1 PRESS NOTICE N.I.T No 11/SE CRMC 21/PWD M-212 /2007-2008 The Executive Engineer, PWD Division No.-M-212, (NCTD), invites on behalf of President of India, sealed percentage Rate tenders from approved and eligible contractors of CPWD, for the following work(s) S. No. Name of work and location 1. Providing and fixing wire fencing & stone pitching at rainy well No. 7 & 8 ITO Vikas Marg (SH: Providing computer services in the O/o Principal Secretary, PWD, Chief Engineer M-2 Superintending Engineer M-21 & PWD CRM Division M-212). Tender I.D No. ………* Estimated cost (Rs.) Earnest Money (Rs.) Time allowed Rs. 3,33,312/- Rs.6666/- Six Month Last date of receipt of application/ issue of tender documents& its cost ……………* Time and date of opening of tenders ……………* The details of tenders may be seen on web site No. www.delhigovt.nic.in. of Govt. of NCT of Delhi for information only. The contractors will not be permitted to submit downloaded tenders on the basis of documents published on the web. Earnest Money should be deposited along with application seeking issue of tender documents in cash (upto Rs.10,000/-)Receipt Treasury Challan / Deposit at call receipt of a scheduled bank/fixed deposit receipt of a scheduled bank / Demand Draft of a scheduled bank issued in favour of the Executive Engineer, PWD Division-M-212 (DS), Delhi. The tender document shall be issued to eligible CPWD contractors only. The Earnest money as mentioned above should be deposited along with the application in the appropriate forms as given in PWD-6 attached with the tender documents. The tenderers shall submit requisite documentary proof in support of their eligibility as per the criteria laid down in the Notice Inviting Tender. The conditions and tender documents (excluding standard form 2005 edition) can also be had from the office of the Executive Engineer, PWD Division – M-212, Delhi, on all working days between hours 11.00 A.M. to 4.00 P.M. As per the construction works welfare cess Act, 1996 the cess @ 1% of the total cost of work done shall be recovered from R/A and final bills. The amount so deducted shall be remitted to secretary “Delhi Building and other construction workers Welfare Board” Room No. 51, C- Block , 5 Sham Nath, Marg , Delhi-110054. CPWD – 150 years of Engineering Excellence ------------------------------------------------------------------------------------------------------------------------NOT TO BE PRINTED BELOW THIS LINE. *To be filled by Executive Engineer , PWD Division –M-212 Executive Engineer, PWD Divn.-M-212 (DS), Patpar Ganj, Delhi-110092.. Approved Superintending Engineer PWD CRMC M-21, Delhi Sarkar, Delhi-110091. 2 PWD-6 GOVT. OF DELHI PUBLIC WORKS DEPARTMENT NOTICE INVITING TENDER Percentage Rate Tenders are invited on the behalf of the President of India from approved and eligible Contractor of CPWD for the work of :- Providing and fixing wire fencing & stone pitching at rainy well no. 7 & 8 ITO Vikas Marg (SH: Providing computer services in the O/o Principal Secretary, PWD, Chief Engineer M-2 Superintending Engineer M-21 & PWD CRM Division M-212). The work is estimated to cost Rs 3,33,312/- This estimate, however, is given merely as a rough guide. 2. Agreement shall be drawn with the successful Tenderer on prescribed Form No.CPWD-7 with up to date correction slips which is available as a Govt. of India Publication 2005 edition, Tenderer shall quote his rates as per various terms and conditions of the said form which forms part of the agreement. 1.. Time allowed for carrying out the work will be …6……Month from the 12th day after the date of written orders to commence the work or from the first day of handing over of the site, whichever is later. 2. The site for the work is available. 3. Receipt of applications for issue of tender forms will be stopped by 1600 hours on 14-022008 Tender documents consisting of plans, specifications, the schedule of quantities of the various classes of work to be done and the set of terms and conditions of contract to be complied with by the contractor whose tender may be accepted and other necessary documents can be seen in the office of the Executive Engineer, PWD Division- M-212, between hours 11.00 A.M. & 4.00P.M. from ……….*. to…………*, everyday except on Sunday and Public Holidays. Tender documents (excluding standard form), will be issued from his office, during the hours specified above, on payment of the following :i) Rs. 500/- in cash as cost of tender AND ii) Earnest money of Rs. _6666/-_ in shape of Receipt of Treasury Challan / Deposit at Receipt of a Scheduled Bank/ Fixed Deposit Receipt of Scheduled Bank/ Demand Draft of a Scheduled Bank issued in favour of the Executive Engineer, PWD Division-M-212, Delhi. 6. Tenders which should always be placed in sealed envelope, with the name of work and due date written on the envelopes, will be received by the Executive Engineer, PWD Division-M212, Delhi up to 3.00 P.M. on 18-02-2008 and will be opened by him or his authorized representative in his office on same day at 3.30 P.M. 7. The details of tenders may be seen on web site No. www.delhigovt.nic.in. of Govt. of NCT of Delhi for information only. The contractors will not be permitted to submit downloaded tenders on the basis of documents published on the web. . 3 The description of the work is as follows: :- :- Providing and fixing wire fencing & stone pitching at rainy well no. 7 & 8 ITO Vikas Marg (SH: Providing computer services in the O/o Principal Secretary, PWD, Chief Engineer M-2 Superintending Engineer M-21 & PWD CRM Division M-212). 8.Copies of other drawings and documents pertaining to the work will be open for Inspection by the tenderers at the office of the above-mentioned officer at Patpar Ganj Delhi-110092. Tenderers are advised to inspect and examine the site and its surrounding and satisfy themselves before submitting their tenders as to the nature of the ground and sub-soil (so far as is practicable) the form and nature of the site, the means of access to the site, the accommodation they may require and in general shall themselves obtain all necessary information as to risks, contingencies and other circumstances which may influence or affect their tender. A Tenderer shall be deemed to have full knowledge of the site whether he inspects it or not and no extra charges consequent on any misunderstanding or otherwise shall be allowed. The tenderers shall be responsible for arranging and maintaining at his own cost all materials, tools and plants, water, electricity, access, facilities for workers and all other services required for executing the work unless otherwise specifically provided for in the contract documents. Submission of a tender by a tenderers implies that he has read this notice and all other contract documents and has made himself aware of the scope and specifications of the work to be done and of conditions and rates at which stores, tools and plants etc. will be issued to him by the Govt. and local conditions and other factors having a bearing on the execution of the work. 9.The competent authority on behalf of President of India does not bind himself to accept the lowest or any other tender, and reserves to himself the authority to reject any or all of the tenders received without the assignment of a reason. All tenders, in which any of the prescribed conditions is not fulfilled or any condition including that of conditional rebate is put forth by the tenderers shall be summarily rejected. 10.Canvassing whether directly or indirectly, in connection with tenders is strictly prohibited and tenders submitted by the contractors who resort to canvassing will be liable to rejection. 11.The competent authority on behalf of President of India reserves to himself the right of accepting the whole or any part of the tender and the tenderers shall be bound to perform the same at the rate quoted. 12.No Engineer of Gazetted rank or other Gazetted officer employed in Engineer or Administrative duties in an Engineering Department of Govt. of India is allowed to work as an contractor, for a period of two years after his retirement from Govt. service, without the previous permission of the Govt. of India in writing. This contract is liable to be cancelled if either the contractor or any of his employees is found any time to be such a person who had not obtained the permission of the Govt. of India as aforesaid before submission of the tender or engagement in the contractor’s service. 13.The tender for the work shall remain open for acceptance for a period of 60 (SIXTY) days from the date of opening of tenders. If any tenderers withdraws his tender before the said period or makes any modification in terms and conditions of the tender which are not acceptable to the department, then the Govt. shall, without prejudice to any other right or remedy, be liable to forfeit 50% of the said earnest money as aforesaid. 4 14.This notice inviting tender shall form a part of the contract document. The successful Tenderer/ Contractor, on acceptance of his tender by the Accepting Authority, shall, within 15 days from the stipulated date of start of the work, sign the contract consisting of :a.The notice inviting tender, all the documents including additional conditions, specifications and drawings, if any, forming the tender as issued at the time of invitation of tender and acceptance thereof together with any correspondence leading to thereto. b. Standard PWD-7. Executive Engineer, PWD Divn.-M-212 (DS), Patpar Ganj, Delhi-110092. 5 PWD-7 GOVERNMENT OF DELHI PUBLIC WORKS DEPARTMENT STATE DELHI CIRCLE BRANCH ZONE B&R PWD Zone-II DIVISION SUB DIVISION PWD Circle-M-21, Delhi PWD – M-212 PERCENTAGE RATE TENDER & CONTRACT OF WORKS Tender for the work of :- Providing and fixing wire fencing & stone pitching at rainy well no. 7 & 8 ITO Vikas Marg (SH: Providing computer services in the O/o Principal Secretary, PWD, Chief Engineer M-2 Superintending Engineer M-21 & PWD CRM Division M-212). (i) To be submitted by 1500 hours on …………* to Executive Engineer, PWD-M-212. (ii) To be opened in presence of tenderers who may be present at 1530 hours on ………….* in the office of the Executive Engineer, PWD-M-212. Issued to : (Contractor) ……………………………………………………* Signature of officer of issuing the documents Designation : Executive Engineer, PWD Division-M-212,(DS) , Delhi. Date of issue…………………………………………………………* TENDER I/ We have read and examined the notice inviting tender, schedule A,B,C,D,E,&F Specifications applicable, Drawings & Designs, General Rules and Directions, conditions of contract, clauses of contract, special conditions, schedule of rate and other documents and rules referred to in the conditions of the contract and all other contents in the tender document for the work. I/We hereby tender for the execution of the work specified by the Executive Engineer , PWD Division-M-212, Delhi, on behalf of the President of India within the time specified in Schedule F viz. schedule of quantities and in all respects with the specifications, designs, drawings and instructions in writing referred to in Rule-1 of General Rules and Directions and in Clause –11 of the conditions of contract and with such materials as are provided for, by, and in respects in accordance with, such conditions so far as applicable. I/We agree to keep the tender open for 60 (sixty) days from the due date of submission thereof and not make any modifications in its terms and conditions. A sum of Rs. 6666/- is hereby forwarded in Receipt Treasury Challan/ Deposit at call Receipt of a Scheduled Bank as Earnest money. If I/we fail to commence the work specified I/we agree that the said President of India or his successors in office shall without prejudice to any other right or remedy, be liberty to forfeit the said earnest money absolutely otherwise the said earnest 6 money shall be retained by him towards security deposit to execute all the works referred to in the tender documents upon the terms and conditions contained or referred to therein and to carry out such derivations as may be ordered, up to maximum of the percentage mentioned in Schedule ‘F’ and those in excess of that limit at the rates to be determined in accordance with the provision contained in clause 12.2 and 12.3 of the tender form. I/we hereby declare that I/we shall treat the tender documents drawings and other records connected with the work as secret/ confidential documents and shall not communicate information/ derived there from to any person other than a person to whom I/we am/ are authorized to communicate the same or use the information in any manner prejudicial to the safety of the state. I/ we agree that should I/we fail to commence the work specified in the above memorandum, an amount equal to the amount of the earnest money mentioned in the form of invitation of tender shall be absolutely forfeited to the President of India and the same may at the option of the competent authority on behalf of the President of India be recovered without prejudice to any other right or remedy available in law out of the deposit in so far as the same may extended in terms of the said bond and in the event of deficiency out of any other money due to me/ us under this contract or otherwise. Dated Signature of contractor Postal address Witness: Address: Occupation: ACCEPTANCE The above tender (as modified by you as provided in the letters mentioned hereunder) is accepted by me for and on behalf of the President of India for a sum of Rs.…………………………………… (Rupees………………………………………………………………………………………………) The letters referred to below shall form part of this contract/agreement:(i). (ii). (iii). For and on behalf of the President of India, Signature……………………. Designation …………………. Dated: 7 PROFORMA OF SCHEDULES Schedule ‘A’ Schedule of quantities. (Enclosed) Schedule ‘B’ Schedule of materials to be issued to the contractor. S. No. 1. Description of item 2. Quantity Rates in figures & words at which the material will be charged to the contractor. 4. 3. Place of issue 5. -------------------Not applicable-------------------Schedule ‘C’ Tools and plants to be hired to the contractor. S. No. 1. Description 2. Hire charges per day 3. Place of issue 4. -------------------Not applicable-------------------Schedule ‘D’ Extra schedule for specific requirements/ documents for the work, if any. Not applicable. Schedule ‘E’ Schedule of component of materials, labour etc. for escalation. Clause 10 CC Schedule ‘F’ Reference to General Conditions of contract For CPWD/PWD works Name of work: Not applicable. Not applicable. 2005 edition published by CPWD incorporating Amendments upto circular bearing No. DGW/CON/207 dated 08.12.205 Providing and fixing wire fencing & stone pitching at rainy well no. 7 & 8 ITO Vikas Marg (SH: Providing computer services in the O/o Principal Secretary, PWD, Chief Engineer M-2 Superintending Engineer M-21 & PWD CRM Division M-212). Estimated cost of work : Rs. 333312/- i) Earnest Money : Rs. 6666/- 8 ii) Performance Guarantee : iii) : Security deposit 5 % of the tendered value 5 % of the tendered value GENERAL RULES & DIRECTIONS Officer inviting tender:- The Executive Engineer, Road Maintenance Division M-212,PWD (DS) Delhi. Maximum percentage for quantity of items of work to be executed beyond which rates are to be determined in accordance with clauses 12.2 & 12.3. See below. Definitions 2(i) Engineer-in-charge 2(vii) Accepting Authority 2(x) 2(xi) Percentage on cost of materials and labour to cover all overheads and profits. Standard schedule of Rates 2(xii) Department Clause 1 (i) Time allowed for submission of performance Guarantee from the date of issue of letter of acceptance. In days. 7 (Seven) days Maximum allowable extension beyond the 5 (Five) days period as provided in (i) above in days. Authority for fixing compensation under Superintending Engineer, Clause -2. Road Maintenance Circle M-21, PWD (DS) Delhi Whether Clause-2A shall be applicable (Incentive for early completion of work). No (ii) Clause 2 Clause 2 (A) Clause 5 SL. No. 1. 2. 3. 4. The Executive Engineer, Road Maintenance Division M-212, PWD (DS) Delhi The Executive Engineer, Road Maintenance Division M-212, PWD (DS) Delhi 7.5% contractors profit and 2.5% overheads. DSR-2002 with upto date Correction slips. PWD, (NCT OF DELHI) No. of days from the date of issue on letter of acceptance for reckoning date of start. Mile stone(s) as per table given below:- Financial Progress. 1/8th (of whole work) 3/8th (of whole work) 3/4th (of whole work) Full Time allowed for execution of work . Table of Mile Stone(s) Time Allowed (from date of start) 1/4th (of whole work) ½ (of whole work) 3/4th (of whole work) Full One Amount to be with-held in case of non achievement of milestone In the event of not achieving the necessary progress as assessed from the running payments, 1% of the tendered value of work will be withheld for failure of each milestone. MONTH Authority to give fair and reasonable extension of time Superintending Engineer, for completion of work. Road Maintenance Circle M-21, PWD (DS) Delhi. 9 Clause 7 Clause 10 CC Clause 11 Gross work to be done together with net payment/ adjustment of advances for Rs. material collected, if any, since the last such payment for being eligible to interim payment. lacs Clause 10 CC to be applicable in contract with stipulated period of completion 18 Months exceeding the period in next column. Specifications to be followed for execution CPWD Specifications 1996 Vol. I to VI of work & Revised CPWD Specification 2002 for cement mortar, cement concrete & RCC with upto date Correction Slips for building works & MORTH specifications for Road works(Fourth Revision). Also refer para-2 on page 12 Clause 12 Clause 12 12.2 & 12.3 12.5 Clause 16 Clause 36 Deviation Limit beyond which clauses 12.2 & 12.3 shall apply for building work. 30% for Building Super structure works Deviation Limit beyond which clauses 12.2 & 12.3 shall apply for Foundation work & 100% Road work. Competent authority for deciding reduced Superintending Engineer, rates Road Maintenance Circle M-21, PWD (DS) Delhi. Modified provision Requirement of Technical Representative(s) and Recovery Rate. SL No Minimum Qualification of Technical Representative . Discipline Designation (Principal Technical /Technical representativ e) 1 Engineering Graduate Civil 2 Diploma Civil Minimum experienc e Number Rate at which recovery shall be made per month from to contractor in the event of not fulfilling provision of clause 36(I) Figures Words Site Engineer 5 Years One 15000/- Rupees Fifteen thousand only Site Engineer 3 Years One 10000/- Rs. Ten Thousand only Assistant Engineer retired from Government services that are holding Diploma will be treated at per with Graduate Engineers 10 Clause 42 (i) (a) Schedule/ statement for determining On the basis of Delhi Schedule of theoretical quantity of cement and bitumen Rates 2002 printed by CPWD With Upto date Correction Slips. (ii) Variations permissible on theoretical quantities. (a) Cement for works with estimated cost put 3% plus/minus to tender not more than Rs.5 lacs. For works with estimated cost put to tender 2% plus/minus more than Rs.5 lacs. (b) Bitumen -All works. 2.5% plus only & nil on minus side. (c) Steel Reinforcement and structural steel sections for each diameter, section and 2% plus/minus category. (d) All other materials Nil Recovery Rates For Quantities Beyond Permissible Variation S. No. Description of item 1. 2. 3. 4. 5. Cement Steel reinforcement. Structural sections. Bitumen issued free. Bitumen issued at stipulated fixed price. Rates in figures and words at which recovery shall be made from the contractor. Rate in schedule ‘B’ plus 10 % in case materials issued by Department Excess beyond Less use beyond permissible variation the permissible variation Not applicable. Executive Engineer, Road Maintenance Divn. M-212 PWD (DS) Patpar Ganj, Delhi 11 GENERAL CONDITIONS OF THE CONTRACT 1. The work in general shall be executed as per the description of the item, specification attached, CPWD specifications 1996 Vol. I to VI with up-to-date correction slips and Revised CPWD specifications 2002 for mortar, cement concrete and RCC with upto the date correction slip and MORTH specifications for Road and Bridge works (4th Revision-2001). 2. In case of any variation between different applicable specifications, the following order of precedence will be followed: (i). Nomenclature of item. (ii). Particular specifications attached with the tender documents. (iii). General specifications attached with the tender documents. (iv). MORTH specifications for Road and Bridge works (4th Revision 2001). (v). CPWD specifications 1996 Vol. I to VI with up-to-date correction slips and Revised CPWD specifications 2002 for mortar, cement concrete and RCC. (vi). Relevant ISI code IRC code and CPWD works manual 2003. If there are varying or conflicting provisions made in any document forming part of the contract, the Engineer –in-charge shall be the deciding authority with regards to the intention / interpretation of the tender and his decision shall be final & binding on the contractor. 3. Unless otherwise specified FPS bricks shall be used in all items of brickwork. The classifications of bricks brought by the contractor shall strictly conform to the CPWD specification referred above irrespective of the classification shown on the permit (if there is a permit system) under which the contractor might have obtained the materials. The contractor shall have no claim as to the quality of bricks on the basis of permits to him by the supply department. 4. The contractor shall be required to produce samples of all road and building materials sufficiently in advance to obtain approval of the Engineer-in-Charge. Subsequently the material to be used in the actual execution of the work shall strictly conform to the quality of samples approved. In case of variation, such material shall be liable to rejection. 5. Material (if any) obtained form Govt. stores or otherwise shall be got checked by the Junior Engineer in-charge of the works, on receipt of the same at site before use. 6. All the materials used in the work shall comply with the requirements of Engineer-in-Charge and shall pass all the tests and analysis required by him as per particular specifications as applicable or such recognized specifications as acceptable to the Engineer-in-Charge. 7. The contractor shall be required to provide appliances at site, such a weighing scale, graduated cylinder standard sieves, thermometer, slump cones, cube moulds etc. in order to enable the Engineer-in-Charge. The contractor shall at his cost make all arrangements and shall provide such facilities as the Engineer-in-Charge may require for collecting, preparing and forwarding the required number of samples for tests and for analysis at such time and to such places, as directed by the Engineer-in-Charge. Nothing extra shall be paid for the above and including the cost of materials to be tested. 8. 9. The necessary tests shall be conducted in the laboratory of PWD Central Road Research Institute or IIT Delhi or any other Laboratory approved by the Engineer-in-Charge. The sample for carrying out all or any of the tests shall be collected by the Engineer-in-Charge or on the behalf by the officer-in-Charge of the quality control wing of Central Design Office, CPWD and his authorized subordinate or by the officer-in-charge PWD (DA) lab. and his authorized subordinate for carrying out the independent quality control tests and the results 12 will be binding on the contractor. The the department. testing charges, if any, shall be borne by 10. The contractor or his authorized representative shall associate in collection, preparation, forwarding and testing of such samples. In case he or his authorized representative is not present or does not associate himself, the results of such tests and consequences thereon shall be binding on the contractor. 11. The contractor(s) shall make his/ their own arrangements for water required for the work and nothing extra will be paid for the same. This will be subject to the following condition. (i). That the water used by the contractor (s) shall be fit for construction purposes to the satisfaction of the Engineer-in-Charge. (ii). The Engineer-in-Charge shall make alternative arrangements for supply of water at the risk and cost of contractor(s) if the arrangements made by the contractor(s) for procurement of water are in the opinion of the Engineer-in-Charge unsatisfactorily. 12. Water if available may be supplied to the contractor by the department subject to the following conditions:-. (i). The water charges @ 1% shall be recovered on gross amount of the work done. (ii). The contractor(s) shall make his/their own arrangements of water connection and laying of pipelines from existing main of source of supply. The department do not guarantee to maintain uninterrupted supply of water and it will be incumbent on the contractor(s) to make alternative arrangements for water at his/ their own cost in the event of any temporary break down in the Govt., water main so that the progress of his/ their work is not held up for want of water No. of claim damage or refund of water. 13. The contractor shall get the water tested with regard to its suitability for use in the works and get written approval from the Engineer-in-Charge before the proceeds with the use of same for execution of works. Nothing extra shall be paid to the contractors on this account. 14. Wherever any reference to any Indian Standard Specifications occur in the documents relating to this contract same shall be inclusive of all amendments issued, there to or revision thereof, if any, up to date of the tender notice. 15. Any cement slurry added over base surface or for continuation of concreting for better bond is considered to have been included in the item (unless otherwise explicitly stated) and nothing extra shall be payable or extra cement considered in consumption on this account. 16. The contractor shall make his own arrangement for electricity as per the requirement of work. 13 ADDITIONAL CONDITIONS 1. Before tendering, the tender shall inspect the site of work and shall fully acquaint himself about the conditions with regard to site, nature of soil, availability of materials, suitable location for construction of godowns, stores and labour huts, the extent of leads and lifts involved in the work (over the entire duration of contract) including local conditions, traffic restrictions, obstructions and other conditions, as required for satisfactory execution of work. His rates should take into consideration all such factors and contingencies. No claim whatsoever shall be entertained by the department on this account. 2. The contractor must study the specifications and conditions carefully before tendering. 3. Before start of work, the contractor shall submit the programme of execution of work, get it approved from the Engineer-in-Charge and strictly adhere the same for the timely completion of the project work. 4. The contractor shall have to make approaches to the site if so required and keep them in good condition for transportation of labour and materials as well as inspection of works by the Engineer-in-Charge. Nothing extra shall be paid to the contractor on this account. 5. The work of approach road in the entire stretch shall be completed to safe level in one working season if it lies in the khadir width of river. 6. The contractor shall at all times, carry out the work on the highway in a manner minimum interference in the flow of traffic as per direction of the Engineer-in-Charge. 7. All arrangements for traffic diversion during construction including maintenance of diversion road shall be considered as incidental to the work and contractor’s responsibility and nothing shall be payable to him in this respect, however, if any new diversion road is constructed by the contractor, the same will be paid separately. 8. The work shall be carried out in such a manner so as not to interfere/ or effect or disturb other works, being executed by other agencies, if any. 9. Any damage done by the contractor to any existing work shall be made good by him at his own cost. 10. The work shall be carried out in the manner complying in all respects with the requirements of relevant bye laws of the local bodies under the jurisdiction of which the work is to be executed and nothing extra shall be paid on this account. 11. For completing the work in time, the contractor might be required to work in 2 or more shifts including night shifts and no claims whatsoever shall be entertained on this account, not with standing the fact that the contractor will have to pay to the labourers and other staff engaged directly or indirectly on the work according to the provisions of the labour regulation and the agreement entered upon and / or extra amount for other reason. 12. The contractor shall make his own arrangements for obtaining electric connection(s) if required, and make necessary payments directly to the department concerned. The department will however, make all necessary recommendations to the authority concerned in this regard. 13. The contractor or his authorized representative should have always be available at this site of work. No work should be done in the absence of such authorized representative. 14 14. The structural and other drawings for the work shall at all times, be properly correlated before executing any work and no claims whatsoever shall be entertained in this respect. 15. The Contractor shall maintain in good condition all work executed till the completion of entire work allotted to the contractor. 16. No payment will be made to the contractor for damage caused by rains, or other natural calamities during the execution of the works and no such claim on this account will be entertained. 17. Royalty at the prevalent rates and all others incidental expenditure shall have to be paid by the contractor on all the boulders, metal, shingle, earth and sand bajri etc. collected by him for the execution of the work direct to the concerned Revenue Authority of the State or Central Govt. His rates are deemed to include all such expenditure and nothing extra shall be paid. 18. The contractor shall take all necessary measures for the safety of traffic during construction and provide erect and maintain such barricades, including signs markings, flags. Lights and flagman as necessary at either end of the excavation/ embankment and such intermediate points as directed by the Engineer-in-Charge for the procure identification of construction area, he shall be responsible for all damages and accidents caused due to negligence on this part. 19. The contractor shall provide suitable barricading with suitably pointed single row or G.I. sheets about 3’-0 wide (90cm) nailed or bolted with wooden poles spaced 2 to 3 meter apart and each pole 1.6 m to 2 m long, 8 cm to 10 cm diameter. The poles will be embedded in mobile iron pedestal rings suitably framed for giving stable support without hindering the traffic as per direction of the Engineer-in-Charge. All managements (including watch and ward) of barricades shall be the full responsibility of the contractor. The barricades shall be removed only after completion of the work of part of the work. The contractor’s rates shall include all above items of work and nothing extra shall be paid to the contactor over and above his quoted rates. 20. The contractor may have to do dewatering for the construction of new drain or for some other purposes as per the requirement of the work. This cost will be ancillary to the excavation work unless otherwise specified in the schedule of work. The contractor’s rates for excavation shall include the cost of dewatering work and nothing extra shall be paid to the contactor over and above his quoted rates. How ever payment of excavation in or under water and/liquid mud or in foul position including pumping out water as required will be made as per CPWD DSR 2002 item no. 2.24.1 or 2.24.2( + / -) percentage rates quoted for the entire work, as the case may be. 21. The temporary warning lamps shall be installed at all barricades during the hours of darkness and kept lit at all times during these hours. 22. The malba/ garbage, removed from the site shall be disposed off by the contractor at MCD authorized dumping ground or at a suitable place as directed by the Engineer-inCharge. 23. All work and materials brought and left upon the ground by the contractor or by orders for the purpose of forming part of the works, are to be considered to be the property of the president of India and the same are not to be remove or taken away by the contractor or any other person without the special license and consent in writing of the Engineer-inCharge, but the President of India is not to be in any way responsibly for any loss or damage which may happen to or in respect of any such work or materials either by the same being lost or damaged by weather or otherwise. 15 24. The contactor will be responsible to provide deep hand pump/ tube well at site of work to make potable and safe drinking water to labour engaged in execution of work. 25. The rates for all items of work, unless clearly specified otherwise, shall include the cost of all labour, materials, Dewatering and other inputs involved in the execution of the items. 26. Unless otherwise provided in the schedule of quantities the rates tendered by the contractor shall be all- inclusive and shall apply to all heights, depths and lifts. 27. The materials to be issued to the contractor and the places of delivery shall be as mentioned elsewhere in the tender documents. If these are delivered at another site, the difference in cost due to cartage will be adjusted accordingly. The contactor shall have to cart at his cost the materials to the site of work as soon as these are issued. The materials will be issued during the working hours and as per rules of the central stores of CPWD or the store of PWD Delhi Administration from time to time. 28. The contactor shall construct suitable godown at the site of work for storing the materials safe against damage due to sun, rain, dampness, fire, theft etc. He shall also employ necessary watch and ward establishment for the purpose and no extra claim whatsoever shall be entertained on this account. 29. The contractor shall bear all incidental charges, storage and safe custody of materials issued to him by the department. 30. MS bars and cold twisted bars etc. where stipulated, will be issued in any length in coils or in straight length as available in the stores. No claim on this account shall be entertained. 31. The standard weight referred to as standard table No.4 in paras 5.33 in CPWD Specifications for works 1991-92 Vol. II to be considered of for conversion of length of various sizes of reinforcing bars into weights, which are reproduced as under:- 32. The contractor has to pay the salaries to the staff (Computer Operator) on or before last day of every month, otherwise he/she has to give Rs. 100 (Rs. One Hundred only) as penalty to Computer Operator for each day of delay. 16 Size (dia) mm Weight kg/m Size (dia) mm 6 0.222 25 8 0.395 26 10 0.617 32 12 0.888 36 16 1.580 40 18 2.000 45 20 2.470 50 22 2.980 -Note :-These are as per clause-5.2 of IS 1786-1985. Weight kg/m 3.850 4.830 6.310 7.990 9.850 12.500 15.420 -- a) Issue of steel of diameter above 10mm will be regulated on sectional weight basis, weight being calculated with the help of above table. However, for bars MS/TMT/ Tor – steel upto and including 10mm, the following procedure shall be adopted. b) The average sectional weight for each diameter shall be arrived at from each lot of steel received at site. The actual weight of steel issued shall be modified to take into account c) the variations between the actual and the standard coefficients given above and the contractor’s account will be adjusted by the cost of the modified quantity only. The decision of the Engineer-in-Charge shall be final for the procedure to be followed for determining the average sectional weight of each lot. Quantity of each diameter steel received at site work each day will constitute a lot for this purposes 33. Cement bags shall be stored in separate godowns with pucca flooring, weather proof and walls. Each godown shall be provided with a single door with two locks. The key of one lock shall remain with PWD Junior Engineer-in-Charge of work and the key of the other lock with the authorized agent of the contactor at the site of work so that the cement is removed from the godown according to the daily requirements with the knowledge of both the parties. The provisions para 3.1.2.4 of the CPWD specifications 1991-92 Vol.-II need not be followed in respect of construction of cement godowns for works whose estimated cost does not exceed Rs. 25,000/-. In such cases, the contractor shall be permitted to store cement at site inside a covered shelter providing adequate safeguard against clotting of cement due to action of water and theft. The Engineer-inCharge shall inspect such shelter and satisfy him self that adequate to safeguards as mentioned above exists. 34. Contractor may be required to execute this work under foul position. The decision of the Engineer-in-Charge whether the position is foul or not shall be final and the binding on the contractor and nothing extra for executing the work in foul position is payable beyond what is provided in the schedule of quantities. 35. 4% sale tax will be deducted from each bill on the gross bill of contractor as per Delhi Sale Tax Act-1999 issued vide No.14/22/95-99/LA/367 dt. 15.10.99 issued by Under Secretary (LA), Delhi. 36. Demolition: Before any demolition work is commenced and also during the progress of the work the following precautions are required the to be taken : i) All roads and open areas adjacent to the work site shall either be closed or suitably protected. ii) No electric cable or apparatus which is liable to be a source of danger or a cable or apparatus used by the operator shall remain electrically charged. iii) All practical steps shall be taken to prevent danger to persons employed from risk of fire or explosion or flooding. No floor, roof or other part of the building / road shall be so overloaded with debris or materials as to render it unsafe 17 37. The contractor shall procure 33 grade (conforming to IS 269) or 43 grade (conforming to IS 8112) ordinary Portland cement as required in the work from reputed manufactures of cement having a production capacity of one million tones or more, such ACC, L&T, J.P. Rewa, Vikram Shri Cement, Birla Jute and Cement Corporation of India etc. i.e agencies approved by Ministry of Industry, Govt of India and holding license to use ISI certification mark for their product. The tenderers may also submit a list of names of cement manufactures which they propose to use in the work. The tender accepting authority reserves right to accept or reject name (S) of cement manufacturer(s) which the tenderers proposes to use in the work. No change in the tendered rates will be accepted if the tender accepting authority does not accept the list of cement manufacturers, given by the tender, fully of partially. 38. The contractor shall procure Ready Mixed Concrete from either of the following manufactures: ACC or Unitech or Birla Plus (Aditya Birla Group) or AHLCON of M/S Ahluwalia contracts (I) Pvt. Ltd. for use on the work.. 18 AMENDMENT NO. 1 To General conditions of contract for central PWD Works 2005 No. DGW/CON/208 Issued from file No. CSQ/CM/CM/C/37(6)/2004 Amendment in Clause 36 page 54 of GCC-2005 EXISTING PORTION OF CLAUSE Contractors Superintendence, Supervision, Technical Staff & Employees. i. The contractor shall provide all necessary i. superintendence during execution of the work and as along thereafter as may be necessary for proper fulfilling of the obligations under the contract. The contractor shall immediately after receiving letter of acceptance of the tender and before commencement of the work, intimate in writing to the Engineer-inCharge the Name, qualifications, experience, age, address and other particulars along with certificates, of the principal technical representative to be in charge of the work. Such qualifications and experience shall not be lower than specified in Schedule ‘F’. The Engineer-inCharge shall within 15 days of receipt of such communication intimate in writing his approval or otherwise of such a representative to the contractor. Any such approval may at any time be withdrawn and in case of such withdrawal, the contractor shall appoint another such representative according to the provisions of this clause. Decision of the tender accepting authority shall be final and binding on the contractor in this respect. Such a principal technical representative shall be appointed by the contractor soon after receipt of the approval from Engineer-in-charge and shall be available at site within fifteen days of start of work. If the contractor (or any partner in case of firm/ company) who himself has such qualifications, it will not be necessary for the said contractor to appoint such a principal technical representative but the contractor shall designate and appoint a responsible agent to represent him and to be present at the work whenever the contractor is not in a position to be so present. All the provisions applicable to the principal technical representative under the Clause will also be applicable in such a TO BE READ AS Contractors Superintendence, Supervision, Technical Staff & Employees. The contractor shall provide all necessary superintendence during execution of the work and as along thereafter as may be necessary for proper fulfilling of the obligations under the contract. The contractor shall immediately after receiving letter of acceptance of the tender and before commencement of the work, intimate in writing to the Engineer-in-Charge the Name,(s) qualifications, experience, age, address(s) and other particulars along with certificates, of the principal technical representative to be in charge of the work and other technical representative (s) who will be supervising the work. Minimum requirement of such technical representative(s) and their qualifications and experience shall not be lower than specified in Schedule ‘F’. The Engineer-in-Charge shall within 3 days of receipt of such communication intimate in writing his approval or otherwise of such a representative(s) to the contractor. Any such approval may at any time be withdrawn and in case of such withdrawal, the contractor shall appoint another such representative(s) according to the provisions of this clause. Decision of the tender accepting authority shall be final and binding on the contractor in this respect. Such a principal technical representative and other technical representative(s) shall be appointed by the contractor soon after receipt of the approval from Engineer-in-charge and shall be available at site before start of work. All the provisions applicable to the principal technical representative under the Clause will also be applicable to 19 case to contractor or his responsible agent. The principal technical representative and/or the contractor shall on receiving reasonable notice from the Engineer-inCharge or his designated representative (s) in charge of the work in writing or in person or otherwise, present himself to the Engineer-in-Charge and / or at the site of work, as required, to take instructions. Instructions given to the principal technical representative or the responsible agent shall be deemed to have the same force as if these have been given to the contractor. The principal technical representative and / or the contractor or his responsible authorized agent shall be actually available at site at least two working days week, these days shall be determined in consultation with the Engineer-in-Charge as well as fully during important stages of execution of work, during recording of measurement of works and whenever so required by the Engineer-in-Charge by a notice as aforesaid and shall also note down instructions conveyed by the Engineer-in-Charge or his designated representative in the site order book and shall affix his signature in token of noting down the instructions and in token of acceptance of measurements. There shall be no objection if the representative/agent looks after more than one work and not more than three works in the same station provided these details are disclosed to the Engineer-in-Charge and he shall be satisfied that the provisions and the purpose of this clause are fulfilled satisfactorily. other technical representative(s) The principal technical representative and other technical representative(s) shall be present at the site of work for supervision at all times when any construction activity is in progress and also present himself/themselves. As required, to the Engineer-in-Charge and /or his designated representative to take instructions. Instructions given to the principal technical representative or other technical representative(s) shall be deemed to have the same force as if these have been given to the contractor. The principal technical representative and other technical representative(s) shall be actually available at site fully during all stages of execution of work, during recording/checking/test checking of measurements of works and whenever so required by the Engineer-in-Charge and shall also note down instructions conveyed by the Engineer-in-Charge or his designated representative(s) in the site order book and shall affix his/their signature in token of noting down the instructions and in toke of acceptance of measurements/checked measurements/test checked measurements. The representative9s) shall not look after any other work. Substitutes, duly approved by Engineer-in-Charge of the work in similar manner as aforesaid shall be provided in events of absence of any of the representative(s) by more ;than two days. If the Engineer-in-Charge, whose decision in this respect is final and binding on the contractor, is convinced that no such technical representative or agent is effectively appointed or is effectively attending or fulfilling the provision of this clause, a recovery shall be effected from the contractor as specified in Schedule ‘F’ and the decision of the Engineer-in-Charge as recorded in the site order book and measurement recorded in Measurement Book shall be final and binding on the contractor. Further if the contractor fails to appoint a suitable technical representative or responsible agent and if such appointed persons are not effectively present or do not discharge their responsibilities satisfactorily, the Engineer-in-Charge shall have full powers to suspend the execution of the work until such date as a suitable If the Engineer-in-Charge, whose decision in this respect is final and binding on the contractor, is convinced that no such technical representative(s) is/are effectively appointed or is effectively is/are effectively attending or fulfilling the provision of this clause, a recovery (non-refundable) shall be effected from the contractor as specified in Schedule ‘F’ and the decision of the Engineer-in-Charge as recorded in the site order book and measurement recorded checked/test checked in Measurement Book shall be final and binding on the contractor. Further if the contractor fails to appoint a suitable technical Principal technical representative and/or other technical representative(s) and if such appointed persons are not effectively present or 20 agent is appointed and the contractor shall be held responsible for the delay so caused to the work. The contractor shall submit a certificate of employment of the technical representative/responsible agent along with every on account bill/final bill and shall produce evidence if a t any time so required by the Engineer-in-Charge. are absent by more than two days without duly approved substitute or do not discharge their responsibilities satisfactorily, the Engineer-in-Charge shall have full powers to suspend the execution of the work until such date as a suitable agent is appointed and the contractor shall be held responsible for the delay so caused to the work. The contractor shall submit a certificate of employment of the technical representative(s) alongwith every on account bill/final bill and shall produce evidence if at any time so required by the Engineer-in-Charge. Assistant Engineer retired from Government services that are holding Diploma will be treated at per with Graduate Engineers 21 Name of work :-P/F barbed wire fencing & stone pitching at rainy well 7& 8, I.T.O Vikas Marg. (SH: Providing Computer Services in the O/o Principal Secretary, PWD, Chief Engineer M-2, Superintending Engineer M-21 & PWD CRM Division M-212). S.No 1 Description of Item Providing man power for service for operating system in offices of Principal Secretary Chief Engineer Zone M-2, Superintending Engineer Circle M-21 and Division M-212 of PWD for monitoring of civil works of various sites under PWD Division such as roads, subways etc. preparation of reports, estimates under jurisdiction of circle office, operating the various soft wares, with the help of mouse and all other jobs i/c cleaning and minor repair without spare parts as per direction of concerned office -in- charge in all working days and in working hours and in extra hours as per direction of office- in- charge a) For general duty hours Qty. Unit Rate Amount 42 Each 7936.00 333312.00 Remarks A/R attached