.2009 Ask the unit to apply for consent to establish, file permission from Central Ground Water Authority for extracting the ground water and noise monitoring report of D.G.Set from empanelled laboratories of DPCC. Call on 29.04.2009. Letter issued. Reply awaited. Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 Paste the letter on the premises. Call on 24.06.2009 Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 167 257 3288 BHARAT ENTERPRISES I-2173, DSIDC, Narela Industrial Area Narela Industrial Area hand pump parts (zinc plating and (Light Engineering works) Operate 168 258 4078 CLASSIC FASHION / M/s Boutique Global D-80, Phase-I, Okhla Industrial Area Okhla Industrial Area Cutting the Raw Cloth as per Design and then Stitching is done Operate CTE not obtained. Applied for CTO on 02.02.2006 vide I.D. No. 17654. CTO applied on 21.06.2005 Applied for authorization on 20.02.2006 vide I.D. No. 2602. 16.03.2009 Ask the unit to apply for consent to establish and affidavit for source of water supply. Call on 29.04.2009. Letter issued. Reply awaited. Issue final reminder for full compliance of earlier CMC decision. Call on 24.06.2009 16.03.2009 Issue final reminder to Boutique Global. Call on 29.04.2009. Letter issued. Reply awaited. Consent application of M/s Classic Fashion has already been refused as it has been closed .M/s Boutique Global is existing at the premises which has applied for CTE on 4.12.07.Classic fashion be delisted. Ask the unit M/s Boutique Global to submit affidavit regarding installation of ETP & source of water, adequacy report of ETP from empanelled consultant of DPCC and noise monitoring report of D.G Set from approved laboratory of DPCC. Call on 24.06.2009 169 259 6151 CREST INN (A UNIT OF MPA HOSPITALITY PVT. LTD) 4/27, WEA, Saraswati Marg, Karol Bagh N/A Guest house Establish Applied on 11.06.08 __ ___ 16.03.2009 SIT-II to inspect and report. Call on 29.04.2009. SIT-II report to be discussed. Call for personal hearing on 12.06.2009 at 5.15 PM. 170 260 4661 DAKSH INTERNATIONAL KH. NO-22/6/2, GALI NO-9, Samaipur Industrial Area Samaipur Industrial Area MANUFACTURING OF AUTO PARTS (SLUMINUM DIE CASTING). Renewal CTE not obtained. Authorization obtained on 28.11.2006 vide I.D. No. 1904 16.03.2009 Ask the unit to apply for consent to establish and affidavit for installation of ECS. Call on 29.04.2009. Letter issued. Reply awaited. Issue final reminder for full compliance of earlier CMC decision. Call on 24.06.2009 171 261 5965 DEVYANI INTERNATIONAL PVT. LTD. (PIZZA HUT) G-5, Aggarwal Millennium Tower, Subhash Place N/A Fast Food Service Operate CTE not obtained. CTO obtained on 05.11.2004 vide consent no. 12165 valid upto 30.08.2007 Applied for CTO (R) on 30.08.2007 vide I.D.No. 23350. Applied for CTO on 08.10.2004 vide I.D. No. 11865. 16.03.2009 Ask the unit to apply for consent to establish, fresh adequacy report of ETP from empanelled consultants of DPCC and affidavit for non installation of D.G. Set. Call on 29.04.2009. Letter issued. The same is returned back undelievered. Paste the letter on the premises. Call on 24.06.2009 172 262 2866 DIC INDIA LIMITED 7, DLF Shivaji Marg. Najafgarh Road Industrial Area Najafgarh Road Industrial Area Non-flexo graphic ink mfg. Operate 173 263 2867 FAHRENHEIT AUTOMOBILES PVT. LTD 68/3, NAJAFGARH ROAD INDUSTRIAL AREA Najafgarh Road Industrial Area AUTOMOBILE / CAR SERVICE Establish 174 264 1937 GANGA ROLLER FLOUR MILLS P. LTD B-37, Lawrence Road Industrial Area Lawrence Road Industrial Area manufacturing of Atta and Suji and maida & Dalia and Cattelfeed. Operate Applied for CTO on 25.09.06 in new name. Applied for Authorization on 20.06.08 in the name of old unit. 16.03.2009 Ask the unit to apply for consent to establish, noise monitoring report of D.G. Set from approved laboratories of DPCC and affidavit for source of water supply. Call on 29.04.2009. Letter issued on 15.04.09 Reply received stating that they have already submitted Noise Monitoring Report alongwith CTO-R application submitted in Sept. 2006 and unit may be informed in case fresh NMR is required. Issue final reminder for full compliance of earlier CMC decision. Call on 24.06.2009 CTE issued on 28.01.09 valid upto 27.01.2010 __ Applied on 03.12.08 16.03.2009 Ask the unit to apply for consent to operate and file permission from Central Ground Water Authority for extracting the ground water. Call on 29.04.2009. Letter issued on 15.04.09. Reply awaited. Two times consent CTO (R) obtained on 15.10.2004 vide consent no. 11834 valid upto 29.09.2007 Applied for CTO (R) on 27.11.2007 vide I.D. No. 24323 16.03.2009 Ask the unit to fresh adequacy report of ECS from empanelled consultants of DPCC and affidavit for source of water. Call on 29.04.2009. Letter issued on 17.04.09. Reply received on 18.04.09 along with copy of adequacy report of ECS & certificate of registration of wells from CGWA . Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 Issue renewal of consent. Call on 24.06.2009 175 265 3289 KHARE & ASSOCIATES B-2560, DSIDC Narela Industrial Area Narela Industrial Area Engineering Works Operate CTE obained on on 30.11.2004 vide consent no. 12218 valid upto 25.10.2005 Applied for CTO on 30.05.2005 vide I.D. No. 14222. 176 266 3227 MEHTA OFFSET PVT LTD A-16 East Naraina Industrial Area Phase - II Naraina Industrial Area Phase - II Photo type setting, processing plate making, printing. Establish Applied on 11.02.08 Applied for CTO on 05.11.04 177 267 4393 PRECISION PIPES & PROFILES CO LTD. 70, Phase-III, Okhla Industrial Estate Okhla Industrial Estate Mfg. of Trims & Moulded Components for Automobiles. Renewal CTO issued on 23.02.2005 CTO ( R) applied on 22.02.2008 Applied for renewal of authorization 21.07.08. 16.03.2009 Ask the unit to apply for consent to operate, file permission from Central Ground Water Authority for extracting the ground water and affidavit for non installation of D.G. Set and installation of ETP/ECS. Call on 29.04.2009. Letter issued. Reply awaited. 16.03.2009 Ask the unit to apply for consent to operate afresh, a fresh adequacy report of ETP from empanelled consultants of DPCC and affidavit for source of water supply. Call on 29.04.2009. Letter issued on 15.04.09. Reply awaited. 16.03.2009 Ask the unit to apply for consent to establish, file permission from Central Ground Water Authority for extracting the ground water and noise monitoring report of D.G.Set from empanelled laboratories of DPCC. Call on 29.04.2009. Letter issued. Reply awaited. Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 Issue final reminder for full compliance of earlier CMC decision. Call on 24.06.2009 Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 178 268 4394 PRECISION PIPES & PROFILES CO. LTD. 161, Okhla Industrial Estate, Phase-III Okhla Industrial Estate Weather strips and Moulded items for Automobiles Renewal CTO applied on 23.02.2005 179 269 4429 PRJ ENTERPRISES 82, FIE Patparganj Industrial Area Patparganj Industrial Area Show Room Workshop of car (washing) Establish CTE obtained on 17.06.2003 vide consent no. 5820 valid upto 01.06.2004 180 270 4080 RICHA GLOBAL C-68/1, Ph-II, Okhla Industrial Area Okhla Industrial Area Readymade Garment & madeups without washing Operate CTE issued on 20.03.2006 CTO applied on 28.11.2006 16.03.2009 Ask the unit to apply for consent to establish, file permission from Central Ground Water Authority for extracting the ground water and noise monitoring report of D.G.Set from empanelled laboratories of DPCC. Call on 29.04.2009. Letter issued. Reply awaited. 16.03.2009 Ask the unit to apply for consent to operate, authorization under HWM Rules, file permission from Central Ground Water Authority for extracting the ground water and affidavit for stack height / acoustic enclosure with the D.G. Set. Call on 29.04.2009. Letter issued. Reply awaited. 16.03.2009 SIT-II to inspect and report. Call on 29.04.2009. SIT-II report to be discussed. Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 Call on 24.06.2009 with SIT-II report. 181 273 1788 NEETA KATHURIA 31-A, DLF Najafgarh Road Industrial Area Kirti Nagar Industrial Area cycle rim and buffing & polishing and electroplating. Renewal CTE issued on 23.03.04 valid upto 05.02.05 CTO issued on 15.06.06 valid upto 14.02.07. Applied for CTO-R on 07.12.07 Applied for renewal of autorisation on 28.06.06 16.03.2009 Ask the unit to file permission from Central Ground Water Authority for extracting the ground water , adequacy report from approved laboratories of DPCC and affidavit for non installation of D.G. Set and installation of ECS. Call on 29.04.2009. Letter issued on 15.04.09. Reply awaited. 182 274 6152 AUTO CARE Disst.Centre,Shivagi Place,Najafgarh Road,Rajouri Garden N/A Filling pump cum service station(etc) Establish Applied on 28.02.07 __ __ 16.03.2009 Ask the unit to apply for Consent to Operate, file permission from Central Ground Water Authority for extracting the ground water and affidavit for installation of ETP. Call on 29.04.2009. Letter issued on 15.04.09. Reply awaited. 183 275 4082 LALLY AUTOMOBILES PVT LTD. 15-16,DSIDC SHED,PHASEII,Okhla Industrial Area Okhla Industrial Area Servicing of vechiles Establish CTE applied on 12.04.2007 16.03.2009 Ask the unit to apply for Consent to Operate, file permission from Central Ground Water Authority for extracting the ground water and adequacy report of ETP and noise monitoring report of D.G. Set from empanelled consultants / approved laboratories of DPCC. Call on 29.04.2009. Letter issued. Reply awaited. Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 Ask the unit to apply authorizaton under HWM Rules and full compliance of earlier CMC decision. Call on 24.06.2009 184 276 359 PARKASH INDUSTRIES 121, Phase-II, Badli Industrial Easte Badli Industrial Estate Chrome Plated Bathroom Fittings. Establish Applied for CTE on 07.05.2008 vide I.D. No. 25673 CTO (R) refused on 23.05.2006 vide refusal no. 1141. 185 277 5857 RUBY TUESDAY (A UNIT OF ROUND THE CLOCK STORES LTD.) M-48, Connaught Place N/A Restaurant with 96 covers. Establish CTE issued on 29.06.07 Applied for CTO on 13.08.07 186 278 2437 S.K. TRADERS A-50, Phase-I, Mayapuri Industrial Area Mayapuri Industrial Area REPAIR WORKSHOP & SERVICING OF AUTOMOBILES (TWO WHEELERS). Establish CTE applied on 17.10.2007 Applied for authorization on 07.05.2008 vide I.D. no. 4567. 16.03.2009 Ask the unit to submit an affidavit for installation of ETP and stack height / acoustic enclosure of D.G. Set. Call on 29.04.2009. Letter issued. Reply awaited. Issue final reminder for full compliance of earlier CMC decision. Call on 24.06.2009 16.03.2009 SIT-II to inspect and report.Call on 29.04.2009. SIT-II report to be discussed. 16.03.2009 Ask the unit to apply for Consent to Operate, file permission from Central Ground Water Authority for extracting the ground water and adequacy report of ETP from empanelled consultants of DPCC. Call on 29.04.2009. Letter issued. Reply awaited. Consent to M/s Ruby Tuesday refused. Ask the new unit namely M/s Sancho's Restaurant to appy for Consent to Establish under Orange category. Call on 24.06.2009 Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 187 279 6043 SAGAR VENTURES 22, Mother House, Community Centre, Yusuf Sarai N/A RESTRAINTS (48 SHEETS). Renewal CTO issued on 15.04.2004 CTO ( R) applied on 19.09.2007 188 280 6107 YASHWANT PLACE SERVICE STATION Africa Avenue, Opp. Chanakya Cinema N/A Filling Station cum service station. Renewal __ 189 281 4083 IGLOO INDIA PVT. LTD 51, DSIDC Shed, Okhla Industrial Area, Phase-1 Okhla Industrial Area mfg. of split Airconditionery and sheet metal parts with powder coating. Establish CTE applied on 03.01.2008 CTO issued on 09.05.02 valid upto 30.04.05. CTO-R valid upto 19.09.08. CTO-R applied on 24.11.08 Athorization valid upto 16.08.08 Applied on 03.01.2008 16.03.2009 Ask the unit to apply for Consent to Establish, file permission from Central Ground Water Authority for extracting the ground water and to install flow meter device and channelization system for the kitchen emissions. Call on 29.04.2009. Letter issued. Reply awaited. 16.03.2009 Ask the unit to apply for authorization under HWM Rules, noise monitoring report of D.G. Set from approved laboratories of DPCC and affidavit for source of water supply. Call on 29.04.2009. 16.03.2009 Ask the unit to file permission from Central Ground Water Authority for extracting the ground water and adequacy report from empanelled consultants of DPCC and noise monitoring report of D.G. Set from approved laboratories of DPCC. Call on 29.04.2009. Letter issued. Reply awaited. Letter issued to file permission from Central Ground Water Authority for extracting the ground water and adequacy report from empanelled consultants of DPCC and noise monitoring report of D.G. Set from approved laboratories of DPCC.. Reply received stating that there is no bore well, no D.G. set and for adequacy report they are approaching the consultant. Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 Issue final reminder for full compliance of earlier CMC decision. Call on 24.06.2009 Call for personal hearing on 12.06.2009 at 5.30 PM. 190 283 4555 STANDARD METAL INDUSTRIES E-8, S.M.A Industrial Area, G.T. Karnal Road S.M.A Industrial Area Mfg. of Door Fitting Including Plating & Buffing. Renewal 191 284 531 AKHILESH CHANDRA 185, SEC-4, PKT-B, DSIDC COMPLEX Bawana Industrial Area Bawana Industrial Area ELECTROPLATING WITH JOB WORKS Establish 192 285 4084 BOUTIQUE INTERNATIONAL PVT. LTD D-14/1, Phase-II, Okhla Industrial Area Okhla Industrial Area Mfg. of Readymade Garments. Establish Two times consent Obtained CTO (R) on 07.07.2006 vide consent no. 16136 valid upto 23.06.2008 Applied for CTO (R) on 19.08.2008 vide I.D. No. 27004. Applied for renewal of authorization on 07.08.2006 vide I.D. no. 3189. Applied for CTE on 10.05.2007 vide I.D.No. 21289. CTO applied on 21.06.2005 Applied on 11.08.2006 16.03.2009 Ask the unit to file permission from Central Ground Water Authority for extracting the ground water and affidavit for installation of ETP/ECS and stack height / acosutic enclosure with the D.G. Set. Call on 29.04.2009. Letter issued. Reply awaited. 16.03.2009 Ask the unit to file permission from Central Ground Water Authority for extracting the ground water and affidavit for installation of ETP/ECS . Call on 29.04.2009. Letter issued. Reply awaited. 16.03.2009 Ask the unit to apply for a fresh Consent to operate, noise monitoring report of D.G. Set from approved laboratories of DPCC and affidvit for source of water supply. Call on 29.04.2009. Letter issued to apply for a fresh Consent to operate, noise monitoring report of D.G. Set from approved laboratories of DPCC and affidvit for source of water supply. Reply received stating that they have applied for noise monitoring and water test report and as they will get the report they will apply for CTO. Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 Issue final reminder for full compliance of earlier CMC decision. Call on 24.06.2009 193 194 286 287 4085 360 PUBLIC PRINTING (DELHI) SERVICE C-80, Phase-1, Okhla Industrial Area Okhla Industrial Area printing S.B. STEEL S-58, PHASE-I, Badli Industrial Estate Badli Industrial Estate pickling and Annealing & reroling of S. S. Sheets. Renewal Establish CTO issued on 20.06.2005 CTO ( R) applied on 18.06.2008 Applied for CTE on 20.09.2007 vide I.D.No. 23570. Applied on 21.10.2004 Applied for renewal of authorization on 20.07.2006 vide I.D. no. 2884. 16.03.2009 Ask the unit to apply for Consent to establish, noise monitoring report of D.G. Set from approved laboratories of DPCC , fresh adequacy report of ETP from empanelled consultants of DPCC and affidvit for source of water supply. 16.03.2009 Ask the unit to file permission from Central Ground Water Authority for extracting the ground water, submit fresh adequacy report of ECS from any of the empanelled consultants of DPCC and affidavit for stack height / acoustic enclosure with the D.G. Set. Also ask the unit to submit an action plan for stoppage of the activity before 07.02.2010, which falls under negative list as per MPD-2021 and an action plan for new proposed activity in conformity with MPD2021 on the vacant plot due to closure of present activity. Call on 29.04.2009 Letter issued. Reply awaited. Issue final reminder for full compliance of earlier CMC decision. Call on 24.06.2009 Letter issued on 21.04.09. Reply received along with affidavit for stack height/ acoustic enclsure with D.G. set on 05.05.09 stating that they have applied for permission from CGWA as soon as they get the permission they will submit the same, they have submitted the bank draft of Rs. 16000/- in favour of Registrar GGSIPU for adequacy/ ECS as soon as they get the report they will submit the same, for stoppage of the activity they said that they will plan their bussiness activity depending upon the prevailing circumstances & guidelines of the Govt. of Delhi. Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 195 288 5858 SHANKAR AUTOMOBILES Bhai Veer Singh Marg, Near Gole Market N/A Filling station cum service station. Renewal __ CTO issued on 07.03.01 valid upto 18.02.04. CTO-R valid upto 27.04.07. CTO-R applied on 17.11.087. Athorization valid upto 27.03.08 196 289 362 SWIFT CHEMICAL CORPORATION S-56, Phase-I Badli Industrial Estate Badli Industrial Estate Annealing & Pickling of S. S. Sheets. Establish Applied for CTE on 20.09.2007 vide I.D.No. 23585. Applied for CTO (R) on 03.07.2007 vide I.D. No. 22134. Applied for renewal of authorization on 18.07.2006 vide I.D. No. 2859. 16.03.2009 Ask the unit to apply for renewal of authorization under HWM Rules, file permission from Central Ground Water Authority for extracting the ground water, submit noise monitoring report of D.G. Set from approved laboratories of DPCC. Call on 29.04.2009. 16.03.2009 Ask the unit to file permission from Central Ground Water Authority for extracting the ground water, submit fresh adequacy report of ECS from any of the empanelled consultants of DPCC and affidavit for stack height / acoustic enclosure with the D.G. Set. Also ask the unit to submit an action plan for stoppage of the activity before 07.02.2010, which falls under negative list as per MPD-2021 and an action plan for new proposed activity in conformity with MPD2021 on the vacant plot due to closure of present activity. Call on 29.04.2009 Letter issued on 15.04.09 Reply received requesting 45 days time compliance. Time allowed till 24.06.2009 for full compliance. Call on 24.06.2009 Letter issued. Reply awaited. Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 197 290 3290 A.J. EXPORTS (P) LTD G-1024, DSIDC, NARELA INDUSTRIAL AREA Narela Industrial Area Mfg. of Wire Drawing with pickling. Establish Applied for CTE on 07.03.2008 vide I.D. No. 25105 CTO refused on 30.06.2006 vide refusal no. 1195. Applied for authorization on 07.03.2008 vide I.D. No. 4505. 16.03.2009 Ask the unit to apply for a fresh consent to operate and file permission from Central Ground Water Authority for extracting the ground water. Call on 29.04.2009. Letter issued. Reply awaited. 198 291 2166 BAJAJ MOTORS T-5/242, PH-I, Mangolpuri Industrial Area Mangolpuri Industrial Area Servicing of Vehicles Renewal CTE not obtained. Applied for CTO (R) on 22.06.2007 vide I.D.No. 21945. Authorization granted on 28.11.2006 vide I.D. No. 1916. 16.03.2009 Ask the unit to apply for consent to establish and affidavit for source of water supply. Call on 29.04.2009. Letter issued. Reply awaited. 199 293 4086 JANEX X-2, Ph-II,Okhla Industrial Area Okhla Industrial Area mfg. & Export of Handicraft and jewelries item with plating. Operate CTE issued on 17.10.2006 CTO applied on 26.09.2007 Applied on 26.09.2007 16.03.2009 Ask the unit to file permission from Central Ground Water Authority for extracting the ground water and noise monitoring report of D.G.Set from empanelled laboratories of DPCC. Call on 29.04.2009. Letter issued to file permission from Central Ground Water Authority for extracting the ground water and noise monitoring report of D.G.Set from empanelled laboratories of DPCC. Reply received and requested for time to submit the compliance. Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 Issue final reminder for full compliance of earlier CMC decision. Call on 24.06.2009 Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 200 295 6108 BIKANER SWEET SHOP 1/2695, DB Gupta Road, Karol Bagh N/A Preparation and sale of Indian and fast fods in the restaurant with seating capacity for 80(eighty) Person Operate __ Applied for CTO on 28.11.05. 201 296 1789 PETER(S) INDIA P. LTD 5/26, Kirti Nagar Industrial Area Kirti Nagar Industrial Area Offset Printing. Renewal __ CTO issued on 26.11.08 valid upto 24.06.04. CTO-R valid upto 24.06.07. Applied for CTO-R on 22.06.07. Applied for renewal on 08.08.06 351 F.I.E. Patparganj Industrial Area Patparganj Industrial Area Silver plating on handicraft Brassware items. Obtained CTO (R) on 23.11.2005 vide consent no. 13399 valid upto 04.07.2007 Applied for CTO (R) on 18.01.2008 vide I.D. No. 24787. Applied for renewal of authorization on 18.08.2006 vide I.D. No. 3344. 202 297 4430 WHORRA ENTERPRISES Renewal CTE not obtained. 16.03.2009 Ask the unit to apply for consent to establish, a fresh consent to operate , file permission from Central Ground Water Authority for extracting the ground water and affidavit for non installation of D.G. Set. Also ask the unit to install flow measuring device and channelization system for the kitchen emissions. Call on 29.04.2009. 16.03.2009 Ask the unit to file permission from Central Ground Water Authority for extracting the ground water and fresh adequacy report of ETP from approved consultants of DPCC. Call on 29.04.2009. 20.03.2009 Ask the unit to file permission from Central Ground Water Authority for extracting the ground water and submit affidavit for stack height / acoustic enclosure with the D.G. Set. Call on 29.04.2009. Letter issued on 15.04..09 Reply received seeking time till end of may for compliance. Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 Letter issued on 15.04.09 Reply received alongwith CGWA permission and stating unit has applied for Adequacy report of ETP. Issue final reminder for full compliance of earlier CMC decision. Call on 24.06.2009 Letter issued on 20.03.09. Reply received on 30.04.09 stating that they are registered with the CGWA under registration no. DLOFCT/21683 Type borewell and they submit a affidavit for removal of D.G. Set. Issue renewal of consent. Call on 24.06.2009 203 298 4087 YAATRI B-159, Phase-I, Okhla Industrial Area Okhla Industrial Area Readymade Garments (with washing). Establish CTE applied on 11.06.2008 204 299 5813 DASHMESH AUTOMOBILES(UNITII) Plot no-7,Local shopping center,Gazipur N/A Automobile repairing & servicing including washing and painting. Establish CTE refused on 27.06.2007 vide refusal no. 1622. 205 300 4088 M.R. UTILITY PRODUCTS PVT. LTD. E-46/6, Ph-II, Okhla Industrial Area Okhla Industrial Area Electroplating Establish CTE issued on 12.08.2004 CTE applied on 21.11.2007 Applied on 11.06.2008 CTO issued on 08.09.2004 CTO ( R) applied on 13.07.2006 Applied on 16.05.2005 20.03.2009 Ask the unit to submit affidavit for source of water supply, adequacy report of ETP from any of the empanelled consultants of DPCC and noise monitoring report of the D.G.Set from approved laboratories of DPCC. Call on 29.04.2009. Letter issuedto submit affidavit for source of water supply, adequacy report of ETP from any of the empanelled consultants of DPCC and noise monitoring report of the D.G.Set from approved laboratories of DPCC.. Reply received stating that they have applied for noise monitoring report. Also, unit has submitted an affidavit stating that they are not using any ground water and submitted adequacy report. Ask the unit to file accurate adequacy report from empanelled consultant of DPCC and noise monitoring report of D.G. Set from approved laboratory of DPCC. Call on 24.06.2009 20.03.2009 Trainee, CMC-II to inspect and report. Call on 29.04.2009 Inspection carried out and found that the unit has closed its operations and the premises is lying vacant. No action. 20.03.2009 Ask the unit to submit affidavit for source of water supply, adequacy report of ETP from any of the empanelled consultants of DPCC and noise monitoring report of the D.G.Set from approved laboratories of DPCC. Call on 29.04.2009. Letter issued. Reply awaited. Issue final reminder for full compliance of earlier CMC decision. Call on 24.06.2009 206 301 5 COSMO PLATER PVT. LTD. 3/31, Anand Parbat Industrial Area Anand Parbat Industrial Area Electroplating & Anodizing (Job work) Renewal 207 302 2438 JASMINE GRAPHICS A-42, 3rd Floor, Gate No.4, Ph-II, Mayapuri Industrial Area Mayapuri Industrial Area Dyeing of suit salwar & Dupattas. Renewal 208 304 532 KHANDELWAL INDUSTRIES Plot No. -151, PocketE, Sector-4, DSIDC Industrial Complex Bawana Industrial Area Bawana Industrial Area Mfg of assembling of electrical home appliances with buffing & plating Establish ___ Applied for CTE on 10.05.2007 vide I.D.No. 21290. CTO valid upto 02.07.05. CTOR applied01.07.05 again applied for CTO-R on 21.08.08. Applied for renewal of Authorization on 14.07.06 20.03.2009 Ask the unit to apply for Consent to Establish and affidavit about source of water supply. Call on 29.04.2009. Letter issued on 17.04.09 Reply awaited. Issue final reminder for full compliance of earlier CMC decision. Call on 24.06.2009 CTO issued on 02.08.2004 CTO ( R) applied on 20.02.2008 Applied on 27.11.2006 Renewal 20.03.2009 Ask the unit to apply for Consent to Establish, file permission from Central Ground Water Authority for extracting the ground water and adequacy report of ETP from any of the empanelled consultants of DPCC. Call on 29.04.2009. Letter issued. Reply awaited. 20.03.2009 Ask the unit to apply for authorization under HWM Rules, file permission from Central Ground Water Authority for extracting the ground water and submit affidavit for installation of ETP/ECS. Call on 29.04.2009. Letter issued. Reply awaited. Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 209 305 5890 MOTOR CENTRE Mall Road. Opp. Alpana Cinema, Model Town N/A Servicing of Automobiles. Establish CTE obtained on 26.03.2008 vide consent no. 18472 valid upto 25.03.2009 210 306 3291 NU-LITE INDUSTRIES (INDIA) Plot no.-F-1898, DSIDC industrial Complex narela Narela Industrial Area Mfg. of hardware goods with electroplating. Establish Applied for CTE on 11.03.2008 vide I.D. No. 25146 CTO obtained on 30.07.2003 vide consent no. 6921 valid upto 15.04.2006. Authorization granted on 02.06.2008 vide no. 2024. 20.03.2009 Ask the unit to submit affidavit for source of water supply, adequacy report of ETP from any of the empanelled consultants of DPCC and noise monitoring report of the D.G.Set from approved laboratories of DPCC. Call on 29.04.2009. Letter issued on 17.04.09. Reply received along with copy of permission from CGWA , Adequacy report of ETP plant issued by GGSIPU & noise monitoring report of the D.G. set issued by DPCC lab on 04.05.09 Issue renewal of consent and authorization under HWM Rules. Call on 24.06.2009 20.03.2009 Ask the unit to apply for authorization under HWM Rules, file permission from Central Ground Water Authority for extracting the ground water and submit affidavit for installation of ETP. Call on 29.04.2009. Letter issued. Reply awaited. Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 211 212 307 308 4090 1210 POWDER COATERS SHIVA MOTORS B-197, Phase-I, Okhla Industrial Area Okhla Industrial Area Powder COATING. PLOT NO. 1/536-A, FRIENDS COLONY INDUSTRIAL AREA JHILMIL TAHIRPUR G. T. ROAD SHAHDRA Friends Colony Industrial Area Auto moriles service & repair workshop (Motor cycle etc) Establish Establish CTE applied on 22.02.2008 CTE applied on 13.12.2007 CTO applied on 24.08.2004 Applied on 05.10.2006 Renewal 20.03.2009 Ask the unit to apply for consent to operate, submit affidavit for source of water supply, adequacy report of ETP from any of the empanelled consultants of DPCC and noise monitoring report of the D.G.Set from approved laboratories of DPCC. Also ask the unit to provide acoustic enclossure with the D.G. Set. Call on 29.04.2009. 20.03.2009 Ask the unit to apply for Consent to Operate, submit permission from Central Ground Water Authority for extracting the ground water, adequacy report of ETP from any of the empanelled consultants of DPCC and noise monitoring report of the D.G.Set from approved laboratories of DPCC. Call on 29.04.2009. Letter issued to apply for consent to operate, submit affidavit for source of water supply, adequacy report of ETP from any of the empanelled consultants of DPCC and noise monitoring report of the D.G.Set from approved laboratories of DPCC. Also ask the unit to provide acoustic enclossure with the D.G. Set. Reply received stating that they have applied for noise monitoring report and adequacy report and request for some time to submit the compliance report. Ask the unit to file proper signed affidavit and full compliance of earlier CMC decision. Call on 24.06.2009 Letter issued. Reply awaited. Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 213 309 533 VISHWASH AUTO MOBILES INDIA Plot No.-84, PocketG, Sector-1, DSIDC Industrial Complex, Bawana Industrial Area Bawana Industrial Area Mfg. of Auto Parts With Electroplating. Establish Applied for CTE on 21.07.2008 vide I.D. No. 26613. Applied for authorization on 21.07.2008 vide I.D. No. 4643. 214 310 6045 AUTOCENTRE D-Block Defence Colony N/A Petrol Pump cum Service Station. Renewal CTO applied on 05.03.2008 215 312 2439 D.K. TRADERS C-198, PH-II, Mayapuri Industrial Area Mayapuri Industrial Area Manufacturing of Refined paraffin wax, compound wax and candles. Renewal CTO issued on 23.07.2002 CTO ( R) applied on 24.08.2005 20.03.2009 Ask the unit to file permission from Central Ground Water Authority for extracting the ground water and submit affidavit for installation of ETP. Call on 29.04.2009. Letter issued. Reply awaited. 20.03.2009 Ask the unit to submit affidavit about source of water supply. Call on 29.04.2009. Letter issued. Reply awaited. 20.03.2009 Ask the unit to apply for Consent to Establish, fresh renewal of consent, submit permission from Central Ground Water Authority for extracting the ground water and noise monitoring report of the D.G.Set from approved laboratories of DPCC. Call on 29.04.2009. Letter issued to apply for Consent to Establish, fresh renewal of consent, submit permission from Central Ground Water Authority for extracting the ground water and noise monitoring report of the D.G.Set from approved laboratories of DPCC. . Reply received stating that they have applied for noise monitoring report of D.G Set and have applied for Consent. Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 Issue final reminder for full compliance of earlier CMC decision. Call on 24.06.2009 Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 216 217 218 313 314 315 6109 5047 2440 DELHI TRANSPORT CORPORATION Ghuman Hera Depot GPS SENSORS & INDICATORS (P) LTD. K-14, Udyog Nagar Industrial area METAL FORGINGS B-1, B-17, Mayapuri Industrial Area , Ph-I N/A Repair & Maintenance of Buses. Establish Udyog Nagar Industrial area Mfg. of electronic Indicators and load Cells Operate Mayapuri Industrial Area Manufacturing of automobile parts and engineering goods. Operate 20.03.2009 Ask the unit to apply for authorization under HWM Rules and file permission from Central Ground Water Authority for extracting the ground water. Call on 29.04.2009. CTE issued on 07.07.06 valid upto 06.07.07 Applied for CTO on 31.01.08 CTO applied on 12.04.2007 Applied on 31.01.08 20.03.2009 Ask the unit to file permission from Central Ground Water Authority for extracting the ground water. Call on 29.04.2009. 20.03.2009 Ask the unit to apply for consent to establish, submit affidavit for source of water supply and noise monitoring report of the D.G.Set from an approved laboratory of DPCC. Call on 29.04.2009. Letter issued. Reply awaited. Letter issued on 17.04.09 Reply awaited. Letter issued to apply for consent to establish, submit affidavit for source of water supply and noise monitoring report of the D.G.Set from an approved laboratory of DPCC.. Reply received stating that they have applied for renewal and unit has submit an affidavit for source of water supply and applied for getting noise monitoring report. Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 Issue final reminder for full compliance of earlier CMC decision. Call on 24.06.2009 Issue final reminder for full compliance of earlier CMC decision. Call on 24.06.2009 219 316 5892 PRAG DISTILED WATER ICE FACTORY AND PRAG COLD STORAGE 3754-XII, Old Subzi Mandi N/A Ice manufacturing and Cold Storage. Renewal Two times consent 220 319 2441 SANYA MOTORS C-101, Mayapuri Industrial Area, Phase-II Mayapuri Industrial Area Showroom Cum Service Station Renewal CTE issued on 07.03.2003 221 320 1941 Am Automobiles (A Unit of Blue Bird Enterprises PVT. LTD) Plot No. 189-91 Lawrence Road Industrial Area Lawrence Road Industrial Area Automobiles servic Center with washing Denting and painting & Repairing Establish CTE obtained on 13.08.2008 vide consent no. 18725 valid upto 12.08.2009 CTO (R) obtained on 15.11.2006 vide consent no. 17627 valid upto 15.07.2008. Applied for CTO (R) on 07.07.2008 vide I.D. No. 26343. CTO issued on 18.01.2005 CTO ( R) applied on 17.11.2008 20.03.2009 Ask the unit to submit an affidavit regarding correct information about the source of water supply and its consumption. Call on 29.04.2009 Letter issued. Reply received on 30.04.2009 along with affidavit. Call for personal hearing on 12.06.2009 at 5.45 PM. Applied on 17.11.2007 Renewal 20.03.2009 Ask the unit to file permission from Central Ground Water Authority for extracting the ground water, adequacy report of ETP from any of the empanelled consultants of DPCC and affidavit for non installation of D.G.Set. Call on 29.04.2009. Letter issued. Reply awaited. Time allowed for full compliance. Call on 24.06.2009 Applied for authorization on 07.04.2008 vide I.D. No. 4542. 20.03.2009 Ask the unit to apply for consent to operate. Call on 29.04.2009 Letter issued. Reply awaited. Issue final reminder for full compliance of earlier CMC decision. Call on 24.06.2009 222 321 534 BAJRANG ELECTROPLATORS Plot No.220, Pkt-I, Sec-5, DSIDC Complex, Bawana Industrial Area Bawana Industrial Area Electriplating Establish CTE obtained on 27.03.2006 vide consent no. 13891 valid upto 26.03.2007 223 322 1496 Choprasons Plot No B-73, GTK Road Industrial Area G.T. Karnal Road Industrial Area Car service centre Establish Applied for CTE on 10.07.2007 vide I.D. No. 22277. 224 323 535 HIMSHEEL INTERNATIONAL Plot No.31, Pkt-N, Sec-3, DSIDC, Bawana Industrial Area Bawana Industrial Area Automobiles showroom cum service centre (Repairing, painting, denting, servicing) Establish Applied for CTE on 16.01.2007 vide I.D No. 20468 20.03.2009 Ask the unit to apply for authorization under HWM Rules, file permission from Central Ground Water Authority for extracting the ground water and submit affidavit for installation of ETP. Call on 29.04.2009. 20.03.2009 Ask the unit to apply for authorization under HWM Rules, file permission from Central Ground Water Authority for extracting the ground water and affidavit for installation of ETP and for non installation of D.G.Set. Call on 29.04.2009. Letter issued on 17.04.09. Reply received on 05.05.09 stating that they are not engaging in any activity at present and when they will start their unit they will install ETP plant. Issue SCN for closure. Call on 24.06.2009 Letter issued. Reply awaited. 20.03.2009 Ask the unit to apply for authorization under HWM Rules, file permission from Central Ground Water Authority for extracting the ground water and affidavit for installation of ETP and for non installation of D.G.Set. Also ask the unit to provide information about painting booth and suction arrangement. Call on 29.04.2009. Letter issued on 19.04.09. Reply received on 01.05.09 stating that they need 2 months time so that they can collect all relevant documents from different concerned department. Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 Time allowed for full compliance. Call on 24.06.2009 225 324 4556 M.G. AUTOSALES E-18,S.M.A. Idustiral area S.M.A Industrial Area Automobiles Service Centre with washing denting and painting Establish Applied for CTE on 17.12.2007 vide I.D. No. 24509. 226 325 1624 RAJINDRA MOTORS A-17, DSIDC, Jhilmil Industrial Area, Shahdara Jhilmil Industrial Area Servicing & Washing of Two Wheelers. Establish CTE applied on 27.03.2008 20.03.2009 Ask the unit to apply for authorization under HWM Rules, file permission from Central Ground Water Authority for extracting the ground water and affidavit for installation of ETP and for non installation of D.G.Set. Also ask the unit to provide information about painting booth and suction arrangement. Call on 29.04.2009. 20.03.2009 Ask the unit to file permission from Central Ground Water Authority for extracting the ground water and adequacy report of ETP from any of the empanelled consultants of DPCC. Call on 29.04.2009. Letter issued on 17.04.09. Reply received along with affidavit on 04.05.09 stating that they are not extracting ground water , only purchase water is used, ETP has been provided, they will apply consent to operate application as soon as they get the adequacy report . At present there is no D.G. set & if installed in future then acoustic enclosures shall be provided wtih adequate stack height, there is no paint booth at present. Ask the unit to file affidavit stating that ground water is not being extracted. Call on 24.06.2009 Letter issued. Reply awaited. Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 227 326 536 SHARP GRAVURE CO. Plot No 10, Sect-J, Pocket-I, Bawana Industrial Area Bawana Industrial Area Engg. Works & Electroplating Establish Applied for CTE on 29.12.2006 vide I.D. No. 20324. 228 328 6153 VAIBHAV FILLING STATION A. Block, Community Centre, Vikaspuri N/A Petrol Pump Cum Service station. Renewal __ 229 329 1497 GAY SERVICE STATION G.T. Karnal Road Industrial Area, Opp. Hans Cinema, Azadpur G.T. Karnal Road Industrial Area Mechanical repair and servicing of vehicles (car washing). Establish Applied for CTE on 15.04.2008 vide I.D. No. 25493. CTO issued on 24.08.04 valid upto 24.07.05. Applied for CTO-R on 18.07.05. Again applied for CTO-R on 07.08.08 20.03.2009 Ask the unit to apply for authorization under HWM Rules, file permission from Central Ground Water Authority for extracting the ground water and affidavit for installation of ETP and for non installation of D.G.Set. Call on 29.04.2009. Letter issued. The same is returned back undelievered. Paste the letter on the premises. Call on 24.06.2009 Applied for Authorization on 28.09.06 20.03.2009 Ask the unit to apply for Consent to Establish and file permission from Central Ground Water Authority for extracting the ground water. Also ask the unit to install flow measuring device. Call on 29.04.2009. Letter issued on 17.04.09 Reply awaited. Applied for authorization on 15.04.2008 vide I.D.No. 4547. 20.03.2009 Ask the unit to file permission from Central Ground Water Authority for extracting the ground water, affidavit for installation of ETP and for stack height & acoustic enclosure of D.G. Set. Call on 29.04.2009. Letter issued. Reply awaited. Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 230 331 5859 MOTI MAHAL DELUX (A UNIT OF I.N.SHROFF ENTERPRISES) 20/48M MALCHA MARG , DIPLOMATIC ENCLAVE , CHANAKYA PURI N/A Restaurant Renewal 231 332 1625 PLAST TECH (INDIA) B-40, Jhilmil Industrial Area GT Road Shahdara N/A Electroplating Renewal __ CTO issued on 22.04.04, valid upto 28.03.07. Applied for CTO-R on 26.03.07 CTO obtained on 29.06.2004. Applied for renewal on 15.10.2007 __ 20.03.2009 Ask the unit to apply for consent to establish, submit affidavit for source of water supply, information about seating capacity of the restaurant and adequacy report from any of the empanelled consultants of DPCC. Call on 29.04.2009. Letter issued on 17.04.09 Reply awaited. Issue final reminder for full compliance of earlier CMC decision. Call on 24.06.2009 20.03.2009 Ask the unit to apply for consent to establish, submit affidavit for source of water supply and adequacy report of ETP from any of the empanelled consultants of DPCC. Call on 29.04.2009. Letter issued to apply for consent to establish, submit affidavit for source of water supply and adequacy report of ETP from any of the empanelled consultants of DPCC.. Reply received that they have applied for CTE, thay are not any ground water and will submit the adequacy report in due course of time. Issue final reminder for full compliance of earlier CMC decision. Call on 24.06.2009 232 333 4431 SHAH NAMKEEN 283, FIE Patparganj Industrial Area Patparganj Industrial Area Mfg. of Namkeens. Renewal 233 334 2870 SINGH SONS ELECTROPLATING WORKS 70 Rama Road, Shivaji Marg Najafgarh Road Industrial Area Electroplating. Renewal 234 335 5860 VOLGA RESTAURANT 19-B, Connaught Place N/A Restaurant Renewal Applied for CTE on 0.05.2009 vide I.D. No. 29800 CTO obtained on 26.10.2004 vide consent no. 11998 valid upto 03.10.2007. Applied for CTO (R) on 11.12.2007 vide I.D. No. 24455. CTO issued on 30.12.03 valid upto 24.07.05. CTO-R valid upto 24.07.08. Applied for CTO-R on 23.07.08 __ CTO issued on 01.05.06, valid upto 20.04.07. Applied for renewal on 19.03.07. 20.03.2009 Ask the unit to apply for Consent to Establish, file permission from Central Ground Water Authority for extracting the ground water and affidavit for installation of oil & grease trap and hood and suction arrangement. Call on 29.04.2009. Applied for renewal on 18.08.08 20.03.2009 Ask the unit to file permission from Central Ground Water Authority for extracting the ground water. Call on 29.04.2009. 20.03.2009 Ask the unit to apply for Consent to Establish and file permission from Central Ground Water Authority for extracting the ground water. Call on 29.04.2009. Letter issued on 13.04.09. Reply received along with copy of permission from CGWA on 06.05.09 stating that they are applying for consent to establish & they use corporation water in process , they have provided the oil & Grease trap for the generation of Effluent and Hood & suction arrangement for air freshness. Letter issued on 17.04.09 Reply areceived stating that the existing industry doesnot come under the perview of obtaining Ground Water Clearaance from CGWA. (Letter from CGWA enclosed). Letter issued on 17.04.09 Reply areceived stating that the existing industry doesnot come under the perview of obtaining Ground Water Clearaance from CGWA. (Letter from CGWA enclosed). SIT-I to inspect and report. Call on 24.06.2009 Ask the unit to file permission from DJB for ground water extraction as per new orders. Call on 24.06.2009 Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 235 336 4395 NEW WOOL MOORES SPORTS E-123, Phase-III, Okhla Industrial Estate Okhla Industrial Estate 236 337 4092 ORIENTAL AUTOMOBILE Y-34, Phase-II, Okhla Industrial Area Okhla Industrial Area 237 338 5967 AJANTA ESPRESSO BAR 8-UB, Bunglow Road N/A Washing of Cotton Quits Bed Spreads Cushion Covers. EATING HOUSE Renewal CTO obtained on 06.07.2002. CTR obtained on 06.07.2005. Applied for renewal on 04.07.2008. 20.03.2009 Ask the unit to file permission from Central Ground Water Authority for extracting the ground water. Call on 29.04.2009. Letter issued to file permission from Central Ground Water Authority for extracting the ground water.. Reply received and unit has requested for time to submit the same. Time allowed till 24.06.2009 for full compliance. Call on 24.06.2009 Operate 20.03.2009 Ask the unit to apply for consent to operate, authorization under HWM Rules, submit affidavit for source of water supply and adequacy report of ETP from any of the empanelled consultants of DPCC. Call on 29.04.2009. Letter issued. Reply awaited. Issue final reminder for full compliance of earlier CMC decision. Call on 24.06.2009 Operate 20.03.2009 Ask the unit to apply for consent to establish, consent to operate, file permission from Central Ground Water Authority for extracting the ground water and affidavit for installation of oil & grease trap and hood and suction arrangement. Call on 29.04.2009. Letter issued. Reply awaited. Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 238 339 2871 APEX SHOES CO. PVT. LTD. 70 Rama Road, (16B), Najafgarh Road Industrial Area Najafgarh Road Industrial Area Manufacturing Of PVC Compound. Operate 239 340 3092 ASIATIC ELECTRONIC INDUSTRIES A-58, Naraina Industrial Area Phase -I Naraina Industrial Area Phase -I mfg Renewal 240 342 2167 FLORA ELECTRICAL INDUSTRIES (REGD.) A-104, Mangolpuri Industrial Area PhaseII Mangolpuri Industrial Area Electrical goods like main switches & main switch boxes with phosphating & electroplating Establish CTE issued on 31.09.04 valid upto 16.08.05, again CTE issued valid upto 04.11.07 Applied for CTE on 12.02.2008 vide I.D. No. 24922. applied for CTO on 26.02.07. 20.03.2009 Ask the unit to submit an affidavit about source of water supply. Call on 29.04.2009. Letter issued on 17.04.09. Reply awaited. Issue final reminder for full compliance of earlier CMC decision. Call on 24.06.2009 CTR obtained on 05.05.2006. Appled for renewal on27.12.2006 20.03.2009 Ask the unit to submit permission from Central Ground Water Authority for extracting the ground water and noise monitoring report of the D.G.Set from approved laboratories of DPCC. Call on 29.04.2009. Letter issued to submit permission from Central Ground Water Authority for extracting the ground water and noise monitoring report of the D.G.Set from approved laboratories of DPCC. . Reply received stating that they are not using any ground water and submitted the noise monitoring report. Ask the unit to install flow measuring device with STP and to file permission from DJB for ground water extraction as per new orders. Call on 24.06.2009 20.03.2009 Ask the unit to submit permission from Central Ground Water Authority for extracting the ground water, affidavit for stack height & acoustic enclosure of D.G. Set and adequacy report of ETP from any of the empanelled consultants of DPCC. Call on 29.04.2009. Letter issued. Reply awaited. Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 CTO (R) obtained on 22.11.2005 vide consent no. 13377 valid upto 05.04.2008 Applied for renewal of authorization on 01.09.2006 vide I.D. No. 3520. 241 242 343 345 3093 537 MAYUR PRINT HOUSE SHRI GURUNANAK PLASTIC INDUSTRIES. A-29/1, Naraina Industrial Area Phase -I Naraina Industrial Area Phase -I Offset Printing inecuding washing of plates Operate Plot No-4,PocketN,Sec-5,DSIDC Indl Complex,Bawana Industrial Area Bawana Industrial Area Mfg of PVC/plastic goods with injection moulding machine,rubber goods,electrical goods & engg works Establish CTO obtained on 12.10.2004. Applied for renewal on 11.07.2006. Applied for CTE on 06.02.2007 vide I.D. No. 20588 20.03.2009 Ask the unit to apply for consent to establish, submit permission from Central Ground Water Authority for extracting the ground water and adequacy report of ETP from any of the empanelled consultants of DPCC. Call on 29.04.2009. 20.03.2009 Ask the unit to submit permission from Central Ground Water Authority for extracting the ground water, manufacturing process with flow chart and information about hood and suction device for rubber goods. Call on 29.04.2009. Letter issued. Reply awaited. Letter issued. Reply awaited. Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 243 346 1626 VEEKAY GENERAL INDUSTRIES B-46 , Jhilmil Industrial Area Jhilmil Industrial Area Mfg of copper catenary wire and grooved copper conductor. Renewal CTO obtained on 13.12.2002. Applied for renewal on 12.12.2005. Again applied for renewal on 05.01.2009. 20.03.2009 SIT-II to inspect and report. Call on 29.04.2009 SIT-II report to be discussed. The following deficiencies observed during the inspection by SIT :(i) Stack height of D.G. Set of 200 KVA needs to be raised. (ii) Oil spillage observed within site. Oil storage area needs to be maintained properly to avoid oil spillage. Spent oil / used oil / fresh oil to be stored and managed as per HWM Rules. (iii) One borwell exists at site for which permission from DJB is required as per new orders. Ask the unit to correct the above deficiencies and submit an affidavit in this regard. Call on 24.06.2009. 244 347 4093 VIBHA PRESS PVT. LTD C-66/3, Ph-II, Okhla Industrial Area Okhla Indl. Area Offset Printing inecuding washing of plates & ink rollers Operate 245 348 365 VINEET & COMPANY B-1, PH-I, Badli Industrial Estate Badli Industrial Estate Copper/Copper Alloy/Brass ingots (Casting only). Renewal 246 349 4396 LUXOR PEN COMPANY 229, Phase-III, Okhla Industrial Estate Okhla Indl. Estate Industrial. Renewal 247 350 538 S.G. BEVERAGES PLOT NO. 1, SECTOR-5, POCKET-G, DSIDC INDUSTRIAL AREA Bawana Industrial Area Bawana Industrial Area Packing of drinking water carbonated water and mfg. of pet plastic bottles. Operate CTO obtained on 12.08.2004. Applied for renewal on 05.12.2007. Two times consent CTE obtained on 17.08.2006 vide consent no. 16429 valid upto 16.08.2007 CTO (R) obtained on 14.06.2006 vide consent no. 15160 valid upto 10.05.2008. Applied for CTO (R) on 17.06.2008 vide I.D. No. 26089. CTO obtained on 08.11.2002. CTR obtained on 07.11.2005. Applied for renewal 25.11.2008. Applied for CTO on 23.11.2007 vide I.D. No. 24303. Applied for authorization on 01.08.2006 vide I.D. No. 3039. Letter issued. Reply awaited. Issue final reminder for full compliance of earlier CMC decision. Call on 24.06.2009 SIT-II report to be discussed. Consent refused. Call on 24.06.2009 20.03.2009 SIT-II to inspect and report. Call on 29.04.2009 SIT-II report to be discussed. Call on 24.06.2009 with SIT-II report. 20.03.2009 SIT-II to inspect and report. Call on 29.04.2009 SIT-II report to be discussed. Call on 24.06.2009 with SIT-II report. 20.03.2009 Ask the unit to apply for consent to establish, submit affidavit for source of water supply and adequacy report of ETP from any of the empanelled consultants of DPCC. Call on 29.04.2009. 20.03.2009 SIT-II to inspect and report. Call on 29.04.2009 248 351 3094 TARUN ELECTRONICS C-171, Naraina Industrial Area Phase -I Naraina Industrial Area Phase -I Mfg. of electronics components with electroplating. Renewal CTR obtained on 27.04.2005. Applied for renewal on 21.05.2008. 20.03.2009 Ask the unit to file permission from Central Ground Water Authority for extracting the ground water. Call on 29.04.2009. Letter issued to file permission from Central Ground Water Authority for extracting the ground water.. Reply received wherein unit has mentioned that they have registered with CGWA. Issue renewal of consent. Call on 24.06.2009 Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 249 352 3292 GURU NANAK CYCLE INDUSTRIES I-2066, Narela Industrial Area Narela Industrial Area Mfg Of Spokes (with electroplating) Operate Applied for CTO on 30.01.2006 vide I.D. No. 17609. 20.03.2009 Ask the unit to apply for authorization under HWM Rules and file permission from Central Ground Water Authority for extracting the ground water. Call on 29.04.2009. Letter issued. Reply awaited. 250 353 2442 METAL COADING A-34, PhaseII,Mayapuri Industrial Area Mayapuri Industrial Area Electroplating Job Work Operate CTR obtained on 17.07.2003. Applied for renewal on 11.07.2006. 20.03.2009 Ask the unit to apply for consent to establish, authorization under HWM Rules, submit permission from Central Ground Water Authority for extracting the ground water and fresh adequacy report of ETP from any of the empanelled consultants of DPCC. Call on 29.04.2009. Letter issued. Reply awaited. 251 354 2443 KRISHNA ELECTROPLATING WORKS C-81, Mayapuri Indl. Area, Phase-II Mayapuri Industrial Area Job Work of Electroplating Renewal 252 355 1498 B.K. Motors & Tractors A-81, G.T.Karnal Road, Opp. Hans Chnema, Industrial Area G.T. Karnal Road Industrial Area Servicing of Two Wheelers. Establish 253 356 3095 DELTA ELECTRONICS PVT LTD B-99/2, Naraina Industrial Area Phase -I Naraina Industrial Area Phase -I Mfg of Electronic Components, Electronic sub assembly and PC Board Assembly. Operate GORAMAL HARI RAM LTD. 39, Rama Road, Najafgarh Road Industrial Area Najafgarh Road Industrial Area Manufacturing of Soap, Detergent Cake, Powder, Scouring Powder & Bar without trade effluent discharge. Renewal 254 357 2872 CTR obtained on 17.07.2003. Applied for renewal on 11.07.2006. Applied for CTE on 25.04.2008 vide I.D. No. 25582. Applied for CTO on 28.01.2005 vide I.D. No. 12522. Applied for CTO on 28.04.2008 vide I.D. No. 25597. Applied CTO on 12.12..2006. ___ CTO issued on 01.10.01 valid upto 31.08.04, CTO-R valid upto 29.08.07. Applied for CTO-R on 21.08.07 Applied for authorization on 05.09.2006 vide I.D. No. 3536. 20.03.2009 Ask the unit to apply for consent to establish, authorization under HWM Rules, submit permission from Central Ground Water Authority for extracting the ground water and adequacy report of ETP from any of the empanelled consultants of DPCC. Call on 29.04.2009. Letter issued. Reply awaited. Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 20.03.2009 Ask the unit to submit affidavit about source of water supply. Call on 29.04.2009. Letter issued. Reply awaited. Issue final reminder for full compliance of earlier CMC decision. Call on 24.06.2009 20.03.2009 Trainee, CMC-III to inspect and report. Call on 29.04.2009 Letter issued. Reply awaited. Inspection be expedited by Trainee, CMCIII. Call on 24.06.2009 20.03.2009 SIT-II to inspect and report. Call on 29.04.2009 SIT-II report to be discussed. Call on 24.06.2009 with SIT-II report. 255 358 6112 HINDUSTAN PETROLEUM CORPORATION LTD. Bijwasan Installation, Bijwasan N/A Storage & Distribution of Petroleum Product Renewal CTR obtained on 22.06.2004. Applied for renewal on 15.06.2007. 256 359 539 KIRPAL CONFECTIONERY WORKS Plot no 173, Pocket-E, Sec-2, DSIDC Bawana Industrial Area Bawana Industrial Area Mfg Of Confectionery Products Establish Applied for CTE on 26.04.2007 vide I.D. No. 21136. 257 360 2444 MOHAN ENTERPRISES C-141, Ph-II, Mayapuri Industrial Area Mayapuri Industrial Area Electroplating. Renewal CTE obtained on 09.12.2003 258 361 2445 NAULAKHA CHEMICAL INDUSTRIES A-10 Mayapuri Industrial Area PhaseII Mayapuri Industrial Area Mfg. of washing soap Operate 20.03.2009 Ask the unit to file permission from Central Ground Water Authority for extracting the ground water. Call on 29.04.2009. 20.03.2009 Ask the unit to apply for consent to operate, authorization under HWM Rules and affidavit for installation of ETP and hood and suction arrangement. Call on 29.04.2009. Letter issued. Reply awaited. Issue final reminder for full compliance of earlier CMC decision. Call on 24.06.2009 Letter issued. Reply awaited. Issue final reminder for full compliance of earlier CMC decision. Call on 24.06.2009 Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction CTO obtained on 06.12.2004. Applied for renewal on 28.11.2007. 20.03.2009 Ask the unit to apply for renewal of authorization under HWM Rules, submit permission from Central Ground Water Authority for extracting the ground water and adequacy report of ETP from any of the empanelled consultants of DPCC. Call on 29.04.2009. Letter issued. Reply awaited. CTO applied on 05.07.2006 20.03.2009 Ask the unit to apply for Consent to Establish and file permission from Central Ground Water Authority for extracting the ground water. Call on 29.04.2009. Letter issued. Reply awaited. from DJB in view of new orders. Call on 24.06.2009 259 362 5048 NIKHIL UDYOG D-15, Udyog Nagar Industrial area Udyog Nagar Industrial area Manufacturing of Footwear. Renewal __ 260 363 5049 NIKHIL UDYOG UNIT II D-14 , Udyog Nagar Industrial area ,Main Rohtak Road Udyog Nagar Industrial area Mfg Of Footwear Renewal __ CTO issued on 14.02.03 valid upto 24.07.05, CTO-R issued on 11.05.06 valid upto 24.07.08. Applied for CTO-R on 16.07.08 CTO issued on 01.03.04 valid upto 05.02.07, Applied for CTO-R on 29.01.07 __ 20.03.2009 Ask the unit to submit affidavit for source of water supply and for installation of hood and suction arrangement for mixing process. Call on 29.04.2009. Letter issued on 17.04.09. Reply awaited. Issue final reminder for full compliance of earlier CMC decision. Call on 24.06.2009 20.03.2009 Ask the unit to file permission from Central Ground Water Authority for extracting the ground water and affidavit for installation of hood and suction arrangement for mixing process. Call on 29.04.2009. Letter issued on 17.04.09. Reply awaited. Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 261 364 1627 OM PRAKASH B-34, G T Road, Shahdara, Jhilmil Industrial Area Jhilmil Industrial Area M S Wire Drawing with Pickling Operate Applied for CTO on 13.08.2003 20.03.2009 Ask the unit to apply for Consent to Establish and renewal of consent, file permission from Central Ground Water Authority for extracting the ground water and submit affidavit for installation of ETP/ECS. Call on 29.04.2009. Letter issued. Reply awaited. 262 365 1628 CHINTAMANI FOOD AND SNACKS PVT. LTD. A-10, Jhilmil Industrial Area Jhilmil Industrial Area FOOD AND SNACKS SWEETS AND RESTAURANT (48 SEATS) Operate Applied for CTO on 7.08.2006 20.03.2009 Ask the unit to submit adequacy report of ETP from any of the empanelled consultants of DPCC, affidavit for source of water supply and for installation of hood and suction arrangement. Call on 29.04.2009. Letter issued to submit adequacy report of ETP from any of the empanelled consultants of DPCC, affidavit for source of water supply and for installation of hood and suction arrangement. . Reply received and unit requested for time of two months to submit the compliance report 263 366 4432 DELITE MOULDING WORKS Plot No C-16, DSIDC Industrial Complex, Patparganj Industrial Area Patparganj Industrial Area Mfg Of Ice Cream, Milk products & Confectionery Products Establish 20.03.2009 Ask the unit to apply for consent to operate, authorization under HWM Rules, file permission from Central Ground Water Authority for extracting the ground water and affidavit for installation of ETP and hood and suction arrangement. Call on 29.04.2009. Letter issued. Reply awaited. Applied for CTE on 05.02.2007 vide I.D. No. 20572. Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 Time allowed till 24.06.2009 for full compliance. Call on 24.06.2009 Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 264 367 4867 EVERBRIGHT ELECTROPLATERS 308/5, Shahzada Bagh Industrial Area Shahzada Bagh Industrial Area Nickel & Chrome Electroplating. Establish 265 368 2446 EVEREST TRANSMISSION B-44 , Mayapuri Industrial Area PhaseI Mayapuri Industrial Area MFG OF AIR/VACUUM BLOWER & SPARESDRY PROCESS Operate Applied for CTE on 13.07.2007 vide I.D. No. 22414. CTO obtained on 03.11.2004 vide consent no. 12072 valid upto 30.09.2007. Applied for CTR under Green category on 13.10.2005. Applied for CTO on 21.12.2006. Applied for renewal of authorization on 20.07.2006 vide I.D. no. 2881. 20.03.2009 Ask the unit to submit affidavit for source of water supply and fresh adequacy report of ETP from any of the empanelled consultants of DPCC. Call on 29.04.2009. Letter issued. Reply received on 04.05.2009 and stating that they have submitted fee for AR of ETP to GGSI and also informed that water supply is through borewell but not in the form of affidavit. Ask the unit to file permission from DJB for ground water extraction as per new orders and file its reply on an affidavit. Call on 24.06.2009 20.03.2009 Ask the unit to apply for Consent to Establish under Orange category, file permission from Central Ground Water Authority for extracting the ground water and noise monitoring report of the D.G.Set from approved laboratories of DPCC. Call on 29.04.2009. Letter issued to apply for Consent to Establish under Orange category, file permission from Central Ground Water Authority for extracting the ground water and noise monitoring report of the D.G.Set from approved laboratories of DPCC.. Reply received wherein unit has mentioned that they have already applied for CTO under orange category and also unit has submitted the noise monitoring report and an application form to file CGWA permission. Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 266 369 4094 GOOD LUCK COATERS A-267, Phase-I, Okhla Industrial Area Okhla Indl. Area Powder Coating. Establish Applied for CTE on 28.03.2008. 20.03.2009 Ask the unit to apply for consent to operate, file affidavit for installation of ETP, permission from Central Ground Water Authority for extracting the ground water, adequacy report of ETP from any of the empanelled consultants of DPCC and noise monitoring report of the D.G.Set from approved laboratories of DPCC. Call on 29.04.2009. Letter issued to apply for consent to operate, file affidavit for installation of ETP, permission from Central Ground Water Authority for extracting the ground water, adequacy report of ETP from any of the empanelled consultants of DPCC and noise monitoring report of the D.G.Set from approved laboratories of DPCC.. Reply received stating that unit has applied for adequacy report and as soon as they will get the report they will applied for CTO. Also, unit has submitted noise monitoring report, affidavit for installation of ETP, affidavit of using water. Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 267 370 3096 Knitcraft Apparels International P. Ltd. A-81, Phase-I, Naraina Industrial Area Naraina Industrial Area Phase -I MFG. OF READYMADE GARMENTS WITHOUT WASHING & DYEING. Establish Obtained CTE on 03.08.2007. Applied for CTE on 02.11.2007 20.03.2009 Trainee, CMC-III to inspect and report. Call on 29.04.2009 Letter issued. Reply awaited. Inspection be expedited by Trainee, CMCIII. Call on 24.06.2009 268 373 4096 SERVEL INDIA PVT. LTD D-6/1, Phase-II, Okhla Industrial Area Okhla Indl. Area Manufacturing of Wires and Cables. Establish Applied for CTE on 14.05.2008.. 20.03.2009 Trainee, CMC-III to inspect and report. Call on 29.04.2009 Letter issued. Reply awaited. Inspection be expedited by Trainee, CMCIII. Call on 24.06.2009 269 374 4097 SEVERAL INDIA PVT LTD D-6/1, Ph-II, Okhla Industrial Area Okhla Indl. Area MFG OF TELECOMMUNICATION CABLE Renewal 270 375 2810 SHREYANS MOTERS PVT. LTD. A-31, Mohan Cooperative Industrial Area ,Mathura Road Mohan Cooperative Industrial Area CAR SERVIC STATION INCLUDING WASHING. Operate 271 376 6154 GYANS RESTAURANTS 28/10, Central Market, Opp. Neelkanth Mandir, East Patel Nagar N/A Restaurant Operate G-1094-1087, DSIDC Narela Industrial Area Narela Industrial Area 272 377 3293 KANSIL INDUSTRIES/RUKMANI WIRES (P) LTD. Mfg of Bright Steel Bars including Pickling. Renewal Applied for CTR on 03.11.2006. 20.03.2009 Trainee, CMC-III to inspect and report. Call on 29.04.2009 Letter issued. Reply awaited. Obtained CTE on 10.08.2006. Applied for CTO on 21.02.2008. 20.03.2009 SIT-II to inspect and report. Call on 29.04.2009 SIT-II report to be discussed. __ Applied for CTO on 24.08.06 CTE not obtained. CTO obtained on 02.09.2004 vide consent no. 11463 valid upto 31.07.2005 Applied for CTO(R) on 27.11.2006 vide I.D. No. 19942. Authorization granted on 28.11.2006 vide no. 1910. 20.03.2009 Ask the unit to apply for consent to establish, submit affidavit for source of water supply & for installation of ETP and adequacy report of ETP from any of the empanelled consultants of DPCC. Also ask the unit to file valid health licence from MCD & eating house licence from Delhi Police. Call on 29.04.2009. 20.03.2009 Ask the unit to apply for consent to establish, submit permission from Central Ground Water Authority for extracting the ground water and fresh adequacy report of ETP from any of the empanelled consultants of DPCC. Call on 29.04.2009. Inspection be expedited by Trainee, CMCIII. Call on 24.06.2009 Call on 24.06.2009 with SIT-II report. Letter issued on 17.04.09. Reply awaited. Issue final reminder for full compliance of earlier CMC decision. Call on 24.06.2009 Letter issued. Reply awaited. Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 273 378 4098 SILVER OCEAN EXPORTS PVT. LTD Plot No. E-45/9&10, Phase-II, Okhla Industrial Area Okhla Indl. Area Mfg. of Readymade garments W/o Washing. Establish 274 379 4099 AJ INTERNATIONAL PVT. LTD. D-160/2, Okhla Industrial Area Okhla Indl. Area manf. of readymade Garments with washing Operate Applied for CTE on 03.04.2008. 20.03.2009 Trainee, CMC-III to inspect and report. Call on 29.04.2009 Applied for CTO on 06.09.2005. 20.03.2009 Ask the unit to apply for consent to establish, submit affidavit for source of water supply and noise monitoring report of the D.G.Set from approved laboratories of DPCC. Call on 29.04.2009. Letter issued. Reply awaited. Inspection be expedited by Trainee, CMCIII. Call on 24.06.2009 Letter issued to apply for consent to establish, submit affidavit for source of water supply and noise monitoring report of the D.G.Set from approved laboratories of DPCC.. Reply received wherein unit has requested for some time. Time allowed till 24.06.2009 for full compliance. Call on 24.06.2009 275 380 4100 COSMO METAL FINISHING CO. T-31, Okhla Industrial Area, Phase-II Okhla Indl. Area Electroplating and Phosphating. Renewal Obtained CTR on 08.06.2004. Applied for CTR on 30.07.2007. 20.03.2009 Ask the unit to submit affidavit for source of water supply and fresh adequacy report of ETP from any of the empanelled consultants of DPCC. Call on 29.04.2009. Letter issued. Reply awaited. Issue final reminder for full compliance of earlier CMC decision. Call on 24.06.2009 276 381 2447 D.D. MOTORS (A DIV. OF D.D. INDUSTRIES LTD) B-8, Phase-I Mayapuri Industrial Area Mayapuri Industrial Area Servicing & Repairing of Automobiles Vehicles. Renewal Obtained CTR on 16.06.2004. Applied for CTR on 31.07.2007. 20.03.2009 Ask the unit to submit affidavit for source of water supply, fresh adequacy report of ETP from any of the empanelled consultants of DPCC and noise monitoring report of the D.G.Set from approved laboratories of DPCC. Call on 29.04.2009. Letter issued. Reply awaited. Issue final reminder for full compliance of earlier CMC decision. Call on 24.06.2009 277 383 6113 HUNDRED PERCENT FILLING & SERVICE STATION LSC, SEC-9, OPP. NHAI, DWARIKA N/A Filling cum Service Station. Renewal 278 384 1500 INDICARE MOTORS PVT LTD A-32,G.T. Karnal Road Industrial Area G.T. Karnal Road Industrial Area Automobile service stations Operate NITISH INDUSTRIES G-1012, DSIDC Narela Industrial Area Narela Industrial Area Mfg. of Fastners (Electroplating) 279 386 3294 Renewal Obtained CTO on 15.07.2004. Applied for CTR on 11.07.2007. 20.03.2009 Ask the unit to apply for consent to establilsh, authorization under HWM Rules, submit affidavit for source of water supply and fresh adequacy report of ETP from any of the empanelled consultants of DPCC. Call on 29.04.2009. CTE obtained on 09.06.2003 vide consent no. 5428 valid upto 23.04.2004 Applied for CTO (R) on 11.09.2007 vide I.D. No. 23454 Applied for authorization on 11.09.2007 vide I.D. No. 4373. Two times consent CTO (R) obtained on 07.07.2006 vide consent no. 16127 valid upto 25.07.2008. Applied for CTO (R) on 24.10.2008 vide I.D. No. 27937. Applied for renewal of authorization on 12.01.2007 vide I.D. No. 4201. 20.03.2009 Ask the unit to file permission from Central Ground Water Authority for extracting the ground water and fresh adequacy report of ETP from any of the empanelled consultants of DPCC. Also ask the unit to submit an affidavit for installation of hood and suction arrangement over the paint booth. Call on 29.04.2009. 20.03.2009 Ask the unit to file permission from Central Ground Water Authority for extracting the ground water. Call on 29.04.2009. Letter issued. Reply awaited. Issue final reminder for full compliance of earlier CMC decision. Call on 24.06.2009 Letter issued. Reply awaited. Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 Letter issued. Reply awaited. Issue final reminder for full compliance of earlier CMC decision. Call on 24.06.2009 280 387 4104 KRITI B-279, Okhla Industrial Area PhaseI Okhla Indl. Area Printing including plate making. Renewal Obtained CTO on 17.08.2004. 281 388 4433 RANA METAL WORKS plot no. 251,FIE. Patparganj Industrial Area Patparganj Industrial Area mfg sheet metal boxes with electroplating Establish CTE obtained on 26.03.2003 vide consent no. 3604 valid upto 09.03.2004 282 389 540 REENKY RUBBER UDYOG P. No. 13, Sector-I, Pocket-O, DSIDC, Bawana Industrial Area Bawana Industrial Area MFG OF RUBBER GASKET & RUBBER PARTS (WITHOUT TYRE & TUBES) Establish Applied for CTE on 26.02.2007 vide I.D.No. 20721. Applied for CTO(R) on 21.01.2007 vide I.D. No. 20511. Applied for renewal of authorization on 18.08.2006 vide I.D. No. 3380. 20.03.2009 Ask the unit to apply for consent to establish, renewal of consent, authorization under HWM Rules, submit adequacy report of ETP from any of the empanelled consultants of DPCC and noise monitoring report of the D.G.Set from approved laboratories of DPCC. Call on 29.04.2009. Letter issued. Reply awaited. Issue final reminder for full compliance of earlier CMC decision. Call on 24.06.2009 20.03.2009 Ask the unit to submit affidavit for source of water supply and fresh adequacy report of ETP from any of the empanelled consultants of DPCC. Call on 29.04.2009. Letter issued. Reply awaited. Issue final reminder for full compliance of earlier CMC decision. Call on 24.06.2009 20.03.2009 Ask the unit to apply for consent to operate, submit an affidavit for installation of hood and suction arrangement and permission from Central Ground Water Authority for extracting the ground water. Call on 29.04.2009. Letter issued. Reply awaited. Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 283 390 6155 SANJHA CHULLAH RESTAURANT P. LTD 361, Kohat Enclave, Pitampura N/A Restaurant cum banquet hall. Establish Applied for CTE on 13.10.2008 vide I.D. No. 27789. 20.03.2009 Ask the unit to apply for consent to operate, authorization under HWM Rules and submit affidavit for source of water supply, for installation of ETP and hood and suction arrangement. Call on 29.04.2009. Letter issued. Reply awaited. Issue final reminder for full compliance of earlier CMC decision. Call on 24.06.2009 284 391 4434 U. K. B. ELECTRONICS Plot No 7, FIE, Patparganj Industrial Area Patparganj Industrial Area Mfg Of PVC Wire & Cable & Plastic Goods With Injection Moulding Machine Establish CTE obtained on 26.12.2006 vide consent no. 17803 valid upto 25.12.2007 Applied for CTE on 02.03.2007 vide I.D.No. 20766. 20.03.2009 Ask the unit to submit an affidavit for installation of hood and suction arrangement and permission from Central Ground Water Authority for extracting the ground water. Call on 29.04.2009. Letter issued. Reply awaited. Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 285 392 2811 UTILITY FORMS PVT. LTD. A-23/B-1, mohan Cooperative Industrial Estate Mohan Cooperative Industrial Area Offset Printig & Computer Stationery. Operate 20.03.2009 Ask the unit to apply for Consent to Establish and file permission from Central Ground Water Authority for extracting the ground water. Call on 29.04.2009. Letter issued. Reply awaited. Time allowed for full compliance. Call on 24.06.2009 Obtained CTO on 07.04.2003 Applied for CTO on 06.07.2007. 286 393 2873 VALENTINE BANQUBLEX 4-A, Najafgarh Road Industrial Area Najafgarh Road Industrial Area Catering service(Banquet hall) Renewal 287 394 2449 ALLIED PUBLISHERS PRIVATE LIMITED A-104, Mayapuri Industrial Area, Phase-II Mayapuri Industrial Area OFFSET PRINTING 9TEXT BOOKS, BROCHERS, LABELS, CATALOGUES ETC) WITH PLATE MAKING Operate __ CTO issued on 13.11.03 valid upto 25.07.05. Applied for CTO-R on 25.07.05. 20.03.2009 Ask the unit to apply for consent to establish, renewal of consent, authorization under HWM Rules and submit affidavit for source of water supply, for installation of hood and suction arrangement and noise monitoring report of the D.G.Set from approved laboratories of DPCC. Also ask the unit to install CFL, rain water harvesting system, solar water harvesting and plantation of tree. Call on 29.04.2009. Letter issued on 17.04.09. Reply awaited. Time allowed for full compliance. Call on 24.06.2009 Consent refused under Green category on 08.09.2005. Applied for CTO on 24.01.2007. 20.03.2009 Ask the unit to apply for Consent to Establish and file permission from Central Ground Water Authority for extracting the ground water. Call on 29.04.2009. Letter issued to apply for Consent to Establish and file permission from Central Ground Water Authority for extracting the ground water.. Reply received stating that at present there is not industrial activity, they are just having the trading of computers peripherals only and whenever they will start their industrial activity they take the permission form DPCC. Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 288 289 290 395 396 397 541 3295 3019 METALLIC PRODUCTS MULTIPLEXUS (INDIA) Shiv Ganga Automobiles Plot No. J-61, DSIDC Bawana Industrial Area Bawana Industrial Area Manufacturing & Job Work of Hot Dip Galvanized of Small MS Components. Establish C-440, Narela Industrial Area Narela Industrial Area Printing of Paper & CARDS. Renewal G-5, Dsidc Industrial Complex, Rohtak Road Nangloi Dsidc Industrial Area Nangloi Industrial Area repair workshop & servicing of automobiles Establish Applied for CTE on 02.08.2007 vide I.D.No. 22994. CTE not obtained. Applied for CTE on 06.11.07 20.03.2009 Ask the unit to apply for consent to operate, authorization under HWM Rules and file permission from Central Ground Water Authority for extracting the ground water. Call on 29.04.2009. CTO obtained under Green category on 04.07.2003 vide consent no. 6404 valid upto 31.03.2008 Applied for CTO under Orange category on 27.05.2008 vide I.D. No. 25849. __ Applied for renewal of authorization on 14.08.2006 vide I.D. No. 3308. 20.03.2009 Ask the unit to apply for Consent to Establish and affidavit about source of water supply. Call on 29.04.2009. 20.03.2009 Ask the unit to apply for consent to operate, authorization under HWM Rules, file permission from Central Ground Water Authority for extracting the ground water, affidavit for installation of ETP and for non installation of D.G.Set. Also ask the unit to file adequacy report of ETP from any of the empanelled consultants of DPCC. Call on 29.04.2009. Letter issued. The same is returned back undelievered. Paste the letter on the premises. Call on 24.06.2009 Letter issued . Reply received on 03.06.08 stating that they have wrongly not submitted the water cess return along with the pay order, thus they are enclosing duly filled return of water cess. Issue final reminder for full compliance of earlier CMC decision. Call on 24.06.2009 Letter issued on 17.04.09. Reply awaited. Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 291 398 5027 VARDHMAN TRADERS 15, TILAK NAGAR INDUSTRIAL AREA Tilak Nagar Industrial Area REPAIR WORKSHOP & SERVICING OF AUTOMOBILES (TWO WHEELERS). Establish 292 399 5050 AAR AAY PRODUCTS PVT. LTD. G-1, Udyog Nagar Industrial area Udyog Nagar Industrial area Mfg of PVC Soles Renewal 293 400 1942 BAWA MASALA CO PVT. LTD. G-20-21, Lawrence Road Industrial Area Lawrence Road Industrial Area MFG. & PACKING OF SPICES. Renewal Applied fro CTE on 07.11.08 CTE not obtained. CTO issued on 07.12.2000 valid upto 30.11.03. CTO-R issued on 21.10.03 valid upto 30.11.06. Applied for CTO-R on 05.01.2007 Applied for CTO (R) on 28.09.2007 vide I.D. No. 23710. 20.03.2009 Ask the unit to apply for consent to operate, authorization under HWM Rules, file permission from Central Ground Water Authority for extracting the ground water, affidavit for installation of ETP and for non installation of D.G.Set. Also ask the unit to file adequacy report of ETP from any of the empanelled consultants of DPCC. Call on 29.04.2009. Letter issued on 17.04.09. Reply awaited. Issue final reminder for full compliance of earlier CMC decision with direction to seek permission for ground water extraction from DJB in view of new orders. Call on 24.06.2009 20.03.2009 Ask the unit to submit affidavit for source of water supply and hood and suction arrangement. Call on 29.04.2009. Letter issued on 17.04.09. Reply received alonwith an affidavit stating that unit has installed proper hood & suction arrangement and source of water supply is MCD Issue renewal of consent. Call on 24.06.2009 20.03.2009 Ask the unit to apply for Consent to Establish and affidavit about source of water supply. Call on 29.04.2009. Letter issued. Reply received on 01.05.2009 Issue final reminder for full compliance of earlier CMC decision including consent to establish application. Call on 24.06.2009 294 401 6 BHAGWANTI INDUSTRIES PP-25, ST.NO. 10, Anand Parbat Industrial Area Anand Parbat Industrial Area MFG OF ACID SLURRY & LIQUID DETERGENT Operate 295 402 6156 CHANAKYA PURI SERVICE STATION OUTER RING ROAD, MEERA BAGH, PASCHIM VIHAR N/A CAR REPAIR & SERVICE STATION. Establish CHANDRA ELECTRICAL INDUSTRIES 7/18, Kirti Nagar Industrial Area Kirti Nagar Industrial Area COPPER WIRE DRAWING & enamelling Renewal 296 403 1791 Applied for CTO on 20.05.02. 20.03.2009 Ask the unit to apply for Consent to Establish and fresh consent to operate. Call on 29.04.2009. Applied on 19.10.07 __ 20.03.2009 Ask the unit to apply for consent to operate, authorization under HWM Rules, submit affidavit about source of water supply, for installation of ETP and for non installation of D.G.Set. Call on 29.04.2009. CTO issued on 16.10.01 valid upto 30.09.04. again CTO issued on 09.05.05 valid upto 30.05.06. Applied for CTO-R on 03.08.06 Applied for renewal of athorization on 03.10.06 20.03.2009 Ask the unit to file permission from Central Ground Water Authority for extracting the ground water, adequacy report of ETP from any of the empanelled consultants of DPCC and noise monitoring report of the D.G.Set from approved laboratories of DPCC. Call on 29.04.2009. Letter issued on 17.04.09. Reply awaited. Issue final reminder for full compliance of earlier CMC decision. Call on 24.06.2009 Letter issued on 17.04.09. Reply awaited. Issue final reminder for full compliance of earlier CMC decision. Call on 24.06.2009 Letter issued on 17.04.09. Reply received stating that unti is involved in copper wire drawing & enamelling which is a dry process and there is no usage of water. Therefore unit doesnot require adequacy report of ETP and permission from CGWA. Also unit has submitted NMR dated 14.06.06. SIT-I to inspect and report. Call on 24.06.2009